Loading...
Plans (18) F I PS2014 00162 G _�Fps 210 1 ff FIRE STOPPING REQUIREMENT: PENETRATIONS THRU RATED WALLS AND FLOORS SHALL BE SEALED WITH EIRE PROTECTION GENERAL NOTES n u ; ( iii.••fff E) 114" BRANCHLINE OST 20' A MATERIAL CAPABLE OF PREVENTING THE PASSAGE OF FLAMES AND FIRE PROTECTION SYSTEM TO COMPLY WITH NFPA 13, 2007 EDITION AND • MAINTAIN A MINIMUM OF 18 INCHES FROM THE BOTTOM OF THE HOT GASSES WHEN SUBJECTED TO THE REQUIREMENTS OF THE TEST 1"x 0-2 NIPPLE �iti• �'�`' STANDARD SPECIFIC FOR THE FIRE STOPS A.S.T.M.-E-814. (BY OTHERS) WITH 1" ELBOW CITY OF PORTLAND REQUIREMENTS. SPRINKLER DEFLECTOR TO THE TOP OF STORAGE/ FILE STORAGENj , 0 � e e .a NEW 1"x (VARIES) ARMOVER • FINAL INSPECTION AND APPROVAL BY LOCAL FIRE DEPARTMENT, AND + PER NFPA 13, 16.2.1.5: WHERE ADDITION OR MODIFICATION IS MADE TO Q) ARCHITECT/ ENGINEER. AN EXISTING SYSTEM AFFECTING MORE THAN 20 SPRINKLERS, THE NEW (� - PORTION SHALL BE ISOLATED AND TESTED AT NOT LESS THAN 200 PSI • CUTTING OF STRUCTURAL AND/OR ARCHITECTURAL MEMBERS TO BE (13.8 BAR) FOR 2 HOURS. L 38"X3"KWIK BOLT TZ DONE ONLY WITH APPROVAL OF THE ARCHITECT. N Q� TENANT IMPROVEMENT NOTES: = W/ 2 EMBED • PER NFPA 13, 16.2.1.6: MODIFICATIONS THAT CANNOT BE ISOLATED, N 38"ROD COUPLING NEW 1"x (VARIES) DROP • PIPE ROUTING SHOWN SHALL BE USED AND ANY ADDITIONAL OFFSETS SUCH AS RELOCATED DROPS, SHALL NOT REQUIRE TESTING IN EXCESS EXISTING SPRINKLER PIPING OR FITTINGS REQUIRED FOR PROPER INSTALLATION, COORDINATION WITH OF SYSTEM PRESSURE. 06 1"x 1/2 R.C. OTHER TRADES, AND/OR TO MAINTAIN PROPER CLEARANCES SHALL BE S 0:) — NEW SPRINKLER PIPING 3$"ALL THREAD ROD RASCO FlFR-56 PROVIDED. VERIFY EXISTING STRUCTURAL, MECHANICAL, ELECTRICAL + DISTANCE FROM SPRINKLER TO HANGER, WHERE MAXIMUM PRESSURE LINE RESTRAINT CLIP Q.R. PENDENT W/ INSTALLATIONS AND AVOID ANY/ALL OBSTRUCTION OR INTERFERENCE'S EXCEED 100 PSI (6.9 BARS) AND A BRANCH LINE ABOVE A CEILING R�•J = RELOCATED PENDENT SPRINKLER OVERSIZE ESCUTCHEON�`� WITH FIRE PROTECTION PIPE ROUTING. SUPPLIES PENDENT SPRINKLER BELOW THE CEILINGS SHALL NOT EXCEED Mr CE = EXISTING PENDENT SPRINKLER REMAIN PIPE RING 12" FOR STEEL PIPE AND 6" FOR COPPER PIPE. TYPICAL ACT SUSPENDED CEILING — • FIRE STOP ALL PENETRATIONS OF ALL RATED WALLS, FLOORS, ROOFS • - � = NEW PENDENT SPRINKLER ADDED (FLASH AND COUNTER FLASH ROOF PENETRATIONS), ECT. (SEE FIRE • THE HANGER CLOSEST TO THE SPRINKLER SHALL BE OF A TYPE THAT HANGER DETAIL NEW ARM—OVER DETAILS RATED PIPE PENETRATIONS DETAILS) PREVENTS UPWARD MOVEMENT OF PIPING. • SPRINKLER HEADS ARE TO BE COORDINATED WITH ALL DIFFUSERS, • PER NFPA 13, SMALL ROOM: A ROOM OF LIGHT HAZARD OCCUPANCY SPEAKERS, LIGHTING FIXTURES AND CEILING SYSTEMS. CLASSIFICATION HAVING UNOBSTRUCTED CONSTRUCTION AND FLOOR AREA NOT EXCEEDING 800 SQ. FT. THAT ARE ENCLOSED BY WALL AND • PROVIDE SPARE STOCK OF EXTRA SPRINKLERS IN ACCORDANCE WITH CEILING. OPENINGS TO THE ADJOINING SPACE ARE PERMITTED IF THE NFPA 13, 6.2.9. MINIMUM LINTEL DEPTH IS 8" FROM CEILING. PER NFPA NFPA 13; AS SUITE 206 AS "SMALL ROOM" SPRINKLERS SHALL BE PERMITTED TO BE MEDICAL HOME REMODEL + METHODS OF HANGING PIPES, HEADERS AND BRANCHES SHALL BE IN LOCATED NOT MORE THAN 9'-0" FROM ANY SINGLE WALL AND SCHOLLSMED/CAL Off/CES PER ASCE/SEI 2007 STATES THE FOLLOWING: ACCORDANCE WITH NFPA 13. SPRINKLER AREA LIMITATIONS SHALL NOT BE EXCEEDED. MAXIMUM DISTANCE BETWEEN HANGERS 13.5.6.2.2 SEISMIC CATEGORIES D THROUGH F— SUSPENDED CEILINGS IN SEISMIC DESIGN CATEGORIES D,E AND F SHALL BE DESIGNED AND 12442SWSCHOLLSFERRYROAD NOMINAL PIPE INSTALLED IN ACCORDANCE WITH ATSM C635, ATSM C636, AND CISCA FOR SEISMIC ZONE TIGARD,OREGON 97223 3/4" 1" 1-114, 1-1/7' 2" 2-1/7' 3" 3-117' 4" 5" d" 9" SIZE(in.) 3-4, AS MODIFIED BY THE FOLLOWING:(IN T—BAR CEILINGS ONLY) GROOVED-SCH 10&LIGHTWALL (E) EXCEPT WHERE RIGID BRACES ARE USED TO LIMIT LATERAL DEFLECTION, SPRINKLER N/A 12-0 12-0 15-0 15-0 15-0 15-0 15-0 15-0 15-0 15-0 15-0 HEADS AND OTHER PENETRATIONS SHALL HAVE A 2 INCH (50mm) OVERSIZED RING, S C 0 P E 0 F WORK STEEL PIPE SLEEVE OR ADAPTER THROUGH THE CEILING TILE TO ALLOW FOR FREE MOVEMENT OF AT THREADED SCH.40 LEAST 1 INCH (25mm) IN ALL HORIZONTAL DIRECTIONS IS PERMITTED TO BE PROVIDED AT N/A 12-0 12-0 12-0 120 12-0 12-o N/A N/A N/A N/A N/A TENANT IMPROVEMENT o STEEL PIPE THE TOP OF THE SPRINKLER EXTENSION. B 4 SPRINKLERS RELOCATED AND 2 SPRINKLERS ADDED IN (E)ACT � rn CEILINGS AROUND NEW WALLS. ° �o o to '� rn Cl . m t („f O ti 0rn LO C\1 a) � l�J ' I '''~ (lc LO 3 0 LO EC -:)TION -1s U I I ° i I I 1 I I * E_ PROCEDURE - i , 206.16 O E,� I AITI G ` I 06.00 _ ---- EXAM - , - j - 206.02 tt r r LJ Ir N HALLy"JA I C L X06.i • N I I - - I NUR S� I E - 1 ' I I ST I - -- - — i i I i I I It 15I - - - - - - - - - - - 4 2 S I I I 1 it EXArn ' I I - IN- 1' o I �0 .031 HAIL VAY 5 I I r � � � U� EXAA I �(1. , fi co v © E EXAM _- {A v0 t2 • I r - - E _� I OooC� �w RR—U—ADI 'JW w� LLU.� `?06.06 HJ6. co LLW Y I NJ, _ � T Q < -- — — - �Z LU a _ o: . -- -a - I ------- -- I Z o r ^ o U ICh a- m �.L�. U is Q d m r MEDICAL HOME POD i AREA 0 F ® E 206.02 I NOTICE OF EXTENDED PAYMENT PROVISION i EXAM I , The agreement will allow the Owner to make payment within thirty-five(35)da after the date an Application for Payment is 1 re v d by the . 206.07 I O II E I NOTICE OF ALTERNATE BILLING CYCLE I O O R I The Agreement will allow the Owner to require the submission of Application for Payment in billing cyder otter than 30 day L 6 g I tyles.The period coverred by each ApphCatioo for Payment will U WORK be one glertdar month a fortheon the last day of the month. forr - the later than the 5th d2AY of each north.subtrtifted t6 - ------ --------- —_— - - ------ - - -- --- - - - --- --- -- - ------ ---- --- ------- --- - ------- -- 4 JRJ Project Number. 8713&ZZ Drawing file Name. SCRO.20 SPI.O dw9 Date: F G Ga NORTH SEPTEMBER 11,2014 FIRE SPRINKLER PLAN SPRINKLERS USED 2' 1' o 1' 2' 4' 6' 8' SYM CNT POSITION FINISH TEMP K NPT SIN MFG. MODEL# SP IN 0 SCALE: 1 /4" = 1 '-0" Q 6 PENDENT CHROME 155° 5.6 11 /2 RA1314 RASCO F1 -56