Loading...
Report (11) �Le A DAILY FIELD REPORT FOR STRUCTURAL WELDING ACS Testing,Inc. 7409 SW Tech Center Dc Ste.145 Tigard,OR. aarun Ph:503-443-3799 Fax:503-620-2748 Date: Oct 25,2016 ACS Job# 16-6805 Wa rasrrvc.INC Permit#: N/A 503.413.3794 PO#/6312 Inspection type: CONTINUOUS IMPERIAL STEEL CRAFT,INC @ IMPERIAL STEEL CRAFT,INC 5455 SE ALEXANDER Is this a re-inspection? ❑yes 0 No 5455 SE ALEXANDER FULLSBORO,OR 97123 Weld Process Used: FCAW-G MLLSBORO,OR 97123 If Continuous Inspection performed,complete the following INSPECTOR: Bob Brown#393!Michelle Chaeon Volts/Amps Monitored? z Yes ❑No ❑NA Pre-Heat Monitored? ©Yes ❑No ❑NA Reviewed prior inspection reports: t/ Yeso ✓❑ ❑No [:INA N ❑ NA Joint Assembly Verified? Yes Approved plans available: Yes ❑ No ❑ NA Interpass temps checked per WPS? 0 Yes ❑No ❑NA QA Manual Reviewed: 0 Yes ❑ No ❑ NA Rebar welding? ❑Yes ❑No QNA MTR's Randomly reviewed: ✓❑ Yes ❑ No ❑ NA CE below.55%? ❑Yes ❑No Welder Certification Verified: Z Yes ❑ No ❑ NA Rebar size and grade? Size(s)# ASTM: WPS verified: Yes ❑ No ❑ NA RE-WORK NEEDED ❑yes ❑✓ No Electrodes per WPS used? Yes ❑ No ❑ NA NCR!Notes/Conditions: N/A Seismic Inspection ❑NA Electrode:E71T-1 Continuity Plates❑✓Yes ❑No Frame: BRACE FRAME K Zone checked QYes ❑No Other MT Required? ❑Yes ❑✓No Location of Inspection? On Site 0 Fab.Shop " Fab Shop IMPERIAL STEEL CRAFT,INC. Type of Weld(s): Full Pen,Fillet&Partial Pen The following was noted: ACS representative arrived at Imperial Steel Craft for continuous inspection and NDT of CJP groove welds,plus visual inspection of fillet welds for double moment frames lots 137, 139,141 and single moment frame lot 40. Picture 1 Picture 2 This work is per detail 10/1.1,Rel.2-12-16(revision 0)and detail Double Single 11/1.1,Rel.2-18-16(revision 0). All fabrication of the mentioned pieces was completed and meets the minimum requirements of AWS DIA section 6,visual inspection requirements. No issues noted. NON-DESTRUCTIVE TESTING ❑NA See separate UT Report for non-destructive testing details. Q UT RMT ❑ PT If NDE is required there will be a separate report attached. Foreman notified of nonconformance items? [__j Yes E]No �NA Foremans Name: John Burlingham Pieces noted in box above unless Q yes notedotherwise meet the minimum Reviewed Date:10-26-2016 visual requirements of AWS DLI Section 6 ❑No Bob Brown,President Int. BB/mc CC: Vince Gallina aciu®izea Visual Inspectors are in compliance with ACS Testing's Written Practice.