Loading...
Plans (41) gi Markup Legend SPRINKLER SYMBOL DEFINITION COLOR/LINETYPE LEGEND BLUE LINES=FEED TO FIXTURES(BATH,SHOWER,ETC.). hel. Z o Delete Line XXX-XX GREEN LINES=INTERLEVEL CONNECTIONS/SUPPLY. J u } BLACK LINES=SPRINKLER HEAD TO SPRINKLER HEAD. O o MAXIMUM SPACING(TYP) = 1/2"PIPE SIZE >_,o Add Line -- SPRINKLER MODEL(TYP) ,,0.S HEAD SYMBOL(TYP) J —..— =3/4"PIPE SIZE C r @,u Add Tee =I= = 1"PIPE SIZE O N u CITY OF TIGARD = 1-1/4"PIPE SIZE L, 3.1w o Add Elbow Approved [ ,'7'''-''', a Add Coupling 1 I Conditionally Approved [ l ,;AgE1 See Letter to: Follow [ l .7,_.--],.. WPmw Add Head @. ale CI Attached [ I 0,-,,,...1- , m 1 Delete Head 1 X)- Permit Number: C'�1-cT a'vlb-0U 318 i`w XX t ¢ S4)• S;Itk-+ Fox 1erroc.. o _ E Address: f o r-E Move Head -O- -O- 0—(.—a0i6 7,z,-°'¢-000y�,z. xo Noioz`w�=` Note:All revisions must be reviewed by Uponor `H r- - p --z y p Table FOO2-3 ,,i�..I z-zoo�d_S��y vz zox1 Multipurpose Fire Safety Systems ; 000�'o<ow The Uponor Residential Fire Safety System is a residential fire protections a o o °°z system installed in combination with the cold side of the domestic potable W non 0>s<o-z 3 0 water system. Only licensed contractors trained by Uponor can install this F,Y - o.J -f, '4' .- .,,`',-,9oS z system. '- Bz `93<C9 E.-, . Q<� = o o0c¢Nz J.0-�,72u LL6_2�,a0 What to do if Changes are Required zzd=1o�aog-<'�` u If anyfeatures or obstructions require the addition or deletion of sprinkler 1'AQUAPEX INTERLEVEL 1'AQUAPEX INTERLEVEL o o z z o o<" 9 P Q Q ���d�i_ i- heads,or significant relocation of sprinkler heads,contact the Uponor Design CONNECTIONS FROM SECOND CONNECTIONS FROM FIRST C m < u z o,=u zwoz.,z0-rz - Department to determine if observed changes require a redesign FLOOR TO THIRD FLOOR FLOOR TO SECOND FLOOR e.,.,-.,,,,,,,t,,,, ,,,,,,,,; � (888.594.7726). ,r .z E 3 y.,7 <'N a // ',/t x �-o 5 74'1 0 KL,g MOST HYDRAULICALLY REMOTE HEADS // / I( I\ ( ❑< < HEAD# GPM PRESSURE REQ'D AT STREET 1/I \\ ��� I i�dr^ ��� I A I �\35 r # .,9",=--,.,H.-L- -i'i'.-,"`.'n', °�� zo 0 0� �0 1 HEAD H.1 17 47.09 \ 1' o z a 2 HEAD H.13&H.12 26.09 61.96 , I " \ II� N i5 v/ r 5onb o ' ° a �-d LO iI, 3; CUo= I t,"_ 14 kI \NI N \ 'fil ;/ I \ _ azo«� � o�< 2 1st Floor l 'bedroom ,11„_ '11 11\\ N nAt.l... R it N in- u OC \s 4 2nd Floor / - II� 4 ' --. / \ 4 L 11 H °I 8 3rd Floor •-13C-RES-18 >h ^I a TOTAL LF SENJU SPRINKLER Model RC-RES Flat Concealed PendentQuick Response H1 \ \ RC-RES-16' \ �Irt �� , r 4C- ES-18 ►_ ,cs� // \ - r�arr�9.-I /-- I' �cl\ \�{ L.gr � CI' ,''., ''RI F� Sprinklerheaddemandrlfl7 Maximum Spacing 18 x18 i \ H.2 0 - 1 P RC-RES-18 9p ! �� f (---1 3. T w 11 \ \ ��II, r r . , P1 11,,/ 1 All BF N. I' 1 OFFICE COPY K=4.9,L162FSENJU R17/6"ROr Orifice,Maximumat Spacing 16'x16'Pendent Quick Response �..x3 �� �< ' I ! �i, I \ ��r t�7, Areo �� I iN RATED -- 1" MAINAquaPEX TO SYSTEM gpm --� - \, J '277,"' \ �� l-I, 5.1 MAIN SHUTOFF 0 - 11p gi, i_, r ti-Ijjj RC-RES-16 Sprinkler head demand: 13 @ 7.04 li T.19 j t f VALVE LOCATION �� alr�L� �� JIl =, LF SENJU SPRINKLER Model RC-RES175 Flat Concealed Pendent Quick Response 1 ' I \ / I I A %i5 P a I o OiVY® 2P 9 I' " ).. RcJRE('16_ I M. \ F.B i '�.. I \. R ��ir"Ol.6. K=4.9, 175F°,7/16"Orifice,Maximum Spacing 12'x12' I T.24/ \ RC-RES-12-175 Sprinkler9P I � .4 I e head demand: 13 m @ 7 04 .', I tl •— 1., I ,r , I �� I ,_,_2, '±-_1• i F.7cE ( 1 • I� 1. F9 T�17 T2� i. \,a m= O= ' ra.,vim �' I ` III INTIK ,1I.v . !M le �— _ J4 -Qr7- J _ 1 I F 4 ® r r,-- II! THROUGH NI , r r) 1 ,��_ / ti M Bath R t o O u �I tr 1 1 �'� -� {- Cd1jraw r'I701, 7 61 \ (1 Il i 1\ / \r R ,• -� I` ` � � J O'0'1 m°.a'Cis _ / Hmy, a� IT;7-, w 71 , SEE v &P1 4 a R FOR o ill w z n o- Et-.. EXTERIOR WALL T - a / �J *jilt 111'1 1— "r g r ; f: III ' ' i ,,1 11I ` r ,' rl'9' �' ---1:i I U �_odJ o a R BEL T.33 I P•I B C tO p Q ELEV-109' R4'1,1N R YS 1 S� E.8 F 5 N _ EC' /t 1 z V a i STATIC: 67psi �'rl 4'' y •-'I, 17 s 7.38 T:-SG ,K �, �- 37 T.36 r Q ro f z a a o w o � a N 000 xww 0 9P TOASYSTEM .. i Di _ "/ .2 n .,,, Ce uuuaam-ov, RESIDUAL: 51psi / \ R� .4 �0 3 I FLOW RATE: 3650 m e a •1I TO HOT WATER HEATER y12 612_ / . •4 ; 1 - �, Den n I, RC-RES-b& PgNCY 1, w w s.l �PITQH i%-Wk) G 16 J H 1 , III j l.i E— Q �� Fe' o \ Y 1"FULL PORT RC R F�Jq Efa• s 4j r .= RC RES 1B �c r 1 LI w '`- // y. �l ,„ H. m c o b Sc 1 1 1 Ce .°`,IA BALL VALVE I� j� 1',' i -- -- 'SPACE III `"� �� A�.�� W Ce °`w f.n 1"APOLLO 36E PRV :, �� -` I ,r Q w _ ® _ s IN m OR EQUIVALENT L o �i �� (•� l--I CJ i'm o C / (7PSI LOSS FLOWING 26GPM) Z I--I '-o o 6 w ELEV=100' ELEV=100' / C U S a a //////////// 11••••�� r �w a d 1"METER 3 THIRD FLOOR 2 SECOND FLOOR 1 r FIRST FLOOR n�UVy� 35'OF 50'OF __- SHEET DESCRIPTION v 1"COPPER-K 1-1/4"AquaPEX F100/ i/ -it = i I-On F1OO,; 11 1 `t 1 1/4 = lI-Qn �F1OO 1/4" = 1I-0n ALL LEVELS WATER SERVICE DETAIL SHEET NUMBER c 4 5 0 5 15 zF100 NTS 1/4'=1'-0" © UPONOR - CONFIDENTIAL F100 ' Senju RC-RES:Open Web Truss/TJI Construction Insulation Recommendations rm In areas subject to freezing, See General Notes 8.2.5.7 for Architectural A uaSAFE GENERAL NOTES: care should be taken in unheated attic spaces Q ProPEX LF Brass Fire to cover Uponor AquaPEX tubing completely with insulation. Insulation Feature Requirements v"'i Sprinkler Adapter Tee should follow the guidelines of the insulation manufacturer. See Uponor _ 1. THIS SYSTEM IS DESIGNED AS PER NFPA 13D 2016 EDITION AS A RESIDENTIAL MULTIPURPOSE SYSTEM Blocking Maybe _ r Fire Sprinkler Adapter Document"Uponor AquaSAFE Attic Insulation Guidlines"for attic f p SECTION 3.3.11.3. ?c - - - -/{ Posh-on Nut \ / O > u Required.If installation guidelines(Provided in Contractors Documents package or online w Blocking is Used, 1 G 1%y"Min. at www.Uponorpro.com). -, o 2. UPONOR COMPANY RESERVES THE EXCLUSIVE RIGHTS TO ALL DETAILS AND DRAWINGS AS SHOWN ON -�- I I a ti z Use The2Top w^ THISSHEET. THESE DETAILS AND DRAWINGS ARE PROPRIETARY INFORMATION OF UPONOR COMPANY AND 1 "Max. O S E 5 Screw Holes. D.- < z Planter Box Window,Ba Window or Similar Feature. UNAUTHORIZED USE MAY BE SUBJECT TO PROSECUTION TO THE FULL EXTENT OF THE LAW. / 'Bottom of Mounting Extreme Temperature Installations y a ft o �`� I Bracket to Face of Truss AquaSAFE Residential Fire Safety systems are often installed in attics or If no additinal floor area is created No Additional Sprinkler is Required. Q u 3. THE DESIGN OF THIS SYSTEM IS DICTATED BY SPECIFIC CEILING HEIGHTS AND ROOM SIZES. IT IS THE Fire Sprinkler Adapter - 7 other areas exposed to temperature extremes of heat and/or cold. Follow 8'-0"or less O 0 u RESPONSIBILITY OF THE INSTALLING CONTRACTOR TO ENSURE THAT THE CONDITIONS SHOWN ON THESE Mounting Bracket I the recommended extreme weather installation instructions to isolate and / i''''5 t> PLANS ARE EXACTLY AS THEY EXIST IN THE FIELD. DEVIATIONS FROM THE DESIGN MAY CAUSE THE l ',..„Ni_J 1 protect system components from extreme temperatures. Because this RC-RES-161 IS 3 w w o SYSTEM TO BE UNABLE TO CONTROL A FIRE.IF THE BUILDING CONSTRUCTION DIFFERS FROM THE FIRE u w ut z 39 system also delivers domestic cold water directly to plumbing fixtures, 9'-0"or less U. m\ o SPRINKLER PLAN,CONTACT THE SYSTEM DESIGNER IMMEDIATELY. 3-#10 x-1/2"- >�,n z a r } Uponor highly recommends that you protect the tubing with adequate / w K m^to Full aauSt rrse I 1 insulation in warm weather areas to minimize heating of the cold water o v 3 4. THIS SYSTEM AND THE ACCOMPANYING HYDRAULIC CALCULATIONS ARE DESIGNED IN COMPLIANCE WITH Thread Sc rews 0\ NFPA 13D 2016 EDITION. In Bottom Holes supply. \ ;9N / o Z v 5. "STAND-ALONE"OR"MULTIPURPOSE,WET PIPE"SYSTEMS ARE NOT PERMITTED TO USE ANTI-FREEZE. \ ' \ Installation methods include,but are not limited to: W 5 m 3 W Lead-Free Flat. - • Tenting over the fire sprinkler piping. ry c\ 1 w\ O uui I-w 3 6. MODIFICATIONS ARE PROHIBITED.SPRINKLERS THAT HAVE BEEN PAINTED,CAULKED,MODIFIED ORConcealec Senju ru r 3 • Additional layers of batt insulation. If additional floor area is created.Cannot exceed 18 fe,be more than 2'-0" DAMAGED MUST BE REPLACED. Concealed Flat Increased depth of blown-in insulation. deep,more than 9'-0"wide and be with in the coverage area of the o w Sprinkler Head Cover Plate sprinkler.No Additional Sprinkler is Required. z w c w o =,F_. w<_ 7. WATER SHUT OFF VALVE IS NOT PERMITTED THAT ISOLATES THE SPRINKLER SYSTEM. .,5,-,>.„' ft z Y LL z Caution: If you will be installing spray foam insulation,make sure to ,s ¢ o z=o o- x�z v� 8. OWNERS MANUAL MUST BE PROVIDED TO THE OWNER. Senju RC-RES:Traditional Wood Framing Construction Protect all components during application.Consult with the spray foam v z m ¢o o o m =m manufacturer to ensure compatibility with all products before application. NFPA 13D Table 7.5.5.3 Distances From u z°,y z `o z<o u z�hdw ¢swoo>z 5 9. AT THE MAIN SHUT OFF VALVE,A TAG OR A SIGN STATING THE FOLLOWING IS REQUIRED;"WARNING,THE Heat Sources Vt.rJO ?.6ff o o z i_w m z WATER SYSTEM FOR THIS HOME SUPPLIES FIRE SPRINKLERS THAT REQUIRE CERTAIN FLOWS AND Consultation with local building officials is encouraged to ensure Compliance ft's =x F ft PRESSURES TO FIGHT A FIRE.DEVICES THAT RESTRICT THE FLOW OR DECREASE THE PRESSURE OR ProPEX LF Brass Fire with local building codes. ci o 4 o m 2 F =0 3'u AUTOMATICALLY SHUT OFF THE WATER TO THE FIRE SPRINKLER SYSTEM,SUCH AS WATER SOFTENERS, Sprinkler Adapter Tee Sprinkler Adapter Ordinary Intermediate z^-o# 'z i z p p ush-on Nut Heat Source Temp. Temp. Co , > o z FILTRATION SYSTEMS AND AUTOMATIC SHUT OFF VALVES,SHALL NOT BE ADDED TO THIS SYSTEM /Fire 135°-170° 175°-225° z ;r "''z WITHOUT REVIEW OF THE FIRE SPRINKLER SYSTEM BY A FIRE PROTECTION SPECIALIST.DO NOT REMOVE `J' Bending PEX Tubing 2,. - 00_z ft o s 5 THIS SIGN". Side of Fireplace 36" 12" z w c o-' �,z oft Min. The minimum bend radius of Uponor PEX tubing in any direction is six times Front of Fireplace 60" 36" ">m 9.<E f a o r z 3 10. ALL INTERIOR PIPING TO BE UPONOR"AquaPEX®"UNLESS NOTED. .--_-- �.� 1 5 Max. the outside diameter(6 x OD). f,o". h 0 z a ft_`. w_ Fire Sprinkler Adapter _1 I Bottom cf Mounting Bend supports are available for 3/8",1/2",3/4"and 1"Uponor AquaPEX Woad Burning Stove 42" 12" N ¢o a r�; ,¢o 11. UPONOR"AquaPEX"TUBING TO BE SUPPORTED PER NFPA 13D AND MANUFACTURER'S RECOMMENDATIONS. Mounting Bracket J Backer to=ace of truss tubing to facilitate 90-degree rigid bends. Kitchen Range 18" 9" J d z Lg U z z F 2 3 o y Wall Oven 18" 9" o 0n ay_, . �Q 12. MINIMUM SPACING BETWEEN SPRINKLERS IS 8'-0" REFER TO SPACING CHARTS FOR MAXIMUM SPACING 2-#10 z 1 1/2" O ® Recommended Tubing Length Between Fittings Hot Air Flues 18" 9" .`",:-=;,-z°_"z o u r BETWEEN SPRINKLERS AND FROM WALLS.SPRINKLER HEAD MANUFACTURERS MAY HAVE MORE Full Couree j } Fitting Size Minimum Tubing Length Uninsulated Heat Ducts 18" 9" C MI-0 s w m a 5 u z 0 0 0 u RESTRICTIVE SPACING LIMITATIONS. Thread Screws I I 9 9 • o z_F u t >o r a, In TopHoles r �f Uninsulated Hot Water Pies 12" 6" s- s..o ft r'_N F N U--i� IJ 3/8"ProPEX Fitting 2^ Pipes 0-o o=_'w o< o 13. SPRINKLERS ARE NOT NECESSARILY CENTERED IN ROOMS DUE TO LIGHT FIXTURES OR OTHER CEILING Side of Hot Air Diffuser 24" 12" x . .a MOUNTED OBSTRUCTIONS. \ g 2 1/2" L 1/2"ProPEX Fitting _a�.,.. D w.-- \ Front of Hot Air Diffuser 36" 18" w w z 3o�� `Syza¢oh 14. THE PLUMBING TIE IN CONNECTIONS ARE SCHEMATIC IN NATURE AND CAN BE INSTALLED OFF THE _ 3/4"ProPEX Fitting 3 1/2" Hot Water Heater 6" 3" 0 z o <u`o o u y>w Lead-Free•Flat - 2ozmomp ao$ SPRINKLER LOOP ANYWHERE BETWEEN SPRINKLER TO SPRINKLER CONNECTION. Concealed Senju \ 'II -� 1"ProPEX Fitting 4 1/2" Furnace 6" 3" w�>w z:^u>¢>z,, J Concealed Flat - - owzo="L' om<=0u 15. THIS SUGGESTED LAYOUT IS BASED UPON INFORMATION PROVIDED BY OTHERS. CHANGES IN Sprinkler Head Cover Plate 1 1/4"ProPEX Fitting 5 1/2" SOW-250W Light Fixture 6" 3" =o°,.••• ,-“,,,,/z C o z al.,,, 5 ` K .. CONSTRUCTION OR FIELD CONDITIONS MAY OCCUR WHICH MAY REQUIRE CHANGES TO THE LAYOUT. IT IS 250W-499W Light Fixture 12" 6" F,20- 0,=, „„0-.,w L Fa Wzo ft -ood0 z THE RESPONSIBILITY OF THE INSTALLER TO NOTIFY UPONOR TECHNICAL SERVICES OF SUCH CHANGES. _ >z o�;aw v„n Lli Exposed Installation Requirements. 16. NFPA 13D 8.2.5*OBSTRUCTIONS TO RESIDENTIAL SPRINKLERS \ ~z ¢ • 8.2.5.6* SHADOW AREAS SHALL BE PERMITTED IN THE PROTECTION AREA OF A SPRINKLER AS LONG AS Uponor AquaPEX'`"tubing(white)and ProPEX'"'EP Fittings and ProPEX'" I ut THE CUMULATIVE DRY AREAS DO NOT EXCEED 15 FT'PER SPRINKLER. Brass Fittings are approved for exposed installation where the following • 8.2.5.7 SMALL AREAS CREATED BY ARCHITECTURAL FEATURES,SUCH AS PLANTER BOX WINDOWS,BAY conditions are met.(UL 1821 Approved) WINDOWS,AND SIMILAR FEATURES,SHALL BE EVALUATED AS FOLLOWS: (1)WHERE NO ADDITIONAL FLOOR AREA IS CREATED BY THE ARCHITECTURAL FEATURE,NO Exposed Wood Joist Ceiling Assemblies. ^ m p-Um ADDITIONAL SPRINKLER PROTECTION IS REQUIRED. 1. Joists are of dimensional lumber,engineered wood,wood I-joist or open m ri (2)WHERE ADDITIONAL FLOOR AREA IS CREATED BY AN ARCHITECTURAL FEATURE,NO ADDITIONAL web wood joists. m SPRINKLER PROTECTION IS REQUIRED,PROVIDED ALL OF THE FOLLOWING CONDITIONS ARE MET; 2. Joist are of depths from 6-16 inches(152-204 mm). (a)THE FLOOR AREA SHALL NOT EXCEED 18 FT'(1.7 M2) 3. Joist are of spacing from 12-24 inches(305-610 mm)on center. 611 (b)THE FLOOR AREA SHALL NOT BE GREATER THAN 2 FT IN DEPTH AT THE DEEPEST POINT OF 4. Joists can be exposed after installation. \ \ 'I THE ARCHITECTURAL FEATURE TO THE PLANE OF THE PRIMARY WALL WHERE MEASURED 5. Metal pipe hangers spaced at maximum 24 inches(610 mm)on center 1.55" / 1.66" 'I ALONG THE FINISHED FLOOR. are used. (c)THE FLOOR SHALL NOT BE GREATER THAN 9FT IN LENGTH WHERE MEASURED ALONG THE 6. Listed residential automatic sprinklers of maximum activation z° -411 Hanger 1" Hanger PLANE OF THE PRIMARY WALL. temperature rating of 155°F(68°C). (d)MEASURED FROM THE DEEPEST POINT OF THE ARCHITECTURAL FEATURE TO THE SPRINKLER SHALL NOT EXCEED THE MAXIMUM LISTED SPACING OF THE SPRINKLER. Metal Tubing Support. Tubing Support Spacing: (3)THE HYDRAULIC DESIGN SHALL NOT BE REQUIRED TO CONSIDER THE AREA CREATED BY THE (Anchor AquaPEX Tubing Securely Enough to Support pport the Tubing,Ye[Related 1. Metal tubing supports that willed for plastic tubing shall be used. Enough to Allow the Tubing to Expand and Contract ARCHITECTURAL FEATURE. 2. Do not use supports will damage the tubing.Inspect metal ) supports for sharp edges. 1. Along Horizontal Runs,Install Supports Every 32",if Horizontal Runs are 17. NFPA 13D 8.3 LOCATION OF SPRINKLERS. 3. Do not rigidly anchor Uponor AquaPEX'"'tubing with supports.Allow • 8.3.1 SPRINKLERS SHALL BE INSTALLED IN ALL AREAS EXCEPT WHERE OMISSION IS PERMITTED BY 8.3.2 Continuously Supported,Place Tubing Supports at Six-Foot Intervals. THROUGH 8.3.8. enough tubing for freedom of movement to expand and contract. 2. Along Vertical Runs,Install Supports Every Four to Five Feet,at Each • 8.3.2 SPRINKLERS SHALL NOT BE REQUIRED IN BATHROOMS OF 55 FT°(5.1 M2)AND LESS Floor and at a Mid-story Guide. Co • 8.3.3 SPRINKLERS SHALL NOT BE REQUIRED IN CLOTHES CLOSETS,LINEN CLOSETS,AND PANTRIES THAT m z m MEET ALL OF THE FOLLOWING CONDITIONS: IIn-line F o (1)THE AREA OF THE SPACE DOES NOT EXCEED 24 FT'(2.2 M'). Flow Test v (2)THE WALLS AND CEILINGS ARE SURFACED WITH NONCOMBUSTIBLE OR LIMITED-COMBUSTIBLE The In-line Test can be constructed on site. It performs a flow test to ii S,o High Upstream Pressure ensure proper system operation and flow(see Figure F001-8). MATERIALS AS DEFINED IN NFPA 220,STANDARD ON TYPES OF BUILDING CONSTRUCTION. If the upstream pressure exceeds 80 psi a pressure reducing valve may z w m 8.3.4* SPRINKLERS SHALL NOT BE REQUIRED IN GARAGES,OPEN ATTACHED PORCHES,CARPORTS,AND need to be installed. Somejurisdictions mayrequire a ¢ f y ,o •• pressure reducing m- s SIMILAR STRUCTURES -'o o m-p z valve regardless of upstream pressure. U bing AquaPEX 8.3.5 SPRINKLERS SHALL NOT BE REQUIRED IN ATTICS WITH OR WITHOUT STORAGE,PENTHOUSE % p q ¢ �^ �^-s EQUIPMENT ROOMS,ELEVATOR MACHINE ROOMS,CONCEALED SPACES DEDICATED EXCLUSIVELY TO AND Tubing j w z o CONTAINING ONLY DWELLING UNIT VENTILATIONQEQUIPMENT,FLOOR/CEILING SPACES,ELEVATOR SHAFTS, j % W p CRAWL SPACES,AND OTHER CONCEALED SPACES THAT ARE NOT USED OR INTENDED FOR LIVING f lo PURPOSES. • - . o w z a • 8.3.5.1 SUCH SPACES THAT CONTAIN FUEL-FIRED EQUIPMENT SHALL ALSO COMPLY WITH 8.3.5.1.1 OR % .. U a O 8.3.5.1.2. • • 5' F=u aJ 1°y', • 8.3.5.1.1 WHERE THE FUEL-FIRED EQUIPMENT IS ABOVE ALL OF THE OCCUPIED AREAS OF THE DWELLINGI j • jIttt M Er z F<F w U .. UNIT,NO SPRINKLER PROTECTION SHALL BE REQUIRED IN THE CONCEALED SPACE. _ O O p •!3T.,5,-,9 • 8.3.5.1.2 WHERE FUEL-FIRED EQUIPMENT IS BELOW OR ON THE SAME LEVEL AS OCCUPIED AREAS OF THE N u u u¢a m z a DWELLING UNIT,AT LEAST ONE QUICKRESPONSE INTERMEDIATE TEMPERATURE SPRINKLER SHALL BE Male Threaded Coupling ProPEX Fire O Sprinkler Adapter In INSTALLED ABOVE THE EQUIPMENT OR AT THE WALL SEPARATING THE SPACE WITH THE FUEL-FIRED rY A EQUIPMENT FROM THE OCCUPIED SPACE. NJ 1 ` w 0 1"Ball valve • 8.3.6 SPRINKLERS SHALL NOT BE REQUIRED IN COVERED,UNHEATED PROJECTIONS OF THE BUILDING AT To Hot Water Heater Male Threaded Coupling `D ENTRANCES/EXITS AS LONG AS THE DWELLING UNIT HAS ANOTHER MEANS OF EGRESS. '-` LLJ /1 w O m • 8.3.7 SPRINKLERS SHALL NOT BE REQUIRED FOR CEILING POCKETS THAT MEET THE FOLLOWING [��' Female Threaded F a 'Cue CONDITIONS: v Tee with Water Q f\ ig Lo (1)THE TOTAL VOLUME OF ALL UNPROTECTED CEILING POCKETS IN A COMPARTMENT DOES NOT EXCEED N - Pressure Gauge `�O 0 (•' Pressure Gauge Sprinkler Orifice (Optional) 5 O in 100 FT3(2.83 Ma). t �` 5 5 (2)THE ENTIRE FLOOR UNDER THE UNPROTECTED CEILING POCKET IS PROTECTED BY THE SPRINKLERS , v I - ow m 10)rrvi .. AT THE LOWER CEILING ELEVATION. E `.°z 5 (3)*THE INTERIOR FINISH OF THE UNPROTECTED CEILING POCKET EXCLUDING DECORATIVE L Main Fire Sprinkler Flow Test 5¢5 w 5 5 TREATMENTS IS NONCOMBUSTIBLE OR LIMITED-COMBUSTIBLE MATERIAL. illt - Shut-off Valve To ensure the system provides enough water for proper fire sprinkler °i w f m:.. E performance,you should conduct a flow verification test. ,/ .. (4)SKYLIGHTS NOT EXCEEDING 32 FT'(2.97 M')SHALL BE PERMITTED TO HAVE A PLASTIC COVER. _ Uponor Warning Signs > �l ��., > F 00 • 8.3.8 SPRINKLERS SHALL NOT BE REQUIRED IN CLOSETS IN GARAGES AND EXTERIOR CLOSETS o Note: The NFPA 13D Installation Standard does not require flow f"� f m m ¢., S (REGARDLESS OF SIZE)LOCATED ON EXTERIOR BALCONIES,EXTERIOR BREEZEWAYS/CORRIDORS,OR - verification. 11 z v a o g- O ACCESSED FROM OUTDOORS WHERE THE CLOSET DOES NOT HAVE DOORS OR UNPROTECTED 5 3 G 5 PENETRATIONS DIRECTLY INTO THE DWELLING UNIT. 5 Pressure Reducing 3 w ¢ Valve Before performing a flow verification test,confirm the water pressures by B G P O • 8.3.9 SPRINKLERS SHALL BE INSTALLED IN ANY CLOSET USED FOR HEATING AND/OR AIR-CONDITIONING z contacting the Water and Sewer Department of your local city. Ensure the a o u ri u m 5 EQUIPMENT,WASHERS AND/OR DRYERS,OR WATER HEATERS EXCEPT AS ALLOWED BY 8.3.8. available water pressure matches the pressure used in the system design. F 18. INSULATION GUIDE LINES PER NFPA 13D. - Note: The sprinkler plan indicates the most hydraulically remote sprinkler SHEET DESCRIPTION • 9.1.1*WET PIPE SYSTEMS IN AREAS ABOVE 40°F. A WET PIPE SYSTEM SHALL BE PERMITTED TO BE TO BE - ,8 (or pair of sprinklers). For test requirements on other sprinklers,consult GENERAL NOTES&DETAILS S USED WHERE ALL PIPING IS INSTALLED IN AREAS MAINTAINED ABOVE 40°F,INCLUDING AREAS PROPERLY a your local code. INSULATED TO MAINTAIN 40°F. •• A.9.1.1 IN AREAS SUBJECT TO FREEZING,CARE SHOULD BE TAKEN IN UNHEATED ATTIC SPACES TO Note: It is a good idea to notify the fire inspector at least 24 hours prior to rn COVER SPRINKLER PIPING COMPLETELY WITH INSULATION. INSTALLATION SHOULD FOLLOW THE performing a flow verification test. This may speed up the inspection GUIDELINES OF THE INSULATION MANUFACTURER.FIGURE A.9.1.1(A)THROUGH FIGURE 6.9.1.1(F) process and eliminate the need to repeat the test for the inspector. SHEET NUMBER „,,9---_,,, SHOW SEVERAL METHODS THAT CAN BE CONSIDERED. THESE ARE FOR ILLUSTRATIVE PURPOSES ONLY. CONSULTATION WITH THE GENERAL CONTRACTOR AND/OR OWNER IS RECOMMENDED TO ENSURE , Note: See"AquaSAFE Flow Test Instruction Sheet"(Provided in PROPER METHODS AND MATERIALS ARE USED TO MAKE SURE 40°F WILL BE MAINTAINED. Contractors Documents package or online at www.Uponorpro.com)for Z more information on Flow Tes[Setup,Assembly,Performing the Test and Troubleshooting. If[here are any questions please contact Uponor. BO psi © UPONOR - CONFIDENTIAL FO 0 1 FPRV Set Pressure F-