Loading...
9632 SW WASHINGTON SQUARE ROAD . r / \ 8 A C � r'lv/� L' �•, C • ay Comer �? C ww I iN r .Q Z J: W. WX 9oiden St SW Lehman St a t�• L. .e `~ v Crrr,r:r:+ I - o •.. y SwCOW£t o - °LN Leeust Si I i sw„ h SY!O>A St GYP 8✓ 'I GYP. BD SW tlendvood Loop R� C' Sti1'vOro now 0 LA -- - - - - - -- - - — - r SL/venfv• St S.�J NATC+-IED AREA INDICATES3'-0' I I Ili NON-ACCfESSIHLE / ALI N w w SPACE AF30VE – ---j – – IRA P t t.A OFFICE AND �, f( � tR ! C '�" � i n RESTROOM `- ( U- Ow _ 1�Safl- c E (� r. TOILET ROOM I L L !"F'`-- L k V S Orr, EQI c ft 3 -0 `I- LOCATET2 EO FLUORESCENT STRIP AT w ( 12' r ! CENTER OF "ON-SALES - CE;LING 4c, FW F T2 vl`1i�CE +V. G--09 FIRE-RATED I T2 �- w >�E R�E ?'-0"�' q'-I I" I I twrvrRs l : .. �R,A;�B o ACT-2 I GYP. BD. �' - EQ I i I4c 1 LINE OF T2 -� 4 -U MEZZANINE I I T2 ABOVE -– FRANK s 1 CEILING - 1 LJ E w I -O - • •• . • t_l :1 1� ..� FS -RA NQN -TIEq I ( W �` lit, CORRIDOR w LOCATE DOP . E Y PLAN AT CENTER CEILING ACT-2 I GYP. BD.11 OFFICE COPY C(xwftor6 � t: Frx only t,PERMIT'';' Pup aoub- o=21_. 1� 4 See Lett,• .. ( ): -./�"w'"-- •�"1.---��___ ., .;� ,,, � Baa, c�.r � t WYATT FIRE PROTECTION INC. INSTALLATION AND MAINTENANCE .• 9095 S W BURNHAM TIGARD OREGON 97223 KEY PLAN ` ` TOTAL SPRINKLERS DATE - THIS SHEET 1• I : / , REvISIpNS-LOCATE BY GRID COORDINATES HANGER LEGEND DEVICES- STANDARD SYMBOLS STANDARD SYMBOLS— CONTRACT SCARE_ SPRINKLER MEAD SYMdOIS REVISIONS--LOCATE BY GRID COORDINATES APPIM I a 1NSPfCZION 111,1140014 CONTRACT WITH HOOKS LMTM AS DESIGNAT1tD SIRINKLERS TYKE owm QTY. _ — .^._ � - POST INDICATOR VARVE T - Au1RM CHECK VARVE 4 - UPRIGHT ON 1/2"+ OUTLET 1 '—�- -- _ FIG 11• CEILING Flli. ROD L RING r RI3j 5 -- -; KEY VA1VE Q - RIFER w/At/1AM VARVE H - PENDENT ON 1/'j" OUTLET 2 +' - ~ -ADOM - - _ R - FIG IS! CEILING FLW ROD t RING vL T - rt _ 1 - - - ` ENGINEER SHEET >i! 7 - ODACM SCREW. ROD R RING r-• - � N�� Q• FIRE HYDRANT O - RISEIR w/DRY VALVE -fo- - UPRIGHT ON 1' STU/R U► _- __----.------- ---- 8 +a fes! A ' _ Ctri - _ - r, — >Jr R - COW INSERT. ROD • RING _ I - Pi4NDENT ON 10 DROP 1 PF101* ' Y FIRE DEPT CONNECTION K� - R SERI w/E1tC FLOW S1MiT:Ft !!Y -- _. -�,_- 1 - SI ►AN EXON CASE. ROD i RING -'---�-.--i _• — _-- �S� _ ----_--- -- SIC - EXE SI I, RING - W - O S i Y GATE VALVE i2 - RISER w/DELUGE VALVE � - FtUSM S►R ON 1" DROP WATT psi AI?ONTfCT 1r � f_ s» - wAT>ER AAIDTOR R!!1 - DRY ►INDENT ON I" DRO► - -C'CLAMP, ROD i RING -�-=�-- 1�{ - SWING CHECK VALVE Al ---- - r < < ( - -- -- A00M 1 M 1! - '1"R°D ANGLE QV. ROD A RING — - - uneq - NEW UNDERGROUND - EIEi�RIC RILL 1� - S► DON AT 1/? OUTLET O� ' ` y..,4 ' 1. r r rr/�I / tt 1;1 - Av1-,IE IRON C,IP ROD ♦ RI I Z U D SAME LOCATIONc"y - -_ + far LUST UNLARGROUND � `� rt bN FIRE DEIPT CONN � - - -- PHOW .,.v'+w.w�,•a r.,,.- i,tir _ ifl�:6.G�,':AgM�R.,.•."x rs. .,,.,. aa w._:. s++ a;+:narar.a�"•KrTwvn..�ky�py�'-�,, .. ,- ,. .. . .. w -.w.....,rM..w.w....w..w,w. LEGIBILITY 4TRIP cmt_ Ip I , w 1 S1 l9 y 8 Iy 10 I 1 12 3 4 le 17 is 19 20 21 22 2:3 24 25 26 2-7 26 29 3 r1 11 OI rp -ONO e4308 ` O ,. - k'-'�;; ,+Irk+*��s::?'.,�fi',,:•+ ._ •'�tE:�'<"L' tri.. 1- ola><.+- n ..i. , .. �y,4,_.,.�yyn•:n...`n N�ud>?3;�?++tr•'',+�I�:,,:'!R � .:;.,� .,,: ._rvl,,.a �. ..i,. . --:-. .. ''. n� ,.�, f � .. , �4 I 'i i4 ,M Yjlvlr, ,,iuj u!1 b i, x i i F �N� C . 20'-0' I I I I I i I I I I I II ADJACENT TENANT ' 8 A • I q cc N, _ I ,9 -6 1/2 (6) N4 AT 15" (2) HR AT I GYp QD s j 1 �^ O.C. TYP. AT G GYP BD 15 0.C. TYP. ~-� i PT-I it ! UNIT 2 10. PT-I AT DEMO SINK I - — — — — — — — — _ .J I1.I71' I i I I - + I / L I -iii-z- -°. _ - • ! lr OF 3 AMC] C� L — JL _ JL J _ J O O O O O L - � - JL - JL- „ _ t #ALIGN wl - L - JL _ JL _ JL. J - - -- - - - - _ - T TI3/16 -� UNT t crl rn I TART �- I11�T 1 , ( IRfT i Tn -/- < TA OI� T2 TD TD -' T2 a T2-v T TD T2 / B O T2 TO D T2 I I T2 v D 'T2 ; I T2 TO TDv T2 I ' T2Q T TD 2 H'�O v T2 D D- T2 sim, 1111111111--.W I , T2 TD TO �T2 2 I o 13 T71 TO TO T2 T2 IxRRD `� , I Aar° I L1 �) i ` - ' • I • a T2 2 I IT T2 T2 T2 0 • 8' T2 •I� Y=V-, T2 o I 8' T2 T2 I i T T2 I I T2 T2 T2 �T2 T 2 4' I 11 �' T2 I�T2 T2 '�' '�► 51- " ( E t - r T2 I T2 T2 4 I L ( '� T2 o e e I L. -c. TJ 'I 3'-0' I 1 1 1 1 I ` Pt DIP T- �`T.� _ I y T2 ED EO ° ° ,_ o I �l'-' I/4" I T2 ^ _ I t^ + o 4 T2 T2 I I T2 - I GYP" BD. I I 5 -�' S _.�. u - - t 1 1 I I T2 51-011 5 0 T2 T2 I�► �` Lt`, C FLL)ORF5CFN • J. LICa�T -, 5'-0" I n `� ,� , q- I ( •- i MO�•• \ ._ .t55EI7 I II 1�1 I I 5 -0 T2 I `1 . I O ,� A5 8'-4 7/16" A5 T2 I PT-1 i i YY Q A 6'_0" IAS e -C t1�� , �A5 A5 -0A5 I A5 8 -4 7/16 -Yp. 6 I `' -y'?'` J ► G j I CAN- _ __ - r2 I I T2 T2 g'-0" 8'-0" I p m I DEMO SINK I - �'- I 11'-0" o ti b li � '� Y L�' \ G �►- I LOGA� _� 12. t- I o o_ I I ' I} I I I I Y i I I I 41 -I `9 I 10 -1 1/2° n 41 ?2 T2 Q f- I 10 -1 l/2 i v r 4 �2 �i (s !y cv! I _ o a I I GYP. BD. 4i I v I- �T2 v J FW F I 4 T2 I GYP 8D T2 Q t•- I C AII.1 I I c� I 2 -G -0 PT-1 '-G" GY?. BD 2'-0" m ..; 1 w I I ,rcl� - GY? gD. I �--,. LOC.. !OV G. "RA , vo - �_ _ _ - �--- - TD T2 2 r� O� - { T _ T2 2 q'-11" T2 TD T2 T2 0 meq'-11" I T2 T2 h • T �c c I • D T2 I ___ T2 . ROOM 1 J' I I _tiT RED ON t 2'-0" YR, ESD. _ 2 ( I . o T2 ROOM 4 T2 I wD-3 I T2 T2F �-� o cL T2 I wD-3 1 12 o d "_fG e O —'� I FROM ENTRY ' Pl - I I I o c - I I ?- I I V -' S'-0" 5 -C' GYP B= Ii I EO 1 ED a I + v "v I- ir r -1 I 0> Q I- - _-1 4 T. Ci ! I r I r I T2 � i ,n I T2 '- T2 I I 4 I T2 T2 O A5 A5 T2 41 I T42 I �A5 A5 A5 4 �ao T7�2 I :9 A5 12.- 54c 4c G` A T2 I I AS 1L"-0' 10'-O" I s I �` 5'-0" 5'-0" �i IMT t " _l j ;2 I ' Fw I �f2 ( 1.I 4' T2 ;''P. I TYP. i r - 7— -I _ - IMT I `rr - fir --- - - • I I! 1 I I II I ` L� ! \�� ACCESS PANEL, GC TO C Al rA GODRD,nATE T� MALL ' I _ — T2 T2 I 10'-0" 2 10 -0 TYP• ` y't''" �-� II I k YA ON-SITE T2 T2 ' T2 T2 r , T2 2 TYP. 81 TYP. 72 T2 r- -� T2 • T2 I I I 8', T2 T ! Il ` .q I REPRESE'�TAT VE • I I J I T12 TO TO 'T2 v''2 l� II 1 E TA W i EiD =1f2 TD TO T2, T2 - -1 . 2 YID D 2 - k _ j °".. r- r - r . U rry T . ~ C, ci o ( m T2 T D TD m T2 I I T2 TD '^ T2 IUIIIf a v T2 TD TOS^ T21 1 T2 TO I D T2 I I � a T2 , D D i', -i TA ,— .1 T2 T TDI T2 I 1 I Q - - - - - - - IMT t Q L ? J UIrT. - v - r - ^ c( ulnT ,r - ^ j GYP F W A5 4 -2 5/16" 1A�T S - I� - um s - 'v uT T T L _ J LAIR / - - - , r - �r �17 o 0 0 0 0 0 7r- 77 r - -Ir -� - r .., �-'. rTrz a c, I I I I n / - -_ _ _ - - - - -- - - - - - - - - - - - - I - - I �; 11 11 11 1 Ilk k 9 I i LLOCATE DOWNLIG 4T � AT CENTER OF � "-4'� FOCAL WALL, ry CEILING v FOCAL WALL, ' Vii; II'-0" I FOCAL L G1+TS E GYP, BD PEti".�;.NT LIG'TS t GYP. HD. iv PENDANT LIGHTS t pT-1 SF'�:+CERS SPEAKERS SPEAKERS i ,. ALL FIP'.4v -rl� I� 15 . 40 P.K �TSEI ALL. FlT1ll•1L � Tp � ��T i g.Z v . AL-L.AF%M©V�'�> �.�c ED!N C� Z,_p„ Tb f-,& H JKI6 . ►^ '--- F A(L�N Uep6 TU �p,6 F— NF P{� I z-., 'N N T-5. ..... t'}E/�: GI�h10TEC wlTH '�.' TJF---�• WMIT� '%r.�CLr�LE� . C5) KEY PLAN cJ I 1/4"=1' WY FIRE PROTECTION INC. ,' " •• • INSTALLATION AND MAINTENANCE •• 9098 S W BURNHAM TIGARD, OREGON 97223 TOTAL SPRINKLERS DATE THIS SHEET CONTRACT SCALE REVISIONS-LOCATE BY GRID COORDINATES HANGER LEGEND DEV-CES- STANDARD SYMBOLS STANDARD SYMBCxS SPRINKLER HEAD SYMBOLS REVISIONS-LOCATE BY GRID COORDINATES A LAMAS A INSPECTION PHONE CONTRACT WITH = NOOKS LENGTH AS OESIGNATFD S/RINKIlRS TY►E DROR� Or/� } .. POST INDICATOR VALVE - A-ARM CHECK VALVE O UPRIGHT ON 1/2" OUTJ1 1 �__ ___ _.-.-_ -^ - ENGINEER SHEET I16 C1IUNG FIG ROD A RING / - - _ 21' ADOtEiA ` fIG '�. ' �' - �' `- 1 -- RISER w/ALARM VALVE E+ - PENDENT ON 1 $" OUTLET .�- F�`�►?��� . _� ...�� t - KAY �AL�t e / _ -- - -. I S� CEILING FIG ROD A RING 7 TY (p w it` W Jv _ - R1SFR w;DRY VALVE -- STUBS Up ____ _.� r._'__. __ - -- ----- E RiYDRAKT Q E _ COACH SCREW, ROD • RING _ ._.. . �� - - -. _ _ . -- --rs _ •. .. - --.. - -- 1 �G = Y FIR RI PENDENT ON 11" DROP ----1- TICT �� pMIDPI! - - - - --- R - CONC INSERT. ROD A RING - - � -�+ - fIRE Df1T CONNeCT10N X SER w/E1K FLOW SW1TY_N A' , -- - wATd OVT ARCfII -, ,.. - FLUSH SPR ON 1' DROP LXPAMICNd CASE, ROD A RING (► W N t• -_ - G S A Y GATE VALVE '.' RISER w/DQU1G1 VALLA ! - r 1 _ EYE ROC _ WATER T A# - DRY PENDENT ON I" DROP _ # 0 LL!!y MO Ol Ral — - - 11 'C CLAMP, ROO A RING -- - SWING CHECK VALVE `• - SIDFWAIL ON 112' OUTLET ••- - .*On ANGLE CLIP ROD l RI - w }wy - NEW UNDERGIOUINO trry , � HECTRIC bHl Ory;• i. t /. i. • 1� ie � ' tri � •. - EJIIST UNDERGROUND `+ fl'J!SN fIRF DWT CONN- � 1J► A DN AT SAME l0r-A(IQN __-------..---. ----. -----------_s-_ __ _._._..._i ---.� - _ -- '' •sL, ��. '--* ....,n•mre« MFi . �*m�tul! 1i1It11 lll!!)I111ltlli!III;IIIIIlill!Iil}lliflli!b!illhillluliiii IIIIII!il IIIIIIUI�IIli1111{fllullllilil;1111111!Illllllljlllllllr-�i111111 Illill111111111ii1 1111 1111'iill II!1 Ilil ili,'iiil'lill }iU ILII Lill n II" III IIT III 1111 IItIIJi('I.i; .III 11111111 Iltl uO1�.ITY eTRlr 1 1 7f E� � ► ' � I � I � I I I I' I 'I � ��Mn.;�T A 10 1 1 1�2 13 14 , IES 17 I® 1� b 1!I 22 23 24 26 "16 07 28 Z1; 30 f t I pl ' MONI ryLOS 1611 W 1t IO r A, _ r d. 1111101 -M4a Sd d;eAPz V¢m. ._ kr v• MrPv?ai� 7E •:. .. . ,n - "- yh1. I . I,--� 4"f \ 11,I R.1. a .,t !, H B K CONSULTANTS, LTD. SE-ra-M !¢QQQ 0. FLEXDLE CONNECTNOwFt 171 CHARRING CROSS DR. S. 2. HANGERS SHALL K FASTENED TO BUILDING STEEL, CONCRfiE, OR MASONRY, BUT NOT TO PIPING. HANGING FROM METAL DECK IS NOT 3 INS'ALUt� PERMITTED- MANGERS MUST K ATTACHED TO UPPER CHORD Of BAR JOIST WHERE INTERFERENCES OCCUR, AND BN ORDER TO SUPPORT SUITE 1 B 6-AW_M�CHAWIC-�-�Q�lA���Tsg DUCTWORK OR PIPING. THE CONiRACiOR MUST INSTALL TRAPEZE TYPE HANGERS OOR SUPPORTS WHICH SNAIL BE IDEATED WHERE THEY E• FLEXIBLE f_011ARS SHAD BE fURNpNED AND INSTALLED IN All CONNECTIONS BETWEEN VIBRATING EQUIPMENT (FANS, AIR HANDLERS. DO NOT INTERFERE WITH ACCESS TO FIRE DAMPERS, VALVES, AND OTHER E LIRS NI HANGER TYPES AND INSTALLATION METHODS ARE ETC) AND DUCT; OR CASINGS ALTO, FURNISH AND INSTALL !UXIOU CONNECIIOks WHERE DUCTS CROSS BUILDING EXPAION JO NSINTS A SUCTION LIN '"ALI HAVE ADCOUATE UFT TRAPS AND/UR DOUBLE SUCTION RISERS TO MEET THE REQUIREMENTS OF FIELD WESTERVILLE, OHIO 45081 CONDITIONS Y'. EQUIPMENT MANUFACTURER'S RECOMMENDATIONS 614-882-1199 A. MOTE ALSO SUBJECT TO LANDLORD CRITERIA 2. FLEXIBLE CONNECTIONS SHALL BE CONSiRUC1ED Of NEuPREKF-COATED FLAMEPROOF FABRIC. PROVIDE ADEQUATE JOINT FlEX181U1Y TO I IN[ ABBREVIATION LSDtC WHEREVER Il APPEARS IN THESE MECHANICAL DRAWINGS AND/OR SPECIfICATFONS SHALL REFER i0 'LIMITED 3. MANGERS FOR All INSULATED PIPING SMALL BE SHED AND INSTALLED FOR THE OUTER OIAMCTkR Of INSULATION INSTALL 0' LONG ALLOW FOR MOVEMENT AND PREVENT IM TRANSMISSION Of VIti'UtION B BRAZE ALL . .. NiTN SILFOS-5 STARTING AT THE INDOOR UNIT AND WORKING TOWARD THE OUTDOOR UNIT THE SEALS ON THIE STORE DESIGN AND CONSTRUCTK3.Y', ANY REFERENCE TO TENANT'S Ma CT MANAGER OR FURNISHED BY ANY Of THE ABOVE REFERS %PUT CIRCL' GALVANIZED SADDLE BETWEEN THE HANGER AND THE PIPE INSULATION. OU1D00 SHALL BROKEN LAST' A NITROGEN BIEEC SHALL USED DURING ALL BRAZING AND ANY TIME TIM TO LSOAC. SYSTEM 15 C • AU OPEN LINES SHALT BE CAPPED AND SEALED EKFORE LLAVING THE SITE DURING CONSTRUCTION. PRESSURE ` (�), j _' 4. HANGERS AND PIPING OF DISSIMILAR METALS SHALL BE DI LLUIRK'AILY SEPARATED N. FLEXILE AM DUCT TEST FOR 01' *'!H AN INERT GAS UP TO 245 PSK; REDO LEAKING JOINTS AND RETEST UNTIL SYSTEM IS TIGHT EVACUATE )� j/�','& ENTIRE SYST v I, 200 MICRONS OF MERCURY CHARGE SYSTEM WILL 15 PSI OF R-22 AND A INERT GAS TO 145 PSI UID 1/ 2 DRAWINGS AND GENERAL PROVISIONS OF AND THE INCLUDING ONS Of AND SUPPLEMENTARY CONDITIONS AND All OTHER 1. FLEXIBLE AIR DUCT SHALL BE 1' INSULATED CUSS 1, UL LISTED AND RATED FOR THE OPERAIING PRESSURE OF THE SYSTEM. DUCT RETEST SYST - "GIZE CRANK CASE HEATERS 24 HOURS PRIOR 10 STARTING COMPRESSOR TO ENSURE THAT ALL REFRIGERANT SPECIfICAT10N SECTIONS, APPLY TO THIS AND THE OTHER SECTIONS Of DIVISION 15. k FINAL MVAC MISPECT1pN& CONSTRUCTION MATERIAL PLASTIC, CLOTH, ALUMINUM) MUST ADHERE TO LOCAL CODES AND LANDLORD'S REQUIREMENTS AND BE I)QUIU IS OL 'HE COMPRESSOR. it Z?.6;4- 3 THE CONTRACTOR FOR THIS DIVISION OF WORK IS REtknRED TO READ THE SP[CItICAT10NS ANU REVIEW DRAWINGS FOR ALL DIVISIONS INCLUDED AS SUCH IN THE BTU. 1. ASIDE FROM NORMAL INTERIM INSPECTIONS Of WORK IN PLACE, LSDAC SMALL HAVE AN INDEPENDENT HVAC CONTRACTOR INSPECT THE C. UPON COMPI HN OF TESTING, BUT 611`0[ THE REFRIGERANT PIPING INSULATION IS APPLIED, THE PIPING MUST BE INSPECTED Of WORK AND t5 IS CONTRACTORS FOR THE COORDINATION TO R THIS WORK AND THE WORK IT HIS SUBCONTRACTORS WITN ALL DIVISIONS 2 FLEXIBLE AIR DUCT SHALL BE ATTACHED PER DETAILS ON THE DRAWINGS. FLEXIBLE AIR DUCT MAY ONLY BE USED IN VERTICAL BY A RLPRE' I'VE OF THE LOCAL GOVERNING AUTHORITY AS NECESSARY. OF WORK. IT f5 THIS CONTRACTORS RESPONS181UTr TO PROVIDE HIS SUBCONTRACTORS WITH A COMPLETE SFT Of BID DOCUVENTS. FINISHED HVAC INSTALLATION UPON COMPLETION FOR COMPLIANCE WITH THE PLANS, SPECIFICATIONS AND CODES THE INSTALLING CONTRACTOR WILL Sf. RESPONSIBLE 10 BRING ALL ITEMS REPORTED BY THE INDEPENDENT HVAC CONTRACTOR UP TO PUNS ANOAPPL►CATIONS RK+ERANi 4. THIS CONTRACTOR IS RESPONSIBLE FOR SCHEDULING THE COMPLETION AND INSPECTION OF THIS WORK TO COMPLY WITH THE LSDAC SPECIFICATION REQUIREMENTS D. INSULATE TNf SIT SUCTKIN UNES AND CONDENSATE LINES WiTH RUBATEX OR ARMSTRONG 1 INCH THICK PIPE SCHEDULE AND THE PROJECT COMPLETION DATE. 3 FLEXIBLE OUCT SHALL NOT fXTEND OVER 4'-0' IN LENGTH AT ANY ONE LOCATION. INSULATION I - F,AME SPREAD RATING OF N01 MORE THAN 15 AND A SMOKE DEVELOPED RAYING Of NOT MORE THAN 50 IN END Of SECTION 16000 ACCORDANCE «"N 'NOUSIRY STANDARDS. DO NOT INSULATE THE HOT GAS (LIQUID) LINES OR ANY HUT GAS BYPASS. _r.._. 5. THIS CONTRACTOR SHALL VISIT THE SITE PRIOR TU SuBMink Of BID TO DETERMINE CONDITIONS AFFECTING THE WORK. ANY ITEMS L SUPPLY AM TAKE-OFF FITTINGS WHICH ARE NOT COVERED IN THE BID DOCUMENTS OR ANY PROPOSED SUBSTITUTIONS SHALL BE LISTED SEPARATELY AMU QLAUFIED IN E. PROVIDE UL EL FIRE STOPPING SYSTEM AROUND '111 PIPING PENETRATIONS THROUGH RATED WALLS- PENETRATIONS SHALL THE CONTRACTORS BIO. SUBMlTTAI Of BIG SHALL SERVE AS EVIDENCE Of KNOWLEDCl Of EXISTINC CONDITIONS AND ANY 1. FURNISH AND INSTALL CONICAL, TAPERED OR 45 DEGREE SADDLE TAKEOFFS FROM MAIN DUCTWORK 10 ROUND BRANCHES, INSTALLATION MEET THE RF.:REMENTS OF UI DETAILS WLIOOi (UNINSULATCD WALL) AND WL5039 (INSULATED WALL). MODIFICATIONS WHICH ARE REQUIRED TO MEET THE INTENT OF THE DRAWINGS AND S'ECIFICATIONS, FAILURE TO VISIT THE S E FOES DICTION 15500 SHALL BE PER SMACNA LATEST EDITION NOT RELIEVE THE CONTRACTOR Of RFSPONSIBILITY IN PERFORMANCE Of HIS WORK, HEATING. YFWT L_A - QI�!_�ND ,�iR�Q[1Qlf 14t�11I�1G ,. INSPECiION C REFER TO RESPONSIBILITY SCHEDULE ON SHEET M04 1 OF THIS SET FOR INFORMATION IN REGARD TO RESPONSIBILITY OF W(=7( OR J. DAMPERS - m ITEMS WHICH MAY AFFECT THE END. A. SCOPE Y`f WORK A CONTRACTOR r.;T PREPARE AND SUBMIT A COMPLETE PIPING SCHEMATIC TO THE LOCAL MANUFACTURER REPRESENTATIVE FOR z I. WHERE DLSICNATED, FURNISH AND INSTALL MANUAL IOCKING QUADRANT VOIuME CONTROL DAMPERS WITH HANDLE OPERATORS AS APPROVAL PF w 10 BEGINNING INSTALLATION. UPON COMPLETION OF PIPING, THIS CONTRACTO9 MUS' CALL THE LOCAL O 1. THIS CONTRACTOR SMALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SIRVICES, TOOLS, TRANSPORTATION AND FACILITIES NECESSARY SHOWN ON PLANS TO FACILITATE AIR BALANCING. DURODYNE MCOtL NO: K SERIES QUADRANT. REPRESENTAT.E FOP FIELD INSPECTION OF WORK PERFORMED . All ITEMS FOUND TO BC INADEQUATE FOR PROPER PERFQRMAhCf S. GENERAL REOUIREMENTtS FOF, REASONABLY IMPLIED AND INCIDENTAL T0, THE FURNISHING, INSTALLATION, COMPLETION AND TESTING Of ALL THF WORK FOR THEBY MANUFAC .PER REPRESENTATIVE MUST BE CORRECTED. THIS INSPECTION IS PERFORMED AT LSDdC EXPENSE. . F-- � c , WiAC SYSTEMS AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS, i0 2. OPERATING HANDLES ON ALL DAMPERS SMALL BE TAGGED WITH A MINIMUM 18" LONG U U ORANGE MARKER TAPE. // Com) T I. THIS CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EOUIPMENF, SERVICES, TOOLS, TRANSPORTATION, INCIDENTALS AND DETAILS ACLUDE, BUi NOT BE LIMITED TO THE FOLLOWING: O. LABELS/PIPE M ", M A•NKERS c NECESSARY TO PROVIDE A COMPLETE MECHANICAL SYSTEM AS SHOWN ON THE DRAWINGS, CALLED FOR IN THL SPECIFICATIONS, AND AS 3. WHERE ACCESS TO BALANCING DAMPER IS RESTRICTED, A REMOTE DEVICE, MANGAUY OPERATED SHALL BE USED. UNITS SHAH BE .J L D T ^' • REQUIRED BY JOB CONDITIONS. ALL WORK NOT SPECIFICALLY NOTED AS BEING BY THE LANDLORD OR ISC&C SHALL BE PRO�,JED BY A HVAC UNITS, ALL RELATED EQUIPMENT AND ACCESSORIES (UNLESS NOTED OTHERWISE). ORUEREO THREE WEEKS BEFORE INSTAIU,I(NI TO ALLOW EOR OE LIVERY LEAD TIME. 1. FURNISH AND INS PIPE IDENTIFICATION MARK[RS ON ALL PIPES INSTALLED UNDER THIS CONTRACT. MARKERS SHALL BE A MINIMUM .-! '? 4T: THIS CONTRACTOR CLOSELY COORDINATE THE ENTIRE INSTALLATION WITH THE LANDLORD AND THE LSGdC PROJECT MANAGER, AS B. DUCTWORK, FITTINGS, DAMPERS, AND INSULATION. of 1-1/2' X 8' As' IDENTIFIED IN ACCORDANCE WITH TNF BACKGROUND AND LETTER COLORS ISSUED BY THE AMERICAN NATIONAL �i )-•- .0 -t ; REQUIRED. K. FIRE/ SMOKE DAMPERS STANDAROS INSiITU (ANSI C. HYDRONIC PIPING,. (AS APPLICABLE, REFER TO PIANS). ) z U) p r 2 THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH OTHER AND ANY MATERIAL OR LIBOR CALLED FOR IN ONE O. REFRIGERANT PIPING (AS APPLICABLE, REFER TO PLANS). 1. FURNISH AND INSTALL PRIMARY FIRE DAMPERS WHERE INDICATED OR REQUIRED BY CODES, DAMPERS SMALL BE DESIGNED FOR BE I! "'IIFC Ac Z Zcl�) : SHALL BE FURNISHED AND INSTALLED EVEN THOUGH NOT SPECIFICALLY MENTIONED IN BOTH. ANY MATERIAL OR LABOR WHICH IS E. CURBS, ROOFING, AND STEEL FRAYING FOR SUPPORT (AS APPLICABLE, REFER TO PUNS) HORIZONTAL OR YERTICAI FIDW OF AIR AS REQUIRED FIRE DAMPERS SHALL BE UL LABELED AND MEET Alt CODE REOUIRFMENTS. 2 PIPING SMALLY C; �,�fOl10wS CHILLED WATER RETURN, CHILLED WATER SUPPLY, CONDENSATE, N01 WATER RETURN, HOT I-M L 0 f!J WATER SU ER RETURN, CONDENSER WATER SUPPLY, REFRIGERANT LIQUID, REFRIGERANT SUCTION. AND DIRECTIONAL � � �- M NEITHER SHOWN ON THE DRAWINGS NOR CAILEO FOR IN THE SPECIFICATIONS, BUT WHICH IS OBVIOUSLY NECESSARY iO COW'LETE THE F. TESTING, ADJUSTING, AND BALANCING. _ U .I: x a_ ARROWS. All iU-h` ";4", MUST BE VISIBLE AT EQUIPMENT. WORK, AND WHICH IS USUALLY INCLUDED IN WORK Of SIMILAR CHARACTER, SHALL BE FURNISHED AND INSTALLED AS PART OF G. KEEPING A RECORD SET AND PREPARE AS-BUILTS DRAWINGS. 2 FIRE DAMPERS SHALL HAVE THE BLADES OUT OF TI!E AIRSTREAM AND A 165 OCONEE f FUSIBLE LINK, TYPE B, AS MINIMUM. FURNISH J 7 L.. +, CONTRACT. AND INSTALL ACCESS DOORS AS NECESSARY. ( Q . � CU FAS BEFORE STARTING WORK, THiS CONiRACiOR SMALL VISIT THE JOB SITE AND EXAMINE THE ARCHITECTURAL, STRUCTURAL, MECHANICAL P. CSB FOR SUJPh411T ,"I _J _5 3. FURNISH AND INSTALL ALL NECESSARY FRAMING AND SLEEVES FOR DAMPER MOUNTING PER UL AND CODE REQUIREMENTS- , n- Z O _J 3 WHERE THE DRAWINGS OR SPL!IFICATIONS GALL FOR ITEMS WHICH EXCEED CODES OR iNE UHDIORD'S TENANT CRITERIA ih; ANO ELLCTRtCAI P ANS ANO SPECIFICATIONS TO SEQUENCE, COORDINATE, AND INTEGRATE THE VARIOUS ELEMENTS OF THE HVAC 1. THIS CONTRACTOR 14 FURNISH AND INSTALL ALL NECESSARY CURBS REQUIRED TO INSTALL ALL HYAC EQUIPMENT AS DESCRIBED ON C CONTRACTOR IS RESPONSIBLE FOR FURNISHING AND INSTALLING THE SYSTEM WITH THE MORE STRINGENT REQUIREMENTS AS USIGNED THE DRAWINGS- CUP:, SHA.; BE A MINIMUM Of 14' (SEE M04.1 'LOCAL AREA REQUIREMENTS' REM # 5) HIGH, OF THE SAME J (D - O (-, T c SYSTEM, MATERIALS, AND EQUIPMENT WITH OTHER CONTRACTORS TO AVOID INTERFERENCES AND CONFRONTATIONS ,Ic I AND DESCRIBED ON THESE DRAWINGS, UNLESS SPECIFICALLY NOTED OTHERWISE. 4. FiRE SMOKE DAMPERS SHALL BE FURNISHED AND INSTALLED WITH ELECTRIC POWERED MECHANISM. COORDINATE WITH ELECTRICAL -E c M P_ C MANUFACTURER OF =u,NT UNTIES NOTED OTHERWISE. All CURBS MUST BE INSTALLED THAT TOP OF SO CURBS ARE LEVEL. � 3 PELOCATION OF EXISTING DUCT MAINS OR BRANCHES TO MEET STORE DESIGN CRITERIA MUST BE INCLUDED IN BID PROPOSAL. CONTRACTOR FOR POWER REQUIREMENTS. 0 31 u') 4 AU WORK IN THIS SECTION SHALL BE INSTALLED SO AS TO BE READILY ACCESSIBLE FOR OPERATING, SERVICING, MAJNTAINIW., AND ALL PENETRATIONS k I EA �; STRUCTURE SHAM BE DONE IN ACCORDANCE 10 THE LANDLORD'S GUIDELINES AT THIS CONTRACTOR'S Q LLl Y .- (,/,) REPAIRING. THIS CONTRACTOR IS RESPONSIBLE FOR PROVIDING SUFFICIENT SERVICE ACCESS TO ALL EQUIPMENT. L DUCTWORK INSULATION EXPENSE THIS CON :LC`'= u.;ST RECEIVE LSDAC PROJECT MANAGER'S WRITTEN APPROVAL BEFORE ANY WORK TAKES PUCE. THIS F_ `z .;; B. HVAC EOLO ENT CONTRACTOR IS ALS RESP,ASIBLE FOR ALL SEISMIC, HURRICANE OR OTHER SECURING DEVICES REQUIRED Of LOCAL OR OTHER CODES U� 0 2 1. FURNISH AND INSTALL INSULATION PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS, AND IN ACCORDANCE WITH , a,^, W _ S S. All WORK SHALL BE PERFORMED IN A NEAT PROFESSIONAL MANNER USING GOOD CONSTRUCTION PRACTICES. 1. PRIMARY HEATING AND AIR CONDITIONING UNITS ARE TO BE FURNISHED BY LSDAC AS SCNEDUIED UNLESS NOTED OTHERWISE. REFER TO RECOGNIZED INDUSTRY PRACTICES. INSULATKIN MUST COMPLY HIEN NEPA 90A. (D r-J a PUNS FOR REQUIREMENTS ALL EQUIPMENT SHALL INCLUDE A FIVE (5) YEAR COMPRESSOR AND TEN (10) YEAR HEAT EXCHANGER 0. TE8TiNIG, AD"111E AND BALANCIINO 1 LJ O ; �: 5 5. UNLESS SPE�IfICALLY NOTED OTHERWISE, MATERIALS, PRODUCTS, AND EQUIPMENT, INCLUDING All COMPONENTS THEREOF, SHN�; � WARRANTY. 2 DUCT STIES SHOWN ON DRAWINGS ARE INSIDE CLEAR OIMENSKNNS. ALL RECTANGULAR DUCTWORK (SUPPLY AND RETURN) SHALL P` F- -: C� NEW, UNDEISRW RE LABORATORIES LISTED AND LABELED AND SIZED IN CONFORMITY WITH REQUIREMENTS Of STATE AND LOC l GLIDES, INTERNALLY INSULATED WITH 1- THICK, 1-1/2 LB. DENSITY UNER (C=0.28 0 75 DEGREE F) WHEN A COMPLETE DUCTED RETURN AIR 1. TESTING, ADJUSTING AND BALANCING Of ALL WORK SHALL BE MADE BY AN INDEPENDENT CONTRACTOR 'n H0 IS A CURRENTLY LICENSED WHICHEVER IS YORE STRINGENT ~ - a - + 2. ALL EQUIPMENT SHALL BE COMPLETE IN EVERY RESPECT WITH ALL DEVICES AND ACCESSORIES PROVIDED TO MEET THE DESIGN INTENT SYSTEM IS INDICATED ON THE DRAWINGS, ONLY THE 15'-0' Of THE RETURN AIR DUCT CLOSEST 10 THE AIR HANDLING UNIT IS TO BE ASSOCIATED AIR SAL''KtNG COONUI (UK) OR NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBO) BALANCING CONTRACTOR. NO �_ Ct1 a r. w AND OPERATION OF THE SYSTEMS SHOWN ON THE DRAWINGS AND SPECIFIED HEREIN. INSULATED. LINER IS 10 HAVE A COATED SURFACE EXPOSED TO AIRSTREAM TO PREVENT EROSION. APPLY ADHESIVES AND MECHANICAL OTHER BALANCE REFAY! WI.L BE ACCEPTED. ALL BALANCING WORK MUST BE COMPLETE AND DONE IN ACCORDANCE WiTH THE MOST .- a 1. THIS CONTFUCICR SHALL DO ALL CUTTING, CHASING AND CHANNELING REQUIRED FOR ANY WORK UNDER THIS DIVISION. CUT'' ; SHALL RECENT STANDARDS - kCIETY AND AS A MIKMUM SHALL INCLUDE THE INFORMATION AS SHOWN IN THE AIR BALANCE REVIEW -- �` ~ NAVE PRIOR APPROVAL BY LSDAC PROJECT MANAGER AND THE LANDLORD. ALL PATCHING SHALL BE BY G.C. AND SHALL MATCH THE FASTENERS AS RECOMMENDED BY SYACNA AND THE MANUFACTURER TO PREVENT LINER SEPARATION FROM THE DUCT. ALL TRANSVERSE OF ALL COSTS FOR TESTING AND 9AUNCvG SHALL BE INCLUDED IN THE B10 HOWEVER, li WILL BE r. 3. EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE wtlN THE MAhUFAC1URER'S INSTRUCTIONS. EDGES TO BE COATED WITH ADHESIVE. CHECKLIST ON M02. �_'+' SURROUNDING SURFACES. THE G.C. THAT WILL .-n'F,ALT DIRECTLY WITH THE AIR BALANCING CDMPANY. ,; 4. SECONDARY DRAIN PANS ARE REQUIRED 10 BE INSTALLED BENEATH ALL INDOOR AIR CONDITIONING EQUIPMENT WITH THE EXCEPTION OF S. THE MECHANICAL CONTRACTOR SHAD MAKE ALL FiNAL MECHANICAL CONNECTIONS AS REQUIRED FOR A COMPLETE AND OPERATING VAV BOXES. SECONDARY PANS ARE TO CAPTURE POTENTIAL TEAKS FROM THE ENTIRE UNIT. PROVIDE CONDENSATE PUMPS, AS REQUIRED. 3. ALL ROUND DR OVAL SUPPLY AIR DUCTWORK SHAH BE EXTERNALLY INSULATED WITH A MINIMUM OF 1 1/2' THICK, 1� DENSITY 1. SYSTEM. CONDENSATE SHAH BE DIRECTED TO MOP $INK OR A$ SPECIFIED ON PIANS. (R-5.6) DUCT WRAP WITH VAPOR BARRIER. VAPOR BARRIER IS TO BE MAINTAINED THROUGHOUT DUCT SYSTEM, EXCEPT LINED DUCTWORK 2. FINAL TESTING, AGJLI ,w; AND BALANCING REPORT MUST BE COMPLETE AND SuBYITTEO WITH FINAL CLOSE-OUT DOCUMENTS TO LSDAC SPECIFIED ELSEWHERE AND EXHAUST DUCTWORK. ALL JOINTS MUST BE OVERLAPPED AND TUCKED SO THAT NO INSULATION FIBER IS 1 WEEK PRIOR TOM AhDt$ING PAT[. A. THE MECHANICAL CONTRACTOR SHALL NOTIFY THE GENERAL CONTRACTOR TO CONTACT THE HVAC EOUIPMENT MANUFACTI'RER'S VISIBLE. EXTEND DUCTWORK INSULATION WITHOUT INTERRUPTION THROUGH WALLS AND OPENEFRAT;ONS. S FLOORS 3 THE HVAC CONTRAS - ,-A'.L BE PRESENT FOR AIR BALANCE ?0 vfPlFr ACCESSIBILITY TO ALL DEVICES, VERIFY ALL OPERAiING REP. FOR START-UP. (SEE 'LENNOX GENERAL NOTES' ON SHEET M2.3) C. EOUNI ENT FURNISHED SY LIMITED STORE DESIGN AND CONSTRUCTION ♦. All INSULATION SHAH HAVE A FUME SPREAD RATING OF NOT MORE THAN 25 AND A SMOKE DEVELOPED RATING OF NO NIGHER THAT SEQUENCES AND IFAS -_ NE* FILTERS IN ALL l'YITS JUST PRiOR TO THE AIR BALANCE. THE COMPLETE AIR BALANCE SMALL TAKE a' 50 WHEN TESTED IN ACCORDANCE WITH ASTM C 411, OR AS RiOUIRED BY LOCAL CODES. PUCE WITH OUTSI`f -: 'AMPERS IN MINIMUM POSITION, EXCEPT AS NOTED OTHERWISE. HVAC CONTRACTOR SHALL ALSO INSTALL A C. CODE& I 1, THE FOLLOWING EQUIPMENT IS FURNISHED BY LSDAC AND INSTALLED BY THIS CONTRACTOR UNLESS SPECIFICALLY NOTED OTHERWISE. NEW SET Of FITTER ;;AY PRIOR TO MERCHANDISING REFER TO RESPONSIBIUiY SCHEDULE AND PUNS FOR APPLICABILITY. j, 11 1. ALL WORK SHALL CONFORM TO THE LANDLORDS' CRITERIA, THE STATE'S, COUNTY'S, CITY'S AND LOCAL CODES AND ORDINANCES, M. HYDRONIC PIPSNN' 4 BALANCE LANDLORD rE:A QUANTITIES TO WITHIN 5% OF THAT INDICATED ON THE DRAWINGS. ANY REQUIRED CHANGES IN SHEAVES, - SAFETY AND HEALTH CODES, NFPA CODES, ENERGY CODES AND ALL OTHER APPLICABLE CODES AND REQUIREMENTS. THIS CCiTKACTOR A. HVAC UNITS. BELTS OR PUUEYS 1,'EDEG TO ACHIEVE SPECIFIED FLOW RATES SHALL BE PERFORMED BY THE HVAC CONTRACTOR WITH NO ADDITIONAL a L 6 SMALL INQUIRE INTO AND COMPLY WITH ALL APPLICABLE CODES, ORDINANCES, AND REGULATIONS. THIS CONTRACTOR SHALL NCIUGE B. TOILET EXHAUST FANS- 1. FURNISH AND INSTALL A COMPLETE HYDRONIC PIPING SYSTEM IF APPLICABLE REFER TO PLANS TO DETERMINE IF A HYDRONIC SYSTEM COST TO L5DtC. A'q f r a ANY CHANGES REQUIRED BY COC"' IN THE BID AND IF THESE CHANGES ARE NOT INCLUDED IN THE BID, THEY MUST BE OCtUFIED AS C. BASE90ARD, CABINET AND UNIT HEATERS. IS REQUIRED. *I-G � LS9 _' A SEPARATE UNE ITEM IN THE BIL. tfTER CONTRACT IS AWARDED, CHANGE ORDERS FOR INCREASED COSTS DUE TO COOS K TOES WILL D. DIFFUSERS, GRILLES AND REGISTERS. ` 1i•► N o W u NOT BE ACCEPTED 9Y LSDAC. E. TEMPERATURE CONTROLS- S ALL CONTROL SFQUfa'CS SHALL BE TESTED (INTERLOCKED EQUIPMENT, SMOKE DETECTORS, SPOKE EVACUATION, ECONOAIIER, FICO .�� NI o'►, +8� , �3 2. PIPING AND OPERA i ING STAY ! RECORDED IN THE BALANCE REPORT. Y Z 5 Ii"41t y`-' G-N ;H, ft , ft '4 2. ALL DUCTWORK, ROOF OPENINGS AND CAPS NECESSARY TO PROVIDE A COMPLETE TOILET EXHAUST SYSTEM SHALL BE FURNISHED AND A. HYDRONIC PIPING FOR CHILLED WATER, CONDENSER WATER AND/OR HEATING WATER SHALL BE ASTM A-53, SCHEDULE 40, ERW, 6. AIR BALANCING CON1'A"OR iS TO .'ONFIRM OVERRIDE OF MINIMUM OUTSIDE AIR INTAKE UPON CO2 MONITORING CONF,RMATION. FOR cXax-H ,'g,2Nn Itxvz �f D. LICENSE&, PERMIT8, INSPECTIONS & FEES INSTALLED BY THIS CONTRACTOR. / �'i� : iso: o o t i 9i 4 i BUCK STEEL PIPE WITH PLAIN ENDS. INSTAII STEEL PIPE WITH WELMO JOINTS WHERE PIPE IS 2-1/1 INCH AND LARGER. CO2 YON(TORING GOR'ACT. SEE ALR BALANCE COVER SHEET M02.3. g 5 ,s a;; :=r j _: INSTALL STEEL PIPE WITH THREADED JOINTS AND FITTINGS. INSTAII TYPE K' COPPER PIPE FOR 2 INCH ANO SMALLER PID[, 7, THREE COPIES OF TH. BALANCE REPORT SMALL BE SUBMITTED THROUGH THE GENERAL CONTRACTOR TO LSDAC FOR APPROVAL. THE °.`�;Y riozN;< =Y o d- "' a W. 1. T NIS CONTRACTOR SHAD OBTAIN AND PAY FOR AL1 LICENSES, PERMITS, INSPECTIONS, ANO ICES REQUIRED OR REUTEO TO it!5 WORK. p METAL DUCTWORK - 1N0 FIBERGLASS DUCT ALLOWED PROVIDE DIELECTRIC UNIONS BETWEEN DISSIMILAP METALS. ALL PIPING SHALL BF IN STRICT CONFORMANCE WITH ASTM, ASA, AND R_ k LANDLORD'S REQUIREMENTS. WHICHEVER IS MOST STRINGENT. UNIONS OR FLANGES MUST BE USED AT EQUIPMENT CONNECTIONS GENERAL CONTRACTOi SHALL VERIFY THE COMPLETENESS OF THE REPORTS PRIOR TO SUBMITTING TO LSDAC. SUBMIT ONE ^DRY OF t'}` Jc -_ s ca° -i 1 FURNISH TO THE LSDAC'S PROJECT MANAGER ALL CERTIFICATES OF INSPECTION AND FINAL INSPECTION APPROVAL AT CGYYItIION OF 1. NO DUCTWORK SHALL BE FABRICATED PRIOR TO JOB SITE V!SIT AND APPROVAL BY THE GENERAL CONTRACTOR. A SKETCH MUST BE fINAI i4°PROVED AIR ► ANCE REPORT TO MALL GENERAL MANAGER. c a : 8- : `� . ' PROJECT. WHERE SERVICE OR REMOVAL MAY BE REQUIRED. t SUBMITTED INDICATING DEVIATIONS FTkOY DESIGN AND MUST BE APPROVED BY ISUdCS PROJECT MANAGER PRIOR TO FABRICATION OR 8 THE BALANCING CON+ - "OR SHALL PERFORM ALL APPLICABLE TESTING AND BALANCING FUNCTIONS REQUIRED FOR iHf SYSTEM .,.NNW � 'TS Sit 1~ INSTALLATION. I �• W� _T YVou= `N B. ALL PIPING AND EQUIPMENT SMALL BF. PRESSURE TESTED WITHOUT LEAKAGE Al A MINIMUM PRESSURE Of 125 PSI. %; .; N E. TRADE NAMES. MANUFACTURERS AND SHOP DRAWINGS DESIGNED ON THESE AWINGS. ALL SYSTEMS UNABLE TO BE COMPLETELY BALANCED AT THE TIME OF ORIGINAL BALANCE MUST BE _ .'! g - _15 0Qo8q 2. EXCEPT AS OTHERWISE INDICATED, FABRICATE AND INSTALL RECTANGULAR AND ROUND DUCTWORK WITH GALVANIZED STEEL, IN BALANCED IN FUTURE AT NO ADDITIONAL EXPENSE TO LSO&C THE BALANCING CONTRACTOR SHALL RECHECK ANY ITEMS THAT LSDdC R • ., :• o kI'E E 9 1- WHERE TRADE NAMES AND MANUFACTURERS ARE USED ON THE DRAWINGS OR IN THE SPECIFICATIONS, THE EXACT EQUIPYEN; SHALL BE ACCORDANCE WITH SYACNA 'HVAC O11C1 CONSTROCTION TAN AR T i I C. ALL HYDRONiC PIPING AND ECUIPMENT CONNECTED TO THE HVAC PIPING SYSTEM SHALL BE CLEANED AND FLUSHED REMOVE. M N NG A T TO �' <a 0%,i q. ;:.j,2, ,q�`:E� S D DS Of HE LA EST EDTION. WHERE OTHER CODES ARE ENFORCED, DEEMS ECESSARY A ADDITIONAL COS LSDAC It Y.x -„ ZN USED AS A MINIMUM FOR THE BASE BID. MANUFACTURERS CONSIDERED AS AN EQUAL OR BETTER IN ALL ASPECTS 10 THAT SPECIFIED CLEAN, AND REPLACE STRAINER SCREENS FELL TENANT'S SYSTEM WITH DOMESTIC WATER AND VENT ALL PIPING AND EQUIPMENT 11,T Y W: 4 J W`0a f t, - Il N o�Cf. (.E. UMC, SOCA ETC.) USE THE M051 STRINGENT CODE FOR DUCT CONSTRUCTION STANDARDS. PRIOR TO CONNECTION TO THE UNDIORD'S SYSTEM- CONTRACTOR SHALL NOT Flll TENANT'S SYSTEM WITH WATER FROM THE .5`- S • N q z ffi z WILL BE BOATER? TO APPROVAL IN WRITING BY F A Y PROJECT MANAGER THROUGH SLOP DRAWING SUBMITTAL PROCESS F R LANDLORD'S SYSTEM UNLESS SPECIFICALLY INSTRUCTED TO DO SO FROM THE UNDCOR�J'S FIELD REPRESENTATIVE. ANY RUNS END OF SECTION 166N � tt�$ NvB;iI ACCEPTANCE PRIOR TO INSTALLATION. THE USE OF ANY UNAUTHORIZED EQUIPMENT SHAH BE REPLACED AT THE CONTRACTORS 3. EXCEPT WHERE OTHERWISE INDICATED, CONSTRUCT DUCT SYSTEMS TQ THE FOLLOWING PRESSURE CLASSIFICATIONS THRU A r,HASF OR SHAFT WILL BE DONE WITH FEWEST JOINTS POSSIBLE USING THE LONGEST LENGTH Of HARD COPPER PIPE �:�N�� ;;:v�.1 WIt. �WIa, EXPENSE AVAILABLE, SHOULD A JOINT BE REQUIRED, CONTRACTOR SHAH MAKE ALL EFFORTS TO KEEP THE JOINTS IN ACCESSIBLE AREAS. ABBREVIATIONS - HVAC s _ : N:T o s� SUPPLY DUCTS: 1' W.G., POSITIVE W �j Q9 H ii d I N S � 2. GENERAL CONTRACTOR SHALL SUBMIT ONLY SUBSTITUTION REQUESTS TO ISOdC PROJECT MANAGER FOR APPROVAL SUBMISSIONS SHALL RETURN AND EXHAUST DUCTS: 2' W.G., NEGATIVE D. PRIOR TO CONNECTION 10 THE IANplORO'S SYSTEM, CONTRACTOR SHAD MAIN WRITTEN CONFIRMATION FROM THE LANDLORD'S uq4� >: ° `S`�YS '" 'i21 i VN-BE MADE EARLY ENOUGH IN PROJECT TO ALLOW FOUR i4) WORKING DAYS FOR LSDAC PROJECT MANAGER'S REVIEW WITHOUT CAUSING ,� DELAYS OR CONFLICTS TO THE JOB'S PROGRESS- SUBMITTALS SHALL BEAR THE STAMP ANO/OR THE SIGNATURE OF THE GENERAL EXCEPT WHERE OTHERWISE INDICATED, USE DUCT SEAIANiS Of THE f011OwiNG PRESSURE CLASSIFICATIONS: FIELD REPRESENTATIVE, THAT ALL TESTING, FLUSHING, AND PSUFER FILLING OF THE TENANT'S SYSTEM HAS BEEN COMPLETED IN MBC AMERICAN AIR )_N IL 10 INSIDE DIAMETER ,°�r W� � g&^Z� ��trI ,et TIC r, V; I: I<" 1'�ae �51,4N ' CONTRACTOR ANO TME SUBCONTRACTOR SHOWING THAT HE HAS REVIEWED AND CONFIRMED THAT THE SUBMITTALS ARE IN CC•FOWMANCE ACCORDANCE TO THE LANDLORD'S R(OUIREMENTS AND THAT THE TENANT'S SYSTEM iS READY 10 BE CONNECTED TO THE A/C AIR CONDITION! _ti' IN INCH T!^ 3•' :s e„ ;a�;u wi WITH THE CONTRACT DRAWINGS AND SPECIFICATIONS OR INDICATE WHERE EXCEPTIONS HAVE BECK TAKEN. SUPPLY DUCTS: CUSS B - 3' W.G. LANDLORD'S SYSTEM. ABV ABOVE RETURN AND EXHAUST DUCTS: CUSS C - 1' W.G. AD ACCESS DOOR KW KILOWATT rr^^ � p 3. VALVES AFD APPROVED FIRE •4'ER W N Lo F. GUARANTEE _ I,J IN ACCORDANCE WITH THESE CONSTRUCTION AND SEALANT PRESSURE CLASSIFICATIONS, MAXIMUM DUCT AIR LEAKAGE WILL. NOT EXCEED AFT ABOVE FINISH I 4 L LONG L O l/7 uz N 1. THiS CONTRACTOR SHAH GUARANTEE All MATERIALS AND WORK PROVIDED UNDER HIS CONTRACT AND SHALL MAKE GOOD, Rt rA1R OR 5% AS REQUIRED FOR FINAL AIR BALANCE APPROVAL A. GATE VALVES, 1-I4CH AND SMALLER: CUSS ISO, BODY AND UNION 80NKEi OF ASTM B 61 CAST BRONZE WITH THREADED OR AMU AIR MANDUNG , Lb POUND Y J 0 0 It REPLACE AT HIS OWN EXPENSE, ANY DEFECTIVE WORK, MATERIAL, OR EQUIPMENT WHICH MAY BE DISCOVERED WITHIN A PERIL ) OF 12 SOLDER ENDS, INTEGRAL SEAT, RENEWABLE SOLID BRONZE WEDGE DISC, RISING STEM, SCREWED BONNET AND RE-PACKABLE AP ACCESS PANEL LF LINEAR FEET M/�� W. MONTHS FROM THE DATE OF ACCEPTANCE (IN WRITING) OF THE INSTALLATION BY LSDAC'S PROJECT MANAGER. EXTENDED WA, '.ANTIES < UNDER PRESSURE. BAIL VALVES ARE ACCEPTED AS AN EQUAL SUBSTITUTION" ASHRAE AMERICAN SOCH OF HEATING, REFRIGERATING UN DIFF LINEAR DIFFUSER 0 LL ARE AS SPECIFIED WITH INDIVIDUAL EQUIPMENT. 4 ROUND DUCTWORK SHALL BE GALVANIZED STEEL WITH SPIRAL LOCK_EAM CONSTRUCTION FOR ALL SIZES 14' DIAMETER AND URGER. AND AIR CONCH ANG HEATING, (l) LINED DUCT ROUND DUCTWORK SIZES 13' DIAMETER AND SMALLER MAY BE SNAP-LOCK CONSTRUCTION. ALL SNAP-LOCK SEAMS SHALL BE SEALED B. GATE VALVES, 2-1/2 INH AND URGER: CLASS 125 CAST IRON BODY, RENCWABLF BRONZE SEATS AND SCUD WEDGE DISC, AS DESCRIBED IN THESE SPECIFICATIONS. ROUND FITTINGS SHALL Sr. GALVANIZED STEEL WITH SPOT WELDED AND BONDED RISING STEM, FLANGED EN' WAX MAXIMUM DS, AND RE-PACKABI E UNDER PRESSURE. BOD BACK DRAFT DAMPERS 2. THE EQUIPMENT MANUFACTURER SHALL GUARANTEE AND PROVIDE A 12 MONTH GUARANTEE TO ISDdC FROM THE GATE OF ACCEPTANCE. CONSTRUCTION. THIS CONTRACTOR SHAD WARRANTY THE INSTALLATION OF THIS EQUIPMENT AND WILL BE RESPONSIBLE FOR ANY DAMAGE ANI'•/OR BEL BELOW MOM THOUSAND BTU PER HOUR C. SWING CHECK VALVES, 2-INCH AND SMALLER: CUSS 1511, CAST BRONZE BODY AND CAP CONFORMING TO ASTM 8 61 WITH BHP BRAKE HORSEPOWER MCA MINIMUM CIRCUIT AMPACIIY MALFUNCTION CAUSED BY THE INSTALLATION. THIS CONTRACTOR SHALL NOT BEAR ADDITIONAL WARRANTIES BEYOND A COMPLETE 5• ROUND SPIRAL GALVANIZED STEEL DUCTWORK MAY BE USED IN PUCE OF RECTANGULAR DUCTWORK IN HORIZONTAL APPLICATION WHEN r WORKING SYSTEM. HORIZONTAL SWING, Y-PATTERN, RENEWABLE BRONZE DiSC. AND HAVIN, THREADED OR SOLDERED ENDS. BLDG BUILDING MO MOTORIZED DAMPER t/'� ABOVE CEILING CLEARANCES PERMITS AND EQUIVALENT FREE AREA IS MAINTAINED, WITH THE FOLLOWING EXCEPTION; All SUPPLY AND BOD BOTTOM Of DCN' MFR MECMANICAI YECH MANUFACTURER RETURN DUCTWORK WITHIN 15 FEET OF THE AIR HANDLER MUST BE RECTANGULAR AND INTERNALLY LINED ONCE A TRANSITION IN THE ml V/ % G RECORD DRAMIINGS DIRECTION OF THE AIRFLOW TO SPIRAL HAS BEEN DONE, DUCT VALE NOT BE ALLOWED TO REVERT TO RECTANGULAR WHERE ROUND D. SWING CHECK VALVE. 2-1/2 INCH AND URGER: CUSS 125 CAST IRON BODY AND BOLTED CAP, HORIZONTAL SWiNG. RENEWABLE BOP BOTTOM OF PIP MOCP MAXIMUM OVER CURRENT PROTECTION v DUCT SUBSTITUTION WILL TAKE PUCE, SUBMIT A SKETCH AND CHART SHOWING EQUIVALENT ROUND CONVERSIONS Of RECTANGULAR BRONZE DISC, FLANGED ENDS AND CAPABLE Of BEING REFITTED WHILE THE VALVE REMAINS IN THE UNE, BTUH BRITISH THERMA rT PER HOUR MTD MOUNTED . e f•- I. THIS CONTRACTOR SHALL MAINTAIN ONE SET OF DRAWINGS ON THE JOB SITE UPDATED WEEKLY TO RECORD All DEVIATIONS ROM r MTR MOTOR Z U CONTRACT DRAWINGS, SUCH AS: DUCTWORK TO LSOA� PROJECT MANAGER'S FOR APPROVAL PRIOR i0 FABRICATION OR INSTALLATION w E. COMBINATION BALANCING AND SHUr(1(F VALVES x BELL d GOSSETT CIRCUIT SETTER WITH LOCKING SET POINT, A CIRCUIT SETTER CAP CAPACITY Lig „ O --) 11 BALANCE WHEFL MUST BE INCLUDED WITH 0 d M MANUAL. TACO OR GRISWOLD ARE CONSIDERED AS EQUAL CO CEILING DIFFUSE` .K CONDENSATE DRAIN NF88 NATIONAL ENVIRONMENTAL BALANCING DUREAU W f_ O A. LOCATION OF CONCEALED PIPING VALVES AND DUCTS. 6. INSTALL FACTORY MANUFACTURED DOUBLE THICKNESS TURNING VANES IN RIGHT ANGLE ELBOWS IN MAIN DUCT PER LATEST EDITION OF CFM CUBIC FEET PEf r 4UTE N.G. NORMALLY CLOSED U Q m B. REVISIONS, ADDENDUM, AND CHANGE ORDERS. SMACNA. 4 PIPING SPECIALTIES CHWR ENTICED WATER N.I.C. NOT IN CONTRACT Q w a- RN Sc W CHWS CHILLED WATER 'LY N.O. NORMALLY OPEN C SIGNIFICANT DEVIATIONS MADE NECESSARY BY FIELD CONDITIONS, APPROVED EQUIPMENT SUBSTITUTIONS, AND CONTRACTOR'S 1. INSTALL RIGID ROUND AND RECU.NGUUR METAL DUCT WITH SUPPORT SYSTEMS INDICATED IN SYACNA STANDARDS SUPPORT HORIZONTAL A. PRESSURE/TrUPERATURE TEST PLUGS (PETE'S PLUG) - 1/4 INCH NPT FITTINGS TO RECEIVE EITHER A TEMPERATURE OR CLG CEILING, COOUh N/A NOT APPLICABLE � Q w COORDINATION WITH OTHER TRADES. DOUBLE STRAP MANGERS ON EACH CONN CONNECTION OR HECTOR NTS NOT TO SCALE a, U Q 1-1 DUCES WITHIN 1 FEET OF EACH ELBOW AND WITHIN 1 FEET OF EACH BRANCH INTERSECTION USING PRESSURE PROBE, I/8 INCH O.D. FITTING AND CAPS SHAH BE BRASS WITH VALVE OGRE OF NORUEI, RATED AT 400 PSIG 0 TO CONi CONTINUOUS SIDE OF FITTING. SUPPORT VERTICAL DUCTS AT A MAXIMUM INTERVAL OF 16 FEET AND AT EACH FLOOR. NO WOOD SHAM BE USED TO NEW 10 I oa � z 2 AT COMPLETION OF THE PROJECT AND BEFORE FINAL APPROVAL, THIS CONTRACTOR SHALL MAKE ANY FINAL CORRECTIONS TO DRAWINGS SUPPORT OR BRACE DUCTS. PROVIDE SWAY AND SEISMIC BRACING AS REQUIRED BY STATE AND LOCAL CODES OR BY LANDLORD. 200 DEGREES F. (N) AND CERTIFY THE ACCURACY OF EACH PRINT BY SIGNATURE THEREON. FAILURE TO KEEP THESE RECORDS WILL ALLOW LSDAC TO CONiR CONTRACTOR DIRECT THE GENERAL CONTRACTOR TO PROVIDE THESE RECORDS Al HIS EXPENSE PRIOR TO FINAL PAYMENT. B. STRAINERS - 'Y' PATTERN STRAINERS, 125 PSIG, CAST IRON BODY WITH PERFORATED STAINLESS STEEL SCREEN, THREADED FOR COP COEFFICIENT OF ,JKMANCE 080 OPPOSED BUOi DAMPER W LTJ to ul) 8. WHERE DUCTS PASS THROUGH ROOFS AND FLOORS, PROVIDE AS MINIMUM ALL B Xi CAULKED KWITH STEEL ANGLE FRAMES ri EACH SIDE 2 INCHES AND SMALLER, FLANGED FOR 2-1/2 INCHES AND LARGER. SCREEN OPENING SIZE AT 0.033 INCH FOR HEATING AND CSFO COMBINATION Elf ',WOKE DAMPER OC OUTSIDE DIMENSION OR DIAMETER Q LTJ I W d N. DISCREPAPCIES M DOCUMENTS OF OPENING. THE ANNULAR SPACE BETWEEN DUCT AND ANGLE FRAMES SHAH BE CAl1LKED WITH SILICONE SEALANT OR FIREPROOFED CWR CONDENSER WA1 ?C1URN OPNG OPENING Q Q O Q O AS REQUIRED BY ASSEMBLY FIRE RATING. 1/8 INCH FOR CHILLED OR CONDENSER WATER. PROVIDE WITH BIOwDOWN VALVE WITH NOSE END FITTING. CWC CONDENSER WA" CPPIY OSA OUTDOOR AIR O 4 Q .- a O 1. DRAWINGS (PUNS, SPECIFICATIONS, AND DETAILS) ARE DIAGRAMMATIC AND INDICATE THE GENERAL LOCATION AND INTENT OF HE 5• INSuuT1oN DB DRY BULB, Do Cr P PUMP to L/T MECHANICAL SYSTEMS. WHERE DRAWINGS, EXISTING SITE CONDITIONS, SPECIFICATIONS OR OTHER TRADES CONFLICT OR ARE UWCLEAR, ALL JOINED AND SEAMS SHAM BE SEALED WITH Y WIDE, GBY UNIIBER-FABRIC REINFORCED TAPE. JOINTS ALSO SHALL BE RIVE OR ADVISE THF GENERAL CONTRACTOR IN WRITING, PRIOR TO SUBMITTAL Of BID. THE GENERAL CONTRACTOR IS RESPONSIBLE TO ADVISE CONNECTED WITH SHEET METAL SCREWS. L10U10 SEALANTS BY UNITED MCG1ll CORP., Dow CORNING, MIRACLE ADHESIVES AND DEG DEGREE PD PRESSURE DROP M 150dC'S PROJECT MANAGER, IN WRITING, Of VARIATIONS TO CONTRACT DOCUMENTS PRIOR TO SUBMISSION Of BID. OIHERWISC, LSDAC $UREBOND INC. WILL RE ACCEPTED IN UEu Of TAPE. A. ALL HYDRONIC PIPING FOR CHILLED WATER AND/OR HEATING WATER (NOT INCLUDING CONDENSER WATER UNLESS SPECIFICALLY OCT DETAIL PIRG PLUMBING Z (nZ N NOTED OTHERWISE), VALVES, FITTINGS, AND ACCESSORIES SHALL BE INSULATED FOR PIPE SIZES UP TO 2 INCHES, INSULATE DIADIAMETER POC POINT OF CONNECTION O N PROJECT MANAGER'S INTERPRETATION Of CONTRACT DOCUMENT$ OR CONDITIONS SHALL BE FINAL WITH NO ADDITIONAL COMPENSATION 10. SOFT ELASTOMER BUTYL GASKET WiTH ADHESIVE BACKING SHALL BE USED TO SEAL FLANGED JOINTS. WITH 1 INCH THICK (K=0.23 0 75'F) FIBERGLASS INSULATION WITH ALL SERVICE JACKET AND VAPOR BARRIER. FOR PIPE SIZES OIM pIMENS10N PRV PRESSURE REDUCING VALVE F Z 0 a, mk PERMITTED. 2-1/2 INCHES AND URGER, INSULATE WITH 1-1/2 INCH THICK (K=0.13 0 751) FIBERGLASS INSULATION WITH ALL SERVICE DISC"H DISCHARGE PSI POUNDS PER SQUARE INCH a 06 Q Z_ L PHA8010 REOUNtEMENTS 11. DUCT TRANSITIONS SHALL NOT EXCEED 30 DEGREES SLOPE EXCEPT AS SPECIFICALLY NOTED OTHERWISE. JACKET AND VAPOR BARRIER Dl DOOR LOUVER 2 = O U I ON DOWN RA RETUkN AIF O 1. THIS CONTRACTOR IS TO INCLUDE IN HIS BID ALL NECESSARY SERVICE REQUIRED TO KEEP THE OPERATING PHASE OF THE STORE'S 12. PROVIDE ACCESS TO ALL MOTORIZED DAMPERS, PIPE DAMPERS, CONTROLS. AND OTHER HEMS IN DUCTWORK THAT REQUIRE SERVICE OR S. INSULAiI)N Al ALL HANGERS FOR PIPING 2 1/2 INCHES AND LARGER SHALL BE HARD AND NON-COMPRESSIBLE. DTR DOWN THRU ROD RAG RETURN AIR GRILLE LJ 0) Q W W HVAC, PLUMBING AND SPRINKLER SERVICE IN OPERATION CONTRACTOR MUST SCHEDULE IN WRITING WiTH LSDAC'S PROJECT MANAGER INSPECTION, IF THE ACCESS PANEL LOCATION IS EXPOSED TO THE SALES AREA, IT MUST BE APPROVED BY LSOAC'S PROJECT MANAGER DWG DRAWING RAI-. RETURN AIR REGISTER z Z Ory 3 0,� CL a AND THE LANDLORD ONE WEEK PRIOR TO ANY SHUT DOWN Of THE HVAC. PLUMBING OR FIRE PROTECII(NI ;YSTEMS. PRIOR TO INSTALLATION. IN HARD CEILINGS, LAY-IN SUPPLY AND RETURN AIR DIFFUSERS, GRAZES AND REGISTERS WITH PLASTER C. ALL INSULATION $HAIL NAVE A FUME SPREAD RATING OF NOT MORE THAN 25 AND A SPOKE DEVELOPED RATING OF NO HIGHER RG RETURN GRILLE = (I 3 O � cc FRAMES MAY BE USED AS ACCESS LOCATIONS WHEN WITHIN 3'-0' OF DEVICE. THAT 50 TO CONFORM WITH THE REQUIREMENTS Of THE NFPA. EA EXHAUST AIR PH RELATIVE HUMIDITY _) V) J DEMOLITION EAG EXHAUST AIR GR, RPM REVOLUTIONS PER MINUTE Li U) LAJ a 2$ w U 13. ALL DUCTWORK SHALL BC INSTALLED WITH INSICC CLEAR DIMENSIONS AS NOTED ON DRAWINGS. WHERE DUCTWORK SIZE 15 LARGER 0. PROVIDE ZESTON OR EQUAL INSULATION FITTINGS FOR All TEES, ELLS OR SPECIALTY FITTINGS. UR EXHAUST AIR P•EI O Q Q a0 Q O N .16 13. I. THIS 'ONTRACTOR SHALL BE RESPONSIBLE FOR [HE COORDINATION OF THE D(MOUtION Of EXISTING WORK AND THE DEMOLITION THAN CONNECTED DEVICE (IE. VAV BOX, DIVFUSER, REGISTER) SMOOTH DUCT TRANSITIONS ARE 1O TAKE PUCE JUST PRIOR TO DEVICE EAT ENTERING AIR TEM-,MATURE SA SUPPLY AIR xLam a- U) CO U WV) PROVIG'D BY THE GENERAL CONTRACTOR COORDINATE WITH THE GENERAL CONTRACTOR ANY EXISTING EQUIPMENT REQUIRED TO BE LEFT CONNECTION. SE[ MECHANICAL DRAWINGS FOR DETAIL. 6. GENERAL INSTALLATION EC ELECTRICAL CONT10c TOR SAG SUPPLY AIR GRILLE a m V1 O+ F- V1 INTACT. EER ENERGY EfFI Aky RATIO SAP SUPPLY AIR REGISTER A. INSTALL WATER MAINS WITHOUT PITCH. USE ECCENTRIC REDUCING COUPLINGS AT CHANGES IN SIZE WITH THE TOP OF PIPES AT EF EXHAUST FAN SCH SCHEDULE REVISIONS EFF EFFICIENCY SENS SENSIBLE .• 2. THIS CONTRACTOR SHALL INCLUDE, AND Will B[ HELD RESPONSIBLE FOR, THE REMOVAL Of All EXISTING HVAC UNITS, H/DFONIi, E. MEDIUM PRESSURE DUCT SAME ELEVATION. EXHAUST GRIME SF SUPPLY FAN, SQUARE F001 PIPING, REFRIGERANT RECAPTURE, EXHAUST FANS, ETC. AND ASSOCIATED ROOF CURBS NOT 10 BE REUSED ON THIS PROJECT, 'jNLESS EC SPECIfICAU.Y NOTED OTHERWISE. CONTRACTOR MUST VERIFY WITH THE LANDLORD All PRESUMED ABANDONED EQUIPMENT, Pr S. 1. WHERE DUCTWORK IS SPECIFICALLY NOTED AS MEDIUM PRESSURE, 11 SMALL BE CONSTRUCTED IN ACCORDANCE WITH SYACNA B. BRANCHES TO UNITS BELOW MAINS TO BE TAKEN FROM BOTTOM Of MAINS AT A 45 DEGREE ANGLE, PITCH DOWNWARD TOWARD CLEC ELECTRIC SYACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS Le 40 BRANCHES TO UNITS ABOVE PAINS TO BE TAKEN FROM TOP Of MAINS ATA 4S DEGREE ANGLE P!TCHEO UPWARD ELV EIEVAT.ON NATIONAL ASSOCIATION ;I'{f DUCTWORK, AND EQUIPMENT PRiOR TO REMOVAL ROOF CURRS SHALL Bf REMOVED AND THE ROOF PATCHED. ALL EXTRANEOUS ITEMS IN STANDARDS FOR A PRESSURE RATING OF 4 INCHES WATER COLUMN MINIMUM OR GREATER AS REQUIRED BY LANDLORD. ELV ENCLOSURE SOV SHUT-OFF VANE ANY' 1' THE SPACE OR ON THE ROM NOT APPLICABLE TO THE NEW WORK MUST BE REMOVED AND ROOF/WALL/FLOOR PATCHEDIRE"AIRED TO TOWARDS UNITS PITCH NOT LESS THAN i' TO 10 FEET. �/d v & EQUIV EQUIVALENT SP STATIC PRESSURE /- YA1CH EXISTING STRUCTURE. EXISTING ABANDONED PIPES, DUCTS, OR EQUIPMENT IN THE ELIXIR, EMBEDDED IN CONCRETE OR Y. ALL GAUGES AND REINFORCEMENT MUST NEE[ W11N THE LATEST EDITION OF SMACNA STANDARDS FOR MEDIUM PRESSURE DUCT AND C. SEE MECHANICAL DETAIL D:AWINGS FOR APPLICABLE DETAILS. ESP EXTERNAL STATIC :T 50 SQUARE OTHERWISE INACCESSIBLE ARE TO BE CUT OFF AND SEALED BCLOW OR WITHIN FLOOR OR WALT. LEVEL WHEN THEY ARE NOl TO BE WITH THE LANDLORD'S CRITERIA. ESP ELECTRIC WATER f� SO FT SQUARE FEET �1F�F�5-r' ,t 95 REUSED IN THIS PROJECT. IF REWJIRED BY LANDLORD OR CODES, ABANDONED PIPING AND/OR DUCTWORK MUST BE REMOVEC TO POINT D. PROVIDE UL LISTED FIRE STOPPING SYSTEM AROUND ALL PIPING PENETRATIONS THROUGH RATED WALLS. PENETRATIONS SHALL EXH EXHAUST SS STAINLESS STEEL /' y OF ORIGIN CONFIRM THE EXTENT OF DEMOLITION PRIOR t0 BIO AND INCLUDE IN BIO PROPOSAL_ 3. COt RWISE R i0 THE LANDLORD'S MEDIUM PRESSURE pUCTWURK SNAIL BE MADE WITH 'LO-LOSS' SADDLE TEE TAPS OR AS MEET THE REQUIREMENTS OF UL DETAILS WL1001 (UNINSULATEO WALL) AND WL5030 (INSULATED WALL). (E) EXISTING TEMP TEMPERATURE 1G�` ]� fTru wd I~ Iti► s OTF ERWISE REQUIRED BY THE LANDLORD. JJ K SLEEVES F 144?f NHEIT TG TRANSFER GRILLE i/R� 7( }/a 4. ALL Ui4[; tktY^. FROM METAI. DUCTWORK SPECIFICATION SECTION APPLY TO THIS SECTION, WITH THE EXCEPTION THAT ALL MEDIUM TSP TOTAL STATIC PRESSURE FCU FAN LULL UNIT TSTAT THERMOSTAT I His CONTRACTOR SHAH PROVIDE SLEEVES TO PROTECT EQUIPMENT OR FACILITIES IN THE INSTAU AnON_ EACH SLEEVE SHAG EXTEND PRESSURE DUCl1VORI' MUST BE WRAPPED WITH INSULATION, NOT LINED. N REFRIGERANT PIPM/0: THROUGH IT'S RESPECTIVE FLOOR, WALL OR PARTITION AND SHALL RE CUT FLUSH WITH EACH SURFACE EXCEPT SLEEVES THAi FF1EX �l%i AC AMPS TYR TYPICAL 1. THIS CONTRACTOR StLALL FURNISH AND INSTALL A COMPLETE REFRIGERANT PIPING SYSTEM BETWEEN THE INDOOR FAN UNITS AND nvn . •c ,s y,�I• PENETRATE THE FIDOR, WHICH SHAH EXTEND 2- ABOVE THE FLOOR CONTRACTOR MUST COORDINATE. THROUGH THE Ul.NDLOFO ANY OUTDOOR CONDENSING UNITS REFER 10 PUNS TO DETERMINE IF A REFRIGERANT SYSTEM IS REQUIRED. I FPM FEFLO ET PER MINUTE UC UNDERCUT OFFICE COPY DATE ISSUED: 11/23/( ', CORE DRILLING OR CUTTING OF OPENINGS IN MASONRY FLOORS OR WALLS, F. VI&RATHM ISOLATHON DEVICE& FPS FTET PER SECOND UH UNIT HEATER 2. ALL SLEEVES AND OPENINGS THROUGH FIR[ RATED WALLS ANO/OR FLOORS SHALL BE FIRE SEALED WITH CALCIUM SILICATE, iIIICONE 1, SPRING VIBRATION MLATiON DEVICES SHAH BE PURNISHfD AND INSTALLED IN ALL SUPPORTS BETWEEN VIBRATING EQUIPMENT (FANS, 2. PIPING LION UNLESS OTHERWISE NOTED DESIGNED BY: MR 'STV' FOAM, '311' FIRE PATEO SEALANTS OR EQUAL SO AS TO RETAIN THEIR FIRE RATING. AIR HANDLERS, ETC.) AND STRUCTURE. ISOLATORS TO BE SIZED ACCORDING 10 LOAD WITH A MIN. I' DEFLECTION. VIBRATING G CAS UTR UP THRU ROOF EQUIPMENT HUNG FROM STRUCTURE SHALL BE ISOLATED WITH RUBBER AND SPRING DEVICES VIBRATING EOUIPMENT SUPPORTED FROM A. REFRIGERANT PIPING SHALT BE TYPE ACR COPPER TUBING TUBING SHALL E CLEAN AND CLEAR OF DFek15, AND EVACUATED GAL GALLONS BRAWN BY MR WITH A DEEP VACUUM PRIOR TO REFRIGERANT CHARGE THE CONTRACTOR SHALL CONFIRM THE DIAMETER OF THE REFRIGERANT GALY GALVANIZED VAV VARIABLE AIR VOLUME CHECKED BY: KH F100R OR DECK SNAIL BE ISOLATED WITH HOUSED SPRING MOUNT DEVICES. PIPING RUNS IN EXCESS OF 50 EOUIVALCNT FEET WITH THE ARCNIlECi, ENGINEER, AND MANUFACTURER FOR All SPLIT SYSTEMS. GC GENERAL CONTRA, VENT VENTILATION, VENTILATOR 3 SIEfVES IN BEARING ANO MASONRY WALLS, FLOORS, AND PARTITIONS SHAH � STANDARD WEIGHT STEEL PIPE FINISHED WITH SMOOTH EDGES FOR OiHf R THAN MASONRY PARTITIONS, THROUGH SUSPENDED CEILINGS, OR FOR CONCEAL.D VERTICAL PIPING, SLEEVES SHALL NO REFRIGERANT PIPING RUNS EXCELO!NG 100 EQUIVALENT FEET ARE TO BE INSTALLED WITHOUT UMIiED BRANDS' PERMISSION. O TRA• ' VEp VARIABLE FREQUENCY DRIVE MECHANICAL _ IIF 410 22 USG GALVANIZED STEEL. MINIMUM 2. EXAMINE DEAD LOAD AND OPERATING LOAD CONDITIONS WHEN SFLECTING DEVICES, ADJUST FOR PROPER ALIGNMENT AND LOADING. GPM GALLONS PER Ylh 'E AVOID 'GROUNDING THE ISOLATOR. VTI+ VENT THRU ROOF P ALL i ITTINGS ANO JOINTS SHALL Of WROUGHT COPPER OR CAST BRONZE (ANSI 916.22). ALL COPPER TO COPPER JOINTS SHALL ' HD HEAD 5 P E C I F I C A '� IONS fJE BRAZED WITH ACOPPER-PHOSPHORUS ALLOY AND ALI OTHER JOINTS SHALL 8E BRAZED WITH SiLFOS-5 ALLOY. HP 14ORSMWER W WATT L. NOERS 3. CHECK HANGER ROD SIZE FOR ALIOwABIE TOADS AT THE ISOLATING DEVICE AND AT THE UPPER AND LOWER ATTACHMENTS t0 HTR NEATER � WET �� I STRUCTURES, DUCTS, EOUIPM[N1, ETC. C. ALL ELBOWS ARE TO BE LONG RADIUS TYPE. HVAC HEATING VENTIUT'h(: AND AIA CONDITIONING WCO WALL ClEA1NJU1 1 {, 1,�„� F 1 HANGERS ODS,SMAINCLUDE ALL MISCELLANEOUS STEEL SUCH AS ANGLE IRON, BANDS, C ClA1NPS WITH RETAINING CLIPS, CHAP.NCI,S MVA HOT WATER RETURN WG WATER If A*) I HANGER RODS, ETC., NECESSARY FOR THE INSTALLATION OF WORK. 4, CONSULT MANUFACTURER FOR APPLICATION DATA, HWS HOT WATER SLIPPI' WT WEIGHT DRAWING NUMBER: i I MECHANICAL SPECT.S. M01 . 1 SPECIFICATIONS � .�.� - _.. CRTj ,jII,I� 1 , 1!-,+ �N� LE(3NlILFI'YSTRIP ToA�.I 2 3 4 °S d � � Y Io 11 i7 Ia Ia F I d a3 r 2 AT 2e r ,e ��9 ' 8,1 I 1 OI Now 0 04 ANAiAAiIt IN�iAI , �AN+ D iI c 1 tI N lI,", ', .", - -.. .. ,i,M n. to v':: .. ..- Y -I' ..M s .:.":.. �,i ,R i... ... �. .. ..1- '.. .. ,. Tj"I .. :YL d n a �tf't> vwM,�nN'Y...w. r. r 1•.+., W 1 4t'ey*, i. w.'IY!�fwMM. M e+-<,r4,k _f`^tAR. i ^Y-Y .:2�R,MIh3:M4.1 .....N��1F•-.`~M^ yIn' .. '�" '�- T%vr. i4 _,_.. ,.. .. -. °1+_. wn7. ._ tM . Tar... IF •M4 . .# _ 'M4�"5_. N. I'll I wwRw • ... ,, , ,. - : 4oF +Ki'6'1h " !yderM,�r.. :#MNbNWIiGNhYaMha ,. ,.�.,,y�,. E t C y lyi fly H B K CONSULTANTS, L-TD. 171 CHARRING CROSS DR. SUITE 1 B WESTERVILLE, OHIO 43081 1 614-882-1199 r n r an E F G z G cv c•► C Z Dt U6 ci� 2 Z r r z z " " Ir z0 � x U' Jct c Qi IZ Z t' _0LL (} o C j I ADJACENT TENANT I � 2 ALL 2�0'p� O w r' I , A 8TM O 20 -0 / 6TM O 14 -2 _ ,� j 3 BTM O 2 /� ( I 12 14•• MEDIUM VAV w T • l I I PRESS. 3 ? 7 1 --- - -- -- — ' LLJ — T--.--T f� _ — �___ — _ - - - __-_ . _ _ _m-. - _ _ - - - - _._ __ ❑ I I ❑ 1O 1 _ c r_ - A� 1 a r 1 n l (13 1 I I 350 I 5�1• Is:..L1' I o � l -�7 (TYP)• r 350 �J 1 ' TYP �.� • II L _ — J I VAV o . i I ► I I _ I• J ► ^� 03. 420 I I !2 - 0'-1 1/2 I I �I 9 3'5t- 10 0 .10 P 10 0 I I I 12"e 12"o I 16'0 MEDIUM PRESS. ' a I !2'X16' 0 ; 18'x16" 20'X18' I I � � � �N� : � �,� 6 i - - - - 12"I I J I' I y' r ° a 12'e 5 Room � �g� '„ � o$ ; V p Q g p i -10"0 MEDIUM 0'-t 1/2 L _j I II Sc��Q�l • [ a i Y �aJ?v i ,� I I ► PRESS. ► 6 1 I is 71 f $�► , I _ - - - - - -- - - -- - - - - - ------ _�-- - -s- ----- 1 • 5 I�— I � — _ • I 10"0 d 1 • • m Sa��'� 4.°t,o�'^w � °r,' 10"X12" - - I EXISTING MEDIUM PRESS. I ► I 18"X18' M031 (T�) i a o�Ma U; a •` i -- --- - - - - - - - -- 1- - _.- --...�_ I --1_s- - ----- --------- ---- - --- a- __ -1-- - _ - _ - I `` - 1 . .'tom =..fax I I 14"X14" Rowl l v11' Q qS�N ►� yv. 5 >ij VA '� } ► VAV I I 10 I . . 1 -_ 10"0 1i 19, :L 'oYC'. - E (TYP) • I ,`1LT 2 M03.1 350 I I 1 10"e 10"0 A TYPe� s� `!mq vZ3W . 1 I &45t' __ 420 N •f ', - ----------------------.----- -_---- -�- x50=1 >e 01=11- 1 ---------- t ' *------- ------- t. ------- --- t ----------- � i q • r I - qq.Q N ;Noo Yom ` ---�------ - ----- I� 1� 1• - • ( li .� I -.3501 . . 350 . [_ �.- FF ', L .g. !. - J' 0 0 G 0 0 G �_� l� T I T Lo EXHAUST UP _1 - 1 2 Q n THRU DECK `� t'�UT 1 t dY -.. 4. 3 P P �-STAT UIBTM o t — W AR�IAOE[ET_I>EIlAMI O . oma O w4cr c� a � Q � a Y W d LAj 0 Q O STRUCTURAL ELEVATIONS �" w cr W N Ln c W 1 W a BASED ON: j ? u Q o FI Y O � FIELD ;URVE LANDLORD INFORMATION �+ `� N ca STRUC(URAL DkAWINGS -_ HEIGHTS UNAVAILABLE 2 ch Z V U O n STORE IS LOCATED ON LEVEL 1 OF 1 Z 0 n a c� rn ,� W O Z = Z FINISHED ft00R f0 BOTTOM OF DECK ABOVE IS APPROX. IS'-e' LANDLORD SHALL PROVIDE cr. a W W FINISHED FLOOR E BOTTOM OF LOWEST STRUCTURAL MEMBER 5050 CFM OF 57°F AIR AT 1.5" S.P. 7 S Z O 3 cr a o (STEEL OR CONCRETE BEAMS/ JOISTS) IS APPROX 12'-Y = o 3 O � a ALL OTHER EQUIPMENT, PIPING, AND DUCTWORK ELEVATIONS ARE AS NOTED U ��E/� N U Z U ON THE DRAWINGS. \i u Ln � �a �f o Q < w acne NOTE: CONTRACTOR IS TO VERIFY ALL CONDITIONS IN THE FIELD PRIOR _ _ _ _ 2 3i V) � h N p TO BIDDING WORK. ANY CONDITIONS THAT AFFECT THE INSTALLATION OF IS PROJECT MUST IMMEDIATELY BE BROUGHT TO THE ATTENTION Of REVISIONS- THE CONSTRUCTION MANAGER OR BE INCORPORATED IN THE BID. LAyQLQRRD COMMENTS: DUCTWORK SHALL NOT BE FABRICATED OR ANY EQUIPMENT ORDERED PRIOR TO APPROVAL BY THE TENANT'S CONSTRUCTION MANAGER. TENANT H.V.A.C. WILL CONFORM TO THE REQUIREMENTS SET FORTH IN THE - -^- TENANT MANUAL. TENANT MUST PROVIDE ADEQUATE CF.M. SO AS TO FIELD SURVEY BY EYE—ON 11-08-05 MAINTAIN A POSITIVE AIR PRESSURE IN RELATION TO THE MALL. i ONNECTIONS TO MALL SYSTEMS (IE PLUMBING, ELECTRICAL AND MECHANICAL) MUST BE COORDINATED AND APPROVED BY LANDLORD. TFST AND BALANCE REPORT MUST BE SUBMITTED TO LANDL.ORD FOR APPROVAL UPON COMPLETION. DATE ISSUED: 1 1/7 V0`, DESIGNED BY: MR DRAWN BY: MR - CHECKED BY: N MECHANICAL Irl; . i PLAN roz.: /� W - E "VERIFY ALL FIELD CONDITIONS PRIOR TO BID" KEY PLAN S DRAWING NUMBER: MECHANICAL PLAN _----_-----� — — _» ----- /� M020 1/4" - V-0� H LEOISIIRY SCRIP cm c.0. T 3 a �S 8 7 FA �+ p 2 3 1 R F 9 2r) 2t 22 23 24 JS 2f3 P 9 "mow, ti �I I v -- 111tIL11t1, �1; I�J:t1a�111��IJ�tJI�I�►lll�1�!���t�� l+U�lw�t�l�l:►Idil�� 4 . H B K CONSULTANTS, LTD. 171 CHARRING CROSS DR. S SUITE 11B WESTERVILLE. OHIO 43081 614-882-1199 � s c O UU_ � cr. E cl Z -) N c"i ►�. U cl� ll N L rf C Zz — ZW Z p Z x v U E LZ Z VIw cy � z 1 'c EF <I75 CL Z o ..� t 5 �j wUl nor. ' w INLLR PIPE 3 Pgt 43- 3 Y�HI�I�!@� / BTM O 11 -0 3 BTM 013� �� TM O 13-6 AT DECK ILIJ El LJ 0 vAT DE _ _ o 8'-_0_ LINE OF MALLC -11 �.�1Lfl 111 *-O�RV /V ROOM ABOVE t6 I J c0 NT STUB *11 0) �T DECK mo- 8.0 I _ ) FSB B"TBQo" .'IPE DN5D-3 /9-' - II. - —off 200- THRU WALL-----"'�:� i I \9 t VENT W I j C3 —�PV���- THRU WAIL I 8-e 1 BTM O 13-6 i (91 MA MON-SALES 11 N c 5 COMM 15 ICIS I � ' z 200 c"vWv ' Plp"8T%A 0 12--9� I I I 1J 1 I t oXg W� ��� x� ==; { LINE OF MALL S 1W STORAGE 10'X12' - - --T— - 10'X12' >t-�8� s�W" -" � 4 ROOM ABOVE +1r1>i oea:. BTM V8T1.)0'133' (*' v 1 I I ' i ��•` � � � o�b� 9_ TT AVT A f erM o '1_2F-"2"1___-- �• 1 t. NANf T9L A //��TT�� y� >i � g.•i _lo Al I — — -—- —————— — ——— ——* _; '---------- ' - ag �F �— - 3 PIPE Up_ - -- ------- -- --- -- - ----- - - I- 9'-0' —M4[�-11AI1�Q X o Z� �is THRU DECK �\ C �l LozrN O (• ` EXHAUST UP f 1 \�-{} �T O 00 �N�N1 TOIL�ET,EXHAj THRU DECK j BTM O 15-0 I 3 BTT.F0�12T-8 O ulw �iZ � 1111k 5C Z � QCoLJ o � (L Q Q o< (L Y W CL Q O p a z r x0 („ W W N u_ UJIa ac O0 3 � p �, � W Q � O � CL c. Wto r) � ) N) Z VI Z N O t- rn z a 0 = o C) N O 0040 �iW z I Z3 � a- 00 w (n W N � Ll; Z 00Ln 00a ONU cr V W N a co 3: v► rn ►- Nom REVISIONS: DATE ISSUED: 11/23/0") DESIGNED BY: MR DRAWN BY: MR -- --- CHECKED BY: KH N MECHANICAL PLAN M02.1 I w -- -- E "VERIFY ALL FIELD CONDITIONS PRIOR TO BID" KEY PLAN S DRAWING NUMBER: I Ivi 0 2 . 2 _ A MECHANICAL PLAN! t FUIBII ITV STRIP 14 a (! 7 p e n 1 � Jho o 1 jahk ; r -. �. •.P.�', •" .1i��:' -�� ��'? .......'i.`. 7. •—'•.;.::_ �,. •.emYr-��;. ..7•'-r•:..ivi('¢ny. _'m�.,�^r rq,�e.a.� �z. n -... .��_..,... - .. yi �,�a�,..w�: a. a�.c..:, v..,.._... ._rw .. .�. ... _ MIAII PACKAGE I�tscRlPYIoN HB K CUNSULIANTS, LTD. GENERAL NOTES HVAC_ EQUIPMENT COMWIScALLcwT IE,SIQNING SUPPLY DIFFUSER I . FIRE DAMPER - FD 171 CHARRING CROSS DR. 5 ALL NOTES INCLUDED HEREIN ARE MADE PARi Of EACH AND ALL MECHANICAL, ELECTRICAL AND PLUMBING SECTIONS OF WORK 1. HVAC COMMISSIONING QUITE 1 f AK PQYYLRLD YARIABLL ALR YQI.VML 1LRMIlLAI IllylT � � W C S T E R V 11.L E, OHIO 43081 VAV SUPPL'- DIFFUSER UNIT MODEL NU NAIIOR - 35PE 1 COMBINATION i REFER TO LANDLORD'S SPECIFICATIONS AND TENANT DESIGN CRITERIA FOR NECESSARY INFORMATION AND COORDINATION WITH OTHER A GC TO CALL LOSS AT $00-431-1198 TO SCHEDULE HVAC COMMISSIONING SITE VISIT BY IBS HVAC EQUIPMENT, CONTROLS, AND UN17 SIZE W/SECTORIZING BAFFLE -!-;., b14-892-1199 T I5 TIRE/SMOKE DAMPER - CFSD TRADES POWER MUST BE IN PLACE PRIOR 10 SITE VISIT. UPON SUCCESSFUL SITE VISIT, IH( fIRSI THREE DIGITS Of THE CONTROL I11101 SIZE 10. NUMBER ARE ISSUED. PRIMARY AIR 510 CFM DESIGN, 300 CFM MIN POSITION RETURN GRILLE 2 114E ABBREVIATION LSO&C WHEREVER IT APPEARS IN THE DRAWINGS, Slue REFER TO 'LIMITED STORE DESIGN AND CONSTRUCTION'. FAN ANI 475 CFL • 0.5 Is P AUTOMATIC ANY REFERENCE TO TENANi, BRAND SPECIFIC (EXPRESS, ETC.) OR FURNISHED BY ANY Of THE ABOVE REFERS 10 LSDAC 6 LOSS WILL DISPATCH INDUSIRIAL BUILDING SERVICES (IBS). IBS WILL BE ON SITE MINIM THREE (3) BUSINESS DAYS. GC CAN ELECTRIC HTR: 3 KW, 206 VOL], 3 PH, 60 HI T BACKDRAFT DAMPER - ABD CONFIRM SCHEDULE WITH IBS AT 8(Y)-333-4001 X280. FAN MOTOR 1/2 HP, 120 VOLT, 1 PH, 60 HI I _A ACCESS DOOR/PANEL 3 ANY DISCREPANCY B(Tv4EN LSO&C DRAWINGS AND TENANT CRITERIA, T.SDAC DRAWINGS SHAH TAKE PRECEDENCE. SINGLE POINT ELECTRICAL CONNECTION r�r MOTOR IBS WILL ISSUE THE FIRST THREE DIGITS Of THE HVAC CONTROL NUMBER PROVIDED THE INSTALLATION IS PER PUNS AND IS 1 OPERATED DAMPER - MOD 4 THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC TO THE EXIENT THAI All INSTALI.LD ITEMS AND LOCATIONS ARE NOT EXACILY PLACED OPE RAi*MAI. i BALANCE DAMPER AND ARE NUT TO BE SCALED. 5LWIC15 PRQVIDLD IT 16`+, ZONE NOTE: DO NOT SCHEDULE CONTROLS COMMISSIONING UNTIL HVAC COMMISSIONING IS COMPIETE AND THE FIRST iHRFF DIGITS Of THt COMMISSIONING A 'iPIN IN FITTING '-ti- DAMPER - ZD 5. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR HIS PERMITS AND INSPECTION FEES. CONTROL CODE ARE GSUEO. WARRANTY PREVENTIVE MAiNT[NAhC[ 6 BEFORE COMMENCING ANY WORK, CONTRACTORS SHALL KEVIEW THE LATEST NATIONAL, STATE AND LOCAL CODE REQUIREMENTS 2. CONTRO:S COMMISSIONING ECCENTRIC DUCT TRANSITION Alllfr FLEXIBLE DUCT INCLUDING LANDLORD CRITERIA AND PERFORM THE WORK IN STRICT ACCORDANCE WITH THESE. IN CASE Of CONFLICT THE STRICTER ITUd PRQYIDLD BY SIRSQN/CBQS� RfOUIREMENTS WILL PREVAIL A. GC 10 CALL LOSS AT 800-431-1198 10 SCHEDULE CONTROLS COMMISSIONING BY CUNiINLNiAL BUILDING CONIROL SYSIEMS ACTUATOR INCLUDED IN CIRCON/CBCs PACKAGE CONCENTRIC DUCT TRANSITION Q 1• ROUND DUCT - UP (CBCS). UHC-301 CONTROLLER �! 1. NO ADDITIONAL COMPENSATION SHALL BE MADE FOR ANY CHANGE ORDERS DUE TO CONTRACTOR'S FAILURE TO VISIT THE JOBSOE REMOTE SETPOINT SUPPLY DUCT - UP ROUND DUCT DOWN AND/OR PREDETERMINE ALL EXISTING CONDITIONS BEFORE SUSMITTIN, HIS MO. CBCS WILL CONTACT THE CON'RACTOR SUPERINTENDENT WITHIN 24 HOURS 10 SCHEDULE A TIME TO COMMISSION THE (ONTQoIS SUPPLY AIR TEMPERSO TEMPERATURE SENR COMMISSIONING TO OCCUR WITHIN THREE (3) BUSINESS DAYS FROM NOTIFICATION. ti S TEMPERATURE SENSOR A CONTRACTOR SHAH BE RESPONSIBLE FOR FIELD ViRITIC1TION Of AU EXISTING CONDITIONS PPIOR TO SUBMITTING HIS BLU. FOR THE THREE PRQYIDLD 8Y HVAC ti4LTERSIQB U PURPOSE OF SURVEYING EXISTING CONDITIONS, WHICH MAY AFFECT THE WORK 10 BE DONE UNDER THIS SECTION, ANY C. GC MUST COMPLETE AND FAX THE PRE-COMMISSIONING CHECKLIST 10 CBCS AT 714-894-1294 PRIOR 10 THE CONTROL CONTTHREE SEAS STANDARD AC INTERS, SUPPLY DUCT - DOWN DISCREPANCIES SHALL BE IMMEDIATELY REPORTED TO THE GENERAL CONTRACTOR, LSDAC OR THE LANDLORD'S FIELD REPRcSENTATIVE COMMISSIONING. ONCE AGAINCTOR 10 REFUGE FILTERS JUST PRIOR O AIR BALANCE AND � THERMOSTAT DNC[ AGAIN AfTfR FINAL STORE CLEANING IS COMPLETE RETURN OR OR EXH. DUCT - UP Z FOR CLARIFICATION. D. CBCS MONITORING AND CONtROI CENTER CAN BE REACHED AT 714-373-5363 (7AM-4PM PACIFIC). THE [MERtiENCT MONITORING IN LINE COMMINATION RUBBER AND SPRING VIBRATION 4 a DUCT MTD. SMOKE DETECTOR O B. Af1ER BID, ANY OUESIRONS RELATING TO SPECIFIC M. E. OR P ISSUES ARE TO BE DIRECTED AS RfI'S THROUGH THE LSDkC (AFTER HOURS) CENTER CAN Of REACHED AT 714-343-9990. f RETURN OR EXH. DUCT DOWN PROJECT MANAGER. !._� F- <7 E E. iN( MECHANICAL AND ELECTRICAL SUBCONTRACTORS MUTT BE ON SITE FOR THE CONTROLS COMMISSIONING. POINT OF CONNECTION ' l C. SHOULD i IE SPACE HAVE BEEN INACCESSIBLE FOR INSPECTION CONTRACTOR MUST INDICATE SO ON HIS 810. t 7 U n' < 0 CBC; WILL ISSUE THE SECOND THREE DIGITS OF T14[ HVAC CONTROL NUMBER PROVIDED THERE ARE NO OPEN ISSUES. IN THE EVENT ~VAV fN! PQIV[RLD vJ1RIAJII,E cr AIR VOLUME TLF�NAI UNII_ TJEi r �� ELBOW W/TURNING VANES AL UNDERCUT DOOR -ti...__ - -� �.' U Jim I 8. THE GENERAL CONTRACTOR'S FIRE SPRINKLER SUB-CONTRACTOR SHAD DESIGN AND INSTALL FIRE SPRINKLER SYSTEM CONFORMING TO I THERE ARE OPEN ITEMS. THE GC MUST CORRECT THEM AND RESCHEDULE THE CONTROLS COMMISSIONING WITH CKS AT 714-373-5163 �� UNIT MODEL NONAIIOR - 35PE LANDLORD'S CRITENiA, TFNA4T'S REQUIREMENTS AND PER LOCAI CODES AND NFPA STANDARDS UNIT SITE /6 C, � INTEL SIIe t6' (R)'--- RELOCATED 3. AIR BALANCING CONTROL SYSTEM CALIBRATION � �' � / PRIMARY AIR. 2440 CFM DESI,'+, IOOO CFM MIN POSITION z Z �• 9 iH[ CONTRACTOR, WITHIN FIFTEEN (15) DAYS OF THE AWARD Of TOif CONTRACT, SHAH SUBMIT TO THE OWNER, SIX (6) COPIES Of A FAN AIR BOYO CFM • 0', E.`_ o (E) EXISTING 10 REMAIN 4 COMPLETE LIST Of MATERIALS AND EQUIPMENT PROPOSED FOR THE JOB INCLUDING ALL DATA, PART NUMBERS, RATING CAPACITY, SIZE, A. GC TO CALL CBCS Al 714-373 5363 TO SCHEDULE AIR BALANCING AND CONTROL SYSTEM CAUBRATION (CALIBRATE AIR FLOW ELECTRIC HiR. 12 Xw, 206 VL,IT. � 60 HZ � --- Z O D,MENSIONS, ELECTRICAL DATA, GRADE, MANUFACTURER AND ANY OTHER DESCRIPTIVE DATA FOR ALL EQUIPMENT OR SYSTEMS THAT SENSORS AND MINIMUM POSITION FOR ECONOMIZER DAMPERS) If 11 NEEDS 10 OCCUR PRIOR TO CDCS REGULAR WORKING HOURS FAN MOTOR. 3/4 HP, 110 VAT, I ' . a0 HZ (D) �-!_ EXISTING TO Z U DEVIATE FROM SPECIFIED ITEMS. ANY DELAYS OR COSTS DUE TO THESE DEVIATIONS, WILL BE 114E RESPONSIBILITY OF THE CONTRACTOR. (7AM-4PM PACIFIC). SINGLE POINT ELECTRICAL CONNECTION BE REMOVED (`. . L < �. C 10. CONTRACTOR SHAH OF RESPONSIBLE FOR THE DISPOSAL OF ALL UNUSED OR ABANDONFD MATERIALS AND EQUIPMENT, AND ITS CBCs Will ISSUE THE THIRD iHREf DIGITS OF THE HVAC CONTROL NUMBER ONCE THE AIR BALANCE AND SYSTEM CALIBRATION ISCL z REMOVAL OFF THE LANDLORD'S PREMISES. COMPLETE, PROVIDED THERE ARE NO OPEN ISSUES. IN THE EVENT THERE ARE OPEN ITEMS, THE GC MUST CORRECT THEM AND SLRYIGLS PRQYIDLD BT 185: = ' RESCHEDULE WITH CBCS AT 714-373 5363. COMMISSIONING 11. OWNER RESERVES THE RIGHT TO HAVE CONSTRUCTION REVIEWED BY AN OUTSIDE CONSULTANT PRIOR TO ACCEPTANCE OF THE PROJECT. WARRANTY [� - PREVENTIVE MAINTENANCE NOTE: INCLUDE ALL NINE (9) DIGITS Of THE CONTR01, NUMBER WITH THE AIR BALANCE COVER SHEET AND SUBMIT TO LIMITED BRANDS O i2. EACH CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORKMANSHIP RELATED TO HIS WORK FOR A MINIMUM PCR100 Of ONE YEAR STORE DESIGN AND CONSTRUCTION WITH THE PROJECT CLOSE OUT PACKAGE. W FROM THE DATE WHICH THE OWNER ACCEPTS THE PROJECT. THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER OR TENANT 1TE115.PROVIDED BY OKON/CKC SHALL CORRECT ANY DEFECTS IN MATERIALS OR WORKMANSHIP DURING THIS GUARANTEE PERIOD. ACTUATOR INCLUDED IN CIRCON�CwS PACKAGE co 7n UNC-302 CONTROLLER w w r , REMOTE SETPOINT 0 ' 13. EACH CONTRACTOR SNAIL BE RESPONSIBLE AND ENSURE A CLEAN INSTALLATION ESPECIALLY 114 EXPOSED CEILING ARDS. THE FINIAL SUPPLY AIR TEMPERATURE SENSOR j LLJ C , APPROVAL Of THIS WORK WILL BE ISSUED BY LSOAC PROJECT MANAGER. O J 1TLR5-PRQYIDLD_IT HYAC GDNIRASTDR, IC PROVIDE THREE SETS Of 'A$-BUILT' URAwINC$ AND Two BIND SETS OF ALL OPERATIONS MANUALS, DIAGRAMS, SERVICE CONTRACTS - - THREE SETS STANDARD AIR FILTERS. --_ co AND GUARANTEES TO LSO&C PRECEDENT TO FiNAL PAYMENT. A REPORT PREPARED BY AN INDEPENDENT AIR BALANCE CONTRACTOR, -- - 1t1 SEGLIENCE 2nd SEOUENCE FINAL SEQUENCE CONTRACTOR 70 REPLACE FILTERS JUST PRIOR TO AIR BALANCE AND HIRED BY GC, MUST BE INCLUDED IN THE CLOSEOUT PACKAGE - F1( f (��� ONCE AGAIN AFTER FINAL STORE CLEANING IS COMPLETE LEGEND AND SYMBOLS NTS C -' I� 11 F �] U LI-L] LI Ll IN-UNE COMBINATION RIBBER AND SPRING VIBRATION 42DMO23COSYN ISSUED BY IBS ISSUED BY CBCs 1 ROOM THEPrOS1AT/TEMPERATURE SENSOR FURNISHED BY W&C AND INSTALLED BY THE MECHANICAL CONTRACTOR 0 A B C _ _ 48' ABOVE. 'NSHED FLOOR. VERIFY EXACT LOCATION Of SENSOR WITH LSO&C'S PROJECT MANAGER PRIOR TO INSTAllAT1Uti THERE ARE MULTIPLE SENSORS FOR EACH SrSTEM, CHECK DRAWINGS CAREFULLY TO VERIFY QUANTITIES. REFER TO SHEET TCO.1 FOR ADDITIONAL INFORMATION. VA �P4YV!M .VARJM LL.J�Y��L 1��V� �2 EXISTING C :?WORT( TO REMAIN. TYPE, SIZE AND ELEVATION ARE AS NOTED HVAC GEN�RA�-.NQT UNIT MODEL N0: NAILOR - 35PE 3 UNIT SIZE: /6 D4 O3 EXISTING PIPING 10 REMAIN. TYPE, SITE AND ELEVAiION ARE AS NOTED. INLET SIZE: 14' PRIMARY AIR: 2100 CFM DESIGN; 1000 CFM MIN. POSITION O EXISTING C,4DUTT TO REMAIN. TYPE, SIZE AND ELEVATION ARE AS NOTED. 1 THESE PLANS MAY BE USED FOR CONSTRUCTION ONLY AFTER APPROVAL IS OBTAINED FROM THE BUILDING DEPARTMENT MECHANICAL - - FAN AIR: 1300 CfM • 0.5 E.S.P. PLAN CHECK DIVISION AND THAT DIVISION'S STAMPED APPROVAL AND AUTHORIZED SIGNATURE APPEAR ON THE PLANS 1 ELECTRIC HTR: 10 KW, 2O8 VOLT, 3 PH., 60 HZ INSTALL TOLET EXHAUST FAN WHERE SHOWN ON PLANS. EXHAUST TO BE CONNECTED TO THE LANDLORD'S CENTRAL SALAi�GE�QNTRA�e?-4g--SeOVER-�HEEI FAN MOTOR. 3/4 HP, 120 VOLT, 1 PH, 60 H1 EXHAUST DUCT. REFER TO PLANS FOR FURTHER INFORMATION. CONTRACTOR TO FURNISH AND INSTALL 'XHAUST DUCT a� ` 2. COORDINATE ALL WORK WITH ALL TRADES INCLUDED BUT NOT LIMITED TO ELECTRICAL, PLUMBING, FIRE PROTECTION AND STRUCTURAL I SINGLE POINT ELECTRICAL CCNNfCT10N AND ACCESSORIES AS REQUIRED. REFER TO PUNS FOR IOCAT10N5. y� g o T F CONTRACTORS. INSTALL All WORK TO CLEAR NFW AND EXISTING ARCHITECTURAL AND STRUCTURAL MEMBERS. NO ITEM SUCH AS PIPE, BALANCE CONTRACTOR TO COPY THIS FORM AND ATTACH AS COVER SHEET TO AIR �EGLS DUCT, ETC. 1S 10 COME IN CONTACT WITH ANY EQUIPMENT. BALANCE REPORT AND SUBMIT 10 GENERAL CONTRACTOR �6 SUPPLY AIR TEMPERATURE SENSOR FURNISHED BY LSD&C AND INSTALLED BY THE MECHANICAL CONTRACTOR IN SUPPLY SEISES RQVIDED By IBS: AIR DUCT. INSTALL SENSOR IN A LOCATION THAT ALLOWS SERVICE ACCESS. REFER TO SHEET TCOA FOR 44.A o� n 3. REFER TO ARCHITECTURAL DRAWINGS FOR GC'44UTION WORK. �''- -" - COMMISSIONING ADDITIONAL INFORMATION. b �fo 3y; ' t WARRANTY l7) CONTROL MODULE AND TRANSFORMER FURNISHED BY LSDAC WITH CONTROL PACKAGE AND INSTALLED BY MECHANICAL S ~2 t W "' �If 4 REFER TO ARCHITECTURAL DRAWINGS FOR EXACT FIXTURE LOCATION. YES NO PREVENTIVE MAINTENANCE CONTRACTOF. REFER TO ELECTRICAL SHEETS FOR J-BOX LOCATION ACCESSIBLE IN PLENUM NEAR HVAC UNIT AND2s T ❑ j 1. REPORT PREPARED BY NEBB OR AABC LICENSED CONTRACTOR? INSTALL 24V1120V 40 VA TRANSFORMER. MECHANICAL CONTRACTOR 10 INSTALL CONTROL WIRE AS DIRECTED BYaFE; gZ< ox• ° ; E S. CONTRACTOR SHALL PROVIDE CUT SHEETS TO LSD&C FOR ALL EQUIPMENT AND DEVICES FURNISHED BY THE CONTRACTOR 14AT DEVIATE ITW PRQYIOLD BY 0KQh TEMPERATURE CONTROL SUPPLIER. SEE SHEET TCOA FOR ADDITIONAL INFORMATION. FROM SPECIFIED ITEM FOR REVIEW AND APPROVAL PRIOR TO THE PURCHASE Of ANY SUCH EQUIPMENT OR DEVICES. ACTUATOR INCLUDED IN CIRCON CBCS PACKAGE S i 3� g' o -Fit $. 1. ALL VOLTAGES WITHIN 2% FROM PHASE TO PHASE AS REQUIRED BY UNIT NAMEPLATE UNC-302 CONTROLLER ! DASHED LINE AROUND HVAC EQUIPMENT REPRESENTS MANUFACTURER'S RECOMMENDED CLEARANCES FOR EQUIPMENT ..^fit„ ':' Y :>s '.0 1 ❑ ❑ SPECIFICATIONS? REMOTE $ETPOINT MAINTENANCE IT IS THE MECHANICAL CONTRACTOR'S RESPONSIBILITY TO MAINTAIN SERVICE CLEARANCES THE ••WW '. c4 6. HYAC CONTRACTOR IS RESPONS BLE TO INQUIRE WITH THE LANDLORD'S REFRESFNTATIVE ON ANY SMOKE EVACUATION SYSTEM IN USE full HEIGHT OF THE UNIT IN THIS AREA AND TC PROVIDE ACCESS TO THESE AREAS SUBJECT TO LSOAC PROJECT �: X� AT THE MALL AT THE T:ME Of THE BID, If THE SAID SYSTEM iS NOT ADEQUATELY DESCRIBED ON THE DRAWINGS, THE MECHANICAL SUPPLY AIR TEMPERATURE SENSOR Ya- CI VA N .GSW CONTRACTOR IS RESPONSIBLE TO INFORM THE GENERAL CONTRACTOR AND INCLUDE THE COST AS A SEPARATE UNE ITEM IN THE 810. MANAGER'S APPROVAL IF FREE AREA CANNOT BE OBTAINED IN THIS LOCATION, IMMEDIATELY CONTACT ISOdC'S IF <�/ .c1X'^. .��. (3 (� 3. ALL CURRENT WITHIN 10% FROM PHASE TO PHASE AS REQUIRED BY UNIT NAMEPLATE ITLI!S PRQVIDD r_.rY1l� SQr1Bl►STDR PROJECT MANAGER FOR FURTHER INSTALLATION INSTRUCTIONS. 1� �: Titit� B^ 'Xe N NO ADDITIONAL PONIES ,HALE BE AWARDED FOR TIE IN REQUIREMENT, TC A LANDLORD'S SMOKE EVACUATION SYSTEM THAT IS IN SPE0FK:ATIONS? iHRLE SETS STANDARD AIR FILTERS §r8 0 o f8 - EXISTENCE AT THE TiME OF THE BID, WITHOUT HAVING IDENTIFIED A SEPARATE LINE ITEM FOR THE SMOKE EVACUATION SYSTEM AT THE 9j Ala DEVICE TO 8E ASLO FOR ACCESS TO EQU'PMENT LOCATED ABOVE CEILING. THIS CONTRACTOR SHAH (If ,• 5 .a . {p CONTRACTOR 10 REPLACE FILTERS JUST PRIOR TO AIR BALANCE AND RESPONSIBLE TO EN$UR[ THAT A MINIMUM UNOBSTRUCTED FREE AREA OF 3-FEET VERTICALLY ANO 1-FEET r •r`1' YebMg` iiCN TIME OF T14f DID. ONCE AGAIN AFTER FINAL STORF CLEANING IS COMPLETE 4• ALL INPUT AND OUTPUT AIR TEMPERATURES WITHIN ACCEPTABLE RANGE FCR THIS UNIT HORIIONTALLY IN ALL DIRECTIONS AROUND EQUIPMENT IS MAINTAINED TO AVOW FOR INSTALLATION AND : S� -_ 4 ❑ ❑ T IN-LINE COMBINATION RUBBER AND SPRING VIBRATION MAINTENANCE OF EQUIPMENT. IF THIS FREE AREA CAN NO1 BE OBTAINED, CONTACT THE LSDRC PROJECT MANAGER yKR;Y 54119 .,x 7. ACCESS TO ALL COMPONENTS AND EQUIPMENT MUS BE PRL'VIOED TO MEET CODE AND SERVICE/MAINTENANCE EASE. FOR EACH MODE AND SAGE? IMMEDIATELY. J`f£Hj1 Iii: o a0;3 :1'J 8 PRIOR TO START-UP Of HVAC EQUIPMENT, MECHANICAL CONTRACTOR WILL CONFIRM WITH HVAC MANUFACTURER REPRESENTATIVE THAT "10/ THE GENERAL CONTRACTOR SHALL FURNISH AND INSTALL A SERVICE PLATFORM AS SHOWN AND REQUIRED TO MAINTAIN CORRECT POWER FOR EQUIPMENT HAS BEEN PROVIDED TO LSD&C PROVIDED h'VAC UNITS AND HAS BEEN TURNED ON FOR A MINIMUM [] ❑ S. LANDLORD SUPPLIED MEDIA (AIR OR WATF0 TFMPERATURE w�THIN 5% Of DESIr,N AND - SERVICE ACCESS TO AIL EOWFMENT. SERVICE PLATFORM SHALL BE 3'--0' WIDE WITH FLOORING CONSISTING OF Of 24 HOURS. LSDAC RESERVES THE RIGHT TO CHECK CONSTRUCTION COMPLIANCE WITH PUNS AND SPECIFICATIONS. SHOULD THE MEDIA FLOW WITHIN 10% OF DESIGN? EF CLIUK_mI1L-l:)S UST--fAN um CSJ6 X 18 GA. METAL STUDS (FLAT WISE) SUPPORTED 3'-0' ON CENTER BY S* X 3' X 1/4' X 4'-0. LONG (l1H) UNIT MODEL NO: LOREN COOK IGC-160 o OWNER FIND CORRECTIVE WORK TO BE NECESSARY, HE WILL NOTIIY CONTRACTOR OF SUCH WORK IN WRITING AND EXPECT COMPLIANCE STEEL ANGLES. PROVIDE A36 3/8' ALL THREAD ROD AT EACH END OF THE S' X 3- ANGLE AND EXTEND TO DOUBLE W NW- V ;u N PERfORMEO WITH Ouf DILIGENCE. 6 ANY CORRECTIVE WORK IS DEEMED TO BE NECESSARY, THE COST OF REINSPECTION$ WILL BE 1 EXHAUST AIR: 150 CFM 0 0.615' S.P. 3- X 3- X 1!4' BACK TO BACK STEEL ANGLES ABOVE. THE DOUBLE 3- X 3- ANGLES ARE TO BE SUPPORTED BY 'x 2 :.' * 6. ALL SUPPLY DIFFUSERS, RETURN AIR GRILLES, DUCT TRAVERSES AND STATIC PRFSSURKS FAN MOTOR. 113 WATTS, 12OV 1 60 � , ',r,,It 0. BORNE BY THE CONTRACTOR. THE MECHANICAL CON.RACTOR WILL THEN ENSURE THAT THE EOUIPMENI IS POWERED FOR A MIN:MUN Of ❑ ❑ THE EXISTING STRUCTURAL BEAMS. JOISTS. ETC. ABOVE. DOUBLE NUT EACH END OF THREADED ROD PROVIDE 14 HRS BEFORE START-UP. WITHIN 10% OF DESIGN (PER LATEST REVISION)? INTEGRAL BACKDRAFT DAMPER AND STEEL GRILLE STUDS AT 6'-0' ON CENTER FROM PLATFORM TO STRUCTURE ABOVE TO PREVENT SWAYING. PROVIDE CSJ3 5/8' X INTERLOCKED WITH LIGHT SWITCH 8Y E.C. 18 GA STUDS AT 30' ABOVE PLATFORM ON EACH SIDE FOR RAILINGS. J n 9 IF WORK IS REQUIRED 8T LSGdC IN ORDER TO IMPROVE, CHANE OR CORRECT AIR CONDITIONING OPERATIONAL CONDITION. DUE T0: ❑ �� 7. IS THIS PROJECT SIGNED OFF BY ISSUE Of A CONTROL NUMBER FROM THE 11105.P-ROVIDID BY HYA►C__S9!lIR91K' 11 EXISTING BRANCH TAPS NOT BEING REUSED SHALL BE CAPPED. INSULATED. AND SEALED TO PROVIDE LEAK--FREE 1/'% ul cel PART MALFUNCTION, WARRANTY OR OTHER INABILITY TO PROVIDE THE COMFORT CONDITIONS REQUIRED BY THE STORE, CONTRACTOR CONTINENTAL. BUILDING CONTROL SYSTEMS MONITORIK: CENTER AT (714) $93-4537 DUCT AND ACCESSORIES OPERATION. Li � CO o `t SHALL BE DIRECTED BY LSD&C TO ADDRESS THIS WORK IN A TIMELY MANNER, If IT BECOMES EVIDENT THAT THE CONTRACTOR CANNOT Q ACCOMPLISH THE TASK, THEN AFTER 72 HOURS OF WRITTEN NOTICE THE OWNER MAY, AT HIS DISCRETION TAKE OVER SUCH WORK (SEE NOTE B1)7 12 THE MECNAN'Ul CONTRACTOR TO CONNECT NEW MEDIUM PRESSURE SUPPLY AIR DUCTWORK INTO NEW TAP AT EXISTING _j AND BACKCHARGE THE CONTRACTOR FOR ANY CORRECTIVE WORK (MAT WAS REQUIRED DUE TO LACK Of PERFORMANCE. WORKMANSHIP - --- ----- WALL MEDIUM PRESSURE SUPPLY AIR DUCTWORK. VERIFY LOCATION OF TAP IN FIELD WITH MALL OPERATIONS MANAGER. 0 00 ANO/OR ADHERENCE TO PUNS AND SPECIFICATIONS. PLEASE ACKNOWLEDGE BY NOTING CONTROL NUMBER: US!iT1P!VTEI+PERATURE 0-NM_ST51 M F3 13 DUCTWORK TO Of INSTALLED TIGHT TO BOTTOM OF DECK. 10 UPON COMP1E110N Of THE WORK, CONTRACTOR SHALL ENSURE THE PROPER WORKING ORDER OF THF SYSiTM(S) AND MAKF ANY - -- HEAD END COMMUNICATION PACKAGE FOR INTERIOR MALL LOCATIONS WITH 0 ADJUSTMENTS AS REQUIRED. I>tl SEOUENCf 2nd SEQUENCE FINAL SEQUENCE I UGHTINC CONTROL FOR ALL SYSTEMS TRAi HAVE DO NOT HAVE TENANT 14 EXISTING MECUM PRESSURE SUPPLY DUCTWORK TO BE REMOVED BY MECHANICAL CCNTRACwm BACK 10 LOCATION l I E l ( l ( l ( I PROVIDED OUTDOOR AIR. (VAV) INDICATED. CONNECT NEW MEDIUM PRESSURE SUPPLY DUCTWORK TO EXISTING MEDIUM PRESSURE DUCTWORK. 04 -J -J1 �iQN$i IS EXISTING TOLET EXHAUST DUCTWORK TO BE REMOVED BY MECHANICAL CONTRACTOR BACK TO LOCATION �{ ISSUED Br 195 ISSUED BY CBCs WN_SMC,-302 CONTROLLER (COMMUNICATIONS) INDICATED. CONNECT NEW TOILET FXHAUST DUCTWORK TO EXISTING TOILET EXHAUST DUCTWORK. UK-320 LIGHTING CONTROIIER WITH COMPLETE OVERRIDE PACKAGE 16 P.E. SWITCH vcRWSHED BY LSD&C AND INSTALLED BY MECHANICAL CONTRACTOR. PE SWITCH SHALL RECEIVE F SYSTEM COMMISSIONING .Z w LANDLORD'S PNEUVATIC SIGNAL FOR OCCUPIED UNOCCUPIED MWE- "I'L It THE AIR BALANCING CONTRACTOR MUST CONTACT CONTINENTAL BUILDING ONE TEAR REMOTE MONITORING O -1 LE:NNOX GENERALS NOT" CONTROL SYSTEMS MONITORING CENTER Ai (114) 373-5363 TO CALIBRATE FLOW ENGINEERING 17 THE MECHAN CAL CONTRACTOR TO CONNECT NEW MEDIUM PRESSURE SUPPLY AIR DUCTWORK INTO EXISTING TAP AT EXISTING ^ W f O SENSOR READINGS. AT THE COMPLETION Of THE AIR BALANCING PROCESS CONTINENTAL MALLMEDIUMPRESSURE SUPPLY AIR DUCTWORK. INSTALL NEW TAP IF EXISTING TAP IS SMALLER THAN NEW r ' BRANCH. VEFI LOCATION OF TAP IN FIELD WITH MALI. OPERATIONS MANAGER. V LENNOX EQUIPMENT NOTED HAS BEEN PREPURCHASED BY LIMITED STORE. DESIGN A CONSTRUCTION. WiTHIN THE FIRST WEEK Of BUILDING CONTROL SYSTEMS MONITORING CENTER WILL ISSUE THE FIKAL SEQUENCE OF Ne Li NTS NTS U z W CONSTRUCTION, THE GENERAL CONTRACTOR OR THEIR MECHANICAL SUB-CONTRACTOR SNAIL NOTIFY LENNOX VIA FAIT: THE CONTROL NUMBER. E t�"J I P M E N T SCHEDULE E MECHANICAL CODED NOTES B � a w Q LENNOX NATIONAL ACCOUNTS ATTN. RAZI DOLE 42DM023EOSCHD 42DM023a0NOTE o PHONE NO : 614.871 2952 STORE /: O a. z � FAX NO 614.871.0854 Q= x U tD 1. UNLESS OTHERWISE SP1i ?IEC. CONTRACTOR SHAH PROVIDE ALL EQUIPMENT, MATERIAL, LABOR AND SUPERVISION NECESSARY TO COMPLETE LLJ FINISH: BORDER STYLE: W I!1 'n THE FAX SHA L STATE THE PHONE NUMBER, THE fAX NUMBER AND DELIVERY ADDREg5 Of THE CONTACT PERSON RESPON;IBLE FOR DIVISION: (� TITUS /26 - STANDARD WHITE. (LINEAR DIFFUSERS ONLY). Ci SURFACE MOUNTED THE HEATING, VENTILATINi• AND AIR CONDITIONING WORK IN ACCORDANCE WITH THE SPECIFICATIONS AND STANDARDS AS OUTLINED HEREIN. Q cc L,.1 1 W O SEE RESPONSI9fUTY SCHEDULE ON SHEET M04.1. _J n SCHEDULING AND RECEIVING THE HVAC EQUIPMENT AND ACCESSORIES. EQUIPMENT AND ACCESSORIES ARE TO BE SHIPPED BY ANY Q Q SPECIAL SHIPPING INSTRUCTIONS REQUIRED OR REOAFSiED. D1OW A MINIMUM OF TWO WEEKS AFTER CONSTRUCTION STARTS FOR MALL NAME: - - 0 TITUS /27 - 'IMITED WHITE. (ALL DIFFUSERS EXCEPT LINEAR). ON GYP. BD. (PROVIDE WITH TITUS MODEL � O w Q O DELIVERY UNLESS SPECIAL ARRANGEMENTS ARE MADE PRIOR TO THE START OF CONSTRUCTION. ,C.C. TO FIELD PAINT A OR 8 70 MATCH CEILING UR WALL / iRM FRAME FOR DRYWALL CEILING 2, ALL HEATING VENTILATING AND AIR CONDITIONING EQUIPMENT SHALL BE CLEARLY IDENTIFIED WITH TENANT'S NAME, SPACE NUMBER AND O Q' C. O CITY: WITH ENAMEL FINISH). SEE DETAIL ON SHEET M03.2.) UNIT DESIGNATION AND SHALL BE STENCILED IN 4- HIGH BUCK LETTERS. O V) V' GENERAL CONTRACTOR SHALL BE RESFOHSIBLE FOR ANY ADDITIONAL SHIPPING COST INCURRED If DELIVERY IS REQUIRED PRIOR 10 DAMPERS: m Z lY THE STANDARD TWO WEEKS SCHEDULED. %UTE: 2A-XX FRAME AND BORDER } FURNISH AND INSTALL AU NEW DUCTWORK INCLUDING INSTALLATION OF OWNER SUPPLIED PLENUM BOOTS, SUPPLY AIR DIFFUSERS, AND Z 04 t� LUCKING QUADRANT VOLUME-. DAMPER WITH MP-39 INSULATED BOOT O ►0- n RETURN AIR GRILLES. (SEE AIR DEVICE SCHEDULE ON THIS SHEET). � Z (, � If THIS INFORMATION IS NOT SENT 10 LENNOX NATIONAL ACCOUNTS, THEN THE EQUIPMENT AND ACCESSORW; WILL BE SHIPPED IN QO RUSKIN CFD OR CFOR FERC DAMPER W/VOLUME CONTROL. Q O z ACCORDANCE WITH THE PURCHASE ORDER DATE AND INSTRUCTIONS ISSUED BY LSO&C AND THE GENERAL CCNTRACTOR SMALL BE AIR BALANCE CONTRACTOR'S U LAY-IN RFSPONS:BLE FOR UNLOADING AND STORAGE Of EQUIPMENT UNTIL SUCH TIME AS REOUIRED FOR INSTALLATICN ON PROJECT. BALANCE CONTRACTOR SIGNATURE SEAL (REQUIRED) © YOUNG'S REGULATOR, DPR MODEL / 5020-CC A All MATERIAL SNAIL BE NEW AND OF COMMERCIAL GRADE AND SCAR UNDERWRITER'S LABORATORY AND UNION LABELS WHERE SUCI+ 2 2 f- UBELING APPLIES. O rn Q W IF OWNER'S REPRESENTATIVE IS PERFORMING START UP, THEN GC AND/OR IECHANICAL CONTRACTOR MUST i;OORDINATC WITH i i I --1-v,ft 8 I 8. ALL PLENUMS SHALL BE FABRICATED FROM GALVANIZED SHEET METAL OF THE APPROPRIATE GAUGE AND BE INSULATED WITH A z = � 0 3 cr CL p MANUFACTURER REP. 2 WEEKS PRIOR TO CONSTRUCTION CND DATE. SIZE MOUNTING MATERIAL EAC BORDER MINIMUM OF i' THICK, 75 LB/CU.FT. DENSITY FIBERGLASS INSULATION WITH ALUMINUM FOIL BACKED VAPOR BARRIER. 1 O SYiOOL MODEL FINISH STYLE DAMPER REMARKS f' = 111 3 d NUMBER FURN. (!Y FURN. FURN. U V) � C. WHERE DESIGNATED, BRANCHES FROM MAIN LOW VELOCITY TRUNK DUCTWORK SHALL BE FURNISHED WITH SPLIi ,,TS, DAMPERS OR W (/� w � W V MODUIf NECK CEILING STEEL ALUM. LSW Mc BY By � SIMILAR BALANCING DEVICES IN ACCORDANCE WITH THE STANDARDS Of ;MACNA. -� Q U � cr Q- U LSD&C O Q Q 017 < O Ce p e 4 WAY (2 WAY OR 3 WAY D ALL DUCTS FOR FINAL CONNECTION TO DIFFUSERS SHALL BE CLASS 1. U.L. LISTED (SL 181 FLEXIBLE AIR DUCT NOT TO IXC(CD SD-) OMtM' 24e1E24 10�/ • • 0 • O -© _ WHERE INDICATED ON PLANS) ) a co � N � ~ N � 4 WAY IN WAY OR 3 WAY 4'-0- IN LENGTH (THERMAFLEX, GIASFLEX, OR APPROVED EQUAL). SO-2 OMEN 24eR24e 12'/ • • - • - O O WHERE INDICATED ON PLANS) REVISIONS: T WAY FN WAY OR 3 PLA E. SUPPLY AND RETURN DUCTWORK SHALL BE LINED AND WITH CODE COMPLYING BLANKET INSULATION ACOUSTICAL LINER MAY RE WAY SO-3 OMEN 24'X24e 8*/ • • OO • O OO WHERE INDICATED ON PLANS)_ PROVIDED. ALL MATERIALS SHALL COMPLY WITH N.F.P.A. 90A AND 908 SEE SPECIFICATIONS ON SHEET MOI.i. SD-4 IMSA 12'NI2e 8*/ • • R • Q C 1 WAY (2 WAY OR 3 WAY __ O O O INHERE [NDICA1fD ON PLANS) F. HAY.GEA WIRES, DUCT STRAPS, FASTENING DEVICES, ETC. SHALL BE FASiENCO TO THE STEEL JOISTS AND/OR BEAMS ABOVE. DO NCT ATTACH ANY SUCH ITEMS OIRECiLY TO FLOOR SUBS, PIPING, OTHER DUCTWORK, ELECTRICAL CONDUITS OR THE ROOF DECK A dOVE. G ADLiTIONAL FIRE DAMPERS SHOULD BE INSTALLED AS REOWRED BY ANY APPLICABLE CODES AND/OR JURICDICTIONAL AUTHORITIES. �` RO-) 3S4-I� • • D • p INSTALL BLADES FACING THE BACK 24'N12e O O STORE, CABINETS 0R WALL --� - 4. SEA, AROUND PIPES ANh DUCTS PENETRATING FIRE SEPARATIONS WITH LISTED AND APPROVED FIRE SEAL MAITRIAI. ONLY LISTED AND { RO-2 355-RL 24'R1Y • • DO • _O INSTALL BODES FACING THE BACK APPROVED SEA ANTS ANC yFTPODS FOR THE SPECIFIC USE WILL BE PERMITTED. I _ OF $TOPE, CABINETS OR WALL a e - INSTALL BLADES FACING THE BACK RQ-3 355-ft lieuli • • O • _ 0 Qf SToaL, CABINETS OR WAIL 5. MECHANICAL CONTRACTOR WILL INSTALL TEMPERATURE SENSORS AND AS SHOWN ON THE PUN (VERIFY LOCAL CODES. IF PUN s LOCATION IS NOT ACCEPTABLE, IMMEDIATELY CONTACT LSD&C PROJECT MANAGER FOR DIRECTION.) 6. UI ON COMPLETION OF TNF WORK, THE CONTRACTOR SHALL FULLY PRESSURE CHECK AND CHARGE THE SYSTEM (IF REQUIRED) DATE ISSUED: 1 11231, 5 7. GENERAL CONTRACTOR SHALL ENGAGE THE SERVICE Of AN INDEPENDENT, CERTIFIED AIR/WATER BALANCING COMPANY THE COMPANY SHAH BE A MEMBER OF UK OR NEON. THIS COMPANY SHALL PERFORM THE BALANCING OF AIR/WATER SYS14M(S) AND MAKE ANY RE0111RFD DESIGNED BY: ►� ADJUSTMENTS TO ENSURF PROPER WORKING ORDER. UPON COMPLETION, THE BALANCING COMPANY SHALL PROVIDE A COMPLETE SYSTEM DRAWN BY: 1�R '•j tLr,' ,"t - -- REPORT. SEE AIR BALANCE ONTRACTOR REPORT COVER SHEET ON SHEET M02.3 ACCEPTANCE Of THIS REPORT BY ISDhC SHALL BE CHECKED BY: KN PRECEDENT TO FINAL PA`MENT iO GC. F il' P CONTRACTOR SHALL RCPT A-T A/C UNIT FILTERS AFTER EQUIPMENT START-IIP, BEFORE AIR BALANCE AND BEFORE MERCHANDISING. MECHANICAL PLAN NOTES - - - -- _ rY b. �I E I (1RAWINf_, NUMBCF M02 . 3 MECHANICAL NOTES AND SPECIFICATIONS AIR DEVICE SCHEDULE "Ts DI MECHANICAL PLAN CONTRUCTION NOTES "T� A JIHD h��s f LEGIBILITY STRIP 9 10 11 12 1'3 14 G 17 I® 19 20 ,11 22 PJ 24 „5 r 20_ 2Fi 12 0 d. ti w' H B K CONSULTANTS, LTD 171 CHARRING CROSS DR. SUITE 1 B WESTERVILLE. OHIO 43081 614-882-1199 TOILET EXHAUST IN-LINE FAN i EXHAUST 1 FROM CEILING EXHAUST \ / GRILLE W/HARD DUCT - CONNECTION UP THRU ROOF OR l L.L. EXHAUST MAIN CIO j ti v TORY MOUNTING BRACKET S ED TO CEILING OR WALL JOIST (r (fl tJ ~ ? 70 LING T (TYP) Z NOT � _ zo ^ Y zv -cam USED CLzLIJ (1) _ _ � l..l._ r^ 0 U,JL'i c :. :. d � ILET EXHAUST IN-LINE MOUNTING DETAIL NITS _.�42uM031COEFAKIT � 0 6 24 1/4' OR 13 1/4' HQTE�_FQUGh:'__QP0ITIst_= raN o�4'8i o:`c NOMINAL 11'g 12' = 13 1/2'z 13 1/2' AA CONCENTRK:_TRANISITION D ECCENTRIC TRANSITION _ � z`•e� "4i it k�� 'C' • OUTSIDE DIMENSION NOMINAL 12'■ 24• : 13 1/2'r 11 1/2' v / - MAX. 45' : 4R;ING, 60' R - MAX. 30' (EXCEPT 4S' IS PERMITTED IgA G X-IN NOMINAL 24'X 24' = 24 1/2'z 24 1/2' CONVERGING AT ROUND TO FLAT C:AL) �sg� : , *111 p�'i$y� s�8�r� oY4ogNY INSIDE DIMLNSION • • p v � `Y RECTANGULAR DUCT C CHANNEL REINFORCING BY C.C. AROUND OPENING Q,0q '\ g $ 8~ I m 6a • i{r Y3 .1.�y5° i° O _ RECTANGULA', DUCT Y F r.o Y Y a ; Y 3 y Std 1 I � CONICAL FITTING SERI NAIRTIGHT W/MASTN' MOUNTING SCREW FIELD INSTALLED ~ s ROUND DUCT Xr�_F"[ v zEo" + ~pT� AIR FLOW 45' s� Wo"�^ fl17c � io 1 'L, SADDLE TAP z°i �oE' ` WNk W p ORECTANGULAR TO ROUND 'eiE`i ?`�ei~o , zL v'1 RECTANGULAR TO ROUND �`� I" :n3Cu i4' OR 12' 4 - GYP. BU. CEILING --- �I 4 � STEEL MOUNTING FRAME ---- LrI' (' r MAIN DUCT < h'1 Q t I� •- 4S' Cl AIR FLOW (�I IBRANCH DUCT \ !I AIR FLOW GROUND TO ROUND ORECTANGULAR TO RECTANGULAR O � DRYWALL CEILING DIFF. MTG. FRAME DETAIL NTS DUCT GETAILS a2DM031BODUCT S a 42DM031EOFRME _ o Q' a Z l•. oxO (o W w cn u'1 0 w w Q a �I o 0 aQo � a a M V1 N PROVIDE VOLUME DAMPER WITH LOCKING W U) N QUADRANT. PROVIDE WITH 3' EXTLNDED Z p N N RJJND DUCT - SHAFT AND HANDLE (SEE AIR DEVICE O .s SCHEDULE O m) Q DAMPER HANDLE TO BE ��_ Z Z INSTALLED MAXIMUM Of SHT. MTI. ELBOW REOUtRED O F N 00 W 3'-0' ABOVE CEIUNG l T (� rn a w w -� SECURELY TAPE VINYL FLEX DUCT 10 SHY. i z 0 3 �d MTL W/ MIN. OF (2) CONTINUOUS WRAPS :C o 3 O ►- STORM COLLAR 24' OF DUCT TAPE. STRAP CLAMP OVER FLEX DUCT INSULATION & VINYL TO SHT. MTL LAJU N 2 �- TAPE INSULATION TO DUCT TO FORM A Q N W 0 a 2 .16 Ox w Q 0000 SEAL 1W /N/1 j Q. uul GU w V) PE a W FLASHING by G.C. 18' LONG ORANGE MARKER TA > V1 rn ►- N 0 _J ROOF ATTACHED TO DAMPER TO IDENTIFYREVISIONS: I mo- LOCATION -- / ED 80 IODIFFUSERNG HY COLLAR. S CTI MNNS CURSHT. ? l MTL. SCREWS, DUCT TAPE AND MASTIC. INSULATED FLEX18l CINN(CTION (MIN. 3 FT., MAX. i FT) TRANSITION FROM DUCT SIZE TO DIFFUSER NECK SIZE AS NECESSARY FIRE DAMPER WHERE INDICATED ON PLANS THERMAL INSULATING BLANKET REOUIRFD DUCT SUPPORT FASTENED -- FOR FIRE RATED CEILINGS ONLY. TO NEAREST ROOF STRUCTURAL MEMBER. SIZE ----m- AL1 BE PER DETAIL 'K' TITUS MODEL 'DB' CEILING MOUNTING FRAME FOR GYP, BD, FAH. DUCT HIS SHEET. DIRECTIONAL BLOW APPLICATION TITUS MODEL TRW, SEE PLATE CLIPPED ON DETAIL C THIS SHEET DIFFUSER RODS. SEE NOTE BELOW. SUPPLY AIR DIFFUSER NOTE: ALL DIFFUSERS ARE 4-WAY BLOW UNLESS NOTED DATE ISSUED: 11 /23/0` 0 T (LAY-IN FRAME) - - OTHERWISE PROVIDE OPTIONAL DIRECTIONAL RIOW, TITU; DESIGNED BY: f MODEL 'DR' TO CONVLRT DIIfUSER FROM STANDARD M R WITH MANUAL VOLUME DAMPER 4-WAY TO I-WAY, 2-WAY OR 3-WAY TOW AS DRAWN BY: MR U'SED DMCNATED ON PIANS BY SHADED AREA CHECKED BY KH MECHANICAL Y� DETAILS 1 I DRAWING NUMBER: L4 NTS � NIS � 03 . 1 LAHALISTCEILIN R MOUNTING DETAIL A AIR DUCT ASSEMBLY DETAIL G DIFFUSE f Lrt'0181LFTY STRIP " Cm w.. 13 1 4 2 3 4 B N 4 10 2 n ll 18 17 le 19 20 21 r2 23 24 25 28 2 ' 28 29 30 W1 1 1 OI M7Mt z l0 111diIIIIII,111,11111 ,I 1 '.'Ir p fl` All" L _ r.. - .... - .:-. ,:. - - : _ � ". '�r�'�A�+ .. �s�1.n,�a+w.+.�ksa• -.aavwr. �. .0- . .. , ... DESIGN_ WEATHER PARAMETERS H B K CONSULTANTS, LTD City Name . .. ............ ......... ..... .... ....... ............. . ....... . ..................... Portland NOTE TO CONTRACTOR 171 CHAkRING CROSS DR. S Location .................................................................................................... OrOgon SUITE 18 Latitude .......................................................................... .................................. 45.6 Deg WESTERVILLE, OHIO 43081 Longitude ....................................................................................................... 1126 Deg IF AN ITEM IS NOT SHOWN ON ANY OF THE 514-882 Elevation . ....................................................................................................... 39,0 ft RESPONSIBILITY SCHEDULES, THEN rr IS THE Summer Design Dry-Bulb 90 .... ............................................................................... .0 OF Summer Coincident Wet-Bulb ......................................................... .................... $7.0 OF PFSPONSIBILITY OF THE CONTRACTOR. SummerDaily Range ............................................................. ......... ................. 21 6 OF WinterDesign Dry-Bulb .................................................................................. 220 OF Winter Design Wet-Bulb .. ................................................................................ 184 `F -3; Atmospheric Clearness Number ......................................................................... 1.05 Average Ground Rell"Imtaxe ............................................ ................................ 0 20 Soil Conductivity ........... .. ... ........... ................................................................ 0.800 b I Ll/(hr 41 'f UST OF CONTACTS FOR OWNER SUPPLIED MATERIAL local Time Zone(GMT+/- N hours) ..................................................................... 80 hairs IF NOT LISTED, CONTACT LSD&C PURCHASING AGENT Consider Daylight Savings Time ............................................................................ No Simulation Weather Data ............................................................ noneli 111w ��PPUER CONTACT Current Data is ... ... ... ..................................................... 2001 ASHRAE Handbook Design Cooling Months ...................... ..................................... January to December HVAC 1,ENOOX RAZI NU CONTROLS ClICS no#" SUPPORT HVAC LOAD CALCULATIONS Air Syblain Information Am System Name BOW-WASHINGTON SQUARE Number of zones F quipineni Class SPLT AHU Floor Area 4201 U t1' 0 Air System Type CAVIRM I-Mation Portland.Of egon LOCAL AREA REQUIREMENTS F Sizing Calculation information Zone and Space Sizing Method YES 00 YES NO L) Z I. SSE EVACUATION 5. SPECIAL CURB HEIGHT REOUIREMENTS U-) U, Zone CFM Peak zone sensible laad Calculation Months Jan to Doc 2. CA" DIOXIDE MOWOW 6. FIVE MILE COASTAL PROXIMITY Space CFM . Individual peal,space loads Sizing Data C&ILulated! 3. KuICANE ZONE 7 OTHERS, LL METHANE, CARBON MONOXIDE, SOUND Cl) 0 ro 4. SE w,' ZONE SENSITIVE, ETC. DESCRIPTION. Z Z Central Cooling Coil Sizing Data - vi tC Z 0 n X Z () -1' M Total cod load 10.2 Tens Load u(xurs at Jul 1500 2 E III. Total coil load 1224 11 OADB/VVB 91167 0 < Sensible cal load 116 7 MBH Enlisting DB i WB 79 2 1"4 C11 C, Coil CFM at Jul 1500 5008 CFM Leaving DB I WB 57.9 1 Ill IF Z Max Nock C F M woe CFM CodADP 11411 IF ABBREVIATIONS, RESPONSMILITY SCHEDULES Uj (D Sensible heat ratio 0953 Resulting RH 54 % M N. C 31 Lei n Elton 4111 9 Design supply twnp $7.0 IF AC WAC EOUIPi ",FPJER LD - LIGHTING PACKAGE DISTRIBUTOR BITIJI(hr-ti 291 0 Uj C- Sum of peak zone CFM S00111 CFM Bypass F limi 0.100 Zone T slat Check 4 of 4 OK CV HVAC EOUIPMI* ^011illillSSIONING CONTRACTOR LL - LANDLORDC) Water flow le 10 0'F nse NIA Max zone temperature deviation 00 IF DS - DREAMSTEAMI11 NDOR LSD&C - LIMITED STORE DESIrN & CORSTRUC' lei U) EC - ELECTRICAL C("ACTOR MC - MECHANICAL CONTRACTOR UJ to EMS - ENERGY MAN& "WENT SYSTEM VENDOR. MS - MUSIC SYSTEM VENDOR Supply Fan Sizing Data FAC - FIRE ALARM ( ,*RACTOR PC - PLUMBING CONTRACTOR LL, 0 FPC - FIRE PROTECT I, CONTRACTOR POS POINT Of SALES (CASHORAP) Actual max CFM SM CFM Fan motor BHP0 00 BHP GC GENERAL COMPACTOR PS - PAGING SYSTEM VENDOR 2 w Standard CFM 5001 CFM Fan motor kW 0,00 kw IBS INDUSTRIAL 91" SERVICE SC - SECURITY CONTRACTOR Actual max CFMfff 1.19 CFM/W IFS IFS SUPPLIER SSV SECURITY SYSTEM VENDOR Co Outdoor Ventilation Air Data LBSS - UNITED BRAN;; SERVICE SOURCE SV - SENSORMATIC VENDOR Des4nairflomiCII'M 11123 CFM CFM/person ................. 24.36 Cl`Miperson LC LANDLORD CON-ArTOR TEL - TELEPHONE CONTRACTOR CFMMe 0.27 CFMIW Maximum Design Minfmun TNF» Madrnurn Zone Cooling Air Air 41 Host" Flow Sensible Flow Flow Peak Load Afft zoa,lI Zom Neittial jMI8H)' (CF11111) (M) Load (ml"l I" CF11i Z111111%1 22.3 1379 11379 Jun ISM 43 1056.0 1 Zaro 2 1-201 Im Jun I&V 4.2 '103 .0 1 68 Jun 27-C HVAC RESPONSIBILITY SCHEDULE Zone 3 L ZOM4 431 bill Jun 2 1001 V 9134- C' 2 Sill lt� i Z FURNISHED 6' INSTAUBy ID A` ITEMLSDAC RE-USE N/A REMARKS LUO.00 Cc*-IL L4Nkm W1111% am Dww DESIGN COOLING DESIGN HEATING 111001711K a" I POM 111111111111111AW -0 w COOLING DATA AT Jul 1900 HEATING DATA AT DES HTO k CUM LMUML Q- COOLING 0A 08 1 WB 90.0'F 167.0*1111 HEATING OA 08 1111111111111 210 OF 118.4'F X�w o - a H- 81 F aw 5 j Latem a" M OW KMC 4f ZONE LOADIII 'gi,T 08.up, 12, D*Wb (111171.1111ill (11111ITUll" D*Wb (BTLO" fWlndw A Skylight SOW Looft --oft, 0 fli $11i SnTm Acussm&. r J__ WIN Transmissloil jf 0 fr 0 0 r 0 6; �Roof Transmission 420110 3255 4201 fle 1552111 wusm No LD 125lBN -91' r V.7 'Wwdm Transmission 0 w 0 0 w 0 Skywil Transmission 0 w 0 -0 fia 0 DooroRr Losift Off WFVKUIWALS-t W NOM 0 or iI 4201 film 0 4201tr VAL FINE CAMPM .jL ;2� -1ia j,,,1.- Off" 0 0 IF 0 ilj�t 1 4 1 A 91 r' 4' , ') 0 le 0 0 fie 0 =swim rK/Swu wow eOverhlsad Lighting 1365_W 2= I Wait 0 0 liiif�i 47306 Ir - 0 0 LOW PWOM kcrom wC 111111C 31� Ekm*ic Equipmerit2255 W 7416 0 0 FPaopka 46 CL 0 0. 0 111111IN/ImIED11.41 PKZK WCTWi Infiltration .1 0 0 .1 0 0 Tallaneous (A D r,4 0 0 0 Vi lu"Is K U) _') 0 sefetoactor 10%110% 022 10% 1553 < -j-Total Zone Londa _j ri-T, - 1101147 11701111,11 0 KOK NAM 1100 �!TjCondlij 907601014? 116234 0 LPI@rwm WON LOW 0% 0 0 0 ow WAS)Plarium Root Load 70% ?M 0 0 • 0 Plenum UW".Land -30% 1397------- 0 0Ul"M 41ilirwillin Load 5000 CFM 0 5008 CFM 0 TOW 0111161119 0"Wa NAZI op IV -1 =1 rc? 'ientl&Uon Load 1123CFM 16897 _1123CFli 56101 01 TO 111111C me U) rSupply Fan Load 5008 CFM0 5000 CFM 0 - Space Fen Coil Fos 0 - 0 Duct Hem Gain I Logo 0% 0 0% 0 U�011`110AP DRAM PAR U W Total system Leads 1`161146 frot 0 _-) I 1.- 0 Central ccowvg CON 113306 Via 01 0 XI M) < Terminal Rallied Cab 0 714141 0 )e WW. o. - NAMM NM Total Conditioning Sri$ -71414' OWMAM I U Z w Key: Positive values are cIg loads Positive values are-htg loads- CL 0 I Negative values are htq loads Negative values are C19 loads -MRIs 0 - SALES NON-SALES < CL Z r- LMOLM COMM 1111111111110 >0 0 Lu x 0 cl; SPACE AREA (FT 2 0,000 0.000 1jili TACTOP WAC UWT A= CC Mw 01 AVG. CEILING HEIGHT Ic _j 00 00 LAJ C, --MISC. ELEC. WATTS FOR COMPUTER LOAD EST. ItWVAIM OOIfF96I 9r9tor atupwin as oc 0 0 SPACE VOLUME (F 00.000 00.000 ------_ROG M 00 0 0 EQUIPMENT N.E.C. HN.A.C. Cn SALES NON SALES IDOMIUK C1111111 SYM ww we nm WIN.w wC Z Z C14 NAME ELEC. LOAD 0 0 (N 06 Z CODE RLOUIRED AIR CHANGES PER HOUR X 0 X 0 REQ. WATTS OTY. WATTS OTY. WATTS w=4 WMAW"UK aw" w ue 0 0 4 0 Z IRED AIR CHANGES (FT-/HR) 0.000 0.000 AEI SOUND SYSTEM 165 W. 165 W. --- --- 1 165 2 y Z UK Doom • M li- in 0 CFM VERSION (MIN /HR) 60 + CASH REGISTER 4100 0 < 0 LLJ 275 W. 275 W. 4 - tJ1L&J --) "'mr 0 3: w 0. C) TWOMAT W low uwtq Z Or PC COMPUTER/PRINTER 480 W. 400 W. cr MINIMUM EXHAUST REQUIRED 0.000 1 400 meeme 0 T%VWMKN 106 IOM( DAWK9 • V) - MONITORS 120 W. 120 W. --- --- --- --- L.J w 0 LAJ Z n (-) a- 2 ad MAW POWs= 0 < 0C) 0 In C) cr 'MY] TCP PANEL 250 W. 250 W. --- 1 250 Q FRIG/MICRO PWUkUnt-nfCfW setar&a nn 1200 W. 300 W. --- --- 1 300 REVISIONS: RTU-I POWER LIST CFM 0 0.5 ESP 111111111111MATIC nuc no tit RTU-2 POWER EXHI 000 CFM 9 0.5 ESP SENSORIMATIC 360 W. 360 W. --- --- - --- VARIABLE AIR VOLUME (VAV) BOX RESPONSIBILITY SCHEDULE oc TELE. SYSTEM 40 W. 40 W. --- --- 1 40 SEF-1 SMOKE EXHAUST 0,000 CFM 0 0.5 ESP RAF - TRANSFORMER 0 KVA 0 W. --- --- FUWHF 0 BY INSTALLED By It-UK N/A REMARKS It I If F MR r"Il I AND AMM -2 RIETURN/RELIEF D,DOO. CFM 0 0.5 ESP LNCLM CONTt MN"] am we EXww AM POAMU AVMItWff VAN POOTP[D VAY KLj1r A111I ra a K%w lial ra TOTAL ELEC. EQUIP. 1100 1155 1111111(M MAT AM 00 NUT OVOM) At [TOTAL CFM EXHAUST 00 CFIM MISC. BTU FOR COMPUTER LOAD EST. FM a[D Vw sum rVAMIATIN • • TOTAL CFM EXHAUST > TEAMER OUTSIDI AIR OTAXI 4000 -T--i676 U SENSIBLE MINIMUM EXHAUST REQUIRED DREAM�ALM S -SA 3070 BTU LATENT Is ON LES) Corlo$M WIN! 11111111 .000 OUTIDE 111111 WTAIM 1111111111110 0 X OUTSIDE AIR REQUIREMENTS IbLe 24 vmf x"Criom 901 Neill S EXHAUST C NEMONCE IT DATE ISSUED: 1 1/23/0'_ WINF AN 40M 0 FLOOR ASHRAE 62-1989 ACTUAL my a iwmrm In" DESIGNED BY: MR ROOM OUTSIDE AIR SYSTEM OUTSIDE AIR MO rx`4111 0 DRAWN BY: MR REMARKS AREA ­ REQUIREMENTS vw CHECKED BY: KH USED PURPOSE SO. FT. CFM PERCFMNUMBER CFM frwwlnp nkmm 0 SO. FT READ. PER UNIT uwmlw iialaiiiiis MECHANICAL 11`100`01i DAWIN Arwros SALES 3266 0.30 986 LL SYS. 1125 WAC trip" RESPONSIBILITY NON WMK All IlAwto • SALES 913 0.15 137 no*maw" SCHEDULES TOTAL - --------- 1123 TOTAL 1125 DRAWING -1 - KE EVACUATION CALCULATIONS NTS HVAC LOAD CALCULATIONS NTS MECHANICAL RESPONSIBILITY SAn �G A SCHEDULES A nU INTS AIAISCHD M04 . 1 mom jl# LEGIBILITY 97 RIP 4 5 e 7 P -0 i 1 14 1 21 22 23 2A 2. ^r 2A 29 3C 01 cl� Ir F- 4 -A jW*h] W A go"."ali"M 1,s _J­'� I .� A.. i ttLy ;0 y' i FANF "'LID VAV CONTROLLER WITH ACTUATOR DIAGRAM H 1 K C QNSvIT 171 CHARRING CWS- (TYPICALFOR ALL VAV TERMINALS) SUITE 18 WESTERVILLE. 000 40 614-882-1199 us 0 -0c)1 An If - 110b lRIlT A11 I STTTW AW - - Am 24 ;; NSoll JT tyl4-Y AIS 002 is 0 ►AM svwlvoF 001 12 0 c0M -1-1 etCfD 00-IV* 10 DUCT KATO UHC-302 000 .1 0 -Fi Aoo •T —CN) z -�• cow i __24v cow —14rAt - 1 ! . s COM s '�2A r Toats 0 tNLOU �_... � oN PLATE rt _.._ zr .. s ArAa To AXA c \ Amr.lION 107 /1{ F v ci� z z0 s t0 VAV AM fps x101[ (� .J a- z ` W (7 } Y A Lu J 0 � .• y TO NEXT COYPON[l11 M SYSTEMFROM 0111[411104 C01001[Nt IN SYSTEM W 4 } IF APPUf11li) (R AT'RUGABU) W O 'C Z LACI CAY In d a ted _ -.-1 m +- :oil: l F AF f_41 1 .-sT INIINT _J SPA1;E 7-STAT SPACE +/Sr AL. TEMP S[IQ01 JC ZT o�gRN o: a -; oo� NOTE: ; ;moo 115-019 O ALL FIELD INSTALLED WIRING IS 1 CONDUCTOR 18 GAUGE TWISTED PAIR, WITH PLENUM RATING AND NON-SHIELDED. CONTROL ' 'd-Ai13 T >'. WIRES SUPPLIED B" CBCS. _- 4j.x h� 5 44Ir " FAN POWERED VAV UNIT SEQUENCE OF OPERATIONS o' TAyg T. UNIT MODJLA ES DAMPER OPEN ON A CALL FCR COOLING WHEN THE SPACE TEMPERATURE RiSES ABOVE THE OCCUPIED r W :• Rab SETPOiNT. WHEN THE SPACE TEMPERATURE DROPS BELOW THE OCCUPIED SET POiNT THE DAMPER MODULATES BACK TO THE >t�- $W- bl5� IoGoy VENTILATION POSITION. ,�1,. xg zs 2. UPON A DROF , SPACE TEMPERATURE BELOW THE SETPOINT, THE PRIMARY AIR DAMPER CLOSES TO MIMIMUM, AND THE •g a S c :E B .q- PARALLEL FAr E4ERGIZED TO IVDU;E RETURN AIR INTO THE DUCT. UPON A CONTINUED DROP IN THE SPACE TEMPERATURE, Y o Y m l3 # 1 i• iSx ONE OF THE )WING WILL OCCUR UNTIL THE SPACE TEMPERATURE IS SATISFIED AS APPLICABLE. r Z i - z A. [ICTRiC HEAT WILL ENERGIZE. B NOT WATER VALVE WILL OPEN. n r y$"' yy•1 ig�Y3�3w- TOP - "g' , Ilk 3. COMFORT 10 CONTROLLER COMMUNICATES WITH ROOFTOP UNiT CONTROLLER TO ESTABLISH SYSTEM OPERATION TO PREVENT 'sR • - ' .� TERMINAL UNIT COOLING UOUENCE WHEN "FTOP HEATING iS OPERATING. 4. THROUGH UNI AGE THE DAMPER CAN BE DRIVEN CLOSED FOR SMOKE SHUTDOWN OR SMOKE EVACUATION MODE TO MEET THESE a II m .191c SEQUENCES. 5. THROUGH UNI,AGF THE DAMPER CAN BE DRIVEN OPEN FOR SMOKE PRESSURIZATION MODE TO MEET THESE SEQUENCES. LO v co O Q N � Wt WA � /�p� r Z LeiO 0 Qua FPVAV UN11 CONTROL SYSTEM DETAIL "Ts B � .4 Z W 42DTCOiBOFVAV a u a Op a _ GENERAL NATE$ 1. ENERGY MANAGEMENT SYSTEM (EMS) WILL AUTOMATICALLY CONTROL THE HEATING, VENTILATING, AIR CONDITIONING EOUIPMENT AND LIC 11T!NG uj ct t j L Ln j SYSTEMS AS INDICATED AN AS SHOWN ON THE DRAWINGS. ALL EMS COMPONENTS REQUIRED TO PERFORM THE INTENDED SEOUENCE Of 9 1. ALL FIELD-INSTALLED CONTROL WIRING SHALL BE PLENUM RATED, 4-CONDUCTOR, 18 GAUGE, UNSHIELDED TWISTED PAIR. W I w co CONTROL WIRING SUPPLIED BY EMS. OPERATION ARE TO BE FIJI• 4ED BY EMS PROVIDER AND INSTALLED BY THE GENERAL CONTRACTOR WITH THE EXCEPTION OF FACTORY Q p o MOUNTED CONTROLS. (SEE �RAOIINGS)- = O w Q 0 0 2. ALL LOW VOLTAGE, COMMUN,:ATION AND/OR SENSOR WIRES SHALL BE FURNISHED AS PART Of THE ENERGY MANAGEMENT SYSTEM AND p CL DE S 1XIEWT or m S�C_►DED NATE$ INSTALLED BY THE GENERA �NTfAC10R. WIRING MIST BE INSTALLED AT A MINIMUM Of 18- AWAY FROM ANY LIGHTING FIXTURES, d N M "' 0 ra• xs PAlAi. _ 0 SPEAKERS OR ANY MAGNET "EVICES. NO SPLICING IS PERMITTED. ALL WIRING AND EQtIPMENT SHALL BE INSTALLED IN ACCORDANCE Z Z (V ITEM(S) FURNISHED BY EMS, LOW VOLTAGE FIELD WIRING AND TERMINATION 10 BE COMPLETED BY MECHANICAL CONTRACTOR. WITH THE LATEST EDITION -HE NATWNAL ELtCTRICAL CODE, LOCAL CODES AND LANE,.)RD REQUIREMENTS. NOTE TO GENERAL 0 Z o C- y CONTRACTOR: IF NFCESSA• 'HE PROJECT SUPERINTENDENT MAY PUCE A PHONE CAL. TO THE CBCS TECHNICAL SUPPORi CENTER AT --- ® 0 (714) 373-5363 FOR TEC) AL ASSISTANCE. Q W O Z y 0 � ONLY ONE CO2 SENSOR AND ONC OUTSIDE AIR SENSOR PER tOCATION IS NECESSARY. Z 0 3. A CHECKLIST FOR INSTALU '4 OF THE EMS WiLL BE PROVIDED WITH THE EMS EQUIPMENT. NO START-UP IS TO BE PERFORMED PRIOR TO q ~ N O V 0 ALL CONTROL WIRING AND WIRING HARNESSES SHALL BE FURNISHED BY EMS AND INSTALLED BY MECHANICAL CONTRACTOR. a O ti1 0 __ COMPLETION AND VERIFICAi , Of THE CHECKLIST BY GENERAL CONTRACTOR. THIS CHECKLIST IS TO BE SIGNED AND SUBMITTED TO 0 a, _ W W 44 CONTINENTAL BUILDING CL 'L SYSTEMS (CBCS) MONITORING CENTER PRIOR TO STARTING THE COMMISSIONING PROCESS THE ? z 3 a a p - M 0 ITEMS) r'JRNISHED BY AND FACTORY INSTALLED BY HVAC FOUIPMFNT MANUFACTURER. ( pICY fCOMMISSIONING PROCESS CA�40T BE INITIATED WITHOUT THE COMPLETED CHECKLIST. _ (7 3 �- 0- 0 y - I MOUNT TO 4 X 4 JUNCTION BOX AND CONNECT TO 110 108 VOLT - SINGLE PHASE V N u Z ® t0 `—' / 4. REMOTE. COMMISSIONING OF TN[ HVAC CONTROL SYSTEM REQUIRES THE USE OF AN ANALOG PHONE LINE, SUCH AS A FAX LINE. If THE W (n W W (� PERMANENT PHONE LINES APT NOT INSTALLED, THE JOB SITE'S PHONE UNE CAN BE USED. THE CENERAL CONTRACTOR MUST CUNTACT Q U IPI m d O �D ITEM(S) FURNISHED BY EMS AND INSTALLED BY SWITCHGEAR VENDOR. lV Q Q 00 Q O ton p CBCS CAI) CENTER 0 (71. '13-5363, TO REQUEST PEMOTF COMMISSIONING. M a in _� u W FOR CONTROL OF OUTDOOR CANOPY LIGHTING. APPLIES TO STRIP CENTERS OR OUTDOOR LOCATIONS ONLY n ca 0 `T ~ V) 0 _0P / S. A GENERA) CONTRACTOR DI :NATEO REPRESENTATIVE SHALL CONTACT CBCS 10 SCHEDULE A TIME FOR CONTROL SYSTEM REMOTE �"/ (�!D LON WIRING SHALL Of FURNISHED BY EMS AND INSTAILFD BY MECHANICAL CONTRACTOR. COMMISSIONING, AT THE SI,41DJLED TIME, THE GENERAI CONTRACTOR CALLS CBCS AND WILL JOINTLY PERFORM THE REMOTE REVISIONS: C 0 COMMISSIONING, THE GENERAL CONTRACTOR SHOULD ALLOW ONE HOUR FOR TACH HVAC UNIT FOR COMMISSIONING, AT THE COMPLETION y _ _ LEGEND Of COMMISSIONING THE SECOND SEOUENCE OF THE CONTROL NUMBER WILL BE ISSUED. I 6, THE EMS CONTROL ENGINEER WILL ASSIST THE AIR BALANCING CONTRACTOR WITH THE CALIBRATION Of ANY FLOW SEMSCF;. THE AIR E10M PHOTOCELL (9 �_ 4 COMPONENT REFERENCE - REFER TO INSTALLATION DETAIL BALANCING CONTRACTOR MUS CONTACT CBCS AT (714) 373.5363 10 VERIFY THAT THF ON-SITE READINGS OF ANY AIR OR WATER FLOW PACKAGED WITH EACH COMPONENT. SENSORS ARE CONSISTENT WITH THE VALUES BEING MONITORED BY CBCS. AT THE COMPLETION OF THE AIR BALANCING PROCESS, CBCS 0? WILL ISSUE THE UST SEQUENCE OF THE CONTROL NUMBER TO THE AIR BALANCE CONTRACTOR, THIS WiLL INDICATE THAT THE SYSTEM HA' - 0 SUPPLY AIR TEMPERATURE SENSOR LOCATED IN SUPPLY DUCT 36- FROM SUPPLY FAN (UNLESS FACTORY INSTALLED) BEEN ShNED-OFT' FOR PROPEp OPERATION. LON WIRING PROVIDED TO Ts1sT OR UST INSIDE ITS PANEL O2 OUTSIDE AIR TEMPERATURE SENSOR, MOUNT ON NORTH SIDE OF UNIT. C(IMPONENI M SYSTEM LIC4f.VA- I �) O3 CW TEMPERAiURE SENSOR FOR SUPPLY (THLRMOWELL W/ BULIt1 PROBE) NOTE 10 GENERAL CONTRAC'OR: iF NECESSARY THE PROJECT SUPERINTENDENT MAY PUCE A PHONE CALL TO THE CBCS TECHNICAL SUPPORT CENTER AT (714) 313-5363 FOR TECHNICAL ASSISTANCE. CW TEMPERATURE SENSOR FOR RETURN THiRMOWELL W/ RUIIET PROOF) IFS - INTEGRATED FACILITY SYSTEMS. PRE-MANUFACTURED AND PRL ASSEMBLED STRUCTURE THAT CONTAINS TRANSFORMER, BREAKER PANELS, COMMUNICATION EOUIPMENT, EMS EQUIPMENT, Etc. DATE ISSUED: 11/23/05 PHOTOCELL ASSFMBtY WHERE ABLE (OUTOOCk LIGHTING ONLY) [MS - ENERGY MANAGEMENT SYSTEM VENDOR DESIGNED BY. MR T/P - TWISTED PAIR DRAWN BY: MR A. PHOTOCELL ASSEMB STS OF ONE WEA ER Du HOiOCEII SIN T-STAT - THERMOSTAT CHECKED BY KH B. LOCATE PHOT ASSEMBLY ON THE ROOF f T TO FLA L DAYLIGHT, T SHADOWED OR FMS COMM LINK DAISY CHAINED SYSTEM N;TWORK RUSS. DIRECTLY EX TO ANY NIGHT TIME ILLUMINATION. FTEMPERATURE - C PHOT SS(MBIY M1151 BE MOUNTED HORIZEINTALLY, FACING NORTHERN SKY, WITH THE HOODED PORT TOP1--- �--- FIELDIELD WIRING WIRING a D IN 4 CONDUCTOR 18 GAUGE TWISTED WIRE AS SHOWN, FROM PHOTOCELL ASSEMBLY TO LIGHTING CONTRO S CONTROL MARK WIRES TG AV040 CROSSOVERS. WIRING DIAGRAM DRAWING NUMBER. S PANEL MOUNTED LIGHTING CONTROLLER "Ts GENERAL NOTES, CODED NOTES AND LEGEND _ "Ts (� CONSTRUCTION NOTES NTS coumu A TCO . 1 .N. I/ LEGIBILITY!3TRiP p5 R 7 A in i '2 3 14 Ai 19 2t:, 21 e2 2"''1 24 25 26 27 26 24 ,.-'71#•+!{,1 '. may, 7AF n y h1NI • 4 a Ormi 0111111111101,001011100 Y k, .. y t -- -- - - - a B K CONSULTANTS, LTD. DIVISION 15 (CONTINUEDI PLUMBING RESPONSIBILITY SCHEDULE SAIL WASTE OR sEwER s. OR w OR SAN TMERMOMf fR ' 71 CHARRING CROSS DR. S.+ $COTIQN-15200 - PLUMBIN0 -- SUITE 1 B Gp�- C7Nt�ENSATE DRAIN C D PRESSURE GAGE WESTERVILLE, OHIO 43081 - ITEM FURNiSNED BY IIS1AIlEU BY of USE REMARKS A. SCOPE OF WORK NDORc imDLORD+ CONTR. DLORD CONTI. -OTHER EXISTING A _ _ SANTARP VENT V INLINE PUMP 614--882-1199 1. THIS CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION AND FACILITIES NECESSARY PLUMBING FIXTIWS l TRIM PC K CAD WATER C W BFP BACK FLOW PREV FOR, REASONABLY IMPLIED AND INCIDENTAL 10, THE FURNISHING, INSTALLATION, COMPLETION AND TESTING OF ALL WORK FOR THE - -- -- - - -- PLUMBING SYSTEMS AS SHOWN UN THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONUITIONS, to ORNIKING FOUNTAIN AND ASSOCIATED INCLUDE. BUT NOT BE LIMITED TO THE FOLLOWING. ACCESSORIES t --- - - -- NIT WATER H W A. COMPLETE SANITARY PIPING SYSTEMS OF WASTE, DRAINS, AND VENTS. SEINER AND VENT PIPING Kr! P k T RELIEF VALVE {iQ-= S+i1 T-OFF VALVE S O V B. COMPLETE COLD AND HOT WATER PIPING SYSTEMS, APPURTENANCES AND INSULATION, C. FIXTURES AND EQUIPMENT AS SCHEDULED. NATER HEATER PC K Q-• 0- FI IFJR CLEAN-OUT C 0 L�[J ACCESS DOOR D- COMPLETE NATURAL GAS OR PROPANE PIPING SYSTEMS (AS APPLICABLE, REFER TO PLANS) - - - - -- -- - T E. CONDENSATE PIPING SYSTEMSAS APPUCABLE, REFER TO PLANS). DOMESTIC HOT AND COLO COMBINATION BALANCE SYSTEMS (AS �WATER PIPING K K --�� WALL CLEAN-OUT F. TESTS AND ADJUSTMENTS. _.-.-. .._...___ /SHUT-OFF G. SUBMIT A COMPLETE SET OF REPRODUCIBLE AS--BUILTS. I CONDENSATE DRAIN PIPING ® 10'ASS FLOOR DRAIN BALL VALVE 2. BEFORE STARTING WORK, THIS CONTRACTOR SHALL EXAMINE THE ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL PIANS 'SECONDARY GOND DRAIN PIPING O R>E GATE VALVE AND SPECIFICATIONS TO SEQUENCE, COORDINATE. AND INTEGRATE THE VARIOUS ELEMENTS Of THE PLUMBING SYSTEM, MATERIALS, AND EQUIPMENT VITH OTHER CONTRACIM TO AV040 INTERFERENCES AND CONIRONTATIONS. -- - --- - - (� CONDENSATE DRAIN Pu11P � .•---�-� D•<OP GLOBE VALVE o BUTTERFLY VALVE 3. RELOCATION OF EXISTING WATER, GAS, WASTE. VENT, OR DRAINAGE LINES TO fACIL1TATE STORE DESIGN CRITERIA MUST I)f INCLUDED FLOOR DRAIN,, CLEAN OUTS, ti P-TINT OF CONNECTION P.O.C. IN BID PROPOSAL. WATER HAMMER ARRESTORS, ETC K PC ] DRAIN VALVE S EQUIPMENT AND INBTALLATION /S-BUILT DRAWINGS PC - - - G',, PIPING I` I CHECK VALVE z , (E) - REFER f0 PIANS FOR SCHEDULES Of EQUIPMENT ANC FIXTURES AMERICAN STANDARD, KONICR AND CRANE ARE. RNSTAWANEOUS WATER HEATER E''STING III UNION CONSIDERED PC K F•- �z c- E ACCEPTABLE AS EQUALS. ` - (N) N, w Ext PLUMBING FIXTURE U r' 2CRAIN PUMP K K z . SANITARY PIPING `v U (R) R .00ATE }><t -PLUMBING FIXTURE - Lr , C(MO SINK LAY AND FAUCET K A. WASTE. DOWN AND VENT SMALLER WAY BL GALVANIZED NST EFL ALLL BTERNARVICE TEE PIPINGGHT CAST MATERIALSRAE ACICEPTABLE ASL PIPE. TAPIPING SUBSTI/TU0VE TIONFWHEN THEIR USE "'- - - - _ _ S ,AcH BLOCK r FIXTURE UNITS 1 I L c IS PERMITTED BY THE LANDLORD, LOCAL CODES AND BUILDING DEPARTMENT OFFICIALS AND DOES NOT AIFLCT OTHER O FIXTURE UNITS `"ri CO \`- ��/J - z TRADES. SUBSTITUTIONS MUST BE LISTED AND QUALIFIED IN BID. NO PLASTIC PIPING ALLOWED. i , �- z O _ EC,iPMENT TYPE - HVAC EOUIPy[NT CALLOWE B INSULATE ALL HORIZONTAL RUNS OF PIPING LOCATED IN CEILING SPACES, WHEN APPLICABLE. INSULATION TO BE AS / DETAIL MARK Q EG��PMENT NUMBER P03.1 _ SPECIFIED FOR WATER PIPING. _j ~ C. CONDENSATE PIPING SHALL BE TYPE 'l' DRAWN COPPER TUBE WITH 95-5 IIIA-ANTIMONY SOLDERED JO'NTS AND WROUGHT EL z COPPER FITTINGS WITH DIELECTRIC SEPARATION BETWEEN DISSIMILAR METALS, W U > a. � (C r'., t 3. POTABLE WATER PIPING SHALL BE AS FOLLOWS: r r Co 39 u-, O E Lo A. BELOW GRADE- TYPE 'K', ANNEALED TYPE TEMPERED COPPER TUBE FOR PIPE SIZES 2 INCHES AND SMALLER, BRAZE ALL JOINTS. Cf) 0 ' LIJ B, ALL OTHER: TYPE 'L' DRAWN COPPER TUBE WITH WROUGHT COPPER FITTINGS AND 95-5 TIN- r ; ` ANTIMONY SOLDER. 4. PIPING OF DISSIMILAR METALS MUST BE DIELECTRICALLY SEPARATED. W O E ` 5. GENERALLY, SANITARY AND POTABLE WATER TAPS WILL BE PROVIDED BY THF LANDLORD, FIELD VERIFY EXACT CONNECTION POINT p L M BIN G RESPONSIBILITY D NTS NTS c� +M PRIOR TO SUBMITTING BID. NOTIFY THE LSD3C PROJECT MANAGER, IF CONDITIONS ARE NOT AS SHOWN ON THE PUNS OR AS S C N E ULE F LEGEND AND SYMBOLS C 42NP 1 01 FOSCNO 42NP011COLGN D SLATED IN THE SPEC IFICATIONS. CONTRACTOR MUST VERIFY THE OPERABILITY OF ENTIRE SYSTEM PRIOR TO TIE-IN AS FOLLOWS: ROUGH-IN SEER ITEM FIXTURE �pTl DESCRIPTIOP4 REMARKt, 1. THESE PLANS MAY BE l5E FOR CONSTRUCTION ON,Y AFTER APPROVAL IS OBTAINED FROM THE BUILDING DEPARTMENT PLUMBING PLAN CHECK A. SNAKE SANITARY TO MALL MAIN AND REPORT ANY BLOCKAGE. TtOT IWASTE�Yf W1� DIVISION AND THAT DTVI` 'N'S S'AMPED APPROVAL AND AUTHORIZED SIGNATURE APPEAR ON THE CLANS. B. TEST WATER PRESSURE TO INSURE MINIMUM PSI MATCHES MOST DEMANDED BY EQUIPMENT SUPPLIED. -- --- ---- --- - + - -- KOHLER •HIGHUNE PRESSURE UTE*, PRESSURE-ASSISTED WHITE WATER 2, COORDINATE ALL WORK «!'H All TRADES INCLUDED BUT NOT LIMITED TO ELECTRICAL, FIRE PROTECTION, MECHANICAL AND STRUCTJRA, 6. INSULATE ALL HOT WATER, COLD WATER AND CONDENSATE PIPING WITH 1' THICK (K=0.23 0 75'F) PIPE INSULATION WITH AN All WATER CLOSET CLOSET /K-3544 WITH ELONGATED VITREOUS CHINA BOWL. 17-1/1• 1.6 GPF CONTRACTORS, INSTALL WORK TO CLEAR NEW AND EXISTING ARCHITECTURAL AND STRUCTURAL MEMBERS. NO ITEM SUCH AS PIPE, DL�;,T, -- SERVICE JACKET TO MEET LOCAL CODES AND UL FLkME SPREAD AND SMOKE DEWLOPED RATINGS. ;�TANK TYPE 1/2•I - 4" 20 - - HIGH, WHITE OPEN FRONT SEAT AND COVER /K-4710-T FURNISH wITH HANDICAP ETC. IS TO BE IN CONTA'T WITH ANY EQUIPMENT, 7. INSULATE THE TRAP, SANITARY AND SUPPLY PIPES UNDER LAVATORY WITH 112• ARMSTRONG •ARMAFLEX• PIPING, INSULATION OR BOLT CAPS AND CHROME SUPPLY STOP (FOR PUBLIC AND NON-PUBUC TYPE3.FLUSH LMR SHALL BE LOCATED ON THE ACCESSIBLE 3. REFER TO AkCHITECTUR/_ DRAWINGS FOR DEMOunON WORK. TRUEBRO MODEL 102W •HANDI LAV GUAPD• INSULATION KIT. 510( OF 111E TANK 4. REFER T5 ARCHITECTUR/_ DRAWINGS FOR EXACT FIXTURE LOCATION. _ S. INSTALL ALL NECESSARY PIPE HANGERS, SADDLES, AND CARRIERS TO PROPERLY SUPPORT ALL PIPING AND FIXTURES. MANGERS KOMIER •CHESAPEAKE• 20608• LAVATORY, FURN K-1729. / S. CONTRACTOR ShALi PRO. E Ci,T SHEETS TO LSORC FOR ALL EQUIPMENT AND DEVICES FURNISHED BY THE CONTRACTOR THAT DfwtATE FROM SHALL SUIT TYPE Of PIPING PROVIDED AND BE SPACED AT A MAXIMUM SPAN OF S FEET, PROVIDE SWAY AND SEISMIC BRACING CONCEALED ARM WALL HANGER, CHROME SUPPLY STOPS AND P-TRAP, ISH WITH I WHERE REQUIRED BY CODES. I SPECIFIED ITEM FOR REV iw AND APPROVAL PRIOR TO THE PURCHASE OF ANY SUCH fOUIPMENT OR DEVICES. " $� : •'^ N h �� YATORY _ _ KOMLER LIVER-OPERATED •CORAUIS• FAIK;ET JK-1S182-F WITH °o-gf1.. IaVUV�'WALL 1/2• 1/2• 2 1 1/2 -- - POP UP DRAIN. INSULATE P-TRAP AND SUPPLY LINES WITH 1/1' HANDICAP 6 THE PLUMBING CONTRAC',R SHALL BE RESPONSIBLE TO FIELD VERIFY THE EXACT LOCATIONS, SIZES, INVERTS AND CONDITION OF EXISTING ' Au S:s y G'Z 9. STERILIZE WATER SYSTEM IN ACCORDANCE WITH LOCAL CODES TYPE Y � N MOUNTED ARMSTRONG •ARMAFLEX• PIPING INSULATION OR EQUIVALENT MOUNT AT SANITARY WASTE PIPING BELOW SUB, VENT PIPING ABOVE CEIUNG AND UP THROUGH ROOF AND DOMESTIC COLD WATER SUPPLY PIPING TO 6 � G$zc8y`= 10, CLEANOUTS AND FLOOR DRAINS SHALL BE INSTALLED PER LOCAL CODES. WALL COVERS ARE TO BE STAINLESS STEEL AroD FLOOR 111111 HEKGFT DIRECTED BY THE ARCHITECT. (FOR NON-PUBLIC RESTROOMS) TENANT'S DEMISED PREM SES PRIOR TO SUBMITTING HIS BID. NO ADDITIONAL COMPENSATION WILL BE MADE FOR ANY EXTRAS DUE TO T COVERS ARE TO BE BRASS, UNLESS OTHERWISE SPECIFIED. PROVIDE FLOOR COVERS WITH INSET AREA FOR CARPETED LOCATIONS. CONTRACTOR'S FAILURE '3 VISIT THE JOB SITE AND/OR FAILURE TO PREDETERMINE ALL EXISTING CONDITIONS BEFORE SUBMITTING HIS BID. ALL CLEANOUT LOCATIONS SHALL BE APPROVED BY THE LSD&C PROJECT MANAGER. KOHLER •PURII ST• WADING BASIN LAVATORY MODEL NO. K-1314 WITH DEMO SINK - !• HANDICAP 7. ACCESS TO ALL COMPOR,aTS AND EOUIPMENT MUST BE PROVIDED TO MEET CODE AND SERVICE MAINTENANCE EASE. X � _ W o • 11. ESCUTCHEONS SHALL BE CHROME PLATED. SIZE AS REOUIRED, AND PLACED A' ALL PIPE PENETRATIONS AT WAILS, FLOORS AND LJ PURIST WIDESPREAD LAVATORY' FAUCET MODEL NO K-1440-4-CP / ^ Ig CEILINGS IN FINISHED AREAS. COUNTERTO► WITH $POUT, LEVER HANDLES AND POP-UP DRAIN. T11K �'`>C � �> I5 �A>;+° k 8. THE CONTRACTOR SHALL IERIFY WITH LOCAL CODES AS TO THE REQUIREMENT/INSTALLATION OF ANY WATER SAVING- DEVICES TO THE ► W Z S Y _ ' F 12. LEAKAGE TESTS SHALL BE PER LOCAL CODES MINIMUM AS FOLLOWS: ZOELLER /131, FLOOR MOUNTED S GAL. POLTETHYENE BASIN WITH PLUMBING FIXTURES. (F1,+WPIC: TOILET, FAUCETS, ETC.). :aS „` $ `" [� PUMP - - NW 2• - - GASKETED POLYTHYLENE LID PUMP: ZOELLER /M98. 1 1 SV., 1 PHASE, ii A. TEST WATER PIPING AT 100 PSIG FOR SIX HOURS. �• 1 2 H.P., 1725 RPM, 15 FT. H0. U1, LISTED. PUMP PASSES 112- 9. PLUMBING SYSTEM SHAU BF PRESSJRE TESTED AND STERILIZED PER UNDLORC'S CRITERIA AND LOCAL AUTHORITY. V, B. TEST DRAIN, WASTE, VENT PIPING BY A 10' WATER COLUMN FOR TWO HOURS ~ SPHERICAL SOLIDS ELECTRICAL CONNECTION TO Of MADE WITH 15 FT. �$ ja �o TEf 13. FLASHING SHALL BE SEALED WATERTIGHT AND PERFORMED IN ACCORDANCE TO THE LANDLORD'S CRITERIA. USE A LANDLORD Vs' U.L. LISTED 3 WIRE CORA AND PLUG. BASIN AND PUMP TO BE 10. UPON COMPLETION OF T,E WORK, CONTRACTOR SHALL ENSURE THE PROPZR WORKING ORDER OF THE SYSTEMS) AND MAKE ANT *I-:r X a TEMPERATURE RATED TO 130 'F. UNIT IS FURNISHED WITH CHECKA!1JUSTMENTS AS REQUIkEG. APPROVED ROOFING CONTRACTOR, WHERE APPLICABLE. VALVE ; $_ 2 A p N s N • 14. Ti-tla!jft zoo PROVIDE WATER METER AND REMOTE READER PER LANDLORD'S CRITERIA OR IOCAI UTILITIES REQUIREMENTS, IF APPLICABLE. REFER - - - kQ I TO PUNS TO DETERMINE IF WATER METER IS REQUIRED. r U - - " r "� ZX $p y, F-4-1 UR-1 WAIT j/4• 2• LOAN ROYAL �N; , 'kir W" <# ' ►°`c END OF SECTION 15200 M I I fig$° •_ $III I GHQ` OASIS BARRIER-FREE NON-REFRIGERATED DRINKING FOUNTAIN PAMSL F�;� L✓ xa::4 l V,a �Z I„ru�IORINKING 1/2•' I Y 1 1/2• - - PROVIDE CHROME SUPPLY STOP AND P-TRAP. SEE MANUFACTURER'S IHANDIU ? 13 z� �jW Y L� IFOUNTAIN +INSTRUCTIONS FOR PROPER INSTALLATION PER ADA. TYPE t w/ V) tG DRINKING OASIS BARRIER-FIEF NON-RTFRIGERAT 1 h DF LO-2 'FOUNTAIN 1/2• A . SEE MANUFACTURER'S Q O v ADA 00I Vb► Lam• Boom - - FIAT MOP MOLDED STONE SERVICE BASIN /MSB-2414 WITH VINYL - - O ®MOP Sw 1/2• 1/2• 2• 1 1/2• - - 911.1I4JERGUARD. FURNISH WITH AMERICAN STANDARD FAUCET /8344.112 O WITH INTEGRAL VACUUM BREAKER AND STOPS. WN-2 WATER HEATER CHRONOMITE IIISTANT-FLOW JSR-20L. 0.3 GPM 0 57' RISE, 4.2 KW, 20 �3 INSTANTANEOUS 1/20 - - - - - AWP BREAKER, 208V-10-60. WH-1 HA TTEER� 3/4• 3/4' - - j/4' - RMEEM WATER HEATER /EGSP-6, 6 GALLON, 208V-10-60, 3 KW AND 4 TANK 1T►E 14.4 AMPS. SET TEMPERATURE TO 120'F. __ MCISI01) PLUMBING PRODUCTS TRA► PRIMER, /P-2. COPPER BODY, Y W TRAP PRIMER 1/2 - - - ADJUS1AAE WITH i/1• COPPER TYPE TO FDOR DRAIN. NTS � z uT► PLUMBING G1-:NERAL NOTES �' 42NP01180NOTE v 0 WATER o WHA HAMMER - - - - - -- SIOUX CMEF ON SERIES WATER HAMMER ARRESTER OR EQUAL a ARRESTG 1 UNLESS OTHERWISE SPEII 'E0, CONTRACTOR SHALL PROVIDE ALL NECESSARY EQUIPMENT, MATERIAL LIBOR AND SUPERVISION NECESSARY TO +� O X LD 4c ABBREVIATIONS - PLUMBING -`-^ - -"-- -- -- WITH COMPLETE THE PLUMBING MORK IN ACCORDANCE WITH THE SPECIFICATIONS AND STANDARDS. /_ EjJ x LLL V� V) ZURN FLOOR DRAIN /Z-415-68, CAST IRON BODY, COMBINATION Q CC I,, I w OC C�FLOOR DRAM - - t• 1 1/2• - INVERTIBLE CLAMP AND ADJUSTABLE COLLAR, 2• BOTTOM OUTLET WITH DEEP 2. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING WASTE PIPING BELOW SLAB, VENT PIPING ABOVE CEILING AND UP THROUGH ROOF AND Ix O p •a COLA WATER SUPPLY PIF ti� ABOVE CEILING PRIOR TO COMMENCEMENT Of ANY WORK. AFTER INSTALLATION AND FINAL CONNECTION OF NEW 'Q Q I6• ROUND NICKEL BRONZE STRAINEP,. SEAR I^ W AO ACCESS DOOR LAV LAVATORY - - ---- -.._-- --- - __ --- ti P TRAP WASTE PIPING BELOW SLAB. BACKFILL AND PATCH IN ACCORDANCE WITH THE LANDLORD'S CRITERIA REGARDING SUCH WORK. 07 � c CL ADA AMERICAN DISABIUTY ACT LB POUND TURN CLEANOUT TEE /ZN-1446-BP, DURA-COATED CAST IRON BODY, M Q N VI AFF ABOVE FINISHED FLOOR LF LINEAL FEET ��CLEANOUT - - - - - - GAS AND WATER TIGHT BRONZE PLUG AND STAINLESS STEEL WALL 3. CONTRACTOR SHALL FURf,'�-,H AND INSTALL ALL OF THE NECESSARY PLUMBING FIXTURES (SEE PLUMBING RESPONSIBILITY SCHEDULE ON FOO.1) W M AP ACCESS PANEL ACCESS COVER WITH SECURING SCREW. TO SERVE THE TENANT'S DEMISEC PREMISES AND MAKE NECESSARY INSTALLATION OF DOMESTIC WATER AND SEWER PIPING FROM TENANT'S Z (V MECH MECHANICAL -- - - _ - DEMISED PREMISE TO COfINECT10N PROVIDED BY UNOIORD. �`' �O r` CD CEILING DIFFUSER OR CONDENSATE DRAIN MFR MANUFACTURER ZURN FLOOR CLEANOUT /ZN-1400 WITH GAS-TIGHT AND WATER-TIGHT f- ,�>( z Orn t�J CI CAST IRON MTD MOTOR FLOOR TAPERED THREADED PLUG AND ROUND POLISHED NICKEL BRONZE a Z CO CLEANOUT CLEANOUT - - - A SANITARY VENTS SHAH Ft ROUTED TO THE EXISTING LANDLORD'S POINT OF CONNECTION WITHIN THE TENANT'S DEMISED PREMISES OR 10 A O CFM CUBIC FEET PER MINUTE MTD MOUNTED r I SCORIATED AUJUSIARLE TOP, POINT APPROVED BY LOCAL AUTHORITY. THE CONTRACTOR SHALL PROVIDE A CAPPED TEE FOR POSSIBLE FUTURE CONNECTION (IF REQUIRED F•" = O U F - --.. - CONT CONTINUE (N) NEW BY THE LANMORD). CONTRACTOR SHALL COORDINATE All ROOF PENETRATIONS WITH THE LANDLORDS ROOFING CONTRACTOR, AS REQUIRED. i, T (� Q W W � CONTR CON RACTOR N.C. NORMALLY CLOSED VENT THRU ROOF SHALL BE AT LEAST ,S FEET AWAY FROM A/C UNIT FRESH AIR INTAKE. 7 3: ,Z O 3 QY a O I O COTO CLEANOUT TO GRADE N.LC. NOT IN CONTRACT ►` CL Cw COLD WATER N.O. NORMALLY OPEN S. SEAL AROUND ALL PIPES PENETRATING FIRE SEPARATIONS WITH LISTED AND APPROVED FIRE SEAL MATERIAL ONLY LISTED AND APPROVED ' I = O N fA N/A NOT APPLICABLE SEALANTS AND METHODS FOR THE SPECIFIC USE WILL BE PERMITTED. (n W o LI; Z V DET DETAIL NTS NOT TO SCALE In CX 2 0 DF DRINKING FOUNTAIN 6. THE CONTRACTOR SHAH INSTALL ALL TOILET FIXTURES IN ACCORDANCE WtTH ALL CODES AND AS REQUIRED BY LANDLOFD'S CRITERIA I ' Q 0- LO Q O Ln d ��yy�'� O DL DOOR LOUVER P PUMP CONTROLS FOR FLUSH AIDE`+ SHALL BE MOUNTED ON I'VE WIDE SIDE OF THE WATER 'IOSET AND NO MORE THAN 44• AFf. 0L W � VI rn 1- Ln 0 -j OS DEMO SINK COUNTERTOP PD PRESSURE DROP OTR DOWN THRU ROOF PLOG PLUMBING 7. THE CONTRACTOR SHALL INSURE THAT ALL SLAB PFNETRATIONS WITHIN THE TENANT'S DEMISED PREMISES ARE PROPERLY SEALED AND RFMAIN REVISIONS: DWG DRAWING POC POINT OF CONNECTION WATERTIGHT TO PREVENT Aar POSSIBLE DAMAGE TO OTHER TENANTS AND/OR TO THE BUILDING FAILURE TO DO 50 SHALL K AT THE R'SK "WIND e• tin PRV PRESSURE REDUCING VALVE AND SOLE EXPENSE OF THE CONTRACTOR. w (E) EXISTING PSI POUNDS PER SQUARE INCH EWC ELECTRIC WATER COOLEk 8. ALL MATERIALS SHALL BE NEV AND OF COMMERCIAL GRADE, AND BEAR UNDERWRITER'S LABORATORIES AND UNION LABELS WHERE SUCH (R) RLLOCATE UBEIIN� APPLIES. FCO FLOOR CLEANOUT RD ROOF DRAIN ;-CU FAN COIL UNIT RPRP REDUCED PRESSURE BACKFLOW PRFVFNTFR FO FLOOR DRAIN RPM REVOLUTION PER MINUTE 9. PLUMBING CONTRACTOR ',1 FIELD VERIFY PROPER SLOP[ Of EXISTING SEWfP 't, ►LAIN SCWFR ^RIOR TO ANY NEW PlUMB!NG INSTALLATION FPS FEET PER SECOND 10 PLUMBING CONTRACTOR MIST VISIT THE JOBSITE TO BECOME FAMILIAR WITH MAJOR ITEMS SUCH AS STRUCTURAL ELEMENTS AND OTHER FS FLOOR SINK SCH SCHEDULE SOV SHUT-OFF VALVE OR SCHEDULE OF VALVE EXISTING JOB CONDITION.<, THAI MAY AFFECT THE WORK. ADDITIONALLY, PLUMBING CONTRACTOR SHALL VERIFY EXACT LOCATIONS AND e GAL GALLONS OPNENSIONS OF SUCH ITEMS AS WASTE. VENTS, WATER LINES, ETC. GC GENERAL CONTRACTOR UH UNIT HEATER GPM GALLONS PER MINUTE UON UNLESS OTHERWISE NOTED 11 PLUMBING CONTRACTOR T1 FAMILIARIZE AND FOLLOW SPECInCATIONS AND DETAILS CONTAINED IN DESIGN CRITERIA OF TENANT HANDBOOK UTR UP THRU ROOF + HEI HOSE BIBB 12 PLUMBING CONTRACTOR I^ CLEAR ALL EXISTING AND NEW DRAIN LINES AND FIXTURES, PRIOR TO TURNING OVER SPACE TO TENANT n•I<w 0111tt •mss awt, HD HEAD VTR VENT THRU ROOF F '' HP HORSEPOWER 13. PLUMBING CONTRACTOR '.TALL FROVIDE ACCESS TO VALVES, TRAP PRIMERS, ETC. INSTALLED BEHIND WALLS, FLOORS OR CEIUNfS. DATE ISSUED: 11/23/05 JL WC WATER CLOSET HW HOT WATER r, �Lw cR.tc Q�:,�Ai i>,..1...r o,�Bu:.%Al�y DESIGNED BY: MR I' �t WCO `ALL CLEANOUT �•- Pty 7IO,S r "� cit O;rr "- ¢t S'�24 DRAWN BY: MR INV INVERT "� L`�'�1� '"'� -'lA V'G 'NATER GAUGE IZt. l~ R Su •� ��'`+� A``L I ! ' ,{ C1.. t1cf11b..• CHECKED BY: KH WH WATER HEATER ,I ,L, CITY ( 1 AF7D WHA WATER HAMMER ARRESTER 'Fu F,a.ic� Otrwo 1....►t ?w 2 �' IJP+ �► AO'P►D'J1adZ✓FLr44.• j fr,�,,,,,,� w; WT WEIGHT L. N 1 v� /r A.1L.,r•+c. n G 11vt. t"��h (ter P M fliK, � � � �"�4T;a+dlrionaar AF,wrvrYe. PL,,..,,,, Rc..itv1-1 '1 a.►t l Otw _SrL•w. Stu bhp�`4 Far Only VV work as cles&trcj Ir PLUMBING n.�►1- a�.�.,+�, o i r:�.-,� o�.-TSI►+� 7-..r o s P.tc. OL" PERMIT NO N-M vw,- ;o_�-(, SPECIFICATIONS s,..'j 0►+w- U\4, P It, . *T 002. 1 M? Af f .s1. See LefW to Follow AND NOTES D�n.h....y, LtA.s. Fv . .. fir,.er �r,L L l Ut1«. 'rU L'o.l..',�11 ►..•,�,.. I�n�y>'�u DRAWING NAME R , ` "T$ "Ts "Ts P 0 1 . 1 PLUMBING SPECIFICATION G PLUMBING FIXTURE SCHEDULE D PLUMBING CONSTRUCTION NOTES A OFFICE core LE01191lRv STRIP CTfit 2 23 24 � , t i ♦ AYl+'C'�A�Y A4"r r ✓ dWfr.M l M J vin+...4. �. � . .. ... .. .1'M!t1, Wy .._ CRY_ ... ,Y - .. i. ...�n .. ..,. ...:r ren i• i ?>h ,R�y•�tl :"TBWA"�?9A."n.M�!M�ea._'R •«1.k•^S IM... a� ' 8 K CONSULTANTS, LTD. 171 CHARRING CROSS DR. S. SUITE 1 B WESTERVILLE, OHIO 43081 014-882-1199 &_3 EXISTING VTR-\ �f + 10 4 3/4 V 1 C ALL WATER LINES, VENT LINES, DUCTWORK, DRAIN LINES, 1 SPRINKLER LINES, ETC. SHALL BE OFFSET BELOW PLATFORM AND CONCEALED IN WALL ABOVE PLATFORM Dj NOT ROUTE PIPING, ETC. Y THROUGH STORAGE SPACE ABOVE PLATFORM OR ABOVE ELECTRICAL EQUIPMENT. 1\ - P03.1 C CONNECT NEW SANITARY LINE INTO THE EXISTING SANITARY SERVICE 011 AS SHOWN INSTALL CLEAN OUT AT CONNECTION TO MAIN AND COORDINATE LOCATION AND TYPE OF COVER REOU RED TO MATCH \ NMA 5 2• FLOOR FINISH WITH LSO&C'S PROJECT MANAGER NEW SANITARY LINE I (TYP) 1� /�f - T HALL BE PRESSURE TESTED PER LOCAL CODES WITH A MINIMUM 1/2• I� 4QUIREMENT OF HOLDING 10 FT. WC. FOR TWO HOURS \ �` I `�` � 1 I w� 3/4' I �. ( C� 2" C3 CONNECT NEW VENT LINE FROM PLUMBING FIXTURES INTO THE UJLAV • 1 `"' �� LAV 4' 2-1/2� i EXISTING VENT STUB THRU ROOF. VERIFY LOCATION PRIOR TO BID 1/2 �\ TP 8 Ali I z `\) 1 1-1/2 C CONNECT NEW COLD WATER LINE INTO THE EXISTING COLD WATER 1.5 1/2 �/f FD _A_ 8 -4• f TAP. NOTIFY LSD&C'S CONSTRUCTION MANAGER IF TAP IS SMALLER 0 3/4 _ ' P03.1 /i I 3" THAN SHOWN ON RISER DIAGRAM. �. _0 J __ r — CJ U U -t c 2 \j �-1 P03.1 ( �� �� NC , 6 FURNISH AND INSTALL WATER HAMMER ARRESTERS IN THE DOMESTIC � L � r � �� �� / MS COLD AND HOT WATER PIPING AS SHOWN ON THE WATER RISER _ .? I _ 4 DIAGRAM, WATER HAMMER ARRESTERS TO BE LOCATED IN AN 112- 14 2 (TYp) 1 =� ACCESSIBLE LOCATION. f- �' "t �� 4" 1_1/2' 4 ALL PLUMBING FIXTURES SHALL BE INSTALLED WITH STOP VALVES TO Z Z G to b- ` / ^ ISOLATE EACH FIXTURE. �— 7 046 /2• r 1 Di-1 G FURNISH AND INSTALL WATER METER. INSTALL IN LOCATION AS z U E k 1/2" /� 2' n DIRECTED BY LANDLORD PROVIDE REMOTE READER IF REQUIRED. J G 10 1/2. ( �, .0 1 � 12 3"VTFt v INSTALL 112* WATER PIPE FROM TRAP PRIMER DOWN IN WALL UNDER Q" � O -J P03.1 FLOOR TO FLGOR DRAIN. TRAP PRIMLR TO BE LOCATED IN AN 'n C V A C F _ �i ACCESSIBLE LOCATION Li I C OF-1 P03.1 _2 E FCO < c/) U; C. � DP I C9 EXISTING PIPING TO REMAIN TYPE, SIZE AND ELEVATION ARE AS 0 LTJ " ., cn O S \ P03 1 1 1/2- 2•I NOTED. f - [[) J \\ ^ DS '/ 10 1 1�? \ r\J 1C; INSTALL, ABOVE THE CEILING, 1 112' SANITARY AND 112* DOMESTIC LLJ a 3 `\ 1 S I F DS I �'1 COLD WATER FROM SINK ON SALES FLOOR TO TOILET ROOM. 0 CC = ? i P03-1 2 �� I _+___jW c \ �.� 1/2' .01I 2' !1 1 1/2' SANITARY PIPE FROM SALES FLOOR SINK DOWN FROM CEILING — --- ~ O J IN WALL INSTALL CLEAN OUT AT BASE OF SANITARY RISER. (n a a v I 12 SENT FROM SUMP TO BE EXTENDED THROUGH ROOF DIRECTLY OUTSIDE. J (\U h t CDP XFSE i 2'-0 AND TERMINATE WITH 3" VENT THROUGH ROOF. �- F DS 5 � P03 1 2 FL 1.5 P03.t �-3 J 1� M �k'� � o i l. a� ,pg4z c� Ic NOTE: PROVIDE AN APPROVED BACKFLOW PREVENTER FOR • Lo on, �W � � �on, MAIN DOMES TIC WATER UNE, IN ACCORDANCE ><a' �� � �k 15C WITH LOCAL CODE AND LANDLORD REQUIREMENTS. , : \ � i >s of a �. •. DOMESTIC WATER PIPING DIAGRAM "Ts J WASTE & VENT PIPING DIAGRAM "T' F PLUMBING CODED NOTES 42ND2i NS C s=���� s�=��_� ���a�=V,-43 : A B C D E F G � u ► L jjwj.! o` � 1111 4 W T N Lr) N �D N O O � 0 a J (�+�] 1. V APJACLNT TENANT IM1 J ` t t WOO}--- P03 \ A P0.].1 FD F F_ Z L) 9 DP P03.t O w AT DECK 6 TYP W ►- O ��3 ��n PIPE � 9BTM013- 2 I F t F U Zw Q w \ ac� a n - -- ----1— — —T T-- - T___ a z r r---- _ ' - � il. ,4• I �� 1 � L p - -'-q ----' T ' Q � a o a 9 LAV I 1 1 I DS P03.t 12 3"VTR ' I D O LAJ L a G i i r _ I ' V) 9 AT DECK � I � _-.___.----- - - - - - - -- - - - - -- - - -- - - - - --- �- J /� O -0' PIPE DN I, I DIFFUSER USED FOR ACCESS a (n Z N �(TYP) THRU WALL __ I DIFFUSER USED 1 10 1/2" 0 O N RESTROOM Of-) II -i ____ .-_ -,i . I ( CO� FOR ACCESS (i _ .i 1 I Z � , _ �.� 'IT DN 1�------ -- �'��_ _ — _�L �_������---,..���....-- `-- ----- �. J� - -_..�.._-.__ .__ - -- - - ---- -------- --_.".J 2 O Z = Z �- 1 T ,l-I WALL 7 0 Z m 0 0 3 0. O z V �f' I W Co ►- !Eo 3 a _01r) 1 1/2' V v1 - ., z a0U Ln � MM Q_ LI) c� wN J &-F=CO -- I I a LI.1 � Q_ LI) N o 0Pot t Po2.1 I REVISIONS: I --- g � ,1'-0` I 0'-1 1/2 i Room ROOM Z 11'-0` 0'-1 1 211 __ II r _ _ � L J NONE -- I I L ._ _ ALE! I I) I II I — -- —- -- —_--_ _ �� .--- -- — I ago Li I Y DATE GNSSUB : 1112310' f >� DESIGNED R DRAWN B MR — CHECKED BY: �— KH PLUMBING 9ONatee- W E PLAN DRAWING NI IMBF F✓ "VERIFY ALL FIELD CONDITIONS PRIOR TO BID" S 1 1/4" t PLUMBING PLAN A P 0 2 . ,a cm LF <IBILITY STRIP } ,; b 0 10 1 12 13 4 leg 17 P lip 20 21 22 23 24 21� 2� 10 1N7N1 7 �1 AWL I H B K CONSULTANTS, LTC) 1 T 1 CHARRING CROSS DR. SUITE 18 WESTERVILLE_, OHIO 43081 t,14-882-1199 I r TURN DOWN {� WALL CLEANOUT INTO STACK TO VENT SYSTEM 1 _ ROOFING MATERIALS - DEMO SINK - (Fl A,HINC ETC.) eER MIN 12" HOT WATER WALL ACCESS COVER FLOW CONTROL --- REOUIREM NTS OUN i- INSTANTANEOUS WATER NEATER MTED // OUTLET ON THE UNDERSIDE Of THE COUNTER (St[ y ------- NIUMBING PUN FOR IOCATICN) COLW�i OUT/ET ATER _ MIN. 12" � VENT + DISCHARGE PE PIPECOLO WATERf cf) ACCESS SUPPLY - COVER � Z WALL o r-a a -sues- a a a a e n a a a �r BALL VALVF SOLENOID __ -ROOFING MATERIAL ! CONNECT TO VALVE ROOF CONSTRUCTION - —'-CHECK ELECTRICAL I I VALVE TEAT 1/2" TO 3 8" (� U M E REDUCER - C -SLEEVE ROOF CONSTRUCTION z -7 m I"` C ---- P-TRAP AS REQUIRED .. ui Ir ELEC. CONDUIT ��- --�` INCREASER J� AND J BOX WHEN REGI RED 00 r (SEE ELEC. DRAWINGS) _ ' ► ` BASIN ` 0 N Z I -LAz ^ UES PUMP WITH < I- --- - L FLOAT SWITCH ---- VENT STACK -J`•`CABINET OR WALL -FINISHED FLOOR r-L Li 0 _ --- HIGH LIMIT FLOAT SWITCH _ re } Ow „ u-, () NQIE: INSULATE EXPOSED PIPING BELOW SINK PER HANDICAPPED REQUIREMENTS. cf) UJ Lij 0t :J c WALL CLEANOUT DETAIL "Ts DEMONSTRATION SINK DETAIL NTS VENT THRt; ROOF DETAIL "Ts -� Y 42DP031JOWCOD � 42DP03�OOEMO F t2DP031C0 rTRD C Y #„ VACUUM BREAKER BY P.C. -HW a �— UNION BY P.C. (TYP.) Qi` o C CLEANOUT PLUG ---_ ---- ----- 3/4`r-- 3/ 5" CAVI K WITH t< u FLEXIBLE FILLER COVER FINISHED FLOOR a € f �- WATER HEATER SEEd,8 SLEEVE CATS BALL VALVE x W ADJUSTABLE HOUSING BY P.C. (TYP.) / EY `�� ■ ` }, _ _ �� PLUMBING F,XTURE Y$: i CONCRETE 51118 _� SCHEDULE FOR o J \ ADDITIONAL INFO. Mh 4" THERMAL EXPANSION _..._ >ii!avYW ° Z w - --- TANK, IF REQUIRED Ii `�- : 9� s ,•'t'•• + -. , BY CODE. . _ .....- - 2' WIDE. 20 GA. SHEET 'S.ga• v p � { " 4 ' . METAL BAND AT UPPER THIRD q �_ _ _•. _ - - - '- A - AND LOWER THIRD. SECURE Pa. •���` t�� Pa. -- - • • 3/4' T 3 P REUEF Yz��o Wax VALVE BY P.C. - -_ TO WALL. FOR SEISMIC. BRACING Z`a � 6 .NON-COMBUSTIBLE -- ;-t�/� �l�`�h`/ - WHERE REQUIRED BY CODE. _�'� ; : ;��:F• ,I r� /� / / Ti FIRE STOPPING STRUCTURE AT �� '�\\� �\\ \\ \\ \\ (BY P.C.) � �B FAX.- o FLOOR SLAB UPPER LEVEL /\ `//\��/\//\//\ \//\/ RUN 3/4' COPPER "�E g' +=�`�a : ►g i PIPE �\i \�\\/\�\ \ i TO MOP SINK. - I -- 'vuY ns�'A tffo" `5 s �i`i SEALANT -- — — u , DRAIN VALVE BY RC BYLP.CV. DRIP PAN �ellg1 '� ,315 N TF: A F PENETRATIONS GRADE AT 1 I Vztr 0 ALL FLOOR MUST BE SLEEVED AND LIQUID TIGHT. LOWER LEVEL _ TO TENANT'S PLATFORM BY t' SECONDARY DRAT I (Da v, ,l. ,^ _ SANITARY SEWER - GENERAL CONTRACT( DRAINS TO �i J 0 MOP SINK. 00 J C) LL 0 0 INSULATE ALL PIPING IN ACCORDANLE WITH SPECIFICATIONS. ^' + zW E a o I U iL J PIPE FLOOR PENETRATION DETAIL 42DPo31ti0PFPD H FLOOR CLEANOUT DETAIL_ 42DPNTS o3EOFcoD WATER HEATER DETAIL 42DPo TiaowHTR3: a (3Q 0 a ~_ �- w j cr W I v + I Q a 0 1 s Dao cr 1 V1 m 'n� M 1 pN Q � z 0 t Z RATED WALL O 0 Al N z 4 r q ;� THREAT WALLONLY INSULATION -'CONCRETE ETE SLAB OR Z u t... � � aW y FINISHED FLOOR Z O ; C FINISHEc FLOOR — 1 O ` CA ' T LOWER V E F- f X 0 3 "^ (E) OR (N) PIPE SEALANT — GRADE A l0 E LEVEL w V) 0 ,a W W L t� _ 0. re a- re aQa`n0a p C ca x - TO TENANT'S REVISIONS: STRUCTURE ATJ SANITARY SEWER rlWWI o n j — 3M BRAND FIRE BARRIER UPPER LEVEL' —_ — CP25WB+ CAULK OR EQUAL. COMPLETELY FILL ANNULAR SPACE BETWEEN PIPE AND f J WALL AND LEAVE A MIN. 5/8" BEAD AROUND BOTH MIN. 4' DEEP SEAL — OUTSIDE FACES OF WALL. - I� VNINSULATED VL SYSTEM WL 1001 MSVLATED__SIL,=�Tb !L 5039 xNµ_,rr•i Iln.t Vcrw 14.4 DATE ISSUED. ' 1 ; . 3/ DESIGNED BY: tr DRAWN BY. ► NOTE: INSTALLATION TO FOLL )W UL SYSTEM WL 1001 OR WL 5039 CHECKED BY: h AND BE A UL TESTED ASSEMBLY. PLUMBING DETAILS _ DRAWING NUMBER NTS NTS M P030 PIPE THRU FIRE WALL PENETRATION DETAIL 42DPjj=Wp DI FLOOR DRAIN DETAIL 42DP031AOFLDN A �t•11FW 3'alfn 4 �.ns..'1y;. 4.YP r., t1. _- LEGIBILITY STRIP 2 A R a A 10 14 T + of rn g �lpI�LII��1GG���f.'l�,l+l�lh���G������l�l��� I ;1 �I n `�' _. _ . . - ,. .. ,. .� 1!"!�IMIIA�".-. s.#s'x!w,:"sW".",a�v.���c�mca. �; _ •www., ,.... .. .. �' �yyy -