Loading...
Plans (3) BUP2013 00079 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 RECEIVED Jco .2 co n CU M APR 162013 M a C4 � o � � @) CITY OF TIGARDF- LL E BUILDINGDNISION E �' Y ■� v CD J Q '— W C W00 ■ > LO O Q 00 LO 0 M L y. L CU N J C N O O C � O K K I 71m I== AIL 11) ";- ;It i : i t 71m e n a n I nn 13 rove ni e n t W) J M }+ CJ J Lf) � 12080 IVI St t O in ree Q � � Wo M t: 00 .2) � N r H Tigard , OR 97223 H G G 0 Q 0 Flzuo F CITY OF TIGARD Approved..... . E[t�]� n n E Conditionally Approved........... See Letter to:Follow................. [ ] Ari e ................[ Permit Number: Address: I tm By: Date: (^ Approved pians shall be on (tih tC W� HOWARD G. KIMURA �� 4 OFFICCOPY E COPS' REN N, WASHINGTON D 3658 0� D OF Oe D1 PROJECT DESCRIPTION D5 DESIGN-BUILD SYSTEMS D12 SHEET INDEX NONE NONE NONE SHEET # SHEET TITLE PERMIT BID CONSTRUCTION TENANT IMPROVEMENT INCLUDES: I Mechanical HVAC ISSUE DATE ISSUE DATE ISSUE DATE —ADDING A CONSULTATION ROOM ADJACENT TO THE EXISTING PHARMACY A-000 COVER SHEET, SHEET INDEX, PROJECT DESCRIPTION 4-8-2013 Electrical A-001 GENERAL INFORMATION, SITE PLAN 4-8-2013 WITHIN THE EXISTING WAITING ROOM A-002 GENERAL CONDITIONS, EXIST. CONDITIONS, DEMOLITION PLAN 4-8-2013 ~ W — RELOCATE A WAITING "AREA" IN THE SALES FLOOR AREA Plumbing A-003 DEMOLITION FLOOR PLAN 4-8-2013 a. — REPLACE EXISTING CHECKOUT WITH NEW o — REPLACING FIXTURES IN TOILET ROOMS PER A101 Fire Sprinkler Permit A-101 PROPOSED FLOOR PLAN 4-8-2013 — REPLACING FIXTURES IN LOUNGE PER A101 A-102 ENLARGED PLANS; DETAILS 4-8-2013 0 — INSTALLING 1 NEW PRINTER STATIONS Smoke Detection System — REPLACE EXISTING COOLERS WITH NEW U) Z M PAINTING EXISTING WALLS WITH NEW IMAGELIMITED SCOPE OF THE ABOVE "DESIGN—BUILD" SYSTEMS SHALL BE PROVIDED A-sol INTERIOR DETAILS, WALL SECTIONS, DETAILS 4-8-2013 W o — NEW ELECTRICAL TO ALL REVISIONS IN DRAWINGS AND SCOPE OF BASED UPON REVISIONS MADE AT THE PHARMACY WAITING ROOM AREA AND NEW WORK FROM RCM WAITING AREA TO BE RELOCATED TO THE EXISTING SALES ROOMA-801 DOOR SCHEDULE, DETAILS 4-8-2013 Z . B— REPLACE SELECT WALL SHELVING AND GONDOLAS WITH NEW AS A-802 FINISH SCHEDULES 4-8-2013 g SHOWN ON A101 . Drawn — REFER TO PLANS AND SCOPE OF WORK FOR ADDITIONAL WORK SALES FLOOR GONDOLAS WILL BE REPLACED AS SHOWN ON A101 Checked Approved HGK THE GC SHALL RESEARCH THE REQUIREMENTS FOR EACH OF THE "DESIGN—BUILD Project No. 13-6173 NO NEW AREA WILL BE ADDED TO THE BUILDING FOOTPRINT. NO SYSTEMS" AND PROVIDE A FULLY OPERATIONAL PROPOSAL CAPABLE OF SATISFYING REVISIONS ANTICIPATED OUTSIDE FOOTPRINT OF BUILDING. ALL APPLICABLE CODES, ORDINANCES AND AGENCY INSPECTIONS PRIOR TO Title SUBMISSION OF BIDS. COVER SHEET ANY DEMOLITION MAY REQUIRE THE CONTRACTOR TO CONTACT AUTHORITY HAVING JURISDICTION REGARDING ASBESTOS REQUIREMENTS AND OTHER HAZARDOUS A MATERIALS. A Sheet No. NOTE: PER OSSC SECTION 107.3.4.2, ALL DESIGN—BUILD SYSTEMS MUST BE REVIEWED BY THE ARCHITECT OF RECORD FOR GENERAL CONFORMANCE TO THE DESIGN. A-000 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 PROJECT LOCATION u "-,' m AB ANCHOR BOLT JAN JANITOR J a .1 N N ACT ACOUSTICAL CEILING TILE JST JOIST STORE #5354 N N E M AW ACOUSTICAL WALLCOVERING JT JOINT RITE AID TENANT IMPROVEMENT M d ui Ln o ACOUST ACOUSTICAL 12080 MAIN STREET co ) TIGARD, OR 97223 x ADJ ADJACENT, ADJUSTABLE KP KICK PLATE �`' E Cu E AFF ABOVE FINISHED FLOOR * �' W I ♦' AL ALUMINUM MDG MOLDING Cn ♦, ALT ALTERNATE MACH MACHINE AP ACCESS PANEL MATL MATERIAL REFERENCE CODES SITE AREA: APPROX APPROXIMATE MAX MAXIMUM – ARCH ARCHITECTURAL MECH MECHANICALs M w T � ■ 2010 OREGON STRUCTURAL SPECIALTY CODE 2.54 ACRES AF AWNING FABRIC MEMB MEMBRANE MET, MTL METAL 2010 OREGON MECHANICAL SPECIALTY CODE00 ', B BASE MFR MANUFACTURER 2010 OREGON FIRE CODE , " oCID BD BOARD MGR MANANGER 2011 OREGON ELECTRICAL SPECIALTY CODE GROSS TENANT SPACE. BG BUMPER GUARD MH MANHOLE 2010 OREGON ENERGY EFFICIENCY SPECIALTY CODE BLDG BUILDING MIN MINIMUM 2011 OREGON PLUMBING SPECIALTY CODE �� ro �,' o m L FIRST FLOOR: 24,967 SE L BLK BLOCK MIR MIRROR ICC/ANSI 117.1-2003 °' - "° ='' BLKG BLOCKING MISC MISCELLANEOUS VACATED AREA: 9,323 SE . ca _ a. BM BEAM MO MASONRY OPENING M EZZ. 0 SES BOF BOTTOM OF FOOTING M/R MOISTURE RESISTANT TOTAL: � `; BOT BOTTOM MTD MOUNTED USE GROUP 34,290 SE MTG CAB CABINET MUG MULLION' MOUNTING TYPE OF CONSTRUCTION CB CONCRETE BLOCK MERCANTILE (M) CONSTRUCTION CDV COMBINATION DRAIN AND VENT NEO NEOPRENE IIIB WITH SPRINKLERS CEM CEMENT NIC NOT IN CONTRACT ALLOWABLE HEIGHT & BUILDING AREA CER CERAMIC NO NUMBER CF CONCRETE FINISH NOM NOMINAL BUILDING TYPE IIIB CONSTRUCTION = 12,500 SQ.FT./4 STORIES CFMF COLD FORMED METAL FRAMING NTS NOT TO SCALE Q. / CG CORNER GUARD HEIGHT INCREASE DUE TO SPRINKLERS NA CJ CONTROL JOINT OA OVERALL AREA INCREASE DUE TO EONTAGE = NA K CRCT CIRCUIT OBS OBSCURE AREA INCREASE DUE TO SPRINKLERS= +37,500 (300%) a K CL CLOSET OC ON CENTER CLKG CAULKING OD OUTSIDE DIAMETER TOTAL AREA ALLOWED = 50,000 SQ.FT. > 34290 SE CLG CEILING OFF OFFICE � ' CLR CLEAR OPNG OPENING CMU CONCRETE MASONRY UNIT OPP OPPOSITE COL COLUMN ` COM CUSTOM HUTCH P PAINT MAXIMUM ALLOWABLE FLAME SPREAD CONC CONCRETE PL PLATE COND CONDITION P. LAM PLASTIC LAMINATE SPRINKLERED BUILDINGS CONSTR CONSTRUCT10N PLAS PLASTER CONT CONTINUOUS PLYWD PLYWOOD VERTICAL EXITS AND EXIT PASSAGEWAYS CLASS B CONTR CONTRACTOR PM PARTITION MOUNTED EXIT ACCESS CORRIDORS AND OTHER EXITWAYS CLASS C CORR CORRIDOR PNL PANEL, PANELBOARD ROOMS AND ENCLOSED SPACES CLASS C Ln L N ti CPT CARPET PP s PREFINISHED PANELS � ® r � ��: �� �� �+ CV CTR CERVAC TILE PR PAIR �IIt LO 1� 1. �;: zr#r,+s ;.� " PROJ PROJECT 07 DN DOWN PROP PROPERTY OCCUPANT LOAD DET DETAIL P.T. PRESSURE TREATED 0 '� DIA DIAMETER PT POINT 0 DIFF DIFFUSER PTD PAPER TOWEL DISPENSER DIM DIMENSION PTN PART11ION SQ.FT. PER OCCUPANT = SALES FLOOR - 16,220 sq.ft / 30 OCCUPANT = 572 Q sq.ft DISP DISPENSER PWR POWER STOCK ROOM - 5818 s ft 300 OCCUPANT- 19 I'I' VIII L DR DOOR VACATED STORE AREA 11,323 SF/300= 38 j (� DWG(S) DRAWING, DRAWINGS QT QUARRY TILE ACCESSORY USE LOUNGE/TOILET 929 SF 0 00 L DWR DRAWER QTY QUANTITY Q �— E EAST R RISER N TOM EA EACH RAD, R RADIUS TOTAL OCCUPANT LOAD: 34,290 SE 629 k^ EIFS EXTERIOR INSULATION AND RCM REGIONAL CONSTRUCTION MANAGER FINISH RD ROOF H EJ E PANSIONYSTEM JOINT REC RECESSED IN MEANS OF EGRESS H EL, ELEV ELEVA11ON RE REFERENCE .. ELEC ELECTRIC, ELECTRICAL REFL REFLECTED ELEV ELEVATOR REINF REINFORCED OCCUPANT LOAD SALES FLOOR = 495 OCCUPANTS EMER EMERGENCY REQ, REQD REQUIRED 629 X .20 = 126 INCHES OF WIDTH REQUIRED { ENCL ENCLOSURE RESIL RESILIENT EQUIP EQUIPMENT RF RESILIENT FLOORING -` NUMBER OF REQUIRED EXITS FROM SALES FLOOR = 3 EXITS (<500 OCCUP. LOAD) x -� EWC ELECTRIC WATER COOLER RM ROOM ' r EXH EXHAUST RO ROUGH OPENING REQUIRED WIDTH = 126 INCHES, MIN. ' EXIST EXISTING RWL RAIN WATER LEADER EXITS PROVIDED: 3 EXITS WITH 144" QE WIDTH, THEREFORE, OK. EXP EXPANSION, EXPOSED EXT EXTERIOR S SOUTH SAN SANITARY STOCK ROOM REQUIRES (2) EXITS DUE TO OCCUPANT LOAD OF 57, 4 EXITS PROVIDED RITE AID #5354 FA FIRE ALARM SC SOLID CORE FB FLAT BAR SCHED SCHEDULE REQUIRED EXIT WIDTH FOR STOCK ROOM = 57 X .20 = 11" OR 36" MIN. 12080 MAIN STREET G FCO FLOOR CLEANOUT SD SOAP DISPENSER G FD FLOOR DRAIN N SESECTION SQUARE FEET CT EXIT PROVIDED: 4 EXITS PROVIDED, 180" WIDTH, THEREFORE OK TIGARD, OR 97223 FDN FE FIRE EXTINGUISHER SH SHELF EXITS FROM MEZZANINE: NOT APPLICABLE Z FEC FIRE EXTINGUISHER CABINET SHT SHEET FIN FINISH SIM SIMILAR FIX, FIXT FIXTURE SL SLIDING FL, FLR FLOOR SM SURFACE MOUNTED ACCESSIBILITY Q FLASH FLASHING SPEC SPECIFICATION ACCESSIBILITY COMPLIES WITH ICC/ANSI 117.1-2003 FRTW FIRE RESISTANT TREATED WOOD SQ SQUARE FLUOR FLUORESCENT SST STAINLESS STEEL CONTRACTOR TO VERIFY EXISTING HC ACCESSIBLE RESTROOMS FOR 0 FOC FACE OF CONCRETE ST STAIN CODE COMPLIANCE FOF FACE OF FINISH STD STANDARD NORTH FOS FACE OF STUDS STL STEEL O FOW FACE OF WALL STO STORM MINIMUM NUMBER OF REQUIRED TOILET FIXTURES F FR FIRE RATED/RETARDANT STOR STORAGE F U FRP FIBERGLASS REINFORCED POLYESTER PANEL STRUCT STRUCTURAL FRT FIRE RETARDANT TREATED SUSP SUSPENDED EXIST. TO REMAIN FT FOOT, FEET SYM SYMMETRICAL FTG FOOTING SWSB SOLID WHITE STOP BAR FURR FURRING TEL TELEPHONE TEMP TEMPERED, TEMPORARY EW THK THICK, FIRE RATED ASSEMBLIES F9 SITE PLAN �� SERVICE THICKNESS GC GENERAL CONTRACTOR TOS TOP OF STEEL GRT GROUT TOW TOP OF WALL NONE GA GAUGE TT TOILET TISSUE DISPENSER GALV GALVANIZED CAL VERIFY EXISTING RATING & MAINTAIN RATINGS IF APPLICABLE. GB GRAB BAR UN UNFIINSHED PROPERTY ACCT. NO. ZONING: GEN GENERATOR UNO UNLESS NOTED OTHERWISE i GND,GRND GROUND VCT VINYL COMPOSITION TILE FIRE PROTECTION CT I O N SYSTEMS �J E GWB GYPSUM WALLBOARD R460218 COMMERCIAL E GYP GYPSUM VERT VERTICAL VEST VES11BULE HB HOSE BIBB VTRVENT THROUGH ROOF VERIFY EXISTING SPRINKLERS, FIRE ALARM SYSTEMS, MAINTAIN EXISTING MAP & TAX LOT i D HC HANDICAPPED VWC VINYL WALLCOVERING SYSTEMS AS REQUIRED. HCT HANDICAPPED TOILET HD HEAD W WEST 2S1 02AA00906 HDWD HARDWOOD W/ WITH HDWR HARDWARE WAT WATER HM HOLLOW METAL WC WALL COVERING HORIZ HORIZONTAL WD WOOD SQUARE FOOTAGE OF RENOVATION LEGAL DESCRIPTION: HR HOUR WNDW WINDOW HT HEIGHT WF WOOD FLOOR HVAC HEAR NCON IPUNMG, AND WM WALK—OFF MAT - PAYLESS SHOPPING CENTER '-OT: W/0 WITHOUT RENOVATED GROSS AREA: 676 SQ.FT. (TOILET RMS, LOUNGE, PHOTO STAND, C ID INSIDE DIAMETER WP WATERPROOF CHECKSTANDS) +64 SF (CONSULTATION ROOM) _ •: D IE INVERT ELEVATION WR WATER RESISTANT TOTAL RENOVATED AREA: 740 SE D IN INCH WT WEIGHT f INSUL INSULATION 260.,m:11 7,h."::.. IR IRRIGATION w r ,. ,t D13 PROJECT INFORMATION D1 ABBREVIATIONS D5 CODE DATA �� �i I NONE u- NONE NONE r VENDOR COMPANY PRODUCT TYPE CONTACT CONTACT NUMBER ` "` ` VENDOR , ARMSTRONG CEILINGS BOB WILLIAMS 877-276-7876 EXT 8052 �� "� " REGIONAL CONSTRUCTION PROPERTY OWNER. VENDOR 2 ARMSTRONG FLOORING TONY LAWSON 800-356-9301 EXT 8943 VENDOR 3 ATAS INTERNATIONAL INC. ROOF COPING MARK BROWN 800-468-1441 EXT 227 DETAIL NUMBER �' " ,„ �, MANAGER. VENDOR 4 ALP LIGHTING COMPONENTS SOFFIT EGG CRATE CUSTOMER SERVICE 800-237-3938 SHEET NUMBER gy ` t 1 ' a RITE AID CORPORATION #5354 VENDOR 5 BESAM AUTOMATED ENTRANCE AUTO DOORS PAM HOMYAK 609-443-5800 EXT 20415 0 SHEET NOTE REFERENCE COMPANY: RITE AID CORPORATION C - --_ . ,� ..£ to P 0 BOX 839 C ,- VENDOR 6 - - - - A-000 a . T, t- U� =,7 CAMP HILL, PA 17011 VENDOR 7 CARLISLE SYNTEC INC ROOFING JOE CARBINE 717-245-7065 `' -r y far=r. 6925 SEABORN STREET w VENDOR 8 CARRIER CORPORATION HVAC BILI_ SJOVALI_ 973-227-4311 EXT. 3012 SECTION INDICATOR 101 _11 .c. v n. ,9 LAKEWOOD, CA 90713CL VENDOR 9 CONSOLIDATED ELECTRICAL DISTRIBUTORS ELECTRICAL SUPPLIES EAST COAST - DON FRALEY 800-632-1828 c = TG WK= o WEST COAST - ANDY IPSON 909-889-1071 DOOR TAG � CONTACT: C U R TI S D YC K, RCM Li 10 DIEBOLD DRIVE THRU EQUIPMENT KEVIN DOSS 717-764-7566 EMAIL: CURTIS.L.DYCK@R TEAID.C0M a mDETAIL NUMBER 11 ELIASON CORPORATION IMPACT DOORS JASON HORN 800-828-3655 EXT 128 r^r'` " °' VENDOR 12 CITADEL EXTERIOR PANELS DAVID WERNZ 800-446-8828 EXT. 120 SHEET NUMBER B j r. i" VENDOR 13 EMERSON CLIMATE TECH. EMS - INSTALL SCOTT MARSHALL 717-930-0808 tea, G E N E f�/'1 L CONTRACTOR Z VENDOR 14 EP HENRY CORPORATION CONCRETE BLOCK 800-W-3679 3679 A-000,' M VENDOR 15 FIRESTONE BUILDING PRODUCTS ROOFING MARK WERNER 800-428-4442 EXT 53226 PARTITION TAG V o o VENDOR 16 GLEN-GERY CORPORATION MASONRY CUSTOMER SERVICE REP 610-374-4100 DETAIL INDICATOR i t ° f COMPANY: TO BE DETERMINED `� 06 VENDOR 17 HADRIAN, INC. RESTROOM PARTITIONS DIANE STEGMEIER 440-942-9118 " VENDOR 18 HILL PHOENIX COOLER/FREEZER KEN GURA 716-667-3687 " I B VENDOR 19 INTERSTATE BRICK MASONRY BETH POLIS 951-352-6678 ARCHITECT: t� - _;ft., I VENDOR 20 KAWNEER STOREFRONT DAVE TRAUTMAN 800-310-4350 EXT. 631 4 FURNITURE TAG r g Drawn VENDOR 21 KOROSEAL INTERIOR PRODUCTS WALL COVERINGS KEVIN PLANT 800-753-7505 E^_ '`` "' st VENDOR 22 JOHNSONITE FLOORING / BASE DENNIS LANG 800-899-8916 COMPANY: HG KIMURA ARCHITECT, PLLC Checked VENDOR 23 MATWORKS CARPET KIM OSTROSKY 301-837-1266 3 A-000 1 0 Approved HGK _ A-000 ROOM NAME 18012 W. LAKE DESIRE DR. SE VENDOR 25 MJB ARCHITECTURAL SPECIALTIES CHAIVENDOR 24 MARLITE R IRAIL AMIE MAYERNG BILL � 610-584-8701 2 101 RITE AID SITE RENTON, WA 98058 ��� A�C� Project No. 13-6173 VENDOR 26 OVERHEAD DOOR RECEIVING DOOR ANGELA BURGESS 800-972-1730 EXT 661 - ROOMNAME AND NUMBER PHONE. (425) 271 1875 VENDOR 27 NOT USED ELEVATION INDICATOR 12080 MAIN STREET FAX: (425) 271-2383 HOWARD G. KIMURA �� Tide VENDOR 28 SHERWIN WILLIAMS PAINT JIM GEIST 724-933-1900 EXT. 104 P-1 TIGARD, OR 97223 CONTACT: HOWARD KIMURA � VENDOR 29 SANTANA PLASTIC PRODUCTS RESTROOM PARTITIONS GREG BORGIA 800-368-5002 EXT 225 E-MAIL: H HOWARD KIMURA SITE PLAN, VENDOR 30 SQUARE D COMPANY ELECTRICAL GEAR NATIONAL ACCOUNT MANAGER 518-452-2590 VENDOR 31 WESTERN EXTRALITE COMPANY COSMETIC LIGHTS MARK KANER 314-432-4560 FINISHES TAG 4 -2013 VICINITY MAP VENDOR 32 YORK INTERNATIONAL CORPORATION HVAC MARK RITZ 405-419-6537 NORTH REN N, WASHINGTON ,� CODE INFORMATION VENDOR 33 LITHONIA LIGHTING NEIL TOBLER 770-860-3062 CO — 3658 O VENDOR 34 GERBERT LIMITED RESILIENT FLOORING S.R. ZIMMERMAN 717-299-5035 � � A VENDOR 35 NOT USED A VENDOR 36 NOT USED COLUMN GRID REFERENCE REVISION TAG O ® sheet No. NOTE: SEE SHEET A-402 FOR FINISH MATERIAL SCHEDULE Al VENDOR CONTACTS A5 SYMBOLS LEGEND A9 VICINITY MAP A13 PROJECT TEAM A-001 NONE NONE NONE NONE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 1 6 7 8 9 10 1 11 1 12 13 1 14 1 15 r 16 1) SCOPE OF WORK 4) INTERPRETATION OF DRAWINGS AND DOCUMENTS: F. PROTECTION OF EXISTING WORK — ANY WORK DAMAGED BY FAILURE TO PROVIDE PROTECTION SHALL BE REMOVED C. WHEREVER WORDS "APPROVED BY", "SATISFACTORY TO", "SUBMITTED TO", "INSPECTED BY", OR SIMILAR PHRASES A. THE GENERAL CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS AND INSPECTIONS REQUIRED AND SHALL A. IF THE BIDDER IS IN DOUBT AS TO THE TRUE MEANING OF ANY PART OF THE CONTRACT DOCUMENTS OR FINDS AND REPLACED WITH NEW WORK AT THE CONTRACTOR'S EXPENSE. ARE USED IN THESE DOCUMENTS, THEY SHALL BE UNDERSTOOD TO MEAN THAT THE MATERIAL OR ITEM REFERRED TO ALSO PAY FEES REQUIRED FOR THE GENERAL CONSTRUCTIONS, PLUMBING. ELECTRICAL AND HVAC. ERRORS, DISCREPANCIES OR OMISSIONS IN THEM, THEY SHALL AT ONCE REQUEST INTERPRETATION OR CORRECTION SHALL BE APPROVED BY, BE SATISFACTORY TO, SUBMITTED TO, OR INSPECTED BY, CONSTRUCTION MANAGER. THEREOF BY THE ARCHITECT OR CONSTRUCTION MANAGER. G. PROTECTION ADJACENT PROPERTY — CONTRACTOR SHALL PROVIDE ALL NECESSARY PROTECTION FOR ADJACENT vc B. SCHEDULE WORK WITH RITE AID AND LANDLORD AS NECESSARY. PROPERTY AND LATERAL SUPPORT THEREOF. D. ALL EQUIPMENT AND ALL PRODUCTS PURCHASED TO BE REVIEWED BY THE CONTRACTOR AND ALL APPLICABLE co B. THE ARCHITECT OR CONSTRUCTION MANAGER WILL PROMPTLY CLARIFY THE AREA IN QUESTION AND ISSUE WRITTEN SUBCONTRACTORS FOR ANY CONDITION REQUIRED PER MANUFACTURERS RECOMMENDATIONS. THE CONTRACTOR SHALL L. J Cu M C. CONTRACTOR IS FULLY RESPONSIBLE FOR THE PROJECT SCHEDULE AND ALL MATERIALS AND WORK CONNECTED INSTRUCTIONS TO ALL PROSPECTIVE BIDDERS. VERBAL INSTRUCTIONS OR INTERPRETATIONS WILL HAVE NO VALIDITY H. ACCEPTANCE OF WORK AND EXISTING CONDITIONS — APPLICATIONS OF MATERIALS TO SURFACES EXISTING OR SUPPLY THESE ITEMS AT NO COST TO OWNER OR ARCHITECT. M d � o THEREWITH UNTIL THE OWNER HAS ACCEPTED THE COMPLETED PROJECT IN WRITING. THE CONTRACTOR SHALL REGARDLESS OF THE SOURCE. PROVIDED SHALL IMPLY ACCEPTANCE AND SUITABILITY OF EXISTING CONDITIONS. CONTRACTOR SHALL REPLACE AT HIS 3 N N REPLACE OR REPAIR AT HIS OWN EXPENSE ANY MATERIALS OR WORK DAMAGED OR STOLEN, REGARDLESS OF COST AND EXPENSE ANY WORK THAT IS APPLIED TO IRREGULAR OR NON—CONFORMING SURFACES. 17) FINAL CLEANING: a) X M WHETHER HE HAS RECEIVED PAYMENT FOR THE WORK OR MATERIALS FROM THE RITE AID CORPORATION. C. REQUEST FOR SUCH CLARIFICATION MUST BE IN THE OFFICE OF CONSTRUCTION MANAGER A MINIMUM OF FIVE (5) A. CONTRACTOR SHALL, AT COMPLETION OF WORK, REMOVE ALL CONSTRUCTION RELATED RUBBISH FROM UNDER AND ~ U DAYS BEFORE BID OPENING. I. CONTRACTOR IS RESPONSIBLE FOR OVERSEEING ALL ASPECTS OF SUBCONTRACTOR'S WORK. ABOUT THE BUILDING, ALL HIS TOOLS, SCAFFOLDING, AND SURPLUS MATERIALS SHALL BE REMOVED. THE CONTRACTOR Y D. UNLESS OTHERWISE PROVIDED, CONTRACTOR SHALL PROVIDE AT HIS EXPENSE ALL MATERIALS, LABOR, EQUIPMENT, SHALL LEAVE THE AREAS OF THE BUILDING WHERE CONSTRUCTION RELATED ACTIVITIES OCCURRED CLEAN AND u TOOLS, TRANSPORTATION AND UTILITIES INCLUDING COST OF CONNECTION NECESSARY FOR SUCCESSFUL D. CONTRACTOR IS RESPONSIBLE TO MAINTAIN A CURRENT SET OF DRAWINGS ON SITE AT ALL TIMES AND TO INSURE 8) SECURITY: HABITABLE. ALL SURFACES SHALL BE WIPED CLEAN OF DUST AND ALL WINDOWS CLEANED. d A. CONTRACTOR SHALL BE RESPONSIBLE FOR BUILDING AND CONTENTS WHILE WORK IS BEING DONE AND FOR i Q COMPLETION OF THE PROJECT. THE DISTRIBUTION OF NEW DRAWINGS TO SUBCONTRACTORS AND OTHER RELEVANT PARTIES AS SOON AS THEY ARE SECURING BUILDING WHEN WORK IS FINISHED FOR DAY. B. IF CONTRACTOR FAILS TO CLEAN UP, RITE AID MAY DO SO AND THE COST THEREOF WILL BE CHARGED TO THE — w MADE AVAILABLE. ALL OLD DRAWINGS ARE TO BE MARKED VOID, REMOVED FROM THE SITE AND RENDERED USELESS. E. CONTRACTOR SHALL INSTALL CERTAIN ITEMS AS SPECIFIED TO BE FURNISHED BY THE RITE AID CORPORATION, OR B. GENERAL CONTRACTOR (GC) & ALL SUB—CONTRACTORS SHALL WEAR IDENTIFICATION TAGS WITH FULL NAME AND CONTRACTOR. . C SHALL RECEIVE AND STORE IN SAFE CONDITION CERTAIN OTHER ITEMS WHICH WILL BE PURCHASED DIRECT BY RITE E. CONTRACTOR TO REVIEW ALL SHOP DRAWINGS AND SUBMIT A COPY TO THE ARCHITECT FOR HIS RECORD. THE COMPANY THEY WORK FOR AND SHALL BE VISIBLE ON EACH CREW MEMBER WORKING. G.C. SHALL BE �� U) AID CORPORATION. RESPONSIBLE FOR COORDINATING THIS WITH ALL THEIR SUBS. 18) FINAL INSPECTIONS & ACCEPTANCE: ; 00 F. THE CONTRACTOR IS RESPONSIBLE FOR ALL ITEMS BUILT OR INSTALLED TO BE TRUE AND PLUMB. 9) CUTTING AND PATCHING: A. SUBSTANTIAL COMPLETION INSPECTION a o Co F. CONTRACTOR TO REVIEW ALL DRAWINGS AND SPECIFICATIONS IN SET. PROVIDE SHOP DRAWINGS AS REQUIRED. A. CONTRACTOR SHALL COORDINATE ALL CUTTING, FITTING AND PATCHING OF WORK THAT MAY BE REQUIRED TO 1. PUNCH LIST SHALL BE 1009 COMPLETE WITHIN (1) WEEK OF STORE OPENING. G. GENERAL CONTRACTOR SHALL FIELD VERIFY ALL EXISTING DIMENSIONS, CONDUITS & UTILITY LOCATIONS, PRIOR TO MAKE THE SEVERAL PARTS OF THE WORK COME TOGETHER PROPERLY AND FIT IT TO RECEIVE OR TO BE RECEIVED BY 0 G. CONTRACTOR SHALL SUPPLY ALL SUBCONTRACTORS WITH A FULL SET OF CONSTRUCTION DOCUMENTS INCLUDING FABRICATION AND INSTALLATION OF MATERIALS. NOTIFY RITE AID/ARCHITECT OF ANY DISCREPANCIES IMMEDIATELY. OTHER PORTIONS OF HIS OWN WORK OR THAT OF SUBCONTRACTORS OR INSTALLING MATERIAL AS SHOWN OR 2. CONSTRUCTION MANAGER WILL CONDUCT PUNCH LIST INSPECTION IN PRESENCE OF CONTRACTOR'S DESIGNATED o Cm .s ALL ADDENDUMS. ALL ADDITIONAL DOCUMENTS REQUIRED FOR PERMITS ARE TO BE SUPPLIED BY THE REASONABLY IMPLIED BY THE CONTRACT DOCUMENTS FOR A COMPLETED STRUCTURE. CONTRACTOR SHALL ALSO MAKE REPRESENTATIVE. A LIST OF ITEMS TO BE CORRECTED BY THE CONTRACTOR WILL BE FURNISHED WITHIN TWO DAYS. CONTRACTOR. H. DRAWINGS INDICATE THE MINIMUM STANDARDS BUT IF WORK SHOULD BE INDICATED TO BE SUBSTANDARD TO ANY OR HAVE MADE PROPER AND SUFFICIENT REPAIR AND CLOSURE AS DIRECTED BY CONSTRUCTION MANAGER. ORDINANCES, LAWS, CODES, RULES OR REGULATIONS BEARING ON THE WORK, THE CONTRACTOR SHALL INCLUDE RULES 3. CONTRACTOR SHALL NOTIFY CONSTRUCTION MANAGER IN WRITING WHEN ITEMS HAVE BEEN CORRECTED. UPON a H. CONTRACTOR TO PROVIDE A COMPLETE BUILDING WITH ALL FINISHES AND ELECTRICAL COMPONENTS AS SHOWN OR AND REGULATIONS WITH NO INCREASE IN COST. 10) CONTRACTOR QUALITY CONTROL: CONSTRUCTION MANAGER'S VERIFICATION OF CORRECTION OF ITEMS, CONSTRUCTION MANAGER WILL ARRANGE A FINAL o INDICATED ON DRAWINGS. CONTRACTOR TO PROVIDE ALL ITEMS SHOWN ON DRAWINGS AND WRITTEN A. MATERIAL QUALITY ACCEPTANCE MEETING TO INCLUDE USER REPRESENTATIVES. CONSTRUCTION MANAGER WILL ALSO NOTIFY CONTRACTOR SPECIFICATIONS. I. GENERAL CONTRACTOR TO PROVIDE ALL BLOCKING AND FASTENERS, INCLUDING ALL BLOCKING FOR 1. MATERIALS INCORPORATED INTO PROJECT SHALL BE NEW, EXCEPT AS OTHERWISE INDICATED IN CONTRACT AND USER REPRESENTATIVES IN WRITING OF TIME AND PLACE OF INSPECTION. I. THERE ARE TO BE NO CHANGES IN THE FOLLOWING SET OF CONSTRUCTION DRAWINGS AND SPECIFICATIONS UNLESS GRAB BARS, SHELVES, AND ANY AND ALL OTHER WALL OR CEILING MOUNTED ITEMS. DOCUMENTS AND OF SPECIFIED PRODUCTS. APPROVED IN WRITING BY RITE AID CORPORATION. B. FINAL ACCEPTANCE MEETING J. CHANGES AS STATED ABOVE WOULD INCLUDE ANY VARIATION OF MATERIALS, PRODUCTS, MANUFACTURERS, OR J. LOCATION OF EQUIPMENT, AND WORK SUPPLIED BY OTHERS THAT IS DIAGRAMMATICALLY INDICATED ON THESE 2. CONTRACTOR SHALL FURNISH EVIDENCE OF THE QUALITY OF MATERIALS INCORPORATED INTO THE PROJECT AT 1. WHEN ALL ITEMS HAVE BEEN CORRECTED, CONSTRUCTION MANAGER WILL ISSUE A LETTER TO RITE AID DRAWINGS SHALL BE DETERMINED BY THE G.C. THE GENERAL CONTRACTOR SHALL DETERMINE LOCATIONS AND THE REQUEST OF THE CONSTRUCTION MANAGER. AUTHORIZING FINAL PAYMENT. CONSTRUCTION SHOWN, IMPLIED OR WRITTEN IN THIS CONSTRUCTION DOCUMENTS SET. DIMENSIONS SUBJECT TO STRUCTURAL CONDITIONS AND WORK OF THE OTHER SUBCONTRACTORS. K. GENERAL CONTRACTOR TO FURNISH SUBCONTRACTORS AND RELATED PARTIES WITH COMPLETE SET OF DRAWINGS. 3. MATERIAL NOT MEETING THE REQUIREMENTS OF THE CONTRACT DOCUMENTS SHALL BE REMOVED FROM THE 2. IF ALL ITEMS HAVE NOT BEEN CORRECTED AS AGREED, RITE AID MAY ELECT TO COMPLETE THE WORK AND THE K. CONSTRUCTION TO BE INSTALLED LEVEL, PLUMB, TRUE AND WITHIN THE TOLERANCES SET FORTH IN THE PROJECT AND REPLACED WITH MATERIALS MEETING THE CONTRACT DOCUMENT REQUIREMENTS BY CONTRACTOR WITH COST THEREOF WILL BE CHARGED TO THE CONTRACTOR. NO PARTIAL SET OR SHEETS REMOVED FROM SET WILL BE PERMITTED. APPROPRIATE SPECIFICATION SECTION. POORLY INSTALLED NONCOMPLIANT WORK SHALL BE REMOVED AND NO ADDITIONAL EXPENSE TO THE OWNER. K L. GENERAL CONTRACTOR SHALL FURNISH ALL MATERIAL, LABOR AND EQUIPMENT TO COMPLETE ALL WORK AND REINSTALLED WITH OUT A BURDEN ON RITE AID. C. GENERAL CONTRACTOR TO FURNISH "AS BUILT" SET OF DRAWINGS TO OWNER UPON COMPLETION OF BUILD—OUT. K B. ASBESTOS: FURNISH A COMPLETED JOB ALL IN ACCORDANCE WITH LOCAL AND STATE GOVERNING AUTHORITIES AND OTHER 1. NOTIFY THE CONSTRUCTION MANAGER IMMEDIATELY FOR INSTRUCTIONS IF: AUTHORITIES HAVING LAWFUL JURISDICTION OVER THE WORK. 5) RESPONSIBILITY FOR ACTS & OMISSIONS a. MATERIALS CONTAINING ASBESTOS ARE BROUGHT TO THE SITE FOR INCLUSION INTO THE WORK. 19) SUBMITTALS: A. CONTRACTOR AGREES THAT HE IS FULLY RESPONSIBLE TO OWNER/ TENET FOR ACTS AND/OR OMISSIONS OF HIS b. ASBESTOS MATERIALS ARE ENCOUNTERED IN ANY EXISTING STRUCTURES UPON WHICH WORK IS BE PERFORMED. A. CONTRACTOR TO SUBMIT PLUMBING AND ELECTRICAL FIXTURE CUTS TO CONSTRUCTION MANAGER FOR APPROVAL 2) DEFINITIONS: SUBCONTRACTORS AND THEIR MATERIAL, MEN AND OF PERSONS EITHER DIRECTLY OR INDIRECTLY EMPLOYED BY THEM. c. DO NOT INSTALL OR REMOVE ANY ASBESTOS CONTAINING MATERIALS. PRIOR TO INSTALLATION. A. RITE AID — THE CORPORATE ENTITY OF RITE AID CORPORATION. 11) CONSTRUCTION AIDS: B. SUBMIT SHOP DRAWING TO ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION. B. CONSTRUCTION MANAGER — RITE AID DESIGNATED REPRESENTATIVE IDENTIFIED IN CONTRACT DOCUMENTS. 6) PERMITS AND REGULATIONS: A. CONTRACTOR AND HIS SUBCONTRACTORS SHALL FURNISH AND MAINTAIN ALL EQUIPMENT AS REQUIRED FOR A. PERMITS: PROPER EXECUTION OF WORK. C. CONTRACTOR TO PROVIDE MECHANICAL, PLUMBING AND ELECTRICAL RECORD DRAWINGS AND OPERATING MANUALS C. CONTRACTOR — THE CONTRACTOR IS THE PERSON OR ORGANIZATION IDENTIFIED AS SUCH IN THE AGREEMENT. 1. CONTRACTOR SHALL AT HIS OWN EXPENSE AND COST OBTAIN AND PROVIDE NECESSARY PERMITS, LICENSES, TO RITE AID WITHIN TWO WEEKS OF SUBSTANTIAL COMPLETION. FEES AND BONDS NECESSARY FOR COMPLETION OF THIS WORK UNLESS OTHERWISE DIRECTED BY THE CONSTRUCTION B. ALL APPARATUS, EQUIPMENT AND CONSTRUCTION SHALL MEET ALL REQUIREMENTS OF THE LABOR LAW, SAFETY REGULATIONS AND OTHER STATE AND LOCAL LAWS APPLICABLE THERETO. D. SUBCONTRACTOR — THE PERSON, FIRM OR CORPORATION SUPPLYING DIRECT OR INDIRECT LABOR AND/OR MANAGER. 20) WARRANTIES & BONDS: MATERIALS AT THE SITE OF THE PROJECT AND UNDER SEPARATE CONTRACT OR AGREEMENT WITH THE CONTRACTOR. 2. CONTRACTOR SHALL SECURE CERTIFICATES OF INSPECTION AND OF OCCUPANCY THAT MAY BE REQUIRED BY A. CONTRACTOR SHALL SECURE AND DELIVER ALL GUARANTEES AND WARRANTIES PROPERLY ADDRESSED AND SIGNED L M AUTHORITIES HAVING JURISDICTION OVER THE WORK. CONTRACTOR SHALL DELIVER THESE CERTIFICATES TO THE C. CONTRACTOR SHALL PAY FOR FOR ALL TEMPORARY UTILITIES, INCLUDING TELEPHONE AND FAX, USED DURING AND IN FAVOR OF OWNER/TENANT, WITHIN TWO WEEKS OF SUBSTANTIAL COMPLETION. M E. THE WORK — THE WORK INCLUDES ALL LABOR NECESSARY TO PRODUCE THE CONSTRUCTION REQUIRED BY THE CONSTRUCTION MANAGER PRIOR TO SUBSTANTIAL COMPLETION. CONSTRUCTION PERIOD UNTIL SUCH TIME THAT RITE AID TAKES OCCUPANCY. N J CONTRACT DOCUMENTS AND ALL MATERIALS AND EQUIPMENT INCORPORATED OR TO BE INCORPORATED IN SUCH B. DELIVERY OF GUARANTEES AND WARRANTEES SHALL NOT RELIEVE CONTRACTOR FROM ANY OBLIGATION ASSUMED CONSTRUCTION. B. REGULATIONS: D. CONTRACTOR SHALL COORDINATE ALL PICKUPS & DROP OFFS FOR ALL GARBAGE DUMPSTERS AND RECEPTACLES UNDER ANY OTHER PROVISIONS OF HIS CONTRACT. 0') 1. CONTRACTOR AND OTHERS WORKING UNDER HIS JURISDICTION SHALL PERFORM ALL WORK IN COMPLIANCE WITH AND TOILET FACILITIES AS REQUIRED. GARBAGE DUMPSTERS PROVIDED BY RITE AID. 3) REQUIREMENTS BEFORE SUBMITTING BIDS: LAWS, REGULATIONS AND ORDINANCES OF ANY KIND REQUIRED BY GOVERNMENTAL AUTHORITIES AND OTHER AGENCIES C. NOTHING IN THIS SECTION INTENDS OR IMPLIES THAT GUARANTEES AND WARRANTEES SHALL APPLY TO WORK D A. THE SITE AND ANY BUILDING LOCATED THEREON SHALL BE THOROUGHLY EXAMINED IN RELATION TO CONDITIONS HAVING JURISDICTION OVER THIS WORK. 12) BARRIER'S & ENCLOSURES: ABUSED OR NEGLECTED BY OWNER. 0 WHICH MIGHT DIRECTLY EFFECT THE CONTRACT WORK. THE BID SUM SHALL REFLECT ALL SUCH EFFECTING CONDITIONS. 2. IF THE CONTRACTOR OBSERVES THAT THE CONTRACT DOCUMENTS ARE IN VARIANCE WITH ANY LAWS, A. TEMPORARY ENCLOSURES — CONTRACTOR SHALL PROVIDE TEMPORARY WEATHER TIGHT ENCLOSURES FOR ALL BIDDERS SHALL BE RESPONSIBLE FOR VERIFYING ALL DIMENSIONS WHICH MAY AFFECT THE WORK. REGULATIONS OR ORDINANCES, HE SHALL NOTIFY THE ARCHITECT AND SHALL NOT PROCEED UNLESS NECESSARY EXTERIOR OPENINGS AS SOON AS WALLS AND ROOF ARE BUILT SO AS TO PROTECT ALL WORK FROM WEATHER. 21) NON—COMBUSTIBLE ITEMS CHANGES REQUIRED FOR COMPLIANCE WITH SAID LAWS, REGULATIONS OR ORDINANCES HAVE BEEN MADE. CONTRACTOR 13) TEMPORARY CONTROLS: A. CONTRACTOR SHALL VERIFY CONSTRUCTION TYPE OF EXISTING SHELL SPACE. IF EXISTING CONSTRUCTION TYPE IS W O co B. CONTRACTOR TO VERIFY THAT ALL UTILITIES REQUIRED FOR COMPLETION AND FULL OPERATION OF WORK WILL BE SHALL BE FULLY RESPONSIBLE FOR ANY WORK KNOWINGLY PERFORMED CONTRARY TO SAID LAWS, REGULATIONS AND A. CONSTRUCTION CLEANING NON—COMBUSTIBLE ALL BLOCKING & WOOD ITEMS SHALL BE NON—COMBUSTIBLE AS ALLOWED BY CODE. C* 2) AVAILABLE AT THE TIME OF COMPLETION. ORDINANCES AND SHALL FULLY INDEMNIFY OWNER AGAINST LOSS AND BEAR ALL COST AND PENALTIES ARISING 1. CONTRACTOR SHALL KEEP PREMISES BROOM CLEAN DURING THE PROGRESS OF WORK. Ft C C DRAWINGS DO NOT TAKE PRECEDENCE OVER SPECIFICATIONS. ANY CONFLICTS BETWEEN OR WITHIN THE THEREFROM. 2. REMOVE WASTE MATERIAL AND RUBBISH CAUSED BY EMPLOYEES, SUBCONTRACTORS AND TRADES 22) CARPET SEAMS N . DRAWING AND SPECIFICATIONS ARE TO BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE RCM AND a. PROVIDE ADEQUATE WASTE RECEPTACLES AND DISPOSE OF MATERIALS WHEN FULL. A. THE CARPET VENDOR SHALL COORDINATE DIRECTION OF CARPET SEAMS WITH RITE AID'S CONSTRUCTION MANAGER ARCHITECT. UNLESS DIRECTED OTHERWISE THE MOST STRINGENT CONDITION SHALL APPLY. 7) JOB SITE ADMINISTRATION: b. PROPERLY STORE VOLATILE WASTE AND REMOVE DAILY. PRIOR TO BIDDING. NO ADDITIONAL MONEY SHALL BE PAID IF SEAM DIRECTION IS INCORRECT AND MUST BE CHANGED r A. WORKMEN — CONTRACTOR SHALL AT ALL TIMES ENFORCE STRICT DISCIPLINE AND GOOD ORDER AMONG HIS c. DO NOT BURN OR BURY WASTE. (IF COORDINATION HAS NOT OCCURRED). H D. ANY CONTRADICTIONS BETWEEN SPECIFICATION SHEETS AND CONSTRUCTION DRAWINGS SHALL BE BROUGHT TO THE WORKMEN AND SHALL NOT EMPLOY ON THE WORK ANY UNFIT PERSON OR ANYONE NOT SKILLED IN THE WORK d. DO NOT DEPOSIT WASTE INTO STORM DRAINS, SANITARY SEWERS, STREAMS OR WATERWAYS. H ATTENTION OF THE ARCHITECT AND RITE AID CONSTRUCTION MANAGER FOR VERIFICATION. ASSIGNED TO THEM. e. DISPOSE OF WASTE IN ACCORDANCE WITH APPLICABLE LAWS. 23) EXISTING ITEMS & EQUIPMENT A. THE CONTRACTOR SHALL INCLUDE MONEY IN BID TO CLEAN, REPAIR AND REPLACE IF NECESSARY ALL EXISTING E. ANY AND ALL ERRORS, DISCREPANCIES AND "MISSED' ITEMS ARE TO BE BROUGHT TO THE ATTENTION OF THE B. BRACING, SHORING & SHEATHING — CONTRACTOR SHALL DESIGN, FURNISH AND INSTALL ALL SHORING, BRACING 14) DELIVERY, STORAGE & HANDLING: ITEMS/EQUIPMENT TO REMAIN AND BE REUSED. THESE ITEMS/EQUIPMENT MAY INCLUDE, BUT NOT BE LIMITED TO, ARCHITECT DURING THE BIDDING PROCESS BY THE CONTRACTOR. ALL THESE ITEMS ARE TO BE INCLUDED IN BID. NO AND SHEATHING AS REQUIRED FOR SAFETY AND FOR PROPER EXECUTION OF THE WORK AND HAVE SAME REMOVED IF A. THE CONTRACTOR SHALL CONFINE APPARATUS, STORAGE OF MATERIALS AND OPERATIONS OF HIS WORKMEN TO EXISTING LIGHT FIXTURES (INTERIOR AND EXTERIOR), EXISTING EXIT OR EGRESS LIGHTS, EXISTING MECHANICAL UNITS, "EXTRA" WILL BE ALLOWED FOR MISSED ITEMS. REQUIRED WHEN WORK IS COMPLETED. LIMITS INDICATED BY LAW, ORDINANCES, AND PERMITS AND SHALL ARRANGE AND MAINTAIN PARKING OF VEHICLES EXISTING ELECTRICAL SERVICE, ETC. CONTRACTOR IS TO COORDINATE WITH RITE AID CONSTRUCTION MANAGER TO C. GENERAL CONTRACTOR IS TO BE RESPONSIBLE FOR ALL ON—SITE SAFETY FROM THE TIME JOB IS AWARDED UNTIL AND STORAGE OF MATERIALS IN AN ORDERLY MANNER LEAVING ALL WALKS, DRIVEWAYS, ROADS AND ENTRANCES IDENTIFY EXISTING ITEMS/EQUIPMENT TO BE REUSED, THEN IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT AND F. GENERAL CONTRACTOR TO REVIEW ALL DRAWINGS IN SET. ALL WORK IS COMPLETED AND ACCEPTED BY THE OWNER. UNEMCUMBERED. EVALUATE ALL SAID ITEMS/EQUIPMENT IN THE FIELD PRIOR TO SUBMISSION OF BID. G. GENERAL CONTRACTOR TO PROVIDE A COMPLETE BUILD—OUT WITH ALL FINISHES, MECHANICAL AND ELECTRICAL 15) INSTALLATION STANDARDS: 25 D. PROTECTION OF PERSONS — CONTRACTOR SHALL PROVIDE INSTALLATION AND MAINTENANCE OF NECESSARY ' ) OWNER GENERATED DRAWINGS COMPONENTS AS SHOWN OR INDICATED ON DRAWINGS. GENERAL CONTRACTOR TO PROVIDE ALL ITEMS SHOWN ON PRECAUTIONS TO PROTECT ALL PERSONS ON THE SITE, INCLUDING MEMBERS OF THE GENERAL PUBLIC, FROM INJURY A. FOLLOW MANUFACTURERS DIRECTIONS UNLESS OTHERWISE INDICATED IN CONTRACT DOCUMENTS. A. OWNER GENERATED DRAWINGS ARE NOT THE RESPONSIBILITY OF STAMPFL HARTKE ASSOCIATES, LLC. ALL DRAWINGS AND WRITTEN IN SPECIFICATIONS, UNLESS NOTED OTHERWISE. OR HARM. 16) PRODUCT SUBSTITUTIONS: CONSTRUCTION WORK (EXCEPT FINISHES, FIXTURES AND CASEWORK) SHALL BE PER THE ARCHITECTURAL DRAWINGS H. ALL ITEMS SHOWN ON DRAWINGS ARE TO BE FURNISHED AND INSTALLED BY GENERAL CONTRACTOR UNLESS A. USE ONLY PRODUCTS FROM A SINGLE MANUFACTURER FOR ONE USE. AND SPECIFICATIONS UNLESS OTHERWISE NOTED. ALL FINISHES, FIXTURES, AND CASEWORK, SHALL BE PER THE FINISH E. PROTECTION AGAINST WEATHER — CONTRACTOR SHALL AT ALL TIMES PROVIDE PROTECTION AGAINST WEATHER SO DRAWINGS AND SPECIFICATIONS UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SPECIFICALLY NOTED OTHERWISE. AS TO MAINTAIN ALL WORK, MATERIALS, APPARATUS AND FIXTURES FREE FROM INJURY OR DAMAGE. AT THE END OF B. WHEREVER A PRODUCT OR CLASS OF MATERIAL IS SPECIFIED EXCLUSIVELY BY TRADE NAME, NAME OF MAKER, OR COORDINATING THE ARCHITECTURAL DRAWINGS, SPECIFICATIONS, FIXTURE PLANS, AND FINISH PLANS. THE G THE DAY'S WORK, ALL NEW WORK LIKELY TO BE DAMAGED SHALL BE COVERED. BY CATALOG REFERENCE, USE ONLY SUCH A SPECIFIED PRODUCT. PRODUCTS AND MATERIALS NOT SPECIFIED IN THE CONTRACTOR SHALL NOTIFY THE ARCHITECT AND RITE AID CONSTRUCTION MANAGER IN WRITING IMMEDIATELY OF ANY G CONTRACT DOCUMENTS AND INSTALLED IN THE WORK SHALL BE REMOVED AND REPLACED WITH SPECIFIED PRODUCTS DISCREPANCIES. AND MATERIALS AT NO ADDITIONAL COST TO OWNER AND FOR NO ADDITIONAL TIME ADDED TO CONTRACT. — z G1 GENERAL NOTES 0 NONE Q SHEET NOTES ® Lao F F Imu E E EU HOWARD G. KIMURA D � � D 8-2013 REN N, WASHINGTON ?j 3658 OF �vv GENERAL NOTES A. G.G. SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO START OF CONSTRUCTION. C B. G.C. IS RESPONSIBLE FOR NOTIFYING ARCHITECT IF ANY C DISCREPANCIES ARE FOUND WITH EXISTING CONDITIONS AND PLAN. a 0 Uin N in N � LEGEND Z Cl) 0 O) N f 00 W C) 6 Q Z B B Drawn Checked Approved HGK Project No. 13-6173 Title GENERAL NOTES A A Sheet No. A-002 1 2 3 4 5 1 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Lo M C2 co C Co J N N M Z Z M 3 °' LO � o w w @ED m ® ® � L � Z Z Y af 005 005 s- Y Y 005 ww,, :21 W J i C 00 ■ L > L' 0 Q 0, 0 TERMINAL a ° o m L ROOM L Y s N J N O 0 C U CO O I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I L____ 008 1 010 010 010 I I J I K 1 — — — r---� r---� r---� r---� r---� r---� r----i r---� r---� r----i r---� K r---_1 7-7 I I I I I I I I I I I I I I I I I I I I I I I I I I 1 I I I I I I I I I r—T--1 r—T--1 I--T--1 I—T—'-I r—T-1 r—T-1 I I I II I I II I I II I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I II I I II I I II I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I II I I II I I II I I I I I I I I I I I I I I I I I I I I I I I I L_1_J I I I I I I I I I I I I I I F--i _H F—T-1 L—T—J F—T—� L—T_J L—T_� L—T—� L—T—J L—T—� r—T-1 L—T—J �—T-1 1 I r--T—_1 F_—T—_1 F_—T__1 F—T-1 r—T—� I I I II I I II I I II I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I L___J I I I I I I I I I I I I I I I I �— I I II I I II I I II I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I II I I II I I II I L_1_J L_1_J L_1_J L_1_J L_1_J L_1_J L_1_J L_1_J L_1._J L_J__J L_J__J L-1__1 L_1_J L_1_J L_1_J L_J__J I � I II I I II I I II I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I r— I II I I II I II I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I M I--+--ILo 16. I II I I II I II I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I II I I II I I II I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I JF—T-1 LO Cl)r—T—� r--T-1 r--T--i r—T—� r—T-1 r—T—� r--T-1 r—T--1 r—T-1 r—T—� r—T—� r—T—� r--T--1 r—T-1 r—T--I I J I I II I I II I I II I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I II I I II I I II I ` I I I I I I I I I� I I I I I I I 1 01 1 1 1 1 1 1 1 1 )k I I I I )k I I I I I I I L_ 1 I II I I II I I II I I I I I I I I I I I I I I I I I I I I I I I I I I L —7 1 1 1 1 1 1 1 1 1 1 1 1 I 1 1 I 1 LJLJ LJLJ LJL_J L_1_J L_1_J L_1_J L_1_J L_1_J L_1_J L_1_J L_1_J L_1_J L_1_J L_1_J 1 L_1_J L_1_J L_1_J L_1_J L_1_J II I I II I I II I I I I I I I I I I I I I I I I I I 1 I I I I 1 1 1 I I I I I I I I I I II I I 11 I I II I I I I I I I I I I I I I I I I I I I I I I I � I I I I I I I I I I I 1 1 I Y, I I Y, I I Y, II I II I I II I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I J � f '� `1 u_ .I L—L—� —L—� I--J —� I--1— —1--I I —1—� —1— I I--1--I I--1—� —1— I —1— I —J--J �--1--4 L-1-4 k-1-4 I L II JII I I I I I I I I I I I I I I I I I I I I I I I I I L—_J L__J L__ L---J uJ O I I I L_ r---1 F---1 F---1 F----J F___7 r---_1 r----_1 F ---J r ---J �----� F ---J --- F_--1 r--77 F r---J r---J r ---J i r I I I_— — 1 I _ _ 1 I__ 1-- — 1 I _ _ I I I__ — I__ I__ I I _ I I-- I I 1 I__ I 1 f—T-1 I T I F T 1 I � � I T— I I T I � T � �—T— I I T I I —T— I I T— I I T--1 L—T— I I H�� I T— I I I I I T— I I —T— I I T— I L I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I L_J I I I I I I I I I I I H I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I * I I I I I I H I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 01 2 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 r—T-1 r—T—1 r—T-1 -1 F_—T—_1 r—T-1 F_—T-1 r—T-7 F_—T—_1 F_—T—_1 F_—T—_1 F_—T—_1 F_--I--_1 r—T-1 r—T—� F_—T—_1 �— I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 L_1_J L_1_J L_1_J L_ _J L_1_J L_1_J L_1_J L_J__J L_1_J L_1_J L_1_J L_1_J L_1_J L_1_J L__I__J L_1_J L_1_J L_1_J I I I I I I I I I I I I I I I I I I I I I 001 1 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I r_ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I ❑ 012 I I I I I I I I I I I I I I I I I I I I I I II I I I I I I I I I I I I I I I , O I I I I I 1 I I I I I I I I I I I I I 1 I I I I I I I I I I I I I I I I I r-7-1 I I I I I I I I I I I I I I I 1 I-T-i I I I I I I I I I I I I I I I I I I I I 1 I I I H1-4 L---J L---J L---J L----J L___J L___J L---J L___J L___J L___J L___J L___J L___J LL_J L___J L____J L___J L---J 1 0 1 I O I r---� r---� r---� r----i r---� r---� r---� r---� r----i r---� rT T1 r----� L---� 1 r---� r---� r---� I F—T-1 r—T-1 r—T-1 F—T— i F-T— I f —T—� —T—� r—T—J LJ_------ LJ— � F 1 --� r---� I I I I I I I I I I I I I I I I I I I 1 1 I I I I L_, L_, I I 1 I I I I I I I I I I I I I I I F 1 I I I I I I I I I I I I I I I I I I I L_1_J I I I I I rT-1 rT7 I _ L_1_J _ I I I I I I I I I I I lzu 1 �—T— r—T-1 r—T-1 r—T-1 r—T-1 F—T—� F_—T—_l r—T__1 f —T—J 1 1 r—T—_1 F_—T—J I I I I I I L T—� I I I L T—J L—T—J F_—T—J L—T—J L—T—J I F— I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I__ L_J__J L_1_J L_1_J L-1_J L_1_J L_1_J L_1_J L_1_J L_1_J L-1_J I I I I I I L_1_J L_1_J L_1_J L_1_J L_1_J L_1J _ I I I I I I I I I I I I I I I I I I I IrTJ I I I I I I I I I I I I I I I I I I I J I I I I I I I I I I I I I I I I V I I I I I I I I I I I I 1 I 1 I I I 1 1 1 I I I I I r— I I I I I I I I I I I I I I I I I I I I I I I I I I L- L� I I I I I I I I I I I I I I I I I L_J L__J r--T--1 J I I I I I I I l o l I I I I I I I I I I I I I I I I I I I I I I I 1 I I I I I I I I I I I I I rr�� 1 Cm I I I I I I I I I I I I I ( LJ1 1LJ1 i_1_ f•—t-1 r—t-1 r—T-7 r—T—1 r—T-7 LL_J1L—J r—T--1 7—T-7 r—T--1 r—T--1 r—T--1 I L---J I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I L- 1 I I I I I 1 I I 1 I I I I 1 I I I 1 I 1 I I I 1 I j F—T-1 F—T-1 I I I I I I I I i I J I I I I I I I I I 010 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I r-7-1 I I I I I I I I I I I 1 1 1 1 1 I L_1_J L__L_J -L--I I J I I I I 1 I 1 L L L___J L L -- I I �T-1 STI LL_J 1 I L J FT 1 1 1 1 1 1 1 1 1 1 I I I I 1 I 1 I F— F---r—� 1\ I\ 1 1 1 1 1 1 1 1 1 1 I I I I I 1 1 I 1 1 1 1 1 1 \I \I 1 1 1 1 1 1 1 1 1 I I I I 1 j j I I I F rl I rl I FF I rl I I I I 130:1I � I ® I � I L- 1 I 1 1 1Ed 1 1 1C: II IE€� II I[€0 r---� �� �� I 1 �i ]i l ��l t Lel O I II I L�� I I I I I 004 ;— ���� ������ I 11 I 11 1 11 1 11 I 11 I ______ � . � i 1 I II 1 I II I I II I I II I I r—� I j I --- ---�--� L_ _J L------J L=i====�� L—J II L_J II L_J II L_J II L_J II L------J --- 6 FILM ------ ------ ------ 1 I 1 OO9 ---11======JJ LL===— J1L J�---�—�—J I ! I D 010 I D 7 T ---J L___7 T T r____r___,____T_ ����� I I I I I I 013 DEMOLITION NOTES: 001 REFER TO OVERALL PLAN, SHT A101 FOR WORK RELATED TO REMOVAL AND REPLACEMENT/RELOCATION OF STEEL FIXTURES. C 002 REMOVE EXISTING WAITING ROOM CARPET, CHAIR RAILS, CHAIRS, DRINKING FOUNTAIN IF EXISTS C AS REQ'D TO MAKE ROOM FOR NEW CONSULTATION ROOM LAYOUT PER A101 W 003 REFER TO RCM SCOPE OF WORK TO DETERMINE EXTENT OF NEW FLOORING AND IF OVERLAYED OR DEMO W/NEW x 0 004 REMOVE EXISTING PHOTO DEPARTMENT CASEWORK, CHEM. FLOORING, SHELVING AND EQUIPMENT SHOWN DASHED. tz DISCUSS WITH RCM HOW TO REMOVE AND DISPOSE OF PHOTO EQUIPMENT. o 005 REFER TO A101 AND REMOVE ACCESSORIES SPECIFIED AND REPLACE WITH MODEL SHOWN AT HTS SPECIFIED AT LOUNGE AND TOILET ROOMS. AT LOUNGE, REMOVE EXIST. COUNTERS SHOWN DASHED Z M 006 REFER TO RCM SCOPE OF WORK AND REMOVE EXISTING FLOORING AND CEILING TILE PER RCM'SN >- 1506 BUDGETED AMOUNT, THAT ARE IN DISSREPAIR. 0 007 EXIST. BLOOD PRESSURE MACHINE AND ELECTRIC WATER COOLER TO BE RELOCATED PER A101 Z B SEE A101 FOR LOCATION B Drawn 008 REMOVE EXIST. ELIASON DOORS, RETAIN EXIST. HOLLOW METAL FRAME Checked 009 REMOVE EXIST. CHECKSTANDS AS REQ'D TO MAKE ROOM FOR NEW PER A101 Approved HGK 010 REMOVE EXIST. WALL STEEL SHOWN DASHED, SEE A101 �C,�ED V'C�r Project No. 13-6173 ® CLEAN UP PHARMACY FRONT WALL TO PREPARE FOR NEW WALL PAPER, REMOVE EXIST. COUNTER TOPS AND REPLACE WITH NEW PER A101 xowARn G. xIMURA 012 REMOVE EXISTING COUNTER TOP AT PICK-UP AND DROP-OFF LOCATIONS AND INSTALL NEW PER A101 AND RCM SCOPE OF WORK. Title Lu LAI 013 REMOVE PORTION OF STOREFRONT GLASS, AS REQ'D TO INSTALL NEW 3'X7' STOREFRONT DOOR PER A101. SEE A101 FOR LOCATION DEMOLITION PLAN 8-2013 REN N, WASHINGTON �j 3658 C' Sheet No. Al DEMOLITION PLAN A-003 1/89 = 1'-O" 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 1 3 4 1 5 1 6 7 8 9 10 11 12 13 14 15 1 16 I I SHEET NOTES ® (FOR DET. H8 ONLY) CONSTRUCTION NOTES RA 5354 - - - - - - - - - - - - - - - - - -I - - - - - - - NOTE: GC SHALL VERIFY ALL INTERIOR FINISHES AND SHEET NOTES COLORS HATH RCM DURING BIO WALK THRU MEETING TO KEY NOTES CAPTURE THE LATEST UPDATES FROM CORPORATE. J CO 1 CONSULTATION ROOM: m i 1) INSTALL NEW STEEL THROUGHOUT STORE AS s' N N M o01 DUPLEX OUTLETS IN NEW CONSULTATON ROOM, TYP OF 2 CEILING: ARMSTRONG GEORGIAN (763) 2X4 SHOWN. M = 0" to N 8 PHARMACY F1 WALL COVERING: KOROSEAL RITE AID "BONE WHITE" GC X 00 RELOCATED ELECTRIC WATER COOLER, PROVIDE 2) INSTALL NEW CHECKOUT AS SHOWN. cc (THE PATTY MADDEN LINE OF PRODUCTS) GABI U 3) INSTALL NEW PHOTO KIT AS SHOWN. E E WATER & POWER � A102 LXB-GAB-03 "BONE WHITE." #,, E C-3he 0o EXIST. COUNG IN SALES AREA TO REMAIN cB-2 I I FLOOR COVERING: MATWORKS - EARTH QUEST - GC 4) INSTALL NEW COOLERS & FREEZERS AS A D NT P A MA"Y COVE BASE: JOHNSONITE FUDGE RWDC-167-GC SHOWN. te Q 004 GC TO VERIFY SPRINKLER HEAD LOCATIONS AND (D W LL EA NTP \rS 2. CHAIR RAIL AT PERIMETER OF CONSULTATION ROOM AT 5) CONSTRUCT NEW CONSULTATION ROOM AS = w PROVIDE DESIGN-BUILD SERVICES TO VERIFY 32 A.F.F. CHAIR RAIL- JOHNSONITE - FUDGE NEW PLACEMENT IS ACCEPTABLE PER CODE I I I I CHR-167-C SHOWN. s 005 NEW AC PNL CEILING AT 8-6 AFF WITH NEW 2X4 RECESSED MTD 1 6) CONSTRUCT NEW WAITING AREA AS SHOWN. n 00 3. VESTIBULES AT TOILET ROOMS & SALES FLOOR WALLS: i .? o UNLESS DIRECTED OTHERWISE BY RCM TO USE EXIST. 7 INSTALL NEW VALANCE AS SHOWN. FLUORSCENT LIGHT FIXTURES. MARLITE WALL PANELS: ) = a 0 CO 006 NEW OUTLET FOR BLOOD PRESSURE MACHINE 8 I WALLS: INSTALL MARUTE ARTIZAN MONTEREY SAND 8) INSTALL NEW COSMETIC PROMO TABLES AS _ 007 ® 007 O W M. RECEIVED FRP 54oa SHOWN. 2 INSTALL NEW AIR SUPPLY, CONNECT TO EXIST. HVAC SYSTEM MAY 15 2013 BASE. JOHNSONITE FUNDG RWDC-167-GC o 0) L I I I I EF I I I I I VERIFY COLOR AND FINISH WITH RCM AT BID WALK 9} INSTALL NEW HIM & HER ENDS AS SHOWN. L 0 - 00 DUPLEX OUTLETS IN WAITING ROOM 6 CITYOFTIGAIRD 10) INSTALL NEW WELCOME FIXTURE AS 4 ,_ c-t 4. FRONT WALL OF PHARMACY: PREPARE GWB SURFACE 2 WITH TO RECEIVE GREEN LEAF RX MURAL ON OUTER 009 GC TO REVIEW FIRE ALARM STROBES & ALARMS AND PROVIDE �� BUILDI�IG�VISI0�1 wALL LSI, BLAIR OR ENTERA. SHOWN. N o NEW ® DESIGN-BUILD SERVICES TO ACCOMMODATE CHANGE. 01AH1 NEW Co WAITING GFCI 010 DUPLEX OUTLET FOR BLOOD PRESSURE MACHINE 6 WA I 5 WALLS: INSTALL NEW MARLITE WALL COVERING ON WING 11) INSTALL NEW FITNESS COOLER AS SHOWN. 011 ADJUST 1X4 LIGHT TO CENTER WITHIN VESTIBULE, INSTALL NEW GRID CONSULT M. 2 I ITING I I I I WALL OR MATCH EXISTING ADJACENT MARLITE 12) INSTALL NEW WELLNESS STATION AS COVERINGS. OTHERWISE USE NEW MARLITE ARTIZAN SHOWN. IN AREA012 MODIFY GRID AS REQ'D TO CENTER 1X4 UGIT RECESSED LT FIXTURE NEW AREA MONTEREY SAND FRP #5408. VERIFY WITH RCM PRIOR c-t TO ORDERING AND INSTALLATION 13) INSTALL NEW BULK STACKS AS SHOWN. \ 02 NOS, CB-2 CONSULT. I FLOORS: INSTALL LVT FLOORING PER FIXTURE PLAN:ILI 14) CONSTRUCT NEW WALL TO DOWNSIZE A Ot CI I SEE OVERALL FLOOR PLAN, GENERAL CONSTRUCTION NOTES i 2 I ARMSTRONG LVT CARBONIZED BAMBOO - TP753 STORE AS SHOWN. CONSULT. GFCI O TO ACCOMMODATE NEW WORK. I LEGE I I I I 6. NO WAINSCOT WHERE WALL STEEL EXISTS. SEE A101 15) INSTALL NEW EMERGENCY EXIT DOOR AS PHARMACY INTERIOR: 110 E10 5 N H R C P AL ATMENT 7. FLOOR: MATwORKS PREFERENCE EZE SHOWN. K C PN , LEGEND : A6o1 P 1 1 2, 16 INSTALL NEW CART CORRAL AS SHOWN. K �.,.,...�.. S 0 BASE: COVE BASE JOHNSONITE FUDGE RWDC-167-A ) 8'-6» I WALLS AND WOOD TRIM: PAINT WADS BENJAMINE 17) REMOVE STEEL AND INSTALL NEW WALL NA 009 MTC XI T. W N O A L pR MOORE "CLOUD COVER OC-25 - - COVERING ON FRONT OF PHARMACY. ® AA S 0 8. PHARMACY COUNTER TOPS: �P P , 5E NTE 1 I CHANGE OUT COUNTER TOPS PER RCM SCOPE OF 18) INSTALL NEW SHELF AND PRIVACY PANELS WORK. WILSON ART - CASUAL LINEN #4944-38 FOR DROP OFF AREA AS SHOWN. I ------ -------------- CH R S O LAMINATE LAM. BY RA, INSTALL BY GC. 2X4 FLUORESCENT RECESSED LIGHT ................. Low G A A LI0 I N 9. SALES FLOOR FLOOR: LVT PATHWAY FLOORING PER 19) INSTALL NEW HAND MAGNIFIERS AT THE SEE NO FIXTURE PLAN: ARMSTRONG LVT CARBONIZED BANB00 FOLLOWING MERCHANDISE SETS: SKIN CARE, FIXTURE, LITHONIA, - TP753 2SP8-G-2-32-Al2-MVOLT-GEB NOTE: FOR SALES AREA FLOORING AND WA NI E , R M E A MATCH OR USE ARMSTRONG STRIATIONS BBT EYE CARE, FIRST AID, HAIR CARE, STOMACH, I 58 WATTS SCOPE OF WORK AND ASSOCIATED DECOR PLA OR�WA F1 SHE I y (BIO-BASED TILE) MUSHROOM 73611, 12"x24" ANALGESICS, COUGH & COLD, REFER TO SHEET A-802 FOR PROJECT FINISH SHAMPOO/CONDITIONERS, HAIR STYLING, (V co MATERIALS AND REFER TO RCM SCOPE OF WORK TO N DETERMINE EXTENT OF FINISHED MATERIALS NUTRITION, NATIONAL BRANDS, PHARMA,, N U WEIGHT MANAGEMENT, HEALTH, NATURAL REM, U C H1 REFLECTED CEILING PLAN (SCHEMATIC POWER/DATA PLAN H8 ENLARGED FLOOR FINISH AND WALL PLAN W-SLIM, MEN'S HAIR, AND CONVENIENCE FOOD. _ 1 4 = 1 —0 1 4 = 1 —0 20) 4 CUSTOMER PULL BASKETS SHOULD BE Q ,� _ SPACED THROUGHOUT THE SALES FLOOR AREA _ 0 LE'�EN -------�--— IN EASILY VISIBLE LOCATIONS AS FOLLOWS: BLACK FILM ON INSIDE TO CONCEAL BACK OF WALL STEEL 2 STANDS NEAR STORE FRANCES , NEW CEILING HEIGHT } s`- 1 STAND NEAR RX, AND 1 NEAR MIDDLE OF W O � 0 2' WIDE FLUORESCENT WALL MTD LIGHT TEMP. GLASS, THIS BAY B B Q B B B STORE PREFERABLY CLOSE TO THE 12 PACK IF < 24" ARG FROM NEW DOOR J z BEVERAGE MERCHANDISER. ~ O E-- 4', . TUBE, FLUORESCENT, RECESSED RAISED LOADING DOCK a 21} EX. SLIDING GLASS DOORS TO REMAIN, ® MTD. SEE SCHED. SOFFIT OF OVERHANG s-0, o 8, (4) 4 TUBES, FLUORESCENT, RECESSED a 1� ® -�" �9'-� w'- ,' LOCK AND INSTALL BLACK FILM ON INSIDE MTD. - SEE SCHED. H ® INSTALL TEMP. GLASS WITHIN ETR FACE NEW 2'X4', 4-LAMP LIGHT TO MATCH EXIST. �� 24" ARC OF NEW DOOR E R H b TELEPHONE LINE, PROVIDE 1/2' CONDUIT W/ PULL LINE TO A POINT 6° ABOVE AC PNL CEILING NEW STOREFRONT DOOR TEMP �� EXIST. EGRESS DOOR - INSTALL (3) INTERIOR COMPRESSOR I INDICATES NEW PHONE LINE H DATA JACK, PROVIDE 1/2° CONDUIT W/ PULL LINE b ® ® I UNITS FOR (6) COOLERS FREEZERS TO A POINT 6" ABOVE AC PNL CEILING —=— --=_ -=- -=- ------- - W/ PANIC HARDWARE a / --------------=—_ KAWNEER, 2X4.5" FRAME, AND PUMP CONDENSATE TO NEAREST • EXIST. SPRINKLER HEAD —_-- --------- — - UTILITY SINK --_= --______—= 1=�_ -= INSUL. CLASS, MATCH FINISH, ---- =-= —____= _- _ PROVIDE 4' WIDE PAI T 3'-0' HT STU WALL TO DELINEATE P.T. 4X4 BOLTED r0 CONC. FLR W/ � ErR ErR ET R p EXIST. SPEAKER —____ _—__—___ - -.=s:-. _ GLASS LOC (CENTERED OR FLUSH --__�: _= — MTD) ANG COLOR OR APP'D EO. LINES 18" OC AT A �5 F. EGRESS PATH ER 1014.2(4 .4) i/2" DIAM EXPAN BOLTS. COMPR. U IT ® NEW EXIT SIGN (ILLUMINATED) ---- _ -_== - I BOLTED TO 4X4 PER MANUF. SPECS ----=-= - _ DEGREE ANGLE TO D SIGNATE 3625125-33 TUDS AT 16" OC EXI =TEMP. CONTROL __—_ _-__ EM_ _TEh^ EM PANEL 15 INFILL EGRESS PATH. PAIN SIGN / W/5 f 8" GWB ASIDE WITH WD CAP SPACE OUT UNITS WITH CLEARANCE ® =V-SAT ---_- ——--_- - =_— - SITE VERIFY EXACT DIMENSIONS "DO NOT BLOCK EGR SS PATH" 24 X30" STL GLE BOLTED TO FLOOR ON ALL SIDES PER MANUF. REQ'MTS. R EXIT -=_ = ON CONCRETE SURFACE AND STUD WA TO STABILIZE UNSUPPORTE TERMINAL ETR =DUPLEX OUTLET - GROUND FAULT INTERRUPTER _s IN FIELD PRIOR TO ORDERING GLASS END WALL CO G., TYP OF 5 LOCATIONS $'G gppn wP =DUPLEX OUTLET - WEATHER PROOF EXIT ONLY -=:�� AND CONFIGURATION I I A801 G =QUADRUPLEX OUTLET SEE A5/A102 OR LOW HEIGHT WALL IL A9 G b =DUPLEX OUTLET (MT. AT 18" AFF UNLESS NOTED OTHERWISE) �� RR A102 ® ETR m CARPET =DUPLEX OUTLET- ISOLATED GROUND - - - - - - - - - - - - - - - - - - - TS-1 Z =QUADRUPLEX OUTLET- ISOLATED GROUND NEM,71 ( ) 6 B RESILIENT FLOORING - ------- ------------ - --------- NEW 48'(90")16"BD® -- -- � 90' 1 D® -- ----------- I =DOOR BELL (90" ) 16"BD W12 EMERGENCY EXIT ETR) �- =JUNCTION-BOX EXIT 7 7�+ F� FP P FFT Q $ - LIGHT SWITCH ' ' 10'-10" 8'-5• ��p 8'-5' 8'-S' B'-8" il 8'-5" B'-S" B'-5' 8'-5' 9'-0- 8'-8' 8'-3' 8'1° 8'-3' 10'-10' � $3 =THREE-WAY SWITCH - - - - - T-9- V-6. 5'-6* 5,-6• 5'-9' 5'-6' 5,-6, 5'6" 5'-6' 6' I• 5-9' S'4' S'-4' O Y -TELEPHONE LOCATION eI _70! CL -HARMONIC JACK LOCATION o oA - R E S I L I E N T TO CARPET O/C -ABOVE COUNTER \ i i � ,r F ,CC PHOTOCELL UNIT - LOCATE OUT OF DIRECT m a o ,' n �� F U SUNLIGHT, UP INSIDE CANOPY AREA m 0 0 0 � 0 "" "" ® s B o RESIDENT FLOORING EMERGENCY LIGHTS o TRANSITION STRIP v �. �•i .,C A R R .„C iP. R JS R �*. JC n TS-3 6 6 A9 8,G F3 ENLARGED EXIT DOOR PLAN / PLAN N N N N I N N N N N I N N N N Ai02 A$Di LE COMPOSITION 91 6 _174 = 1 —0 — — — — — — — — I — — — — — — — — — z z z z z z z z z z z z z z l IEf I I I I I ET O POWER A" 616(D)® RE°° I, 13 2a � A601 QCT TO RESILIENT 2 NESP M7 [tFq E WSTATIQN z TIII I 1 i 6R i 0 E POWER I - F15 FLOOR FIN. JOINT ` N 8'-B• 8'-5' 8'-5' ��8'-J" 8'-5' REO'D - � 9' 5'-6* S_8 S a 5 b' S ti 5 11 S t It 6• 5-3' �MDOWN=ARFA GARDEN CBM I 17. ,.. �, \` 11 I '`,\� _ ,%' I A9A 9737 SQ Ff WALL PANEL KEY c 01 W o NEVI _� I I I Q 0 0 � " y �' B �„■ A102 L �-� I�'`t IIII ,9 19 � ,9 19 Y �, 49» TO I 12 I o o m y ,III 1 E vE uo io co oo ao m o ao W BOTTOM OF SFOAERN z N N N N N N N N z n N I I 11 REa o 16 8 #w z eutK ( u TOECAP I R I III I I z z z z z z z z z ETR D I I IIII IIII I I 1 wood wood � * D � � , 11I 11 I II II II III I o 1 II ( 109A i 1 I� J I I I I (I F15 3 �, 2 I s I I I I III 1 A101 �G � _ � % 1 g- II II II 1 m I 4 s GENERAL NOTES w � � � � � � � I � I I v � o , 8,_1» AREA I a I I I I _ RNG , z IIII III - T �r' `\ �i `�� i � PLAN DIMENSIONS ON THIS SHEET AND LARGE SCALE �� it pI = 6' (0') B I I I I \ // 1\ 11 ; � DRAWINGS ARE TO FACE OF GWB AND CENTER LINES OF iA\-) Nov N - I I I I Z B'-5�� 5' B-5' 8 ° B'-I° e'-5' 8'-3.� ��B-3 i WINDOWS UNLESS OTHERIMSE NOTED. 1 c' NEW 24'(6616 L8 I I I I I 5'-6' 51-6. 5'-6- 5'4 5'-6* 5'-6' S'{" 5' 4' 5,° ® - I I I I I I I o ETR SEE SHEET A-801 FOR DOOR TYPES. \ 1 47k_ ------------ • 7 10' I $ C W//LIGHTED CANOPY - - - I - - - - - ; - - - - —'— - - - - - C (E3WR REQ D) to NEW II II III N m CO NEW J w/uanEo cwoPr r+Enro) a III o ---JJ , � Lu Z ), 7 1$ ,n/O I w�I�'iM�CA�Pf ) z N N N N N N r C:) 6' (g ) W03 8 ( (�� � is II II I I I SEE SHEET A-802 FOR FINISH SCHEDULE. - �� I I I I � O 16"gD - NO BD \N MG I I I z Z z z z U) p �j Q �� NEW 2.01 (66 r6"LB® C054EOC1PR IAO TABLE I I I I I I I AG I ®I _� co w - o III III o � LEGEND C9 _ z w CMM PMR RM ID) II III ---- - ------------------------ -- o o aNN NEW 24' 66" 6"LB 504 I I I I I I IV R, I N NEW PARTITION ro � 0 5Iip -CI, BACK PANELS—IM SDE 009AEB0 TI6LE o I r a a a w/LDNIEo sNEL>Es cANOPr(PNR Rwro) Q o I I I ' �' o wo 20' EA c ECKour Z B = z w/LK REn SHMWS&CANOR(POR FOV) g_'-5� "° 2 EXISTING EXTERIOR WALL z I B ,�-., �, -, : -, 120M �Pw1DW I EXIT NEW 26'(6616'La so, 1 � � 111 1 S 1 � t O I Drawn EW cl `'' ------° -= - ------ - r ---= ------------ - --L ------ler aeacaur " ■r+-� - i�1-5-- ----------- ----------------------------------------------- EXISTING INTERIOR WALL Checked ---- - " _ ENEACENCY 21 Approved HGK .� NEW 3 2 6 6 6 ------ NEW 48�90"jl6 B N 20'(90 )13 LB , 7 -- --- 76"B--- 6' (9 ")i6"B� 1 - - - - - - - - - B ,oxn ----- ----- - -- -- ATM - -- oar 1 ' o ' Pp 66L - ________= EXISTING INTERIOR WALL TO BE REMOVED z ETR I $G " I �, 100A li ETR TR AFTER NON-LOAD BEARING STATUS HAS BEEN Project No. 13-6173 1 A801 I T Al? B. VERIFIED BY GENERAL CONTRACTOR. L-------------------- ----------- � �� ------ INDICATES ITEMS ABOVE Title I I I A9 NOTE: A102 F- HOWARD G. KIMURA PROPOSED FLOOR F1i AIOI a 100 INDICATES DOOR NUMBER (RE: K7/A-801) PLANS NOTE: GC TO VERIFY ALL EXIT DOORS 1HOWN ABOVE ARE EQUIPPED WITH A102 ROOM NAME -REFER TO H1/A101 FOR CLG FINISH INTERNALLY ILLUMINATE EXIT SIGNS WITH BATTERY BACK UP. 8-2013 xxx ROOM NUMBER - REFER TO H8/A101 FOR FLOOR&WALL FINISHES REN N, wnsxllvGTON F. A LIGHTS SHALL HAVE EMERGENCY LIGHTS ON 24 7 TO ILLUMINATE 3658 ® A q - REFER TO K7/A801 FOR DOOR SCHEDULE / PARTITION TYPE (RE G4/A-801) Sheet No. -REFER TO A1/A101 FOR DIMENSIONS THE COMMON PATH OF TRAVEL TO EXIT DOORS SHOWN. �' OF Ole QA WINDOW TAG (RE: A-802) Al 1 /4" PLAN OF NEW CONSULTATION RM. A6 PROPOSED FLOOR PLAN A- 1 01 3/32 = TV— RM MN (M- A—=) 1 2 1 3 1 4 1 5 6 1 7 1 8 T, 9 10 1 11 1 12 1 13 1 14 15 16 1 2 1 3 1 4 5 1 6 1 7 8 F 9 10 11 12 13 14 15 16 v 00 co :r J N in M -REMOVE EX. SIGNAGE 1 J CN C14 UE M d LOU') o EXIST ACCORDIAN GATE NEW GREEN LEAF MURAL WALL PAPER - NEW CHECKSTANDS, NEW POWER/DATA PROVIDE POWER TO g x TO EACH POINT OF SALE UNIT PER NEW PRINTER, ATM AND TO REMAIN IN FRONT OF PHARMACY WALL _ RELOC. WESTERN UNION PAINT LQWcI�2'SIRP pt-05 AUTUMN LEAF BUT PANT RECEIVED RCM AND MANUF. REQUIREMENTS -14 UPPER 2'STRIP AGAINST CEILING PT-01 ASTM TAN VERIFY COLOR AND DISTANCES 1MTH i� 0' € SAWCUT CONC. SLAB TO BRING ADD NEW DATA JBOX I t REFER TO DECOR PLAN _ _ — _ _ — _ _ _ — _ — _ —— — _ . _ — _ _ — — qP DRAVANGS MAY 15 2013 POWER & DATA UNDERGROUND TO " T *, < BENAMIN oORE•ASIIIENrAN # ss'EGCAt SPAM - - -- - - - - - - - - - -_ - _ - _ - _ - _ - _ - _ - _ - _ - _ __- _ - _ _ _ - - _ - _ - BENCH CHECKOUT UNIT COUNTER HT 36 A.F.F. •- -_--- - : - -_ - _ - - - - - _ - : :_ --- : . -- - - --- =-- -- -- - - - - - --= CITYOFTIG+'$RD SERVICE COUNTER PER .� __ _ _ __ _ __ _ _ ____ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___ _ _ _ _ _ _ _ _ . . _ . . _ . _ . BUILDtNGQiUISION ICC/ANSI A 117.1-2003 C5 , . _ . . _ . . _ . . _ . . _ . . _ . . _. . _ . . _. . _ . . _ . . _ . . _ . . _ . . _ . . _ . _ . . _ . . _ . . _ . . _ . _ . . _ . . - _-- - . PROVIDE POWER TO ALL NEW RELO EX. SECTION 904 PARALLEL _ _ _ _ _ _ _ _ _ _ -:_ flaw..uric -off-_ € € �T.=r �. _ CASHIER STATIONS, TYP. OF 3 / APPROACH A102 Q - -�T.,� �T_-:-.ter-T�-v . . _ . . _ . . _ . . _. . _ . . _ . . _ . . _. . _ . . _ . . _ . _ . . _ . . _ . . _ . . _. . _ . . _ . . _ . . _ . . _ . . _ . . _ . . _ . . _ . . _ . . _ . . _ . .. . . . . . . . . . . ... CD r INSTALL CHECKSTAND COUNTER TOP 36" o L - - - - - - - a Ir I I I ABOVE FINISHED FLOOR FOR H.C. ACCESS, \ L - _ - _ _ _- I I I 1 I SIDE APPROACH \ i u \\ cou = -_ - _ -_ = WALL STEEL C14 o \ TOP WITH NEMITV --------- ---------------- ---------------------------------------- --------------------------------------------------- -------- ---- _ - _ - _ . . _ -_EXIST.1RIMiOMATCH +++ — _ . ._ . . _ . . _ . . _ . . _ . . _ _ __ _ _ _ _ _ _ _ _ _ _ _ — _ — _VMnEMARIA PANEL- - - - - - 7 7 _ _ _ _ _ _ ----------------------------- ---- --- --- ----__ ---- - . _ 1 _ . . _ . . _ . . _. . = - - - - - - -- - -- - --- - -- - . - - - -- - - -- _ . . _ . . . - --- - -- - ---- o NEW CONSULTATION REPAIR DOOR V RUBBER BASE ROOM DOOR WAITING ROOM PICK–UP COUNTER WORK STATIONS DROP–OFF COUNTER K VERIFY IF REFRIG. REMAINS IN THIS CORNER WITH RCM K F1 FRONT PHARMACY WALL TREATMENT SCHEMATIC POWER AT PRINT STATION 3/160' = 1 -4 NOTE: G.C. TO VERIFY ALL NEW EQUIPMENT W4 t) " - BEING INSTALLED IN PHOTO DEPT. AND i co DQS pp5 CONFIRM ELECTRICAL REQUIREMENTS PRIOR TO BIDDING TO ACCOMMODATE NEW EQUIPMENT REFER TO GENERAL CONSTRUCTION NOTES ON d '— � h SHEET A101 FOR ADDITIONAL INFORMATION - — Q 5'-6" 36"MAX HEIGHT, SIDE APPROACH, SERVICE DUAN VIEW 429 LINE CABINET 20429 LINE CABINET VERIFY 90UNTER PER ICC/ANSI A117,1-2oC3 SEcTIaN 2-2 CONFIGURATION 1?486 COUNTER TOP 12486 COUNTER TOP I W 0 M X04 PROVIDE NEW TELEPHONE DATA LINE AND 30 BASE FRONT 20430 BASE FRONT �-- 00 POWER FOR RELOC. WESTERN UNION UNIT & BACK & BACK •-- O I— NEW GFGI OUTLETS As SHOWN NOTE: 2 PRINT STATION SHOWN SEE A102 FOR NEW LOCATION AT CHECKSTAND � N TYP. OF 3 HOWEVER 1 WILL BE INSTALLED TYPICAL �� �CAL TYPICAL DOS 17 COUNTER IT P F2D NEW Cl ECKOIJT C5 NEW MICROWAVE REFER To PLAIN FOR CONFIGURATION FILM DRQ PROVIDE NEW OUTLET PER NEW COOLER p�0�40� BASE (FRONT A102 H F— NEW PROTOTYPE 30" CABINET ALONG EXTERIOR WALL AS NEEDED, SEE A101 RRAL & BACK) H Lp J WITH MICROWAVE OVEN BELOW rte► o IF EXIST. OUTLETS ARE IN CORRECT LOC. AND 12888 F2 N N --i N, 12888 r-----� r---� MAX. HT DINING/BREAK RM X ARE ON SEPARATE CIRCUITS THEY MAY BE I I I NEW PHOTO KIT o COUNTER 34" A.F.F PER ICC/ANSI g ' o o II l o CN CN A117.1-2003 SECTION 902.3 REUSED. VERIFY PRIOR TO SUBMISSION OF BID T N NEW CHECKOUT ,N EW , PASSPORT ' w 1 .3 13273 13273 INSTALL ALL DATA AND 120 VOLT PROVIDE POWER FOR OVERHEAD VALANCE -------------------- � - �-�- -- --RI4QT9--- ------------ +++ --------- ------------- -- ----�-- - - ---- NEW PROTOTYPE COUNTER JUNCTION BOXES; IN CROSS HATCHED AREA SEE OVERALL FLOOR PLAN A101 FOR NEW +++ NEW 20' (9O ) 13 LB w14 ------ 16"BD SCREEN 8, -- --- ------- EW ----_ ---- WITH REFRIGERATOR BELOW WALL STEEL/VALANCE 10271--­,, -------------- -------------------- ------------------------------------------T ATM � Das E R 3366 CONFIRM SCOPE OF WORK IN LOUNGE REAR R VI EYY _ � _ _ _ _ _ _ _ _ _ _ � UNION p WITH RCM AND DURING BID WALK THRU G KITCHENETTE ELEVATION 2--2 CONFIGURATION ,o� #, G C1 KITCHENETTE ELEVATION C5 PRINTER 0 COUNTER ELEVATION _ NTS IT'S ENLARGED CHECKSTAND AND PRINTER STATION I— �C L � 0 � n � n, F � � F (J F11 CHECKSTANDS / SCHEMATIC POWER l DATA - PHOTO COUNTER I I I Q 4 E 5 GC TO VERIFY EXACT @ RESTROOM LAYOUT AND Epji� 7 REPLACE THE LISTED g 8 ACCESSORIES AS NOTED Ci T AT THE HEIGHTS SPECIE D Aio2 DBL MI STUD i , "%W C"%W � �� i n 1x WOOD SILL cur Q ,>..- ETR (;l`~� TO FIT WITH 1X2 OVER 362S125-33 METAL STUD 1fi"OC BOLTED TO .• STL ANGLE AT TWO LOCATIONS WITH 1/2 DIAM T R ve_:� -AS SHOWN, EA SIDE THRU BOLT. �/ } qC 0 n o Ext. AECTI I_r 1T ' • •'v" LI't .'�`hL 1 EI1t41� -' l"Ut 'r{�f�lwt Secure bracket UL'k . , V"11t11 #4x8' Flex 1-1©�t>j�Crr�ti',�. E3 se Deck Deptll -5/8 GWB EA SIDE PROVIDE (2) 3/16" THICK (SEE PLAN) (. rcuoc#eU in Valance kit by FtQC;I Q ,�� ✓" STEEL FLAT BAR 3" WIDE X 30" HIGH �d I D WITH A 24" LEG ON CHIC. FLOOR : - . F] BOLTED WITH 1/2' DIAM. EXPAN BOLTS I D I AT 12" OC. SEE ELEV. FOR PLACEMENT :•' • ,•. � ,� CD 1X PAINTED WD TRI II ' �� CD INSTALLED FLUSH WI H NEW TI\\ I ALTERNATIVELY, (2) 2"X2"X3/16" WITH 24" HORIZ. 'a o Ex. A t tT� VALANCE TO CLOSE GAP FROM 3 000� AND 30 HT MAY BE USED WITH SAME ATTACHEMENT After alignment Secure bracket BOT: OF VALANCE T TOP o (,ETR) L -- AS ABOVE. with#1r8x518"' Hex HD SIJ 8cre�,,v E I / (provieci 4r� Valrtce kit yC OF COOLER UNIT 240' CVV Valance C e>cure Valance tivith Hardware provided � C L a in kit (provided,in ValarLee kit by'FDC) 'NOMCE' 8c� c zit Valance is Edgebanne�l a �nce Secure Valance vjith 1-lardware provided o W LEGEND in (JI (provided in Valancr� kit by:FDO') ° " e "NOTICE" N 1@18 HT VERT GRAB BAR PER A601 Bottom of Valance is Edgebanned o � � Ix tJ2 TOILET PAPER DISPENSER �r}IttS °`t'F.' 17C7 Si0Wf1 E PAPER TOWEL DISPENSER Parts for Val ance SANITARY NAPKIN DISPOSAL (provided � � M CW �r y FDC� O — bN © Pads for Yy Glance' PN: 23932 i anepy I�xtensjon Arm ( 1 per bracket) > 2 � (J5 18"W X 30" HT MIRROR (Frrovided by Fl PN:1 6 Oxygen Retum Valance 314"x 9-314"x X18, � o � � ®SEAT COVER DISPENSER PN:133�5' Oxygen Jalarrce 314"'x 9w3tr1"x t3 o @HC SIGN ON WALL PER A10/A601 PN r, z B 2 2 ancpy �terlsiarl Arm ( 1 per bracket) PN:23936 Valance Hardware Kit (1 pr-,r PC, store, 2 per WC:store) B O8 NEW LENSE ON EX. LIGHT FIXTURE ':13346 Oxygen Return Valance 311" x 9-314" x 43" "New Installation 'On��ilr�c Drawn ®NEW SOAP DISPENSER ..,,�._ ..�.. PN:13345 Oxygen Valance 314'" x 9-3/4"x 96" PN: 23978 CW Valance Cooler Bracket SEI Checked PN:23936 Valance Hardware Kit (1 per EC stare, 2 per WC sure) Approved HGK NOTE: ** Solut"on �YD Project No. 13-6173 SEE H6/A601 FOR SPECIFICATIONS New Installation Only 3� �� •nr uui.",i.". . w, ...nw... �.�� l'�, PN: 23977 -CW Valance W all Mount Bracket SET � Title SEE K10/A601 FOR INSTALLATION HEIGHTS HOWARD G. KIMURA ENLARGED CHECKSTANDS & • 4 - 013 POWER; DETAILS A �� EN N, WASHINGTON 3658 A 9 VALANCE AT PERIMIETER WALE STEEL 9A VALANCE OVER COOLERS/FREEZERS ® Q Sheet No. OF Al ENLARGED EXISTING LOUNGE/TOILET RMS A5 LOW HEIGHT WALL AT RECEIVING ROOM A9 CUSTOMER WORLD VALANCE DETAILS A- 1 02 1 4 = 1 –0 1/2 = 1 –0 N.T.S. 1 1 2 1 3 1 4 5 6 7 8 9 10 1 11 12 1 13 1 14 15777 16 1 1 2 1 3 1 4 1 5 6 7 1 8 9 10 11 12 13 1 14 15 16 ROOFING OVER RIGID INSULATION OVER METAL DECKING OVER STEEL ROOF TRUSSES Lo Mv 00ZZ co 00 Any restroom equipment in a Segmeratatlon remodel project that requires replacement � J � N M should follow this schedule. fate: ff a paper towel dispenser Is to be replaced then it � J N N E shoufd be replaced with arlcattler paper towel dispenser Do not incur cost't}+running M IL N N o power for o new electric hand dryer, NOTE: x 2 L NOTE: VERIFY BOTH MEN'S AND WOMEN'S RESTROOM I— CU / GC TO PROVIDE METAL OR FIRE E ACCESSORY SCHEDULE AND PROVIDE THE 18" VERTICAL GRAB BAR IF NONE RETARDANT TREATED WOOD �'' E APPLICABLE TO THIS PROJECT: CURRENTLY EXISTS . SECURE TO SOLID STUD BACKING BLOCKING AS REQUIRED FOR ALL X A, Toilet Paper Holder rimberly-Clark lrt-Sight No,04507 RESTROOM ACCESSORIES GC Supplied,GC installed i Q 1). Fronted Mirrors Bobrick Model No,B-165, 18 by 30 Inches 39'TO 41' BOBRICKTAMPON ADA COMPLIANT lit GC svpplied,GC'Installed INSTALL VERT. 24" 12" DISPENSE MIRROR W/ FRAME ■ _ GRAB BAR, TYP, MIN. MIN. BOB2706-50 LU / ❑ C. Grob Bars Bobrick Model No.8-5806,49 by 42 Inches MENS/WOMENS TA—C TA—D TA—E TA—F PAPER � � � ao Bobrick Model No.B-5806,99 by 36 Inches TOILET RM. } SURFACE MOUNTED INFANT CARE SURFACE SURFACE TOWEL ■ L > o Bobrick Model No.B-5606,49 key 18 inches 12" is A GRAB BARS RETRACTABLE TABLE MOUNTED MOUNTED DISPENSER rnGC supplif d,GC installed 1I ALL tO a — 36" LONG — HAND�DRYER SOAP DISP•SURFACE/ / i A C C4 b — 42" LONG TA—G �ADA DOMESTICChcancUing Stations Kcctla Clapc�rStcTtian TA—A o MOUNTEDL� WATER TA A 0 L �� Calor:Cream-model KB-100-00 AND WASTE PIPE o o TOILET TOILET L r GC SUp78d,GC Installed PROTECTION PAPER SEAT COVER m � DISPENSER DISPENSER J ❑ E. i,.�_i(ic ,land Dryers Excel Dryer,Inc.;Xlerotor Hand Dryer 0 TA—A CENTER Model No,XL-SB-I J,N 1 10/12ov 12.5 amps a z O '� Q OVER b N c GO st)piplled,GC installed " MIN. M io M SINK M io i� i%� � To ao � EXIST. SALES FLOOR ACOUSTICAL PANEL S2 0, N INSTALL PAPER Tower 0 T CEILING TO REMAIN Contact:Keith Vanderbilt M N Y MAX. l*feVwlon Distribution Company a „0 17" MIN. - n DISPENSER 9' T P FACE IS n n N iv , w . N TOUT PAPER DISPENSES. Phone: 617-500-2554. 25 MAX. 36" MAX. Fax: fit 7-i�d�a35Q SANITARY NAPKIN DISPOSAL STIFFENER BLOCKING AT CEILING LINE GCt++rrwr+ ✓vtol�Gl t t"r'n'-_ " '- GCsupplied,GCinstalled SIDE VIEW FRONT VIEW BOX HEADER WITH 362X125-33 TOP AND BOT I� F. soap Dispenser Model GOJMX-I 5 Dispenser, LAVATORY MOUNTING DETAIL TOILET & ACCESSORY MOUNTING DETAIL WITH 2 600X125-33 HORIZ. STUDS Model G0 3 5150-06 O Color: Grey Contact, X dx,Lonle Danner,717-612-3987, K _ - - - - - - - - - _ - _ - _ e-mail lorrie.danner@ipaper_com _ _ _ _ _ _ _ _ 362S125-33 STUDS AT 16" OC GC suppilled,GC Installed K - - - - - - - _ _ . . _ - WITH 5/8" GWB EACH SIDE AS SHOWN. _ _ _ _ _ G. Toilet Cover 1�spensw Botx'ick Model.No.B-221 Surface Mounted GC suppled,GC installed - N AGPNLEILING-Sl1SP - I� 1rT�tLnrabrt Model tl .B8aSurface ot,nte . ,� K10 TOILET ACCESSORY INSTALLATION HEIGHTS FROM STRUCTURE STRUCTURE-ABOVE � GC plastic, upplied`GC Installed - L SURFACE MTD SANITARY BOBRICK B-270 - 4-ANGLE-AT-P€RIME1EI,EYP NAPKIN DISPOSAL - - _ - - - - - - Please contact e Wffi ony questions. Jahn /� � PLEXIGLAS TRACK SYSTEM ON TOP OF � - - / LOW HT PARTITION FURNISHED BY RITE d' -- - - - - - - - AID, INSTALLED BY GEN. CONTRACTOR M - - - - - - - - - - - Addressee LISt / \\ - DBL MTL STUD wLO L C,4 -co - - - - - - - - - - - - - - - - - Alter),Hark;Antos,Gaary;Bradley,Rich,Butler,Matt;>Caglia,John;Gorgonio,Ray;Hansen,Jeff, / \ � `_+ `�"� (,4 _ - _ - - - _ _ _ _ _ Hoffman,Roger:Hughes Garyr;Keating,Ray;Lativton,Chris;Marshall,Philp,Mason.Lance; . � 1 = 0 1X12 WOOD SILL CUT J Maus.Bob;MOSS,Geoff;Rodttgue D rls:Stxevo,KevDn;Tebo,Lion;TeTttd Waltzer I I n METAL STUD BOLTED TO _ . _ _ _ " / I - TO FIT WITH 1/2 OVER- / _ . . . . _ _ _ _ _ _ _ _ - 1 1/2 SIMPSON PDPWL-150 POWDER - I _ STL ANGLE AT TWO LOCATIONS WITH 1/2" DIAM - - - - - - - ACTUATED FASTENER SYSTEM AT 36 OC 1 I— — ON EACH SIDE THRU BOLT. .� - - - - - - - - - - - - - - - OR WITHIN 12" OF STUD END MIN. VERIFY CON-CD-06-442 Page3of3 - - - - - - - - CONSTRUCTION SLAB TYPE PRIOR TO USING - - - WNSULTA_H0N-MVI..- - _ AND AVOID POST TENSION SLABS. / PROVIDE 2 3 16 THICK SE _ - - - - - \ / � / WALL PAPER AS SPEC'D O / " (SEE PLAN) Q - - - - - - - / BY RCM STEEL FLAT BAR 3" WIDE X 30" HIGH WALL, BASE, FLOOR AND CEILING PER FINISH / o WITH A 24" LEG ON CONC. FLOOR W Q (10 —BOLTED WITH 1/2" DIAM, EXPAN BOLTS � 2) _ - _ - _ - - - ❑ J. 2 42" SIDE GRAB BAR BOBRICK B-6806-42 m " - - - - - - - ❑ 2 36" REAR GRAB BAR BOBRICK B-6806-36 D E TA I o SE U OC. SEE ELEV. FOR PLACEMENT � Q t— F- SECURE WALL TO EXIST. DEMISING WALL AT LL Ix 2 18" VERT. GRAB BAR BOBRICK B-6806-18 WRAP WALL PAPER UP AND OVER SALES FLOOR AREA. N LOW HT WALL PRIOR TO INSTALLING � O n n n n RETROFIT EX. MEN'S AND WOMEN'S STALLS WITH 1X WOOD PLATE 0 � ALTERNATIVELY, (2) 2X2 X3/16 WITH 24 HORIZ. NEW GRAB BARS PER PLAN. INSTALL NEW BACKING AND 30" HT MAY BE USED WITH SAME ATTACHEMENT H SUCH THAT EACH CONNECTION IS SCREWED TO A SOLID I- -- AS ABOVE. H STUD BACKING SECURED TO ADJACENT STUDS 24" H1 SECTION THRU NEW WALL AT CONSULTATION ROOM H6 TOILET ROOM EQUIPMENT SPECIFICATIONS 1/2" = 1'-0" Nis- SECTION figure 2 figure�F 1/2" EMT UP TO 6'-0" g Wal( Molding Requirements EXIST. DEMISING WALL FROM SALES FLOOR 3/4" EMT UP TO 8'-6" n Lateratforce Bracing AREA TO CONSULTATION ROOM 1" EMT UP TO 10'-0" LOCATE @ 12 -0 O.C. MAX. � G IN EACH DIRECTION C11 XICl10111 «r >., 12" O PLEXIGLAS TOP 1X WOOD TRIM ON TOP OF G STARTING @ 6 -0 MAXIMUM (76mml) �maximumW(202mm) // RIGIDLY ATTACH TO " STRUCTURE ABOVE "'orWs :- /.",450 SECURE TO SOLID STUDS IN SALES ROOM DEMISING PART1TlON —� FROM EACH WALL. or ss hAll • WALL 3 5/8" MTL STUD WALL WITH — z `� 2 FLAT BAR STEEL ANGLES TO 1/2" ELECTRIC CONDUIT - ` ' 12 a e '$ �� aroma zuaatAe LATERALLY SUPPORT LOW HT O / NOTE. EXTEND TUBE TO BE e s ° ""am for '�,,,, ,�. sy_tem rmQun9d.Co splayed ;omporvaors from PART1T10N, BOLTED TO CONC. THIN WALL TIGHT TO CEILING GRID AND - brace mmimurc SUr9aCIl°:au'I PER DETAIL E10/A-601 STRUCTURE ABOVE, THEN 'oriels 4 �arl�s� wires mimum na (19mm) '` m:nimurn at ui,4"09adwalls ► Q 50 mlyl) DRILL 5/32" HOLE & INSTALL BOLT TO SECURE INSTALL 1/8 BOLT & ONE TUBE TO THE OTHER. O TUBES SHALL LAP ONE LOCK NUT II —Cross tee Main beam _ _ _ _ - _ _ - - - - - - - - - - - - - - - - - - - : - : - - - - - - - INN ANOTHER AT LEAST 4" IN - - - - - - - - - - - - - - _ - - r - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _I — 5/8" GWBEACH SIDE - r - - - _ - _ - _ - - _ _ _ _ _ - _ - - - _ - _ -1 12 GAGE SPLAY 45^ �_1 45" FULLY EXTENDED POSITION - - - - - - - - - - - - - - - - - - - - - - - - - - INSTALL MARLITE WALL COVERING ON WING F WIRE AT 4'-0" OC ' I / I WALL, MATCH EXISTING ADJACENT SALES FLOOR F &M U fig ure I - - - - - - - - - - _ - - - - - - - - - - L - _ - - - - - - _ - - - - - - - - - - - - - - - - - -1 MARLITE COVERINGS (DAPPLE OR RAWLINS). - - - - : - - _ - - _ - - _ - _ - _ - _ - - - -_ - - - - - - - - _ _ - - - - _ - - - - WISE, USE NEW MARLITES'S ARTIZAN CROSS RUNNER n _ - - - - - - - - - - - - - - - - _0 - - _ - - - - - - - - - -�- - - - FRP #5408 � OTHER ,�. 3/4 ELECTRIC CONDUIT - - _ - - - - - - - - - - - - - - - - - - - - IT - - - _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _I Co MONTEREY SAND 45^ 45^ THIN WALL _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - - - - - - - - - - - - - - - - - - - _ - - - _ _ .- _ - _ - _ - _ - _ - - - - - _ - _ - _ - _ - _ - _ - _ - _ _ - -1 4" BASE PER FIN. SCHED. _ SLOT END OF TUBE TO FIT OVER CEILING RUNNER — — — — 7-7 MAIN RUNNER INSTALL CEILING IN ACCORDANCE WALL MOLDING IS REQUIRED TO HAVE WITH ASTM C635 AND ASTM C636 ELEC OUTLET ELEVATION �l�l 2' WIDE FLANGE AT PERIMETER OF ROOM & ASCE 7-02 AND CISCA STDS. �I E INSTALL DEFLECTION TRAC PER CHAIR RAIL ATTACH GRID AT TWO SIDES TO 2" MOLDING AND DET. Al/A601 RUBBER BASE- - - E AT OPPOSITE SIDES, ALLOW 3/4" GAP, NON-ATTACHED FOR MOVEMENT. 'P REFER TO SUSPENSION SYSTEMS FOR ACOUSTICAL E 1 0 LOW HEIGHT PARTITION AT WAITING AREA �U J LAY-IN CEILINGS, FIELD TECHNICAL INFORMATION #401 — 1/20 _ 19_0a `-� NORTHWEST WALL & CEILING BUREAU. NEW DEMISING WALL BETWEEN A COPY CAN BE REQUESTED OF THE ARCHITECT OF RECORD DOWNSIZED VACANT SPACE AND BY CALLING THE OFFICE LISTED BELOW, FOR ADDITIONAL SALES AREA / \ DETAIL INFORMATION THAT IS REQUIRED. � 5/8" GWB ON EACH SIDE OF 60OS125-33 IF < 23'-9" // �� ACCESSIBLE SIGN SHALL BE BLUE D 60OS125-43 IF 23'-9" TO 26'-1" \ D / \\ WITH WHITE SYMBOLS D1 AC PNL SEISMIC CEILING SUPPORT DETAIL N.T.S. I E L 1 I I I I C E. ° - -- _ATTACH TOP TRACK> TO BOTTOM OF METAL DECKING r 1 � C _% ! SO AS NOT TO PUNCTURE THRU THE ROOF MEMBRANE � 'v � INSTALL HC SIGN TO IDENIFY "MEN" AND "WOMEN" W RESTROOM Cr SCREW ATTACHMENT i� \ M EN / o SECTION A-A --- — — , \ z Cl) / m I I / \ w o `° v B - -' .. B Drawn X r C) / \ Checked DEF'LTRACK- �t� r F Approved HGK {' `+-�TOPTRACK Project No. 13-6173 I ' / I STUD � \ / - � _ - - SALES FLOOR DOWNSIZED SPACE �\ / &HOWARD G � �� Title I - �` ►-� INTERIOR DETAILS 18---2013 Ul SIMPSON PDPWL-150 POWDER WOMEN'S DObR /MEN'S x, WASHINGTON SECTIONS DRIVEN FASTENER AT 24 OC MEN'S DOOR 18 2013 tj1 FINISHED FLOOR \ / �' s858 O� A OF 0 A Sheet No. Al DEFLECTION TRACK ASSEMBLY A5 SECTION THRU EX. WALK-IN COOLER UNIT - NEW FASCIA A10 HANDICAP SIGNAGE AT TOILET ROOMS A-601 Nis 1/2 - 1'-0" NTS 1 1 2 3 1 4 1 5 1 6 1 7 8 1 9 1 10 11 12 1 13 14 1 15 16 1 2 3 4 1 5 T 6 7 8 9 F 10 1 11 1 12 13 1 14 15 16 DOOR FRAME HARDWARE KEY SCHEDULE NOTES SHEET NOTES DOOR# SIZE MATERIAL TYPE FINISH MATERIAL TYPE JAMB HEAD FINISH LABEL SET No. KEY SIDE KEY NUMBER 100A 3'-0"X7'-0" ALUM/GLASS E MANUF MANUF MANUF MANUF MANUF MANUF - 1 EXTERIOR KEY #1 STOREFRONT ENTRY DOOR - SUPPLIED AND INSTALLED BY RITE AID WITH BEST CORES. KEY PROCEDURE NOTES (FOR REFERENCE ONLY) v r- CO00 N N M DOORS COME 1. KEY SET IIS WITHFARTHE FRONT CONSTRUCTIONNTRANCE DOORS.ORE AND KEYS.THE BESAM M �■ IL c4 � o THE RITE AID OPERATIONS DISTRICT MANGER WILL REMOVE THIS = v v U CORE AND REPLACE IT WITH ANOTHER CORE. THE FINAL KEYS F- o FOR THIS KEY SET ARE SUPPLIED BY RITE AID. E �. " E Y 2. KEY SET #2 IS TO HAVE 6 COPIES. THESE ARE SUPPLIED BY THE GC. J Q 3. KEY SET #3 IS TO HAVE 8 COPIES. THESE ARE SUPPLIED BY '- W THE GC. ■ s „ PHARMACY DOOR VATH FLOOR STOP. CONSULTATION SIDE OF DOOR FRAME TO BE PAINTED P-10). W 109A 3'-Om X 7'-Om HM C P-10 HM 1 11 H1 P-8/P-10 - 3 110 KEY #4 PROVIDE 1/2' UNDERCUT AT DOOR F RETURN AIR; U ao 4. KEY SET #4 IS TO HAVE 6 COPIES. THESE ARE SUPPLIED BY ■ L > LO 109B 3'-0° X 7'-O" WD F PL-8 HM 1 A H1 P-10/P-10 - 3 SALES KEY #4 CONSULTATION ACCESS DOOR. (DOOR FRAME TO BE PAINTED P-10 ON CONSULTATION SIDE, P-10 ON WAITING ROOM SIDE.). THE GC. = a o 00 5. KEY SET #5 IS SUPPLIED BY RITE AID. o m 6. KEY SET #6 IS TO HAVE 6 COPIES. THESE ARE SUPPLIED BY L c THE GC. THESE KEYS ARE FOR THE ACCESS PANELS IN THE UNDERSIDE OF THE DRIVE THRU CANOPY. N o o � 7. KEY SET #7 IS TO HAVE 6 COPIES. THESE ARE SUPPLIED BY ACO RITE AID THROUGH THE GATE SUPPLIER, QMI. 8. ALL OF THE LOCKSETS FOR THE KEY SETS WHICH ARE NOTE: SUPPLIED BY THE GC ARE TO BE TURNED OVER TO RITE AID PER ALL NEW LOCKS SHALL BE KEYED ALIKE TO MATCH EXISTING THE DIRECTION OF THE RITE AID CONSTRUCTION MANAGER. STORE 9. THE GC IS TO SUPPLY ONE BLANK KEY FOR EACH LOCKSET. REFER TO RCM SCOPE OF WORK FOR KEYING. PROVIDE 7 COPIES OF KEYS TO PHARMACY. FOLLOW STRICT DIRECTIONS FROM RCM K SCOPE ONCE LOCKS ARE REKEYED AND ARRANGE FOR KEYS TO K BE DELIVERED DIRECTLY FROM LOCKSMITH TO PHARMACIST MANAGER. K4 PARTITION HEAD AND SILL K7 DOOR SCHEDULE 2 9 = 1 9-00RE: A4/A-801 , D4/A-801 NUN L;UNUUI I I U ALARM BOX OVER J-BOX RUN TO �1■■r POWER PANEL SEE ME-101. MOUNTEDLO M AT 14'-0" A.F.F. ON M 4W N SALES SIDE OF WALL J .1 1/2- ;; ABOVE DOOR 114B t�' Lo 0')CONCEALED CONDUIT RUN IN WALL 0 II • � d � (i • ii til bn ", • Q I I Wo Cu 0 ;; USE (2) 3/8" DIAM X 3" BASE ELEVATIONSF'�■ O �- II HILTI KWIK BOLT-TZ ANCHORS I I II PER BASE PL., 2.5° EMBED., ESR-1917 N SPECIAL INSPECTION IS REQ'D. / UPPER BOLT MODULE �I KEYSWITCH / OPTION: H ;, / IN LIEU OF HILTI KWIK BOLTS, CC MAY H / PANIC HARDWARE USE SIMPSON TITAN HD 3/8" DIAM Xw ' II / 2 1/2" EMBED. INTO CONC. ALI PER 'C..-�' iii PRIMARY BOLT MODULE ESR 2713. ii o aA5E PLATE LEVELIN SCREW LEVELING &CR0V LOWER BOLT MODULE T4� DOUBLE SIDE SINGLE GI F ICFo - PL DOOR NEW L. n- EMB (SEE ,OTE NO 4.1 1/4" SPIRAL RUN INSTALL ) ACROSS FACE OF DOOR ETR HARDWARE G AND INTO DOOR FRAME SET #6 j BASE DETAIL 84" HIGH (12" HIGH ANCHORS EVERY OTHER BAY. fig" HIGH NO ANCHORS REQ'pb) G • z G4 SECURITY ALARM DOOR ELEVATION G8 WALL STEEL AND GONDOLA BASE CONNECTION FOR UNITS > 69" HIGH 3/8 = -o REFER TO SHEETS A5/A-101 A11/A-801 3" _ i'-o" Q W � - 1— n F ��� �� � � F lzu 1x3 CONT. HORIZ. BOLTED TO STUDS BEHIND WITI \ SIMPSON SDS "' Diam. X\\ AT RELOCATED OR NEW WALL STEEL THAT 2 3/8" LONG AT 16" OC \ EXCEEDS 69" IN HEIGHT, CONTRACTOR SHALL AT BOTH TOP AND BOT MATCH EXIST. WALL THICKNESS UTILIZE THE FOLLOWING ATTACHMENT DETAIL / 1X3'S. TO SUPPORT THE WALL STEEL. (SCREW INTO EX. STUDS) + E PANELING WHERE "COZIER" BRAND WALL — — E SCHEDULED - - - - - - - - SEE PARTITION TYPE �� BRACKET ATTACHED TO BLOCKING 1X3 WITH (2) X10 X 1 1/2' /292 1 " 2" SCREWS / / / CONT. SEALANT \ PEG BOARD INSERT (TYP.) N N \ WELDED METAL DOOR 5 7/8" FRAME PAINTED go g DOOR _ D 6 1/4" AT RR DOOR JAMB 6 1/4" AT RR / D H1 ANCHOR / I I J1 INTERIOR HEAD INTERIOR JAMB - PLAN VIEW VERT. POST CONDITION CONDITION - " D4HEAD & JAMB DETAIL D8 WALL STEEL CONNECTION DETAIL FOR STEEL > 69" HIGH GENERAL NOTES 3" = 1'-0" 4 3" = 1'-0" HARDWARE SET NUMBER 1 NOT USED HARDWARE SET NUMBER 5 (#106 AND #107)(LEVER HANDLE A. NOT ALL DOOR TYPES ARE USED. REFER TO SHEET A-101 FOR MAPLE WD DOOR USED DOORS AND LOCATIONS MIRRORED GLASS WITH NAT. STAIN FIN. � C 1 - r� PAIR BUTTS, STANLEY 4-1/2" X 4-1/2" FBB C 191XUS 26D B. NOT ALL DOOR TYPES ARE USED. REFER TO SHEET A-101 FOR 1 CLOSER, CORBIN-RUSSWIN DC 6210 X 689 X M54 USED DOORS AND LOCATIONS 6" 2'-0' 3" 2'-6" 3" HARDWARE SET NUMBER 2 (#103, #104, #116, 114C) 1 LOCKSET, CORBIN-RUSSWIN CL 3320 NZD X 626 X a 1 FLOOR BUMPER 406 1/2 X PA 28 X HB-IVES 2-3/4" B.S. (PRIVACY) o U- 1-1/2 PAIR BUTTS, 4-1/2 X 4-1/2 STANLEY FBB 191 X 1 WALL BUMPER, HB IVES 406-1/2 X MS X PA 28 o �� US 26D NRP 1 KICK PLATE 10"x34" SERIES 8400. Co 1 CLOSER, CORBIN-RUSSWIN DC 621OX 689 X M54 o P10 ON DR. FRAME 1 LOCK, CORBIN-RUSSWIN CL 3357 NZD X 626 X 2 3/4" HARDWARE SET NUMBER 6 (#101 AND #114A) U' „ AND GLASS FRAME, B.S. (STOREROOM) / CD TYP. BOTH SIDES. 4-1 2"PX IUSB26DSX STANLEY LEY FBB 191 X 4-1 2 X LEGEND o M 1 LOCK/LATCH GUARD-IVES LG13 US32D / - �� - 1 PUSH PLATE - IVES #8200-8-US32D-4X16 DOOR #103 1 CLOSURE, CORRIN-RUSSWIN DC 6210 X 685 X M54 Ln w N WITH 105 DEGREE HOLD OPEN WITH WIND CHAIN > Cu - - - 1 DOOR PULL IVES #83038US32D-4X16 DOOR #103 W o 1 KICK PLATE, 10"x34" SERIES 8400. JB IVES 115 AND SLEEVE PROTECTORS, THROUGH HARDWARE SET NUMBER 3 ( #109A, #109B)(LEVER HANDLE) BOLTED o 1 THRESHOLDREESE S-486 AN X 36 Z , " X EXP SH B 2'-10" o � 3'-0" 1 FLOOR BUMPER 406 1/2 X PA 28 X HB-IVES B FROSTED PLEXIGLASS 1-1/2 PAIR BUTTS, 4-1/2 X 4-1/2 STANLEY FBB 191 1 SET WEATHER-STRIPPING, REESE - DS78X17 Drawn C 1 ALARMED PANIC DEVICE SERCURITECT MODEL KICK PLATE E - P95 X US 26D NRP 1 DOOR VIEWER, STANLEY (MOUNTED 60" A.F.F.) Checked ALUMINUM WF_2 1 CLOSER, CORRIN-RUSSWIN DC 6210X 689 X M54 #KAP- T-8 TRIDENT 4 POINT EXIT DOOR LOCK WITH Approved HGK STOREFRONT 1 LOCK, CORRIN-RUSSWIN CL 3357 NZD X 626 X 2 110V DIRECT POWER SUPPLY. CONTACT MARC 3/4" B.S. (STOREROOM) KAPELUS, KAPLOSS SECURITY INC., 156-36 CROSS BAY Project No. 13-6173 1 LOCK/LATCH GUARD-IVES LG13 US32D BLDVD, HOWARD BEACH, NY 11414, PH (800) 1 KICK PLATE, 10"x34" SERIES 8400. 548-7486, FX (718) 32203131, BLIDIV®AOL.COM. �D A Title HARDWARE SET NUMBER 4 ( #108) HARDWARE SET #7 (109D) KXg �C DOOR SCHEDULE, 1 FLOOR BUMPER 406 1/2 X PA 28 X HB-IVES 1 LOCK, CORBIN-RUSSWIN #CL;3357NZD X 626 X 2 1-1/2 PAIR BUTTS, 4-1/2 X 4-1/2 STANLEY FBB 3/4" B.S. (STOREROOM) �3~ HOWARD G. KIMURA ��s� DETAILS, AN D 191 X US 26D 1 PAIR BUTTS - 3 1/2 X 3 1/2" STANLEY FBB191 X n PARTITION TYPES 1 DOOR PULL - IVES #8303-8-US32D-4X16 US 26D. NRP 1 SIMPLEX L-1000 SERIES PUSHBUTTON LOCK, ''rJ A A MODEL # LR1021C26D HARDWARE SET NUMBER 8 (ROOF HATCH, OVERHEAD DOOR 4 8-2013 1 CLOSER, CORBIN-RUSSWIN DC 6200 X 689 XM54 CHAIN KEEPER) REN N, WASHINGTON� sheet No. 1 KICK PLATE, 10"04" SERIES 8400. 1 PADLOCK - CORBIN RUSSWIN # 1C PL5180 3656 �® 4 DOOR AND FRAME TYPES A11 HARDWARE SETS OF Ole A-801 .A_ 4 - -o NOTE: NOT ALL DOOR TYPES USED No SCALE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 ________ __ ____________.__________ -----,------- , .__ ___ --------------,----�. �-,------ -------,- --�.---�. - _______- ____­__ ------- ___ ___ I 1 2 1 3 1 4 1 5 "'T 6 1 7 'r' 8 1 9 1 10 I 1 1 1 12 1 13 1 14 1 15 1 16 1 -11-� � I ,.­­ � , ­­­ - 11"I 11 I . , .1 I "Ai ''I N...I I - I I ­:: ` `:, ti�::­... 11 , 1�1, , ,.A.": iilil� � 1, 1. Type C L_`N_ I - ! �,,�:, � , , �� � , !ii,. ,)Fyp"� ,,, 11-1-l":I', ­. ,49i I'll I��� - � 11-1-I-­I�I I�­­­ .1 � , , , � I Response- Pesponse- � � I I ..I I I.. I Pr I�-i-,,- Rite Aid StafFe Planning & Construction Revised 0 1-27-201,3 1 'bility fGC ibility(CC, 111)1111'� � -� Genuine Wellbeing Scope of Work Guidance Levels A,B L C LO M Z Area Of Concern Scope/Guidance,/Comments Specification " ' , ScopeJ Guidance/Cornmerts Specification 1, Scope/Gluldonce/Comments Specification '.--, r-_ OD RA,D6col, RA,D6cr, RA,L � ,,1, (I U M C: Vendor) Vendor) Verdlor) 1. INTRODUCTION. Following Sections describe the scope of work to treat the respective area ofthe,store to .J �R C� �; -_ - . in Carpeting Install new(roiled broad loorn),corpeti , Matworks- Earth Qu�_It GC Install new(rolled broad loom)carpeting. .J ;�: ca I Ing , � Matworks- Earth Ovest GC Install new(rolled broad loom)corpeting. Motworks- EarthGuest .GC meetthe Genuine Wellbeing Design forType A vs.13 vs.C Remodels. - 1111M t- 0 M tich is avoilable by Which is arvailoble-by which Is.-available by . . Type C il , ­ I - I I ��-­��, I C� E . - 1� � Typ,=A M = IL to Ln o M 01/28/221013. Interim substitute oim/2oia intetimsubstitute, 01/�W2013. Interim substitute : C� . ' . Response- Resfaor;se-- i'-,;�)i,­- c,4 N L) is Motworks's Mallotus, isMatworks!s Mallotus: is Matsvoi Mallotus, : bil ly(CC ibilit�/� -(-', ii-r ��, ('�,_ ,q 'T g M9�4704*iril SA M�'AA!79-Cnl_qA 1 Aruu -'!,,--,['�,,ji) SoOPQ,"Guidance/Cownle�f�l, ' Scope/:GViclonce 0-,,,I''�I, . Speci ,aflon Scope J GOiciance/Comments Specification - I I , I '111 I'I I I X M . I .11 I M?(J794)QI SA RA.D,i RA..D,cor, RA,F14�_cl, CU - 'l-rif-i- , i'lageclormissing Install new cove base. Johnsonfe,Fudge RW nC1 67- GC Install newcove base. I I .11, I I- Z; I I I Johmonite Fudge RW DC 167 ':�;C Install new cove base, Johnsonife Fudge RWOC-167� G(�� vendorl Vp,ndorl 1./,�[­,­.-.�I U- -AD ba�,__,. A A, A E 1W E Consultation Room Ceiling I Il. EXTERIOR :2 0) Ceiling, Ight fixture,,W.a,,C. use CW Spec,, Use CW Spec. GC Use CW Spec. Use CW spec. GC Use CW Spec. Use,CVV Spec. 6C A) Storefront - '(: --' sm lu = Consultation Room Walls - - � �Point building, ACM trectmentsi raint EIFS&clapboard stiffoces,if in poor condition. Fai e,e Determined(113Q). GC Modify exterior to add elements of wood groin 8, Ci todel Narrow Cherry W coo G Modify exterior to add elements of wood grain& Citadel Narrow Cherry Wood G� (Yuldling�hell Benjornin white.ACM finishes ani.brown ancillar),sign Gain and Reveal White using while ACM fir)shes and/or brown ancillary sign Groln:oncl Reveal Vq.hite using 4) _iwi sy all covering Supply&Install new wall covering. Koroseal Rite Aid"Bone White"GC supply&install new Wall covering. Koroseol Rite Aid"Bone White"CC Supply&Install new wall covering. Kcrosecl Rite Aid'Bone Whlte�'GC I � ,. , � I Moore"French Convas'*OC- band,similar to Store#01074 preect. Exterlof Citadel's Rainscr,5er) bond,Similar to Store$010/4 projecl. Exterior Citadel's Rainscreen k ,4110 < ,(.Gob!LXB-(5�A,B-Q�:"Bone (Gobi L',<D-(Z-.A5-O'�"Bone (Gobi LXIB-(,��AB�03`$one 41 and C139 RCM's to rendering/guidance to be released separately. mounting sy�stem� Alu um rendenng/goicIcnice to be released separately. mounting system. Aluminum , , 2E Whitelly , mrn .- While"i hite"I contact Monica Weisner for (Treatment/scope based or,probability of ancillary sign bond pointed (Treatment/scope based on probability of or:111ciry sign bond pointed. � L1_1 Supply/Insiall Char Roil. I newvni chair rail. Johnsonite-FudgeCHR-167- GC hilall new,vinyl chairrail. Johnsonile-Fudge CHR-1 67- GC Install new vinyl choir rail. Johnsci-Fudge CHR-I 67� GC I 11 . � . . � - store specific g v clance.) permitting approval vs.-Segmentation schedule.) to Benjamin Moore�vdrrct porr,nittin approval vs.S,,�,gm�.�,nfato.n,sched�ile�) to Denjornin Moore Sierra : C C C � � ,9 . , = cove Base 1 ­ I 11 linsicillnew. 11 ­ I.........-...I...� ­­ Johni Fudge.RW DC-I 67- GC lnstdllbevv� Juhn�orlite Fvdge:RWDi 67- PC � ­install new.��: I— - �� ­.­ Johnsonite-NdgeRINDC-i 67- GC I saruce#21 0&20. Spni#2108-2D, IJ LU .. .. I C/) .. 1. I . I .. -A I I. . .I- - . 1. . -.A I I .1 - I I I.. A_ - - I ...I I Sliom*offfrnullioni aciorfroming. Out of scopi-_ Fraint rri,AlLons andcloor frames(eAsljn�g unpainted Benjamin Moore-Sierro spiuce GC Point rnullk�rs and.door trom6s(existing unpainted Benjorrith.Moord.Zi.erild Spruce GC 0 a) 00 I , - a 6. 1.0 Doorsupipher Locl<Net Door to silver/alkimiii framing d0i require painting). *2168-20. silver/oluminum framing don't require palrifir)4). 421 08-20. 1 .� 0 1 00 i 0, provide a Nevarriar Santo X 4 a) Rosa Flum Tree W Z200)T door Buitdingsigr�oge.,,9.py.lQnsigncige, Ouiof.t(.*4p,-Pfv.,orke)�t-ept�M-c,.i(-..i-ic.,ncit,)n)odify Sig?)Co Rite Aid Shield witI­1 White returns(no change,from Aluminumencillarysignband Sic . gn Co Rite Adshield Win white return-,inu,change from Citadel Narrow Cherry Wood Sign,Cn .�= C: lsomis Hard Rock Maple exterio�andflary bQjlding siqnaae c,.fequited,�_,g7 post slandurd). Reuse ansting CA cnannel letters pointed to Benjamin'Mocre postsiundarc). Reu se existing,CW channel e Iters Grain and Revej'N hrie using W 0 � doors 0�bedisirilbutedin Door su oplier Loc;kNet Door to Door supplier LockNef Door to re.move"I Hour". - - with blue returns. fnewrequireo then Rite Aid Sierra Spruce#2108-20. With blue returns. If inevV required then Rite Aid Citadel's Rainscreen a) -5) wt provide a Navarnar Santo provide a NevarnarSonto � 0 1Z I � channel letters with brown returns. Alum�nvm channel letterswth brown returns. Aluminum mounting systenri Aluminum a) L Door -,_,L­,I�ll�--nd Install new door. Jon to.depliete Inventory). GC Supply�and install new door.. Rosa Plum Tree W Z2C01 T door. CC Supply and install new door. Rosa Plum Tree W Z2001 T door. CC d I L _�if E . - - I � . �. I I ancillary sign band to be pointed brown. Reface cri sign band to be pairiled brown, Refoce cincillary sign bond pa()led 0 Replace/Install the following � I ,i to M pylon face to have wood grain background. bylan face to have wQodgr - 0 � I to Benjamin Moore Sierra _J equipment In Consultation Room: I. , .pin b.,cN.rounr ­ . " I ' ' .. � � Spruce#21.08-.2Q. . 37 � �: ,Z� Table,Chairs Install RA supplied furniture,per fixture plan. PC Instal1RA si�called furnitvie.per fixture pion. GC Install RA supplied fu rnilivre,per fixture pi GC N 0 G)Waiting Area - _ I - Ill, :INTERIOR �; i, Waiting Area Flooring '4) Vestlbule� 2 �2 q) LVT Labor or d Materials, Instoll I VT Flooring,per fixture plan. Armstrong LVT Carbonized GC .Install LVT Flooring per III plon� I :vestibule Flooring � Armstrong LVT Carbonized GC install ILVT Floating per fixture plan. ,Armstrong INT Carbonized GC, �Carpet Maierials;(Mi�,_�Patching) Replace as recIvited. Mci slicks 8,Sibne GC Replace as required. Matworks'Slicks 9 Stone (_�C 'Replace as required, Malworks'Slicks&Stione GC , I I Bamboo-TP753. Bom boo-TP7.53. Bamboo-Tfi I I Replaqe domaged or missing Asrequired. (if hear new Rx wall ru ino I t)er) Mald')existing, GC Asrequired. (if near new Rx wall mural then Match existing. CC Asrequired. (if r-ear nevv R.x wall murel then Match existing, GC Carpet Materials(Complete RepIcce as required. Motworks'Arnbasscdor PC Replace as required. Mativorks'A mbassoc3r r1C Replace as required. Matworks'Afnbassodor GC cove base. transition as required to Johnsonite Fudge I 67-A.) transition as required to Johnsenite Fudge I 67-A,I) transition as required to,johnsonife Fudge 1'67-A.) replacementl Charcoal Charcoal Charcoal . Waiting Area Ceiling Replace clarnaged or missing As required. Johnsonite- 20 CHARCOAL G3 C As req u rod. johnsonite-20 Cf�ARCOAL GC As recoiled. -1chnsonite- 20 CHARCOAL GC cove,bmo, I Miscellaneous I vestibule Ceiling Waiting Area Walls � - Repair/Replace domage(I(eiling As required. Match existing. GC As required, match existing. GC As required. Match existing. PC, Con,litruct new waiting area Install Mettle well covering on new wing wall. MatcheAsting sales floor,, (If GC Marlifte's Artizan Monterey Sand ERR#5408. Marlite's Arfizon Monterey GC Marlite's Artizon Monterey Sane FRP 45408. Marl Artizan Moi ��-C Matclh�crxistlng adjacent Sofas Floor marlile.. new[her)Marlite's Artizdn Sand FRPI.5408 Sand FRP.45408 VestibuleWalls coverings.(DopplearRowlinsI. Otherwiseusenew Monterey$and FRP#6408) Replace damaged area Asrequ�recl. Match existing. GC Remove existingA Install new. MorTt6s Affl7on Monterey GC Remove exilri Install new. Merlite's.Arfizon.Montetey GC Marlite's,Artzon Monterey,Scind FRP#5408. 1 send wr*6408 -___ . Sand FRP#6403 1 B) Sales Floor . I I ,,�ppi�/I�cfall Criair Rail. Install new vryl chair roil. chnsanite-Fudge CEIR-167- G C Install new At iyl cl-dw ripf K .I � , I[. Johnsorfla-Fudge CIER-1 67- 5C [ristall newvOyl(-halt rail. Johnsonite-'iLidge CHR-1 67- GC .Sales Floor Valance K C C . C Install Ne-vivatance.. . RA supplied. GC 4ii Iled. FunderWintergreen .. GC PA supplied. GC instalied. I . runderWintergreen GC -RA supplied. GC installed. ­ FvinderWinterareen GC ReplacelInstal the following InstalineWlexisting valance lights Rebstall existing&inslall addifionall cis required. Lamp color350o r CIC Painstall o>dstfn,q.&instal]ocii as required. Lamp color 3500 r GC eguipment in Waiting Area: I I I Water Fountain Relocate if required per fixture plan. GC Relocate if required per fixture plan, GC Relocate If required per tixture plan. GC - Mainline Cosmetic Canopy Out of scope. Supply&Install internally illuminated cosmetic Pite Aid Supply 8, nstcfl r-iternolly Illuminated cosmetic Rite Aid Table/Chairs Install Rite Aid suppliedfurr-irture per fixture plan. Furniture by Install Rite Aid supplied furniture per fixture plan, Furniture by Install Rlte:Ald supplied fumiture per fixture plan. Furnitture by Header I-r�,adcr fixture over wall Steel shelvinc). vendor. header fixture overvvni steel shchAng. vendor. ADC:GC FDC,GC FDC;,CC Sales Floor Flooring install insiall . install LVT Pathway install new LVT pathway perfixture plan Armstrong LVT Carbonized G C Install new I-Vt pcithway per fixture plan Armstrong LVT Carbonized C_(i: install new LVT pothway per fixture plan Armstrong LVT Carbonized GC Relocate electric for Blood Relocate if required,per fixture plan. PC Relocate if required per fixture pion. CC Relocate if required per fixt.vre plan. GC Bamboo-TP753. Bamboo:-TP753. Bamboo-TP753. I � I I I Pressure Machine VCT Field Existing far�remain. Kepairowequired. Match existing. GC Existingto remain and repair/replace misc VCT ArrYdrang Striations L BT(Bic, ,---C Install new BBT'field floating. Art,.Strong Striations BBT(Bic CC . I � � � . - 11 .. . .... unless'VCT can't be rnatch,ed...then install now Based Tj.lej-Mudhroorn.T36lI , Based Tile)-Mushroom T3611 , H)Associate Lounge . BBT flooring. 12�4'f - I IZx2,1r'. Associate Lounge Flooring Carpeting FA sting to remain. Repair as required. 11'pothway Matchexisfing. (IfloorThway OC Romove.corpeting. Install ii field flooring. ArmstrongStr. RoinsERT(Bio GC Renrinviecorpefing. lnsfdllnew,5,RTfJeJd.,flo 'ng. Armstro , C, - 1. , q , 1. 11 I I on ,ng striartior)s BBTlBIo G 1 . - - Replace domaged floor. As required. GC As required. GC As required. 1�.� - shown on fixture plan contact John Lombardo for Shown on plicl contact John Based Tile)-Mushroom 361� , Based Tile)-iviushroom:12611 I Associate Lounge Ceiling n(lidance. 1­Ei­q�I 171,Q4". I Z'x�4­. 4-0 1 Replace scmacled ceilina. As req ulred. -- , GC A�required. PC ,As required. �,�_ Replaceelarriaged or missing Asrecti (if near new Px wall mural T-itan Match exisfing. PC, Re,mQVe&install new. Johnsorti,fie Fudge RV�L)',:-1 6/- GC Pemci 8 install new, Johnsoniie Fudge RW DC-1 6J- (;C Repince-d damaged light fixiures. As required. QC As recivired. PC A�requirt,d, (_�C cove base lron0ion as required to Johnsonfle Fudge 167-A.) A A 444. (D . (D co Ciecr, kcht fixtures. As real uired. GC -AS required. CC _As required. GC Sole Floof Ceiling LO S.. C,iiiiiI Clean HVAC Diffusers and Return As required. PC As required. ,�(: insfallceiling ighfing, Outofscape unless repairsirequired. sting. GC if emsfing ceiling mounted fluorescent fixtures lhen 8"LED DOWNUGHIS,c-otharn Gc Ali cases:rernove e-Asting fluorescent fixtures& 8"L A I As re qu ired. GC � Match exi I I)OWNLIGHTS,Gotham GC Air Grilles. remove existing&.install new LED clowrAights. EVO-GoilhoM AILED 35/29 install new LED dowt i4ghts. LVC,Golham ALED 35/29 M .I.-A N I .. 1. 11 I. . Associate Lounge Walls 6AR. Spec changing to Cree 6AR. Specchonbing to Cree, . I 11, I J Relploce:durnaged ared- I As reclulired. � ­ ���� � � ­ I....­ ­...11 .. � G-:� As requir al.. � I I ­ I � �-,(� As reauired I -r- -30L 35K Clea(dcwhfight I KR6-_A0L­35K Cleo.rdo,hrfl[ght: J LO t__ 11 KR6 - - . . . . - .1 I I . .1 I ­ I .1 , laint wcIls/cloor. -As r6q vired L CW Spec GC As requIr6d. lCVV Spec rDC As r6quired! CW Spec CIC I in March FY2014, in March FY2014., * M . I I -1 I- Sting Walls. As required. GC A , d. GC _As:reaiuireicl� CC I I I 1. ..."I'll I - I'll - I .1....­­­­ I 11 I I'll 11 111. . I'll..... 1.1.11 .11, I I ..... 1-11 I.." I..,.... .I I'll, 11 I I'll, r. Replace/Install the following . a 0,,,,,,,,,,,,, o� equipment In Associate Lounge: --- �-7'e - M 0 CON-CD-03-024 4 of S CON-CD-03-024 I ofli < M - I I -2 L_ . I UJ CD II,l,,,.. C* .0) ...I ..... � . . � ............. ....I.... . . .. 1. .11 .... ...........I.....� I (D �_ . ...... .. I .. -................ -.......................... .......,....I....- 11.11...I , I I I .. ,.. .., . ... ,.... ,. . , I I I ­ .1 I 11 I lytp�r, ij,M,W . . ­�- 'r�­ �jjw :�,! - - 11 lti�T� ­­-- fifil"Milt"Wilm I I .1 11.1 .1 I I I... I I 11 I I.. . I .. . ''I'll, - LL I - I I -1 ____,-_- � - -L, -1 - R C4 Type C L �,i�.% I r,I ,,, Response- �esponse � :-,_,�_J-- .1111 ... 1.111, I I I 1. ­ lbilt bil I,11 . , Response- Response- Re,p.-rue Area OfConcern Scope/Guicance/Comments 1�pecificatbn ,y,(PC. SCopl-/-diclance/Comments Specification ibility C, Scope/Guidance/Coni 'pecification I ibliiy_�GC, iblifty(GC, ilaility(,-,,- RkDpcor, RA,Decor, RA,P�.­ i, At 6,a 01 Concern Scope/Guidance/Comments Specification Scope/Guidance/,Comments Specification Scope/Gu,d o[-,_-e/(_,om m 6nts S L),�_�i I i c a fi a n I � ­ L RA,D(�cor, RA,D6cor, RA,D(�cat, VendorY Vendor) Vendod I Point ceiling. Out of'scope. Point ceiling using Pro,coat painling system. Pro-coat rotor to match PC Paint ceiling using Pirc-coal[1,ming System. Pro-coat color to match PC Vendorl Vendor), I �tdorl Benjamin Moore*995 Mocha benjornin M core#995 Mocha H Counter/Cniainets with,0oorhe,7,ci RAsuppiecicebinotry. Install per fixture plan. FDC Hard Rock maple until G C RASupialledcabinetry. install per fixture plan. FDC Hard Rock mopleuntil GC: RA supplied cabinetry. linsfall per fixture plan.. FDC Hard Poak maple,unti H inventory depleted then inventory depleiedlhen: 1 , inventory depleted then Crearn. Crea ry) I Blue ceiling grid 9 ceiling fascia it) Blue grid to remain, Point ceiling f0scia. Ronjarrin Moore�'Clcucf GC Blue grid to remain, Point ceiling fascia. Benjamin Moore�'Cicvd GC Blve.gridtoremoln, Faintceilingfos6n. Benjamin Moore"Cloud GC Neva met Santa Rosa Plum Nevamor Sonic Rosa Plium Neva,mor Santa Rosa Plum 10.9&13.8 building formats, - cover"OC-25 egg shell. cover"OC-25ocj shel. I . cover"OC-'25 eq T ree,I WZMOIT I T,,-,.V1790CII T free W 720ni T I_ _q , a shell. . - CIC Stiopfy&in tall 12'.diameter clouds with wood Armistrorig.X'high amorn GC I)Men's/Women's Restrooms Install suspended Clouds Out of scope of wai f.o,�, ('ut of Scope� N/A S., . . �� - - .�� � � - I I I � Restrooms Flooring . I I I ­ � ­ ­ - _ , � � , ,. � _ � - �-_.____ . ... ..... .... .. .. .... � _ ­ I grain,cicaii ceiling files� cioucl mounted 2"below . Replace comag ad floor, As reqvired. Malch existing. GC As required. Match exisfing, GC Now ceramic floor tile specification being TQ,be determined. -,-- cei ng.Arms ong. I,- I developed with,S�'hah cermaic cove,base. I Prelude 15/16"gtid-Haze. , - � Alternate s New Floorina Flooring requiring new replacement to match,CW Armstrong Camel Beige VCT. GC Flooring requiring new replacement to march CW Arms',long Camel Beige VCT., GC ,F��Rg,Mqviring,,neW,replcicefr,ent to match CW At .1 I vppilieris Blairsigns - 11 I I I I I I , rimstrong Camel Beige VC.T. :­- hy l Aic I I I Spec. (NeWspec being developed&released Spec. (New Spec being deve loti released SipeC� (,New Spec being I deve loped&released I Install su spencled flrrg� Ir,st,)Ilnor)-�'illuryiir)cstecicilarn�-terfZings, ffouisicediarriefer,13"high RAvendor, ir.)s tall Flu mine led LED Rings. Elecricalconnection 5outsidecromefer, 3"high RAvendor. r.stall illuminated LED Rngs. Electrical connechon V outside diarneter;]&'high RA v(-r,,I �t. Restrooms Ceiling rnid Feb 2013�. I mid Feb 20131. mid Feb 2013), non-ifiurnodled rings. by Ga hternarly illuminated LED Elec by G-C by G C. internally illuminated LED Elea I-,,,, '-,i-- Rit-ipfa-e Jai ricaed ceiling, As required. Match e>iAnzi. GC As required. Matchaxsfina, GC As required. Match existing. GC - lighting. � lighting. I ,',r)1o1.e,f:J dicl light fixtures. As required. Malch existing. (3C AS requ*�(J. Match ex�sfng� GC /,,�reavited. Match existing. GC StOr)dlr)gSeOrnRocif<)vercoolets. Foint. DTM acrylic semi-gloss GC Install new oulkheccl wall(Conceal roof by block Gysum board, point GC install new bulkhead wall(Conceal roof by,block. Gysu Fri board, point GC -- I Sherwin-Wifliams B66-600 up/sheet rock above coolers). Benjamin Moore Ashen Tan up/sheet rock above Coolers), Benjamin Moore Ashen Tart _1c:on rqht fixtures. As required. Match'existinci. CC AS requiro(j. Match existinc. G(- As requjll�cl. Match oxi3tind. GC � I � , Clean HVAC Diffusers and Return As required, Match existing. G-C A,required. Match existing. GC, M requited, - Match existing, 0 C - Tinte to"Girdurided"#6089 #996 egg ell.. I egcjl e, I Ar Gilles. . I RestroomsWalls __ - I Sales FloorWalls .. Point walls(opperwalls; Paint upper walls per d6cor point plan. Benjamin Moore Ashen Tar. GC Paint upperwalls per dt�ccjr paint plan. Benjamin Moore Ashen.Tan GC_ Point upper walls per d6cor poi I plan. Benjamin Moore Ashen Ian GC Replace DomagedlivarlifePrinel.,, Asrequir,�d., Match ensting. GC As required. bAcrild I axsfing. CC Newwall covering specification being clavelopeclL To be determined. C-r .). .n . I - � 1. I I I , I .. . ...I . . I I #9i shell finish) #996 tecia-shell finiishi #996(egg shell finish! I . Wood Beam Install Wood Beam sign parnelS. D,')cor Install 3 ft.high wood beam along upperwalls.. Wood Baarrr:Nevarrar Santo D6cor I Install 3 ft.high Wood bearri along upper wells. Wood Beam:Nie-varror Santa D,Acor G New wall Covering Wails reciviring entircl new replacement to match Mottle Symmetric Almond. GC I 11 I �11 I � Wolfs recivinng entire newreplacement to match MarliteSymmettic Almond. GC Wells recluiring entire new replaCernisht to match Marlite Symmetric Almond. G C 11 I I G CWspec. (NeWspeq being developed�, CWspeQ. (IqewspecIceingdt��veJQpeo& CW Spec. (New Spec being developed, vendor (Block kip RAI diamond vAnclovo/ipolnt). Rosa Plum Tree W 72001 T vendor (Block ur,RAI diamond Wndows/point). Rosa Plu rn Tree W Z2001 T vondor rel�.ase,l mid Feb 20131. released mid Feb?012)� released mid F_�')201,,"�I. 2"ELghiNood Trim in 1.0,9&13.8 Point lower 2'strip PT-05 Autumn Lodi but paint Benjamin moore"Autumn OC Remove lower trim. Paint upper trim along ceiling Benjamin Moore '�Iir$hteri Ton"PC Remove lower trim. Point vpper trfmalong coiling Benjamin Moore "AshtenTan" C,,-- Door's/Frorne Point doors&frame. Benomin,Vioore Sierra Spruce GC Paint doors&frame, Benjamin Moore Sierra Spruce GC Paint doors 9 fro me. Benjamin Moore Sierra Spiruce G,I- I 0 Formats upper 2"stirp against ceiling IT-01 Ashen Tan. Leaf"41 131 Seml-gioss, edge. #,996 Egg-shell. edge. #996 Ego-shell. 42108-20 sernkgloss. #2108-20,semi-g loss, #21'08-20.semI-g loss, I. "A81hten i an"f996 Foo-shell. IIIIIIIIIIIIIIIIIIIIIIIIIIIII ;7 . - - Point Columns above wrops. Paint. Benjamin Moore"C loud GC Point, BenjaminMoore"Cloud GC Paint. Benjorrin Moore"Cloud GC Replace/install the Mlowing cover"OC-25 Sen,,i-.q loss. cover"OC-25 Semi-aloss. cover'-OC-25 Serri I 0 equipment(pet RCM)In I Mirrors. Existing to remain except fover Pharmacy where GC All cases'Remove mirrors,.block up,install sheet Benjamin Moore Ashen Tan PC All doses:Remove.mirrors.block up,install sheet Benjamin Moore Ashen.Tcn PC Restrooms: I - I new mural to be installed.then reri block, rock panels&paint. #996(egg shell finish-f rock.paRels&paint. #99iS(egg Shell fi 44 �upply.ar),Jlhs,lall,.,Res.f.RborTil,�-ig,ns 1nstaIIFDCSvp0&d,sIgn'oge, FCC will deplete old blue GC Install,FL)(2.suiplaiied signage, FbC:will deplete old blue GC Install FDC so pplied sigDage. FDC will Li olablue G,- I �__ 1. I - , �� �. � � - ­­ - �. utolshc,ettockosreouirod. . signage und supply beige in sgr)uge and supply b signage arid sujoply:beige in Wall covering/Marlite Panels Replace clarnaged/poot condition cis required. Match ewsting; GC Remove existing&Install new. _y < 'i elge In Morlite�s Artizan Monterey GC Remove existing&Install new. Mdrlite�s Artizan Mai GC futivird future. fu fu I I I I Sand FRP#5408 1 Sand FIR P*540B . I J)Stockroom I . Sales Floor Fixtures 0:� Impact Doors Y Stockroom Paint ex[tting metal stock roomt doors. Doors,In . Refrigeration Equipment Instal RA.Supplied equipment per fixture ricin. GC -Install RA supplied equipment per lixtureptan. GC install RA supplied equipment per fixture plan. GC Point Ber,�ar6r)Moore Ser"a __�C nstoll new im pact doors. Chase,NW3011 "chocolate GC Install i impact doors. Cbose NW3011"chocolate. GC' Fixtures(C,oi,dolas,W eIccrne, Install RA supplied Fixtures per fixture,plari. GC install RA supplied ftxlures per fixture plan. GC Install RA supplied fixlures per fixture plan. GC 0 poor condition to be repiciced. Spruce#2I 08-20. brown"doors(or equivc lent) brown"doors(or equivalent Arr,ilbassaclor,VV cmens End Caps, With ADA Window,full manufactuierl with ADA Prorno,toldles.Fragrance Wall, perimeter door gasket& Winclow�full perimeter door efc)- IIIIIIIIIIIIIIIIIIIII 0- crilor matching 12"impact gasket&color matching 12" Specialty Shelf Lighting Out of Scope. Out ofscope. Install Rile Aid Supplied specialty lighted shelves. GC IIIIIIIIIIIIIIIIIIIIIIIIIIIIII 0�� plate at base of door. impact plate at bose,of door. 0 1 Noil B�-p. Install powerconclult from coiling&point. Be,I­jj,-,r',riM,-,t,I.-, �71"-)"J .-.c sawcul floor a trench to insta GC - I I llnew powor Sawcu'I Floor&trer.ch,to install.new power GC F K)General Equipment/Stow I . I .1 I I ��.. 1.1. � ­ � .1 . � (­ lcond . ca��nl _%ir,_',�,S--,1111­Hlo��. condvif�................ . � I Jiti� ­­ � � .. ­ ­ I I I 11 11 I � __ . _ - F Items . GN-.'�Fixture bisting ENC dept: install additional wood GINIC C-C EAsti�69 GOC-dept: I stall additioncii wood GN(� GC bistin �litk)nal wood-G�NC PC IN C-) I - ' ' . I . ,,, in.,_ ,g GNC dept: Install ad', I . . Install Rita Aid supplied Install Rile Aid supp!ied refrigeration eaulpmeni per GC Install Rite Aic-supplied refflo6zation equipment pef GC install Rlte.Ald supplied reffigi5rartiorn equipment per G,Z fixtureseclionsperfixturaplain. NOWGINF---dept: fixture Sections Per fixture plan. New GNC dept: fixture sections per fixture plan. NewGNC.depl* refrigeration eq ulpi-nent.(Sports fii*te pion. fixture plarl fixture 1pjon� . I Add newsteelvAth.red I -,ew ste - -.ate c W I . 11 I 1 aminate,canopy top. Addi ,Q1withredLlominote,Qpi top. Add newsteel wth red lamir ,,qnopy,top. all Drink,Grob&bo�.Queuing I Wall sr,elvng: InStall.GNC lighted frornel. Shelving: Install GNC lighted frames. , , cooler,checkout cooler. sales Floor D6cor � I Relocate existing d6corsignei Per fixture&,d6cor plains. RA 06cor Par fixtur(�,&c1i5cor plans. IRA D&ccii F'er fixtoo,&d6c,,(cr plans. RA D&cor Cooler&Freezer Headers-Self Install newcooler/freezer acrylic inserts. D6,corCo. �nstollnelvvQ.00ler/fre--z�--racryltciris,,�es. Decor Co. Install new cooler/reezer acrylic inserts. b6dor Co. by R A(per D6cor Plan) � Contained.Acrylic,insert.ssupplied New decor signage by R,lte Aid Per fixture&d6cor plans. RA D6cor Per fixt ire 8-dA,corplans. RA D6cor Per fixture&dii plans. R,A DA,_-,-)r ond insialled by Vendor, C)Checkouts I � �. . Front Checkout I , Cao!,,� 1�,Fi,-,,--,,_,t Lamps-Internal Repair astecivired. (Retail Fccilifiesinstalling LED CC Repair cisrecivired, (RetailFacilifiesinstolling LED GC Popotasroquired. (Retail Facilitiesinstall LEE) Gc Queuing Ropoz Fixture RA su pfoll<A,install per fixture plan, INotcommon). RA RA supplied.Install pet fixture plan. (Not common). RA RA supplied install per fixture plan. RA , - F�pl - door frame lighting with their lighting siarmice doo�.f.�,am6Hghtih,9�vitht�.e,i..�lig flirig.service, docir frame!�ghtinq wtl')their lighting service I supplied, supplied, suppged, I � . .. � . .. 11 �. . I cornloanv.� 1c.nninar)mL coni I I I GC install �- � . -GC.Finstoll -GC install (_-,-,,'. I reezer Lamps-H.,.�Uder kepairasirequired. Lamp colors to match GC Repairasrequ.ired. Lamp colors foirriatch GQ Repdrcsir,��qui,��d. Lamp Colors to match G C Re-laminate/install new Cher I,,,:,-I [,,:isting to remain unless blue or red then install FDC It new then.FDC supplied Laminate Existing to remain unless blue or red,then.instoll FDC if nrew then FDC supplied Wrninate Remove existing&Instal RA suiclol!ed laminated Wilson.Art-Casual Linen Laminate ' - . _&K, Ke PI,�,� olhP.Mise instaill all new.using ILIrT]o color 3,"K,. otherwise inslall 611 new using,lamp color 3560:K, otherwise it ista 11 ali new using larrip color 3500 K,I counter tops. supp�ednevvlamir,ateN�vithedg6ri�o�ding. All WilsonArf-Casuatt-lbon by FA: supplie,dn(�widniinaTeWth,��do�b:lriibldind. All Wilson Art-Casual Lir�en' by FDC; tops 5c1go molding. #4944-,�8 laminate with edge by FI)C; . . I 11 I I . I I ; I I 11 . .1 I I I I - I - projects will get new Edge Molding(Mink#678). #4944-38 laminate. Edge Install by projects Will get new Edge Molding iMink#678), 44944-38 laminate. Edge Install by mi.olding.(brown)Mink#,1678. install by I � moldina florown)Mink#67A (-�(-, metclino thrown)Mink#A7A (,(-- L)General Conditions Photo Checkout =�] Generoisc�es oie,c cIpcv)np See Cleanii Spedficatior i See Clecrinci Suecification See Cleaninq Specification Install new photo dept Fits. RA,supplied. Install per fixture plan RA supplied krts� G C RA supplied. Install per fixture plain RA Supplied kits, GC RA Supplied. Install per fixture pion RA supplied kjts� GC - i - - Coordination of ffra�f1cor By Floor Core Co. By'Floor Care Co. By Floor Core Co. Wt�,siern Union Self Serve Station Relocate telepl)one jack labeled 11VU POS as GC via LV Relocate telephone jack labeled WU POS as GC via LV Relocate telephone jack labeled WU POS cis GC via_V . E ," �i,j,r,jr)� I. I I I I ___ I I I - I reci,ired. W 0 reouir , sub lrea�41:1. sylo E I n-n-_n ii�­j,,i?�?"��I��!,__ ___ ,, , � - � __J I i i ID)Manager's Office(If exposed to sales floor) I I I Q - 'CON-00-03-024 5 of 5 CON-CD-G3,-024 Z of 5 . @ 1�= ��l - - --- ,.- I .1 11 li�!'Iij , 1 - I 1, - , : Type,c MINN1311121KIMMIMIw",m.mPw" �- I I I I,r � Pyp eA i . �1".-I 3,,:, -1 I . I _ N M .........I C:�� Rq Response- � Response- . I - .Respor,--- �Air or Concern Scope/G,uldance/Comments �Pecificdfioh ibility(GC, Scope/Guiclani Corarrienk Specification ibililytGC'.� SiCooa/P-vidci/:Comrni��6i Specification ibility iL-. . I ' I R A,D6,bor� RA.Di6cor� RA,D�!,- [, ff_� FO� I. I -Vendor) Venclorl I I \�Mdc;` L_-J .Outside wall covering existing Repalras,required. M,SITch,exisfing. GC Remove existing&install new. Marlite's Artizan Monterey GC Remove oxisting&Install new. Morli Artizar�Monterey GC I I I D office, I '�and FRP#5408 Sand FRP#54C8 D I instal window tint, ln5tall.film on window if exposed to sales floor. SUNTECH WINDOW FILM�, GC Install film or)window if exposed to sales floor. SUNTECH W INDOIN FILMS, GC Instail film or,window if exposed to sores floor, SUMCCH WINDOW FILMS, GC ,, product DRMPS 7 HEUTRAL product DRMPS 7 NEUTRAL product DRMPS 7 NEUTRAL .Point Dour/,frame. Point per d6por plan. PT-03 Benjamin Mocre"Cedor GC Paint per cl6cof pion. PT-03 Benjamin Moore"Cedar GC Point pet cli4.co,plon� PT-03 Benjamin Moore"Cedar GC Key"OC-1 6 Seri loss. if Key"OC-I 6 Serrii-gloss. Key"OC-1 6,Semi-g loss. , Dapple walls then pair t dooi &frame Sherwin W illiam Frei Grey,40055. 1 ­ - - Build Newofffice install rew. Marlifteor,outside surfaces. Matchaxisting. __C Install now, Morlite's Artizar, Monterey Cc Install new.. Morlife's Artiz.an Monterey PC �... 1... - Sand FRP#5408 Sand FRP#5408 1 E)Pharmacy � 11hormocy Flooring Replace,lamaged floor; As required. Match existing. GC Asreouirod. Match exstinq. CC As required- Match existing. (-�,-, VCT Labor and M oterfals Asrectuired. Mau)existing. GC ,As reouirt�d. Malch existinQ, 0C As requite--d. Match OXstini�j- G(� I Carpetinq Labor Repair,mrequired. Repairas eguired. Repair as required. Carpet Maieriol$ Repair as required, M alworks,Prefe.rence EZE PC Repair CS rt-qiu4r,�xj. Nlaiworks Preference EZE _GC Repair cis require,cl. - Malworks Preference LZE CC Replace a4arnaged or missing, Repair as required. Match existing. GC Repair as recluired. Match existing. CC ROpair:as required. Mc�f,-,h I-A:Ang. GC cove bos'-1. I 11 I I I I I Pharmacy Ceiling C Replace darnaged ceiling. Astequired. Match exisfina. G-C Asrequied. Match e3dSfing, GC As required. MoTch eAstirq. GC , C F­ Replaced damaged light lf(xrlures� Asrequired. Match existing. C,Cl� As recujr,��d. Match ex[sting, PC As required. Mol'ch existin.q. CC - . - � � . �� . . -� I I Ify- Clean lahl fj Asreouiired. Match existing. GC -As requited. Match emstina. GC As required. Match existing.� GC I LL1 Clear)HVAC Diffusersothd Return As required., Match exisfing� G, Astrequired. Motel)exisfin I , 11 . g- GC As required, Match existing- GC a- Air Grilles. 1. . , I Of Relocate existing d6ciar sIgnage/ As required per llixture/cfi�cor pion. RA As required per fixture/d6cor plan. RA AS required per fixture/d6cor plan. RA 0 1 LL I Install pharmacy banner(as supplied, supplied, supipli�-d, li- recruited) GC install PC install GC r0cill (3 �� I I in M Mlsc�elloneous a) D Pharmacy Walls I 0 (O Green leof Fx:mufdl,on outer wall Remove existing Morlite or any wall covering& Sherwin Wil farns Primer PC Remove existing morlite or any wall covering& Sherwin Willj=5 Primer GC Remove existing Marlite a,,anywall covering& Sherwrin Williams Primer GC (preparation). prepare surface for new RxwcLI mural covering by. *e2OW8980;use KILZ 2 Latex prepare Surface(or new Rxwell mural covering by iIk,B28W81)80;use KIEZ 1 2 Latex. prepare surface for new Rx wall mural covering by #B28W6980;use KILZ 2 Latex I I � blocking,sheet rock,tape&paste,than point With primer for non-white(darker) blocking,Sheet rock.tape&paste,than paint with pri for non-while(darker). blocking,shect'rock.tope,&paste,then paint With primer for non-white.(darker) U) �. wall covering printer. ex ng.primer. eAsting pointed svrb�ice, 0 �; ,51ling pointed surfaces. Wall coyeri S wdjI.C6.vering primer. existing pointed surfaces. Z co . I Orcen leaf Rx muTc!J:,Qn outerwall. InstallGreen 160F.mural- CIP supplying 9 install, RIA vendor Install Green liaof mural. CIP.sulaptyring&.1ni RA vendor Installbueen leaf niurcif. CfP supplying&install. R�& i, -1-� U) a) N 1. .. I .. ", ,, I I 'll .1 I I � .... 11 � I . . 5; 16 C6 Paint walls. I. Point if poor condition or exposed wo Is due to Benjamin Moore"Cloud GC Point if poor condition ore>pbsecl walls due to benjornin Moore"Clovd GC Pol Lu 0 4 1 . ..fht if poor condition or expowd wails due to Benjamin Moore"Cloud GC of I . 11 remodeling, Cu,ver'OC-25 remodeling. Cover"OC-25 Irefflodelina. Cover"OC-25 Add/Relaminate,Bumper. Remove a�Asting.edge molding facing sc,les:floor& c; � McCue(brown)Mink#678 FDC1 Remove existing edge molding facing soles floor& McCue(brown)Mink 4676 FDC Remove existing odge'moJding facing sales f1cor& McCue(brown)Mink#678 Fl,_ Z replace With FDC supplied edge molding&I� supplied replace With FDC supplied edge molding&1: supplied replace,w0h FDC supplied edge mooing&1: siuppl�ed B bumper at too of cove base. C�C bumper at top of cove.base. G C bumper at lop of cove base. G C B I . Installed Indicted � I n0alled Drawn Pahf Wood trFm Point Rx mullons&columns around window B,r,�rjamrn Mpo�e,Clour,l PC FaInf Rx mullIons.&colunins arowd window Benjomin:vi"Ck)od PC Faini Rx,nullions&columns around window D,erjarrtin moore'Cloud GC openinas. I I Cover"OC-25 looenincs. , Cover"OC-25 --opernin.1 s. I Cover"OC-1 25 Checked I ComV,.Bas6 I..�� � ..� �� I I I I . � � I , install new.. johrisoi Fudgei RW OC-1 67� GC Install new. JohnsonitepudgeRWOC-167- GC install new. Johnsontl6l'udgeRWIDC-167. GC Approved HGK I A A A :PhormacY Door Paint door&fr.cume: Replace,existing 'A��sQclates Point Benjamin Moore� RA If facing scles4bor then feplace.wi.th new door If new then LaCkNet door GC If facing soles floor then ftpicce�wltjh new,Joel If new then LockNot door GC . I Only"signcigc�With now bdge-color suIj5pheaty: "Autuirrin Lear'f I I 31 Semi- otherwise paint. Replace existing"Associates Only" using(NovarnarSonta Rosa Qtnori point. Replace exsti.ng"Associat,,s Only' using(Nemnmm�onta Rosa ... . '11, . . I I � I � Project No. 13-6173 FDC. glass, signage Win new,beige color supi by FDC. Plum Tree W72001 T facing eige color supplied by FDC. Plum Tree WZ2001 T facing . I solestloor&,Rx Side Formica solest'locir&Rx side Forr,.)jc,A . .11 . � t,tevfrol White laminate PL-8); Neolral White laminate PL-8); otherwise point Benjamin otherwise point Benjamin Title Moore"Autumn Lear#1 131 M core"Au t Vmn I(10 f'#1 1,31 Seml-gfoss; I seml-gloss; I .:�,)?�ED A4�)C FINISH SCHEDULE Pharmacy Fixtures I I 1�� , Chan, tnen FD.0 supplied Laminate, EAsting to remain unless blue or red then Install FDC It mew then FDC supplied Laminate Remove existing&Instal RA supplied lonnincited ilsor,Art-Casual Linen Lct t i, L_� pe out counter tops. Existing to remain unless blue orre-o then install FDC Ifnrew I , ­ W - ��_ supplied new lamboie with edge molding, All Wilson,Arf-Casual Linen by FA; supplied new,,)ntinatewittrii molding. All Wilson Art-Casual Linen by,FA; tops&e,dge.molding. #4'944-381aminale with,eoge, lb� ,- ��,�Y�HOWARD G. IUMURA "-� r,r(�jec,,tswili,l,gtnOw,.Fdge.Mc,lding(Mink#A73). #4944 38 lanninole- Edge s ll get new Edge Molding(Mink#87ffl. #4944-38 laminate. Edloe Install by molding[brown)M�nk#A76. InsL i,l I-)y te_� NOTE- , molding lictown)Mink#678. GC - molding(brown)Mink#678. GC (:17 C )Q;- n Q� . I.-i I I ... I'll -1 ''I'll'' I ­ ­- 11.1 I I I I � I'll, .1.1.11 11 ­ I I 11 11 A F)Consultation Roo in I I ­ . .. .1 11.1 I - 0 0 A GC SHALL WORK WITH RITE AID RCM AND VERIFY Consultation Room flooring i _____i_ - i 1 8-2013 Sheet No. �� REN N, WASHINGTON,,�t �� 3658 ALL COLORS OF FINISHES PRIOR TO BIDDING ��-�, I CON-CD-03-024 "'N"y 3 ofs , ,�) I�,)� I I -F' I dA)' C G rc LU I t I I - � .8-2013 S 'i 4RENN WA HINGTON I V ov� A-802 I I __ I I 1 1. 2 1 3 1 4 1 5 1 1 6 1 7 1 8 _F 9 1 10 I 11 1 12 1 . 13 1 14 1 15 -1 16 E] III I ____ - � .- - - .---. I � __ - - ­ ___ __________� _____