Loading...
Plans (77) S MILBRANDT ARCHITECTS Bulletin 25 Central Way, Suite 210 • Kirkland, WA 98033 Tel: (425) 454-7130 • Fax: (425) 646-0945 Bulletin#: MA-12 Date: 8-17-2016 ATTACHMENTS: MA-12 Job Name: RIVER TERRACE Job No: 15-03 This bulletin is in response to a request from the City of Tigard regarding a'h"P.T.plywood spacer strip being installed behind the deck ledger as shown on the attached MA-12 detail. The attached MA-12 detail is approved by Milbrandt Architects to be used for the deck ledger installation on the River Terrace project. CITY OF TIGARD REVIEWED FOR CODE COMPLIANCE Approved: t I OTC: [ I Permit#: n b L c`1 Address: l S I R S S w S .; neer— Suite#: Br } I Date: ) OFFICE COPY Distribution: From: David Burnett Polygon Northwest Attn: Chris Walther Phone: (360)695-7700 REVISION: BUILDING PAPER 4. PRE-FLASHING, EXTEND 6" ABOVE LEDGER, MIN. METAL Z-FLASHING TYPE B 4 SEE DETAIL 19/15 SPACED DECKING IT , , p7.777-T�F'-177TTTTaL. i P.T. 2x JOISTS SEE STRUC. FOR a� I CONNECTION DETAILS F._- -1 \--P.T. 2x LEDGER I P.T. PLYWOOD FUR STRIPS Y" x 1Y2"-2" AT EVERY LAG. TYPE A FLASHING SEE DETAIL 19/15 I PRE-FLASHING, EXTEND 2" BELOW LEDGER, MIN. SIDING BUILDING PAPER OR PRE-FLASHING; EXTEND TO ABOVE DECK-TO-WALL FLASHING DECK TO WALL FLASHING CDSPACED DECKING 1-1/2" = 1'-o" SECTION t R317.1.1.1 Field treatment/ Field-cut ends, notches and drilled holes of preservative-treated wood shall be treated in the field in accordance with AWPA M4 PROJECT NAME: RIVER TERRACE ARCH. JOB NO.: 1503 BULLETIN DATE: 08-16-16 SCALE: 1 1/2" = 1'-0" PAGE: PREPARED BY: DAVID BURNETT REF. SHEETS: DETAILS MA-12 This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically. • C T ENGINEERING 1 N C 180 Nickerson St. Suite 302 Seattle,WA 98109 (206)285-4512(V) (206)285-0618(F) asolomon@ctengineering.com BULLETIN Date: August 17,2016 Number:CT-11 Project#: 15238 Project Name: River Terrace Attached: None Subject: Deck Connection Detail(Spaced Decking) Drawings Affected: Description/Action: This bulletin provides response to RFI, design clarifications and/or variation requests for the `River Terrace' project located in Tigard, Oregon. Based on our review of Bulletin MA-12 (Deck to Wall Flashing—Spaced Decking), this is an acceptable deck connection detail provided the fasteners attaching the ledger to the structure have the required penetration to the rim/blocking per the structural deck details. 4GINE !• W 1 44 , 22 . _e3 x,c(c<tt '4 S T. Go' 08/17/2016 CALL WITH ANY QUESTIONS Issued by: Arnold R. Solomon Date: Aug. 17.2016 Distribution: Contact Information: Chris Walther Polygon Northwest Company Angela Graiewski Polygon Northwest Company David Burnett Milbrandt Architects R:\15238 River Terrace\Bulletins 15238_2016.08.17 CT11—Deck Connection Detail(Spaced Decking).doc Structural Engineers i FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard ' COMMUNITY DEVELOPMENT DEPARTMENT I Transmittal Letter T,c-i A r?D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov Vp TO: Tom H. DATE ' l : DEPT: BUILDING DIVISION NUJ G 2 2 2010 FROM: Angela Grajewski COMPANY: Polygon Northwest PHONE: 971-212-2144 BX _ RE: ISI 5\k) S-en I Of J O-30 MST2010 -bO ?.67 (Site Address (Permit Number) Polygon at Bull Mountain (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: 0 Additional set(s)of plans. 0 Revisions: 0 Cross section(s) and details. 0 Wall bracing and/or lateral analysis. 0 Floor/roof framing. 0 Basement and retaining walls. 0 Beam calculations. 0 Engineer's calculations. 3 Other(explain): Additional deck details requested by inspector REMARKS: (V.V. _Iothli2d190 Routed to Permit Technician: Date: • . — Initials: Am Fees Due: M Yes ❑No Fee Descri tion: Amount Due: Off" ,/ i Special Instructions: Re.riot Permit .er PE): ❑Yes [it No ❑ Done Applicant Notified: t9 ';/E Date: 9 Initials: I:1Building\Forms\Transmittals atter-Revisions.doc 05/25/2012 IVC)% S