Specifications (12) • DELSON ENGINEERING INC. Project Title: PATINO CANOPY-B 1
1204 NE 146 AVE Engineer: Project ID: B15-11-146-RE\
VANCOUVER WA 98684 Project Descr: 10660 SW PARK ST TIGARD 97223
360-944-7094 F
JOHN@DELSONENGINEERING.COM
Pnin1 d'.4 MAY 2016.12'30PM
File=c:\915-JOBS1B15-CA-21815.11-1.EC6
Wood Beam ENERCALC,INC.1983-2016,Build:6.16.4.15,Ver.6.16.4.15
.Laic:'#":KW-06002311 ` - Licensee:JOHN DELSON
Description: RB-1
CODE REFERENCES
Calculations per NDS 2012, IBC 2012, CBC 2013,ASCE 7-10
Load Combination Set: IBC2012
Material Properties
Analysis Method: Allowable Stress Design Fb-Tension 875.0 psi E:Modulus of Elasticity
Load Combination 1BC2012 Fb-Compr 875.0 psi Ebend-xx 1,300.0ksi
Fc-PrIl 600.0 psi Eminbend-xx 470.0ksi
Wood Species : Douglas Fir- Larch (North) Fc-Perp 625.0 psi
Wood Grade : No.2 Fv 170.0 psi
Ft 425.0 psi Density 30.580 pcf
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
D(0119)S(0.1 5) D(0.119)S(0.175) +D( 19)S(0.175)
+ +
i i + i i . i
x M
N I
6x10 6x10 6x10
Span=2.Oft Span=l2.Oft Span=2.Oft
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Load for Span Number 1
Uniform Load: D=0.0170, S=0.0250 ksf, Tributary Width=7.0 ft,(ROOF)
Load for Span Number 2
Uniform Load: D=0.0170, S=0.0250 ksf, Tributary Width=7.0 ft,(ROOF)
Load for Span Number 3
Uniform Load: D=0.0170, S=0.0250 ksf, Tributary Width=7.0 ft,(ROOF)
DESIGN SUMMARY Desi e n OK_
Maximum Bending Stress Ratio = 0.678 1 Maximum Shear Stress Ratio = 0.229 : 1
Section used for this span 6x10 Section used for this span 6x10
fb:Actual = 682.27 psi fv:Actual = 44.68 psi
FB:Allowable = 1,006.25 psi Fv:Allowable = 195.50 psi
Load Combination +D+S+H Load Combination +D+S+H
Location of maximum on span = 5.950ft Location of maximum on span = 2.000 ft
Span#where maximum occurs = Span#2 Span#where maximum occurs = Span#1
Maximum Deflection
Max Downward Transient Deflection 0.140 in Ratio= 1026>=360
Max Upward Transient Deflection -0.070 in Ratio= 686>=360
Max Downward Total Deflection 0.236 in Ratio= 610>=180
Max Upward Total Deflection -0.117 in Ratio= 408>=180
Overall Maximum Deflections
Load Combination Span Max.""Defl Location in Span Load Combination Max."+"Defl Location in Span
1 0.0000 0.000 +D+S41 -0.1173 0.000
+D+5+H 2 0.2357 6.050 0.0000 0.000
3 0.0000 6.050 +D+S+H -0.1174 2.000
Vertical Reactions Support notation:Far left is#1 Values in KIPS
Load Combination Support 1 Support 2 Support 3 Support 4
Overall MAXimum 2.352 2.352
Overall MINimum 0.571 0.571
DELSON ENGINEERING INC. Project Title: PATINO CANOPY-B
1204 NE 146 AVE Engineer: Project ID: B15-11-146-RE\
VANCOUVER WA 98684 Project Descr: 10660 SW PARK ST TIGARD 97223
360-944-7094 — Z
JOHN@DELSONENGINEERING.COM
Printed 4 MAY 2015.12.34P1,1
File=c:11315J0BSIB15-CA-21B15-11-1.EC6
Wood Beam ENERCALC,INC.1983-2016,Build:6.16.4.15,Ver•6.16.415
t,#e. .Kti1t-06002391 _.
- Licensee:JOHN DELSON
Description: RB-2
CODE REFERENCES
Calculations per NDS 2012, IBC 2012, CBC 2013,ASCE 7-10
Load Combination Set : IBC2012
Material Properties
Analysis Method: Allowable Stress Design Fb-Tension 875.0 psi E:Modulus of Elasticity
Load Combination i BC2012 Fb-Compr 875.0 psi Ebend-xx 1,300.0 ksi
Fc-PrIl 600.0 psi Eminbend-xx 470.0ksi
Wood Species : Douglas Fir- Larch (North) Fc-Perp 625.0 psi
Wood Grade : No.2 Fv 170.0 psi
Ft 425.0 psi Density 30.580 pcf
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
D(0 17)S(0.25) D(0.17)S(0.25) DC0.17)S(0.25)
i i i i i i i i i
N N
S'
1
6x10 6x10 6x10
Span=2.Oft Span=12.0ft Span=2.Oft
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Load for Span Number 1
Uniform Load: D=0.0170, S=0.0250 ksf, Tributary Width=10.0 ft,(ROOF)
Load for Span Number 2
Uniform Load: D=0.0170, S=0.0250 ksf, Tributary Width=10.0 ft,(ROOF)
Load for Span Number 3
Uniform Load: D=0.0170, S=0.0250 ksf, Tributary Width=10.0 ft,(ROOF)
DESIGN SUMMARY Desi•n OK
Maximum Bending Stress Ratio = 0.9691 1 Maximum Shear Stress Ratio = 0.327 : 1
Section used for this span 6x10 Section used for this span 6x10
fb:Actual = 974.67 psi fit:Actual = 63.83 psi
FB:Allowable = 1,006.25 psi Fv:Allowable = 195.50 psi
Load Combination +D+S+H Load Combination +D+S+H
Location of maximum on span = 6.050ft Location of maximum on span = 2.000 ft
Span#where maximum occurs = Span#2 Span#where maximum occurs = Span#1
Maximum Deflection
Max Downward Transient Deflection 0.200 in Ratio= 718>=360
Max Upward Transient Deflection -0.100 in Ratio= 480>=360
Max Downward Total Deflection 0.337 in Ratio= 427>=180
Max Upward Total Deflection -0.168 in Ratio= 286>=180
Overall Maximum Deflections
Load Combination Span Max."2 Defl Location in Span Load Combination Max."+"Defl Location in Span
1 0.0000 0.000 +D+S+H -0.1676 0.000
+D+S+H 2 0.3368 6.050 0.0000 0.000
3 0.0000 6.050 +D+S+H -0.1677 2.000
Vertical Reactions Support notation:Far left is#1 Values in KIPS
Load Combination Support 1 Support 2 Support 3 Support 4
Overall MAXimum 3.360 3.360
Overall MINimum 0.816 0.816
DELSON ENGINEERING INC. Project Title: PATINO CANOPY-B
1204 NE 146 AVE Engineer: Project ID: B15-11-146-RE,
VANCOUVER WA 98684 Project Descr: 10660 SW PARK ST TIGARD 97223
360-944-7094 F- 3
JOHN@DELSONENGINEERING.COM
PHI ied'4 MAY 2016.1238P
File=c:11315JOBS1B15-CA-2\B15-11-1.EC6
Wood Beam ENERCALC,INC.1983-2016,Build:6.16.4.15,Ver:6.16.4.15
lac: ,itsvIt-I6OU2311 . - � ''`• � • _ Licensee:JOHN DELSON_
Description: RB-3
CODE REFERENCES
Calculations per NDS 2012, IBC 2012, CBC 2013,ASCE 7-10
Load Combination Set: IBC2012
Material Properties
Analysis Method: Allowable Stress Design Fb-Tension 2400 psi E:Modulus of Elasticity
Load Combination iBC2012 Fb-Compr 1650 psi Ebend-xx 1700ksi
Fc-PrIl 1350 psi Eminbend-xx 900ksi
Wood Species : SP/SP Fc-Perp 650 psi Ebend-yy 1500ksi
Wood Grade :24F-V4 Fv 210 psi Eminbend-yy 790 ksi
Ft 975 psi Density 34.32 pcf
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
D(3.4)
K
' 5.5x11.25
Span=20,0 ft
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Point Load: D=3.40 k(@610.0 ft,(ROOF)
DESIGN SUMMARY Desi•n OK
Maximum Bending Stress Ratio = 0.814 1 Maximum Shear Stress Ratio = 0.218 : 1
Section used for this span 5.5x11.25 Section used for this span 5.5x11.25
fb:Actual = 1,758.38 psi N:Actual = 41.21 psi
FB:Allowable = 2,160.00psi Fv:Allowable = 189.00 psi
Load Combination +D+H Load Combination +D+H
Location of maximum on span = 10.000ft Location of maximum on span = 0.000 ft
Span#where maximum occurs = Span#1 Span#where maximum occurs = Span#1
Maximum Deflection
Max Downward Transient Deflection 0.000 in Ratio= 0<360
Max Upward Transient Deflection 0.000 in Ratio= 0<360
Max Downward Total Deflection 0.887 in Ratio= 270>=180
Max Upward Total Deflection 0.000 in Ratio= 0<180
Overall Maximum Deflections
Load Combination Span Max.""Defl Location in Span Load Combination Max."+"Defl Location in Span
D Only 1 0.8875 10.000 0.0000 0.000
Vertical Reactions Support notation:Far left is#1 Values in KIPS
Load Combination Support 1 Support 2
Overall MAXimum 1.700 1.700
Overall MINimum 1.020 1.020
+D+H 1.700 1.700
+D+L+H 1.700 1.700
+D+Lr+H 1.700 1.700
+D+S+H 1.700 1.700
+D+0.750Lr+0.750L+H 1.700 1.700
+D+0.750L+0.750S+H 1.700 1.700
+D+0.60W+H 1.700 1.700
' DELSON ENGINEERING INC. Project Title: PATINO CANOPY-B
1204 NE 146 AVE Engineer: Project ID: B15-11-146-RE1,
VANCOUVER WA 98684 Project Descr: 10660 SW PARK ST TIGARD 97223
360-944-7094 F-If
JOHN@DELSONENGINEERING.COM _/
Prirdeu'4 fv1AY 2(116 12'4JPM1l
File=c:\B15JOBS\B15-CA-2\B 15-11-1.EC6
Wood Beam ENERCALC,INC.1983-2016,Build:6.16.4.15,Ver:6.16.4.15
-
Lic �t�=t160t?2331 ._. Licensee:JOHN DELSON
Description: RJ-1
CODE REFERENCES
Calculations per NDS 2012, IBC 2012, CBC 2013,ASCE 7-10
Load Combination Set: IBC2012
Material Properties
Analysis Method: Allowable Stress Design Fb-Tension 875.0 psi E:Modulus of Elasticity
Load Combination iBC2012 Fb-Compr 875.0 psi Ebend-xx 1,300.0ksi
Fc-Prll 600.0 psi Eminbend-xx 470.0 ksi
Wood Species : Douglas Fir-Larch (North) Fc-Perp 625.0 psi
Wood Grade : No.2 Fv 170.0 psi
Ft 425.0 psi Density 30.580 pcf
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
•
Dto.os+ + ♦ +
s(a11 o.osa�sto.+
+
+ +
w i
1:
4, 7
4x8 4x8
Span=10.Oft Span=2.Oft
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Load for Span Number 1
Uniform Load: D=0,0170, S=0.0250 ksf, Tributary Width=4.0 ft,(ROOF)
Load for Span Number 2
Uniform Load: D=0.0170, S=0.0250 ksf, Tributary Width=4.0 ft,(ROOF)
DESIGN SUMMARY Desi•n OK
Maximum Bending Stress Ratio = 0.579 1 Maximum Shear Stress Ratio = 0.236 : 1
Section used for this span 4x8 Section used for this span 4x8
fb:Actual = 757.44 psi fv:Actual = 46.09 psi
FB:Allowable = 1,308.13psi Fv:Allowable = 195.50 psi
Load Combination +D+S+H Load Combination +D+S+H
Location of maximum on span = 4.804ft Location of maximum on span = 9.441 ft
Span#where maximum occdrs = Span#1 Span#where maximum occurs = Span#1
Maximum Deflection
Max Downward Transient Deflection 0.142 in Ratio= 844>=360
Max Upward Transient Deflection -0.081 in Ratio= 590>=360
Max Downward Total Deflection 0.239 in Ratio= 502>=180
Max Upward Total Deflection -0.137 in Ratio= 350>=180
Overall Maximum Deflections
Load Combination Span Max.""Defl Location in Span Load Combination Max."+"Defl Location in Span
+D+S+H 1 0.2387 4.972 0.0000 0.000
2 0.0000 4.972 +D+5+H -0.1366 2.000
Vertical Reactions Support notation:Far left is#1 Values in KIPS
Load Combination Support 1 Support 2 Support 3
Overall MAXimum 0.806 1.210
Overall MINimum 0.196 0.294
+D+H 0.326 0.490
+D+L+H 0.326 0.490
+D+Lr+H 0.326 0.490
DELSON ENGINEERING INC. Project Title: PATINO CANOPY-B
1204 NE 146 AVE Engineer: Project ID: B15-11-146-REQ
VANCOUVER WA 98684 Project Descr: 10660 SW PARK ST TIGARD 97223
360-944-7094 F "
JOHN@DELSONENGINEERING.COM
Pnn eo•4 MAY 2016 12,11PM
File=c:\B15-JOBS\B15-CA-21815-11-1.EC6
Wood Beam ENERCALC,INC.1983-2016,Build:6.16.4.15,Ver:6.16.4.15
1Lic:41. !C`tN4160{I2311
., Licensee:JOHN DELSON
Description: PH-1 POST CHECK FOR BENDING
CODE REFERENCES
Calculations per NDS 2012, IBC 2012, CBC 2013,ASCE 7-10
Load Combination Set: IBC2012
Material Properties
Analysis Method: Allowable Stress Design Fb-Tension 575.0 psi E:Modulus of Elasticity
Load Combination 1BC2012 Fb-Compr 575.0 psi Ebend-xx 1,100.0 ksi
Fc-Pill 575.0 psi Eminbend-xx 400.0 ksi
Wood Species : Hem Fir Fc-Perp 405.0 psi
Wood Grade : No.2 Fv 140.0 psi
Ft 375.0 psi Density 26.830 pcf
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
W(0.5)
I 'I
6x8
Span=9.0 ft
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Point Load: W=0.50k(a,9.0ft,(WIND)
DESIGN SUMMARY Desi.n OK
Maximum Bending Stress Ratio = 0.683 1 Maximum Shear Stress Ratio = 0.049 : 1
Section used for this span 6x8 Section used for this span 6x8
fb:Actual = 628.36psi fv:Actual = 10.91 psi
FB:Allowable = 920.00 psi Fv:Allowable = 224.00 psi
Load Combination +D+0.60W+H Load Combination +D+0.60W+H
Location of maximum on span = 0.000ft Location of maximum on span = 0.000 ft
Span#where maximum occurs = Span#1 Span#where maximum occurs = Span#1
Maximum Deflection
Max Downward Transient Deflection 0.984 in Ratio= 218>=180.
Max Upward Transient Deflection 0.000 in Ratio= 0<180.0
Max Downward Total Deflection 0.591 in Ratio= 364>=180
Max Upward Total Deflection 0.000 in Ratio= 0<180
Overall Maximum Deflections
Load Combination Span Max."-"Defl Location in Span Load Combination Max."+"Defl Location in Span
W Only 1 0.9844 9.000 0.0000 0.000
Vertical Reactions Support notation:Far left is#1 Values in KIPS
Load Combination Support 1 Support 2
Overall MAXimum 0.500
Overall MINimum 0.225
+D+H
+D+L+H
+D+Lr+H
+D+5-+H
+D+0.750Lr+0.750L+H
+D+0.750L+0.750S+H
+D+0.60W+H 0.300
DELSON ENGINEERING INC. Project Title: PATINO CANOPY-B
1204 NE 146 AVE Engineer: Project ID: B15-11-146-RE\
VANCOUVER WA 98684 Project Descr: 10660 SW PARK ST TIGARD 97223
360-944-7094 F
JOHN@DELSONENGINEERING.COM
Primed4 MAY 2016.12 41014
File=c:1815-JOBS\815-CA-21815.11-1.EC6
Wood Column ENERCALC,INC.1983-2016,Build:6.16.4.15,Ver:6.16.4.15
t:tcs KW::tY6002`311-
_,. Licensee:JOHN DELSON
Description: P-1 CHECK FOR COMBINED LOAD
Code References
Calculations per 2012 NDS, IBC 2012, CBC 2013,ASCE 7-10
Load Combinations Used :ASCE 7-10
General Information
Analysis Method: Allowable Stress Design Wood Section Name 6x8
End Fixities Top Free, Bottom Fixed Wood Grading/Manuf. Graded Lumber
Overall Column Height 9.0 ft Wood Member Type Sawn
Exact Width 5.50 in Allow Stress Modification Factors
Wood Species Exact Depth 7.50 in Cf or Cv for Bending 1.0
Wood Grade Area 41.250 inA2 Cf or Cv for Compression 1.0
Fb-Tension 1,500.0 psi Ft( 150.0 psi Ix 193.359 inA4 Cf or Cv for Tension 1.0
Fb-Compr 1,500.0 psi Ft 1,000.0 psi ly 103.984 in^4 Cm:Wet Use Factor 1.0
Fc-PrIl 1,000.0 psi Density 33.0 pcf Ct:Temperature Factor 1.0
Fc-Perp 1,000.0 psi Cfu:Flat Use Factor 1.0
E:Modulus of Elasticity. .. x-x Bending y-y Bending Axial Kf:Built-up columns 1.0 ' . ''
Basic 1,400.0 1,400.0 1,400.0 ksi Use Cr:Repetitive? No
Minimum 1,400.0 1,400.0 Brace condition for deflection(buckling)along columns:
X-X(width)axis: Fully braced against buckling along X-X Axis
Y-Y(depth)axis: Fully braced against buckling along Y-Y Axis
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Column self weight included :85.078 lbs*Dead Load Factor
AXIAL LOADS. . .
Axial Load at 9.0 ft, D=4.20 k
BENDING LOADS. . .
Lat. Point Load at 9.0 ft creating Mx-x,W=0.50 k
DESIGN SUMMARY
Bending& Shear Check Results
PASS Max.Axial+Bending Stress Ratio = 0.4297 :1 Maximum SERVICE Lateral Load Reactions..
Load Combination +D+0.60W+H Top along Y-Y 0.0 k Bottom along Y-Y 0.50 k
Governing NDS Forumla Comp+Mxx, NDS Eq. 3.9-3 Top along X-X 0.0 k Bottom along X-X 0.0 k
Location of max.above base 0.0 ft Maximum SERVICE Load Lateral Deflections...
At maximum location values are... Along Y-Y 0.7717 in at 9.0 ft above base
Applied Axial 4.285 k for load combination: W Only
Applied Mx -2.70 k-ft
Applied My 0.0 k-ft Along X-X 0.0 in at 0.0 ft above base
Fc:Allowable 1,000.0 psi for load combination:n/a
Other Factors used to calculate allowable stresses...
PASS Maximum Shear Stress Ratio= 0.04849:1 Bending Compression Tension
Load Combination +D+0.60W+H
Location of max.above base 8.940 ft
Applied Design Shear 10.909 psi
Allowable Shear 150.0 psi
Load Combination Results
Maximum Axial+Bending Stress Ratios Maximum Shear Ratios
Load Combination C D C p Stress Ratio Status Location Stress Ratio Status Location
+D+H 1.000 1.000 0.1039 PASS 0.Oft 0.0 PASS 9.Oft
+D+L+H 1.000 1.000 0.1039 PASS 0.0 ft 0.0 PASS 9.0 ft
+D+Lr+H 1.000 1.000 0.1039 PASS 0.0 ft 0.0 PASS 9.0 ft
+D+S+H 1.000 1.000 0.1039 PASS 0.Oft 0.0 PASS 9.Oft
+D+0.750Lr+0.750L+H 1.000 1.000 0.1039 PASS 0.0 ft 0.0 PASS 9.0 ft
+D+0.750L+0.750S+H 1.000 1.000 0.1039 PASS 0.0 ft 0.0 PASS 9.0 ft
+D+0.60W+H 1.000 1.000 0.4297 PASS 0.0ft 0.04849 PASS 8.940 ft
+D+0.70E+H 1.000 1.000 0.1039 PASS 0.Oft 0.0 PASS 9.Oft
+D+0.750Lr+0.750L+0.450W+H 1.000 1.000 0.3250 PASS 0.0 ft 0.03636 PASS 8.940 ft
•
DELSON ENGINEERING INC. Project Title: PATINO CANOPY-B
1204 NE 146 AVE Engineer: Project ID: B15-11-146-RE\
VANCOUVER WA 98684 Project Descr: 10660 SW PARK ST TIGARD 97223
360-944-7094 F-7
JOHN@DELSONENGINEERING.COM
?anted 4 MAY 2016.1241PM
File=c:\B15-JOBS1B15-CA-2\B15-11-1.EC6
L Wood C OI U f Y1 C1 ENERCALC,INC.1983-2016,Build:6.16.4.15,Ver.6.16.4.15
„"Y"' ;-''- r Licensee:JOHN DELSON
Description: P-1 CHECK FOR COMBINED LOAD
Load Combination Results
Maximum Axial+Bending Stress Ratios Maximum Shear Ratios
Load Combination C D C p Stress Ratio Status Location Stress Ratio Status Location
+D+0.750L+0.750S+0.450W+H 1.000 1.000 0.3250 PASS 0.0 ft 0.03636 PASS 8.940 ft
+D+0.750L+0.750S+0.5250E+H 1.000 1.000 0.1039 PASS 0.0ft 0.0 PASS 9.Oft
+0.60D+0.60W+0.60H 1.000 1.000 0.4228 PASS 0.0 ft 0.04849 PASS 8.940 ft
+0.60D+0.70E+0.60H 1.000 1.000 0.06233 PASS 0.0ft 0.0 PASS 9.0 ft
Maximum Reactions Note. Only non-zero reactions are listed.
-..._-_
X-X Axis Reaction Y-Y Axis Reaction Axial ea ion
Load Combination @ Base @ Top @ Base @ Top @ Base
+D+H k k 4.285 k I
+D+L+H k k 4.285 k
k k 4.285 k
+D+Lr+H
+D+S+H k k 4.285 k
+D+0.750Lr+0.750L+H k k 4.285 k
+D+0.750L+0.750S+H k k 4.285 k
+D+0.60W+H k 0.300 k 4.285 k
+D+0.70E+H k k 4.285 k
+D+0.750Lr+0.750L+0.450W+H k 0.225 k 4.285 k
+D+0.750L+0.750S+0.450W+H k 0.225 k 4.285 k
+D+0.750L+0.750S+0.5250E+H k k 4.285 k
+0.60D+0.60W+0.60H k 0.300 k 2.571 k
+0.60D+0.70E+0.60H k k 2.571 k
D Only
k k 4.285 k
Lr Only k k k
L Only k k k
S Only k k k
W Only k 0.500 k k
E Only k k k
H Only k k k
Maximum Deflections for Load Combinations
Load Combination Max.X-X Deflection Distance Max.Y-Y Deflection Distance
+D+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+D+L+t-t 0.0000 in 0.000 ft 0.000 in 0.000 ft
+D+Lr+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+D+S+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+D+0.750Lr+0.750L+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+D+0.750L+0.750S+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+D+0.60W+H 0.0000 in 0.000 ft 0.463 in 9.000 ft
+D+0.70E+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+D+0.750Lr+0.750L+0.450W+H 0.0000 in 0.000 ft 0.347 in 9.000 ft
+D+0.750L+0.7505+0.450W+H 0.0000 in 0,000 ft 0.347 in 9.000 ft
+D+0.750L+0.750S+0.5250E+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+0.60D+0.60W+0.60H 0.0000 in 0.000 ft 0.463 in 9.000 ft
+0.60D+0.70E+0.60H 0.0000 in 0.000 ft 0.000 in 0.000 ft
D Only 0.0000 in 0.000 ft 0.000 in 0.000 ft
Lr Only 0.0000 in 0.000 ft 0.000 in 0.000 ft
L Only 0.0000 in 0.000 ft 0.000 in 0.000 ft
S Only 0.0000 in 0.000 ft 0.000 in 0.000 ft
W Only 0.0000 in 0.000 ft 0.772 in 9.000 ft
E Only 0.0000 in 0.000 ft 0.000 in 0.000 ft
H Only 0.0000 in 0.000 ft 0.000 in 0.000 ft
J
DELSON ENGINEERING INC. Project Title: PATINO CANOPY-B
1204 NE 146 AVE Engineer: Project ID: B15-11-146-RE\
VANCOUVER WA 98684 Project Descr: 10660 SW PARK ST TIGARD 97223
360-944-7094 f-3
JOHN@DELSONENGINEERING.COM
Pnuied'41 MAY 2016.12,11PM
File=c:\B15-JOBS1B15-CA-2\B15-11-1.EC6
Wood Column ENERCALC,INC.1983-2016,Build:6.16.4.15,Ver:6.16.4.15
_ Licensee:JOHN DELSON
Description: P-1 CHECK FOR COMBINED LOAD
Sketches _
t Mx Loads
1
0
of
II
2
Loads are total entered value.Arrows do not reflect absolute direction.
INC. 'JOB` (- 1-5-��'�9�
— DELSON ENGINEERING s
• 04 14671
1-1EET���. �-A.4.-l o;,
'12TE .1 CT
VANCOUVER llA 98684 CALCi1�Af1=J Sf c .%•�. DIME:
(360)944-?094 SCALE: w,q , ,.
LATERAL LOAD ANALYSIS
FOR: - -r`vo - C4-ti 071
LOCATION: /o660 srrg4-0& Sr 7.7 4 ep 97123
1.4) a WIND y - IR 2��Z l C, /Zo m Edi s
i- lilis=ze
I/
Y
FRONT - BACK — a°"'°"'- coisrkki. Tda 'f
5/T N
II:- If ti--.., 75' `7-
:::>7
'T-v ?of: -(757x►x g
.r.1 4
EB.) .EFT - RIGHT — ‘v dilrf � _ 39(94
��� 6K -; 1-T:
- Lvt/ if V= col 4-
Ar 4
t ,111 i ( boa 3 0 , 30 x 3,o k
6v�
-tI CC/ipi' 49-4-9 >Mc- 7-
--e791-7- Clowei.L. Pit-if; ?VA-1
1
DELSON ENGINEERING INC. Project Title: PATINO CANOPY-B
1204 NE 146 AVE Engineer: Project ID: B15-11-146-RE\
VANCOUVER WA 98684 Project Descr: 10660 SW PARK ST TIGARD 97223
360-944-7094 -- L --2,
JOHN@DELSONENGINEERING.COM
Printed.4 MAX 2016. '38PM
File=c:1815-JOBSIB15-CA-21815-11-1.EC6
Wood Column ENERCALC,INC.1983-2016,Build 6.16.4.15,Ver:6.16.4.15
:Lk.-#:--KW-06002311_'"
- .,,..- Licensee:JOHN DELSON
Description: P-1 CHECK FOR COMBINED LOAD
Code References_
Calculations per 2012 NDS, IBC 2012, CBC 2013,ASCE 7-10
Load Combinations Used :ASCE 7-10
General Information
Analysis Method: Allowable Stress Design Wood Section Name 6x8
End Fixities Top Free, Bottom Fixed Wood Grading/Manuf. Graded Lumber
Overall Column Height 9.0 ft Wood Member Type Sawn
Exact Width 5.50 in Allow Stress Modification Factors
Wood Species Exact Depth 7.50 in Cf or Cv for Bending 1.0
Wood Grade Area 41.250 inA2 Cf or Cv for Compression 1.0
Fb-Tension 1,500.0 psi Fv 150.0 psi Ix 193.359 inA4 Cf or Cv for Tension 1.0
Fb-Compr 1,500.0 psi Ft 1,000.0 psi ly 103.984 inA4 Cm:Wet Use Factor 1.0
Fc-PrIl 1,000.0 psi Density 33.0 pcf Ct:Temperature Factor 1.0
Fc-Perp 1,000.0 psi Cfu:Flat Use Factor 1.0
x-x BendingBendingAxial Kf:Built-upcolumns 1.0
E:Modulus of Elasticity... Y Y
Basic 1,400.0 1,400.0 1,400.0 ksi Use Cr:Repetitive? No
Minimum 1,400.0 1,400.0 Brace condition for deflection(buckling)along columns:
X-X(width)axis: Fully braced against buckling along X-X Axis
Y-Y(depth)axis: Fully braced against buckling along Y-Y Axis
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Column self weight included:85.078 lbs*Dead Load Factor
AXIAL LOADS. . .
Axial Load at 9.0 ft, D=5.10k
BENDING LOADS. . .
Lat. Point Load at 9.0 ft creating Mx-x,W=0.30 k
DESIGN SUMMARY
Bending&Shear Check Results
PASS Max.Axial+Bending Stress Ratio = 0.2671 :1 Maximum SERVICE Lateral Load Reactions..
Load Combination +D+0.60W+H Top along Y-Y 0.0 k Bottom along Y-Y 0.30 k
Governing NDS Forumla Comp+Mxx, NDS Eq. 3.9-3 Top along X-X 0.0 k Bottom along X-X 0.0 k
Location of max.above base 0.0 ft Maximum SERVICE Load Lateral Deflections...
At maximum location values are... Along Y-Y 0.4630 in at 9.0 ft above base
Applied Axial 5.185 k for load combination: W Only
Applied Mx -1.620 k-ft
Applied My 0.0 k-ft Along X-X 0.0 in at 0.0 ft above base
Fc:Allowable 1,000.0 psi for load combination:n/a
Other Factors used to calculate allowable stresses...
PASS Maximum Shear Stress Ratio= 0.02909:1 Bending Compression Tension
Load Combination +D+0.60W+H
Location of max.above base 8.940 ft
Applied Design Shear 6.545 psi
Allowable Shear 150.0 psi
Load Combination Results
Maximum Axial+Bending Stress Ratios Maximum Shear Ratios
Load Combination C D C p Stress Ratio Status Location Stress Ratio Status Location
+D+H 1.000 1.000 0.1257 PASS 0.0 ft 0.0 PASS 9.0 ft
+D+L+H 1.000 1.000 0.1257 PASS 0.0 ft 0.0 PASS 9.0 ft
+D+Lr+H 1.000 1.000 0.1257 PASS 0.0 ft 0.0 PASS 9.0 ft
+D+S+H 1.000 1.000 0.1257 PASS 0.0 ft 0.0 PASS 9.0 ft
+D+0.750Lr+0.750L+H 1.000 1.000 0.1257 PASS 0.0 ft 0.0 PASS 9.0 ft
+D+0.750L+0.750S+H 1.000 1.000 0.1257 PASS 0.0 ft 0.0 PASS 9.0 ft
+D+0.60W+H 1.000 1.000 0.2671 PASS 0.0 ft 0.02909 PASS 8.940 ft
+D+0.70E+H 1.000 1.000 0.1257 PASS 0.0 ft 0.0 PASS 9.0 ft
+D+0.750Lr+0.750L+0.450W+H 1.000 1.000 0.2043 PASS 0.0ft 0.02182 PASS 8.940 ft
DELSON ENGINEERING INC. Project Title: PATINO CANOPY-B
1204 NE 146 AVE Engineer: Project ID: B15-11-146-REQ,
VANCOUVER WA 98684 Project Descr: 10660 SW PARK ST TIGARD 97223
360-944-7094L �-
JOHN@DELSONENGINEERING.COM
Panted.4 MAY 20th, 13P
File=c:1815-JOBS1B15-CA-2\815-11-1.EC6
Wood Column ENERCALC,INC.1983-2016,Build:6.16.4.15,Ver:6.16.4.15
x. Licensee:JOHN DELSON
Description: P-1 CHECK FOR COMBINED LOAD
Load Combination Results
Maximum Axial+Bending Stress Ratios Maximum Shear Ratios
Load Combination C D C p Stress Ratio Status Location Stress Ratio Status Location
+D+0.750L+0.750S+0.450W+H 1.000 1.000 0.2043 PASS 0.0ft 0.02182 PASS 8.940 ft
+D+0.750L+0.750S+0.5250E+H 1.000 1.000 0.1257 PASS 0.0 ft 0.0 PASS 9.0 ft
+0.60D+0.60W+0.60H 1.000 1.000 0.2570 PASS 0.0 ft 0.02909 PASS 8.940 ft
+0.60D+0.70E+0.60H 1.000 1.000 0.07542 PASS 0.0ft 0.0 PASS 9.0ft
M.Maximum Reactions Note: Only non-zero reactions are listed.
X-X Axis Reaction Y-Y Axis Reaction Axial Reaction
Load Combination @ Base @ Top @ Base @ Top @ Base
+D+H k k 5.185 k
+D+L+H k k 5.185 k
+D+Lr+H k k 5.185 k
+D+S+H k k 5.185 k
+D+0.750Lr+0.750L+H k k 5,185 k
+D+0.750L+0.750S+H k k 5.185 k
+D+0.60W+H k 0.180 k 5.185 k
+D+0.70E+H k k 5.185 k
+D+0.750Lr+0.750L+0.450W+H k 0.135 k 5.185 k
+D+0.750L+0.750S+0.450W+H k 0.135 k 5.185 k
+D+0.750L+0.750S+0.5250E+H k k 5.185 k
+0.60D+0.60W+0.60H k 0.180 k 3.111 k
+0.60D+0.70E+0.60H k k 3.111 k
D Only k k 5.185 k
Lr Only k k k
L Only k k k
S Only k k k
W Only k 0.300 k k
E Only k k k
H Only k k k
Maximum Deflections for Load Combinations
Load Combination Max.X-X Deflection Distance Max.Y-Y Deflection Distance
+D+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+D+L+H 0,0000 in 0.000 ft 0.000 in 0.000 ft
+D+Lr+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+D+S+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+D+0.750Lr+0.750L+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+D+0.750L+0.750S+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+D+0.60W+H 0.0000 in 0.000 ft 0.278 in 9.000 ft
+D+0.70E+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+D+0.750Lr+0.750L+0.450W+H 0.0000 in 0.000 ft 0.208 in 9.000 ft
+D+0.750L+0.750S+0.450W+H 0.0000 in 0.000 ft 0.208 in 9.000 ft
+D+0.750L+0.750S+0.5250E+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+0.60D+0.60W+0.60H 0.0000 in 0.000 ft 0.278 in 9.000 ft
+0.60D+0.70E+0.60H 0.0000 in 0.000 ft 0.000 in 0.000 ft
D Only 0.0000 in 0.000 ft 0.000 in 0.000 ft
Lr Only 0.0000 in 0.000 ft 0.000 in 0.000 ft
L Only 0.0000 in 0.000 ft 0.000 in 0.000 ft
S Only 0.0000 in 0.000 ft 0.000 in 0.000 ft
W Only 0.0000 in 0.000 ft 0.463 in 9.000 ft
E Only 0.0000 in 0.000 ft 0.000 in 0.000 ft
H Only 0.0000 in 0.000 ft 0.000 in 0.000 ft
DPLSON ENC..z.INEERING INC. Project Titie. PA.TINO CANOPY
1204 NE 146 AVE Enginetlr: Project ID: B16-11-146
VANCOUVER WA 98684 Projc.c.'.Des,2r: 10660 OW PARK ST T;GARD P2:3
360-944-7094
jOHN@DELSONENGINEERING.COM
Pre,zet.2=Et:
File=6315-vOriS181p;CA-21814AF1-1'815-11-1.EC6
Wood Column
2NERC".LC.INC.:383-2015, Ver.615 10.6
• :JOHNDELS019:
Description: P-1 CHECK FOP COMB!NED LOAD
Sketches
L.oads
•
5 C. I
1
, I
1
H. I
I
!
Loads are total entered value.Arrows do not reflect absolute direction.
DELSON ENGINEERING INC. Projeci Title. P TINt)CANOPY
1204 NE 146 AVE Engi5ecr: Project ID: 615-11-146
VANCOUVER WA 98684 Project(less, 10660£W PARK S'TGARD 57223
360-944-7094
JOHN@DELSONENGINEERING.COM ��,�/
-- - 4:, .2OEC2015:2CPP'
Pole Footing Embedded in Soil File=c.1s.fi-JoLSe1r-C'-2\s14AF1-1k81s,1-1.F.cs
ENERCPLC,INC.1983-21'15.9udd:6.15.10.6,Ver.6.15.10.6
Description FING-1
Code References
Calculations per IBC 2012 1807.3, CBC 2013,ASCE 7-10
Load Combinations Used :ASCE 7-10
General Information _
Pole Footing Shape Rectangular
Footing Width 30.0 in
Calculate Min.Depth for Allowable Pressures
No Lateral Restraint at Ground Surface
Allow Passive 350.0 Pcf
Max Passive 1,500.0 Psf -_A
r
Controlling Valuesri-
Governing Load Combination: ;-p,0.6001,-H
Lateral Load 0.30 k t .
moment 2.70 k-ft
NC GroLn'd Surface Restre:
Pressures at 1/3 Dept sor s rfae :; No ateral
Actual 323.563 P it 4400
Allowable 324.819 Pe a : ': '�'"w:
P �,r':t- �
mss:,:= _ ..YL_v'•"-ri• -._...a.x+Y�;5*
Minimum Required Depth 2.875 ft ="r'.=re
Footing Base Area 6.250 ftA2
Maximum Soil Pressure 0.6720 ksf
Applied Loads _ _
Lateral Concentrated Load Lateral Distributed Load Vertical Load
D Dead Load 0.0 k k/ft 4.20 k
Roof Live k tuft k
L:Live k k/ft
k
S:Snow k ki ft k
W:'Wind 0.50 k kilt k
E:Earthquake k k/ft
.i.Lateral Earth k
Load distance above TOP of Load above ground surface
around surface 9.0 ft ft
BOTTOM of Load above ground surface
ft
Load Combination Results
Forces @ Ground Surface Required Pressure at la Depth Soil increase
Load Combination Loads-(k) Moments-(ft-k) Depth-{ft) Actual-(psf) Mow-(psf). •',.Factor
-D--l-1 0.000 0.000 0.13 0.0 0.0 1.000
-rte+:
J
:� 0.000 6.0001
0 3 0.0
0.0 1.000
'ti* r+H 0.000 0.000 0.13 0.0 0.0 1.000
-D'S-: 0.000 0.000 0.13 0.0 0.0 1.000
-0-w.750Lr-L0 750L-.-H 0.000 0.000 0.13 0.0 0.0 1.000
--D-0.750L+075054i 0.000 0.000 0.13 0.0 0.0 1.000
-D40.60W+H 0.300 2.700 2.88 323.6 324.8 1.000
-J-0.70E+H 0.000 0.000
0.13 0.0 0.0 1.000
D-0.750Lr+0.750L+0.45CW"-r; 0.225 2.025 2.63 291.6 293.1 1.000
DEL SON ENGINEERING INC. Project Title PATINO CANOPY
1204 NE 146 AVE Engiiecr: Project ID: 815-11-146
VANCOUVER WA 98684 Project Desor: 10660 EV!PARK ST T:3ARD 97223
360-944-7094
JOHN@DELSONENGINEERING.COM �Z
Pole Footing Embedded in Soil
Fie= 1B?S JbSt31SCA-78?4AFi-?r8?S??-t.FC6
c.NERCN C,INC.1113-2015 L'uk:6.15.10.6.Vec6.510.6
"I -"Ic. {f_.4GD0-2341i-a47 5- z". L e JO EL
SOW
Descriotiol:
-D-0.750 +0.75CS+0.450W+H 0.225 2.025 2.63 2P1.6
293.1 1.000
,-D-3.750L O.750S-0.5250E 0.000 0.000 G.13 0.0 0.0 1.000
�.6CD-3.60',6C 0.300 2.700 X2.88 1'.3.8 324.8 1.000
0.60D-0.70E+0.60H 0 000 0.000 0.13 0.0 0.0 1.000
...ism DELSON
1/5J'146 DELSON ENGINEERING INC. SHEET NO. p"i---/ OF
�� 1204 NE 146TH GT CALCULATED BY: */+�. DATE: 7:7¢ /Fj
��..
VANCOUVER WA 98684(360)944-1094 SCALE: N/A
. ---Tiorr ittr . - .mssi4. REVISION-
:
7-
:
' ' . 4 ( I '. f•
rCite 0t::'l:gar
1 1 App.r; eco Plans
B. . .
_ ,.:Y _ )ates/;P .//
14. 4 ' . ' '
i11 .
.1 .77:::,t. H 1 521?qi Y el ;:t - T?(:/e-1
: �� ®s
K
rtii g)c 0 )6, 34 ?c,2 :11(r 4)/ q/44I •
/ :
' j -
DELSON ENGINEERING INC. SOB: 11,�-1/=�¢�
SWEET NO. �_roF
1204 NE 146TH CT CALCULATED BY: J,��• DATE: r-fri
VANCOUVER WA 98684 SCALE: N/A
l��. (360)944-1094
: : 1 . . : GLI:Ejr_ri.: E ! ! : ; ; _
a 0r3 TU --$4 ,,,4g,5roft-i. ri.,,,ig
:' -'ll.; � :fes']� a.
7
w . -,m.�.............e.d.- u
o. i . - :4 . _40: 07 ;
hits
1
:
: ] -i-p.:$4 . vtivw A/.........:_________ i . ,
....5-4(4, oti pc ----x?
q)4 .://t.:404:34 ; : , 1: ! :.i
_ _,;,__ : , , : . .7d. : :
I
Cv1VC, . .
-
: , 30 " 30Sf3-1)= /011.
i (0)01; cot-A.' . )
11'FT4/L.
erg ,
PiePDX* r� jts4f. - .
1
OFFICE COPY
.
JOB: Pc-17-I46
-.lig DELSON ENGINEERING INC. SHEET NO. g,'Z OF
�� 1204 NE 146TH GT CALCULATED BY: i-P, DATE: 4
wammil VANCOUVER, WA 98664 SCALE: N/A
MUM (360)944-1094
4
rPt_- /
t- / )e e k ll 4
crT �
1 4/7(19' '5-4.?I'4t9"E'f. \ /
J.
. \ . ,
D <IZ4VI1D.
' N:41. .\ . . / . Y ,is. : IASX 1? ,
. . : . : ,_4_, 4 , . . . 4o : ' yi .. :: i ; :.
1 : . * . . .
' . . . • , ; 1 , , L gsci,i4-7.7f.--i? --6c)
?:2)--/4pm--7-A*4- ._ _ • k . ! : * : : 1( xittekt rmtlit9
6- .
II I 1-4 1 ' . . 4 ' -! __, ,, ,, 6v-rork. (:-
, ..7 ,,,,a, , i, !, .
, .,
.. , ,
v..47,,,,4„, T. . . ).:, . . . : 7. . '
. : . . ,._.....________.,
r k
S
r :
I/ . 14'u .
a, 2'ffThIL
. mir i1X %w
mcgii: _ c,„,—,:, --,--., v,,,,
. A.,, Ir)E1-47-; --N'tiii-Act/scoff Cr.itrisipict!I
Po 0-0-A - b otp-r ` .
.S?` cscr t, cfmne,r_ re, coittmvi , : ikritt.'43t
,-744s...-Di Lia-41.4 14 Ai 't'ii79Xx
EqzPf
FOR OFFICE USE ONLY—SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
IS . Transmittal Letter
13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 •www.tigard-or.gov
TO: /CeA--,/S EIc '"// DATE RECE (tD
�E
DEPT: BUILDING DIVISION c ,
Mp,Y 0 2016
FROM: u /S /7`22 -C-0L C1T`� °G VS ON
COMPANY: gV1LD1N
PHONE: x'03
RE: /0 6 6 0 -CA-)J "e9--2/< c % /-r/r7/6 -e000
(Site Address) 7erinit Number)
22�0�
(Project name or subdivision name and lot number)
ATTACHED ARE THE FOLLOWING ITEMS:
Additional set(s) of plans. ► Revisions:
Cross section(s)and details. Wall bracing and/or lateral analysis.
Floor/roof framing. Basement and retaining walls.
Beam calculations. Engineer's calculations.
Other(explain):
REMARKS: 41A6/776/vfJe____ f5zr 4/v..
COL-LI/IA/5
Routed to Permit Technician: Date: ( 10
Fees Due: !A Yes • No Fee Descri•tion: Amount Due:
. 0, r O) ; V $
$
Special
Instructions:
Re•rint Permit •er PE : ❑ Yes PO No ❑ Done
A
A. •licant Notified: Z.-14-/S Date:
l:\Buildin \Forms\Tr
g ansmittalLetter-Revisions.doc 05/25/2012
L _