Loading...
Plans (2) HECFIV�y �, , P;`j �� /� F[ SEP 8 264 • A.ppr ..trot/ by F­3rnmn�; UTILITY VAULT CITYOF R Da:-e: UNDERGROUND BVIL D W, Initials: 9* 10' POWER •10 EASEMENT 15' POWER 8.3qy EASEMENT 7— 7 - — — — — — 7 % POWER POLE z 0 E PLANTED STAND #2 15' z� LLJ 7 ELIGIBLE CANOPY AREA 1FAR_SETBAO\ crj PLANTED STAND#3 'PORT *PT2 ROPOSED KEY RESIDENCE 5'PO R ELIGIBLE CANOPY AREA < EASEM�NT TREE PROTECTION FENCING P IT, CONTROL FENCINGU) NEW PO 0 WIDE SEWER 0 ------- EASEMENT a DRIVEWAY Cn ;- Cf) LEGEND -------- ------ ----------- a ------------------ z L---- -------------- F -------------- 012 L L------ ---- ------ ---- ------ - ---- ----- n WESTERN RED CEDAR, TYP EROSI FENCE OR 3---- ---------- 75 B5' ­7- -- ------- STRAW DID 0 ------ - ------------ -0 CEDAR FENCE L ENCE ------ -- -------- 00 0 4. CHERRY TREE EASE ENT ------- --- SANITARY SEWER (BUILDER PROPERTY LINE I hereby attest that,to the best of my knowledge, TO VERIFY LOCATION) this building site plan meets the tree requirements --- ----4, WATER SFPIVIC'.E q,I?� in Section 11,Part 1.0 of the Urban Forestry Q. RED ALDER STORM DRA,N TO LEGAL DESCRIPTION Manual. 0 (OFF SITE) CONNET WITH CITY TAX LOT #25111AD00401 7- LOT 401 - PINEBROOK TERRACE > AICA14E i4age. z Lij ITO BLACK COTTONWOOD 8605 SW PINEBROOK ST < __j P90VIPC CVA"Jec, TIGARD, OREGON Todd Prager,AICP,ISA Certified Arborist WE-6723A < (OFF SITE) a- ru G 0 4* TREE PROTECTION NOTES i PI-4 N.,&r WASHINGTON COUNTY, OR ISA Tree Risk Assessment Qualified U C2 11� (/) (Dto 11 BIG LEAF MAPLE 1. TREE PROTECTION ZONE(OFF SITE) THE PROJECT ARBORIST SHALL DESIGNATE THE TREE PROTECTION ZONE (TPZ). WHERE FEASIBLE, THE TPZ SHALL BE ESTABLISHED AT THE DRIPLINE OF PROTECTED TREES AS A MINIMUM, IF INFRACTURE MUST BE INSTALLED CLOSER TO THE T K- TREES, THE TPZ MAY BE ESTABLISHED WITHIN THE DRIPLINE AREA IF THE PROJECT ARBORIST DETERMINES THAT THE TREES WILL NOT BE UNDULY DAMAGED. THE LOCATION OF THE TPZ SHALL BE SHOWN ON CONSTRUCTION DRAWINGS. fig= 2 PROTECTION FENCING. psi 12. BIG LEAF MAPLE ALL TREES TO BE RETAINED SHALL BE PROTECTED BY 5 FOOT TALL MIN CHAIN LINK FENCING. PROTECTION FENCING SHALL BE SECURED TO STEEL POSTS PLACED NO FURTHER THAN 15 FEET APART AND SHALL BE INSTALLED AT THE EDGE OF 0 (OFF SITE) THE TPZ. q 3. PRUNING: 1byI it THE PROJECT ARBORIST CAN HELP IDENTIFY WHERE PRUNING IS NECESSARY ONCE TREES RECOMMENDED FOR REMOVAL HAVE BEEN REMOVED AND THE SITE IS STAKED AND PREPARED FOR CONSTRUCTION. PRUNING SHALL BE PERFORMED PT2 OREGON WHITE OAK OR BY A QUALIFIED TREE SERVICE BIG LEAF MAPLE OCIOMC�T IWb 4 TREE PROTECTION ZONE MAINTENANCE. _/'LJr1T17L THE PROTECTION FENCING SHALL NOT BE MOVED, REMOVED OR ENTERED BY EQUIPMENT EXCEPT UNDER DIRECTION OF THE PROJECT ARBORIST. • PT3 WESTERN RED CEDAR 5. STORAGE OF MATERIAL OR EQUIPMENT: THE CONTRACTOR SHALL NOT STORE MATERIALS OR EQUIPMENT WITHIN THE TPZ b. EXCAVATION WITHIN THE TPZ: 111111111111111111111w— a EXCAVATION WITHIN THE TPZ SHALL BE AVOIDED IF ALTERNATIVES ARE AVAILABLE. IF EXCAVATION WITHIN THE TPZ IS UNABOIDABLE, THE PROJECT ARBORIST SHALL EVALUATE THE PROPOSED EXCAVATION TO DETERMINE METHODS TO MINIMIZE IMPACT TO TREES ALL CONSTRUCTION WITHIN THE TPZ SHALL BE UNDER THE ON—SITE TECHNICAL SUPERVISION OF THE PROJECT ARBORIST. LINTEL HOME DESIGN, INC. IS NOT 7. TREE PROTECTION INSPECTION �bows— IABLE FOR THE ACCURACY OF THE 202 OPgGRAPHY INFORMATION. IT IS THE PROJECT ARBORIST SHALL MONITOR CONSTRUCTION ACTIVITIES AND PROGRESS, AND PROVIDE BI—WEEKLY WRITTEN REPORTS TO THE CITY DURING PERIODS OF ACTIVE CONSTRUCTION. HE-_-'!n1_E RESPONSIBILITY OF THE 8, FINAL REPORT UILDER TO VERIFY ALL SITE AFTER THE PROJECT HAS BEEN COMPLETED, THE PROJECT ARBORIST SHALL PROVIDE A FINAL REPORT THAT DESCRIBES THE MEASURES NEEDED TO MAINTAIN AND PROTECT THE REMAINING TREES. 'ONDITIONS, INCLUDING ANY FILL LACED ON THE SITE, AND INFORMP )WF*,S OF ANY POTENTIAL FIELD TREE C\ANOPY SITE PLAN A NORTHWEST DESIGN 10DIFICATIONS.