Loading...
Report (36) 1 7 ' 3A 9'5°14/h/ 4 S�. G15 COMcheck Software Version 4.0.5.1 i2:-.505-;,11"....&.:° 1�-�'t! inflAfil Interior LightingFS Compliance - G, � CertificateVA86817E '7 'PC ' '7-itfr Section 1: Project InformationRECIAW 9, q r I)' Energy Code:2014 Oregon Energy Efficiency Specialty Code l�A,� 2[V\''' Project Title: Bath and Body WorksSBD EXPIRES 12/31/ Project Type:Alteration cfl Construction Site: /� sh Owner/Agent: ',lD � `gner/Contractor: Washington Square LBrands Dialectic, Inc 9585 SW Washington Sq.Rd.Space G09 Three Limited Parkway 310 W 20th St Portland,OR 97223 Columbus,OH 43230 Suite 200 614.415.7000 Kansas City,MO 64108 816.997.9601 Section 2: Interior Lighting and Power Calculation A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B x C) Retail Tenant(Retail:Sales Area)(Ceiling Height 11 ft.) 3547 1.5 5321 Allowance:Furniture,clothing,cosmetics highlighting/Fix. ID:CD 1000(a) 1.4 1170(b) Allowance:Furniture,clothing,cosmetics highlighting/Fix. ID:CF 1000(a) 1.4 135(b) Allowance:Furniture,clothing,cosmetics highlighting/Fix. ID:SD/SF 500(a) 1.4 700(b) Allowance:Furniture,clothing,cosmetics highlighting/Fix. ID:SU 500(a) 1.4 700(b) Stock(Warehouse:Medium/Bulky Material Storage)(Ceiling Height 15 ft.) 742 0.64 475 Total Allowed Watts= 8500 (a)Area claimed may exceed total floor area when Retail Merchandise Highlighting allowance(s)are specified. (b) Allowance is(B x C)or the actual wattage of the fixtures given in Section 2,whichever is less. Section 3: Interior Lighting Fixture Schedule A BCD E Fixture ID:Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Retail Tenant Retail:Sales Area 3547 sq.ft.) LED 8 copy 4:BJ3:LED Downlight:Other: 1 12 15 180 LED 10 copy 1:CC:2-Head Recessed:Other: 2 33 30 990 LED 10 copy 2:CD:3-Head Recessed:Other: 3 26 45 1170 LED 10 copy 3:CF:3-Head Recessed:Other: 3 3 45 135 LED 10 copy 4:CG:3-Head Recessed:Other: 3 14 45 630 LED 10:EA1:2-Head Recessed:Other: 2 9 30 270 LED 10 copy 1:EA2:2-Head Recessed:Other: 2 2 30 60 LED 30:P3:Downlight:Other: 2 1 18 18 LED 10:PP/PP1 /PP2/PP3:Decorative Pendant:Other: 1 4 25 100 LED 10 copy 1:PR/PR1 /IPR/IPR1:Decorative Pendant:Other: 1 8 25 200 LED 18 copy 1:SD/SF:LED stick light:Other: 1 28 60 1680 LED 18:SU:LED stick light:Other: 1 12 125 1500 LED 10 copy 2:ZA5:3-Head Recessed:Other: 1 10 75 750 Stock(Warehouse:Medium/Bulky Material Storage 742 sq.ft.) . LED 10:A3/A7:4"Recessed Downlight:Other: 1 3 12 36 Linear Fluorescent 7 copy 1:FG:4'Strip:48"T8 32W:Electronic: 1 6 32 192 Linear Fluorescent 7 copy 3:FR:4'Strip:48"T8 32W:Electronic: 1 6 32 192 Linear Fluorescent 7 copy 3:LF:3'Strip:36"T8 25W:Electronic: 1 1 27 27 Total Proposed Watts= 8130 Project Title: Bath and Body Works Report date: 04/14/17 Data filename:Y:\_Projects\Active\2017\01201736.51\01201736.51.Calcs and Support\Comcheck.cck Page 1 of 3 Section 4: Requirements Checklist In the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met.Checkmarks identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in the plans/specs the requirement can be verified as being satisfied. Lighting Wattage: 1. Total proposed watts must be less than or equal to total allowed watts. Allowed Wattage:8500 Proposed Wattage:8130 Complies:YES Mandatory Requirements: 2. Exit signs. Internally illuminated exit signs shall not exceed 5 watts per side. Plans reference page/section: E04.01 3. Daylight zone control.All daylight zones are provided with individual controls that control the lights independent of general area lighting in the non-daylight zone. In all individual daylight zones larger than 350 sq.ft.,automatic daylight controls is provided.Automatic daylight sensing controls reduce the light output of the controlled luminaires at least 50 percent,and provide an automatic OFF control, while maintaining a uniform level of illumination.Contiguous daylight zones adjacent to vertical fenestration may be controlled by a single controlling device provided that they do not include zones facing more than two adjacent cardinal orientations(i.e.,north,east, south,west).Daylight zones under skylights shall be controlled separately from daylight zones adjacent to vertical fenestration. Plans reference page/section: E03.01 4. Interior lighting controls.At least one local shutoff lighting control has been provided for every 2,000 square feet of lit floor area and each area enclosed by walls or floor-to-ceiling partitions.The required controls are located within the area served by the controls or are a remote switch that identifies the lights served and indicates their status. Plans reference page/section: E03.01 & E05.01 5. Sleeping unit controls.Master switch at entry to hotel/motel guest room. Plans reference page/section: N/A 6. Egress lighting. Egress illumination is controlled by a combination of listed emergency relay and occupancy sensors to shut off during periods that the building space served by the means of egress is unoccupied. Plans reference page/section: E03.01 • 7. Additional controls. Each area that is required to have a manual control shall have additional controls that meet the requirements of Sections 505.2.2.1 and 505.2.2.2. Plans reference page/section: E03.01 & E05.01-02 8. Light reduction controls. Each space required to have a manual control also allows for reducing the connected lighting load by at least 50 percent by either 1)controlling(dimming or multi-level switching)all luminaires;or 2)dual switching of alternate rows of luminaires,alternate luminaires,or alternate lamps;or 3)switching the middle lamp luminaires independently of other lamps;or 4)switching each luminaire or each lamp. Plans reference page/section: E03.01 & E05.01 to 9. Buildings larger than 2,000 square feet are equipped with an automatic control device to shut off lighting in those areas.This automatic control device shall function on either: 1)a scheduled basis,using time-of-day,with an independent program schedule that controls the interior lighting in areas that do not exceed 10,000 square feet and are not more than one floor;or 2)an occupant sensor that shall turn lighting off within 30 minutes of an occupant leaving a space;or 3)a signal from another control or alarm system that indicates the area is unoccupied. Plans reference page/section: E05.01 • 10.Occupancy sensors in rooms that include daylight zones are required to have Manual ON activation. Plans reference page/section: E03.01 &n E05.01-02 • 11.An occupant sensor control device is installed that automatically turns lighting off within 30 minutes of all occupants leaving a space. Plans reference page/section: E03.01 • 12.Additional controls.An occupant sensor control device that automatically turns lighting off within 30 minutes of all occupants leaving a space or a locally activated switch that automatically turns lighting off within 30 minutes of being activated is installed in all storage and supply rooms up to 1000 square feet. Plans reference page/section: E03.01 Project Title: Bath and Body Works Data filename:Y:\_Projects\Active\2017\01201736.51\01201736.51.Calcs and Support\Comcheck.cck Report date:04/14/17 Page 2 of 3 • 13.Occupant override.Automatic lighting shutoff operating on a time-of-day scheduled basis incorporates an override switching device that:1)is readily accessible,2)is located so that a person using the device can see the lights or the area controlled by that switch,or so that the area being lit is annunciated,3)is manually operated,4)allows the lighting to remain on for no more than 2 hours when an override is initiated,and 5)controls an area not exceeding 2,000 square feet. Plans reference page/section: E03.01 & E05.01 • 14.Holiday scheduling.Automatic lighting shutoff operating on a time-of-day scheduled basis has an automatic holiday scheduling feature that turns off all loads for at least 24 hours,then resumes the normally scheduled operation. Exception applies:Retail stores and associated malls,restaurants,grocery stores,places of religious worship,theaters and exterior lighting zones. Plans reference page/section: E05.01 15.Exterior lighting controls.Lighting not designated for dusk-to-dawn operation shall be controlled by either a combination of a photosensor and a time switch,or an astronomical time switch.Lighting designated for dusk-to-dawn operation shall be controlled by an astronomical time switch or photosensor. Plans reference page/section: N/A 16.Tandem wiring.The following luminaires located within the same area shall be tandem wired: 1. Fluorescent luminaires equipped with one,three or odd-numbered lamp configurations,that are recess-mounted within 10 feet center-to-center of each other. 2. Fluorescent luminaires equipped with one,three or any odd-numbered lamp configuration,that are pendant-or surface-mounted within 1 foot edge-to-edge of each other. Plans reference page/section: E04.01 • 17.Medical task lighting or art/history display lighting claimed to be exempt from compliance has a control device independent of the control of the nonexempt lighting. Plans reference page/section: N/A • 18.Each dwelling unit in a building is metered separately. Plans reference page/section: N/A Interior Lighting PASSES Section 5: Compliance Statement Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2014 Oregon Energy Efficiency Specialty Code requirements in COMcheck Version 4.0.5.1 and to comply with the mandatory requirements in the Requirements Checklist. � ,y Sopien Thol- Designer %'d 04/14/17 Name-Title Signature Date Project Title: Bath and Body Works Report date: 04/14/17 Data filename:Y:\_Projects\Active\2017\01201736.51\01201736.51.Calcs and Support\Comcheck.cck Page 3 of 3 II A 21 South Evergreen Avenue Suite 200 Arlington Heights,IL 60005 L � )847 788 9200 �* ATLANTA LOS ANGELES �1�� I ^Oii NEW IGO C CHICAGO H reenbergFarrow NEW YORK EY CITY OF TIGARD �a I>s WISCONSIN BUILDING DIVISION PHILADELPHIA FRESNO MEMPHIS SHANGHAI MEXICO CITY REVISION 1 — POR REVISION AND LANDLORD COMMENTS May 26,2017 Project: Bath&Body Works—Washington Square Store No. 104.01.0856.01 Space No. G09 9585 SW Washington Square Road Portland, OR 97223 Arch. Project# 20170350.0 This Bulletin shall modify as stated Construction Documents dated April 14,2017 issued previously. The items listed below shall supersede referenced portions of the Contract Documents for the above-named project,and shall become part of the executed contract. All changes or additions to the documents are noted as REV1, dated May 26,2017,and shall replace same documents issued previously. The following clarifications,amendments,additions,and deletions are hereby part of the Construction Documents,and alter the original documents only in the manner to the extent stated below. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH WORK DESCRIBED HEREIN. REASON FOR REVISION:POR Revision and Landlord Comments DRAWINGS INCLUDED WITH THIS BULLETIN:A00.0,A00.1,A00.2,A00.3,A01.2,A02.1,A04.1,A05.1,A06.1, A07.1,A07.2,A08.1,A08.2,A08.6,A10.6,A10.8,A11.3,A11.4,Al2.1,A13.1,A13.2,A14.1 A00.0—COVER SHEET • Added A13.2 Toilet Room Details to Drawing Index;revised sheet counts • Revised Sourcing Agent and contact information A00.1—RESPONSIBILITY SCHEDULE • Revised Toilet Room Mirror and Mirror Frame information • Revised Art&Decor in WB Sales Area to USED • Revised Gasket color for Aluminum Window System at storefront • Revised responsibility of Glazing Film to Owner • Revised Barricade and Graphics to specific Boston Barricade installation Bath&Body Works—Washington Square POR Revision and Landlord Comments(REV1) 05/26/2017 Page 2 of 3 A00.2—DOOR SCHEDULE • Revised notes for 4A BBW Sales/Non-Sales door • Revised 6B Elevated Closet door with 4 hinges and no kick-plate • Revised Kickplate for hardware Group B1 • Revised Hinges at hardware Group B4 A00.3—SCHEDULES AND LEGENDS • Added Elevated Corridor to note for WD-6 Shiplap Planking • Revised description for WCB-12W and WCP-12W per designer • Revised notes for G-16 Storefront Glass A01.2—BARRICADE PLAN AND ELEVATION • Added Boston Barricade note • Revised detail specifics to be crossed out per Boston Barricade A02.1—CONSTRUCTION PLAN • Revised Keynote 42 to USED and added to plan • Revised membrane height in Keynote 53 • Removed/revised floor outlets and updated dimensions A04.1—REFLECTED CEILING PLAN • Revised grafik eye location from hallway to cashwrap closet • Revised soffit paint color to elevated hallway A05.1—FLOOR AND WALL FINISH PLAN • Added tile leveling note in Detail H A06.1—PRESENTATION PLAN • Revised location of presentation fixture per designer • Removed floor outlets from WB-45 and CW-MPOS fixtures • Replaced frame with mirror in Toilet Room;updated schedule • Revised tag for Sales/Non-Sales door;updated schedule • Added WB frames in Room 2 per designer A07.1—INTERIOR ELEVATIONS • Added DL-M2 tag to WB transition elevations • Added WB frames to Detail H • Updated cashwrap closet door in Detail A A07.2—INTERIOR ELEVATIONS • Revised Sales/Non-Sales door tag in Details C and D • Revised detail name for Detail D A08.1—STOREFRONT PLAN AND ELEVATION • Revised Keynote 15 A08.2—FRAME AND GINGHAM FILK LAYOUT • Added dimension to bottom gingham square—non-prototypical • Updated gingham square typical size notes A08.6—BBW INTERIOR STOREFRONT DETAILS • Added Detail P and call-out on Detail L A10.6—BBW GRAPHIC FRAME COLLAGE DETAILS • Revised Detail C2 A10.8—BBW CASHWRAP&BACKWRAP DETAILS • Revised Detail H to ultra-condensed section A11.3—WBC PASS-THRU PORTAL DETAILS • Revised base finish call-out in Detail P A11.4—WBC PASS-THRU PORTAL DETAILS • Revised base finish call-out in Detail P Bath&Body Works—Washington Square POR Revision and Landlord Comments(REV1) 05/26/2017 Page 3 of 3 Al2.1—PARTITION DETAILS • Added bottom of structure height to Details A,B,and C A13.1—TOILET ROOM DETAILS • Added Landlord note to Detail A • Revised Keynotes 8 and 9 in Detail A • Updated dimensions in Toilet Room and added mirror dimension in plan • Revised wall covering in Detail C to WC-TBD on all walls;removed brick wall finish • Replaced frame with large mirror in Detail C4 • Added note to vertical grab bar for installation • Revised Detail J and P2 to NOT USED A13.2—TOILET ROOM DETAILS • Added sheet and details A14.1—STOCKROOM SHELVING DETAILS • Revised Detail A to seismic detail conditions End of Architectural Bulletin Loren Peterman 224-210-1722 I p ete rm a n(c�g re e n b e rq fa rrow.c o rn fAik COMcheck Software V c &5n F.06:11i ; ; ; ; , /� 'Itriritipance „..(4, ��-„;t, ii Certificate ' ' • ' '• 86585PE • • •. • . •• .:. • OREGON,5-y • 9 Section 1: Project Information t °9 � 14 . • • • • • Energy Code:2014 Oregon Energy Efficiency Specialty Code : • '; ti r. , t-: Project Title: Bath and Body Works • e • t • • EXPIRES 121311_ Project Type:Alteration I SOG 131 Construction Site: Owner/Agent: Designer/Contractor: Washington Square LBrands Dialectic,Inc 9585 SW Washington Sq.Rd.Space G09 Three Limited Parkway 310 W 20th St Portland,OR 97223 Columbus,OH 43230 Suite 200 614.415.7000 Kansas City,MO 64108 816.997.9601 Section 2: Interior Lighting and Power Calculation A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B x C) Retail Tenant(Retail:Sales Area)(Ceiling Height 11 ft.) 3547 1.5 5321 Allowance:Furniture,clothing,cosmetics highlighting/Fix. ID:CD 1000(a) 1.4 1170(b) Allowance:Furniture,clothing,cosmetics highlighting/Fix. ID:CF 1000(a) 1.4 135(b) Allowance:Furniture,clothing,cosmetics highlighting/Fix. ID:SD/SF 500(a) 1.4 700(b) Allowance:Furniture,clothing,cosmetics highlighting/Fix. ID:SU 500(a) 1.4 700(b) Stock(Warehouse:Medium/Bulky Material Storage)(Ceiling Height 15 ft.) 742 0.64 475 Total Allowed Watts= 8500 (a)Area claimed may exceed total floor area when Retail Merchandise Highlighting allowance(s)are specified. (b) Allowance is(B x C)or the actual wattage of the fixtures given in Section 2,whichever is less. Section 3: Interior Lighting Fixture Schedule A B C D E Fixture ID:Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Retail Tenant(,Retail,Sales Area 3547 sq-ft.) LED 8 copy 4:BJ3:LED Downlight:Other: 1 12 15 180 LED 10 copy 1:CC:2-Head Recessed:Other: 2 33 30 990 LED 10 copy 2:CD:3-Head Recessed:Other: 3 26 45 1170 LED 10 copy 3:CF:3-Head Recessed:Other: 3 3 45 135 LED 10 copy 4:CG:3-Head Recessed:Other: 3 14 45 630 LED 10:EA1:2-Head Recessed:Other: 2 9 30 270 LED 10 copy 1:EA2:2-Head Recessed:Other: 2 2 30 60 LED 30:P3:Downlight:Other: 2 1 18 18 LED 10:PP/PP1 /PP2/PP3:Decorative Pendant:Other: 1 4 25 100 LED 10 copy 1:PR/PR1 /IPR/IPR1:Decorative Pendant:Other: 1 8 25 200 LED 18 copy 1:SD/SF:LED stick light:Other: 1 28 60 1680 LED 18:SU:LED stick light:Other: 1 12 125 1500 LED 10 copy 2:ZA5:3-Head Recessed:Other: 1 10 75 750 Stock(Warehouse:Medium/Bulky Material Storage 742 sq.ft.) LED 10:A3/A7:4”Recessed Downlight:Other: 1 3 12 36 Linear Fluorescent 7 copy 1:FG:4'Strip:48"T8 32W:Electronic: 1 6 32 192 Linear Fluorescent 7 copy 3:FR:4'Strip:48"T8 32W:Electronic: 1 6 32 192 Linear Fluorescent 7 copy 3:LF:3'Strip:36"T8 25W:Electronic: 1 1 27 27 Total Proposed Watts= 8130 Project Title: Bath and Body Works Report date: 04/14/17 Data filename:Y:\_Projects\Active\2017\01201736.51\01201736.51.Calcs and Support\Comcheck.cck Page 1 of 3 Section 4: Requirements Checklist • •• •• • •• • •In the following requirements,blank checkboxes identify requirements a hQ I 3h s otackQoited9ed•a ein met. Checkmarks identify requirements that the applicant acknowledges are met or excerldt>;fr01n coi iplian{e e'Plans rpf21'ence 4A/section'identifies where in the plans/specs the requirement can be verified as being satisfied. • • • • • • • •• Lighting Wattage: ✓ 1. Total proposed watts must be less than or equal to total allowed with •e: •: ••. .: ••: Allowed Wattage:8500 Proposed Wattage:8130 • • •• • • : : • : Complies:YES g • • • . • • • • ••• • ••• • Mandatory Requirements: ✓ 2. Exit signs. Internally illuminated exit signs shall not exceed 5 watts I Z Sid✓sy• • • •• •• • • • Plans reference page/section: E04.01 • ••• ••• •• • • • • ••• • • ✓ 3. Daylight zone control.All daylight zones are provided with individual controls that control the lights independent of general area lighting in the non-daylight zone. In all individual daylight zones larger than 350 sq.ft.,automatic daylight controls is provided.Automatic daylight sensing controls reduce the light output of the controlled luminaires at least 50 percent,and provide an automatic OFF control, while maintaining a uniform level of illumination.Contiguous daylight zones adjacent to vertical fenestration may be controlled by a single controlling device provided that they do not include zones facing more than two adjacent cardinal orientations(i.e.,north,east, south,west). Daylight zones under skylights shall be controlled separately from daylight zones adjacent to vertical fenestration. Plans reference page/section: E03.01 ✓ 4. Interior lighting controls.At least one local shutoff lighting control has been provided for every 2,000 square feet of lit floor area and each area enclosed by walls or floor-to-ceiling partitions.The required controls are located within the area served by the controls or are a remote switch that identifies the lights served and indicates their status. Plans reference page/section: E03.01 & E05.01 i 5. Sleeping unit controls.Master switch at entry to hotel/motel guest room. Plans reference page/section: N/A i 6. Egress lighting. Egress illumination is controlled by a combination of listed emergency relay and occupancy sensors to shut off during periods that the building space served by the means of egress is unoccupied. Plans reference page/section: E03.01 ✓ 7. Additional controls. Each area that is required to have a manual control shall have additional controls that meet the requirements of Sections 505.2.2.1 and 505.2.2.2. Plans reference page/section: E03.01 & E05.01-02 i 8. Light reduction controls. Each space required to have a manual control also allows for reducing the connected lighting load by at least 50 percent by either 1)controlling(dimming or multi-level switching)all luminaires;or 2)dual switching of alternate rows of luminaires,alternate luminaires,or alternate lamps;or 3)switching the middle lamp luminaires independently of other lamps;or 4)switching each luminaire or each lamp. Plans reference page/section: E03.01 & E05.01 ✓ 9. Buildings larger than 2,000 square feet are equipped with an automatic control device to shut off lighting in those areas.This automatic control device shall function on either: 1)a scheduled basis,using time-of-day,with an independent program schedule that controls the interior lighting in areas that do not exceed 10,000 square feet and are not more than one floor;or 2)an occupant sensor that shall turn lighting off within 30 minutes of an occupant leaving a space;or 3)a signal from another control or alarm system that indicates the area is unoccupied. Plans reference page/section: E05.01 ✓ 10.Occupancy sensors in rooms that include daylight zones are required to have Manual ON activation. Plans reference page/section: E03.01 &n E05.01-02 ✓ 11.An occupant sensor control device is installed that automatically turns lighting off within 30 minutes of all occupants leaving a space. Plans reference page/section: E03.01 ✓ 12.Additional controls.An occupant sensor control device that automatically turns lighting off within 30 minutes of all occupants leaving a space or a locally activated switch that automatically turns lighting off within 30 minutes of being activated is installed in all storage and supply rooms up to 1000 square feet. Plans reference page/section: E03.01 Project Title: Bath and Body Works Report date: 04/14/17 Data filename:Y:\_Projects\Active\2017\01201736.51\01201736.51.Calcs and Support\Comcheck.cck Page 2 of 3 • 13.0ccupant override.Automatic lighting shutoff operating on a time-of-day scheduled basis incorporates an override switching device that:1)is readily accessible,2)is located so that a person using the device can see the lights or the area controlled by that switch,or so that the area being lit is annunciated,3)is manually operated•4)•alll14 thrlighn,toff8main:nJdr r frpore than 2 hours when an override is initiated,and 5)controls an area not exceeding 2,00c:siVa?fee:• :•• ••• •• • • • • • • • • • • • • Plans reference page/section: E03.01 & E05.01 • • • • • • • •• t/ 14.Holiday scheduling.Automatic lighting shutoff operating on a time-of-day scheduled basis has an automatic holiday scheduling feature that turns off all loads for at least 24 hours,then resumes the norriAlii splT tuled4eratiap. •; •'; Exception applies:Retail stores and associated malls,rest•rn t••grocery• •ore ,• •aces o reli sous worship,theaters and ��� � S � Z �� P. exterior lighting zones. • • ••• • ••• • Plans reference page/section: E05.01 ••• ••• . .• .• 15.Exterior lighting controls. Lighting not designated for dusk-to-dawn opg,ratior=shSl c:pQoltiiby�it:er a combination of a photosensor and a time switch,or an astronomical time switch.Lighting dagngtv'fordLsk:o-VatQ Operation shall be controlled by an astronomical time switch or photosensor. Plans reference page/section: N/A ✓ 16.Tandem wiring.The following luminaires located within the same area shall be tandem wired: 1.Fluorescent luminaires equipped with one,three or odd-numbered lamp configurations,that are recess-mounted within 10 feet center-to-center of each other. 2.Fluorescent luminaires equipped with one,three or any odd-numbered lamp configuration,that are pendant-or surface-mounted within 1 foot edge-to-edge of each other. Plans reference page/section: E04.01 17.Medical task lighting or art/history display lighting claimed to be exempt from compliance has a control device independent of the control of the nonexempt lighting. Plans reference page/section: N/A 18.Each dwelling unit in a building is metered separately. Plans reference page/section: N/A Interior Lighting PASSES Section 5: Compliance Statement Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2014 Oregon Energy Efficiency Specialty Code requirements in COMcheck Version 4.0.5.1 and to comply with the mandatory requirements in the Requirements Checklist. Sopien Thol- Designer — 04/14/17 Name-Title Signature Date Project Title: Bath and Body Works Report date: 04/14/17 Data filename:Y:\_Projects\Active\2017\01201736.51\01201736.51.Calcs and Support\Comcheck.cck Page 3 of 3 21 South EeAvenue Suite 200 Arlington Heightsvergr ,en IL 60005 t: 847 788 9200 ATLANTA LOS ANGELES NEW JERSEY GreenbergFarrow CHICAGO V NEW YORK IILE ILADEL JUN 2 2 20I7 FRESNOSNOELPHIA MEMPHIS SHANGHAI MEXICO CITY CITY OF TIGARD BUILDING DIVISION REVISION 2 - PERMIT COMMENT RESPONSE June 15,2017 Project: Bath&Body Works—Washington Square Store No. 104.01.0856.01 Space No. G09 9585 SW Washington Square Road Portland, OR 97223 Arch. Project# 20170350.0 This Bulletin shall modify as stated Construction Documents dated April 14,2017 issued previously. The items listed below shall supersede referenced portions of the Contract Documents for the above-named project,and shall become part of the executed contract. All changes or additions to the documents are noted as REV2, dated June 15,2017, and shall replace same documents issued previously. The following clarifications,amendments,additions,and deletions are hereby part of the Construction Documents,and alter the original documents only in the manner to the extent stated below. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH WORK DESCRIBED HEREIN. REASON FOR REVISION: Permit Comment Response DRAWINGS INCLUDED WITH THIS BULLETIN:A00.0,Al2.3 A00.0—COVER SHEET • Added indicators to Drawing Index per Revision 2 Al2.3—CEILING AND LIGHTING DETAILS • Added Compression Strut Size Chart to Detail M End of Architectural Bulletin Loren Peterman 224-210-1722 Ipeterman(a)nreenbergfarrow.cor • PiF &AOMPAN ? RD June 15, 2017 Greenberg Farrow Architects 21 South Evergreen Avenue Suite 200 Arlington Heights, IL 60005 Attn: Loren Peterman Re: Washington Square- Bath and Body Works Tigard, OR Revision#2 (PJF Job No. A65717-0010) Dear Loren: The following table outlines the changes to our drawings for this Revision: Sheet Description Summary S03.01 Structural • Modified Typical Diagonal Bracing-Structural Studs-SDC D, E & Construction F detail A by adding 3 more longer length diagonal brace Details options. • Modified Typical Diagonal Brace Connection detail E by revising coded note 1 to a heavier gage material. • Added Optional Splice for Diagonal Bracing detail H. S03.02 Structural • Modified Angle Brace Connection to Structure Above detail D by Construction adding 2 more longer length diagonal angle brace options. Details Please let us know if you have any questions. Sincerely, PAUL J. FORD AND COMPANY Pcavt Paul R. Cavote, P.E. Project Engineer Columbus Orlando 250 E Broad St,Suite 600 o` 1801 Lee Rd,Suite 230 Columbus,OH 43215 Winter Park, FL 32789 Phone 614.221.6679 1965.2015 Phone 407.898.9039 Founded in 1965 www.PauljFord.com 100%Employee Owned 1111112111 Corporation 1101 Second Ave,Ste 100 206 962 6500 Seattle, WA 98101 MG2.com June 8, 2017 n.E4 ,. i 41 JUN .132_017 City of Tigard Permit Center k 1, , 13125 SW Hall Boulevard eJ� Tigard, OR 97223 Re: Victoria's Secret, Washington Square Mall 9585 SW Washington Square Road, Space B-10 Portland, OR 97223 Project Number: 16-5291-01 Subject: Permit Resubmittal To Whom It May Concern: We have received a permit for the above referenced project, however during early construction we encountered some existing conditions and we would like to revise the permit accordingly. These revisions are outlined in the enclosed Revision Summary. All changes are indicated on the drawings with a cloud and delta '3'. Should you require any additional information regarding this matter, please contact me at 206-962-6575. Thank you. Sincerely, Liz Aiello, RA Associate 206.962.6575 Liz.aiello@mg2.com M 1101G2 SecondCorporation Ave. Ste 100 206 962 6500 Seattle.WA 98101 MG2.cam June 2, 2017 Re: Victoria's Secret — Washington Square Space No. 610 9585 SW Washington Square RD Portland, OR 97223 Project #: 16-5291-01 Store #: 417 Subject: Revision 3 The following instructions are issued to the Contractor. The Contractor shall promptly inform subcontractors and others performing or supplying the Work of relevant contents of this Bulletin. If any changes to the Contract Sum or Time are required,Contractor shall submit quotation showing change in Contract Sum or Time within time frame as dictated by the L Brands pproject manager.If no such quotation is submitted within the time specified,no change to the Contract Sum or Time will be allowed. This Bulletin is not a substitute for a Change Order,which is required to be executed in accordance with the conditions of the Contract for any change to the Contract. Architectural Sheet Description Summary A00.00 Cover Sheet • Update area calculation and occupancy load breakdown per updated floor plan. A00.02 Door Schedule • Add door 8A for Men's Powder Room. • Revise 8C*doors to now be for Office and change to HDW Group K. • Add door 8C. • Add Hardware Group J-1. A00.10 Life Safety/ • Revise egress plan and exit calculations per updated floor plan. Accessibility Plan A01.01 Demolition Plan • Update area of demo for new service door. • Add keynote 34 for existing electrical pull station to remain. A02.01 Construction Floor • Revise floor plan to accommodate existing plumbing and electrical A02.02 Plan obstacles discovered in field. A03.01 Reflected Ceiling Plan • Add trimless access panel in VSL 2 A03.02 • Revise ceiling layout, finishes, and heights per plan changes A04.01 Reflected Lighting Plan • Remove W9 sconces in VSL 1 A04.02 • Revise lighting and HVAC supply/return per plan changes A05.01 Floor and Wall Finish • Revise finishes per plan changes A05.02 Plan A06.01 Presentation and • Update size of sales floor mirror SFM10-V1-SPL A06.02 Fixture Plan • Revise per plan changes A07.02 Interior Elevations • Update size of sales floor mirror SFM10-V1-SPL in A4/A07.02 A07.04 • Revise N/A07.02 and A/07.04 per plan changes Al2.02 General Construction • Add details G and P; remove detail L Details A13.01 Restroom Notes, Plan • Revise restroom floor plans and dimensions per plan changes & Elevations • Update restroom interior elevations • Add keynote 2 A14.02 Non-Sales/Amenity • Revise office and break room floor plans and dimensions per plan Plans changes • Revise keynote 42 Electrical, Mechanical, Plumbing Sheet Description Summary E02.01 • Added receptacles and data outlets to new 3 Person Manager Office and DM E02.02 Office location per latest architectural changes. • Delete note#21 in Electrical Power and Fire Alarm Keynotes. • Revised receptacles and data outlets location in Stock, Break Room and Hallway Areas per latest architectural changes. • Added receptacles to new Men's and Women's Restroom location per latest architectural changes. • Delete note#21 in Electrical Power and Fire Alarm Keynotes. E02.51 • Added 3 Person Office and DM Office location per latest architectural E02.52 changes. • Revised Stock,Break Room and Hallway Areas per latest architectural changes. • Added Men's and Women's Restroom per latest architectural changes. E03.01 • Added light fixtures to new 3 Person Manger Office and DM Office location per E03.02 latest architectural changes. • Revised light fixtures in Stock, Break Room and Hallway Areas per latest architectural changes. • Added light fixtures to new Men's and Women's Restroom location per latest architectural changes. E05.01 • Added circuit"C-28"to Panel"C". • Added circuit"A-27"to Panel"A". M01.01 • Revised cfm quantity at FPVAV-2 and 5 in Existing Fan Terminal Unit Schedule. M02.01 • Delete exhaust fan and ductwork from the drawing per latest architectural M02.02 changes. • Added ceiling diffusers and grilles to new 3 Person Manager Office and DM Office location per latest architectural changes. • Added VAV Boxes and supply ductwork to new 3 Person Manager Office and DM Office location per latest architectural changes. • Revised ceiling diffusers and grilles location in Stock, Break Room and Hallway per latest architectural changes. • Added exhaust fan and ductwork to new Men's and Women's Restroom location per latest architectural changes. P01.01 • Revised Waste&Vent Piping Diagram per latest architectural changes. • Revised Domestic Water Piping Diagram per latest architectural changes. • Delete Circulation. Pump from Plumbing Fixture Schedule. P02.01 • Delete sanitary and domestic water piping from the drawing per latest P02.02 architectural changes. • Added sprinkler heads to new 3 Person Manager Office and DM Office 11( t location per latest architectural changes. • Revised sprinkler heads location in Stock, Break Room and Hallway per latest architectural changes. • Add sanitary and domestic water piping to new Men's and Women's Restroom location per latest architectural changes. • Delete Circulation Pump at Water Heater. Structural Sheet Description Summary S01.01 Structural • Update location of water heater support and mechanical unit on plan A. Specifications& Notes S05.01 Mech Support Framing • Update location of one mechanical unit on framing plan A. Plan & Details • Remove detail N. End of Revision 3 4Y jPJF &P C P A N Y June 15, 2017 . IV ED City of Tigard Permit Center JUN 2 2 2Q17 13125 SW Hall Blvd. CITY OF TK3 Tigard, OR 97223 BUILDING DIVISION Attn: Dan Nelson, Senior Plans Examiner Re: Building Permit Number BUP2017-00112: Commercial Tenant Improvement "Bath & Body Works Remodel" — Washington Square-Bath & Body Works — at 9585 SW Washington Square Road, Space No. G09, Tigard, OR 97223 (PJF Job No. A65717-0010— Rev. 2) Dear Mr. Nelson: We have reviewed the attached City of Tigard, OR, Plan Review Comments, and offer the following response for the structural comments (all other non-structural comments are addressed by others): Response to Item #1 a — (Diagonal bracing / Non full height partitions): Will comply. Refer to Rev. 2 structural drawings (sheets S03.01 & S03.02). Additional options for long diagonal bracing included in Typical Diagonal Bracing-Structural Studs-SDC D, E & F detail A/S03.01 and also in Angle Brace Connection to Structure Above detail D/S03.02. Revised Typical Diagonal Brace Connection detail E/S03.01 and added Optional Splice for Diagonal Bracing detail H/S03.01. Refer to Rev 2 structural calculations (pages 9-11, 44, 44A, 45, 45A, 51A-51L & 52) and also Rev 2 structural shelving calculations (pages P25A-P250, P67, P67A & P73-P84). Response to Item #1 b — (Seismic ceiling struts): Will comply. Refer to Rev. 2 architectural drawings (sheet Al2.3). Compression strut size chart with long lengths included in Gyp Bd. Ceiling Suspension System (Seismic) detail M and also in Lay-in Ceiling Layout (Seismic) detail R. Lay-in Ceiling Suspension System (Seismic) detail L uses the compression strut size chart in detail R. Sincerely, Paul J. Ford and Company ��op PROFESS �., �C,GIN4. .044 Pd i?. 0 l /P OR GDN ,% Paul R. Cavote, P.E. 1 'o�lN 3 Zed Project Engineer S6 H P JPC'O�`, EXPIRATION DATE: 3-1_ . JUN 152011 Columbus Orlando 250 E Broad St,Suite 6001801 Lee Rd,Suite 230 Columbus, OH 43215 PALM' Winter Park, FL 32789 Phone 614.221.6679 t 965 2015 Phone 407.898.9039 -4p- Founded in 1965 www. auliFor .00m 100%Employee Owned June 12, 2017 RE: TENANT IMPROVEMENT Project Information Building Permit: BUP2017-00112 Construction Type: 2-B Address: 9632 SW Washington Sq. Occupancy Type: M Area: 4289 Sq. Ft. Stories: 1 Name: Bath & Body Works Sprinklers: Yes The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2014 edition; 2014 Oregon Fire Code. Please respond to conditions below. 1) Provide calculations and construction details (including seismic bracing details for non full height partitions - not included need size and spacing of diagonal bracing considering 30ft ceiling height) for all walls and seismic ceiling struts - not included show height and diameter of struts with 30ft height. Note: The roof structure is likely to be approximately 30' above the finished floor. Please note roof structure height at wall details on plans. OSSC 106.1 When responding, provide an itemized letter stating in what way each numbered issue has been addressed in the revision. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectfully, Dan Nelson Senior Plans Examiner (503) 718-2436 dann@tigard-or.gov 3 21 South Evergreen Avenue Suite 200 Arlington Heights,IL 60005 REC g( t: 847 788 9200 ATLANTA E IVED LOS CHICAERSE GO YS NEW DALLAS YORK reenbergfarrowGJUN 7 2017 BOSTON COLUMBUS WISCONSIN BENTONVILLEILADEL CITY OF TIGARD PHILADELPHIA CITY FRESNO MEMPHIS BUILDING DIVISION SHANGHAI MEXICO CRY May 31,2017 Re Bath and Body Works—Washington Square 9585 SW Washington Square Road, Space No. G09 Portland, OR 97223 Project#: 20170350.0 Building Permit: BUP2017-00112 Mr. Dan Nelson: The following contains our response to comments made on May 17th,2017. Comments are in italics, response in bold. Building Department Review: 1. Provide calculations and construction details(including seismic bracing details for non-full height partitions)for all walls and seismic ceiling struts. Note—The roof structure is likely to be approximately 30'-0"above the finished floor. Please note roof structure height at wall details on plan OSSC 106.1: Response: Please refer to the Partition Details on Al2.1 —Details A, B and C. Drawings indicate bottom of structure height at+1-30'-0"at wall details on plan. Sincerely, C/?7,01/ it Loren Peterman P:1201712017035001500 Construction Documents1Published-WASHINGTON SQ12017-05-26 REV1-POR Revision100102849REV1responseletter.doc 9 + 11 11F & COMPANY May 26, 2017 City of Tigard Permit Center 13125 SW Hall Blvd. Tigard, OR 97223 Attn: Dan Nelson, Senior Plans Examiner Re: Building Permit Number BUP2017-00112: Commercial Tenant Improvement "Bath & Body Works Remodel" — Washington Square-Bath & Body Works — at 9585 SW Washington Square Road, Space No. G09, Tigard, OR 97223 (PJF Job No. A65717-0010) Dear Mr. Nelson: We have reviewed the attached City of Tigard, OR, Plan Review Comments, and offer the following response for the structural comments (all other non-structural comments are addressed by others): Response to Item #1: Will comply. Refer to new Rev. 1 structural shelving calculations (all pages with details included). Sincerely, Paul J. Ford and Company Ai P, L0,4° t ��aE© PROP, 9`0'1 s, 4 Paul R. Cavote, P.E. S �NGINFS ' 'l, I� Project Engineer lersssh T.... l Ilk,-9 i''EGON 61 / F'°k f'. J NC0 IXpiiZATlOiY DATE' 1 / Columbus i Orlando 250 E Broad St,Suite 600 .1"' 1801 Lee Rd,Suite 230 Columbus,OH 43215 Winter Park, FL 32789 Phone 614.221.6679 1965-2015 Phone 407.898.9039 Founded in 1965 www.Paul3Ford.com 100%Employee Owned May 17, 2017 RE: TENANT IMPROVEMENT Project Information Building Permit: BUP2017-00112 Construction Type: 2-B Address: 9632 SW Washington Sq. Occupancy Type: M Area: 4289 Sq. Ft. Stories: 1 Name: Bath & Body Works Sprinklers: Yes The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2014 edition; 2014 Oregon Fire Code. Please respond to conditions below. 1) Provide calculations and construction details (including seismic bracing details for non full height partitions) for all walls and seismic ceiling struts. Note: The roof structure is likely to be approximately 30' above the finished floor. Please note roof structure height at wall details on plans. OSSC 106.1 When responding, provide an itemized letter stating in what way each numbered issue has been addressed in the revision. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectfully, Dan Nelson Senior Plans Examiner (503) 718-2436 dann@tigard-or.gov