Loading...
Report (47)CH2MHILL STRUCTURAL OBSERVATION REPORT: FINAL CLOSEOUT REPORT �r�a�es-c�i� [l( 3 zS- SW PROJECT NO. 240211 Project Final Structural Observation Summary Project: Clean Water Service's Durham Advanced Wastewater Treatment Facility, Cogeneration and Brown Grease Receiving Facilities — Phase 5D2 Structural Observations By: Luke Scoggins, PE of CH2M HILL Nathan Wallace, PE of CH2M HILL Date: 22 June 2015 Permit Number: BUP2013-00117 Contractor: JW Fowler Comments: Structural observations have been completed for this project as required by Section 1710 of the 2010 Oregon Structural Specialty Code and per the Statement of Special Inspection Plan shown on the Drawings. To the best of my knowledge, the construction conforms to the requirements of the contract documents and all reported deficiencies have been successfully resolved. The above statement is based on: • Structural observation site visits • Special Inspection reports, including Carlson Testing Inc.'s final summary letter dated March 18, 2015. • Contractor subm ittals, deferred submittals, and requests for clarification PE Stamp: PROFFS 1NEF��jO� l 76316PE Digital Signature OREGON Uj G� �qV 10, 2��`1 C9 G %W �'�RON SGO EXP. 06-30-16 (8.1) REV 10/95 FORM 21A