Loading...
Plans (16) Markup Legend SPRINKLER SYMBOL DEFINITION COLOR/LINETYPE LEGEND BLUE LINES=FEED TO FIXTURES(BATH,SHOWER, ETC.). 16l. fo OO XXX-XX GREEN LINES--INTERLEVEL CONNECTIONS/SUPPLY. Delete Line u f BLACK LINES=SPRINKLER HEAD TO SPRINKLER HEAD. O o MAXIMUM SPACING(TYP) = 1/2"PIPE SIZE *74 Add Line SPRINKLER MODEL(TYP) =3/4"PIPE SIZE a a,6 HEAD SYMBOL(TVP) -I.- <m W OU. Add Tee CITY OF TIGARD —1— = 1"PIPE SIZE 0 .:0, = 1-1/4"PIPE SIZE w LL w Approved �� _.— in z CL k„.,,,,!„- , °- Conditionally = Add Elbow Approved [ ] � W W V Add Coupling See Letter to:Follow I ] J Add Head @.1\ le le - Attached [ "L423.72 1 1 1 ) c°i.w3 Permit Number: r'Y1,5'- o,6 .. v 0.a=i i:, Delete Head ,! '. 2 y-4' Address: X711 �;�% ,�,�,�.r o Y_z n Move Head _ _ _ _ By: 4),4 Date: 16)-- 6,_ "20 l F80.ym.=3 Pot ..':..L ''' a'7'05 z..0 b � -...,,..2-.1'.;2,S °,ii oo a zrd8 z Note:All revisions must be reviewed by Uponor � = ¢ � ZO8`o W7F_ Table F002-1 .k',9,=1,,?...;;;--,,', C.0 `4':.-,'� Multipurpose Fire Safety Systems ooaz> z z The Uponor Residential Fire Safety System is a residential fire protections o z z o i c¢a o system installed in combination with the cold side of the domestic potable CW ° F o> water system. Only licensed contractors trained by Uponor can install this a system. N E¢ m � Jai Uzzzoo¢ ,A, o What to do if Changes are Required U z z,.Sc-L',El`uN<a L . If any features or obstructions require the addition or deletion of sprinkler 1"AQUAPEX INTERLEVEL 1"AQUAPEX INTERLEVEL 8'''''- '„°,-i' 8,:, ,,"°.-',2` ,2 ly ¢H o z z z-,,..9,4F,,-. heads,or significant relocation of sprinkler heads,contact the Uponor Design CONNECTIONS FROM SECOND CONNECTIONS FROM FIRST C m 5-a o x¢¢;;z o ho r-g2°_yz-, Department to determine if observed changes require a redesign FLOOR TO THIRD FLOOR FLOOR TO SECOND FLOOR ¢'�z+z F- p o z ? (888.594.7726). o ¢ r ��/j xEf-pzN c, �p.�.n � / za�do Ea7,_o=� 2 \ p'`g,' i E-, " w¢ MOST HYDRAULICALLY REMOTE HEADS // \� \ // \ \ `c z x ¢ s 'o w HEAD# GPM PRESSURE REQ'D AT STREET r • -,,,-,:-/', n �I \V I�i ,, e 10,GD �� II VI A i ,00m azY¢ >� 1 HEAD H.1 17 47.09 l -- / / x zo a •. i - D7 ��oND 7 II „, ° .,- z ¢ 2 HEAD H.13&H.12 26.09 61.96 ( I h� A\ I �� _ o_ il dS„LAt ',� \ 1 \ 5V �_ > 7 ) zyfor¢o° -a1oo= Hi )t.Rl EO _�_ A J I A I 1 ��� o¢o� �Fo�`¢ 1 11 \ in I / 2 1st Floor �( ,J " '" 4 2 d Fltedroom /fi Z / • \/� \\ / // I � \\ G F1\H\AJ - I �4 8 3rd Floor91 C- ES-18 \ ,:d-- 'Y' I I D. / 1 I ILf FI F 'i1 D7 14 TOTAL \ / I V H wv� H.1 y \ RC-RES-1611 • J, F -T a \,H O _n i. LF SENJU SPRINKLER Model RC-RES Flat Concealed Pendent Quick Response a ii—4// Iii 1 A ro 1 1 /a R rnzAr RrAMSWATER He r R 0 - - - 1 K=4,9, 162F°,7/16"Orifice,Maximum Spacing 18'x18' it it II \ \ N.2 r T3Ka 1i/ I ,-- ice V ,EL,..:*c 1 1N; \D FURNACE�' Sprinkler head demand: 17gpm @ 12 tat^, 1 RC-RES-18 p III ,_ l II \ / A SHALL \ ,) l� O1 FILE COP LF SENJU SPRINKLER Model RC RES Flat Concealed Pendent ) rf �'� \ Iry �TG1 T� I N-r �c ,� QUICk Response n1 F _�.' J ,v 7 1"AquaPEX TO SYSTEM 0 - - - 11 K-4.9, 162F°,7/16"Orifice, Maximum Spacing 16'x16' 1 Lu H�1 r RC-RES-16 Sprinkler head demand: 13 gpm @ 7.04 z..D k�T.19 \\ S. MAINSHUTOFF \ diFOl_D r F VALVE LOCATION LF SENJU SPRINKLER Model RC-RES175 Flat Concealed Pendent Quick Response �� i�a� 1"1 A / I I �. 0 - - - 2 K=4.9, 175E°,7/16"Orifice, Maximum Spacing 12'x12' 'll:, I ,,, 1 I M 23 T.24/ �. I A �t I a ri bfr� r RC-RES-12-175 Sprinkler head demand: 13 gpm @ 7.04 °�i 1) Ir;,° 1 •C!RRE 6 1 �� ' V I �I5'1 e l� I RC-� 7 .1 'i F.7 \ T T l X111�� CE1. ( " II 1 56 � AS A� a' M.IBath H T I F.4 F.3> — 1 Wo • '49 II 'l. ' Ie ��� '� �®�� I111 iy / •_ \ I HA -r i It, _ i .:—�_ ! 1l1 o o m°'a a �r 1 \ / " 111 .a -4- t--7'''--- =1' aCmP�.. '`F`-, �a� \RC1 RES • �� r s 4 r 0 1 f �i r � a � _ LA 2 '_-- I hq rt T.33 eEL, , "�?°.r. -Ml, E + w z J ( .r ' I� 3� a �� „ i cE 1 s c F.8 IzG La` a a EXTERIOR WALL T �i F.5 1;c4134'. l , 0 - (15065I10,8 10 �1, u RESIDUAL: 51 sl STATIC: 67psis T '9 RADON RE i p ..r 1 �, STACK x.37T.36 Q agrl rlzo -c .38 �( fV �oaa°T=wo ELEV 109' T FLOW RATE: 3650gpm FtC-._ 2 a e 1' N o > 9P �1 AquaPEXree m11 1 w Ap. D5�1, -o TO SYSTEM I � i LL 1 I J . 1RC-RES-466P 1 /� w w 11'• i s " I ` V r o: / TO HOT WATER HEATER 6 12 6 12 D13f1 s.l 8 'PPITCH PITCH. C 16 ( r- W w f / ELEV=104' li 111 %( I2 7 I1/Z / ,71\ I ,IH V it 0 1 —OVER LOO \ �1' FULL PORT rc, ss r ill, , FLOOR 1 \ ^/ o W o H.1 RDH 14 L.L _ c EGR.Ss HH{y', 1 III I _ R P m BALL VALVE RE - Li �a w m ry �I d�' i f_ HeAr L a r � D W w f o OR EQUIVALENT RV �1 �{ ( r_ 2 L F- Q .. s CP , 64166 1 16,67r (7PSI LOSS FLOWING 26GPM) 1-4 z `./ =m o ELEV=100' ELEV=100' I� '5'8 G //////////] ---_ oR=LFa 5- 1"METER 3 THIRD FLOOR ,/-- --2- --'\ SECOND FLOOR -"1 FIRST FLOOR 6�"V� 35'OF 50'OF 1 i - -_- SHEET DESCRIPTION 1"COPPER-K 1-1/4"AquaPEX F100 n = I tI ,, F100 ' = I II i\ F100, = I II ALL LEVELS 1/4 1 -0 1/4" 1 -0 � , 1/4" 11-0" 8 4 WATER SERVICE DETAIL F100 5 0 5 15 SHEET NUMBER F100,' -- =611Miimi.1111=11 m NTS 1/4"=1'_0" © UPONOR - CONFIDENTIAL F- f Senju RC-RES:Open Web Truss/TJI Construction Insulation Recommendations TM In areas subject to freezing,care should be taken in unheated attic spaces See General Notes 8.2.5.7 for Architectural A/�uaSAFE GENERAL NOTES: in `7 ProPEX LF Brass Fire to cover Uponor AquaPEX tubing completely with insulation. Insulation Feature Requirements u, Sprinkler Adapter Tee should follow the guidelines of the insulation manufacturer. See Uponor _ 1. THIS SYSTEM IS DESIGNED AS PER NFPA 13D 2016 EDITION AS A RESIDENTIAL MULTIPURPOSE SYSTEM Blocking Maybe Fire Sprinkler Adapter Document"Uponor AquaSAFE Attic Insulation Guidlines"for attic O SECTION 3.3.11.3. --' -- - ---- Posh-on Nut ) ` / O J O Required.If h installation guidelines(Provided in Contractors Documents package or online 2. UPONOR COMPANY RESERVES THE EXCLUSIVE RIGHTS TO ALL DETAILS AND DRAWINGS AS SHOWN ON Blocking is Used, Y !' 1 1/q"Min. at www.Uponorpro.com. I I Q z THIS SHEET. THESE DETAILS AND DRAWINGS ARE PROPRIETARY INFORMATION OF UPONOR COMPANY AND Use The 2 Top 1%"Max. `1'^a UNAUTHORIZED USE MAY BE SUBJECT TO PROSECUTION TO THE FULL EXTENT OF THE LAW. Screw Holes. D-7 P Planter Box Window,Ba Window or Similar Feature. a O Bottom of Mounting Extreme Temperature Installations Yo _ pracket to Face of Truss gguaSAFE Residential Fire Safety systems are often installed in attics or If no additinal floor area is created No Additional Sprinkler is Required. ^@,u E:1<@, 3. THE DESIGN OF THIS SYSTEM IS DICTATED BY SPECIFIC CEILING HEIGHTS AND ROOM SIZES. IT IS THE Fire Sprinkler Ada ter -I I- 7 other areas exposed to temperature extremes of heat and/or cold. Follow 8'-0"or less O cry u RESPONSIBILITY OF THE INSTALLING CONTRACTOR TO ENSURE THAT THE CONDITIONS SHOWN ON THESE Mounting Bracket the recommended extreme weather installation instructions to isolate and / iv 3 9 w PLANS ARE EXACTLY AS THEY EXIST IN THE FIELD. DEVIATIONS FROM THE DESIGN MAY CAUSE THE : protect system components from extreme temperatures. Because this RC-RES-16� O SYSTEM TO BE UNABLE TO CONTROL A FIRE.IF THE BUILDING CONSTRUCTION DIFFERS FROM THE FIRE .�.v 'z system also delivers domestic cold water directly to plumbing fixtures, ® u,\ v O SPRINKLER PLAN,CONTACT THE SYSTEM DESIGNER IMMEDIATELY. 3-#10%1 1/2" 9'-0"or less I. Q a } Uponor highly recommends that you protect the tubing with adequate / �" i, ,,,,,„,,,,5, Full Course - insulation in warm weather areas to minimize heating of the cold water o m v w 4. THIS SYSTEM AND THE ACCOMPANYING HYDRAULIC CALCULATIONS ARE DESIGNED IN COMPLIANCE WITH Thread Screws ` o \ / z v,v❑ NFPA 13D 2016 EDITION. In Bottom Holes supply. - 5. "STAND-ALONE"OR"MULTIPURPOSE,WET PIPE"SYSTEMS ARE NOT PERMITTED TO USE ANTI-FREEZE. \ Installation methods include,but are not limited to: `"° `"ft CO a um+ • Tenting over the fire sprinkler piping. '\ \ \ D u°i I-w 3 Lead-Free Flat 6. MODIFICATIONS ARE PROHIBITED.SPRINKLERS THAT HAVE BEEN PAINTED,CAULKED,MODIFIED OR rB r h , _ • Additional layers of batt insulation. If additional floor area is created.Cannot exceed 18 ftz,be more than 2'-0" DAMAGED MUST BE REPLACED. Concealed SenJu L _0" Concealed Flat • Increased depth of blown-in insulation. deep,more than 9'-0"wide and be with in the coverage area of the 9 ¢ - :,_,L.,Sprinkler Head Cover Plate sprinkler.No Additional Sprinkler is Required. z ft o w z o F ¢ 7. WATER SHUT OFF VALVE IS NOT PERMITTED THAT ISOLATES THE SPRINKLER SYSTEM. Caution: If you will be installing spray foam insulation,make sure to h z "0.a 3 r o r protect all components during application.Consult with the spray foam _,-,15 u f 8 n o❑z 8. OWNERS MANUAL MUST BE PROVIDED TO THE OWNER. Senju RC-RES:Traditional Wood Framing Construction p y p pP NFPA 13D Table 7.5.5.3 Distances From u d,, ❑`a o" manufacturer to ensure compatibility with all products before a lication. Heat Sources =rLLzf<of=..xmf 9. AT THE MAIN SHUT OFF VALVE,A TAG OR A SIGN STATING THE FOLLOWING IS REQUIRED;"WARNING,THE ,�z„ LL z z y m.,,z.,,,, ,...,,, Consultation with local building officials is encouraged to ensure compliance n w WATER SYSTEM FOR THIS HOME SUPPLIES FIRE SPRINKLERS THAT REQUIRE CERTAIN FLOWS AND 7,7-t4 ,.-t8 ¢- PRESSURES TO FIGHT A FIRE.DEVICES THAT RESTRICT THE FLOW OR DECREASE THE PRESSURE OR ProPEX LF'Brass Fire with local building codes. Ordinary Intermediate ...i=¢0 .,,-.0703,' AUTOMATICALLY SHUT OFF THE WATER TO THE FIRE SPRINKLER SYSTEM,SUCH AS WATER SOFTENERS, Sprinkler Adapter Tee Fire Sprinkler Adapter ry °o o z ft z F F n n.z pri p Heat Source Temp. Temp. d z z r o s_B - FILTRATION SYSTEMS AND AUTOMATIC SHUT OFF VALVES,SHALL NOT BE ADDED TO THIS SYSTEM -, Push-on Nut 135°-170° 175°-2250 o¢or z WITHOUT REVIEW OF THE FIRE SPRINKLER SYSTEM BY A FIRE PROTECTION SPECIALIST.DO NOT REMOVE `f Bending PEX Tubing '46K6.,.,7.4„.0..r THIS SIGN". 1 1 Fide of Fireplace 36" 12" K ° . f z 1 i y Min. The minimum bend radius of Uponor PEX tubing in any direction is six times Front of Fireplace 60" 36" W Y p m o F°i¢a o J 10. ALL INTERIOR PIPING TO BE UPONOR"AquaPEX®°"UNLESS NOTED. -�- 124 Max. the outside diameter(6 x OD). ° y LL Fire Sprin der Adapter -i 8ottom a Mounting Bend supports are available for 3/8",1/2",3/4"and 1"Uponor AquaPEX Wood Burning Stove 42" 12" N ¢o¢s r ° Mounting Bracket Bracket to,ace of Truss [ubin Kitchen Range 18" 9" Q a o z z o o x J N o 3 z 11. UPONOR"AquaPEX"TUBING TO BE SUPPORTED PER NFPA 130 AND MANUFACTURER'S RECOMMENDATIONS. 9 J g to facilitate 90-degree rigid bends. g J w z J I o o<x.N .g o 0 ® Walt Oven 18" 9" V d¢7w¢u_ ¢ 12. MINIMUM SPACING BETWEEN SPRINKLERS IS 8'-O" REFER TO SPACING CHARTS FOR MAXIMUM SPACING 2-#10 x 1 1/2" Recommended Tubing Length Between Fittings Hot Air Flues 18" 9" z N u^2°"z'°° �' H ft `,,,'-'tCv ft 49w9 BETWEEN SPRINKLERS AND FROM WALLS.SPRINKLER HEAD MANUFACTURERS MAY HAVE MORE Full Course r j N d. ¢.,,?,,J z o RESTRICTIVE SPACING LIMITATIONS. Thread Strews I 1 Fitting Size Minimum Tubing Length Uninsulated Heat Ducts 18" 9" o z 0 u z 1 �7 C� Uninsulated Hot Water Pipes 12" 6" ¢ V w o F N In Top Holes L 1 � CJ 3/8"ProPEX Fitting 2�� �N d,o¢990 13. SPRINKLERS ARE NOT NECESSARILY CENTERED IN ROOMS DUE TO LIGHT FIXTURES OR OTHER CEILING Side of Hot Air Diffuser 24" 12" o¢y o K ;o V 9 o MOUNTED OBSTRUCTIONS. 1/2"ProPEX Fitting 2 1/2" ❑ z z --. \ \ Front of Hot Air Diffuser 36" 18" 3 > --c. 14. THE PLUMBING TIE IN CONNECTIONS ARE SCHEMATIC IN NATURE AND CAN BE INSTALLED OFF THE - - 3/4"ProPEX Fitting 3 1/2" o ,¢ 0 c u-ft Hot Water Heater 6" 3" Lead-Free Flat o.7.0 .0'..40_,.. ,-.-. o SPRINKLER LOOP ANYWHERE BETWEEN SPRINKLER TO SPRINKLER CONNECTION. Concealec SenJu \ ` rii �. 1"ProPEX Fitting 4 1/2" Furnace 6" 3" `0,,,m4=0'.-.-,r ¢n r Concealed Flat ❑o LL,0¢x 0-x Sprinkler Head Cover •Plate 1 1/4"ProPEX Fitting 5 1/2" SOW-250W Light Fixture 6" 3" - >c,o u v.z n=z m 15. THIS SUGGESTED LAYOUT IS BASED UPON INFORMATION PROVIDED BY OTHERS. CHANGES INf,:,,., .0,7` 250W-499W Light Fixture 12" 6" � ,� g x m ft a CONSTRUCTION OR FIELD CONDITIONS MAY OCCUR WHICH MAY REQUIRE CHANGES TO THE LAYOUT. IT IS i n >N 3 y_ o u o_ THE RESPONSIBILITY OF THE INSTALLER TO NOTIFY UPONOR TECHNICAL SERVICES OF SUCH CHANGES. ,q >z°'2 b�u%9 H s \ rFoz¢o xwx� w Exposed Installation Requirements. ' " �� ¢ 16. NFPA 13D 8.2.5*OBSTRUCTIONS TO RESIDENTIAL SPRINKLERS • 8.2.5.6* SHADOW AREAS SHALL BE PERMITTED IN THE PROTECTION AREA OF A SPRINKLER AS LONG AS Uponor Aings ar T"'tubing(white)and ProPtallaEXT'EP Fittings and Pro PEX'"' I m THE CUMULATIVE DRY AREAS DO NOT EXCEED 15 FT°PER SPRINKLER. Brass Fittings are approved for exposed installation where the following • 8.2.5.7 SMALL AREAS CREATED BY ARCHITECTURAL FEATURES,SUCH AS PLANTER BOX WINDOWS,BAY conditions are met.(UL 1821 Approved) WINDOWS,AND SIMILAR FEATURES,SHALL BE EVALUATED AS FOLLOWS: (1)WHERE NO ADDITIONAL FLOOR AREA IS CREATED BY THE ARCHITECTURAL FEATURE,NO Exposed Wood Joist Ceiling Assemblies. o . /�o Um ADDITIONAL SPRINKLER PROTECTION IS REQUIRED. 1. Joists are of dimensional lumber,engineered wood,wood I-joist or open mos'" m (2)WHERE ADDITIONAL FLOOR AREA IS CREATED BY AN ARCHITECTURAL FEATURE,NO ADDITIONAL web wood joists. m SPRINKLER PROTECTION IS REQUIRED,PROVIDED ALL OF THE FOLLOWING CONDITIONS ARE MET; 2. Joist are of depths from 6-16 inches(152-204 mm). (a)THE FLOOR AREA SHALL NOT EXCEED 18 FTS(1.7 M') 3. Joist are of spacing from 12-24 inches(305-610 mm)on center. s") ❑ (b)THE FLOOR AREA SHALL NOT BE GREATER THAN 2 FT IN DEPTH AT THE DEEPEST POINT OF 4. Joists can be exposed after installation. \ \ THE ARCHITECTURAL FEATURE TO THE PLANE OF THE PRIMARY WALL WHERE MEASURED 5. Metal pipe hangers spaced at maximum 24 inches(610 mm)on center 1.55" / 1.66" ALONG THE FINISHED FLOOR. are used. (c)THE FLOOR SHALL NOT BE GREATER THAN 9FT IN LENGTH WHERE MEASURED ALONG THE 6. Listed residential automatic sprinklers of maximum activation Zn -4u Hanger 1" Hanger PLANE OF THE PRIMARY WALL. temperature rating of 155°F(68°C). (d)MEASURED FROM THE DEEPEST POINT OF THE ARCHITECTURAL FEATURE TO THE SPRINKLER SHALL NOT EXCEED THE MAXIMUM LISTED SPACING OF THE SPRINKLER. Metal Tubing Support. Tubing Support Spacing: (3)THE HYDRAULIC DESIGN SHALL NOT BE REQUIRED TO CONSIDER THE AREA CREATED BY THE (Anchor AquaPEX Tubing Securely Enough to Support the Tubing,Yet Relaxed 1. Metal tubing supports designed for plastic tubing shall be used. Enough[o Allow the Tubing to Expand and Contract) ARCHITECTURAL FEATURE. 2. Do no[use supports that will damage the tubing.Inspect metal 17. NFPA 13D 8.3 LOCATION OF SPRINKLERS. supports for sharp edges. 1. Along Horizontal Runs,Install Supports Every 32",if Horizontal Runs are • 8.3.1 SPRINKLERS SHALL BE INSTALLED IN ALL AREAS EXCEPT WHERE OMISSION IS PERMITTED BY 8.3.2 3. Do not rigidly anchor Uponor Aqua PEXne tubing with supports.Allow Continuously Supported,Place Tubing Supports at Six-Foot Intervals. enough tubing for freedom of movement to expand and contract. THROUGH 8.3.8. 2. Along Vertical Runs,Install Supports Every Four to Five Feet,at Each • 8.3.2 SPRINKLERS SHALL NOT BE REQUIRED IN BATHROOMS OF 55 FT°(5.1 M°)AND LESS Floor and at a Mid-story Guide. 0 • 8.3.3 SPRINKLERS SHALL NOT BE REQUIRED IN CLOTHES CLOSETS,LINEN CLOSETS,AND PANTRIES THAT m m The MEET ALL OF THE FOLLOWING CONDITIONS: In-line o (1)THE AREA OF THE SPACE DOES NOT EXCEED 24 FT'(2.2 M°). he Flow Test f f x In-line Flow Test can be constructed on site. It performs a flow test to aJ ✓ (2)THE WALLS AND CEILINGS ARE SURFACED WITH NONCOMBUSTIBLE OR LIMITED-COMBUSTIBLE High Upstream Pressure ensure proper system operation and flow(see Figure F001-8). ❑o iO MATERIALS AS DEFINED IN NFPA 220,STANDARD ON TYPES OF BUILDING CONSTRUCTION. If the upstream pressure exceeds 80 psi a pressure reducing valve may z w m .. 8.3.4* SPRINKLERS SHALL NOT BE REQUIRED IN GARAGES,OPEN ATTACHED PORCHES,CARPORTS,AND need to be installed. Some jurisdictions maya m n j require a pressure reducing to n❑,c.-,:!„ - 's SIMILAR STRUCTURES valve regardless of upstream pressure. Uponor AquaPEX O o 0 a w n • 8.3.5 SPRINKLERS SHALL NOT BE REQUIRED IN ATTICS WITH OR WITHOUT STORAGE,PENTHOUSE Tubing ~ O EQUIPMENT ROOMS,ELEVATOR MACHINE ROOMS,CONCEALED SPACES DEDICATED EXCLUSIVELY TO AND j j z us o CONTAINING ONLY DWELLING UNIT VENTILATION EQUIPMENT,FLOOR/CEILING SPACES,ELEVATOR SHAFTS, j W 0 O CRAWL SPACES,AND OTHER CONCEALED SPACES THAT ARE NOT USED OR INTENDED FOR LIVING a PURPOSES. - a ❑ ., o • 8.3.5.1 SUCH SPACES THAT CONTAIN FUEL-FIRED EQUIPMENT SHALL ALSO COMPLY WITH 8.3.5.1.1 OR / / Uy ..a w.. 6 8.3.5.1.2. • u a m 9 • 8.3.5.1.1 WHERE THE FUEL-FIRED EQUIPMENT IS ABOVE ALL OF THE OCCUPIED AREAS OF THE DWELLING I j / (1r� a¢¢z 9 u w UNIT,NO SPRINKLER PROTECTION SHALL BE REQUIRED IN THE CONCEALED SPACE. j O ZO z❑w O N mut❑ 8.3.5.1.2 WHERE FUEL-FIRED EQUIPMENT IS BELOW OR ON THE SAME LEVEL AS OCCUPIED AREAS OF THE Male Threaded Coupling Pr0PEX Fire N u u ¢a Oz p DWELLING UNIT,AT LEAST ONE QUICKRESPONSE INTERMEDIATE TEMPERATURE SPRINKLER SHALL BE (\j Sprinkler Adapter to INSTALLED ABOVE THE EQUIPMENT OR AT THE WALL SEPARATING THE SPACE WITH THE FUEL-FIRED IY ^ w ❑ EQUIPMENT FROM THE OCCUPIED SPACE. 11....�� ❑ o REQUIREDMale Threaded Coupling 1"Ball Valve • 8.3.6 SPRINKLERS SHALL NOT BE IN COVERED,UNHEATED PROJECTIONS OF THE BUILDING AT -To Hot Water Heater plin LLJ > `ft ENTRANCES/EXITS AS LONG AS THE DWELLING UNIT HAS ANOTHER MEANS OF EGRESS. Z'+- �� 0 w 0 o, • 8.3.7 SPRINKLERS SHALL NOT BE REQUIRED FOR CEILING POCKETS THAT MEET THE FOLLOWING = E u/ ‘i Tee with Wate Female ed H Q 13 9 r CONDITIONS: v 1 (1)THE TOTAL VOLUME OF ALL UNPROTECTED CEILING POCKETS IN A COMPARTMENT DOES NOT EXCEED N _ Pressure Gauge 'u' a ( 1 . Pressure Gauge Sprinkler Orifice (Optional) `/O "w p L Ln 100 FT3(2.83 M'). m � �('� c w (2)THE ENTIRE FLOOR UNDER THE UNPROTECTED CEILING POCKET IS PROTECTED BY THE SPRINKLERS Ce , m cry d .o AT THE LOWER CEILING ELEVATION. E'E aJ -a z w o (3)*THE INTERIOR FINISH OF THE UNPROTECTED CEILING POCKET EXCLUDING DECORATIVE Main Fire Sprinkler Flow Test W m a 9 w 9 z TREATMENTS IS NONCOMBUSTIBLE OR LIMITED-COMBUSTIBLE MATERIAL. - Shut-off Valve To ensure the system provides enough water for proper fire sprinkler w E ut.. performance,you should conduct a flow verification test. (4)SKYLIGHTS NOT EXCEEDING 32 FTz(2.97 M')SHALL BE PERMITTED TO HAVE A PLASTIC COVER. _ v Uponor Warning Signs • 8.3.8 SPRINKLERS SHALL NOT BE REQUIRED IN CLOSETS IN GARAGES AND EXTERIOR CLOSETS o Note: The NFPA 13D Installation Standard does not require Flow I--I (rl 2 -m 9£,u a oo • (REGARDLESS OF SIZE)LOCATED ON EXTERIOR BALCONIES,EXTERIOR BREEZEWAYS/CORRIDORS,OR - verification. I-I Z v 2 m❑o g'L ❑F ACCESSED FROM OUTDOORS WHERE THE CLOSET DOES NOT HAVE DOORS OR UNPROTECTED EL! Pressure Reducing �' A�'w`�w¢ PENETRATIONS DIRECTLY INTO THE DWELLING UNIT. Valve Before performing a flow verification test,confirm the water pressures by i=r-t 5. • 8.3.9 SPRINKLERS SHALL BE INSTALLED IN ANY CLOSET USED FOR HEATING AND/OR AIR-CONDITIONING z _ contacting the Water and Sewer Department of your local city. Ensure the a o u vi E§a Oz- EQUIPMENT,WASHERS AND/OR DRYERS,OR WATER HEATERS EXCEPT AS ALLOWED BY 8.3.8. r, - available water pressure matches the pressure used in the system design. T. F 18. INSULATION GUIDE LINES PER NFPA 13D. - Note: The sprinkler plan indicates the most hydraulically remote sprinkler SHEET DESCRIPTION • 9.1.1*WET PIPE SYSTEMS IN AREAS ABOVE 40°F. A WET PIPE SYSTEM SHALL BE PERMITTED TO BE TO BE - 9 (or pair of sprinklers). For test requirements on other sprinklers,consult GENERAL NOTES&DETAILS USED WHERE ALL PIPING IS INSTALLED IN AREAS MAINTAINED ABOVE 400F,INCLUDING AREAS PROPERLY ite < your local code. INSULATED TO MAINTAIN 40°F. •• A.9.1.1 IN AREAS SUBJECT TO FREEZING,CARE SHOULD BE TAKEN IN UNHEATED ATTIC SPACES TO Note: It is a good idea to notify the fire inspector at least 24 hours prior to al COVER SPRINKLER PIPING COMPLETELY WITH INSULATION. INSTALLATION SHOULD FOLLOW THE performing a flow verification test. This may speed up the inspection 9- GUIDELINES OF THE INSULATION MANUFACTURER.FIGURE A.9.1.1(A)THROUGH FIGURE A.9.1.1(F) process and eliminate the need to repeat the test for the inspector. SHEET NUMBER SHOW SEVERAL METHODS THAT CAN BE CONSIDERED. THESE ARE FOR ILLUSTRATIVE PURPOSES ONLY. CONSULTATION WITH THE GENERAL CONTRACTOR AND/OR OWNER IS RECOMMENDED TO ENSURE Note: See"AquaSAFE Flow Test Instruction Sheet"(Provided in tu PROPER METHODS AND MATERIALS ARE USED TO MAKE SURE 40°F WILL BE MAINTAINED. Contractors Documents package or online at www.Uorming )for more information on Flow Test Setup,Assembly,Performing the Test and Troubleshooting. If there are any questions please contact Uponor. 80 psi © UPONOR - CONFIDENTIAL FO 0 1 l'-'4 PRV Set Pressure