Loading...
Permit .r; CITY OF TIGARD BUILDING PERMIT rIt V Permit#: BUP2015-00273 s COMMUNITY DEVELOPMENT o 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 10/15/2015 TIGARD Parcel: 2S110AB00200 Jurisdiction: Tigard Site address: 14411 SW PACIFIC HWY Project: Oregon Beverage Recycling Center Subdivision: CANTERBURY PLACE,AMENDED Lot: PTS 1-4 Project Description: TI for new tenant:Remodeling existing space to be used as a new beverage container redemption center. Exterior doors will be modified and new doors will be installed. Contractor: OWNER Owner: BULL MOUNTAIN INVESTMENTS LLC ATTN JERRY KOLVE 14389 SW PACIFIC HWY TIGARD, OR 97224 PHONE: PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: Vg Permit Fee-Additions,Alterations, 10/15/2015 $3,521.95 Demolition Occupancy Grp: B Occupancy Load: 112 12%State Surcharge-Building 10/15/2015 $422.63 Dwelling Units: 0 Plan Review 09/10/2015 $2,289.27 Stories: 0 Height: 0 ft Plan Review-Fire Life Safety 09/10/2015 $1,408.78 Bedrooms: 0 Bathrooms: 0 DC Provision Review,COM TI-Ping 10/15/2015 $351.00 Value: $500,000 Info Process/Archiving-Lg$2.00(over 10/15/2015 $18.00 11x17) Metro Const.Excise Tax 10/15/2015 $600.00 Floor Areas: Total Area: 6880 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $8,611.63 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC •alling 503.232.1987 or 1.800.332.2344. C 11111111111 . Issued By: `- mittee Signature: I Shark/2- / e,Ade„ / `*' 4 Cal. by 7:00 a.m.for the next available in Po tion date.• This permit card shall bo kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. ', , Building Permit Application Commercial ��, =FOR cFF10E USE oN, Y Received �j City of Tigard ` 1h Date/By: / /0 1 S Permit No.: AQ�„,/t I,-,y),'7 IIN V 13125 SW Hall Blvd.,Tigard,OR 97223 �0 grQ Plan Review ++ (� l�'!y� l9" r Phone: 503.718.2439 Fax: 503.598.f R: -/B 1 �:(l Other Permit: Mrni:VOts 7xrI1 Y c T I G A RD Inspection Line: 503.639.4175 SC.Q C c .Pate Ready/By: Runs: ® See Page 2 for Internet: www.tigard-or.gov ` O A'(0\ Notified/Method: z i - i 'I� Supplemental Information cA �C, 01i,�,Nn /w /v('ei) TYPE OF WORK CCG..,,,,�®' REQUIRED DATA:1-AND 2-FAMILY DWELLING ❑New construction ®Demd4rtton Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. E] I-and 2-family dwelling ®Commercial/industrial Valuation: $ ❑Accessory building ❑Multi-family Number of bedrooms: ❑Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:14411 SW Pacific Hwy New dwelling area: square feet City/State/ZIP:Tigard,OR 97224 Garage/carport area: square feet Suite/bldg./apt.no.: Project name:OBRC Bottle Drop Covered porch area: square feet Cross street/directions to job site: ca,,rgog„" t...,,, . 4 9g to PpcA,. 1*ml Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Tax map/parcel no.: equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Redemising and remodeling an existing space to be used as a deposit beverage Valuation: $500,000.00 container redemtion center. Exterior walls will be modified for installation of Existing building area: 6880 square feet new exit doors and a walk up EZ drop door. New building area: 6880 square feet ❑ PROPERTY OWNER ® TENANT Number of stories: 1 Name:OBRC Type of construction: V-B Address:3900 NW Yeon Ave Occupancy groups: City/State/ZIP:Portland,OR 97210 Existing: A-2 Phone:(503)542-0756 Fax:( ) New: M,S-1 ® APPLICANT ' ® CONTACT PERSON BUILDING PERMIT FEES* (Please refer to fee schedule) Business name:Framework Architecture Structural plan review fee(or deposit): Contact name:Brian Peters FLS plan review fee(if applicable): Address:107 SE Washington St,Suite 250 Total fees due upon application: 2 f e,. City/State/ZIP:Portland,OR 97214 Phone:(503)889-0604 Fax: :( ) Amount received: E-mail:brian@frameworkarchitecture.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System. Business name:OBRC Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address:3900 NW Yeon Ave Solar Installation Specialty Code checklist. plan review City/State/ZIP:Portland,OR 97210 Permit fee(includes p $180.00 and administrative fees): Phone:(503)201-6014 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB lic.:Tenant Total fee due upon application: $201.60 Authorized signature: This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name:Brian Peters Date:9-7-15 * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) r Building Division Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per-cent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering:' [1] $ 205,000 MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 51,250 ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ 7,500 (b) An accessible entrance: $ 15,000 (c) An accessible route to the altered area: $ 5,000 (d) At least one accessible restroom for each sex or a single unisex restroom: $ 9,000 (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ 15,500 TOTAL(shall equal line [2] of Valuation Computation): $ 52,000 I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011 Albert Shields From: Albert Shields Sent: Monday, September 14, 2015 3:31 PM To: 'brian @frameworkarchitecture.com' Subject: BUP2015-00273, 14411 SW Pacific Hwy Brian, Planning tells me that they need to receive documentation of noise mitigation measures before this permit application can be approved. That is Condition of Approval#1 of the underlying MMD2015-00024: "Prior to issuance of a building permit the applicant shall submit evidence demonstrating compliance with performance standards for noise required by TDC 18.725.030 and provided in TMC 6.02.430. Any noise mitigation measures installed to ensure compliance shall be described in a narrative and identified on a site plan submitted with construction documents submitted for building plan review. " Please submit the appropriate documents. Albert Shields Permit Coordinator Albert Shields From: Brian Peters <brian @frameworkarchitecture.com> Sent: Monday, September 14, 2015 4:12 PM To: Albert Shields Subject: RE: BUP2015-00273, 14411 SW Pacific Hwy Thanks, we will get this from the owner and over to you as soon as possible. brian peters AAIA I principal m 503.809.9362 I o 503.889.0604 I brian @frameworkarchitecture.com am e w o r kARCHITECTURE www.frameworkarchitecture.com I 107 sewashington street, suite 250 I portland,oregon 1 97214 From: Albert Shields [mailto:albert©tigard-or.gov] Sent: Monday, September 14, 2015 3:31 PM To: 'brian©frameworkarchitecture.com' Subject: BUP2015-00273, 14411 SW Pacific Hwy Brian, Planning tells me that they need to receive documentation of noise mitigation measures before this permit application can be approved. That is Condition of Approval#1.of the underlying MMD2015-00024: "Prior to issuance of a building permit the applicant shall submit evidence demonstrating compliance with performance standards for noise required by TDC 18.725.030 and provided in TMC 6.02.430. Any noise mitigation measures installed to ensure compliance shall be described in a narrative and identified on a site plan submitted with construction documents submitted for building plan review. " Please submit the appropriate documents. Albert Shields Permit Coordinator DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules "City General Records Retention Schedule." 1 IN City of Tigard RI COMMUNITY DEVELOPMENT DEPARTMENT C >t "TIGAjRD Building Permit Review — Commercial - With Land Use ,ti - r . Building Permit #: /3(,1/W)/5"---o0A>,3 Site Address: /271L/// ` i) P.2c/24 mi Suite/Bldg#: Project Name: (N m of commercial busines drupving the srnce. I f vaumt, liter Spec Space.) Planning Review ��)) � • Proposal: Ir -4- n.e /7c�Il'� — ( P 2Ai / r ,� C 21714 _v-- r- deMp/-i n CXirk'-, /Le.Gu //•-ec)of t vr- l/,c�)( Verify site address/suite# exists and active in permit syste . ver Terrace Neighborhood: ❑ Yes PNo 11: _,and Use Case #: �f IV anfa�j/S– L`)��� Plans latch Approved Laud Use: I{� Site Plan Altift,andscape Plan ❑ Other: AlftJrban Forestry Plan ta4levation Plan / a/Buildin Height: Maximum Height —�S Actual Height �iY�S�' • ❑ Conditions Met: A— Prior to Submittal ❑ Prior to Permit Issuanc VBusiness Licens : III° Exists: E Yes ❑ No, applicant notified to obtain business license ublic Facilities Improvement(PI�I) Permit: , Required: ❑ Yes, applicant was notified L� No Applied For: ❑ Yes ❑ No, stop intake Notes: - . L.C.,‘ .a // .. _ _' -, i :Al ,'Iii ' ._�C (IS Gk..) Y2QIP YI7M 'i �� �i �'-- .r `� � Date"II Approved by Planning: - __ / Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved \ Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved t Building Permit Submittal \ Original Submittal Date: /5– Site Plans: # A/>� Building Plans: # 3 Building Permit#: Ater building permit#above. Workflow Routing: a't-inning ngineering ❑fit Coordinator ing 1 Workflow Sign-off: P cgn-off for Planning(include notes from planning review) Route Application Documents: uilding: original permit application, site plans, building plans, engineer and beam calculations and trust details, if applicable, etc. Notes: By Permit Technician: �� Date: 7/01--- I:\Building\Forms\BldgPcrm itRvw_COM_W ith Land Vse_0709 I 5.docx Engineering Review ❑ Slope at building pad: ❑ PH Permit#: ❑ Conditions "Met"prior to issuance of building pe •-. ❑ Easements (encroachments) per enginee ' _ conditions of approval and plat (not typical on SDR/CUP) ❑ Water Quality/Quantity Fac' '• . Assess Water •_ i 7 Fee in-lieu: ❑ Yes ❑ No Asse . ater Quantity Fee in-lieu: ❑ Yes ❑ No IDA Facility on lot: ❑ Yes ❑ No ❑ NOT Approved by Engineering: Date Notes: Approved by Engineering: dL Date: 9—a---/-5- Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ) 'Approved,NOT Released: Date: `7:A-51/./.5-Notes: /V al f `false.- Al.'D`i10'` Avt,Cd4144-4.17__ogAf----- Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: • Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: f2SDC Fees Entered: Wash Co Trans Dev Tax: El Yes N/A / _ Tigard Trans SDC: ❑ Yes N/A Parks SDC: ❑ Yes N/A 410,M.? :v:d':;:: oordinator:O t �jDate: f" i/0 Gr4-' °l' 2 L /5- I:\Building\Form\BldgPerrnilRvw_COM_WithLandUse_0709I5.docx Location: Record Type: Inspection Type: Result: Comments: Inspection Date: Record ID: Inspector: City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 14411 SW PACIFIC HWY, TIGARD, OR, 97224 Commercial - Building 299 Final inspection PASS - C of O BUP2015-00273 Chip Barnett Violation Summary: Inspector Contractor FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 74 Transmittal Letter T I G A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov / TO: (12X111Q Ca/ DATE RECEIV i: DEPT: BUILDING DIVISION nn * ACEI V ED FROM: C- A") W--\---1-1 .C.cam. 0 C T 2 9 2015 COMPANY: 'F A ivl g.J.c,p_.k . � N <X'\IP, CITY OF TIGARD PHONE: / suiLDIc ulvisAot ' ��� - ' 3c-1 (c) 4z)ourBy. RE: 1' 9 � -7, sF1� A,,;1 / BuF2615- OC)( "/ `3 (Site Address) V (Permit Number) (Project name or subdivision name an. . ..s:i) ATTACHED ARE THE FOLLOW " G IT 'MS Copies: Description: ;Copies: } Description: Additional set(s) of p ans. ,L 3 Revisions: 4,1,z, S 6,z:)15) .T) Cross section(s) an. detail:. Wall bracing and/or lateral analysis. Floor/roof framin,. Basement and retaining walls. Beam calculations. Engineer's calculations. Other(explain): REMARKS: /l)F„J , )(,..,„0 4c, V,4 c___.,4 4a . 4 Sr-(2-3 c_.•-k- f- AU FOR OFFICE USE ONLY - \ k Routed to Peri,it echnician: Date: t h r r i Fees Due: v es ❑ No Fee Description: Amount Due: I CDV- k-rr� .. C- C..d 3 p j' $ )k`2 F; $ �� - ,� /Q/, l� $ . $ Special ,J &Aar Instructions: Reprint Permit(per PE): ❑ Yes ENo ❑ Done Applicant Notified: e#4-p Date: i�/S/..5- Initials: 1:\Building\Forms\TransmittalLetter-Revisions.doc 05/25/2012