Plans (7) a a 824 SE 12th Avenue Tel(1503)616 9425and,Oregon 7214 FIELD OBSERVATION REPORT II�J..T.�NT I�fJS,f, www.gcnweb.com PROJECT ID DATE REPORT NO. 1062 -Summit Ridge August 17, 2016 27 OWNER/CLIENT OWNER/CLIENT REPRESENTATIVE DAY OF WEEK PAGE D R Horton (DRH) Don Durst Thursday 1 of 1 GENERAL CONTRACTOR GENERAL CONTRACTOR REPRESENTATIVE ARRIVAL TIME DEPARTURE TIME DHI Todd Kurilo 1 130 1230 GRADING CONTRACTOR GRADING CONTRACTOR REPRESENTATIVE WEATHER/TEMPERATURE PERMIT G-Cam Excavation Sergey Sunny, 83° F Project# 1062 TYPE OF WORK SOURCE AND DESCRIPTION OF FILL MATERIAL GCN REPRESENTATIVE Structural Subgrade NA Robert Pendell LOCATION OF WORK CONTRACTORS EQUIPMENT OBSERVED IN USE Lot 145 CONTRACTOR ACTIVITY,OBSERVATIONS,CONCLUSIONS,RECOMMENDATIONS: I made this visit at the request of Don Durst to observe the excavated structural subgrade for lot 145. I used a Y2 inch diameter steel foundation rod to probe footing subgrade. During the probe I observed the structural subgrades to be very stiff soil. In our opinion the building pad has been prepared in general accordance with our recommendations and will support expected foundation for a single family home. A Preliminary report is provided solely as evidence that the field observation was performed. Observations,and/or conclusions,and/or recommendations ® FINAL ❑ PRELIMINARY conveyed in the final report may vary from and shall take precedence over those indicated in a preliminary report. A final report is an instrument of professional service. Any conclusions drawn from this report should be discussed with and evaluated by the professional involved. ITEMS TO OBSERVE,CHECK,OR TEST DURING NEXT VISIT FIELD REPRESENTATIVE SIGNATURE t� DATE Ro- r n emzteAL Aug 17, 2016 GCN's professionals are represented on site solely to observe operations of the contractor identified,to form opinions about the adequacy of those operations,and to report those opinions to our client. The presence and activities of our field representative do not relieve any contractor from its obligation to meet contractual requirements. We rely on the contractor to comply with the plans and specifications throughout the duration of the oroiect.irrespective of the presence of our representative.The contractor retains sole responsibility for site safety and the methods.ooerations.and sequences.