Loading...
Permit CITY OF TIGARD BUILDING PERMIT 1111 COMMUNITY DEVELOPMENT Permit#: BUP2016-00265 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 09/15/2016 Parcel: 2S102BD01503 Jurisdiction: Tigard Site address: 12740 SW PACIFIC HWY Project: StorQuest Tigard Subdivision: FREWING'S ORCHARD TRACTS Lot: 1 Project Description: Demolition of(1)1,180 sq.ft. restaurant. UPON FINAL INSPECTION,DEMO CREDITS FOR SDC FEES WILL BE AVAILABLE FOR FUTURE CONSTRUCTION. Contractor: CAMPBELL DEVELOPMENT Owner: GOSPODINOVIC, ROSE MARY REV TRUS 23026 N 16TH LANE SUITE 101 PO BOX 86727 PHOENIX,AZ 85027 PORTLAND, OR 97286 PHONE: 623-434-8500 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: DEM Type of Const: Permit Fee-Additions,Alterations, 09/15/2016 $332.27 Demolition Occupancy Grp: Occupancy Load: Erosion Control w/Development 09/15/2016 $80.70 Dwelling Units: 0 DC Provision Review,COM TI-Ping 09/15/2016 $90.00 Stories: 0 Height: 0 ft Info Process/Archiving-Lg$2.00(over 09/15/2016 $2.00 Bedrooms: 0 Bathrooms: 0 11x17) Value: $16,649 Info Process/Archiving-Lg$2.00(over 09/15/2016 $2.00 11x17) Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $506.97 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by Iing)503.232.1987,G• 1.800.332.2344. Issued By: !i* Permittee Signature /1 Call 503.639.4175 by 7:00 a.m.for the next availa• • inspe,tion d. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Commercial DEMOLITION AEA i ' E: FOR OFFICE USE ONIA City of Tigard . 2 . eceived Dae/A e EipwinoPermitN 1l Z . ./ ,, , 114 4 13125 SW Hall Blvd.,Tigard,OR 97223 AUG 3 0 2016 Plan Review I Phone: 503.718.2439 Fax: 503.598 1960 Date/I3 : �. i TIGARD Inspection Line: 503 639 4175 a p�i mate Re°d ethos Page 2 for Internet: www.tigard-or.gov °�E. OF a l otifiedlMethod: Supplemental information 31J1L,:) NG DIV& 1 TYPE OF WORK REQUIRED DATA:I-AND 2-FAMILY DWELLING ❑New construction ®Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement 0 Other: equipment,materials.labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. Valuation: $ ❑ 1-and 2-family dwelling Commercial/industrial ❑Accessory building 0 Multi-family Number of bedrooms ❑Master builder 0 Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:12740 SW PACIFIC HIGHWAY New dwelling area: square feet City/State/ZIP:TIGARD,OR 97223 Garage/carport area: square feet Suite/bldg./apt.no.: Project name:STORQUEST SELF STORAGE Covered porch area: square feet Cross street/directions to job site:The project site is located at the south Deck area: square feel corner of SW Pacific Hwy and SW McKenzie Street Other structure area: square feet C /vec- c.af -1 S,c.yc✓ r:1;47.4314 REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision:FREWING'S ORCHARD TRACTS Lot no.:1 Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Tax map/parcel no.:2S102BD01503 equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. r� D� Demolition of existing 2-story vacant retail/office building and single story Valuation. $ 9,00 /69,U��' restaurant per site plan Existing building area: 0 square feet New building area: square feet ® PROPERTY OWNER ® TENANT Number of stories: Name: 12740 SW Pacific Hwy SP,LLC;atta:Jon Suddarth Type of construction: N/A Address:5301 DTC Blvd Occupancy groups: City/State/ZIP:Greenwood Village,CO 80111 Existing: retail/restaura Phone.(303)759-7008 Fax:( ) New: ® APPLICANT ►s CONTACT PERSON BUILDING PERMIT FEES* (Please refer to fee schedule) Business name:Magellan Architecture Structural plan review fee(or deposit): Contact name:Dirk McCulloch FLS plan review fee(if applicable): Address:8383 158th Ave NE,Suite 280 Total fees due upon application: City/State/ZIP:Redmond,WA 98052 Amount received: Phone:(425)885-4300 Fax: :(425)885-4303 PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* E-mail:dirknamagellanarchitects.com Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted Photo Voltaic Solar Panel System. Business name:Campbell Development;Attn:Vince Parravano Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address:23026 N.16th Lane,Suite 101 Solar Installation Specialty code checklist. Permit fee(includes plan review City/State/ZIP:Phoenix,AZ 85027 and administrative fees): $180.00 Phone:(623)434-8500 x109 ``� Fax:(623)434-9020 i State surcharge(12%of permit fee): $21.60 CCB lic.:203714 1'�I . Total fee due upon application: $201.60 4 ~ `t P Pp Authorized signature s-'� This permit application expires if a permit is not obtained ,/ -ap within 180 days after it has been accepted as complete. Print name: „..S.640 C 5 4 /j itil Date: 7/a 7//& * fee methodology set by Tri-County Building Industry Service Board. I.1B \ \ uildingPermitsBUP-COM PennitApp.doc 02/24/2011 440-4613T(I I/0//02/COMIWEB) IIIICity of Tigard ~ COMMUNITY DEVELOPMENT DEPARTMENT T 1 G A R D Building Permit Review — Commercial - With Land Use Building Permit #: ___8W/3/2/6) ..0091(09 Site Address: ,9 7 iv 56,) P 0 GiCIC. kh 6 liv C,',,y Suite/Bldg#: Project Name: EV r c S t (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Rc"----)w Proposal: 'I`)' clod citc WOrk XVerify site address/suite#exists and active in permit system. River Terrace Neighborhoo • W_: ,No Land Use Case#: C f Q�i&—�b 0 0 0 7 Plans Match Approved Land __ Site Plan ' Landscape Plan 0 Other: 0 Urban Forestry Plan 0 Elevation Plan Building Height: Maximum Height 41 Actual Height /1 Conditions Met: 0 Prior to Submittal ?rior to Permit Issuance 0 Business License: Exists: 0 Yes 0 No,applicant notified to obtain business license /21 Public Facilities Improvement(PFI) Permit: Required: 0 Yes,applicant was notified 0 No Applied For: Yes 0 No, stop intake Notes: C0 n cLt i 0nj {moo b JG 11.c cc-cd- v'i�jr tO 1S 1_.141 h v2 Approved by Planning: Al cg-t�� _ Date: 6 ) :?v/ /Jo Revisions (after Building Submittal only) Reviewer Date Revision 1: 0 Approved 0 Not Approved Revision 2: 0 Approved 0 Not Approved Revision 3: 0 Approved 0 Not Approved Building Permit Submittal Original Submittal Date: a ;a 1.0 Site Plans: # Building Plans: # —A Building Permit#: #building permit# bove. Workflow Routing: [ gigering ermit Coordinator 0 Building Workflow Sign-off: ff for Planning(include notes from planning review) Route Application Documents: tg• original permit application,site plans,building plans,engineer and / beam calculations and trust details,if applicable, etc. Notes: �c.rkt', ?/6// By Permit Technician: ,e.,„ Q______GAJ Date: '3/4'6 I:\Building\Forms\BldgPermitRvw_COM_WithLandUse 070915.docx Engineering Review O Slope at building pad: O PFI Permit#: O Conditions"Met"prior to issuance of building permit O Easements (encroachments)per engineering conditions of approval and plat (not typical on SDR/CUP) O Water Quality/Quantity Facility: 4 Assess Water Quality Fee in-lieu: 0 Yes 0 No Assess Water Quantity Fee in-lieu: 0 Yes 0 No LIDA Facility on lot: 0 Yes 0 No 0 NOT Approve• by • 'neering: Date Notes: Ar:+z—�'.-'`!=F 103"-‘1?:a% _, "" ^ moi v'� / L — -41111111111i Approved by Engineering: Z� Date: Q �b Revisions (after Building Submittal only) Reviewer Date Revision 1: 0 Approved 0 Not Approved ��_ Revision 2: 0 Approved ❑ Not Approved Revision 3: 0 Approved 0 Not Approved `4.J -P' Permit Coordinator Review 0 Conditions"Met"prior to issuance of building permit '/ S, pproved,NOT Released: Date: 7' d /0 Notes: L Cg:v vwi�4-e--€ editete, G. Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: SDC Fees Entered: Wash Co Trans Dev Tax: 0 Yes Tigard Trans SDC: ❑ Yes W. ' /A Parks SDC: ❑ Yes P' OK to Issue Permit Approved byPermit Coordinator: 00//7/1 Date: .1//5 PP Y I:\Building\Fonns\BldgPermitRvw COM WithLandUse_070915.docx Branden Taggart From: Dirk McCulloch <dirk@magellanarchitects.com> Sent: Tuesday, September 06, 2016 1:09 PM To: Branden Taggart Subject: FW: Submittal Checklist question: Storquest Permits (BUP2016-00261) Attachments: 2016-07-26_StorQuestTigard_SIT_PermitApp_15-133-signed 8-7-16.pdf Dirk McCulloch I Associate MAGELLAN ARCHITECTS Cameitotot 8383 158th Ave NE, Suite 280 Redmond, WA 98052 Tel: (425) 885-4300 ext.311 rem/ Cell: (206) 617-3716 www.magellanarchitects.com Think before printing-keep the planet VERDE From: Dirk McCulloch Sent: Friday, September 02, 2016 9:00 AM To: 'Branden Taggat; Dan Nelson Cc: #Building Permit Technicians Subject: RE: Submittal Checklist question: Storquest Permits (BUP2016-00261) Good morning Branden—here is a copy of this Site Work permit application. I'm certain that we had this bundled in with the folded sets of civil/site work plans(and there were some geotech reports in that same bundle) on Tuesday— but no matter—here it is again. As for the split on the demo permit valuations: The "Retail &Office" building makes up about 95%of the building square footage on site while the "Restaurant" is the remaining 5%. So, of the $332,979 total demo valuation let's assign: 95%= $316,330 to the Office/Retail building and; 5%=$16,649 to the Restaurant Thank you, Dirk McCulloch I Associate MAGELLAN ARCHITECTS 8383 158th Ave NE, Suite 280 Redmond, WA 98052 Tel: (425) 885-4300 ext.311 rata Cell: (206) 617-3716 www.magellanarchitects.com Think before printing-keep the planet VERDE 1 r Albert Shields From: Albert Shields Sent: Thursday, September 08, 2016 5:57 PM To: 'Dirk McCulloch' Cc: Monica Bilodeau Subject: BUP2016-00265 & -00266 demo permits, Storquest -- Approved but Not Released Dirk, same story with two demo permits, BUP2016-00265 and -00266: because the requisite conditions of approval have not been met we cannot issue these permits yet so I've marked them Approved but Not Released. Of particular concern for these demo permits are the tree protection measures. Please have your arborist send a confirmation to Monica and to me when the protection measures are in place. Albert Shields From: Dirk McCulloch [mailto:dirk@magellanarchitects.com] Sent:Tuesday, September 06, 2016 10:24 AM To:Albert Shields<albert@tigard-or.gov> Cc: Monica Bilodeau <MonicaB@tigard-or.gov>; Ray Woolf<Ray@tigard-or.gov>;Jon Suddarth <jsuddarth@williamwarren.com>; Luke Lappin (Ilappin@pd-grp.com) <Ilappin@pd-grp.com> Subject: RE:SIT2016-00013 & BUP2016-00261,Storquest--Approved but Not Released Thank you Albert. Yes, we are aware of these outstanding items- most of which are in process(i.e. SW Pacific Highway plans/review in process with ODOT, PFI review in process with the City but pending ODOT approval, etc.). With respect to the: • Item#1—Tree Protection measures: We will be arranging for the installation of tree protection measures in the next week or two and will provide verification of this. • Item#2-Tree Data Inventory Fee —can this fee be paid at the time of permit issuance/pick-up? Is there any special paperwork associated or do we simply bring a check for that amount? • Item#3-Tree Establishment Bond—is there specific City paperwork for making this payment? The client has indicated they would likely just provide a cash payment (rather than a bond)—does this go into some sort of escrow account that the City holds? With other jurisdictions there has been specific forms/paperwork associated—is this something we can get started on? • Item#6-Lighting Plan—our submittal from last week did include (the last sheet I believe—labeled "Photometric Lighting Plan"from Simkar Lighting Applications) a Lighting Plan. Can you please double check for this sheet? I am quite certain that it was attached as the last sheet—it's part of the Building Permit packages (I don't think I included in the Site Work Permit packages). We will continue to monitor progress of ODOT approvals which will, in turn, impact PFI approval and update City staff accordingly. Thank you, Dirk McCulloch Associate 1 r MAGELLAN ARCHITECTS _1 I 8383 158th Ave NE, Suite 280 Redmond, WA 98052 Tel: (425) 885-4300 ext.311 Cell: (206) 617-3716 www.magellanarchitects.com Think before printing-keep the planet VERDE From: Albert Shields [mailto:albert@ tigard-or.gov] Sent: Tuesday, September 06, 2016 10:08 AM To: Dirk McCulloch Cc: Monica Bilodeau; Ray Woolf Subject: SIT2016-00013 & BUP2016-00261, Storquest -- Approved but Not Released Dirk, in reviewing the permit applications for Storquest,SIT2016-00013 and BUP2016-00261,we find that multiple Conditions of Approval under the Land Use case, CUP2016-00001, have not been met. I've attached a list of the conditions showing their current status and have highlighted those that need to be met. Accordingly, I have classified these two applications as"Approved but Not Released." Plan Review will proceed but the permits will not be issued until the appropriate conditions have been met. Please let me know if you have any questions. Albert Shields. DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules "City General Records Retention Schedule." 2