Loading...
PFI2016-00119 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT COMMUNITY DEVELOPMENT Permit#: PF12016-00119 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 06/08/2016 Parcel: SEG1907 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: Comcast Project Description: Comcast proposes to overlash(1)-48ct fiber to existing strand,then push(1)-48ct fiber 350'through existing conduit, and trench to place(1)-2"conduit a minimum of 36"below grade within the City of Tigard ROW. Owner: FEES Description Date Amount PFI Permit Fee 06/07/2016 $300.00 PHONE: Contractor: PHONE: FAX: Applicant: IVAN CHANDLER 11308 SW 68TH PKWY TIGARD, OR 97223 PHONE: 971-777-0908 Total $300.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Not Present Signature: 01. Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12016-00119 Type: Condition Name: Status: Severi : PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code,and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes,etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA,current edition,American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services:503-629-0111 (Tigard Police Dept., Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 12-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 14-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads,ditches,etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection,and after completing work covered by the permit. Ken Fisher 503-816-6146 or Kenny@tigard-or.gov PFI_Utilities 18-PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 19-MONUMENT PROTECTION Applied Notice Existing monuments, property corners,and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 20-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and,in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing,of any/all assignment changes. PFI_Utilities 21 -OTHER Applied Notice RECEIVED JUN 0 6 2016 City Of Tigard CITY OF TIGARD �" PUBLIC; WORKS— E:NGINFAMING PLANNINGIENGINEERING a,� s Public Facility Improvement (PFI) Permit DESCRIPTION OF WORK(in the right-of--way) TYPE OF WORK Check one: ❑ Utility Connection ❑ TYPE 1—Franchise Utility\Cork ❑ Sidewalk/driveway approach \Cork performed by N\\N,PGF ❑ Street improvements and/or utility agency. Detailed description: Comcast proposes to overlash(1)-48ct fiber to exisiing strand, ❑ 'TYPE 2 --Sidewalk/Driveway/Sewer then push(1)-48ct fiber 350'through existing conduit,and trench to place(1)-2"conduit Work performed for the purpose of: a minimum of 36"below grade within the city of Tigard ROW - Sidewalk installation or repair. • Driveway approacli installation l O� Ppropertyaddress/locatiot)(s): / and/or repair • Sanitary sewer lateral installation 13249 SW Summit Ridge St,Tigard, OR 97224 and/or main line rap Tigard,OR 97224 ❑ TYPE 3—Dull scale Development Applicant: COME'st Work performed with Land use 11308 SW 68th Parkwayapproval which includes any of Address: the following: City/state: Tigard, OR Zip: 97223 • Subdivisions or Partitions Phone: (971)-777-0908 F:n)ail: Ivan_Chandler@cable.comcast.com - Street widening Contact name: Ivan Chandler Phone: (971)-777-0908 • Mainline installation for Sanitary sewer,Storm sewer,Tigard water Contractor: Texstar Enterprises and/or Tigard Water Service:area CCB#: 178798 Exp)radom 10/1012017_ SUBMIT COAIPLE'rEI)APPI.iCA't'ION 1'O: Address: 14122 Arndt Rd City of Tigard City/state: Aurora, OR zip: 97002 Planning/Engineering 503 776-5049 imminer texstarenter rises.com 13125 SW Nall Blvd. Phone: ) )✓mail:1 @ p Tigard,OR 97223 Contact name: Jim Miner Phone: (503)776-5049 applications for"miner work in right-of-way" only may be emailed to: Engineer: K&B Technical Solutions rowhermitsatigard-or.gov Address: PO BOX 2529 Cit)/stat,: Clackamas,OR Zip: 97015 ®' Phone: (503)650-6041 Email: John_Forster@kbmail.com Case No.: PFICZ� Co g Contact name: John Forster :application submittal fee: S Seo•CO :Additional fees: — Estit))ated value of work is required(if over$5,000):$_.. .application accepted: (within the public right-of-way) By:— L � Datc: —"A2 ,application reviewed: Is work related to a LAND-USD:DECISION? El U- No 't / Date: _ ,f(� If so, please specify (�4LP,SDR,SUIS,etc.)case #: By: t� Applicant notified: Is work related to a BUILDING 1'}�lu�•IIT? E3 Yes [3 No Byi Date: —6�4��2 If so,please specify(BUILDING PERIMI'l)case#: r:ycvRrlf+yMasteiaytanduwAONK+tbns Re�()?X9/201s City of Tigard • 13125 SSV I fall I3h-d. - Tigard,Orcgon 97223 - xvwwtigard-or.gov - 503-718-2421 • Page 1 of 4 _ 1 i APPLICANT'S NOTE: Person specified as Applicant"shall be designated"Permittee"and slialh provide financial assurance for work. When the owner and the applicant are different people,the applicant roust be the purchaser of record or a lessee in possession with written authorization front the owner or an agent of the owner. Tlic owncr(s)must sign this application in the space provided or submit a written authorization with this application. I BY SIGNING BELOW,THE APPLICANTS) SHALL CERTIFY THAT: • Thcabms, rcquest does not v iolate an decd restrictions that may be attached to or imposed upon 1 Subject propertT� • If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the conditions and Luuitations of the approval. • All of the above statements and the statements in the plot plan,attaclunents,and exhibits transinittcd lierewitli,arc true;and the applicants so acknowledge that any permiit issued,based on thus application,may be revoked if it is found that any such statements ace false. • The applicant has read the entire contents of the application,including the policies and criteria,and understands the requireme tits for approving or denying the application. SIGT RES:of each owner IJthe subject pro erty required. Y plica t/f thorized Agent's signature Print name Date i I Owner's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date -"-�_ -✓.- �.. � '.P:.an�&�Z:.-23:4Wuh}.'� iT"..T�+25 �Lw�n - ..fid' P.^il!,ta PUBLIC FACILITY IMPROVEMENT PERMIT City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • ,vw-%mtigard-or.gov 503-718-2421 • Page 2 of 4 i 1 DEVELOPMENT ENGINEERING FEES , Public Facility Improvement(PFI)Permit: ' 1 1 i e � APPLICATION FEE Part 1: Required submittal fee$300.00 FRANCHISE UTILITY AND SIDEWALK/ PERMIT FEE DRIVEWAY AND UTILITY CONNECTIONS,ETC. Part 2: All non-water system improvements (work in the nigh[of way) ' Engineer's estirnate 15%(less$300.00 subnuttal fee) Engineer's estimate X 2%Plan Review Sketch (including information below) WATER SYSTEM FEE ❑ Dimensions Part 3: All public water system unprovemcnts ❑ Street Name Engineer's estitnate 1 12% ❑ Site Address PFI Permit Fee Exemptions: There will be no permit fee charged,or assurance required FULL SCALE DEVELOPMENT for the following types of work: (Subdivisions/Partitions and Street Improvements) • Sidewalk repair(less than 20 lineal feet) • Relocate or replace mailbox Design Plans • Ditch cleaning that does not involve regrading. (6 sets,24-66 or 22x34) • Weephole repair ❑ Cover—Site,Vicinity,Abbreviation,Legend • Curb repair or replacement(less than 20 lineal feet) ❑ General Motes(Cit,Water,Sewer,etc.) • Lawn sprinkler system'installation or repair ❑ Street(Plan,Profile) • Street txee pruning or planting ❑ Water,Storm and Sanitary(Pian Profile) • Planter strip landscape maintenance ❑ Water Quality Facilities • Test wells ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Note: A cash assurance may be required per Storm,Sanitary,Water,Signage,Street Lights,etc) TMC 15.04.140.(crtstomer deposit) ❑ Details ❑ Traffic Sight Distance �.. ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(Project land use name,revision and j plan log block,dates and sheet numbers.) Additional Submittals (per Land Use conditions) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Patliway Design(if applicable) ❑ Water Department Approval PUBLIC FACILITY IMPROVEMENT PERMIT City of Tigard 13125 SW Hall Blvd. • 'Tigard,Oregon 97223 • xvwwtigard-or.gov • 503-718-2121 • Page 3 of 4 SAMPLE SKE,rctl: Edge of Pavement Ditch Streetlight I .®.®.—.—.®._ c^®�'®.® kk " � � I i i®'�•roj>os crSeWer`�rie®' ( i Existing House i ExistingI I >� Driveway I ' a� v� o 0-en t! v' I i I Existing Shop � Powerpole I ( o 2 I rl Ia. .---_.---7iopTrrty'L t'na _._--. iI Fire Hydrant(FH) i 1 I Scale: 1"=30' i I I I I i I I I i N4INIMUM SKETCH REQUIREMENTS (Put"N/A" if Not Applicable): North arrow Property lines &dimension Slope of property Street & street name(s) EXisting building,structiu:es Utility &street light poles Proposed work l.?listing curb or edge Trees LxisunP SAV or of pmement l Xi;ting utilit)' locations D/W Apron (sewer,-Vater, Storni) _s�<.�n,:. =�. ;.^::--r •:,.. �w_�s..,;;,.._. .,,...�...__.. .-,,.. .a�_;. .�,r..-._g._a>:.�u;re,�....�a,.n;��as�:u��:� -��,.;>>:V�-a�:xrr;:cr��.�:z,.�;xx,-,.>_.k.�r..;,z,-���,>,r•�„•.�.✓;;,,,,.,•.•rasa PUBLIC FACILITY IMPROVEMENT PERMIT Cit) of Tigard 13125 SU-Hall Blvd. • ".Figard,Oregon 97223 • \vkvw.tigard-or.gov 503-718-2421 Page 4 of 4 N N N Nj A f � A N N s N N D n y $m 25 z �m o tiO �2 20 O N N I ppCN � �oo€ �Y N N T 4 � SII{tl� N N i.I. �1 y IZ– �T myy Z-1 37T0 2°�r y— CIn Q �p�i cN� m0 U �m mZm •- P. omo y0A O D N z C N N �myir m N N A r N TZg m m0 O N O0 T m T mm2 mm R]I p 0 O i ..�en:ausa�, 13249 SW SUMMIT RIDGE ST Comcast, °�°°° TIGARD,OR 97224 N `•/ 1Evtarxa0unla� , yContact:IvanChandler ppgpXt526,C4tlkrirs,OR67015 48193 N Phone:(503)596-3754 omu-(503)6504041 EA 216 - - TG3A TO TGSO NODE SEGMENTATION a' Ivan Chandler@cable.eomeastc E—t..rom Fo.wgmm.anr - - CITY OF TIGARD ROW PERMIT DRAWING Page 84 2011 Edition Stationary Lane Closure with Flagging Diagram 320 Diagram 320 covers total closure of one lane of a two-lane, two-way roadway. See the detail inset for the layout if using a single flagger to control both directions of traffic on low volume roads (less than 400 ADT)with good sight distance as discussed below. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3—Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. Flaggers at each approach are required if any of the following conditions exist: a. Night Operations. b. Work space is over 200 feet in length. c. Sight distance is less than 750 feet from each approach through the lane closure. d. Traffic volumes are greater than 400 ADT. 4. The length between the Flagger Ahead signs shall not exceed one mile. Use Diagram 340—Lane Closure with Pilot Car if exceeding one mile. 5. Cones should be used to outline the work space when curves or other roadway alignments prevent clear direction for the motorists to pass the work space safely. 6. Cones along the work space are recommended when posted speeds are 45 mph or greater,when working under heavy traffic or when travel lanes are narrower than 11 feet. 7. Extended queue signing (see Diagram 5-4) should be used when traffic queues extend beyond the initial advance warning sign. 8. When flagging near an intersection, the"Flagger Ahead" (CW23-2) sign should be visible to traffic entering from any side road. Additional advance warning and Flagger Ahead symbol signs may be placed on the side road(s). 9. Sign set-up and flagger placement shown may be used for intermittent full road closures of 20 minutes or less. 10. The"ONE LANE ROAD AHEAD" (W20-4) sign is optional and should be considered on high volume or high speed roads, or when extended queues are expected. Chapter 5 December 2011 2011 Edition Page 85 Stationary Lane Closure with Flagging Diagram 320 <@> 0C .6 w C a, 0 go� a o O 0 O X11o a LLw� �F O LU 3 Qo I H a • m m i— --------- I �•• m am I $ I >O a • o oL ® -0 j t m i 2 U) I I I EE CL O m I I 2 CO o-E I og I�' I • I 0)CO q I • -j I r I I o i Is o I •� I wQ� j T Y I mw0 a~ Sign Spacing and Buffer Lengths(feet) 1 1 � w ERRATA. pasted S acin Between Si ns Buffer ug Speed A B C Space qo¢a On SupplernentT&le 25 100 100 100 75 30 100 Updated:renrwry 11, 35 350 350 350 125 tole 40 150 1 0 Q Or:onarTralr A-A-V 45 180 cc3 sea w" 50 500 500 500 210 55 250 Si zn S acin g and Buffer Lengths feet Supplement Posted Spacing Between Signs "Buffer" December 2011 Seed A B C Space Chapter 5 60 285 65 700 700 700 325 70 365 Page 78 2011 Edition Work on Shoulder Diagram 210 Diagram 210 covers stationary work with work or parked equipment on the shoulder. This diagram does not cover work on a freeway shoulder. See Diagram 710 for Freeway Shoulder work. 1. Vehicles should be parked as far off the roadway as practical. 2. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3—Lights and Lighted Signs for exceptions. 3. For added visibility, truck-mounted arrow boards or PCMS in caution mode may be used. 4. Arrow panels in caution mode are recommended for work on roads with posted speeds of 45 mph or greater and high traffic volumes, greater than 2000 average daily traffic (ADT). 5. Requirements for signing and devices are shown in Table 5-2, below. Table 5-2: Device and Signage Guidelines Proximity to Edge of Traveled Way More than 15 feet or behind Barrier or Less than 15 feet Guardrail One advance warning sign is Advance warning required and two signs are Work in Place signs, devices, and recommended. More than 1 Hour flashing warning Cone taper is required. Cones lights are optional. along the edge of traveled way are optional. Work in Place Advance warning signs and devices are optional. Less than 1 Hour Sign Spacing and Buffer Lengths (feet) Posted Spacing Between Signs Buffer Speed A B C Space ERRATA: 20 50 25 100 100 100 75 Supplement Table 30 100 35 350 350 350 125 Updated:February 12, 40 1 1 150 2016 45 180 By:ODM Traffic Roadvsy 50 500 500 500 210 Sectio" 55 250 Chapter 5 Si Zn Spacing and Buffer Len the feet Supplement December 2011 Posted S acin Between Signs F28 Speed A B C 60 65 700 700 700 325 70 1 365 2011 Edition Page 79 Work on Shoulder Diagram 216 It (Optional) • • ; Protection Vehicle w/TMA(both Optional) See Chapter 4 • • —4— Buffer • • • • U3* • • A ROAD SHOULDER WORK OR WORK AHEAD AHEAD Initial Warning Sign t *Use as appropriate-see Table 5-2 December 2011 Chapter 5