09/23/1975 - Minutes MINUTES Tigard Site Development & Architectural Design Review Board September 23, 1975 General Telephone Administration Building Main Street, Tigard, Oregon 1. CALL TO ORDER: 5:05 p.m. 2. ROLL CALL: Members present: Olson, Wakem, McMonagle, Cook, Hammes (arrived at 5 :30) 3. MINUTES: Chairman McMonagle asked that the minutes of September 9 be put off until the following meet ng as the Board had not had time to read them. 4. COMMUNICATIONS: None 5. DESIGN REVIEW 5 .1 PAYLESS SHOPPING CENTER (Planned Development Design Review) A. Staff explained that the purpose of the requested review was to obtain design recommendations from the Design Review Board prior to the Planning Commission' s hearing on October 7. B. Mr. Ehman, architect, presented the plan and showed the alternatives explored since the last meeting of the Design Review Board. C. Board Discussion o McMonagle asked about the situation concerning the Sambo ' s/McCall ' s joint access. He asked that whatever access agreement the parties arrive at be a recorded document. o The Board expressed its concern about storm drainage retention and asked that the proposed retention system be a part of the project design. o Cook asked if the elevation of the buildings relative to the street had been taken into account. Mr. Ehman replied that it had. o McMonagle observed that the City had better get the future grade of Scoffins Street established immediately. o Cook asked who would be responsible for providing landscaping across the front. o Ehman responded that the developer intended to donate the land to the City between Main and Pacific Hwy. Page 2 DRB Minutes September 23, 1975 i o McMonagle said he was concerned about how the development would treat future development areas as far as landscaping is concerned. o Olson said she was skeptical of the architect' s contention that a 20 ft. offset in the building would do much to mitigate the linearity of the building. She asked that a varied roof line be considered also. o Wakem asked what alternatives had been considered by the architect that did not use the 11200 cars in 200 ft. " criteria. He said he felt this criteria was not appropriate for prediction of such a develop- ment' s layout. o Motion (Hammes) to recommend the plan to the Planning Commission with the following conditions: 1. City to provide profiles for Scoffins St. 2. Applicant to provide storm drainage retention on site and provide City with engineering data for future line sizing of Main St. storm drain. 3. "Future building sites" to be planted in grass and maintained until developed. 4. Access road to Hall be constructed by developer to City standards with this projected. 5. If joint access is provided to Sambo ' s and McCall site from Pacific Hwy. , access will be allowed to Payless site. If no joint access, no Payless access from Pacific Hwy. should be considered. 6. Applicant will provide elevations and perspective drawings from main viewpoints. o Seconded (Cook) o Motion carried (unanimously) 5.2 Hiranport SID/ 16-7q ,(Ke"6W A. Staff explained that inasmuch as this was a previously approved project, there was no staff report. B. Board Discussion o Board asked about the materials change proposed. Al w Page 3 DRB Minutes September 23 , 1975 o Applicant explained he wanted to use steel instead of concrete. o Motion to approve (Olson) extension of the previous permission for a period of one (1) year. o Motion seconded (Hammes) . o Motion carried (unanimously) . 6. OTHER BUSINESS: None 7. ADJOURNMENT: 6:45 p.m. WW