Loading...
11/12/2003 - Packet FILE COPY Intergovernmental Water Board Meeting Serving Tigard, King City, Durham and Unincorporated Area AGENDA Wednesday, November 12, 2003 5:30 p.m. 1. Call to Order Moll Call and Introductions Motion to call meeting to order, staff to take roll call. 2. Approval of Minutes—September 10,2003 Motion from Board for minute approval. 3. Rate Study Presentation—Ed Cebron,FCS&G and Debbie Galardi, Galardi Consulting(30 minutes) 4. Request for Credit from Leak—Tom Imdieke(10 minutes) 5. Canterbury Lease to WCCCA—Ed Wegner(10 minutes) 6. PW Director's Report—Ed Wegner(I5 minutes) 7. Informational Items—Ed Wegner Items will be discussed briefly if time allows—otherwise printed info will be distributed. 8. Public Comments Call for any comments from public. 9. Non Agenda Items Call for non-agenda items from Board. 10. Next meeting date—Tuesday,November 25,2003,at 6.30 p.m.for a Joint Meeting with Tigard City Council in Town Hall 11. Adjournment—Approximate Time 7.00 p.m. Motion for adjournment. A light dinner will be provided. Executive Session: The Intergovernmental Water Board may go into Executive Session under the provisions of ORS 192.660(1)(d), (e), (/)&(h)to discuss labor relations,real property transactions,current and pending litigation issues and to consider records that are exempt by law from public inspection. All discussions within this session are confidential; therefore nothing from this meeting may be disclosed by those present. Representatives of the news media are allowed to attend this session,but must not disclose any information discussed during this session. Intergovernmental Water Board Meeting Minutes September 10, 2003 Members Present. Dick Winn, Brian Moore, Beverly Froude, and Patrick Carroll (Bill Scheiderich—absent/excused) Staff Present. Ed Wegner, Dennis and Twila Willson Visitors: Roel Lundquist and Marc Delphine 1. Callao Order, Roll Call and Introductions Commissioner Patrick Carroll called the meeting to order and staff called roll. Bill Scheiderich was not present and was excused. 2. Approval of Minutes—August 13, 2003 Commissioner Beverly Froude motioned to approve the minutes of the August 13, 2003, Intergovernmental Water Board Meeting and Commissioner Dick Winn seconded the motion. The vote to approve and accept the minutes was unanimous. 3. Assistant PW Director's Utility Report—Ed Wegner Dennis Koellermeier was not able to attend the meeting and Ed Wegner gave the utility report. ASR-The land use permit has been applied for and should take approximately 45 days to process. The drilling at the 10-mg well should begin within 60 days and the Baggenstos property test well will follow that schedule. Summer Peaking -Water demand dropped with cooler weather last week. The summer peak day reached a record high of 14.28 mgd. Tigard shut down two wells to reduce purchasing of water and avoid the City of Portland's operational penalties which are set at 20% reduction. Bull Run—The City of Portland announced that they will continue to blend water through the end of October at a 60% Bull Run, 40% groundwater ratio. They have not received complaints from mixing the water. Weather Protections -The weather projections anticipate drier than normal weather for the next two months and possibly longer. Vulnerabiiity Assessment Study—This study is mandated by Congress. Tigard will be meeting tomorrow to begin the process of assessing the vulnerability of the water system, how to prevent intrusions and provide a report. This report is not a public document due to the nature of the issue. Intergovernmental Water Board i September 10,2003 DRAFT COPY Loaned Employee Program—Public Works divisions have loaned employees to help out with the seasonal operational needs of the Streets and Parks divisions; the exchange will begin in October. This program has become necessary due to budget cutbacks. Rider School/Reservoir—A neighborhood meeting was held Monday night with the school district. There are some traffic issues for school parking and buses and the neighbors want a left-turn lane to channel traffic, but it doesn't appear that there will be problems for the reservoir. There is a living estate agreement between the school district and Mrs. Rider,which allows her to live on the property in the two existing structures without any intrusion by the city or school. One concern of the neighbors was how the city would access the reservoir to monitor its operation. It was stated that access would be decided by the school district either through a secondary access road off Bull Mountain Road or a private cul-de-sac off 133`d Street. 4. PW Director's Report- Ed Wegner Joint Water Commission—The JWC draft agreement should be ready at the end of the week. Once the final details are worked out between the four existing city managers and Tigard's City Manager, it will be presented to each of the four agencies involved in the IWB for approval and signature. The raw water pipeline is moving along well. The route has been determined and talks are starting with some of the landowners to purchase easements or property for the pipeline. Some farmers are reluctant to give the easements, but no severe opposition and negotiations will continue. Portland Wholesale Contract— Portland presented three scenarios to the wholesale agencies and from the responses received from those scenarios, Portland realized that they might loose other agencies, including Tigard, as wholesale customers. The City of Portland's attitude has been that the Bull Run water is the best and they haven't thought other agencies are serious about going to other water sources. In actuality, most of the agencies are looking for other sources. The agencies have asked Portland how they would bring their prices to a competitive level, but Portland simply seems not willing to do so because they need $15m to meet their needs and don't want to waiver from that target goal. Soon there will have to be a reality check on both sides. If Tigard no longer purchases water from Portland as a wholesale agency, then other options are necessary in order to back up that decision. At this point, Tigard is not able to go to the Willamette River without a vote of the citizens, the JWC cannot provide enough water until the dam raise takes place, and with ASR wells Tigard will still fall short of what is needed for demand. A decision will have to be made within the next few months. 5. Informational Items-Ed Wegner The water comparison chart did not make it in the Cityscape because of a decision to reduce the size of Cityscape, but it is available on the city web page. Each of the informational packet articles were briefly described. Intergovernmental Water Board 2 September 10,2003 DRAFT COPY The memo regarding Bull Mountain annexation impacts is very important and annexation will affect the TWD board configuration through boundary reduction changes. Referring to the wall map, Mr. Wegner explained that the Tigard Water Service System includes the cities of Tigard, Durham and King City and the Unincorporated (TWD) area, and these four entities are partners. Annexation would reduce the unincorporated area (TWD) and could eventually eliminate it all together. 6. Public Comments Roel Lundquist asked for an update on the quarry project (Bridgeport Village). Mr. Wegner indicated that the project was put on hold because of appeals. The cost analysis has not been completed and nothing has gone to an intergovernmental agreement. Roel Lundquist went on to report that road improvements were going to be worked on at Findley Road and Tigard may want to put the pipes in now in conjunction with the road project. Mr.Wegner said he would have Dennis coordinate that part of the project with the City of Durham. Commissioner Marc Delphine (TWD) requested a brief explanation about the Intergovernmental Water Board and Tigard Water District. Mr. Wegner explained that there are five seats on the IWB consisting of representatives from the Cities of Durham, King City and Tigard and the unincorporated area of Washington County(TWD) plus one appointed member-at-large. The IWB was established in 1993 through an intergovernmental agreement. He went on to explain the process of passing on information from staff to the entities. Commissioner Delphine also requested a survey from the IWB members regarding the fluoridation issue. Commissioner Moore indicated that a survey had not been made of the constituents and their response would be personal opinions only. Mr.Wegner stated that when Beaverton decided to fluoridate their water, the IWB decided that fluoridated water was not an issue with the Tigard Water Service Area because it would be diluted down to only a trace in the system by the time it reached our area of the pipeline. 7. Non-Agenda Items -None 8. Next meeting date— Tuesday, October 21, 2003, at 5:30 pm (location to be announced), followed by a Joint Meeting with Tigard City Council in Town Hall 9. Adjournment The meeting adjourned at 6:40 p.m. Intergovernmental Water Board 3 September 10,2003 DRAFT COPY r Water Rate Model Update & SDC Analysis City of Tigard, Oregon Intergovernmental Water Board Meeting November 12, 2003 Financial Consulting Solutions Group, Inc. 8201-164"' Ave NE, Suite 300 ■ Redmond, WA 98052 (425) 867-1802 ■ fax (425) 867-1937 ■ www.fcsgroup.com Presentation Overview 1 . Study Scope/Objectives 2 . Major Assumptions 3. Supply Options 4. Findings/Recommendations eeFinancial Consulting SolutionsGroua. Inc. . ,.2s,86,.,ao: Pte. : StudyScope/Objectives 1 . Water Rate Model Update — Develop 20-year financial model and plan — Evaluate water supply options — Evaluate short term debt needs (Le. reservoir project) 2. SDC Analysis • Review methodology • Evaluate water supply options Financial Consulting Solutions Group, Inc. ■ (425) 867-1802 Page 3 Major Assumptions • Supply decision by FY2006/07 • First debt issue in FY04/05 for reservoir project • SDCs updated annually for ENR • Data on supply options still preliminary feFinancial Consulting SolutionsGrouo. Inc. . ,azsias,.,�z Page 4 Supply Option A 1 . original scope included preliminary analysis of Bull Run Regional Authority 2. Final options refined to: • Portland Wholesale • Joint Water Commission Partnership 3. New consortium is considering these and other options Financial Consulting Solutions Group, Inc. ■ (425) 867-1802 Page 5 Differential Nominal Costs for the 20- . year period 1 . Capital Program Costs • PDX $ 1072 million • Jwc $ 111 .5 million 2. Annual Water Purchase Costs • PDX $ 109.4 million • JWC $ 61 .9 million 3 . Debt Financing Levels • PDX $ 64.3 million • Jwc: $ 6-3. 1 million �eFinancial Consulting Solutions Group, Inc. • ,.zs,�,-,aoz Pages JWC Cost Structure and Bill Impacts JWC Partnership 20,000 $50.00 18,000 $'`•00 16,000 "� $40.00 14;000 $35.00 12,000 $30.00 Capital Costs O 10,000 $25.00 mom O&M Costs ——Bill 8,000 $20.00 61;000 $15.00 MM 4,000 $10M 2,000 $5.00 _ 1 $0.00 Fiscal Year Financial Consulting Solutions Group, Inc. ■ (425) 867-1802 Page 7 PDXCost Structure and Bill Impacts Portland Wholesale 20,000 $60.00 18,000 / $50.00 16,000 14,000 / $40.00 12,000 Capital Costs 10,000 J� --� $30.00 08M Costs Bill 8,000 �--'`'~ $20.00 6,000 4,000 $10.00 2,000 _ $0.00 O �aNN ti '�O '�b ���y �6 '�� ,�0 ^�'�°' tiN,� Fiscal Year Financial Consulting Solutions Group, Inc. ■ (425) 867-1802 Page 8 Average Residential Bill Comparison through FY 2021 /2022 Nominal value Average Residential Bill $60 - $50 - $40 - $30 - $20 - $10 - $0 - 2004 60$50$40$30$20$10$02004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2046 2017 2018 2019 2020 2021 2022 19 Financial Consulting Solutions Group, Inc. ■ (425) 867-1802 Page 9 Present Value Avg . Residential Bill .Comparison Present Value Average Residential Bill $30 $25 $20 $15 $10 $5 $0 - 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Financial Consulting Solutions Group, Inc. - (425) 867-1802 Page 10 Summaryof Draft Findins • Current information on supply options suggests accelerated capital investment under JWC scenario • Capital investments offset by lower water purchase costs beginning in FY2010/11 • Rate impacts reflect different cost structures • Preliminary JWC option lower in terms of both nominal and present values 19 Financial Consulting Solutions Group, Inc. • (425) 867-1802 Page 11 Recommendations • Continue to refine supply option, assumptions • Use rate model to determine: — Long-terra impacts of supply options — Short term rate increases (beginning in FY2004/05) • Following selection of supply option — Update SDC methodology and charges — Refine capital fi:nancIng plan Financial Consulting Solutions Group, Inc. ■ (425) 867-1802 Page 12 FIRST AMENDMENT TO WATER SERVICE AGREEMENT AND JOINDER AGREEMENT This First Amendment to Water Service Agreement and Joinder Agreement(First Amendment)is made this day of October, 2003,by and between the Joint Water Commission, consisting of the Cities of Hillsboro,Forest Grove, and Beaverton, and the Tualatin Valley Water District, a domestic water supply district organized pursuant to Chapter 2.64 (hereinafter"JWC") those parties individually(who also may be referred to as"Hillsboro," Forest Grove, Beaverton, and TVWD ) and the City of Tigard, a municipal corporation (hereinafter"Tigard"). RECITALS On or about , 2003, the individual members of JWC approved a Water Service Agreement,which replaced earlier agreements between these same parties creating the Joint Water Commission. The Water Service Agreement provides a comprehensive agreement in all aspects of the System as defined therein, including among other things, operation,maintenance,repair, replacement,ownership and allocation of the System,including water rights, and mechanisms for governance and future capital improvements. The City of Tigard desires to become a member of the JWC and the JWC is willing to grant Tigard membership' All parties and Tigard wish to amend the Water Service Agreement, and being fully advised, now therefore the parties agree as follows: 1. Covenant of Tigard. In consideration of Tigard becoming a member of the JWC, Tigard agrees to be bound by all terms and conditions of the Water Service Agreement dated , 2003 and this first Amendment. 2. Acknowledgement of Tigard. By execution hereof, Tigard acknowledges that it has no stored water rights or surface water rights in the Tualatin River, Hagg Lake, or Barney Reservoir and that any water it obtains from JWC shall be through leases of water and use of System components as approved by the JWC according to the Water Service Agreement. 3: Capital Contributions and Future Capital Projects. The JWC,by and through its individual partners, and Tigard, are presently involved in preliminary feasibility analysis to expand stored raw water capacity or to obtain additional stored raw water in Hagg Lake. The parties recognize that such expansion and the amount of stored raw water that may be available as a result of these efforts is speculative and subject to numerous factors that may result in no additional raw water ora completed project yielding less stored raw water than anticipated. The parties agree that Tigard's Capital Contribution to the System will be for these improvements to obtain additional stored raw water and that Tigard's proportionate ownership in the System will AMENDMENT TO WATERSERVICE-JOINDER AGREEMENT,Page 1 of 5 C:\DOCLTME—l\ed\LOCALS-1\Temp\WATERS—l.DOC be calculated based upon that Capital Contribution. Tigard acknowledges and agrees that if additional stored raw water is not obtained through these efforts then no water will ultimately be available to Tigard and Tigard will not be able to continue as a partner. In such event, Tigard agrees that it will voluntarily terminate and withdraw from the System as provided in the Water Service Agreement. 4. Governance. The parties agree that Tigard will have three representatives as set forth in Article III, Section 3.1 of the Water Service Agreement. The parties agree to modify Article III of the Water Service Agreement as follows: "3.1 The Commission. There is hereby continued pursuant to ORS 190 the Joint Water Commission-Hillsboro, Forest Grove, Beaverton, Tigard, and the Tualatin Valley Water District(the"Commission'). The members of the Commission shall be three(3)persons from each of the parties who are from time to time appointed by their respective bodies pursuant to the laws and regulations of the governing bodies. Members of the Commission shall serve at the pleasure of their respective appointing bodies. The name of the Commission shall be the "Joint Water Commission-Hillsboro,Forest Grove,Beaverton, Tigard and the Tualatin Valley Water District." . . . "3.4 Meetings; Manner of Acting. Meetings of the Commission shall be conducted in accordance with the provisions of the Oregon Public Meeting Law, ORS 192.610-192.710. The Commission shall hold meetings not less than quarterly. Such meeting may be cancelled by a vote of the Commission. Special meetings may be called by the Chairperson or by any Vice Chairperson. Sem) Eight 8 members of the.Commission(including at least one(1)member appointed by each party) shall constitute a quorum for the transaction of the business of the Commission. An affirmative vote of a simple majority of the members of the Commission,provided that one(1) affirmative vote is received from each of the parties to this Agreement shall be necessary to decide any issue before this Commission,unless a different voting requirement for a specific action is specified or allowed in this Agreement." . . . "3.8 Management Committee. Each party shall appoint its Chief Executive Officer or their designee to serve on the Management Committee. If the Commission elects to hire its own employees for management the Commission, as provided for this m Section 3.7 of this Agreement,then the General Manager of the Commission shall also be a member of the Management Committee. The Management Committee shall meet as required to review the business operations of the Commission, such as planning, operations, etc.,to make recommendations to the Gemmissien General Manager." 5. Lease of Water by JWC. Until the projects referred to in Section 2 above regarding expansion or obtaining additional stored raw water are successfully completed, and at all times subject to the terms of the Water Service Agreement, JWC will lease water to Tigard upon mutually agreeable terms as to quantity and price. AMENDMENT TO WATERSERVICE-JOINDER AGREEMENT,Page 2 of 5 C:\DOCUME—I\ed\LOCAJ-S—I\Tenv\WATERS—I.DOC 6. The Parties agree that Article V, Section 5.3 of the Water Service Agreement shall be amended as follows: Section 5.3, Stored Raw Water. "Each party shall have available to it or obtain Capacity in Stored Raw Water, such that sufficient raw water is available at the Water Treatment Plant Facilities to serve the Demand of the Party. The Capacity requirement for Stored Raw Water shall consist of the water used by the Party for the period of May 1' through October 31St. Such period may be adjusted from time to time based on the legal and operational availability of Surface Water Rights. Stored Raw Water Capacity may be obtained by purchase of existing Stored Raw Water, expansion of Stored Raw Water and/or leasing of Stored Raw Water from another Party." 7. The Parties agree that Article VII, Sections 7.5 and 7.6 of the Water Service Agreement shall be amended as follows: Section 7.5,Excess Use Payments. "To the extent that a Party uses capacity in the System in excess of its owned or leased capacity but such use does not exceed the threshold for over use as defined in Section 5.8,the Parties shall be required to compensate the Party or Parties for the excess capacity used. The determination of when the terms of this Section apply and the price paid for use of Capacity will be determined bye Commission with the intent being that the Parties are treated equitably and fairly. If there is a lease in place, the lease price shall gpply to the excess. This_pro_vision shall not apply to those.circumstances where the Commission offers additional water to a Party because of operational needs or considerations." Section 7.6,Effective Dates of Leases "The effective date for leases set forth in this Article 7 shall be on March 1, 2003 following the adoption of this Agreement and every March 1St thereafter." 8. Existing Agreement. In all respects, and except as specifically modified by this First Amendment, all terms and conditions of the Water Service Agreement are in full force and effect. IN WITNESS WHEREOF,the parties have executed this First Amendment as of the date opposite their signatures. SIGNATURES (on following pages) AMENDMENT TO WATERSERVICE-JOINDER AGREEMENT,Page 3 of 5 C:\DOCUME—I\ed\LOCALS—I\Temp\WATERS—l.DOC 7 Tualatin Basin Water Supply Feasibility Study (WSFS) Supply Options Evaluation Summary Revised 9/03 The purpose of the Water Supply Feasibility Study(WSFS)is to evaluate reliable,safe and cost-effective water supply options to meet the long term water needs of the Tualatin Basin community. The study began in November 2oo1 as a collaborative effort led by Clean Water Services in cooperation with the Bureau of Reclamation and local water providers. Background A series of water supply studies set the stage for the.WSFS. In the early 19go's the Regional Providers"Phase I Source Options Study"evaluated 29 different new water source options (options list attached in Appendix A).Expansion of Hagg Lake was not included in this study. Phase II of the Regional Water Supply Plan(RWSP), adopted in 1996,detailed how to meet regional 2050 water supply needs and added conservation to the supply options recommended in Phase I. The Integrated Water Resources Management Strategy(IWRM),completed in 2oo1,is a, cooperative approach among water resource agencies in Washington County for addressing a range of water issues. A priority IWRM action is to ensure a long-term water supply to meet future basin needs. The IWRM strategy estimated that the Tualatin Basin would face supply shortfalls by 2050 WSFS Source Options Screening The current Tualatin Basin WSFS is the next step of the IWRM. Using the comprehensive list of potential sources from previous studies and input from a scoping process in early 2002,a set of options were identified for more detailed evaluation: The following options were carried forward. • Water conservation. Programs and policies that reduce the demand for municipal/industrial and agricultural water supplies. • Wastewater reuse. Infrastructure to distribute treated wastewater for irrigation, primarily for non-food crops. Reuse would result in a reduction in demand in the municipal/industrial and agricultural sectors. • New Tualatin Basin storage. Includes several specific options: ■ Scoggins Dam raise. Constructed dam raise would result in a larger pool behind the dam and increased storage. ■ New in-line storage'on a Tualatin River tributary. New dam on a tributary,similar to the existing Scoggins Dam. ■ Off-line storage on a Tualatin River tributary. Water impounded away from tributaries in the high flow season and pumped back to the tributary during low flows to satisfy in-stream water needs only. ■ Stimson Dam. New dam below Scoggins Dam and upstream from Stimson Lumber Mill. Water Supply Feasibility Study y . Supply Options Evaluation Summary r V • Aquifer storage and recovery(ASR). Injecting treated drinlang water into underground aquifers during low demand periods and pumping it to provide supplemental peak use supply.Assumed to satisfy municipal needs only. • Bull Run System Contracts. Two scenarios: Near-term(by 202o)expansion of supply capacity through filtration treatment and a raise of the existing Bull Run Dam Number 2; and construction of a third dam in the Bull Run watershed. Either requires a new transmission pipeline to Washington County and is assumed to satisfy municipal needs only. • Irrigation Exchange Pipeline from the Willamette River. Raw water pipeline from the Willamette River pumped for Tualatin Basin agricultural irrigation use. Provided to Tualatin Valley Irrigation District(TVID)in lieu of the Hagg Lake storage making that water available for municipal and in-stream use. WSFS Source Options Evaluation The Washington County Water Manager's Group(WMG)evaluated these options based on criteria developed from prior studies. Comments received from the Tualatin River Watershed Council,Clean Water Advisory Council and the general public also helped shape the following evaluation criteria list. Evaluation Criteria • Cost • Recreation • Institutional and financial • Flood control feasibility • Environmental impact • Legal and regulatory feasibility • Timeliness • Supply reliability . Property rights preservation • Emergency reliability • Security from intentional harm • Efficiency • Water quality The objective of the screening process was to identify source options that rated poorly in terms of their ability to meet the criteria. These source options were not recommended for further WSFS analysis. It should be noted that source options not being carried forward in the WSFS may be revisited in the future. Based on this evaluation,the WMG made the following recommendations for further WSFS detailed analysis. Source Options-Not Recommended for Further Study These options were ruled out,primarily due to high cost or impact to private property: • Stimson Dam—New dam has the advantage of providing same amount of storage as 40 foot Scoggins raise with impacts similar to 20 foot raise and potential for meeting fish passage requirements on a new facility better than retrofit of existing dam. Main disadvantages are high cost per acre foot of new storage compared to the Scoggins Dam raise options,impacts to fish habitat,Stimson operations and relocation of access roads. Water Supp#Feaaiil,Study page 2 Supp#Optima Evaluation Summary • New,in-line tributary storage— Storage sites throughout the basin have been studied for years and have been rejected for multiple reasons including high cost, water availability,feasibility,environmental and property impacts,and water rights conflicts. • Off-line tributary storage—Only useful to meet in stream flow needs. Significant drawbacks include area-intensive footprint,cost and competition with existing land use, and impacts to private property. • Bull Run Dam#3—This source option is being evaluated in a regional context as part of the RWSP Update,now underway. Information will be considered as it becomes available. This source option has the disadvantage of not increasing the diversification of the region's water supplies. Qualitative Assessment of Source Options Not Recommended for Further Evaluation nor Stimson Dam New In-Line Stora Off-Line Stora Bull Run Datil 3 will be evaluated in RWSP U date =good =fair ❑ =poor Source Options That Should Be Components of All Supply Alternatives These options were perceived as strongly positive in one or more evaluation criteria and should be considered as part of any overall water supply strategy. • Water conservation—Reducing per capita demand is an ongoing goal.Water use in the Portland area peaked in the 198o's and has been dropping ever since (estimated to be a 20 percent drop). An 8%Washington County demand reduction assumption has been made for this analysis.Potential supply—7,600 AF/year*** (***based on updated information,the yield is reduced to 5,000 AF/year) Wastewater reuse—Based on Clean Water Service's Recycled Wastewater Master Plan,WSFS assumes that a modest level of reuse will be achieved by 2050. Potential supply—3,5oo AF/year*** (***based on updated information,the yield is reduced to Y,000AF/year) Water Supply Feasibility Study page 3 Supply Options Evaluation Summary • Aquifer storage and recovery—Several Tualatin Basin water providers have tested,or are currently testing,ASR. WSFS assumes,lo MGD will ultimately be developed including 4.5 MGD being developed by Beaverton. Potential supply— 5,50o AF/year(M/I use only). • Near-term Additional Supply from Portland-Assumes that Portland will continue to provide water and that additional water may become available to the Westside by 2020. New transmission pipeline will be required.Potential supply— 9,20o AF/year(M/I use only). Source Options Recommended for Further Study • No Action—This scenario considers the impact of no increase in water supply on flow and water quality,on irrigated agriculture and on municipal/industrial demand in the Basin. • Scoggins Dam Raise(2o feet) —Raise would increase Hagg Lake storage but would not be adequate to meet projected'2050 water needs unless combined with conservation,reuse,and/or ASR. Potential supply—26,50o AF/year. • Scoggins Dam Raise(4o feet)-Raise would increase Hagg Lake storage to meet 2050 projected need. WSFS will study the environmental impacts of any dam raise, as well as impacts to property and park facilities. Potential supply—50,60o AF/year. • Irrigation Exchange Pipeline from the Willamette River—Trading Willamette River water for TVID irrigation supply in Hagg Lake. WSFS will study the engineering feasibility,cost and environmental impacts of the roughly 18 mile irrigation pipeline. Potential supply—25,00o AF/year.(M/I and in-stream use only) Qualitative Assessment of Source Options Recommended for Further Evaluation NNW No Action co ' s Dam Raise-20 . Sco ' s Dam Raise-40' Q Ioation Exchange P' eliae I Ll I U I LJ I Ll I M I M I Ll I LJ I %I= =good Q =fair ❑ =poor Water Sr ppfy Feasibility Study page 4 Supply Optionr Evaluation Summary Attachment A Water Source Options List Generated by the WMG and TRWC: The following list was developed by these groups in the course of planning meetings conducted during the IWRM project. The list is the result of brainstorming exercises conducted by the groups,and is not intended to be a comprehensive or prioritized evaluation of water-supply.. • Willamette River: • Drain Lake Oswego Every Year 1. trade for Hagg Lake &Reuse/Recycle Water . storage • Bunkers=Underground Storage 2. use for irrigation • Trucking Snow 3. use for municipal supply • Create Water(Scientific Manner) • Bull Run: . • Screening To Prevent i. Another Dam In Bull Run Evaporation 2. Purchase more surplus • Icebergs • Increased Tualatin River • Desalination withdrawals . Deep Tunnel . e Raise Hagg Lake Two-Way Pipe To Willamette • Deepen Hagg Lake/Dredge Hagg River/Columbia River Lake Put In Pump At Mouth Of • Side-System Storage On Tualatin&Circulate Back Tributaries Subsidize Reuse • Off-Stream Storage Using Effluent For,Groundwater • Build Another Dam On Tualatin Recharge • Deepen Tualatin River Channel • Reuse Back To Hagg Additional Groundwater Use Lake/Barney • Aquifer Storage and Recovery . Non-Potable Distribution (ASR) Systems • Yamhill River • Developing Extensive Grey • Columbia River Water • Storm Water System Collection Potable Reuse • Snow Making Machines Multiple Recycling • Cloud Seeding Required Reuse • Fill In Lake Oswego Dual Distribution For Reuse& Potable Water Supply Fw biki ,Study page S Supply Options Evaluation Summary Tualatin Basin Water Supply Feasibility Study Review of Source Options - Cost Criteria Revised 9/03 The Tualatin Basin Water Supply Feasibility Study is to review water supply source§ to .meet the future water needs of the Tualatin Basin. The Study reviewed the alternatives analysis results of previous water supply studies conducted regionally and within the Tualatin Basin. An additional 5%000-acre-feet of water could be needed by the year 2050. The analysis was a qualitative review process. Sources options were evaluated against a broad range of criteria. The cost criterion is one of the key elements of the alternatives analysis. In some cases, the cost criterion was not the determining factor for maintaining or removing a source option. Costs shown here represent the estimated current capital cost for each option,when available. These cost estimates are accurate to a planning level, which is defined as +50% to —3o%. The following is a review of the estimated costs for the various source options reviewed. Source Options Not Recommended for Further Study These options were ruled out,primarily due to high cost or other key criteria: • Stimson Dam—Downstream of Scoggins Dam and upstream of Stimson o Build a new dam to elevation 313 feet(existing height). • Additional storage yield-11,2oo AF/year ■ Estimated cost -$107 million • Cost per additional storage($per acre-Ft)- $9,590 • Stimson Dam—20 foot raise o Build a new Dam to elevation 333 feet(20 foot increase) ■ Additional storage yield—48,000 AF/year ■ Estimated cost -$153 million ■ Cost per additional storage($per acre-Ft)-$3,188 • New in-line tributary storage— o New dams on Tualatin tributaries(Rock Creek and McKay Creek) ■ Additional Storage yield- 35,000 AF/.year ■ No.cost information developed. ■ Regional Water Supply Plan did not develop cost information ■ Option removed due'-to other evaluation criteria • Off-line tributary storage o Construct storage facilities adjacent to streams for winter diversion or pumping. • No cost information developed ■ Option removed due to other evaluation criteria,such as impacts to private property • BullRun Dam#3 -Portland Water Supply System o Build a third dam in the Bull Run Watershed ■ Additional Storage yield of 58,goo AF/year ■ Estimated cost -$210 million WaterSrppl#Fea ibikty,St4 page 1 Reared Sept.2003 Cort Cntma Rmem Summary ■ Cost per additional storage($per acre-ft.)—$3,566 ■ Option being reviewed as part of the Regional Water Supply Plan Update • Municipal yield reduced 5o %,due to instream flow and ESA requirements ■ Additional transmission and storage facilities would be required for Westside municipal and industrial supply utilization,cost undetermined. Source Options That Should Be Components of All Supply Alternatives These options were perceived as strongly positive in one or more evaluation criteria and should be considered as part of any overall water supply strategy. • Water conservation o Water suppliers Conservation programs ■ Potential supply- 7,600 AF/year*** ■ No cost information currently available ■ Regional Water Supply Plan Update is reviewing programs and costs (**'based on updated information,the yield is reduced to 5,000 AF/year) • Wastewater reuse o Clean Water Services Recycled Wastewater Master Plan-:L992 ■ . Additional storage yield—3,5oo AF/year*** ■ Estimated costs-$53 million*** ■ Cost per additional storage($per acre-ft.)— $15,142 ■ Reuse opportunities will need to be balanced with flow and water quality impacts on Tualatin River (***based on updated information, the yield is reduced to i,000AF/year and estimated cost is$15 million) • Aquifer storage and recovery (ASR) o ASR programs for M&I water suppliers ■ Additional storage yield—5,5oo AF/year(municipal use only) ■ No programs costs developed to date ■ Cost information will available as part of the Regional Water Supply Plan Update • Near-term Additional Supply from Portland o Dam 2 Raise/Expansion and Transmission improvements ■ Additional storage yield—9,2oo AF/year(municipal use only) ■ Estimated costs-$45 million • Cost per additional storage($per acre-ft.) —$4,891 Source Options Recommended for Further.Study These options met,many of the criteria and were recommended for further study. • No Action o Tualatin Basin—reduced future water supply ■ No cost estimates available bY/ater S pfy Fewibikty Study page 2 Revired Sept.2003 Cort Cntena Review Summary ■ Impacts of no increase in water supply on River flow and water quality,on irrigated agriculture and on lack of water to meet growth in municipal/industrial demand in the Basin • Scoggins Dam Raise(20 feet) o Raise Scoggins Dam/Hagg to elevation-325 feet ■ Additional storage yield—26,5oo AF/year ■ Estimated costs-$71 million ■ Cost per additional storage($per acre-ft.)—$2,679 • Scoggins Dam Raise(4o feet) o Raise Scoggins Dam/Hagg Lake to elevation 353 feet ■ Additional storage yield—50,000 AF/year - ■ Estimated costs-$129 million ■ Cost per additional storage($per acre-ft.)—$2,58o • Irrigation Exchange Pipeline from the Willamette River o Construct an irrigation exchange pipeline for trading Willamette . River water for TVID irrigation supply in Hagg Lake. ■ Additional storage yield—25,000 AF/year ■ Estimated costs-$96 million ■ Cost per additional storage($per acre-ft.)— $3,840 Water Supply Fearibijrty Study page 3 Bevued Sept.2003 Cart Criteria Review Summary Public Review Process Update Tualatin Basin Water Supply Feasibility Study Updated July 2003 Introduction The purpose of this Update is to document the public review process for the Tualatin Basin Water Supply Feasibility Study (WSFS). The need for this study was determined through an Integrated Water Resource Management (IWRM) strategy to ensure adequate water in the Tualatin Basin for instream flow, agricultural irrigation and municipal and industrial demands. The study is evaluating reliable, safe and cost-effective water supply options to provide up to 50,000 acre feet of water by the year 2050. This Update reflects the major steps in the study that have been completed to-date —the scoping process and identifying/receiving input on key source options for further study. Scoping Process: January — February 2002 On December 13, 2001, a Notice of Intent to prepare an Environmental Impact Statement (EIS) was placed in the Federal Register by the US Bureau of Reclamation, as required by the National Environmental Policy Act (NEPA). The first step in preparing an EIS is called Scoping, a process of information-gathering relevant to the study, including important resources, opportunities and constraints. Scoping is accomplished through notification and provision of opportunities to comment on the study. For the WSFS, the Scoping process was intended to inform stakeholders and the general public about proposed evaluation criteria and a range of source options to be studied and to solicit their initial feedback. A notice for four (4) scoping meetings was distributed with a fact sheet to a combined mailing list of about 1500 developed by Clean Water Services. The list included Hagg Lake property owners, environmental groups, elected officials, CPOs, businesses and interested citizens. A press release was distributed to all area newspapers announcing the scoping meetings. The notice was printed in The Oregonian. Scoping meetings were held on January 8 from 2-4 pm and 6-8 pm at a Clean Water Services facility in Hillsboro and January 9 from 2-4 pm and 6-8 pm at Metro in downtown Portland. A total of 23 people attended the scoping meetings. Comment cards were distributed at the meetings and four comment cards were received. A Scoping Report summarizing the process with copies of all materials and comments was prepared by the project consultant (Montgomery Watson Harza) and distributed to the Water Managers Group who serve as the technical staff from each partner city/district for the project. Most comments were consistent with previous comments from meetings and other communications, with several questions about Hagg Lake as a source. Other comments were received via e-mail. 1 Meetings with Key Stakeholder Groups Tualatin River Watershed Council Tom VanderPlaat attended the January meeting to provide an update and receive comments from this group about the evaluation criteria. Clean Water Services Advisory Commission (CWAC) In January, Clean Water Services staff attended the commission and presented an update on the study process and comments. Coordination with Hagg Lake Resource Management Plan (RMP) Clean Water Services staff attended an open house for the Hagg Lake RMP and provided fact sheets, comment cards and other information. Regulatory Agencies Clean Water Services staff held a meeting for regulatory agencies to provide an overview and solicit comments on the study. Agencies attending included Oregon Dept. of Fish and Wildlife (ODFW), Corps of Engineers, Environmental Protection Agency (EPA), and Oregon Dept. of State Lands (ODSL). A summary of the meeting is contained in the project file. Summary of Issues from Scoping Concerns about raising Scoggins Dam as a supply option, including: • impacts home owners around Hagg Lake including geologic impacts • impacts to wetlands, fish and wildlife and upstream tributaries • whether the dam is structurally sound enough to hold the additional volume of water and whether it is seismically sound Concerns about building a pipeline from the Willamette River, including: • impacts to natural resources from construction • inefficient use of water due to annual energy cost to pump it, cost to build it and uncertainty of its availability because of senior water rights • impacts from mixing the water with local water on fish and other habitat • concern that the Willamette River water would be used exclusively for irrigation and not for drinking and assurance that the water is safe for irrigation of crops Questions and comments about conservation and reuse, including: • important that the public (homeowners, businesses, golf courses and farmers) practices water conservation • need for a thorough analysis of both voluntary and mandatory measures • need to examine reuse of treated effluent as a strategy to reduce temperature loading and provide irrigation source • what types of conservation would be recommended? • what amount of total supply could be attained with conservation and reuse? 2 Comments about aquifer storage and recovery, including: • need to do analysis to identify suitable aquifers • what are the impacts to ground water, neighboring wells and historic hydrologic function? Comment that the study should identify options for restoration of the watershed in addition to options for water supply—they are inter-related. Concern about building in-channel water detention facilities as a supply option because of the impacts to fish and wildlife. Concern about water rights and need to insure that farmers who wish to continue to irrigate will be able to do so. Concern that the study is promoting growth by projecting a larger water need rather than seeking ways to discourage growth. .Source Options Review: April 2002 — May 2003 Water managers proposed three key source options and several other source options to reach a total need of 50,000 acre feet. Public involvement for this step included meetings with key stakeholders and community groups, newsletter articles and accompanying public information materials - a 2002 Spring Update, frequently asked questions, source option display and survey. Key stakeholder groups Hagg Lake neighbors 2002: Staff from the study met with 26 residents of the Hagg Lake area in June to present the proposed key source options and preliminary information on road relocation. Maps of the proposed road relocation were distributed to those whose property was impacted. A summary of the meeting is contained in the project file. Individual meetings were held with six (6)with property owners to answer specific questions. Letters were sent in November to 23 owners directly adjacent to the lake to determine their interest in using a surveyor to measure approximate water levels on individual properties with a dam raise. 2003:" Staff met with one property owner who had submitted a petition with 80 signatures opposing the 40-foot.dam raise to discuss concerns and ideas. A separate meeting was held with six (6) property owners to discuss specific concerns and a third meeting with a property owner wanting general information } Tualatin River Watershed Council 2002: Staff attended the June and December meetings to provide an update and receive comments from this group about the key source options being recommended for further study. Members of the group were asked to take the web survey and provide individual feedback about the source options. 200= . q§takeholder group was asked to respond to the thre proposed keysource options by voting whether to continue studying them. The council was not unanimous but the majority recommended continuing to stud the three key source options. n s. J Y 9 Y Y p , ... ,. 3 Clean Water Services Advisory Commission (CWAC) 2002: Updates about the study were provided by mail in June, including a web survey about the source options that CWAC was asked to assist in testing and revising. In November, Clean Water Services staff attended the commission and presented an update on the study process and survey responses. 2003: In February, CWAC heard the public response to key source options and public comments from a Hagg Lake neighbor who submitted'a petition with 80 signatures opposing the 40-foot dam raise and suggested alternative dam sites. Staff, coordinated a tour of Hagg Lake and Scaggins Dam requested by CWAC.. xy � ,, Public Information on Key Source Options 2002 • Clean Water Connection to 9,000 (elected officials, stakeholder groups, Friends Groups, CPOs) • Article in CPO newsletters • Article in Westside Economic Alliance newsletter • Article in billing insert to all customers in Sept/Oct and Nov/Dec (Water Words - 50,000) • Water Supply Study display sites (all partner facilities, libraries, PCC, Pacific University) • Events (Crawfish Festival, Washington County Fair, Hillsboro Tuesday Market) • Web site page with overview of the study, survey and all public information materials • Presentations to 16 civic, environmental and citizen participation organizations including Beaverton CCI, Tigard CIT, Washington County CCT, Hillsboro Leadership team, Forest-" Grove Rotary and Tualatin Riverkeepers • Article promoting web survey in City of Beaverton and City of Tualatin newsletter • Newsletter (67page)to 1,0,000 including Clean Water Services list and CPO lists 2002 Web Survey and Display A survey was designed to obtain feedback through the internet about the key source options, other source options and criteria for the water supply study. A limitation of the web survey is that it is NOT scientific and therefore the results are not a representative sample. There is no assurance that responses are not duplicated. The web survey went online in August 2002 on the Water Supply Feasibility Study page of the Clean Water Services web site. At the same time the web survey was promoted, the was also available at sites with a P survey display describing the source options. The display was scheduled for consecutive weeks (see details in the chronology at the end of this report)at events, libraries, colleges and local partner buildings from August through November. Total number of responses to both the web survey and display surveys as of November 18, 2002 was 102. Many respondents made additional comments, especially on the web survey. 2003 Web"Surve' l�� Y' p Articles in January 2003 newsletters to promote web survey: "Your City" (City of Beaverton) and City of Tualatin newsletter F s, 4 1'0 Ifil .n ri ,S's y +r. �" '4- ) �¢'' ?. ,1 i Ltal. ponses from web survey 129 Web survey 129 responses (most from reading Clean Water Connection, Water Words and TRWC; zip codes are Portland, Beaverton, Hillsboro, Aloha — includes stakeholders and general public) Events/display 37 responses (most from Hillsboro, Beaverton, some Portland —students and general public) TOTAL: 166 Summary of comments • No particular source option received significantly stronger support than any other • A majority of respondents can accept or"live with" any of the three key source options. • There is a slight preference for the 20 foot dam raise over the 40 foot dam raise. • Many people have reiterated their support for conservation measures to reduce the demand for water. • Respondents are concerned with meeting water quality standards and maintaining a reliable water supply with few environmental impacts. Key Source Options Questions/Concerns Dam raise: • what are impacts to wetlands • how is fish passage addressed • need fair compensation to residents who are impacted • need for more data before comparing or making a preference • recreational features should be enhanced Pipeline: • impacts of removing water from the Willamette River • impacts on water quality • fewer environmental impacts than dam raise • opposed to using Willamette water on food crops Other Source Options Survey respondents selected conservation as one of the two most important other sources. Portland supply and wastewater reuse were also selected as important. Level of Criteria Importance Respondents rated "meeting water quality standards" the highest in importance, and "reliability of supply" as the second highest. "Ability to withstand catastrophes" and "protecting from intentional harm" were also ranked high. 5 Additional factors to consider in selecting key source options: • Impact of silting • Compatible with overall restoration of watershed • Diversifies water sources • Encourages conservation • Protects instream flow for aquatic species and ecosystem functions • Support sound land and water conservation efforts • Progressive rate structures to induce conservation • Less susceptible to cyclic drought years and climate changes • Meets longterm supply needs General survey comments: • Waiting will cost many times more...now is the time to be wise and expand our water sources • Conservation through wise use and low impact on the land is the best way to go • Price water fairly to all users and develop more programs to encourage conservation • Do not consider any further the use of the Willamette water for drinking or agricultural purposes until the political will is there to fully return this river to the condition in which our pioneers found it. gigp 6 ti Listing of Presentations and Publications - 2002 Hagg Lake Property owner Meetings Feb 25 Bill Stoller Tom V, Jeanna C June 4 John Kelly Tom V June 13 all residents for Source Options update Tom V, Jeanna C, BoR July 3 Doug Hogue about road relocation Tom V, Jeanna C June 26 Dan & Beth Irwin about road relocation Tom V Sept 23 John Heistad, John Kelly—survey prep Tom V Dec 3 Doris & Larry Beman—general information Tom V, Jeanna C 7 Public Presentations on Water Supply Feasibility Study Scoping January 8 2 Scoping Meetings, Water Quality Lab Tom V, Lisa O, Jeanna C, BoR January 9 2 Scoping Meetings, Metro Jeanna C, Lisa O, BoR January 9 Tualatin River Watershed Council Tom V January 17 Hagg Lake RMP open house Tom V, Jeanna C January 18 Joint Water Commission Tom V February 6 Tigard Open House Tom V, Lisa O, Jeanna C, BoR February 15 Regulatory agencies Tom V, Lisa O, Jeanna C, BoR February 21 Washington County Parks Advisory Board Tom V Source Options May 21 CCI (representatives from all CPOs) Jack Franklin (CWAC member) May 30 WA County League of Women Voters Mark Jockers June 3 Congressional staff: tour of Hagg Lake Tom V June 5 Tualatin River Watershed Council Tom V, Jeanna C July 11 West Beaverton NAC Jeanna C July 12 Washington County Elected Officials update Chair Tom Brian, staff Aug 16 Senator Wyden staff: tour of Hagg Lake Tom V Aug 29 Westside Economic Alliance Chair Tom Brian Sept 16 Cornelius: amend contract Tom V Sept 17 Tigard: amend contract Tom V Sept 18 TVWD: amend contract Tom V Oct 7 Beaverton: amend contract Tom V Nov 1 Senator Smith staff: watershed tour Tom V November 12 WA County Soil &Water Conservation District Tom V November 20 CWAC—update and process review Jeanna C, Tom V December 3 TRWC - update and process review Jeanna C, Tom V December 26 Beaverton Optimists Club Jeanna C Source Options Display and Survey July 25-28 Washington County Fair Aug 5—9 Tualatin Library & Crawfish festival Aug 12— 16 Hillsboro Public Service Bldg, Tuesday Market Aug 17 & 18 North Plains Garlic Festival Aug 19—23 TVWD Aug 26—30 Tigard City Hall Sept 3—6 Beaverton Library Sept 9— 13 Beaverton City Hall Sept 16—20 Forest Grove library Sept 23—27 Cornelius City Hall/Library Oct 21 - Nov 8 PCC Rock Creek Nov 11 —25 Pacific University Related Newspaper Articles and Broadcast Coverage January 7 The Oregonian Community Snapshot-"water study meetings" January 16 Forest Grove News Times "Hagg Lake raise topic of meeting" (RMP) January 24 Forest Grove News Times "Planning for the Future" (RMP and WSFS) January 31 Tigard Times "Clean Water Services sets Water Supply Meeting" June 10 The Oregonian Community Snapshot—"Hagg Lake Meeting" 8 June 12 Forest Grove News Times "Hagg Lake meeting set" June 19 Forest Grove News Times "Engineering not the only problem in securing water" June 20 The Oregonian "Future a worry for Hagg Lake neighbors" June 27 Tigard Times "Search for water supply options goes deeper" Sept 19 The Oregonian "Tunnel to Tualatin River considered" Newsletter Articles February 2002 newsletters for Washington County CPOs-WSFS Fact Sheet and notice for Tigard open house February 2002 Tigard Cityscape—Finding enough water to meet future demand July 2002 newsletters for Washington County CPOs—Tualatin Water Supply Feasibility Study Identifies Source Options Summer 2002 Clean Water Connection(Clean Water Services newsletter)—Tualatin Basin Water Supply Study Proposes Key Water Sources, Studying the Major Source Options Sept/October Water Words (TVWD &Clean Water Services billing insert)—.Planning for Future Water Supply Nov/Dec Water Words—Tell us your ideas about future water supply options 2001 Public Presentations of IWRM Overview and Water Supply Feasibility Study February 15 CPO 3(W.Slope/R. Hills/Garden Home) Mark Jockers March 7 Tualatin River Watershed Council Tom VanderPlaat March 13 TVID Board Tom V March 13 Hillsboro Utilities Commission Tom V/Sheri Wantland March 13 Banks City Council Mayor Orlowski March 13 Sherwood City Council Todd Heidgerken March 19 Beaverton City Council Sheri Wantland March 20 Washington County CCI Mark Jockers March 21 TVWD Board Lisa Obermeyer/Sheri March 27 Clean Water Services Board (Dinner Meeting) Tom V April 2 North Plains City Council Tom V April 10 Tigard City Council, Tom V April 13 Joint Water Commission Tom V April 18 Clean Water Advisory Commission Tom V/Sheri W June 5 CPO 1 (Cedar Hills./Cedar Mill) Mark Jockers July 13 Joint Water Commission Tom V August 2 Tour of Scoggins Dam (CWS Board) Tom V August 8 Hillsboro Optimist Club Tom V August 22 Clean Water Advisory Commission Sheri W September 6 Tualatin Riverkeepers Citizen Action Committee Tom V September 24 Washington County Public Affairs Forum Bill Gaffi October 16 CCI Chair Tom Brian 9 October 19 Mayors Meeting on Westside Water Supply Chair Tom Brian November 7 Tualatin River Watershed Council Tom V November 27 Mayor/City Manager Meeting Chair Brian and Bill Gaffi December 5 Regional Water Supply Consortium Board Tom V Hagg Lake Property Owner Meetings May 16 All owners for general information Tom V, Sheri W,Wally Otto, Chris June 19 Repeat of May 16(media invited) Wayland, Dave Nelson, reporters Oct 9 Heistad,Watkins, Stutz Tom V, Sheri W Oct 16 Edwards Tom V,.Sheri W Oct 24 All owners to view map Tom V, Sheri W,Wally Otto, Chris W Related Newspaper Articles and Broadcast Coverage 2001 Date publicationlstation headline March 21 Oregonian "Cornelius will take part in study to raise Scoggins Dam" March 22 Hillsboro Argus "Cities, agencies set water supply study" April 5 Oregonian "Face-lift for Scoggins Dam?" April 12 Hillsboro Argus "Water supply below earlier expectations" May 10 Hillsboro Argus `Banks joins study on water" May 10 Hillsboro Argus "Hagg Lake lowest in 23 years,water conservation urged" June 19 Oregonian "Plan to raise Scoggins Dam subject of meeting tonight" June 21 Oregonian "Hagg Lake-area residents ask for answers on possibly raising dam" June 21 Hillsboro Argus "Water Source Sought" June 26 Koin TV 6 "Hagg Lake Dam Expansion" June 27 Forest Grove News Times "Low water, rising concerns . . ." Sept 4 Oregonian "Water Supply Meeting"notice in Community Snapshot Oct 16 Oregonian "Scoggins Dam meeting"notice in Community News Oct 17 Forest Grove News Times "Future of Hagg Lake Oct 24 Topic" Oct 26 Oregonian "Net effect of Hagg Lake options remains uncertain" Oct 31 Forest Grove News Times " Raising Hagg Lake at issue" Oct 31 FG Editorial "Listen to People" Nov 15 Tualatin Times Editorial "Charter change about water more than trust" Newsletter Articles 2001 . Washington County Extension Service"Friends"publication, Spring 2001 issue featured half page IWRM fact sheet. t 10 I Unable Co:.independently meet> - Current water demands Future water demands-: Rely,upon.wholesale water purchased4rom: The,Joint Water Con*T lssion- tiie Pdrdand WatEw eau r FIR Investigated numeroui.source waazer--- ns • Lake Oswego • Proposed Bull Run Dilnking Water,Agkncy. • South Fork Water • Willamette River, 1 Pursuing membership in,jUUG S ncle�2601", Option to become a member; Barney Reseoir .� _ Scoggins Reservoir, ` 70'MGDTredtmenE Ptar►t Fin'isfie i-W,ater..Reserrioir Transmission LFnes. Memberskip mtu.:theJoint,Wdter'Commission' A purchasing 4million gallons a day member =,Ceasedsupply,gEHrat�,, , r '` Does NOT give;' Iga d.wafer lghts S.NOT give Tigard.owrieeshin ifi jWC 2.-Acknovrileiigeiner�t='aifi Tiigari!°�=,"-`-.- igard has-no-storedor'su'dkevater,,rights: Tualatin Rivet - Hagg Cake _. Barney Reservoir E Waier.shall be throughh"leases"ofwatee 3 r r �. m 3. Capital!QoOtribuii&6'f"bf'ure?roje=s. Tigard's Capital Contributions - Shall be for`additional sfored;raw_Waei•Y Will detetrnine.proportioiiate oWntii 1p`b Xster`ii -- ~. dor - Ifadditional stored_raw.+iva€J4r.isNOT„ _. obtained Tig rd'tiViil voluntarily withdraw i 4._Gaiuernancem Tigard will have threerepiestatiyes Article 111 shall be;rrodfie$ Addition of Tigard to the"Cornmission, 3.4 Change"$evert(7) to Eight(8)*,"mem4eis r Insert Genieial Manages;.ret'nove C, Jrnisoori 5.Lease of Water by*C JWC agrees to lease Waierto Tigard UNTIL- - NTIL- Additional stored raw,water is obtained. Tigard agrees to leasirrg'terrtis regarding: Quantity,, �:ka,� 4 Tigard1iecomii i a hiembe-of thejWC, I and voluntarilv_wtLhdraws IF -,Addition AW'Water stor ge,is nbt oiitarned, Current colt tp:pt;chse water`fdrrr}Viii; - Last-year Tigard purchased::.". . Over-1;.0 bidictn gallons •Approximate cost of-4922,Qp0; NO initW'BUY IN coast " Percentage of Feasibility Study Costs Appriixirnately,,$240K.turrent,fiscal year ;i APpiY7ateiy S3gOk in nezt tci;Yeat ,„” ry b - r » IF additional"raaw—water srmcageJs:'btafi*d: - Initial Buon.cost to the existing system A percentage of capacity buikding projects Costs to be paid,for.oue%3i).years 5 s A December" T and Signs Arriendment 2003 January .JVVC Board RevieWs,.Arn-rndmeiit 2004' 2,0.05 feastb ------udy;Complefed :,2 'f Constritroi�© C}Ps Corri'pletet. �o Potential.ownerihip:ina-water ou`rce-: w.m_ Cheaper`water,(in shoii term}tttai%PDX )WC is CIL kiv,Oj seeking oui'Apartrcipation` Solidarity for.Westside.Water Prov ciers' ><aa =key. Up front cosfto"fund feasibility-study No guarantee of watery"rights:._ Costty Ruy4n.and Capital.Im;provemerl n 44 6 "Sign the agrees t 'becorile a pariner Abide by the JWC~Water-Service Agreerneept s Continue.parcicipat'ion n- jWG CLP 8i Tiralatiir Bashi,Water Feasibility Study =jWC Qperation_s&,,Marsagemerii Goin mittee:, i 1-35 03 ` Pfesetit fr?;Tigjj i4 City Council a Z Q3 U Pre§ens tia i✓ity rsf Kf!9 66 ~ �. .. ;iVUC Board Meeting 3 7 MEMORANDUM TO: Intergovernmental Water Board FROM: Tom Imdieke, Financial Operations Manager RE: Criscione Account DATE: November 4, 2003 The attached credit for leak request is being forwarded to you for your review and consideration at your November 12, 2003 meeting. The amount of credit has been calculated to be $549.32 using the existing credit for leak policy outlined in the Tigard Municipal Code (TMC). The TMC requires approval by the Intergovernmental Water Board when a credit is over $500. However, in this case, the customer is also requesting additional credit citing that the initial billing dated June 25, 2003 indicating higher usage was never received and did not become aware of the high usage until she received a past due/shut off notice on August 7, 2003. At that time, the customer called the billing office and someone was sent out to the property and determined that indeed there was a problem. The customer has indicated that a friend promptly repaired the leak once discovered. Please see the attached letter from the customer requesting additional credit. I reviewed the account based on the comments from the customer and found the following: 1. A report was generated on June 20, 2003 indicating higher than normal usage on this account. The bill for$450.80 was manually pulled and mailed separately from the rest of the billing group along with a high usage letter. The customer has indicated that they did not receive this bill or high usage letter. (Attachment A) 2. An urgent notice was mailed to the customer on August 4, 2003. 3. The customer called on August 7 and a Public Works staff person went out to the property to check for a leak. Please see Service Request Detail dated August 7, 2003. Public Works staff found that there was a problem with the irrigation system and explained to customer that it would be their responsibility to repair. (Attachment B) 4. Another billing was mailed on August 20, 2003 in the amount of$1,302.44. A high usage letter was not sent with this billing because staff knew that the customer was obviously aware of the high usage from the phone call on August 7, 2003. The total billing for both cycles now amounted to $1,753.24. 5. Attachment C is a copy of the account history showing consumption. If you have any questions regarding this item, please feel free to call me at 503-718- 2488. 09/16/2003 13:10 FAX 503 630 1471 CM_OF TIGMW Q001 REQUEST FOR ADJUSTMENT DUE TO A, LEAK The City of Tigard has a policy of issuiung partial credits for leaks that are repaired in a timely manner. The city expects leaks to be repaired within ten days of discovery. Credits are based on your average usage for the same period in previous years. This average is deducted from the total consumption used during the time of the leak. The excess usage is charged at the wholesale rate of water,with the difference between wholesale and resale cost deducted from the utility account as the Credit for Leak Please desen'be the specific circumstances of your request:_ 1 "hy—Si-- ;eh�OA e5h t title:%) Yl;t` G1.0 ` f 1� �� lin i � I.C,r � (�, L V c��� �(-tt,t-Cy r•l, I`d !ri 1)CCA cr l LLC;U(6k ha trP� , ( ; [chi IrCC Iry ,P�12i CCal i E214-1-AA J rKA 1 J i•�C i- ','1!-n le 414 1L1P4i,tr �rl.� /� (�/y � 7�U— / u 1(('1'GY , l tr '�LUQ I✓CTtl.-t'�t� `t`ly2 BlCt J a &A s Un i Yl Gam( -Date leak found: I,-_2, C>3._ '"nom- h41kL I-)Cu}C. rr, Date leak repaired-_&j 4A I'% �,�,fr , Accountit: PLEASE SEND LETTER +wy Lim, � � r. AAL Location of Service: 11C U . ti'v. ip�C_,�/- a Customer Name- Mailing Address:__ �� Street address City State zip Phone DOCUMNTATION fl� ��,�='r� ch i x t?c� cY yz&. YOU MUST SUBMYT COPIES OF PLUMBERS 9LLS )6416 RECEIPTS FOR PARTS, REQUIRED TO M THE LEAD. ---------_.�___ FOR OFFICE USE ONLY _-- - LO I �� $1.71 51.69 $1.99 $1.6S $2.12 - 1.090 _ �j� MUR Cp IND j 1� Previous '�`�� 1 ��M'��P Years usage; ( t �S 7 �v �•.� C-10015 Opedo Ids used Average Leak Period .Leak ccf Markup Credit Adjustment Total Credit:$ Date Issued: Issued By: T �a1 G08G-6GS-EOS aN0 Z 95 r J'l V: 0 _ ! � w n -� d at cup P - (,�_����te�. u g t 7 - 1 -he yr ,r At co6ve d ytoA w-e, uta n o r W;t-eA, ..n -. VLA - #Aan CtAta.4-- . 04" eLd , W ai- Cpl hp ln. IkA rt_ � �h� W(, t L.A WAS Sh cc lamed rY,o } thrs Ce a,� n ter)_ Dom_- i - - ? bc e _! Aon °f-� 5 W o cnv �- Q � nch� io b?LL y - ll matt,' CLI . w0UAo(-, tl c-duv �+ _ -- � WOUk c�. C.vt, - --- hGH r�- -CCCr''trl- �►0m�2 (iia G� I -' ' �1- ._�0_ 3 02 - -------_ -- ------..�----------_.cit----�_ (,,�-�,�-- - 1__..... �� --------- -------------- � r 9 Pte" - _ - t,)Ou I_cl� -- pp�'CGi rye.CLr 76 ef le moi- -u.S2-002- Rt a4-t -C -tLLftyi U Mfl 2,00 2 .c CC . $ .--1-72. �y - loa- 3 -- --- r LeGf-s item Ao-er• 1--ITLi i'l7y r�x CITY OF TIGARD Utility Billing Punted:06/20/03 10:44. User:sheryl Meter Misread Report Routes 0042 - 0042 'Reading Date: 06/12/2003 Customer No Customer Name Route&Sea Serial No k& Service Address Consumgtion Prior Cons Variance 0067$3 000 CRISCIONE, MICHAEL&JOAN 00422420 8446 1 16880 SW BULL MOUNTAIN R 259LO 29 /0793 023019 001 SHAW,JENNIFER&TIMO 00422505 15932 3/4 16171 SW POLLARD LN 16 (-- 1 %1,500 024491 000 BAISCH,THEODORE 0042.2519 15958 3/4 16110 SW POLLARD LN 15 0 ? 024491 000 HEIKKINEN, ELIZABETH 00422528 15617 3/4 16215 SW COOPER LN 17 / 4 %325 025470 000 HARRIS, LORI&JEFF 00422535 15986 3/4 16122 SW COOPER LN 7 / 0 ? 022064 000 PARK,JUN 0042 2537 1,5268 3/4 16118 SW COOPER LN 12 6 %100 021373 000 CLAREMONT PROPERTIES 00422548 15087 1 SW BRAY LN 3 0 ? 024922 000 BUELT,JASON&KIM 00422549 15484 3/4 16222 SW BRAY LN 16 / 4 %300 024497 000 VONRUDEN,MARLENE 00422551 15728 3/4 16190 SW BRAY LN 14 7 %100 023830 000 CONNERS,TAMMY 0042 2557 15754 3/4 161'16 SW BRAY LN 18 9 %100 007481 001 WRIGHT,DOUG&MONICA 00422563 15492 3/4 16173 SW DEKALB ST 27 ! 7 %286 024495 000 RICHARDS, DUANE 00422565 15312 3/4 16205 SW DEKALB ST 22 8 %175 025247 000 MURPHY, MARSHA&MIRIAN 00422574 15624 3/4 1.6186 SW HAZELTINE LN 13 0 ? 000108 001 BRETTSCHNEIDER,CONRAD 00422585 15929 3/4 16185 SW HAZELTINE LN 14,,- 6 %133 020663 001 WHITE, KAREN 00422589 15490 3/4 161'20 SW KESSLER LN 19 /- 4 %375 024187 000 FULLER,JOE&KATHERINE 00422593 15671 3/4 16115 SW KESSLER LN 12 2 %500 025244 000 CAUDILLO,RICK 00422595 15673 3/4 16147 SW KESSLER LN 21'/1' 4 %425 024907 000 KABRA,RAJEEVr- 00422596 15674 3/4 1.6179 SW KESSLER LN 16 3 %433 022497 000 PERRY, GREG 00422601 15681 3/4 16146 SW DEKALB ST 27 9 %200 025507 000 BUI,VY 00422602 15744 3/4 16124 SW DEKALB ST 11 3 %267 024912 000 WEBERG,JESSICA&ERIC 00422604 15558 3/4 16114 SW DEKALB ST 16 4 %300 Page 1 « i � Service X 6491 Atickew 16880 SW BULL MOUNTAINr -r OR 97224- Call Date 1,..1 ./IK 1.0A3 Duration of Call /1 /1 Taken By • DIVISION source Project service Raqumm A on Schedule Unsclieduled Wth no due date. Inspac Not inspecled with no due date.Assigned to 788 KEN FISHER Resolve Unresdved whh no due date. Location Area Sub-Area District Parcel Asset Fw= JOANNE, Address city StateflProVince ZNNPC •r5503-5M-5W4 DW (=)579-10W Call 13:;i: W=I IC 1TaImBy DK r. CHECK FOR WATER LEW, HERWATERBLLFRO.MAPRL-JUNEAS$M.00. SHE HAS BEEN GCNE MOST OF THAT TIME. SHE CANT FIND HER METER AND WOULD LIKE ASSISTANCE To SEE IF SHE DOES HAVE A LEAK PLEASE CONTACT JOANNE BEFORE YOU GO OUr,AS SHE WANTS TO BE THERE. °JG'R1Y S t 4 h' ,rr.. •r - t t �„d rm r 4r" �'m Zfl, Y' , � 1 ax' .r p -_.,x 'ca., ,""rs`, s`� 'cT"'",r43"'.z's&� :a h#" `�"�'*sx✓ i s, r- . ?' �� �F' �i*'T 3 Ar r d 'tw^� ��x S.� d�'i aSr; C�� M- MR - -7 . r .��",.,�- .r"a� x v ^,.<,. Ki 4 P�3�F Y''' `v L'��-e t �t��s:�.-� YS�yNMI. .� ;xt"s{ e...,ka5>,� .'. y # n zt w �- r",g$----pN&"$K 'P`i'y 9` L at''rdisk . i ..ei....,. as 1 -" t ��� -.._D_.,t.`rc:::! a...._.:."....i... ..,xt,..:ia. r, ..xi9 ..F,ers ,3sz:a.:t£, `?.G..z' .zx. az:o, ._ Utility Billing Account History List User:Jamie Printed: 11/04/2003- 2:33 PM CITY OF TIGARD Account Number: 006783 000 Reference Number: 4203700 Account Status: Active Customer Name: CRISCIONE,JOAN Owner Name: CRISCiONE,JOAN Connect Date: 01/24/1996 Customer Address: 16880 SW BULL MOUNTAIN RD Service Address: 16880 SW BULL MOUNTAIN RD TIGARD,OR 97224 Home Phone: (503)579-1058 Ext Total Balance Due: 1,243.59 Business Phone: ( ) - Ext Route Number: 0042 Sequence Number: 2420 Serial Number: 8446 Date Type Amount Description Water Sewer SWM Penalty Misc SurChrg Sery 7 Sery 8 1 Read Dt Reads Cons 10/24/2003 Pay 100.00 100.00 110/08/2003 3,814 19 10/22/2003 Bil 41.15 41.15 108/07/2003 3,795 757 09/04/2003 Adj Interfund Transfer 06/12/2003 3,038 259 08/20/2003 Bil 1,302.44 1,302.44 }04/18/2003 2,779 37 08/13/2003 Pay 450:80 450.80 02/13/2003 2,742 9 06/25/2003 Bil 450.80 450.80 12/17/2002 2,733 9 05/13/2003 Pay 71.75 71.75 10/17/2002 2,724 96 04'/23/2003 Bil 71..75 71.75 108/14/2002 2,628 121 03/17/2003 Pay 23.49 23.49 106/14/2002 2,507 29 02/19/2003 Bil 23.49 23.49 104'/18/2002 2,478 10 01/16/2003 Pay 23.68 23.68 02/13/2002 2,468 9 12/25/2002 Bil 23.68 23.68 = 12/20/2001 2,459 12 11/1'212002 Pay 172.64 17164 10/17/2001 2,447 105 10/23/2002 Bil 172.64 172.64 08/16/2001 2,342 112 09/1.0/2002 Pay 196.30 196.30 06/14/2001 2,230 15 08/21/2002 Bil 196.30 196.30 '04/19/2001 2,215 14 07/12/2002 Pay 52.55 52.55 02/16/2001 2,201 14 06/19/2002 Bil 52.55 52.55 12/14/2000 2,187 14 05/10/2002 Pay 23.31. 23.31 110/19/2000 2,173 93 04/24/2002 Bil 23.31 23.31 108/17/2000 2,080 111 UB-Account History List(11/04/2003- 2:33 PM) Page 1 Account Number: 006783 000 Reference Number: 4203700 Account Status: Active • Customer Name: CRISCIONE,JOAN Owner Name: CRISCIONE,JOAN Connect Date: 01/24/1996 Customer Address: 16880 SW BULL MOUNTAIN RD Service Address: 16880 SW BULL MOUNTAIN RD TIGARD,OR 97224 Home Phone: (503)579-1058 Ext Total Balance Due: 1,243.59 Business Phone: ( ) - Ext Route Number: 0042 Sequence Number: 2420 Serial Number: 8446 Date Type Amount Description Water Sewer SWM Penalty Misc SurChrg Sery 7 Sery 8 1 Read Dt Reads Cons 03/07/2002 Pay 21.23 21.23 06/13/2000 1,969 13 02/20/2002 Bi) 21.23 21.23 04/13/2000 1,956 11 0,1/11/2002 Pay 26.43 26.43 02/17/2000 1,945 10 12/26/2001 Bil 26.43 26.43 12/20/1999 1,935 14 11/13/2001 Pay 171.40 171:40 10/20/1999 1,921 88 10/24/2001 Bil 171.40 171.40 08/18/1999 1,833 102 09/13/2001 Pay 182.38 1}82.38 06/16/1999 1,731 17 08/22/2001 Bil 182.38 182.38 04/15/1999 1,714 16 07/03/2001 Pay 30.65 30.65 02/18/1999 1;698 9 06/20/2001 Bil 30.65 30.65 12/17/1998 1,689 13 05/15/2001 Pay 25.83 25.83 10/21/1998 1;676 0 04/25/2001 Bil 25.83 25.83 04/20/1998 1,427 14 03/09/2001 Pay 25.94 25.94 04/20/1998 1,442 15 02/21/2001 Bil 25.94 25.94 04/20/1998 1,551 109 01/09/2001 Pay 25.52 25.52 04/20/1998 1,676 125 12/20/2000 Bil 25.52 25.52 12/31/1996 1,158 17 11/15/2000 Pay 132.54 2 checks 132.54 12/31/1996 1,170 12 10/25/2000 Bil 132.54 132.54 12/31/1996 1,184 14 09/12/2000 Pay 153.42 153.42 112/31/1996 1,234 50 08/23/2000 Bil 153.42 153.42 112/31/1996 1,310 76 07/11/2000 Pay 23.85 23.85 112/31/1996 1,384 74 06/21/2000 Bil 23.85 23.85 112/31/1996 1,398 14 05/08/2000 Pay 20.95 20.95 ( 12/31/1996 1,413 15 04/19/2000 Bil 20.95 20.95 101/24/1996 914 0 03/28/2000 Pay 19.79 19.79 01/24/1996 916 2 02/23/2000 Bil 19.79 19.79 01/24/1996 929 13 02/02/2000 Pay 25.17 25.17 101/24/1996 950 21 12/22/1999 Bil 25.17 25.17 01/24/1996 991 41 12/28/1999 Pay 122.95 122.95 101/24'/1996 1,130 139 10/27/1999 Bil 122.95 122.95 101/24/1996 1,141 11 10/26/1999 Pay 141.43 141.43 N/A 0 0 08/25/1999 Bil 141.43 141.43 1 N/A 0 0 UB-Account History List(11/04/2003- 2:33 PM) Page 2 MEMORANDUM TO: Intergovernmental Water Board FROM: Dennis Koellermeier RE: WCCCA request to install a Tower at Canterbury Lane site DATE: October 20, 2003 Attached please find a packet of information relating to the a,request by Washington County Consolidated Communications Agency (WCCCA) to construct a communications (Police and Fire) radio tower at the Canterbury Lane water site. This facility is proposed to be 150 feet tall, and serve only the Police and Fire communications systems, and is not a commercial-installation. WCCCA has held an informational meeting with the neighborhood and has met numerous times with City staff. It appears that staff's concerns regarding security and avoiding a negative operational impact on the water facilities can be met. The neighborhood meeting was well attended and the desire of the neighbors to avoid cutting existing trees to build the tower has been met. Because of the size of the material packet this information is being distributed to you now for action at your November meeting. At that meeting a WCCCA representative will be present to explain the project and answer any questions. Since WCCCA is not the owner of this property, the IWB will be asked to approve a motion to authorize WCCCA to proceed with fling their land use application. If WCCCA is successful in obtaining a land use permit, staff will return to the Board for final approval of the lease agreement. li SW CANTERBURY LANE f". Q 11 4515;u- VA — � S r------------' .. -o ....�W.�.a. I I raal.K.am TAIL LOT I TAX LOT I D►L�dj,W ay ar„ 2SI11ECO2600 I 7700 I - - _.lBii:Hoae �"-". .:�0f.$.iw . su I I v tea,yl W a I - d !3 I I I IL�..�.P[O I ,eRr VICINITY MAP eFW. — — I %V"I couax�Esr ruwaesrca+ ►aaEcr ClIMD V0 ' W WCCCA 4-1-1 ..RIW4q. 800 MHz RADIO FACILITY I rr I� e I w I � j LL :.w 1 { • +� I � 1�/�fmrrtvf lar uw Q DRAwINc: � •r-- -�� I � Site Plan M DAWREVISR]N: oxxauo42 RRL OIa�al. t . I _ I•I� _ FRoxcr N0: 200242 FRD,r SCALE: 1/1 I a w VOLUME OF STORM WATER Oar neo J` ���Ipr STORM 01A7ER 200 9f.UlPEFRIFABLE SLWACE 3 0IC/•5 f75 Ff.OF CU.F. PER NOUR ,I 200 S.F... FT..50 CO.Fr. u.e Aa • F5 QL PT. U GA-ABL Fr.3S GAL A 3100 AL 5 PEFF'ISI ELLE 50 315 G FINOF S.F.BE ..xOR GAL PER S.F. . t I TOTAL PER LL aF ABBORBm ON srce RANDY R.TONIC J .A G/L PER 34LARE FOOT w'e°Aarwu mow 9r I I • .MGM OF OCs SW MURDOCK STREET SITE PLAN 2 v' r.bo-o- WC. CCA M + aEA Washington County Consolidated Communications Agency PROJECT MEMORANDUM TO: Chief Ron Goodpaster, Tigard Police FROM: John Hartsock,Project Manager DATE: September 3,2002 RE: Public Safety Radio System Expansion—Canterbury Lane Site Per your request the following outlines WCCCA's need for the Canterbury Lane radio site. Attached to this memo is an outline of the current Communications Upgrade project which is being funded by the voter approved levy passed in November 2000. This outline provides a perspective on the entire project.we are currently implementing. The most significant portion of the project is the upgrade and enhancement of the 800MHz public safety radio system. The current radio system, installed in 1992,was designed with 4 simulcast radio sites: Parrot Mtn, Sherwood;Bald Peak and Gales Peak, Washington County; and Council Crest, Portland to serve the County. This design was based on coverage predictions and budget constraints at the time. The engineering input at the time was that the four"high" sites ringing the County would provide adequate coverage. We have subsequently determined from user agency input, field surveys, and extensive coverage predictions studies that additional sites are required to provide adequate radio coverage. The areas of Tigard, Tualatin,Beaverton, and Hillsboro require additional sites to enhance radio system operations. Areas in Tigard along Highway 217,Bonita Road,Highway 99, I5, and Washington Square Mall in particular have lacked adequate radio coverage and have been a significant concern.. Motorola, our system vendor, through further engineering work and experience in other systems has determined that the"high" site concept though providing good general coverage is inadequate for dense urban areas. There recommendation is that we add additional sites lower and more closely related the radio traffic needs. The partnership between WCCCA and Clackamas County on the joint 800MHz public safety radio system will dramatically enhance the coverage in the Tigard, Tualatin area, specifically in the I5 /217 area and along 217. This project is just now coming on line with the Cooks Butte PO Box 6375 • Beaverton Oregon 97907 a (503) 690-4911 "F.rn-Monro. In Fmervancv!',nmmunicntinnc" Chief Ron Goodpaster Page 2 September 3, 2002 site in Lake Oswego, which will enhance the Washington County area the most, scheduled for early 2003. It has been determined that though this will help Tigard's radio needs it will not answer all the questions. Motorola's engineers and the technical staff at WCCCA have spent considerable time in studying the potential sites which would achieve the goals of enhancing and improving coverage in the County and specifically in the City of Tigard. The terrain of the County dictates that we need to identify sites which provide coverage to the greatest area while not being blocked by the adjacent terrain. The sites that they have chosen which provide the most advantages coverage while being able to minimize the number of sites are: Canterbury Lane in Tigard; Witch Hazel in Hillsboro; Burntwood in Beaverton; and the relocation of the Council Crest site to Cedar Mill at Highway 26 and 217.. The Canterbury Lane site has adequate elevation to maximize coverage and it provides the best solution to improve radio operations in key spots within Tigard. The team did produce coverage predictions utilizing other sites for Tigard including Nansen Summit; Cooper Mtn;Bull Mtn; and others. None of these other sites provide as good a solution as did the Canterbury Lane site. We fully understand the Cities concern about communications structures and in particular the significance of this site and the surrounding area. We feel however that we can locate this tower within the large trees on the Canterbury Lane site thus masking its appearance as much as possible. This site is critical to improved public safety communications and thus requests the City's consideration of this use. It additional information or a presentation is required please advise. IWCCC Washington County Consolidated Communications Agency 9-1-1 Communications System — Wireless Enhancement Project September 3,2002 The Washington County Board of Commissioners included a WCCCA requested public safety communications upgrade project in the November 2000 voter approved Public Safety Levy. The WCCCA Board determined the need for this communications upgrade project through the work of a Blue Ribbon Committee appointed by the Board. The members of the Blue Ribbon Committee were: Bill Monahan,City of Tigard;Helen Cain,City of Tualatin;Virgie Reis,City of Forest Grove; Rob Massar,City of Hillsboro;and David Maertens,Washington County. The Board charged the Committee to determine the issue and make a recommendation. The Committee,based on user agency and WCCCA staff input,determine the required upgrades to.maintain WCCCA's mission. ISSUE: The ability of Washington County Consolidated Communications Agency(WCCCA) to continue to provide the level of 9-1-1 emergency communications services required by the member agencies and the citizens of Washington County. The most significant technical challenge facing WCCCA today is the need to expand and upgrade equipment and systems to maintain technologically current solutions. It is important to avoid obsolescence and have the ability to enhance and maintain these vital systems and equipment. WCCCA strives to maximize technology to minimize staff and increase efficiencies. PROPOSED TECHNOLOGY UPGRADES: Voice Radio System: ❖ Update to the `SmartZone' technology similar to the seamless type service on cellular telephones. Improved interoperability with the Portland,Clark County, and Marion County systems, as well as the new Clackamas County system currently under development. PO Box 6375 • Beaverton, Oregon 97907 a (503)690-4911 "FrrPAmrv. Tn Fmeroanry r6mmunirntinm" • ' Chief Ron Goodpaster Page 4 September 3,2002 ❖ Upgrade of existing base station radios and related microwave equipment from analog to digital-capable equipment due to manufacture discontinued production of the current equipment,and technology advances. ❖ Improved radio coverage and quality within the most populated areas of the County. o Addition of 3 new simulcast radio sites and relocation of an existing site in the urban part of the County. o Upgrade of 2 existing standalone sites to simulcast technology and the addition of 1 new site in the west end of the County. ❖ Expansion of the microwave system that is utilized to communicate between the sites and back to WCCCA. ❖ Construction of new radio sites,which includes buildings,towers,battery systems,and emergency generators. Data Radio System: ❖ Addition of new radios on existing and new sites developed for the voice system to improve coverage and availability of mobile data. Paging Radio System: ❖ Addition of new radios on existing and new sites developed for the voice system to improve coverage and availability of paging coverage countywide. BACKGROUND: Washington County Consolidated Communications Agency(WCCCA),is an ORS 190 organization formed in the fall of 1990 to provide 9-1-1 call answering and public safety dispatch for all of Washington County, except the City of Forest Grove which maintains its own 9-1-1 call answering and Police dispatch. WCCCA serves 12 law enforcement agencies, and 7 fire/EMS agencies,which are: Law Enforcement Fire/EMS Washington County Sheriff's Office City of Banks Police Department City of Beaverton,Police Department Tualatin Valley Fire and Rescue City of Hillsboro Police Department City of Hilsboro Fire Department City of Cornelius Police Department Washington County Fire District#2 City of North Plains Police Department City of Forest Grove Fire Department City of Gaston Police Department Tri-Cities Fire Department City of Tigard Police Department City of Cornelius Fire Department City of Tualatin Police Department City of Gaston Fire Department City of Sherwood Police Department City of Durham City of King City Police Department 9-1-1 Communications System—Wireless Enhancement Project Page 4 SMtemher 3. 2007. Chief Ron Goodpaster Page 2 September 3,2002 WCCCA is governed by a Board of Directors(Board)made up of one elected or appointed member(an alternate)from each jurisdictional member,with equal voting shares,which meets quarterly. The Board appoints a five member Executive Board(E Board),which meets monthly to oversee.the agency's policy and financial operations. WCCCA's FY 02-03 budget is $7.7M that is funded through:user fees of$4.3M; 9-1-1 telephone taxes collected by the State of Oregon of$1.8M; and miscellaneous income from operations and a beginning fund balance. The Agency employs 57 dispatchers and 19 administrative and support personnel. In 2001 WCCCA: ❖ ANSWERED 500,980-9-1-1 and NON-EMERGENCY CALLS ❖ DISPATCHED 443,175—POLICE CALLS ❖ DISPATCHED 38,768—FIRE/EMS CALLS This work effort expands each year primarily due to population growth,which over the last ten years has averaged 4%per year. This kind of growth challenges the personnel and systems in place to maintain a high level of service to the Citizens and Public Safety personnel in Washington County. Since 1989,when WCCCA last upgraded its technology and facilities,the following factors have occurred: ❖ COUNTY POPULATION HAS INCREASED 40% •e• 9-1-1 CALLS HAVE INCREASED 69% •e• CALLS FOR LAW ENFORCEMENT/FIRE/EMS HAVE INCREASED 55% (This includes 9-1-1 Calls,non-emergency calls, and officer initiated activity i.e. community policing) ❖ DISPATCH STAFF HAS INCREASED 20% ❖ TECHNOLOGY HAS IMPROVED AND ADVANCED ❖ EQUIPMENT HAS OR IS BECOMING OBSOLETE (Technology Enhancements and Upgrades) . ❖ MEMBER AGENCY OPERATIONAL NEEDS HAVE CHANGED • STAFFING LEVELS • COMMUNITY POLICING • FIRE RESPONSE METHODS •e• ENHANCED INTERAGENCY COOPERATION AND RESPONSE TO EMERGENCIES •S MORE SOPHISTICATED EMERGENCY MANAGEMENT PLANNING •e• GROWTH HAS DICTATED A BROADER RADIO COMMUNICATIONS COVERAGE 9-1-1 Communications System—Wireless Enhancement Project Page 2 September 3,2002 WCCCA is the second largest dispatch center in the state and a model for cooperation and consolidated operation. Its level of service is the highest and its cost of providing service to its users is the lowest in the metropolitan area. The Agency's mission statement is: "EXCELLENCE INEMERGENCY COMMUNICATIONS The Agency's Goals Are: ❖ Provide the highest level of service possible to assure protection of the public. ❖ Dispatch appropriate responders to all calls for service in a timely manner. ❖ Provide and maintain effective telephone,radio,and computer communications equipment. HISTORY OF PUBLIC SAFETY COMIVIUNCIATIONS IN WASHINGTON COUNTY: In 1988,public safety communications in Washington County was a somewhat confusing situation. The ten police agencies,the sheriff,ten fire agencies, and three emergency medical agencies,were served by three 9-1-1 centers for call answering and four dispatch agencies. Those providing 9-1-1 call answering and dispatch were Tigard,Tualatin Fire,Forest Grove,and Washington County Consolidated Communications Agency(WCCCA). It was determined that: ❖ Most of the public safety agencies could not communicate with one another due to differing radio frequencies and equipment; •:° Call taking and dispatch times were slow and resulted in delaying emergency response; ❖ Citizen calls were transferred to various agencies to provide service; ❖ Only basic 9-1-1 was being offered to the citizens in lieu of enhanced,i.e.,the ability of the 9-1- 1 operator to receive address and telephone number information automatically; ❖ Lack of adequate facilities and technology to provide appropriate service to the citizens and public safety personnel of the County. WCCCA,developed a plan to resolve these issues which included: ❖ Consolidation of Public Safety Answering Points(PSAP's) for 9-1-1 calls and dispatch centers in a new facility to house the consolidated organization. ❖ Implementation of Enhanced 9-1-1 for the County. ❖ Development of a new radio system countywide to allow cross communication and growth,as well as improved coverage and reliability. ❖ DeveIopment of the computer aided dispatch system(CAD)to improve dispatch time, accuracy, and reporting. 9-1-1 Communications System—Wireless Enhancement Project Page 3 September 3,2002 ❖ Development of a mobile data terminal system,i.e., computer terminals in the public safety vehicles,to improve dispatch time and information reporting. ❖ Development of a new radio paging system for fire and EMS users to improve dispatch time, coverage and reliability. ❖ Irnprovement of geographical map development for fire dispatch and reporting needs. The plan was completed in 1990 and recommendations prepared with the total cost of the project being $16.6 million. The County took the lead agency role and placed the issue before the voters. In August 1990,by a 60 to 40 margin,the voters approved a three-year serial levy. PROJECT ACHIEVEMENTS: Significant improvements set as a part of the long-range plan were achieved: ❖ 9-1-1 call answering average speed to be 5 seconds or less, 95%of the time. ❖ Reduce the dispatch time of 90%of priority 1 calls from 3 minutes 25 seconds for law enforcement and 1 minute 45 seconds for fire EMS to 1 minute. ❖ Development and implementation of a countywide public safety radio system. ❖ Reduction in radio airtime of 45%due to the use of Mobile Data Computers. ❖ Stabilization of work force expansion due to added technology. Though added staff has been required due to population increases it is considerably less due to the implementation of the technology additions. CURRENT ISSUES: "The most significant technical challenge facing WCCCA today is the need to upgrade equipment and systems to maintain technologically current solutions. It is important to avoid obsolescence and have the ability to maintain these vital systems and equipment" As with all technology,the Washington County radio system being no exception,it ages and becomes obsolete. Obsolescence manifests itself as software and hardware being no longer available,technical support becomes difficult, components do not perform as needed,and the system dose not meet the operating expectations of the users. There are also issues relating to coverage of the radio system or more importantly,the lack of coverage of the radio system. This occurs in significant portions of the County that were not covered with the current system, due to technology and/or available funds or were unpopulated when the current system was developed. Some of the more significant areas are: Highway 26 at the West end of the County (high traffic counts);Highway 8 (high traffic counts);Tiffany Court Apartments,Tigard(high crime activity—gang—domestic—drugs);Washington Square Mall(high concentration of.citizens); and inside large office and retail buildings. There are significant needs for system coverage improvements to maximize citizen and officer safety. Technology Direction:Fully digital and/or satellite public safety communications systems are still significantly(8 to 10 years)into the future. Though the equipment we would purchase now is digitally capable and upgradeable,there is much of what we own that isn't and will have to be replaced when the technology is developed. 9-I-1 Communications System—Wireless Enhancement Project Page 4 September 3,2002 Who Benefits from the Upgrades:All of the current WCCCA radio system users will benefit by the proposed enhancements. Though the large countywide agencies,Sheriff and TVF&RR,will receive the most overall benefit it does improve what Hillsboro,Tigard,Tualatin,Beaverton, Forest Grove, Sherwood, Cornelius or even North Plains, Gaston, or King City will get from the system. Therefore the Countywide levy will be an equitable distribution of cost to.benefit as in the original levy. PROPOSED TECHNOLOGY UPGRADES: Voice Radio System will be updated to the Sm.artZone technology. This allows the system to utilize multiple zones within one system in a seamless manner, similar to the cellular telephone system. This also improves interoperability with the Portland,Clark County and Marion County systems,as well as the new Clackamas County system currently under development. Upgrade of existing base station radios to allow compatibility with the new equipment and allow the conversion to digital technology in the future. Motorola no longer offers the current base station radios, and replacement and repair will become more difficult in the near future. Upgrade of channel bank communications equipment to improve performance and compatibility with the new equipment. Addition of a second simulcast control system to allow the utilization of two simulcast systems to provide coverage for the County. This will improve coverage and quality within the most populated areas of the County and resolves many of the user issues. Additions of 3 new simulcast sites to serve the most populated portions of the County, Canterbury Lane in Tualatin;Burntwood in Beaverton;and Which Hazel in Hillsboro. The relocation of the Council Crest site in Portland to Cedar Hills intended to improve coverage in Highway 26,Highway 217 area. The upgrade of 2 existing standalone sites to simulcast technology at Round Top and Buxton and the addition of a site at Pumpkin Ridge intended to expand and enhance coverage of the system in the west County. The addition of these radio sites will require the expansion of the microwave system that is utilized to communicate between the sites and back to WCCCA. The addition of these sites also requires the construction of the sites,which includes buildings,towers,battery systems, and emergency generators. Data Radio System: Addition of 5 new radios on existing and new sites developed for the voice system. This will improve coverage and availability of mobile data. Paging Radio System: Addition of 5 new radios on existing and new sites developed for the voice system. This will improve coverage and availability of paging coverage countywide. FINANCIAL IMPACT: This project is budgeted at$13.9M. This budget projection is based upon a partnership between WCCCA and Clackamas County in which the new Clackamas system, now under development,will provide radio coverage enhancements into Washington County. In return WCCCA will provide use of their system controller and management of the Clackamas system. This partnership creates a regional solution to radio issues, and reduces capital and operating costs for both entities. 9-1-1 Communications System—Wireless Enhancement Project Page 5 September 3,2002 Washington County Consolidated Communications Agency (WCCCA) 800 MHz Trunked Radio System Phase II Expansion: Site Selection Process by Motorola I. RF coverage Design Methodology: A.Area of Operation,Level of Service,and Subscriber Radio Information: The Motorola customer initially describes the geographic perimeters for desired radio operation, the level of service required within each perimeter,and the subscriber radio types and operational usage.In the case of WCCCA,the Washington County boundary was the general limiting guideline:However,sub-perimeters were described which outlined"Central' and "West End"sub-systems,and differentiated between levels of service for mobile and portable coverage. For public safety radio systems, the level of service is based upon a Motorola"delivered audio quality"rating of three(DAQ3), and a suggested area reliability(CPC Contour reliability)of 95%and a(CPC Area reliability)of 97%.Motorola designs for Area Reliability and conducts CATPs (coverage acceptance test plans)to validate Area Reliability. Subscriber radio types and operational usage information is required to identify transmitter and receiver specifications,antenna types,and how the radios will actually be used or worn in the field. In the case of WCCCA,mobile coverage maps were based upon MCS series mobile specifications with a standard roof-mount antenna,and upon NITS series portables with a'/2 wave dipole antenna(receive on the hip and transmit at head level). R Topographic Projection: Utilizing the Motorola HYDRA computer application tool,engineering creates raised topographic projection maps on-screen in conjunction with the customer perimeter information. An initial comparison is made between desirable high points on the topographic maps and the desired perimeter,keeping in mind fading and signal strength loss characteristics for the particular frequency band of operation,in this case 800 MHz.Existing known sites in and around the customer-defined perimeter are reviewed and taken into account. From this information,the first groupings of potential sites are noted.HYDRA default values are interleaved with customer requirements(area of operation,level of service, and subscriber . radio information)to generate initial fixed network equipment ratings and subscriber radio field operational characteristics. The coordinates and elevations of initial potential sites are run on HYDRA utilizing the above data;then applicable coverage from each site is examined and cross-correlated. Initial sites are accepted or rejected,with an emphasis on site groupings that achieve the best coverage in high profile areas,while looking'for combinations that require the least quantity of sites.The fust list of potential site locations is then generated and saved temporarily for the next step. C.Existing Sites and Customer Perimeter Drive-around: Armed with both existing and potential site location data,a"site search"drive-around is conducted throughout the coverage area to visually determine the accessibility and viability of each known existing site and each new potential site.Lastly,previously undocumented existing RF sites spotted in the area are noted and cataloged using a GPS receiver. D. Sites"Washing' Process: The collected field data is used to generate the second iteration of temporary coverage map models,using the HYDRA tool.This process involves the comparisons of multiple site overlays,and how sites and required coverage relate to each other.Antenna patterns are then reviewed and adjusted carefully at each site for optimal coverage(esp.for interaction with adjacent sites). The impact of tower height on coverage is also modeled,but is balanced out against drive-around visuals of local foliage, structures, and land use. The top two or three combined coverage map series are then modeled,with a purposeful preference for utilization of existing RF sites over un-improved new potential sites.Motorola SmartZone trunking systems can utilize simulcast site groups as subsystems,IntelliRepeater (trunked)standalone sites as subsystems, and conventional fill-in repeater sites(usually for sparse outlying areas). Reality checks are inserted into this process to make sure that potential site groupings and standalone site solutions pass another sanity check for cost effectiveness and for undesirable coverage overlap redundancies. E.Sites Recommendations Deliverables: The next step is to get customer feedback in deciding that the quantity and location of sites modeled provides adequate coverage for their users within the plan of the.original system criteria.A simple dossier is generated for each site in each subsystem, and initial infrastructure requirements are blocked in. The following typical RF coverage design engineering factors(from Motorola Coverage Standards)are considered in the site acquisition and coverage determination process: 1. Reliability Predictions: Suggested Public Safety Area Reliability percentages 2. Delivered Audio Quality:Public Safety recommended ratings 3. Subscriber Receiver Sensitivities and Transmitter Specifications:mobile and portable types,antenna types,operational usage specs. 4. Fixed Infrastructure Transmission and Reception systems:Receiver antennas and multicoupler networks;Transmission antenna and combiner networks;base station/ repeater types. 5. Motorola HYDRA tool basics summary: a. Output display colors&patterns cartography, b. Terrain database, c. Land-use&land cover&development&population databases,building penetration losses, d. RF bawl-based propagation modeling(TIA Okumura/Hata/Davidson models between 30 1.5 GHz and Bullington model to 216 MHz), e. Analog or digital mode impact, WCCCA Site Selection Page 2 September 2003 f. TX simulcast phasing&delay spread impact, g. RX voting&impact, h. Tile-based reliability, i. Faded sensitivities and moving factors, j. Noise&interference factors. 6. Site-related Information: a. Site names&coordinates&elevation(database generated or external measured), b. Fixed antenna systems patterns(vertical horizontal with azimuths), c. Tower and antenna heights. H. WCCCA Sites Selection Process: A.Existing Sites: The existing WCCCA 800 MHz trunked radio system consists of a group of four(4)sites, configured to work together as a single integraied simulcast trunked radio system. These existing sites are as follows: 1. Parrett Mt.site:located at the east tip of the Chehalem Mountains overlooking Sherwood to the north and Wilsonville to the south. 2. Council Crest site: located at the eastern apex of the West Hills,overlooking the City of Portland to the north and Tualatin to the south. 3. Gales Peak site: located on a mountain ridge overlooking Haag Lake to the south and Forest Grove to the east. 4. Bald Peak site: located at the center of the Chehalem Mountains overlooking Beaverton and Cornelius to the north and Newberg to the south. B.Proposed Sites: Four(4)new proposed sites are configured to work together with three(3)of the existing simulcast trunked sites to provide more uniform coverage and-critical penetration into the growing high traffic areas of central and eastern Washington County.The existing Council Crest site infrastructure will be removed and replaced functionally by the proposed Cedar Hills site.These are the proposed sites as follows: 1.Cedar Hills site: Co-located with multiple cellular sites in a commercial zone in Cedar Hills at the junction of Highway 26 and Highway 217 with West Haven to the north and Beaverton to the south. This site was selected because of numerous existing coverage depressions in residential areas to the immediate East and southeast of the proposed site,and to improve portable coverage penetration into new mixed commercial and residential zones to Aloha west along Highway 26 and the high traffic northeastern half of Beaverton. Existing site/tower re-usage. This location includes a tight cluster of four existing cellular sites.Geographically speaking,any of the four existing locations will provide virtually identical coverage. The problem is tower height at existing cellular sites.None of the towers_in that cluster exceed 60', and a minimum 150'tower is needed to provide the needed public safety coverage penetration required. Cellular systems sites are spaced closely,relying heavily upon large quantities of low-lying sites and heavy WCCCA Site Selection Page 3 September 2003 frequency re-usage to achieve acceptable wide area coverage. WCCCA sites are few,and are by necessity spread far,apart,depending heavily upon tower height(in relation to surrounding foliage,protrusions, and structures)to achieve needed coverage. 2.Burntwood site: Located at the wooded apex of a small1u11 with residential areas nearby,overlooking AIoha to the north and Hazeldale to the west. This site was selected to enhance penetration into mixed commercial and residential zones along Farmington Rd,TV Highway 8 East end,and especially into the high traffic southwestern half of Beaverton and Aloha. Existing site/tower re-usage. There were no other RF towers or equivalent structures discovered in the Burntwood vicinity. WCCCA sites are few,and are by necessity spread far apart,depending heavily upon tower height(in relation to surrounding foliage,protrusions, and structures)to achieve needed coverage. A minimum 150'tower at this location is required. 3.Canterbury site: Located at the apex of a low-lying hill water tank site past the east end of Bull Mt.,with residential areas nearby, overlooking Tigard to the north and Tualatin to the south. This site was selected to provide enhanced coverage in Tualatin and Tigard particularly along the Hwy 217 corridor,and to enhance penetration into growing commercial and residential areas nearby,such as King City,Durham,and Scholls. Existing site/tower re-usage. This site is already used as an RF site by other local public agencies on VHF and UHF,but antennas are mounted down low on existing buildings and structures.No other RF towers or equivalent structures were discovered in the vicinity. WCCCA sites are few,and are by necessity spread far apart,depending heavily upon tower height(in relation to surrounding foliage,protrusions,and structures)to achieve needed coverage.A minimum 150'tower at this location is required. Bull Mtn to the west is a higher site but coverage is blocked to the Hwy 217 area by this site. 4.Witch Hazel site: Located at the Clean Water Services Facility at River Road and Witch Hazel,with Hillsboro to the west and Aloha to the east.This site was selected to fill in TV Highway 8 West end coverage, and especially to enhance penetration into surrounding growing high traffic commercial and residential zones. Existing site/tower re-usage: There are adjacent cellular sites.Geographically speaking,any of the existing locations will provide virtually identical coverage. The problem is tower height at existing cellular sites.None of the towers in that cluster exceed 60',and a minimum 150'tower is needed to provide the needed public safety coverage penetration required.Cellular systems sites are spaced closely,relying heavily upon large quantities of low-lying sites and heavy frequency re-usage to achieve acceptable wide area coverage.WCCCA sites are few,and are by necessity spread far apart, depending heavily upon tower height(in relation to surrounding foliage,protrusions,and structures)to achieve needed coverage. WCCCA Site Selection Page 4 September 2003 III.Proposed Sites Antenna Design Details Canterbury Site: A. Location:Canterbury Lane Water Tank Site,Tigard,OR. B. Coordinates:Long:45-24-50 Lat: 122-47-00 C. Ground Elevation(AMSL): 390' D. Proposed Tower Elevation: 120' E. Tower Type:Monopole F. Transmit Antennas height: 100' G. Transmit Antennas Model and Type: Decibel Products DB809T3&XT: 1. Antenna gain:9 dBd 2. Vertical beam tilt:3 degrees,electrical down 3. Horizontal pattern:360 degrees;omni-directional 4: Vertical pattern width: 8 degrees 5. Frequency:806-869 MHz 6. Polarization:Vertical 7. Maximum wind load at 100 mph(Ibf/N):66.7/297 8. Max.Wind speed(mph/lanh):225/362 9. Max.Flat Plate Area(ft2/in): 1.7/0.158 10. Size:Length: 120 inches Diameter:3 inches 11. Connection type:7/16 DIN;N-Female H. Transmit Antennas ERP Calculations: 1. Contributing Single Transmitter Calculation to antennas input port. a) Individual Motorola Quantar RF output: 100 Watts(+50 dBm) b) Transmitter to combiner jpr. (25'of 72" Superflex)loss: (-.92 dB) c) Celwave WIJD862-08S Waveguide Cavity-Ferrite Transmit Combiner port loss:(-4.7 dB) d) Combiner to Polyphaser LA jpr.(10'of 1/2"Supertlex)loss:(-.43 dB) e) Polyphaser LA(lightning arrestor)insertion loss:(.1 dB) f) Antenna Iine kit(120'of 7/8"LDF Heliax)loss:(4.53 dB) g) SUM of all gains and losses from transmitter port to antenna port: (+50 dBm)-(.92 dB)-(4.7 dB)-(.43 dB)-(.1 dB)-(1.53 dB)_ (+42.32 dBm)=17.1 Watts contribution per transmitter 2.DB809T3 Transmit Antenna#1 TX ERP: a.Total of seven(7)transmitters,each contributing 17.1 watts= 119.7 Watts Total = +50.78 dBm to antenna input port b.Antenna gain(+9 dB)+combined 7 transmitters input(+50.78 dBm)_+59.78 dBm ERP =950.6 Watts ERP c.Radiation Emissions:This transmit antenna does not exceed the 1000 watt ERP threshold and therefore complies with the emission standards in Table B. 3.DB809T3 Transmit Antenna#2 TX ERP: a. Total of six(6)transmitters,each contributing 17.1 watts=102.6 Watts Total=+50.11 dBm to antenna input port b.Antenna gain(+9 dB)+combined 6 transmitters input(+50.11 dBm)_+59.11 dBm ERP= 814.7 Watts ERP c.Radiation Emissions:This transmit antenna does not exceed the 1000 watt ERP threshold and therefore complies with the emission standards in Table B. WCCCA Site Selection Page 5 September 2003 Page 1 of 1 Dennis Koellermeier - Canterbury Site Lease From: "Dominic Colletta" <dominicc@rccb.com> To: <dennis@ci.tigard.or.us> Date: 9/24/2003 2:10 PM Subject: Canterbury Site Lease Dennis, I'm sorry I didn't get this out to you yesterday. Attached is the draft lease originally transmitted on 8/14. This email(and any attachments)is a conlidential communication, intended solely for the intended recipient,and may be subject to attorney-client and other privileges. If you have received this communication in error,please delete the email,destroy all copies,and notify the undersigned as soon as possible. Thank you for your courtesy. Dominic G.Colletta Ramis Crew Corrigan&Bachrach,LLP 1727 NW Hoyt Street Portland,Oregon 97209 Telephone: (503)'222-4402 Facsimile: (503)243-2944 Email: dominicc@rccb.com file://C:\Documents%2Oand%2OSettings\denms\Local%2OSettings\Temp\GW}00003.HTM 10/20/2003 COMMUNICATIONS FACILITY SITE LEASE THIS Lease agreement entered .this day of 2003 by and between (Lessor), and Washington County Consolidated Communications Agency, an ORS 190 Organization, Beaverton, Oregon (Lessee). WHEREAS Lessor is the owner of certain real property located in Washington County, State of Oregon, at and hereinafter referred to as the Property. WHEREAS Lessee desires to Lease an approximate square foot portion of the property more particularly shown on Exhibit"A" attached hereto (herein referred to as the Site)for the purpose of erecting and operating thereon a radio communication tower, building, fencing and associated facilities (herein referred to as the Communications Facility). WHEREAS Lessor desires to lease the Site to Lessee upon the terms and conditions hereinafter set forth. NOW THEREFORE in consideration of the mutual promises contained herein agree as.follows: 1. Leased Rights: Lessor does hereby lease to Lessee the Site together with a nonexclusive easement for the right-of-way of ingress and egress to and from the Site from the nearest adjacent roadway, with the right to use existing roads (the Easement). Lessee shall have the temporary right to use such portion of the Property along or adjacent to the Site only for so long as may be necessary for the construction, maintenance, repair, alteration, removal or replacement, as applicable, of the Communications Facility so long as such use, as determined in the exclusive discretion of Lessor, does not interfere with Lessor's use of the property. 2. Authori : Lessor covenants and warrants, that Lessor has the title to the Property and that Lessor has the right and authority to enter into this Lease. Lessee shall not have priority over or interfere with existing uses on the Property. Lessor makes no warranties or guaranties with regard to the Property, and specifically does not guarantee, warrantee or in any other way covenant and agree that there shall be no interference of Lessee's proposed used of the Site from the use on the Property as of the date of the Lease.. Lessee has made its own investigation of the Property and is relying solely upon such investigation, and not upon any written or verbal representations of Lessor or any of its agents; employees or representatives, with regard to the status of the Property and its fitness for Lessee's intended use. 3. Lease Term: The primary term of this Lease shall commence on the date Lessee executes this Lease and terminate on the tenth (10th) anniversary of such date, provided, that extensions to the term of the Lease may be granted as hereinafter set forth. Lessee may terminate the Lease upon not less than ninety (90)days written notice to Lessor. If Lessee should provide such notice, Lessee shall not be entitled to any refund of fees previously paid. Lessor may terminate the Lease by written notice to Lessee given not more than one hundred eighty (180) days nor less than ninety (90) days prior to the expiration of the initial ten-year term or the expiration of subsequent five year terms as applicable. 4. Lease Renewal: If this Lease has not been terminated prior to the expiration of the initial term or any subsequent term agreed upon by the parties as hereinafter provided, Lessee may give written notice to Lessor not later than ninety (90) days prior to the expiration date of a term requesting an G:\Real_Estate\Tigard\Canterbury Site-WCCCA Lease\Lease2DGC(081403).doc Pagel opportunity to negotiate with Lessor for an additional five year lease term. Any such additional lease term shall be on such terns and conditions as the parties shall then agree. 6. Consideration: 1.1 Lease Fees: As consideration for the use of the Site, Lessee shall pay Lessor a fee in the amount of $5,000.00 per year, in advance, commencing on the date the required conditional use permit for the Lessee's proposed facilities is issued prorated to January 1. The anniversary date for all fee payments shall be January 1 each year. 1.2 Damages to the Property: Lessee shall repair or pay to Lessor the cost of repair for any damage done to the Property, including the land and improvements of Lessor and improvements to or personal property located on the Property owned by any person or entity, caused by, arising from or related to Lessee's use of the Property. Lessee agrees to indemnify and hold harmless the Lessor from any claims, damages harm or loss of whatever kind or nature arising from or related to Lessee's use of the Property. Lessee's duty to indemnify Lessor includes the duty to defend Lessor, at Lessee's cost, from such claims damages, harm or loss by legal counsel reasonably acceptable to Lessor. The provisions of this Section 5.2 shall survive any termination of this Lease. 1.3 Late Payments: If Lessee shall not make any payment due under this paragraph 5 on the anniversary date, the Lessee shall be in default and if such event of default remains uncured for thirty (30) days this Lease shall automatically terminate. Such amount in default shall thereafter bear interest at the rate of twelve percent(12%)per annum until paid. 7. Use and Alteration: The Site shall be used and occupied by Lessee for the construction and operation of a Communications Facility and activities incident, related or similar thereto, including, without limitation, maintenance, repair or removal of and additions or alterations to the Communications Facility, subject to the limitations of use set forth in this Lease. 8. Ownership of Communications Facility: The Communications Facility and any alterations or additions thereto which may be constructed by Lessee on the Site shall be owned by Lessee and shall be removed by Lessee upon termination of this Lease, and any damage to the Property caused by or incurred as a result of such removal shall be repaired or paid for by Lessee in accordance with the provisions of Section 5.2 hereof.. In the event that Lessee does not remove the Communications Facility within thirty (30) days of the termination of this Lease, Lessor shall give Lessee thirty (30) days written notice to remove the Communications Facility. At the end of the thirty (30) day notice period, if Lessee has still failed to remove the Communications Facility and any buildings and improvements which may be erected on the Site and all appurtenances thereto they shall be removed by Lessor, and Lessee shall pay all costs of removal including all attorney fees incurred by Lessor. The provisions of this Section 7 shall survive any termination of this Lease. 9. Repair.and Maintenance: Lessee shall, during the term of this Lease, at its own cost and expense, keep and maintain the Site, grounds, Communications Facility and any buildings and improvements which may be erected on the Site and all appurtenances thereto in good order and repair and shall allow no nuisances to exist or be maintained. Lessor shall not be obligated to make any repairs, replacements, or renewals of any kind, nature or description whatsoever to the Site of the Communications Facility or any appurtenances thereto. 10. Notices: All notices, requests, demands or other communications provided for or permitted or required by this Lease shall be deemed given and received upon the earlier of actual delivery in writing to the following address or three (3) days after such shall be deposited in the United States Mail, postage paid by registered or certified mail, return receipt requested,addressed as follows: G:\Real_EstateMiigardkCanterbury Site-WC.CCA Lease\Lease2DGC(081403).doc Page 2 LESSOR: Attn: LESSEE: WCCCA PO Box 6375 Beaverton, OR 97007 Attn: Director 11. Damage and Destruction: If the whole of the Site or the Communications Facility or such portion thereof as will make the Site or the Communications Facility unsuitable for Lessee's business is damaged or destroyed by events not caused by Lessee, then in either of such events, this.Lease shall terminate upon written notice of such termination given by Lessee. If any portion of the Site is damaged or destroyed by events not caused by Lessee, and the Lease is not terminated under the provisions of the immediately preceding sentence, then the fees of the remaining portion of the Site shall be equitably reduced. 12. Condemnation: If the whole of the Site or such portion thereof as will make the Site unsuitable for Lessee's business is condemned for any public use or purpose by any legally constituted authority, then in either of such events, at Lessee's option, this Lease shall terminate as of the time when possession is taken by such public authority, and the fees of the Site shall be abated. If any portion of the Site is condemned for any public use or purpose by any legally constituted authority, and this Lease is not terminated under the provisions of the immediately preceding sentence,then the fees on the remaining portion of the Site shall be equitably reduced. Lessee agrees that Lessor shall be entitled to all compensation paid for condemnation of all or any part of the Site excluding the compensation paid for all or any portion of the Communications Facility. 13. Lessee's Right to Cure: Lessor's Remedies: In the event Lessee defaults in performance, or observation of any of the covenants, obligations or conditions, other than payment which is governed by Section 5, on its part to be performed or observed under this Lease, Lessor shall, before exercising any right or remedy provided herein or by law, give Lessee written notice of the default which shall be cured by Lessee within thirty (30) days. If the default is one which, due to its nature, cannot reasonably be cured within thirty(30)days, Lessee shall be deemed to have cured the default if Lessee has commenced the actions necessary to effect a cure within said thirty (30) day period, and thereafter diligently proceeds with all actions necessaryto effect a complete cure. If at the expiration of the applicable period, cure has not occurred, Lessor may exercise any available right or remedy, including termination of this Lease. 14. Lessor's Right to Cure: Lessee's Remedies. In the event the Lessor defaults in performance or observation of any of the covenants, obligations or conditions on its part to be performed or observed under this Lease, Lessee shall, before exercising any right or remedy provided herein or by law, give Lessor thirty (30) days written notice of the default or such longer period of time as may be reasonably required to,cure a default which, due to its nature, cannot reasonably be cured within thirty (30) days, if during said thirty (30) day period, Lessor commences efforts designed to affect a cure and thereafter diligently pursues such efforts. If at the expiration of said period, cure has not occurred, Lessee may, so long as the default remains uncured, in the place and stead of Lessor, make the payment or accomplish the performance or observance with respect to which Lessor is in default, and in the event Lessee does so, all sums necessarily expended and costs and expenses reasonably incurred by Lessee in connection therewith shall be payable by Lessor to Lessee upon demand. 15. Restrictive Covenants. During the term of this Lease, Lessor shall not use the Property in any manner which would adversely affect the operation of the Communications Facility or use the Site or G:1Real_Estate\Tigard\Canterbury Site-WCCCA Lease\Lease2DGC(081403).doc Page 3 erect or place thereon any structure, vegetation or other condition which would obstruct the transmission of radio frequencies to or from the Communications Facility or otherwise interfere with operation of the communications Facility or use of the Site. Lessee's sole remedy for a breach by Lessor of this covenant shall be the right to terminate the Lease. Upon written notice to Lessor specifying proposed actions, and subject to prior written approval by Lessor which may be conditioned, granted or withheld in the exclusive discretion of Lessor, Lessee may, at its own expense, control or remove natural vegetative growth on the Site. Lessee shall be liable for all damages, whether to the land or improvements of Lessor or any other, which may be caused by erosion created by the removal of any vegetation. The provisions of this paragraph shall apply to all officers, directors, subsidiaries or affiliates of Lessee or Lessor, if applicable, and shall be binding upon the successors and assigns of Lessor and Lessee. 17. Hazardous Materials. Lessee shall not cause or permit any hazardous material to be brought upon, kept or used in or about the Site or the Property by Lessee, its agents, employees, contractors or invitees without the prior written consent of Lessor, which shall not be unreasonably withheld as long as Lessee demonstrates to Lessor's reasonable satisfaction that such hazardous material is necessary or useful to the Lessee's business and will be used, kept, and stored in a manner that complies with all laws regulating any such hazardous material so brought upon or used or kept in or about the Site or the Property. Lessor hereby acknowledges and approves that Lessee has the right to conduct its business of operating a communications site and thus will utilize batteries as power backup, diesel fuel to power its generator, and equipment which may contain or be considered hazardous materials which Lessee shall comply with all laws related thereto. As used in this paragraph, the term "hazardous material" means any hazardous or toxic substance, material, or waste, including but not limited to, those substances, materials, and wastes listed in the United States Department of Transportation Hazardous Materials Table (49 CFR 172.101) or by the United States Environmental Protection Agency as a hazardous substance (40 CFR Part 302) and amendments thereto, petroleum products, or such other substances, materials, and wastes that are or become regulated under applicable local, state or federal law. 18. Liens: Each party hereto shall keep the Site free from liens arising out of the work performed, common materials furnished or obligations incurred by such parties, and shall indemnify, hold harmless and defend the other party from any liens and encumbrances arising out of work performed or materials furnished by or at the direction of the party requesting the same. 19. Indemnity. Lessee shall indemnify and.hold harmless Lessor, its officers, directors, employees, agents, affiliates and subsidiaries, from and against any and all claims arising from Lessee's use of the Site, the Communications Facility, the easement, the Property, or the conduct of its business or from any activity, work or thing done, permitted or the by Lessee in or about the Site or the Property, and shall further indemnify and hold harmless Lessor from and against any and all claims arising from any breach or default by Lessee in the performance of its obligations hereunder and from and against any and all costs and expenses and liabilities, including, but not limited to, attorneys fees and litigation costs, incurred in connection with such claim. The provisions of this Section 17 will survive the termination of this Lease. 18. Assignments and Subletting. Lessee may not assign or sublet this Lease or any portion of the Property without the prior written consent of Lessor which may be conditioned, granted or withheld in Lessor's exclusive discretion. 19. Holding Over. If Lessee remains in possession of all or any part of the Site after the expiration of the term hereof with the express consent of the Lessor, such tenancy shall be from month to month only, and not a renewal hereof or an extension for any further term, then in such case, fee or other monetary sums due hereunder, shall be paid on the fifth (5th) of each month in an amount of one- twelfth (1/12)of the fee described in paragraph 5 hereof, and such month-to-month tenancy shall be subject to every other term,covenant and agreement contained herein G:1Real_EstatelTigard\Canterbury Site-WCCCA Lease\Lease2DGC(081403).dOc Page 4 20. Insurances. Lessee shall provide and maintain public liability and property damage coverage through its self insurance fund with limits of$1,OOp,000 for injury to one person: $1,000,000 for injury to two or more persons in any one occurrence and $1,000,000 for damage to property. Such self- insurance coverage shall cover all risks arising directly or indirectly out of Lessee's activities on or any condition of the Leased Land. Said coverage shall provide for Lessor to be named as an additional insured. The parties agree that said liability and property damage insurance requirements shall be reviewed periodically and maintained at levels acceptable to Lessor. In connection with the above, Lessee shall maintain in force during the performance of this Lease agreement, at its expense,Workmen's Compensation Insurance or equivalent insurance. 21. Taxes and Assessments. Lessee agrees to pay to Lessor when billed, all lawful assessments and charges which Lessor is required to pay because of Lessee's use of the Site, including any real property or personal property tax or fire protection assessments which Lessor shall receive and be required to pay as a result of Lessee's use and operations from or upon the Site. This obligation shall include all real property or personal property tax or fire protection assessments attributable to the improvements themselves and the increase in the value of land occasioned by such improvements. The failure of the Lessee to pay any and all of these taxes upon demand by Lessor shall be grounds, upon the expiration of three (3) months from the date of demand, for the immediate and irrevocable expiration and reversion of this Lease and all rights granted hereunder. 22. Entire Agreement. This Lease constitutes the entire agreement between the parties hereto and cannot be varied except by the written agreement of the parties hereto. 23. Time. Time is of the essence of this Lease. 24. Governing Law. This Lease and all rights and liabilities of the parties hereunder shall be construed and governed by the laws of the State of Oregon. 25. Successors in Interest. This Lease shall be binding upon and inure to the benefit of the successors and assigns of the parties hereto. 26. Attorney Fees. If suit or action is instituted in connection with any controversy arising out of this lease, including actions pursuant to bankruptcy laws, the prevailing,party shall be entitled to recover in addition to costs such sum as the court may adjudge reasonable as attorney fees at trial, appeal and on petition for review. IN WITNESS WHEREOF, the parties hereto have executed this Lease as of the date of execution by the last party to sign this Lease. LESSEE: LESSOR: Washington County Consolidated Communications Agency By: Director: Dave Austin .Address: G.\Real_Estate\Tigard\Canterbury Site-MCCA Lease\Lease2DGC(081403).doc Page 5 Reviewed as to form: Legal Counsel G:\Real_Estate\Tigard\Canterbury Site-WCCCA Lease\Lease2DGC(081403).doc Page 6 EXHIBIT A G:\Real_Estate\Tigard\Canterbury Site-WCCCA Lease\Lease2DGC(081403).doc Page 7 KING CITY 15300 S.W.116th Avenue,King City,Oregon 97224-2693 Phone:(503)639-4082•FAX(503)639-3771 10/17/2003 Tigard Intergovernmental Water Board 13125 SW Hall Blvd. Tigard, Oregon 97223 Subject: Council Representation to Intergovernmental Water Board Chair: The City of King City has repositioned Council assignments to various governmental Organizations. The primary representative to the Water Board will continue to be Dick Winn. The alternate will be Nancy Duthie., 16720 SW Royalty Pkwy., King City, 97224 If you have any questions, please call me. g 8� aDi, Thank you. Sincerely, I ne Turner City Manager Intergovernmental Water Board Meeting Informational Items Supplement November 12, 2003 • Raw Water Pipeline, A Presentation for the Visiting Samarinda, Indonesia Delegation, September 16, 2003 • Groundwater Shut Down, Memo from City of Portland, Mark Knudson, Director of Operations and Maintenance, September 22, 2003 • Oregonian article dated October 15, 2003, Burying reservoirs will be disaster • Many big cities ditching open water reservoirs, October 15, 2003, article in the Oregonian • October 16, 2003, article from the Oregonian, Burying reservoirs makes sense • Fluoridation of water could start in March, Oregonian, October 16, 2003 • Oregonian article dated October 16, 2003, Questions of cost, approach swirl around reservoir plan • Seattle design firm gets nod for reservoir capping job, Oregonian, October 21, 2003 • Tigard Times article dated October 23, 2003, City moves ahead with securing permanent water supply • Portland Tribune_ , November 4, 2003, Reservoir tug of war may stop at the wallet • Get started on the road to Water Conservation-WO Indoor, brochure from the Regional Water Providers Consortium • It's important to conserve water resources during the hot, dry summer months by using water wisely—HZO Outdoor, brochure from the Regional Water Providers Consortium • Water Conservation is a resource that can play a key role in meeting future water needs, brochure from the Regional Water Providers Consortium 0 2004 Calendar, City of Tigard, Make Every Drop Count .418 *'Octaber 23, 2003 Ci . moves ahead with securepermanent� mg water Supply pp Y While talks.with Portland remain and recovers in the summertime stalled,the Joint.Water Commission when water rates are higher. appears ready to accept Tigard Portland charges Tigard 50 is a member „ percent of the regular rate for Our Overall ASR water, according to by BARBARA SHERMAN Koellermeier. , Pf the Times goal is to get 6.million The project's first well has been in operation for two years, TIGARD—While the process of securing gallons per day, SO.We Would according to Brian Rager,engi- a permanent water supply for the city some- n neering manager. The city ,is times seems to move as slow as molasses, need Sik wells pig to put in a second well progress is.being made,Dennis Koellermeier, near the existing 10-million- #re city's assistant public works director,told gallon reservoir near 12-5th the City Council and Intergovernmental Water Avenue and :BullMountain Board Tuesday. R ■ Road. . `Progress remains slow.in wholesale water Brian Rager Construction.is proposed to sights. negotiations between the city of start in December, with injec- gortland and a group composed of Tigard, tions beginning in the fall of Tualatin, Gresham, Tigard, the Rockwell .. 2004 and withdrawal in the - summer of 2005. PUC;Tualatin Valley Water District and the Also, the Baggenstos test West Slope Water District lens to Ti well i§ d In bi-weekly meetings, the two sides are 1� y �d, which would lease pose to.be drilled discussing such issues as rates. JWC facilities until-future capacity-increasing next spring on 150thAvenue near Beef Bend projects are permitted; according to Road.The well would be tested in the winter •r `We ve developed several proposals and Koellermeier.. of 2004,with injections beginning in 2005 and rare now focusing on a comparative structure,” The JWC is considering adding a raw- water withdrawn in 2006. Koellermeier said. "Comparative rates are "We hoe water pipeline and a Sein Creek tunnel as well p to bring at least one ASR well being developed for Portland,the Joint Water as raisin the level of$co online each " . Commission and the Willamette River users. g ggrns Dam,which is year, Roger said. currently undergoing an Integrated Water "In 10 years,we can recover the cost of a Our position with Portland is, `You have to be Resource Management feasibility study. well, he added. "Our overall goal is to get 6 competitive. Tigard is committed to 'contributing million gallons per day,so we would need six Othe ot nher'hand,becomtiiig a member of:",$239,533 in the current fiscal year and wed•°' Qte Joint Water Commission is looking more .$389,484 in 2004-05 for environmental The council will be asked to approve a con- promising all the time, according to impact studies and permitting costs. tract with Groundwater Services for the kCoellermeier. The JWC's year-round average water rates Baggenstos well at its Nov 28 meeting. ' "Me good news is that our membership are 67 cents per 100 cubic feet conipazed to The city and the Tigard-Tualatin School application is'on track," he said. "The board. Portland's$1.15 per 100. District have agreed on a location for a new has agreed in principle to make Tigard a On another front,Tigard is proceeding with reservoir on the future Alberta Rider embeL" its Aquifer Storage and Recovery program,in Elementary School property on Bull L The parties are working on a draft agree- which it purchases water at lower wintertime Mountain: Test borings are expected to be rent that Would allocate up to 4 million gal- rates, injects it into an underground aquifer drilled by the end of the month. QORTLA.V Dan Saltzman,Commissioner CITY OF Morteza Anoushiravani,P.E.,Administrator z '1120 SW 56'Avenue PORTLAND, OREGON Portland,Oregon 97204 Information(503)823-7404 °l Fax(503)823-6133 s, BUREAU OF WATER WORKS TDD(503)823-6868 September 22, 2003 To: Interested Water Customers From: Mark Knudson, Director of Operations and Maintenance Subject: Groundwater Shut Down We started shutting down the groundwater supply this morning and expect to be back to using 100% Bull Run supply sometime this afternoon. It will take about 4- 7 days for this change to reach many of our customers since some groundwater remains in the system until ongoing demand consumes what is currently in pipes and storage. We ran the wells as a supplement to the Bull Run supply throughout the peak season, starting July 22. The blend was typically about 60% Bull Run to 40% groundwater for the last two months. Using groundwater helps extend stored water supplies through the peak season. Current forecasts indicate reservoirs may start to refill within a week. Switching over to 100% Bull Run is typical supply management for this time of year. As we move into the fall, groundwater also helps offset seasonal color in Bull Run water. Seasonal color may be more obvious to all of our customers as we make the transition to 100% Bull Run. That, too, should abate as the rains resume and the reservoirs refill. If you have any questions regarding water quality, please call our Water Quality Information line at 503-823-7525. 4. n .Equtil Oppor iun-rty Employer Portland Tribune Tuesday,November 4,2003 . NEWS A9 Reservoir tug u, . may stop the wallet Foes of Mount Tabor going to win.How else can there be ing needs to come up,"Rust said. any transparency in city govern- "It's difficult to predict exactly all project F' 1 cel foul play merit?" the different things we'd like to ft- The city counters that the state nance in the course of a year or two. over bond issuance statute doesn't require any degree If we get too specific,we end up not of specificity when describing the having the authority when we need purpose of a project, and many it to finance projects.We have to go I3!►JENNIFER ANDERSON times the city needs the flexibility out and do the 60-day notice." . The.TWbune when it issues bonds in large The explanation isn't enough to amounts. satisfy the residents opposing the Opponents of the Mount Ta- The city has used the bond act 20 Mount.Tabor project,who say the bor reservoir burial project will times since 1992,most recently is- statute should be clarified to require get their chance to square off suing bonds in amounts of$200 mil specifically listed purposes so that against the city Wednesday in a lion and$500 million for"public pur- voters can refer revenue bonds Portland courtroom,where.a poses"that could be dedicated to- when they oppose the projects for judge will decide whether to al- ward the effort to cover Mount Ta- which they're intended to be used. low a public vote on revenue bor reservoirs. "It saddensme to note that this = bonds to fund part of the project. Until about five years ago,Rust ordinance is yet another step in a W t Oregon law gives citizens go days said the city used.to describe the chain that has been marked by the E to.refer revenue bond sales to the purpose of the project when issuing short-circuiting of the public voters.But project opponents say bonds.In 1999, the city began de- process,"Southeast Portland resi- the•City Council subverted the in- scribing the bonds as solely for dent and.plaintiff Eric Dickman said tent of the law by first authorizing a "public purposes,"which provided during council testimony Oct.1,just 4 vaguely worded bond sale in De- more leeway.A deadline is attached before the council unanimously ap- cember,then approving the specific to each of those bonds,five of which proved the financing to cover the R project in an Oct.l ordinance that have been issued since 1999. Mount Tabor reservoirs. contained an emergency clause, "The question is,how specific do "This ordinance was conceived in preventing it from being referred to you have to be?"Rust said."Do you deception, borne under the false the voters. have to talk about general improve- declaration of an emergency, as Ken Rust,the city's chief financial ments,water improvements?What part of a deliberate attempt to fur- officer,said the lawsuit is the first le- is the standard?We believe we met ther a public project that lacks any gal challenge of the city's use of the the standard,we followed statutory significant support,"Dickman said. Uniform Revenue Bond Act,a state authority,and that our authority is City Commissioner DanSaltz- statute that gives the city broad au- valid.They don't agree,and that's man, who oversees the water bu- thority to finance projects ranging what the court will decide." reau,conceded that the reservoir is- from the streetcar extension to wa- Deputy City Attorney Terence sue has been"one of the litany of is- ter bureau improvements, Thatcher has requested that the sues that gets recited about why The December ordinance author- case be dismissed because of lack of City Council is not listening or out of ized the sale of$200 million in bonds merit touch." for "public purposes." The Oct. 1 The contentious case under- He added:"In a wider sense,I've s vote approved$91 million in bonds scores several months of growing got to tell you ... we have a lot of for specific projects,including bur- frustration among some residents process here in Portland around ial of the reservoirs.When the op- who claim that City Council hear- public decision making.It's usually ponents tried to refer the October ings and other forums are just a only when people don't get the deci sale to the voters,the City Elections "rubber stamp" for plans that al- sion they want,that they start com- Office said they should have re- ready have been set in motion by of- plaining how inadequate the ferred the December authorization ficials. process was." instead. City officials insist everything is Multnomah Circuit Judge Mari- "It's shameful,"said Moy Jones, being done by the book lyn Litzenberger is scheduled to one of 12 individuals named as "What we've found over years is hear the case 9:30 am.Wednesday r. plaintiffs."If justice prevails,we're that the city has a variety of financ- in Courtroom 318. OregonLive.com's Printer-Friendly Page Page 1 of 1 omwdvexom Evarythinla ?re�trat Burying reservoirs will be disaster 10/15/03 SCOTT FERNANDEZ T he Bull Run Group says"Bury city reservoirs.for safer water"(Commentary,Oct. 9).To make their case they infer support of the citizen-staffed Public Utilities Review Board. I am one of those citizens. 1 want to set the record straight. The review board did not approve the burial project.The budget we approved stated only that the Water Bureau was considering the project, not that it was actually happening. Burying the.reservoirs will not make Portland's water safer. In fact, eliminating natural light and air purification will degrade Portland's water quality. Water Bureau construction engineers have a Maginot line mentality. They think they can make water safe.by building a barrier that insulates it from harm. Their reasoning.is.flawed because it fails to.consider the harmful organisms already in source water supply that grow best when contained without open oxygenated air. It also ignores the many ways.the barrier can be breached. Burial:proponents.claim that open reservoirs are obsolete and.scarce.They don't tell you that millions of people in major cities, including New York and San Francisco, continue to drink unfiltered water from open.reservoirs. Why does this continue?The reason is that these cities rely on the expertise of microbiologists who scientifically evaluate all aspects of water safety, rather than construction engineers whose reflex response is to.solve every supposed problem with an expensive structure. am a microbiologist. I prepared a scientific, annotated 36-page report on the Bull Run water system. It concludes that our water quality is so superior that additional treatment will provide no measurable improvement. Moreover, if Portland adopted a state-of-the-art water quality analysis program, it could have a water system that is safe from all threats, internal and external,for a nominal cost. The Water Bureau continues to claim that its construction plan will cost the average household water user about$1.25 a month. This is false. The true cost of the Water Bureau's total construction water safety plan, including both the reservoir burial and ancillary filtration project and the interest on the bonds to fund it,will be$1 billion.The combined water-sewer rates of Portlanders,already the zecond=highest in the nation, will more than double in the next 10 years. If this project goes forward, it will become Portland's greatest public works disaster. Scott Fernandez of Northeast Portland was a member of the Portland City Council's Water Quality Advisory Committee.from 1996 to 2000 and has been on its Public Utilities.Review Board since 2000. Copyright 2003 Oregon Live.All Rights Reserved. t,++....//_...:.�. ,,............t:_... ..,,..._L-..:�a.._/�..:«�.... .....Cn/L....../...7:a_�..1/1ALLl�ACf�'11GA1/1 _.Y-ln_____�:_�n_�_ t/�•M11•IAII^f OregonLive.com's Printer-Friendly Page Page 1 of 2 Omgon dexo rr EvarAing Oregon Burying reservoirs makes sense A$75 million plan to secure the city's drinking water resources at Mount Tabor fits today's alarming world 10/16/03 A s Sept. 11, 2001, recedes in Portland's rearview mirror, fears of terrorist contamination of the city's water.supply have receded as well. This is only natural, but it natural, too,that those paid to wont'about the safety of Portland's water have not been able to laugh off the city's vulnerability quite as easily as some members of the public. The Portland Water Bureau's duty is to safeguard our city's astonishingly pure and plentiful water supply. It flows, by gravity,from the Bull Run reservoir near Mount Hood to storage reservoirs at Mount Tabor Park that are open to the sky, built in a far more trusting age. Bull Run water is treated with some chlorine and some ammonia, but that's before it reaches the park. From Mount Tabor's reservoirs, Bull Run water travels directly to the mouths of two-thirds of the city's residents.That's what makes the reservoirs such a point of vulnerability for the city. "We've become convinced that it's feasible to contaminate these reservoirs in a way that would be catastrophic for our community,"says Rosemary Menard, in charge of water resources. "We're not saying it's probable." The probability,we hope, is remote.At any rate, it's extremely difficult to assess. But even a hoax or threat of toxic contamination that eventually proves to be unfounded could shut off city water supplies for days and wreak havoc, Menard says. Testing for some contaminants is a lengthy process in itself, requiring a sophisticated analysis that isn't available in our area. In the meantime, a shutdown of water supplies or warning to boil water could have some fairly dramatic effects on our city. It wouldn't be a big draw for business prospects,that's for sure, even if the flurry all proved, in the long run,to be an unnecessary precaution. Given the gravity of the consequences of even a false report,water bureau officials say closer chemical monitoring of the reservoirs cannot take the place of burying them. Monitoring might warn of contamination, but wouldn't prevent it. The Portland Water Bureau did examine other options, but in the end, burial of the open reservoirs at Mount Tabor seemed the best way to minimize the city's risk.The$75 million price tag is daunting, but it would replace the existing obsolete reservoirs—the youngest of which is 92--with a 21 st century system,with the seismic strength to withstand earthquakes. Even if the open reservoirs could limp along, they would eventually need to be replaced.At that point, burial would be the only sensible option, because open drinking-water reservoirs are now considered substandard and hazardous.Across the country, as The Oregonian's Scott Learn reported this week, other big municipalities are facing the same risks and taking similar precautions. Many are taking their open drinking-water reservoirs out of commission. Opponents of the plan to bury the Mount Tabor reservoirs began with aesthetic objections. In response,the city held a design competition to ensure the deluxe, $14 million park treatment on top of the buried reservoirs will be top-notch. But the opponents have long since moved on to new objections. http://www.oregonlive.com/printer/printer.ssP/base/editoriaU106636549964810.xm1?oregonian?ede 10/21/2003 OregonLive.com's Printer-Friendly Page Page 2 of-2 Upgrading infrastructure is the municipal equivalent of forcing down your vegetables. It's not fun, but in pushing for this investment, the,Portland Water Bureau is being responsible. It's doing its duty to safeguard one of the city of Portland's most precious assets for the future. Copyright 2003 Oregon Live.All Rights Reserved. http://Www.oregonlive.com/printer/printer.ssf?/base/editorial/106630549964810.xml?oregonian?ede 10/21/2003 OregonLive:com's Printer-Friendly Page Page 1 of 2 OmqjonUvexom Evarytting ttragaa� Fluoridation of water could start in March A firm is designing the system that will inject fluoride into the main water line near 209th 10/16/03 RICHARD COLBY BEA VERTON --Fluoridation of Beaverton's water,which voters approved last year to help prevent tooth decay, could startby late March. A consulting firm is designing the fluoride-injection system that will be housed on the city's main water line near Southwest 209th Avenue and Tualatin Valley Highway,Tom Ramisch, Beaverton's engineering director, said Wednesday. As the design is completed, Ramisch's office and the consultant will begin looking for a contractor to do the work through a bidding qualification process approved Monday by the Beaverton City Council. Because of health and security concerns over injecting material into its public water supply, Ramisch said,the city must be sure contractors bidding for the work can show they have the expertise to do it. For that reason, he said, the selection will come in two steps,with prospective bidders first submitting statements of their qualifications. Once the city and its consulting firm, Economic&Engineering Services, are satisfied with their qualifications, firms will be invited to submit bids, Ramisch said. "We want to get a contractor who knows the drill,"he said. "We don't want just anybody and everybody bidding on it" State law allows the city to alter bidding procedures in such circumstances, Ramisch told council members Monday before they approved the steps. Last year, at the request of Stand for Children, a pro-fluoride group, Mayor Rob Drake asked the council to put the fluoridation question on the general election ballot.After a hearing that drew extensive testimony from people on both sides of the issue,the council agreed to the November vote, In which 53 percent favored the idea. The city tentatively budgeted $550,000 for the fluoride installation but will probably spend about $600,000 on it, Ramisch said. The extra will include costs of refurbishing a building at 209th Avenue and Tualatin Valley Highway that the city had purchased earlier because it is next to the city's main supply line running east from Hillsboro. The$600,000 will come from the city's water fund,supported by water billings and other revenue from water operations, not property taxes. Obtaining the necessary land-use approval from Washington County--the site is about two miles outside Beaverton city limits-- has taken four months, said David Winship, the city's engineer in charge of water operations. Other county permits related to the work are pending, he said. http://www.oregonlive.com/printer/printer.ssf?/base/metro west news/106630623064810.xml?oregonia... 10/21/2003 OregonLive.com's Printer-Friendly Page Page 2 of-2 The city water to be fluoridated supplies.central and southern parts of the city,taking in about 55 percent of the city's residential and business users. The rest of Beaverton is divided among three water districts that also supply areas outside of the city.One of the districts,Tualatin Valley,fluoridates its water to its customers north and west of central Beaverton.The two other districts serving smaller areas on the east side,West Slope and Raleigh, do not fluoridate their water. Copyright 2003 Oregon Live.All Rights Reserved. http://www.oregonlive.com/printer/printer.ssf?/base/metro west news/106630623064810.xml?oregon a... 10/21/2003 OregonLive.com's Printer-Friendly Page Page 1 of 2 OregonUvexom Evening orag4a Seattle design firm gets nod for reservoir capping job Kathryn Gustafson,whose resume includes a memorial to Princess Diana,wins with a concept linking three reservoirs 10/21/03 RANDY GRAGG The designer of landscapes for Chicago's Millennium Park, Boston's Big Dig freeway capping project and a memorial to Princess Diana in London.has won the competition to design the capping of Mount.Tabor's reservoirs. Kathryn Gustafson and her Seattle-based firm Gustafson Guthrie Nichol won the job over three teams led by architects from Germany, Portland and Boston. The winning firm,announced by Commissioner Dan Saltzman on Monday, arrives amid continuing controversy over the necessity of capping reservoirs.and the project's estimated $77 million price tag, $13:7 million of which would go to build Gustafson's final design. "We cannot leave the reservoirs as they are,"Saltzman said,citing the 92-year-old reservoirs'age and new federal Environmental Protection Agency rules on water quality. Gustafson's design would change the three mostly disconnected reservoirs into a linked series of water experiences.The oldest and most hidden, Reservoir 1,would become a "water garden"of wetland plants. The middle one, Reservoir 5,would be covered by a 6inch-deep"water table"that visitors could wade in above the newly buried tank.The largest, Reservoir 6,would be split with a dramatic entrance walkway, bracketed by waterfalls, 15 feet high and 350.feet long, on each side. The eroding and fenced-off slope between 5 and 6 would.be refashioned.with terraces for picnicking and overlooks of the city. Gustafson's proposals are concepts only,developed during the three-week competition. She cautioned that her firm will develop the final design from further feasibility studies and public meetings. "There's great potential at Mount Tabor,"Gustafson,said from her Seattle office."It's rare to have such a big park with such great bones. I think Portland will get something much better out of it." Saltzman said the design speaks to concerns about changes to the park that capping the reservoirs would cause. "I believe a lot people who have opposed the project will now wonder, What are we against?'"he said. But the opposition group, Friends of the Reservoirs,actually grew by several members since the competition's designs were presented.publicly. "People think the reservoirs are pretty nice the way they are," Friends board member Steve Reinemer said."There's ways to spill them up that would be nice. But all the reasons cited for this project have not been scrutinized enough. That's the bottom line." Laura Gordon, a board member of the Mount Tabor Neighborhood Association who sat on the http://www.oregonlive.com/printer/printer.ssf?/base/front_page/106673785529770.xml 10/21/2003 OregonLive.com's Printer-Friendly Page Page 2.of 2 competition jury, said that city's process for deciding if and how to cap the reservoirs has been flawed. "But the design competition process was very strong," she added. "It's a very simple and refined vision for how we can move the park into the next phase of its life." Randy Gragg: 503-221-8575; randygragg@news.oregonian.com.. Copyright 2003 Oregon Live.All Rights Reserved. http://www.oregonlive.com/printer/printer.§sP/base/front page/106673785529770.xml 10/21/2003 OrggcnLife.com's Printer-Friendly Page Page 1 of 3 OmWnLlvexom Evary0ing Qrragon Questions of cost, approach swirl around reservoir plan The price, need,directives and alternatives to burying key Portland water sources prompt debate on both sides 10/16/03 SCOTT LEARN Portland's Water Bureau is preparing to spend at least$75 million to discourage what city officials agree is the highly unlikely possibility of a terrorist attack on Mount Tabor Park's open reservoirs. The move to bury two key drinking water reservoirs beginning in January 2005 will boost water bills by up to$19 a year for the typical residential customer,the bureau says. The$75 million budget is double the total federal grant money that Oregon has received for terrorism fighting equipment,training, planning and exercises since Sept. 11,2001. Is it worth it? Mort.Anoushiravani,the Water Bureau's administrator, said he balances the low likelihood of an attack against the reservoirs'ages and security consultants'warnings that an attack could have potentially lethal effects. Portland is one of only 16 large water utilities with open drinking water reservoirs, and at least half are planning to cover, bury or decommission their open reservoirs. Most of the rest have deep setbacks and restrictive fencing, not the walk-up public access of Mount Tabor's 92-year-old reservoirs. If the reservoirs,which supply two-thirds of the city's drinking water, remained open, "would something happen?"asked Anoushiravani. "I don't know, and I don't want to stand in front of the microphone explaining to people why we knew about something and didn't do anything about it." Opponents think the risk of a successful attack on the reservoirs is overstated.They want the city to reconsider its decision and study cheaper alternatives, including beefing up reservoir security and using high-tech monitors to detect contamination. Since the Sept. 11 attacks,the city has made do with reservoir security guards and cameras, noted Valerie Hunter, a radiologist and member of the citizens'group Friends of the Reservoirs. "if the city really believed there was an immediate risk from a terrorist,we'd have 200-foot setbacks and armed guards 24 hours a day," Hunter said.'There's been a false sense of urgency here." The City Council approved the project last year. Opponents.are vowing to fight it with ballot referrals and court challenges if the council doesn't reconsider. A look at the some of the key bones of contention: What's the real cost? http://www.oregonlive.com/printer/printer.ssP/base/news/1066306037648l O.xml?oregonian?lcg 10/21/2003 OregonLive.com's Printer-Friendly Page Page 2 of 3 The City Council has approved spending $77 million, including $2 million to temporarily cap less accessible reservoirs in Washington Park, $61 million to bury the Mount Tabor reservoirs in concrete tanks and$14 million for a park on top of the tanks.The project will increase water bills about 8 percent,the Water Bureau says, or a maximum of$19 a year for the typical homeowner. Opponents say the bureau's rate calculation,which includes$30 million in credits for cost cuts and deferred building projects, understates the total hit by nearly 40 percent. Opponents also charge the bureau with low-balling the costs. The bill for topping the reservoirs could increase by at least$10 million,opponents say,citing a city landscape consultant's estimate.The city also has not included costs for increasing storage at Powell Butte Nature Park partly to compensate for the diminished storage at Mount'Tabor,an expense the city's consultants pegged at$22 million.And it has not included the$31.million estimated costs for burying the Washington Park reservoirs within 10 years. Commissioner Dan Saltzman,who oversees the Water Bureau, notes that none of those potential expenses has been approved by the City Council.Adding all of them to the tab brings the total cost to$140 million, about a fifth of the bureau's 10-year building budget. Is the terrorist threat real? Immediately after the Sept. 11 attacks, utilities downplayed the threat to water supplies, saying terrorists would need truckloads of contaminants to threaten the huge volumes in raw water storage reservoirs—including Portland's multibillion-gallon Bull Run reservoirs. But Portland and the rest of the water industry began shifting that stance by 2002. They said the pipes and storage tanks in the distribution system could be attacked with backpack-size quantities of a select few biological and chemical contaminants. Portland's first security consultant-, Veridian,warned in January 2002 that the open reservoirs posed a rare and exposed target. In a report that prompted the city to accelerate its burial program, the consultant said contaminated water could reach customers before it was detected. Rick Hahn,a California-based security consultant who was an FBI agent for 32 years, said there is evidence that terrorists have studied what agents could be used to contaminate water systems. "You are-at risk,"Hahn said. "We've got an enemy out there that has contemplated this." Experts disagree on how readily terrorists could acquire and"weaponize"contaminants that might be effective in large bodies of treated water, and how lethal they would be. If terrorists were looking for a way to attack,spreading chemical contaminants through the air as an aerosol appears easier and a more likely route,security experts say. The bureau's second security consultant, HDR, said in a report last year that one chemical agent and a handful of biological agents could potentially infect the reservoirs in small doses. A terrorist would require nearly 1,000 pounds of the chemical agent to successfully attack the huge Bull Run reservoirs, the consultants said. It would take only 3 pounds to contaminate the largest Mount Tabor reservoir, they said. But the report noted that there is"considerable debate"among scientists about the threat posed by microbial pathogens, considered likely contaminants. Can high-tech come to the rescue? http://wWw.oregonlive.com/printer/printer.ssf?/base/news/106630603764810.xml?oregonian?lcg 10/21/2003 OrggonLive.com's Printer-Friendly Page Page 3 of 3 The Friends of the Reservoirs holds high hopes for relatively inexpensive"real-time monitoring," which uses high-tech sensors to sniff out contaminants throughout the system and warn system operators.They worry that the city will bury the reservoirs,then find a short time later that monitoring could have saved them. Those sensors could be used throughout vulnerable points in the distribution system as part of an improved security plan, not only at the open reservoirs. The Mohawk Valley Water Authority in upstate New York is installing,detectors, at$8,000 a piece, to enhance security and defer burying open reservoirs.The district's reservoirs are ringed by deep setbacks and barbed-wire fences, unlike Portland's. Connie Schreppel,the district's director of water quality, said the sensors can only detect a small number of parameters. But several of them, including chlorine residuals and alkalinity, could be changed by biological or chemical contaminants, providing an early warning, she said. Work is proceeding at a furious pace since the Sept. 11 attacks,funded in part by the Environmental Protection Agency, to improve detection systems. Neil Murphy, president of the State University of New York's College of Environmental Science and Forestry, said research by his school and others could lead to a robust system in two or three years. "I can certainly understand the criteria swaying the city's engineer"toward underground tanks, said Murphy, a former consulting engineer. "But I think you really do have to look at it from the standpoint of cost-effectiveness." Sally Gutierrez,director of the EPA's water supply and water resources division, put the timeline at 10 to 20 years for a system that would detect a wide range of contaminants. The detectors could trigger false alarms and would not prevent the contaminants from getting in the water in the first place. Portland Water Bureau officials said flipping a bypass valve and cutting off the reservoir flows would take 10 to 20 minutes, leaving a bubble of contaminated water in the system. Are there other alternatives to burial? The Water Bureau could build a treatment plant near the reservoirs that would kill small enough viruses to meet upcoming federal standards. That option would allow the bureau to keep the reservoirs open without a state-approved risk mitigation plan. The bureau's consultants, Montgomery Watson Harza, say building a treatment plant large enough to keep Mount Tabor's storage available to the system would cost as least as much to build and operate as burying the reservoirs,whether it was treatment using added chlorine, ultraviolet light or membrane filters. Some options would require pumping or extensive electricity, making the system less reliable in emergencies,the bureau says.And a treatment plant would not neutralize all potential contaminants. Opponents mistrust Montgomery Watson Harza's cost estimates and want an "independent" analysis of the alternatives. Scott Learn: 503-294-7657; scottleam@news.oregonian.com Copyright 2003 Oregon Live.All Rights Reserved. http://Www.oregonlive.com/printer/printer.ssf?/base/news/106630603764810.xml?oregonian?lcg 10/21/2003 OregonLAYe.com's Printer-Friendly Page Page 1 of 4 Omjondvexom Evarvaing Oregon Many big cities ditching open water reservoirs 10/15/03 SCOTT LEARN Portland would be in an increasingly rare—and potentially vulnerable—spot if it opted to keep its three open drinking water reservoirs in Mount Tabor Park. Only 16 large U.S..utilities have open drinking water reservoirs.And at least half intend to bury, cover or deactivate them to improve water quality and security,a review by The Oregonian found. But proposed federal rules would not require the city to cover or bury.the reservoirs, as Commissioner Dan Saltzman and Mayor Vera Katz have asserted. The pending rules give the city the option of trying to keep the reservoirs open with less than.the. 50-to 100-foot exclusion zones that city consultant Montgomery Watson Harza said would be "required" by federal guidelines and regulations. A beefed-up security system, combined with maintenance to Mount Tabor's 92-year-old reservoirs, could cost water ratepayers as much as$10 million,the city estimates. Portland's$75 million reservoir burial,approved last year by the City Council and set to begin construction no earlier than fall 2004, has triggered fierce opposition. Park neighbors are concerned about aesthetics and a business group is concerned about rising water rates. Opponents.of burial want the city to reconsider the decision, this time looking at all security options. The city so far has shown no interest in reconsidering.They also want a review by an "independent"company that has no chance of getting future construction-related work. Valerie Hunter, a radiologist and member of the opposition group Friends of the Reservoirs, said she thinks a creative panel of experts could come up with state-approved security solutions"that would not destroy our park." Among the possibilities opponents suggest: decorative but restrictive fencing,walkways set farther back, additional guards, closing the reservoirs at night, closed-circuit television surveillance, motion alarms,and "real-time"monitors to warn of contaminants in the system. "There is no requirement for a 100-foot setback, and that means there is room for maneuvering and discussion,"Hunter said. "I can't help but think that we could come up with something better than a 10-foot chain-link fence." Saltzman,who oversees the Water Bureau, and bureau officials concede.the regulations give them more flexibility on security measures than depicted in Montgomery Watson Harza's analysis. But they say the difference is semantic. The state, which would be required to approve a risk mitigation plan, has said the reservoirs would need "control of public access"and "increased setbacks"to remain open. Even if the setbacks were slimmer, the city says, the plan would probably require a fence to block access to the -reservoirs, popular destinations for walking and jogging. http://www.oregonlive.com/printer/printer.ssf?ibase/news/106621943125920.xml?oregonian?lcg 10/21/2003 OregonLive.com's Printer-Friendly Page Page 2 of 4. A$14 million budget for park improvements on top of the buried tanks would help compensate for the loss.of the reservoirs, the city says,while even a less-severe security plan would damage park aesthetics. To keep the reservoirs uncovered the city would also have to go against the advice of two security consultants,Veridian and HDR,who said after Sept. 11, 2001, that the reservoirs might be successfully attacked. HDR said attackers could use as little as three pounds of potentially lethal contaminants. The consultants recommended deep setbacks, reservoir covers and fencing that would obliterate one of the park's main roads and shut off blocks of park access if the city opted to keep the reservoirs open. Rosemary Menard,the bureau's director of water resources management,said the city could pursue a slimmed-down risk mitigation plan and possibly get a nod from the state. But she said the bureau can't pursue that option in good conscience given the security concerns and the reservoirs'advanced.age. "The flexibility is obviously there"in the proposed regulations, Menard said."But we've been convinced that open reservoirs are fundamentally not a good strategy." From real mountain to legal one Portland's water flows downhill from the huge Bull Run reserve near Mount Hood to the city's taps,with some important stops along the way.The water gets a chlorine jolt after it leaves Bull Run. Downstream, it gets a shot of ammonia to extend.disinfection. But by the time it reaches Mount Tabor's reservoirs, the water is ready to drink and receives no further treatment.The reservoirs send drinking water directly to two-thirds of the.city. After the Sept. 11 attacks, the Water Bureau accelerated long-dormant plans to bury the. reservoirs and put park land on top at a cost of$75 million.The city also plans to pay$2 million to cap two drinkingwater reservoirs in Washington Park. The EPA's proposed regulations, expected to take effect in about two years,would require Portland or any city that wants to maintain its open reservoirs to get a state approved risk mitigation plan.The plan would be required to address physical access and animal and bird waste. Kathryn Mallon, an engineer with Montgomery Watson Harza, said her firm looked at the proposed federal regulation, reports from the Water Bureau's security consultants,and 1999 Environmental Protection Agency guidelines for open reservoirs in concluding that the city would have to have the deep setbacks to get the plan approved. The 1999 federal guidelines use Washington state's regulations on open reservoirs as a model, and note that the state encourages.50-to 100-foot setbacks,with fence heights rising as the setback diminishes. But the guidelines also note that Washington state allows alternative security measures if the setbacks are"infeasible"at a given site. The guidelines fail to note that the.Washington state regulations referenced by the EPA were changed two decades ago, replaced after popular outcry with regulations that allow more flexibility.Today,the regulations don't reference any setback numbers,says the state's Department of.Health. The Washington state rales have allowed Seattle to maintain one reservoir—at popular Volunteer Park in the Capitol Hill neighborhood—with a 10-to 15-foot setback edged by a chain-link, barbed-wire-topped fence for decades. The site also has closed-circuit video surveillance. The fence is ugly, said Eugene Mantchev,water capital plan manager with Seattle Public Utilities. But it does maintain a spectacular view from the Seattle Asian Art Museum of the reservoir and http://www.oregonlive.com/printer/printer.ssf?/base/news/106621943125920.xml?oregonian?lcg 10/21/2003 OrggonLiye.com's Printer-Friendly Page Page 3 of 4 the Space Needle. "At the time it was a welcome relief because the alternative was burying the reservoirs," Mantchev said. Washington state requires long-term replacement of all open reservoirs. Seattle,which has six open reservoirs left, decided to accelerate its replacement plan after the Sept. 11 attacks. Oregon is not mandating replacement. Dave Leland, manager of the Oregon Department of Human Services drinking water program, said Oregon health officials prefer buried or capped reservoirs for treated drinking water. Oregon and the federal government have banned new open reservoirs for years. Portland's open reservoirs are"obviously"a security vulnerability, Leland said,and meeting the intent of the proposed EPA regulation looks"very challenging." Leland said in an April letter to the city that the reservoirs would need control of public access and increased.setbacks to remain open. But Leland stopped short of saying what specific security measures the state would or wouldn't endorse. "That'd be real speculative right now," he said. Mallon, of Montgomery Watson Harza, said a small setback would provide little security, particularly given the hilly terrain around the Mount Tabor reservoirs. "You tell me how a camera prevents intentional contamination,"she said. "You tell how a motion detector prevents intentional contamination, or how a guard does that. The only thing that keeps people away is a fence, and even then you can throw something in." Such reservoirs vanishing Nationwide, open drinking.water reservoirs are rare and disappearing. Even before the Sept. 11 attacks, many utilities were replacing them for basic water quality reasons, including fears of bird and animal contamination,dirty rainwater runoff, and human pranksters. A late 1990s EPA count found about 140 open drinking water reservoirs.A more precise count of utilities that serve more than 100,000 people found 48 at 16 large U.S. utilities, including Portland and Seattle's, 10 in Los Angeles and five in Baltimore. Of-the large utilities, at least half intend to cover, bury or decommission their reservoirs,which would leave at most two dozen open.Among the cities with..plans finished or under way: Seattle, Los Angeles, Santa Barbara, Calif., Tacoma and Salem. Most of the rest are at least studying the issue. Officials in Baltimore would not comment on their plans, citing security concerns. But the city's capital budget indicates it is studying whether to cover, downsize,decommission or replace the reservoirs. "If you look nationally, one way or another they're eventually going to get everybody with some rule or another,"said Martin Adams, director of water quality and operations for the Los Angeles Department of Water and Power. "The trend is no open reservoirs." Almost all the remaining open reservoirs at large utilities have significant access restrictions,with nothing near the walk-up access at Mount Tabor's reservoirs. That extra measure of security gives those utilities more flexibility. But there are exceptions. Pittsburgh planned to cover all its reservoirs but backed off on its easily accessible main reservoir in Highland Park after public protest, instead installing a $14 million treatment plant to meet state standards. http://www.oregonlive.com/printer/printer.ssf?/base/news/106621943125920.xml?oregonian?lcg 10/21/2003 OregonLive.com's Printer-Friendly Page Page 4-of 4 The plant,with a capacity of only 20 million gallons a day, cut the amount of water that could be drawn from the 120 million gallon reservoir. It wouldn't remove all the potential contaminants Portland and security experts cite. Unlike Portland, Pittsburgh's treatment regimen —using more potent free chlorine throughout the system instead of the more long-lasting combination of chlorine and ammonia—will allow it to avoid getting a state approved risk mitigation plan for its reservoirs under the proposed EPA regulations. Rochester, N.Y., has two open drinking water reservoirs in parks with walk-up access. Rochester also treats with free chlorine and doesn't have to submit a risk mitigation plan. Portland can't use free chlorine without re-treating the reservoir water at great expense,Portland officials say, because it needs to maintain disaffection throughout its far-flung system. Rochester shut down one of its reservoirs after the Sept_ 11 attacks,but has since reopened it during the day with boosted video surveillance and increased.barriers to cars.The other reservoir is too integrated into the park to close off,but its water is easily isolated, said Edward Doherty,the city's commissioner of environmental services. Doherty said.the city has shied away from covering or burying the reservoirs because of the cost. "We recognize it could be something we have.to deal with in the future,"he said. "But as long.as we're not obligated,we're going to at least postpone that issue."Scott Learn: 503-294-7657; scottleam@news.oregonian.com. Copyright 2003 Oregon Live..All Rights Reserved. http://www.oregonlive.coiWprinter/printer.ssP/base/news/106621943125920.xml?oregonian?lcg 10/21/2003 01 Rp JOINT WATER COMMISSION HILLSBORO, OREGON On Behalf of WATER Hillsboro, Forest Grove, Beaverton, Tigard, Tualatin Valley Water District, Managing Agency and Clean Water Services RAW WAT R PIP IN September 16, 2003 A Presentation for the Visiting Samarinda, Indonesia Delegation International City Managers Association k •��,� �-� Resource City Programs i • JWC Project Manager: Joe Thompson • MSA Project Manager: David Leibbrandt MmK Smith&Associates,Inc. Engimeers�l'lanners M A121 CH2MHILL Wan Soon,SAO P'IRX503??s.9022 Scoggins Dam Outlet Poland,Orcgai 91?0�29?0 Et1503.�'i.902� JOINT EXISTING � WATER ...... PROPOSED RAW WATER PIPELINE COMMISSION ow Raw Water Pipeline SupplyExisting JWC Water Proposed ConceptualOverview TRASK RIVER JWC DIVERSION BARNEY RESERVOIR CITY OF HILLSBORO HAINES FALLS INTAKE (O.F.ELEV.5591 1 PROSPECTIVE FUTURE JEE FAGS TRANSFER TUNNEL FOREST GROVE CLEAR CREEK WATERSHED > HENRY �^ \---ti SCOGGINS DAM�f9 c9cF� HAGG LAKE PROPOSED RAW 1 ROAD 1&0 WATER PIPELINE Y FOREST GROVE PRV 8 HILLS 1& 1 VASE METER STATION SINS DILLEV 09MG _ FOREST GROVE WTP& S(1PPLYL1NE SCS' RESERVOIR r j.�� 5 MG RESERVIOR JWC/TVID = SF—SW Hyyy 47 v RIVER INTAKE SPRING HILL RD ''N N ♦ i� --- 1, JWC20MHILL G RDD � �'HILLSBORO FERN HILL RESERVOIR '�f 12 �CS3C a 18-INCH DIA SUPPLY LINE (O.F.ELEV.520) TO BE ABANDONED • JWC � a rr WATER TREATMENT/ JWC HIULSBORO/FOREST \ TUALATIN VALLEY WATER DISTRICT PLANT(WTP) +1 JOINTCOMMISSION MILLIONMG • >„ O.F.ELEV. OVERFLOW SURE REDUCING VALVE • kT1N VALLEY IRRIGAnON WN VALLEY WATER DISTRICT aR TREATMENT ❑ Extended Project Overview *WmElt JOINT WATER PRELIM1NARYCOMMISSION Figure 2 Raw Water Pipeline .� . r Extended Project Corridor O '` Overview #. , ,If ,r ;, _. u _ PNRIOSPPECTIVE CORRWR FOR MW WATER a i _....;" .....�.,.. f'_,.*n t�i'.....,..5 PWI Whip E EXTENSION CWS FOREST Q(iUJEx r.11 r fit. r JULY 1,2000 r AREA r CH2MHILL ; r ,, 1 - "FOREST GRO MM � I .�! /�, „ ' ''_ •� ,,moi ;CWS FOR ST I� OVE S � R WWTP 1• P "+ %ISTINGFORESTGR&V , HILLSBORO JOINT SUPPLY LINE y' _ ,VICPIRY OF RWY47IOtD 7UNATW VALLEY HWI` PROSPECTIVE CWS � • rO TUAIA7INRNE+1811801 RWPEtTENStON ' i.� TVIDIJWC RAW WATfR ! �►+ INTAKE AT SPRING HILL t �,/' .,,�; T•,yr' 1 a; .4 { PUMP STATION .a? l JWC WATER EATMENT PLANT FER OPOSED �IwBIOM OIR I OS�PECTIVE TUALATIN RIVER T1iANSFERTUNNEI "= RFIQ HRL80M HAMM PALLS TRFATi,EM PI/IP(f PROPOSED RAW WATERJ� I ll`� 7'�` }µy'e��•�� j••• ~� E70HWATER ,�'•- f L PIPELINE(VARIOUS ROUTING ' PERI a ALTERNATS) NE ��Zu/l1VN I Y` SCOGGINS (PROPOSED DA00 t 1 GI 1 1 .uw.+•+..... ... «,. «``"`t`Tr ` 1 �*'� W�•' r III: - •Au I,L- //'S./" `.�") $ N:L _ � INS CRt EK '•'�... � . . ?+yam • SC.000I 9 VALLEY ROAD '. ' .. CORRIDOR,OLD TUALATIN �,• T\��,--'I`.... .—t. VALLEY HIGHWAY AREA 1 w 'e.`` r"7! VIEW WEST ,1 L .` LOWER vl `« ROAflhTATE Ey�T- HIGHWAY47INTERSECTION i• _ T' 9C000MB OAM,UPSTREAM CONNECTION __ '�'" I,• ~�"� �;. .J POINT,ANDSTWONMILLAREA � GASTON ❑ Extended Project Overview (Continued) - - - 66 - r....:. ». KEY INTERESTS- �_. �_ + •BASIN WIDE WATER RESOURCE MANAGEMENT t y ,....,_ !' / "T 5 �-f •COORDINATION WITH OTHER ONGOING -\ a I � - y J� UTILITIES&FUTURE JWC PROJECTS HILLSBORO- , yII M1 '�' !+ � � .I rJ�.- J� �" •WATER SUPPLY&DEMAND FORECASTS COORDINATION WITH OTHER REGIONAL 7 • _ I�l ij'_l,3] _ I - WATER SUPPLY PLANNING MULTI-AGENCY PARTICIPATION KA _ YS&N EASE ! i ^ - I; �{ •ROUTING ALTERNATIVES&PIPE SIZE FARMLAND 6 TUMATIN RIVER,PROSPECTIVE MW WATER MPEIINE OQENSION V ;t!y i• <,� ;'.:. { .; +r� AupiNA(T �nff t' (' , �� Ft I •ENVIRONMENTAL IMPACTS&PERMITTING BN SFr „ STREAM FLOW&WATER RIGHTS.. y,r1Jr _ i � 11` HILL580R0 �.i.�+ T� �:; J ..f.�•) i �w INTERESTS I ;` I_ y WW1 P •• r ' •LAND USE IMPACTS&PERMITTING ... •• ��:;-�- -r. ' FINISHED WATER - - '' �,,.. L. R .+ ,<'r-�� 9 1 •PROPERTYIROW ACQUISITIONJ _ tPIPEUNQt 1 J i f.. PROSPECTIVE MW —'� , I ,. AL y •FARM&BUSINESS IMPACTS WATER PIPELINE R SION(S) MOT.(VARIOUS i 3.! ` r VALLEY • OT.COUNTY ROADS&RIR INTERESTS ROUTING ALTERNATIVES) .a- • "f 1,. WATER •DESIGN INTERESTS ............42' DICT LOCAL COMMUNITY INVOLVEMENT --- 1`� ���L��'I �••t,. ��Y{�f4 -n•� _ L TRUCTION ISSUES&IMPACTS CWSTO 7ECT COSTSIIMPLEMENTATION RAMNUNG EXPANSIONS • l ,i .ill BEA VERTON ° r. ... �. { +' ` PROSPECTIVE ..S r t LEGEND EXISTING 45• SECOND JWC FINISHED WATER PIPELINE, ALTERNATIVE RAW WATER PAL r IAEATM[M l ` i { PIPELINEAIJGNMENT(S) PROSPECTIVE CWS PR CTIVE WATER SUPPLY TER M1 PROSPECTIVE RAW WA STREAM FLOW EXP 10 T 0:, ,.,. PIPELINE EXTENSION AUGMENTATION _ ALTERNATIVE(S) .......»..... `1 ? ` • - +. ED WATER �•- - `. f { ° OU N( TRANSMISSION PIPING I �. VOIR q, Ly Jl WATER TREATMENT PLANT ■ ,:. Mm WASTEWATER TREATMENT �- '..._ PLANT(VVWTP) NWNOMISTTO - �' MOLLMJ\PIPELINE -i ^' FINISHED WATER STORAGE • CORRIOM T RESERVOIR RAW WATER INTAKE FACILITY VIEW VYESi, EXISTING WETLAND -'! ,;, '. - - _� SCAM IM onsre+c nvc WATER aEAn+er amort I I� I µ -- J EXISTING FLOOD PLAIN ❑ Joint Water Commission Basic Information • Agency Formed 1979 • Current Partners: Hillsboro, Forest Grove, Beaverton, Tualatin Valley Water District (Tigard PENDING) • Interfacing Agencies: Clean Water Services, Bureau of Reclamation, Tualatin Irrigation District • Water Sources: Scoggins Reservoir/Henry Hagg Lake, Barney Reservoir (Trask River), Tualatin River • Current Population Served 80,352 (2003) • Current Water Treatment Plant Capacity -- 60 - 70 million gallons per day • Finished Water Storage -- 20 million gallons • Current/Pending Projects -- Finished Water Reservoir Expansion, Raw Water Pipeline, Scoggins Dam Raise, Sain Creek Tunnel, Water Treatment Plant Expansion ❑ Raw Water Pipeline Functions & Values/ Purpose & Need • Operational Efficiencies and Flexibilities • Stream Channel Stress Reduction/Summer Bank Overflow Protection • Raw Water Capacity Expansion • Source Protection/Vulnerability Reduction/System Security • Energy Conservation, Water Conservation and Cost Savings • Energy Efficiency/Small Scale Turbine Generation Potential • Water Treatment/Chemical Cost Reduction • Water Quality Enhancement • Potential TVID Operational Cost Reduction ❑ Water Demand Forecast Overview POPUTAnON P511fDAY0EYANDMOD) _-- POPULATION NOrtrNPPAItMYDBIMD�AGD) PLAINS, twx JOINT 0MENT(Z000! uLmuTE IXRtlIBMr ULTIMATE TUMIATwVAL1erWATER wYAre oxw � '76° - -""- .-- ,�,_-_ }a , cunae7r a4o POPULATION f oEMAID2 COMMISSION ='210—_1_ — 1&%420 221A6M 46z 70., 1TER Figure Raw Water Pipeline rox —� roPrAAT _ a oAYouNDAlr�r F0F*Vae- RAb I WRRBMi( �a6 wwretr�2ovo ro ► __-- c 1 " JWCandInterFacin Washington wlca aa7x aw, I 1 ( waui4aro x70 s47o . r--.._j � I , 8 St wATT6 aurnr 1,1 _ ,_. - - -- - -- _.___ s, l �` r 1 County Water Supply System FO a�OF&wAr c».,,e°�'I I i. . - �, p J=-' -' Overview&Water Demands wur,EnAwT - JMLY2002 _ f _ FOIEOirOf10VE p ��i ILLSBOF/0 u(, auromwo Ctt2MHILL POPULATION _ 6RESTt OVE , - CURRENTx006) ULTMATE C40YENf utTMIIUE _ �_- _ aano- �"TaT ' _`I 10.071 I—PEMDAYDEM-NDOW80) - -- SUPPLY F7i0e1 JOYC 6.06 1212 �, ' ` '<. (� '{. TYh o!' 'I � ��- J POPUlATN7N —PEN(DAY DEMAND QiM IYWAYL 6avwAra AME i ro ' WRRl31T(2006) ULTOMATE CURRHMT U.nMATE ff nur TM 61,599 x,7aa ts5e AMC W mTA7 W FIB/ON A SCJ GNB I 4 t IiES P • C M ` r I / - ppdOttl EVANS AYI 7�A � J(yy 1` 6000("OMII�r '1� - 4\� - e6eM, - -_ TONA�aFALu�. 0"°0aiiea6' , } PFD00801 FOOD from m -MTEA w.6w0 Atata+„i,mAw-BEAVE ON 1 / . M � Uff ANDWATER F1YA16,�/lBIEMW I ,T a1rPR TKANENTOeA61 �N r� •' Y � r- - 3. SWM" .dRLv �( TI +1 i IN— �\ II 'fl WAR �. 1�i i. nwYu,¢v wA TNOr SERVICE T I nan&neer ilrrcOne i -'^- - PRELIMINARY NnE uAan,tEr l t , h N REVISED TDARD A3 I W POPULAnDN PEN(DAY DEMAND OMWJ OFA,F ND.a Oj aaYO 'i _7r' --t N WMao xMnY �.�.r L- JULY 11, 2003 I--F �Y'NNOTON WIWTY C%IfiA1442000) ULnMl11E F WRNBlT uLT16NTE x', N yN1 40,1" 06.747 i266 20.10 "1( 1, r I _ 1-Dern LEGEND � � � ��M�� .� ,ow0 aarvKt F7®,ma FI,O►oem j dB,WID OUMMARI'WIM'C OYtE2E21) '' \,;-- .__ { �.� - ":r oon � �. PDI6IRMLOAWYONMI ------ TUAL[� � PEMKMYOEMA11DMaD) '•-".,,,1 ,f r(�.''• %OAU Mnnt. - --r�,., i•. ' I '1 PrrLOeeAua67e11a WNT61T66MIe3/TPlANfO'OFr CURREiT FURNOi " IROM'B,IORAW/YM191 --- , FrAWOMMERMN YWIOIROB171000IOORPUMMMP) BEAVQOON 10Mie 2102 I I �•..- ', I _ FOREST OROYE e.o6 1212 `I I i� TuauTIN , afYOFerANOOON (--� 1NMo016eI1010Me0ogBN001 MDDI POPULATION PEAKDAY DBMNiD -_ pARAalYA/0060010WEMM1110e HR1800RD x.70 6(70 arvOFPaILLsraxaE O Oo1oA1� plaeMM1 ' _IuF$11trl�tyetMU � RRENf(100�D) mto — _FOUNT urnMAr eTVWD :ICU u7.x06 2.6oCI19.81 TOTAL 70MI NA! 126x60 U"OFalsan MTAPDNa _ fy aYOFNONINMAM 0 000aq ONKS M111100910R,118[IeDIJ1Y TIOARD NORTH RAINS OAS 1A aIYSHSN/0SUPPLY FROM JNIC_ 0 : 00 ,6.x 20.10 _ _ _ - n.r.6awNpMw2rYIRru6R . TDTALtvrtrlTaiim --, �J` �--=�' ^� r {I CRY TUAIATN I.� � WIOINPHIMLYx71d1®1 AND NORTH P1A010 06.56•xAM 106x --- _._., _ SHERWOOD I �^ N09MOE0®IOI1iY1LK 061 067 SHERWO 0 0 POPULATION PEAR DIIYOEIIMDO ��- asMem0uR4�'a0r LVE I CURRENT PM � 2x0 CURRENT 2ae6 ,a7Alowx,aeema: L� l7 ❑ anL3iwooD 650 7.70 ARTd1 -_ 12.040 "An 6.60 7.-M - --'—, -•_. �TM�YYMa, � TOTAL N.06•M.06 17056 _ _ _ .. ❑ Raw Water Allocation Summary Table B Raw Water Flow Allocation Summar Peak Day Raw Water Demand Agency Current River Channel Conveyance) Additional Future/Long Range Totals mgd cfs Comments mgd cfs Comments mgd cfs TVID pumping capacity at Springhill Pumping Plant. TVID expansion not anticipated. TVID 95 148 Does not include Patton Valley Pump Station 95 148 transfer flow from Scoggins Creek. - Current rated capacity of Fern Hill Road Water Maximum demands include Tigard's ultimate peak day JWC(and Potential Treatment Plant,60-70 mgd. Normal peak season flow of 28 mgd(current peak day flow of 14 mgd),North Additional Participants) 60 93 July/August. Stream diversion capacity limitations Plain's ultimate peak day flow of 1.4 mgd(current peak observed on July 1,2003. day flow of 0.9 mgd),Sherwood's ultimate peak day flow 103-113 160-175 of 8 mgd(current peak day flow of 3.5 mgd)and a 9 163-173 253-268 Tualatin River withdrawal at TVID/JWC Springhill mgd ultimate allocation to Tualatin. Demand data for Subtotal 155 241 Pumping Plant. the City of Banks to follow. Estimated peak day release rate for in-stream flow Potential allocation for cool water injection of water augmentation from Barney and Scoggins Reservoir, quality enhancement flows. CWS 116 180 65 100 181 280 Reported Tualatin River channel capacity between Prospective Raw Water Pipeline capacity,300 cfs. Scoggins Creek and Gales Creek,approx.300 cts. Subtotal 271 421 Staggered flow management avoids bank flooding. 168-178 260-275 439-449 681-696 1 Total Raw Water Supply(River Conveyance& Raw Water Pipeline),All Uses ❑ Preliminary Routing Alternatives QW1, JOINT LEGEND16-1 WATER °ROADWAY'ROUECOMMISSION 'CROS&COUNf'RY ROUTEVII/_'�. Figure 3 ■ ■ ROUTING VARIATIONS ,,,•' j , •aTnnEnes�s w ip w..w. "�:•. J e F•"♦ ENVIRONMERALIMPACIO • Raw Water Pipeline ••••••••••• EXISTING FINISHED WATER •L 't • TRANSMISSION PIPING ` Ns ' wsI yCORRa �] tJOSRNG WETLANDS 4W.1✓ :' _ % L%1�, •nunnN wvEnc ND 4 g Pre'.,,,.N�^.7 Routing Alternatives _ _ --- w wO&Rnoo RAW NIE 6rS • � PROSPECTIVE PIPELINE CORRIDOR - !,� �• -FARMLAND AND ENVIRONMTMAL WPACIS jWcnw f 4 i ��.) 1 - n^-� i .•�—RAW WA May 28.2005 ., .. j7 :.,- • I 'ItT i 3 { �� �• 0+12'S?tet ffLL � r 1�`n`7! 1nvcWATER�Acurr Ac MSA • AlF 410 10 • •'• • • • PRELIMINARY * :. y��, •� w.. ., . 40 10_ EFfiN Rlll� BCOOpN8 vAl1EY„O.AU COIIWpNt � ♦ '�• �•� IRESERYDIR •OWFIC NPACIBTO BDL60N MILL AREA •, - r.s. /TNUED MINIK7N •PORRAND&WESTERN PA4ADAD -YKN ROIDWAYCORIROP.ROCRPOiENILLL NFi AYS CRRIUUN - -' c, RADG •STET-rTOPooRAPIrcTO ND„TII .Door caDRDNATaNaPEwrrnND - �,,,� 1 .,,. •E0.411Na 12 DM WAlEBINE IN ROADWAY •DOAED„WY&RA&NOAOGR069NO9 r ♦ T ��� , .. 1 •DRAWAOECRISSNO&WETIAI WA.CT6 .� I .GASMNoawE FORCE IMARoAST&DE ._ OASRMN 6EYlf31 FORCE MAN!EAST RDE OF �.: •'IOPORIAPISCNNi,POIENOAL .� ' FRORAUOC COfa4TRASTRA Nr n .� _ I , �� � � FEANHLLWAIETi TPFATMEHr PIAND 1. DO'M131RENI ENO CONNECTION i � J "� _ .amu / \\\ � �, I � •CONOE4f®11IR71Y CORYDORAIDNO y 4 (r/ O " ♦ 1' I- FDW NRLROXI • � d 1 _.', T-' � ` ... ��� I, I+ FHN n&N.TLrAO CDRRIOORMEY FAsry:. EXISTING CWSQAIrrDN •��g+ A> .T�usnNa rvro PIPINOONORr„ W rT :v _.I. .! °• j I FORM MAN Nff --_.-._ .}' , ''fir K'i"TjA I 1 •emw avawT:AD POWER LIAES MWM Sffq 1 EID RNO NN®FlBEiCP CtsOUDIS iM. •N.TEBNAl=WNCOUNIRYROUTE _ .. - RCNDRnYY.I)MrERe I <. ACNOBBBIIMSONMl1PROPERIV PLAIN CONSTRUCT" 'F L•OMWIEIRBACCOCCaEOSNS&POVABLLETYO K%S LA EPAR& TH RALTEBXTECfOS I 11 _ 1000 It YODO 0DUNTceYC .i 1 , •'. '. i ) •CONOFSTEDIfDUTY CORRIOORAIDNOTTOWAY0 rIN i ❑ Engineering/Technical Interests • System Performance - Capacity (current and future) - Operating conditions (reservoir level, gravity flow) • Topographic Constraints • Groundwater Conditions • Physical Conditions/Construction Constraints • End Connections/Future Extensions • Other Design Considerations • Cost JOWT 0n41 --- -- --- ., i PRELIMINARY RAW WATER WATER PIPELINE ALTERNATIVE IRRIGAT ON DISTRICT Figure 5 'TELECOM CABLE PACIFIC -41Raw Water Pipeline ———————CLEAN WATER SERVICES - .._ S'SEWER FORM MAIN �1 �� WATER SUPPLY .1'�• , 0Composite Utility Mapping ----------- AT&T OVERHEAD CABLE VERIZON NETWORK POE OVER11EAD POWER -tomL.A.WATER COOPERATIVE LOCATION OF ALL LITILITIES SHOWN ARE IF fit �► _ Mgt M. 1 Li Easement Requirements 1 H 11 lk 0 12' (DEPTH VARIES) 20' VARIES 25' VARIES 40' 1 15'-150' RECOMMENDED MAXIMUM,CONSTRUCTION ZONE = 150' MINIMUM CONSTRUCTION ZONE = 60' CONSTRUCTION EASEMENT/RIGHT-OF-WAY = 60'-150' PERMANENT RIGHT-OF-WAY = 60' TYPICAL CROSS-COUNTRY CONSTRUCTION EASEMENT PARALLEL 72" P I PE TRENCH SCALE: NTS 41=Raw Water Pipeline JOINT 01 WATER COMMISSION index Sheet Aerial Mapping Alternative Route Analysis Workslect PWSPECTWAUGNMEM .. - 1 ALIGNMENT7. T q, 4 I V N71 X I v 11 `�- ' ❑ Property Inventory Worksheet Of 4% JOINT WATER COMMISSION _ - yItATER FIgure 6 v, Raw Water Pipeline I� JIMIDWATER — p�� tnr Prelimr Preliminary Routing/Property �METRO F_ Inventory Worksheet to ao0D ___ -- _✓ ,f $c —r MAY 2,2003 NSA %0 -------- METROHAGG LAKE UP AT DAM ■ / L\ / I 1,7t Z I / — J • A \ � LEGEND L3 Property Interests (AVLl OWNED AND ---- SAME-OWNERSHIP PROPERTIES • "Friendly" Acquisition Opportunities _ (—I— -- . _L__t �_ ALIGNMENTS PIPELINE 0.LIGNMCNT$ • Property Valuations �- 7 PIVER/5'REAn Minimization of Impacts ❑ Permitting 'Interests • E!nvirmmental/Wetla des "Sectiorn 404"' Corps/DSL Permitting Process (Pendiing . ...Phase 2) • Land Use (Washington County) • Highway and Railroad (ODOT, Washington County, Portland and Western Railroad) ❑ P ro f ect Briefings • Tua]atin Valley Irrigation District (March 11 ) • Wasihii,ngton County Parks Division (March 11 ) • Stimson 'Lurnbe+r Company (March 13) • Wasbingtoln County Land Use and! Transportation (March 17) • Portland and Western 'Railroad (March 26) • Oregon Department of Transportation (March 28) • Tualatin Valley Soil and Water Conservation District (April 8) • Metro Reglional Parks and Greeinspaces (A,p,ril 10) • Public Meeting No. 1 (April 12) i Washi gton County Farm 'Bureau (April 15) • Washington County Parks Advisory Board (Apriil 17) • Public !Meeting 'No. 2 (May 28) • Tualatiin Valiley Water District Board • Tualatin Vallley Watershed Council (Pendliing) ❑ Cost and Programming • Staging Options 1 -72-iinch, diameter p,iipe (EEiimited capacity) 2-72-inch diameter pipes (lo,ng-range capacity. . . . . .potential staged construction) 1 -96-i+nch diameter pipe (lo,ng-ranige capacity with initial construction . . . excess short term capacity) • Punned Pipeline Capacity -- Approximately 3'00 cfs/190 rng ' at reservoir draw down • Cost Range: $40 mullion — $80 mill'ilon, depending on staging scenario o Summary of 'Preliminary Comments & Interests • Environrm.eintalInterests - Wet'lands - Groundwater hydrology • Traffic Interests - Minimize disruptiion to Stimson Mii;ll operation and reservo,i±r/park/upstream activities. . .avoi;d construction in Scogigiins Valley Road - Avoi,d traffic impacts to reservoir viciinity residents • Business/Local Property Owner Interests — Primary Concern: Access and Traffic Impacts ❑ Summary of Preliminary Comments & Interests (Continued) • Ag ricultu ral !interests - Drain tile impacts - Short and long-term crop production effects Easement restrictions on farm use Location of pi:pe,l i ne surface structures - Property valuation methodology . . .fairness - Land use reguilatio�n com,pliance i • other Interests Build now for boing-term capacity. . .avoJd future disruption esign forgravity o.peration . . .avoid pumpling costs and inefficiencies Design to. minimize construction cost Avoidi,mpacts to Hagg Lake Park activities oI Work-in-Progress/Next Step • Detailed Routing Analysis {Undeirway) • Preliminary Environmental and Geotechaical Reviews (Underway) • Preliminary Cost Assessments (Underway) • Preliminary Reviews w,it h Staff, Agencies and Public (Underway) • Preliminary Propeirty Owner Contacts (Underway) • R,eviews of Preliminary Staging Options (Underway) i • Detearmination of Apparent Preferred Alternative (Pending) • Draft Report Deveopmeint (underway) • 'R.epoart Presentatim to JWC & Public - Diraft — October 2003 - Publi,c Meeting No. 3 (November 2003) - Fnal — January 2004 - PublicMeeting No. 4 (2004) ❑ Engineering Program Overview Phase b Phase 2 Phase 3 Phase 4 Routing Study Pre-Design Final Design Construction Phase ❑ Water Supply ❑ Preliminary ❑ Engineering ❑ Construction Planning and Engineering Design Management Integration ❑ Permitting ❑ Drawings and ❑ Field ❑ Pipeline Routing -Water Rights Specifications Engineering Ll Environmental Environmental. ❑ Construction ❑ Special .;Assessments, LandUse; . Bidding and: Inspections y;- iPerm�ttmg x. - Roads Award ; :� `:❑r;;;Enuironmenfal , Assess Vents. w 'Ag' ads 0, Construction Monifor f Goststirrtates' 0❑irROW 'Sequencirig: i 0 Projeict;Startup. _ A q; isitior C �I *.Plan+, �: 0��Tinal''Pay.! ent" iCost Updates! & Closeouf-` a S p r ` Property/ ROW Acquisition I A enc Y Approvals rovals - 9 Utility Relocations by Others Interagency Coordination/ Utility Coordination/ Public Information Identify, Address and Resolve Project Key Issues ❑� Questions & Answers/C I ose 4 4°RTL.1 Dan Saltzman,Commissioner a° °�„ CITY OF Morteza Anoushiravani,P.E.,Administrator x '1120 SW 5h Avenue itEGON Portland,Oregon 97204 PORTLAND, O Information(503)823-7404 BFax(503)823-6133 8 6 1 BUREAU OF WATER WORKS TDD(503)823-6868 September 22, 2003 To: Interested Water Customers From: Mark Knudson, Director of Operations and Maintenance Subject: Groundwater Shut Down We started shutting down the groundwater supply this morning and expect to be back to using 100% Bull Run supply sometime this afternoon. It will take about 4- 7 days for this change to reach many of our customers since some groundwater remains in the system until ongoing demand consumes what is currently in pipes and storage. We ran the wells as a supplement to the Bull Run supply throughout the peak season, starting July 22. The blend was typically about 60% Bull Run to 40% groundwater for the last two months. Using groundwater helps extend stored water supplies through the peak season. Current forecasts indicate reservoirs may start to refill within a week. Switching over to 100% Bull Run is typical supply management for this time of year. As we move into the fall, groundwater also helps offset seasonal color in Bull Run water. Seasonal color may be more obvious to all of our customers as we make the transition to 100% Bull Run. That, too, should abate as the rains resume and the reservoirs refill. If you have any questions regarding water quality, please call our Water Quality Information line at 503-823-7525. An Equal Opportuniq Employer �. sin-mom Benefits of Scoggins Darn Scoggins Dam is located on Scoggins Creek which is a tributary of the Tualatin River. ! Provides flood control, estimated The dam was built during 1972-1975 by the at $1.9 million annually for Bureau of Reclamation. The dam is operated Gaston, Forest Grove, Cornelius, and maintained by the Tualatin Valley and other downstream communities Irrigation District via contract with USBR. Provides 5.5 billion gallons of water Scoggins Dam, like all Reclamation dams, Tualatin Valley is routinely inspected under the Safety of Irrigation District T improve water quality in the Dams program. A law passed by Congress Tualatin River from May to in 1978 specifically directs USBR to identifyWELCOME TO November all structures that pose significant risks tSCOGGINS ® Provides irrigation water for 17,000 public safety, property, the environment, or acres which produce an estimated cultural resources and to take appropriate DAM $119 million of crops annually measures to reduce and manage the risk. 0 Provides municipal and industrial Henry Hagg Lake, formed behind Scoggins water for Forest Grove, Hillsboro, Dam, provides opportunities for fishing, Beaverton, and Lake Oswego boating, and swimming. There are boat Managing water for the Corporation ramps located at Scoggins Valley Park. Tualatin River Basin • Provides 600,000 user-days annually for fishing, swimming, and ', " ' ` ''�`_ boating Maintains in-stream flows for steelhead and salmonContact us for more information x U.S. Bureau of Reclamation •. Lower Columbia Area Office �'" "° • "' ' 825 NE Multnomah St., Suite 1110 • • '- • Portland OR 97232-2135 (503) 872-2795 SCOGGINS DAM WHAT IS A DAM? WHY ARE DAMS BUILT? Scoggins Dam stores water in the A dam is a structure built across a water Here in the Pacific Northwest, dams winter to provide water in the summer. course for the purpose of storage, control, have helped foster economic It is used for irrigation, municipal and or diversion of water. development. Early in the 1900's, dams industrial uses, water quality control, and the water they stored and power recreation, maintenance of fish life in Dams are built from many different types of they generated helped promote the Tualatin River basin, and materials and in many different ways. All, settlement and the development of conservation of wildlife resources. however, are designed for the specific agriculture, cities, and industry. conditions where they are located. Each is In the winter, Scoggins Dam provides unique. Today, Reclamation has 60 large dams flood control to communities located in the Pacific Northwest. These dams downstream. The dam controls runoff Scoggins Dam is a zoned earthfill dam. This provide water for thousands of irrigated from only 5 percent of the Tualatin means there are several layers or zones of acres which grow orchards, vegetables, River basin. material which act as a barrier forming a wheat, hay, nurseries and many other reservoir called Henry Hagg Lake. crops. At Scoggins Dam, earthquake activity, Zones of Dam temperature, snow, and precipitation Ten Reclamation-owned dams in the are recorded electronically. Reservoir Reservoir Northwest generate more than 23.8 water surface elevation and river gauge River billion kilowatts of hydroelectricity. data are also tracked. Many of these Tualatin Project Information electronic reporting stations have http://dataweb.usbr.gov/htmi/tualatin.htmi alarms to alert operators if unusual Scoggins Dam Information conditions develop, such as flooding. http /dataweb.usbr.gov/dams/or10020.htm Scoggins Dam was built with 3.7 million Stream Gauging Station Information cubic yards of material and is 151 feet high. http://oregon.usgs.gov tualatin/streamflow/ The width of the dam at the top is 30 feet http://www.co.washi7gton.or.us/deptmts/ and it is 2,700 feet long. When the reservoir wtr_mstr/str_grph.htm Foree, P� LAND is full, it covers 1,132 acres. It was built row Cornelius 8 Hillsboro during 1972-75 and stores 59,950 n tt Tualatin //ww.t wc.org�Council HENRY row acre-feet* of water. LAKE Weather Links http://www.nwrfc.noaa.gov/ on Tuaia�f Lakehtt /I�ampa.earthsci.do.usbr.gov:8080/awards/ Rrvel '�' Dow OrI Jalatin.html N herWOod -5 *An acre-foot is a volume equal to one foot of water Scoggins Dam and Henry Hagg Lake are located covering one acre of land. It is 45,560 cubic feet or • • 30 miles southwest of Portland off State Highway 325,851 gallons. 47. �9 GtONAI 01 MONO MUM W City of Beaverton 503-526-2222 -_ - Boring Water District #24 503,-663.4594 Clackamas River Water 503-722-9240 ` F City of Fairview, 503-665-9320 ® City of Forest Grove 503-992-3228 J'~ City of Gladstone 503-557-2766 S ® City of Gresham 503-618-2668 --— — - - a.�d. . City of Hillsboro 503-615.6732 City of Lake Oswego 503.635-0257 t Metro 503.7974932 City of Milwaukee 503-786-7616 City of Newberg 503-537-1240 +, Oak Lodge Water District 503-654-7765 City of Portland 503-823-7513 A � _ _. f." Powell Valley Road Water District 503-761-5011 Vim Raleigh Water District 503-292-4894 eq Rockwood Water PUD 503665-4179 City of Sandy 503»668.553 1 a � City of Sherwood 503-642-1511 South Fork Water Board 503-723-9692 Sunrise Water Authority 503-761-0220 ® City of Tigard 503-639-4171 City of Tualatin 503-692-2000 ' =r Tualatin Valley Water District 503-642-1511 t ® City of Wilsonville 503-570-1584 ,. -- West Slope Water District 503-292-2777 • �qrbi-atiori'a boUt'tile Regional Water .� . F • Q 1 Since 1996, THE BY WORKING TOGETHER REG 1 A L WATER the RWPC is able to leverage limited C � resources,support information PROVIDERS CO N SO R Y IUM networking and coordination between agencies,and develop regionally-based . (RWPC) has provided a conservation programs and projects that reduce forum for Collaboration summer water use—a time of year when our `, 9 3 4 water consumption is at its highest.The RWPCs on WATER Supply summer conservation plan includes a variety ofM� M �;�" programs and outreach opportunities,which consist of: resource management • Summer marketing campaign ONE OF THE MOST CRITICAL and conservation - i Education programs FUNCTI®NS of the RWPC is to implement • Regional events the drinking water supply strategy for the issues affecting the • Landscape industry partnerships Portland Metropolitan Area,known as the • Web site Regional Water Supply Plan. This plan recognizes region. Consisting of • Informational materials that water conservation plays a key role in meeting future water needs.The RWPCs conservation 23 water p-roviders objectives are to: IS Metro, the WPC ® Plan and implement regional programs to reduce peak summer water use. is involved in a number • Integrate consistent conservation messages into the daily lives of customers. of different activities, • Develop and implement effective monitoring and including: 6 Emergency reporting techniques to verify program effectiveness. Planning and Preparedness . Invite stakeholder participation in conservation for Water Utilities for development. Seek economies of scale by working together. 6 Water Conservation ° • Foster public awareness of the RWPCs 6 Source Water Protection collaborative efforts. •Water Supply Planning and To learn more about these programs or for information on conservation resources and tips,contact your Transmission local water provider or visit our Web site at:`n"n w e o n se rve H 2 o .o rg Coordination 1I V 11 V V V i E Lucky Ways to Save Water indoors How many do you do? U Fix those faucet and toilet leaks, ❑ Q Use the dishwasher and washing machine only with full loads. ❑ �3 Don't run the water continuously when rinsing How much water does an averse vegetables°r dishes 11 =1 -g Q Don't4et the water run while brushing teeth • . �r�.� g� ., household use in the home? or shaving. ❑ 0 Take a short shower,or only fila the v O - bathtub halfway. ❑ f' Don't use the toilet as a trash can. ❑ . �;, • • ' �� g D Put aerators on kitchen and bathroom faucets. ❑ �3 Don't run the tap to get cold water. Keep a Wl• O, e bottle in the refrigerator. ❑ (' , , , , g Insulate:water heater and pipes. ❑ ` • N Install a low-flow toilet,or use a displacement • , ll device in an older toilet. ❑ toile` 01 Install a low-flow showerhead. �d4cer M Purchase a water-efficient washing machine or dishwasher. ❑ s Contact your local water provider for more o water'saving tips and ideas. sewer and ' ' • kONAL El Toilet 26.7% El Clothes Washer 21.7% �,ice . • ,b ., 1 i��� � • 1• ❑ Shower 16.8% ❑ Faucet 15.7% AV Ago& on the road e ❑ Leak 13.7% O�R.S CO1�S0 11 cons. . 11 Other Domestic 2.2% o ;�- This brochure is brought to you by the Regional ` _ k ❑ Bath 1.7% Water Providers Consortium.The Consortium is comprised of 23 water providers throughout the �` • ■ Dishwasher 1.4% Portland metropolitan area along with Metro.Since J Source:American Water Works 1996,the Consortium has worked to achieve common someof the cjU�,s�cs objectives in water supply planning.Together,we have Association Residential End Uses of Water 1999. worked to further the regional role of utilities in 1 educating the public on water conservation and efficient water use practices. 7 To learn more about the Regional Water Providers / • • ��- Consortium,or for information on conservation resources - and tips,contact your local water provider or visit our Web . . rv . site at: www.conserveH2o.org i 503.823.7528 Should I put a brick in m toilet `:' I spend a lot of time in the Q Do ultra low#low (ULF) toilets ;!` Does water pressure affect tank to sae water? ' kitchen, how can I save water? work as well as older style ones? `_��_� my ability tos ave water? Not a good Idea.The brick will eventually crumble Try some of these helpful ways to use less water in They do now.In the past,some ULF toilets had Surprisingly,it does. if you live In a high-pressure and stop the flapper from seating properly,causing the kitchen: to be flushed several times to empty the area,consider installing a Pressure Reducing Valve a leak.Instead,use a glass jar or stop by your local 0 Scrape dishes without using water and don't contents.However,today's low-flow toilets aren't (PRV) in your water line.This will reduce wear on water provider and pick up something called a rinse before putting them in the dishwasherr any more likely to clog than conventional fixtures and stop excess water from pouring out of "toilet tummy,"which will reduce the amount of o Clean vegetables in a pan of water,then use that models—and they will save your taps. Another option is to only turn the taps water required for each flush. water to give your plants a drink. water.ULF toilets make on partway,or install aerators and low-flow shower On the other hand,if you have a new"ultra low J Use the garbage disposal sparingly. more efficient use of water Giz� heads to reduce the amount of water dispersed by flow"(ULF)toilet,it's already designed to use the Keep drinking water in the refrigerator instead by using gravity or the fixture. least amount of water possible,so there's no need of letting the tap run until cold. pressure,saving a typical to put anything in the tank. household 8,000 to 5 rm interested in a water- 20,000 gallons of water each If my toilet was leaking, wouldn't year and reducing water and effDo they cost in machine. c i e. I be able to hear it? sewer bills. Not necessarily.Some leaks are silent and can only Yes and no.The initial cost may be more,but with be found by checking.Try putting a few drops of How can I send Hess water down available rebates and tax credits the cost a water- food coloring into the toilet tank,wait about 15 wise machine can be brought within rangee of a the drain while I m waiting for it standard washer.Plus,these machines typically use minutes and then check the bowl. If coloring to get warm? 50 percent less energy and 35 to 50 percent less shows up in the bowl without hushing,the tank is water per load than other models. As a result,you leaking and should be flxed.To!lets should be if your faucet or shower is located a long way from checked for leaks at least once a year. the hot water heater,you may want to consider an could save about 7,000 gallons of water a year, "at-point"heater,which will heat the water closer to not to mention the energy needed to heat the the fixture and save you time and water. water.Over the life of the machine,this can < which uses.less water, a shower translate into hundreds of dollars off your water, C_= or a bath? You can also conserve water and save money by electric,gas,and sewer bills.Check with your local That depends on how big your tub is and how insulating your hot water pipes. The most dealer and water provider for details regarding long you shower.One way to tell is to close the important sections to insulate are the first flew feet potential savings. drain while showering and see how full the tub / What's an aerator and why of water line exiting and entering the hot water gets.(But please,don't try this in a shower stall!) heater. This will reduce heat loss when the water is No matter which method you choose,you can save should I Install It on my faucet? standing inside the pipe,so the warm water reaches water by only filling the tub halfway for a bath,and An aerator mixes tiny air bubbles with the water you faster and less water is wasted. using a low-flow shower head for a quick shower. to prevent excessive splashing.Because this reduces the water flow by as much as 50 percent,it helps If I.let the water run while I shave conserve water,too. ;�\ ;l Do dishwashers use more water or brush my teeth, how much - than hand washing? water am 1 wasting? ;%�f I've found a very small .leak. Dishwashers use less water than hand washing,but On average,flve gallons of water will go down Should I bother to fix it? most people waste water with unnecessary pre- the drain if you let it run. You can minimize Absolutely! Leaks are not only wasteful,they're cleaning. Modern dishwashers do a thorough job that amount if you only turn the faucet on expensive.Every unused drop will eventually show of cleaning dishes,so its rarely necessary to rinse partway,or if you install an aerator on the up on your water and sewer bill.Pius,most leaks dishes before loading them into the machine. faucet.Of course,the most water-wises' are easy to repair,so fix it as soon as you can.If To save water and energy,only run the dishwasher method is to turn the water off you want to find out how much water you're when it's completely full.Use the"light wash"cycle except when rinsing. losing,ask your water agency for a leak gauge. if your dishes are only slightly dirty. 7 a l I I) LONAI There's no doubt about it. G Summertime is water time. As the heat rises, so does 1U're ][ke most DeODie, our need to water the ,70 Ur o oor water use Soy- i . '1 �, ; �c �;_ 1-0, T ^ n lawn, wash the car and even Rs cod � � t take a swim. Unfortunately, ® the summer This brochure is brought to you by the i Regional Water Providers Consortium.The ;? this is also when our —1�T1 Consortium is comprised of 23 water . region's water supply is the • 1 1 providers throughout the Portland metropolitan area along with Metro.Since most strained. During the 1996,the Consortium has worked to achieve i! dry summer months we pull -01. _ controlled. common objectives in water supply _ - ' p planning.Together,we have worked to ~ '° water from our reservoirs i further the regional role of utilities in ��� ! ule � , 1 educating the public on water conservation faster than the�, � y can be ll find ii --% ft*-N V%t t-4,% and efficient water use practices. } M U replenished, which threatens • 1 1 • CONSERVE w j k our back-up supply for tz ` fire protection and other UTI I T so u rc emergencies. The good duringthe hot, news is, there's something • - . . . .: '` su '�" you can do to help. 410JUM ITA MORE V410141 KOWIR 1114 )d fer , 1n111� 1 1 1 reNIVATTOJEFro—vider,or Visit Off Web site at: 1 lonths' by usIng water wi'sely' .1 AMEND YOUR SOIL: Adding U GROUND COVER:-Because your compost or mulch to your soil will help hold lawn uses more water than any other part of water in and minimize evaporation by keeping your landscape,keep it to a functional size to l � I the soil covered and cooled. Work generous save water and money.Think about replacing 1 ( , t amounts into the soil as deep as possible some of your lawn with ground covers or i . (6-8" recommended) before planting and your drought-resistant native trees,plants and grasses. `' t ` �> shrubs will love you for it. Water-wise Savings: Native and { -�• Water—wise Tip: Avoid using inorganic drought-resistant plants look beautiful and mulches like rocks or gravel. They can radiate �� M�►WING. Try to keep your grass save water. If you plant less turf and more j �,� the sun's heat and increase the amount of 2 to 3 inches long. This provides shade to the CZ that are suited to our climate,you * V IRRIGATION: Consider using C water that surrounding plants need. its,so your lawn requires less water and can save as much as 750 to 1,500 gallons of N mowing,and allows the root system to become water per month. drip irrigation or soaker hoses for gardens M Water-vise Savings: To maintain and shrubs. These systems apply water proper moisture and minimize evaporation,don't deeper and more efficient at storing water. directly to the plant roots,reducing waste LD on windy days. You can save as much as Water`Wise Tip: Longer grass means less from evaporation or run-off. And make O 200 to 300* gallons of water each time. evaporation,so set your mower blades one notch sure to check your irrigation system for leaks or broken sprinkler heads--these are � WATER THOROUGHLY BUT higher than normal and remember to keep the blades sharpened. This can save as much as 500 ,,�gUAA �" ® some of the biggest causes of water waste. E. INFREQUENTLY: This will produce a to 1,500* gallons of water per month. ' 0 t deep-rooted lawn that`s water-efficient and Water�nrise Savings: If you reduce -CO drought tolerant. You only need about an inch n SWIMMINGPOOLS: If you ' your watering cool,overcast or rainy CZ of water a week—the amount that would fill a have a pool,use a cover to slow evaporation. days and properly adjust your automatic tuna can—to maintain a health lawn. sprinklers,you can save as much as 200 to Y It will keep your pool cleaner and reduce the * CZ need to add chemicals. 300 gallons of water each time. Water-wise Tips: Over-watering causes V AUTOMOBILES: wash your cars, 75% of all turf problems. Water-vise Savings: A pool cover will bikes,trash cans or even the dog on the lawn EV '�h �RANShIRAYIGN: c maintain your pool's beauty and can save you so the grass can get a drink. Be sure to wet it Consider using an evapotranspiration 0 Water-wise Savings: if your lawn as much as 11,300* gallons of water per month. quickly and rinse it quickly,and don't forget ( a springs back when you step on it,it doesn't (ET-based) irrigation system to determine the � to use biodegradable soap, amount of water your landscape needs.This , Co need water. By watering your lawn only when SIDEWALKS AND weather-based system vVill monitor the amount s0 needed,you can save as much as 750 to DRIVEWAYS: Don't hose off your Water-wise Tip: Don't let the water run. of water lost to evaporation and the amount ,(n 1,500* gallons of water per month. Also, driveway and sidewalks. Sweep them instead. Instead,use a bucket of water to wash and of water transpired by plants.It then sets the 0 watering early in the morning or late in theIt's good exercise and it can save you 150* rinse the car. This can save you up to 150* watering time to deliver only the right amount a evenings slows evaporation and can save as gallons or more of water. gallons of water. of water. ET-based systems use 20% to 30°/Q .5 much as 300* gallons of water per month. less water than standard Irrigation systems. 07 Water-wise Tip: A good time for kids Water-wise Savings: Washing a car -a to play in the sprinkler'ls when you're already for 20 minutes can use up to 100 gallons of Water-wise Tip: For more information MMn watering the lawn. This can save as much as water. If you use a hose,be sure it has a on ET and other outdoor water E- UA ��lnl� 600* gallons of water per hour. Remember shut-off nozzle on it. Better yet,put them on conservation items,go�to our web site at: to put shut-off nozzles on all your hoses. aCl your hoses. 0CC)[ � Ui1M®o®` opo W 12 Z VA nn coCD ® f Wclv All `i{ 3 y qvq of 7 "PIA Now i 1 I y MEW WROM igloo L, a. <a N EN zr- MRS gnaw mm MORE CD Y� Ti z4. Sxt� y '• �i � � n r�� T. Sign-in Sheet for Intergovernmental Water Board Meeting November 12, 2003 Name(Please Print) Would you like to speak to the Board? h ZIJ - 5 n h