Loading...
Report (49) Solar heat gain coefficient(SHGC)of glazed fenestration products(windows,glazed doors and skylights)shall be determined in accordance with NFRC 200 by an accredited,independent laboratory,and labeled and certified by the manufacturer or be detemined using the Solar Heat Gain Coefficients(SHGC)in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.10.The overall values must consider type of frame material and operator for the SHGC at normal incidence. Exception(s): ❑ Site-built fenestration products shall have a single certificate specifying glazing type,special coatings,spacers,gas fills, center-of-glass and overall U-factor,and center-of-glass SHGC for every type of site built glass used.These certificates shall be maintained on the jobsite and made available to the inspector. a Plans reference page/section: -S Air Leakage, Insulation, and Component Certification: Sealing of the building envelope.Openings and penetrations in the building envelope are sealed with caulking materials or closed with gasketing systems compatible with the construction materials and location.Joints and seams are sealed in the same manner or taped or covered with a moisture vapor-permeable wrapping material.Sealing materials spanning joints between construction materials allow for expansion and contraction of the construction materials. Plans reference page/section: 4 4 , � { Window and door assemblies.The air leakage of window and sliding or swinging door assemblies that are part of the building envelope are determined in accordance with AAMA/WDMA/CSA 101/I.S.2/A440,or NFRC 400 by an accredited,independent laboratory,and labeled and certified by the manufacturer. Exception(s): ❑ Site-constructed windows and doors that are weatherstripped or sealed in accordance with Section 502.4.3. Plans reference page/section: 45 is'to r PtS t vir5T. Curtain wall,storefront glazing and commercial entrance doors.Curtain wall,storefront glazing and commercial-glazed swinging entrance doors and revolving doors are tested for air leakage in accordance with ASTM E 283.For curtain walls and storefront glazing, the maximum air leakage rate is 0.3 cubic foot per minute per square foot of fenestration area.For commercial glazed swinging entrance doors and revolving doors,the maximum air leakage rate is 1.00 cfm/ft2 of door area. Exception(s): ❑ Requirement is not applicable. Plans reference page/section: 445 t j4-k, C.-1 l a V• Building thermal envelope insulation.An R-value identification mark is applied(by manufacturer)to each piece of insulation 12 inches or greater in width.Alternately,the insulation installers have provided a signed,dated and posted certification listing the type, manufacturer and R-value of insulation installed.Refer to code section for blown or sprayed insulation installation/settling depths and marker requirements. Insulation mark installation.Insulating materials are installed such that the manufacturer's R-value mark is readily observable upon inspection. Er Insulation product rating.The thermal resistance(R-value)of insulation has been determined in accordance with the U.S.FTC R-value rule. Installation.All material,systems and equipment are installed in accordance with the manufacturer's installation instructions and the International Building Code. ❑ 10.Outdoor air intakes and exhaust openings.Stair and elevator shaft vents and other outdoor air intakes and exhaust openings integral to the building envelope shall be equipped with not less than a Class I motorized,leakage-rated damper with a maximum leakage rate of 4 cfm per square foot at 1.0 inch water gauge when tested in accordance with AMCA 500D.Stair and shaft vent dampers shall be capable of being automatically closed during normal building operation and interlocked to open as required by fire and smoke detection systems. Excep on(s): Requirement is not applicable. Plans reference page/section: LUArt. L ( 'U f t.n ' ❑ 11.Loading dock weatherseals.Cargo doors and loading dock doors are equipped with weather seals to restrict infiltration when vehicles are parked in the doorway. Exception(s): irl=i-e-quirement is not applicable. Plans reference page/section: ❑ 12.Recessed lighting.Recessed luminaires installed in the building thermal envelope are sealed to limit air leakage between conditioned and unconditioned spaces.All recessed luminaires are IC-rated and labeled as meeting ASTM E 283.All recessed luminaires are sealed with a gasket or caulk between the housing and interior wall or ceiling covering. Exception(s): Requirement is not applicable. Project Title: Interstate Roofing Report date:08/25/16 )1/4 Data filename: Page 2 of 10 �3Plans reference page/section: .Vestibules.Doors that separate conditioned space from the exterior are protected with an enclosed vestibule,with all doors of the vestibule equipped with self-closing devices.Vestibules are designed so interior and exterior doors to not operate simultaneously. Exception(s): Doors not intended to be used as a building entrance door,such as doors to mechanical or electrical equipment rooms. I] Doors opening directly from a sleeping unit or dwelling unit. p Doors that open directly from a space less than 3000 sq.ft.in area. LI Revolving doors. L] Doors used primarily to facilitate vehicular movement or material handling and adjacent personnel doors. Requirement is not applicable. Plans reference page/section: /'/n� T 55. O 14.'Other'components have supporting documentation for proposed U-Factors. Excep bn(s): Requirement is not applicable. Plans reference page/section: Section 3: Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed envelope system has been designed to meet the 2014 Oregon Energy Efficiency Special •s a requirements in COMcheck-Web and to comply with tly datory requirements in the Requirements Checklist. (....404(43*x-- Name-Title / Signature Dat mfr r Lk 9—r 21/ .`-+ Ac'[Lo-HTel-7r. I Project Title: Interstate Roofing Report date: 08/25/16 Data filename: Page 3 of 10 ,. TRANSMITTAL i"'t'� Project No: 130184.02 Date: 4/4/17 RECE1VEP Project Name: Interstate Roofing - BUP2016-00270 APR 4 2017 Attn: Dan Nelson CITY OF TjGARD Company: City of Tigard - Building Division BUILDINGDIVISIOI': 15895 SW 72ND AVE Address: SUITE 200 PORTLAND,OR 97224 PHONE:503.226.1285 Enclosed: ®Plans❑Specifications ❑Copy of letter FAX:503.226.1670 ❑Details ❑Shop Drawings ❑Calculations INFO@CIDAINC.COM ❑Sketches ®Other: ASI WWW.CIDAINC.COM No. Of Copies Description 3 Revised drawing sets for Architectural (A-series), Interior Tenant Improvements (T-series) and Structural (S-series) drawings 2 Architect's Supplement Instructions memo summarizing revisions to permit package ❑For your Use DFor Review ❑Returned ❑For Approval DAs Requested ❑Other: Comments: Dan As discussed here are the sets addressing the revisions to the approved permit related to Value Engineering and clarification of a few items within the drawing set following review by the contractor. Please let me know if you have any questions and process for formal notice to the site with updated set of drawings once you have completed review. Thank you Chris Walker Copies To: Deliver: ❑ 90 Min ❑ 3 HR ❑ 8 HR ❑ Pick Up , .,Prop Off ARCHITECTURE ❑ US Mail ❑ Next Day ❑ Two Day ENGINEERING PLANNING Signed: INTERIORS