Loading...
Plans (77) A MILBRANDT ARCHITECTS Bulletin 25 Central Way, Suite 210 • Kirkland, WA 98033 Tel: (425) 454-7130 • Fax: (425) 646-0945 Bulletin#: MA-12 Date: 8-17-2016 ATTACHMENTS: MA-12 Job Name: RIVER TERRACE Job No: 15-03 This bulletin is in response to a request from the City of Tigard regarding a %:"P.T.plywood spacer strip being installed behind the deck ledger as shown on the attached MA-12 detail. The attached MA-12 detail is approved by Milbrandt Architects to be used for the deck ledger installation on the River Terrace project. CITY OP TIGARD REVIEWS FOR CODE COMPLIANCE Approved: OTC: [ Permit #: ync-1-0©1 00 as Li- Address: Js a a 45,r se.; soh d r Suite #: By: 4t Date: 9-di- 1 c Distribution: OFFICE PI' , From: David Burnett Polygon Northwest t Attn: Chris Walther • Phone: (360)695-7700 REVISION I a ---J_noa.. BUILDING PAPER ��' PRE-FLASHING, EXTEND 6" ABOVE LEDGER, MIN. ,7 / METAL Z-FLASHING TYPE B SEE DETAIL 19/15 SPACED DECKING 1I V i»i ir1 ' 111 P.T. 2x JOISTS A - II` Ii SEE STRUC. FOR CONNECTION DETAILS --"Iing"..-- P.T. 2x LEDGER 1 P ,..PY .xW000x.F.UR.,STZIPS 1 Y" x 1Y2"-2" AT EVERY LAG. 1 TYPE A FLASHING SEE DETAIL 19/15 ---01111111111, �I PRE-FLASHING, EXTEND 2" BELOW LEDGER, MIN. SIDING BUILDING PAPER OR PRE-FLASHING; EXTEND TO ABOVE DECK-TO-WALL FLASHING DECK TO WALL FLASHING SPACED DECKING 1-1/2" . 1.-0- SECTION R317.1.1.1 Field treatment/ Field-cut ends, notches and drilled holes of preservative-treated wood shall be treated in the field in accordance with AWPA M4 PROJECT NAME: RIVER TERRACE ARCH. JOB NO.: 1503 BULLETIN ETIN DATE 08-16-16 SCALE: 1 1/2" = 1'-0" PAGE: PREPARED BY: DAVID BURNETT REF. SHEETS: DETAILS MA-12 This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically. C T ENGINEERING INC 180 Nickerson St. Suite 302 Seattle,WA 98109 (206)285-4512(V) (206)285-0618(F) asolomon@ctengineering.com BULLETIN Date: August 17,2016 Number:CT-11 Project#: 15238 Project Name: River Terrace Attached: None Subject: Deck Connection Detail(Spaced Decking) Drawings Affected: Description/Action: This bulletin provides response to RFI, design clarifications and/or variation requests for the 'River Terrace' project located in Tigard, Oregon. Based on our review of Bulletin MA-12 (Deck to Wall Flashing —Spaced Decking), this is an acceptable deck connection detail provided the fasteners attaching the ledger to the structure have the required penetration to the rim/blocking per the structural deck details. "° PRD' 4t, ‘,4,G •- 60 y�, REG riA`� 71' 22 ,�Ne', c .4FS T. F 08/17/2016 CALL WITH ANY QUESTIONS Issued by: Arnold R. Solomon Date: Auq. 17,2016 Distribution: Contact Information: Chris Walther Polygon Northwest Company Angela Graiewski Polygon Northwest Company David Burnett Milbrandt Architects R:\15238 River Terrace\Bulletins\15238_2016.08.17 CT11 Deck Connection Detail(Spaced Decking).doc Structural Engineers FOR OFFICE USE ONLY-SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT IN . Transmittal Letter T 1 tC k o 13125 SW Hall Blvd. •Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: Tom H. DATE RECEIVED: DEPT: BUILDING DIVISION FROM: Angela Grajewski AUG 2 2 2016 CRY OE '11(7AAD COMPANY: Polygon Northwest ! 1 ! 4 I V{, ;C im.! PHONE: 971-212-2144 B3_ RE: 1 cDL62 5v\I SAre QQ an MST2014- co 2-5y (Site Address) (Permit Number) Polygon at Bull Mountain (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: rot 0 4 tet, t o ° @� _ ,. g i . 0 Additional set(s) of plans. 0 Revisions: 0 Cross section(s) and details. 0 Wall bracing and/or lateral analysis. 0 Floor/roof framing. 0 Basement and retaining walls. 0 Beam calculations. 0 Engineer's calculations. 3 Other(explain): Additional deck details requested by inspector REMARKS: Routed o Permit Technician: Date: 9 - _ 1 - Initials: a Fees Due'J Yes I No Fee Descristion: Amount Due: Q � $ : baa -s $ Special Instructions: Re'Hilt Permit .er PE : ❑ Yes la No ❑ Done Applicant Notified: niVG/ Date: r / y Initials: I:\Building\FormslTransmittaLLetter-Revisions.doc 05/25/2012 N 0? r_S rf . FOR OFFICE USE ONLY-SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. rtifi City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Transmittal Letter T I G A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: Tom H. DA.4.r , ? II ,LE 1 T,"1 DEPT: BUILDING DIVISION "'� .j H t�_Y a "I j r 4' FROM: Angela Grajewski/Chris Walther t.,', s j,. ;- COMPANY: Polygon Northwest g`.; .F k N',r th ° .. l` PHONE: 503-312-6213M RE: 152252. SW Seine Drive. MST2016-ON ? :�,� Li- (Site Address) (Permit Number) Polygon at Bull Mountain LOT c 7 (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: ,Copies: . riptia* , , ;. i04-,. ICopies:. i i'iltiali ?"::,.1--',,,,; '',m y . 0 Additional set(s) of plans. 3 Revisions: WIC/4a'bath change 0 Cross section(s) and details. 0 Wall bracing and/or lateral analysis. 0 Floor/roof framing. 0 Basement and retaining walls. 0 Beam calculations. 0 Engineer's calculations. 0 Other(explain): REMARKS: Removal of 4th Bedroom bathroom into Walk-in Closet ;' ,:i-::,1:;;N-":* ;: FORb 'ICE sg,ONLY . Routed to Permit Technician: Date: a 6: c). - i C Initials: ---)/ Fees Due: $Y YesDI No Fee Description: Amount Due: I $ 9:0,--t) 0' w _I. v- 101 ,�. lev ' rw' $ � ii`` y�E y � Special Instructions: Reprint Permit(per PE): ❑ Yes (' ) o ❑ Done Applicant Notified: Date: Initials: IABuilding\Forms\TransmittalLetter-Revisions.doc 05/25/2012