Permit CITY OF TIGARD BUILDING PERMIT °r- I ' COMMUNITY DEVELOPMENT Permit#: BUP2015-00112 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 09/01/2015 Parcel: 1S 136CB04400 Jurisdiction: TIGARD Site address: 8500 SW SPRUCE ST Project: Japanese International Baptist Church Subdivision: WEST PORTLAND HEIGHTS Lot: M Project Description: Construction of a new multipurpose building including classrooms and a gym. Contractor: BROCKWAY CONSTRUCTION INC Owner: JAPANESE INTERNATIONAL BAPTIST C 10875 SW HERMAN RD 8500 SW SPRUCE ST TUALATIN, OR 97062 PORTLAND, OR 97223 PHONE: 503-968-3118 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: NEW Type of Const: IIB Permit Fee-COM-New Construction 09/01/2015 $7,643.20 Occupancy Grp: E Occupancy Load: 415 12%State Surcharge-Building 09/01/2015 $917.18 Plan Review 04/14/2015 $2,773.37 Dwelling Units: 0 Plan Review-Fire Life Safety 04/14/2015 $1,706.69 Stories: 2 Height: 0 ft Park-Commercial and Industrial 09/01/2015 $2,230.70 Bedrooms: 0 Bathrooms: 0 TDT-Transportation Development Tax 09/01/2015 $10,187.00 Value: $1,621,017 Plan Review 09/01/2015 $2,194.71 Plan Review-Fire Life Safety 09/01/2015 $1,350.59 Info Process/Archiving-Lg$2.00(over 09/01/2015 $38.00 Floor Areas: 11x17) Total Area 9584 Info Process/Archiving-Sm$0.50(up to 09/01/2015 $85.00 11x17) Accessory Struct: 0 Metro Const.Excise Tax 09/01/2015 $1,945.22 Basement: 0 Tig-Tual School CET-Non Residential 09/01/2015 $5,558.72 Carport: 0 DC Provision Review,COM New-Bldg 09/01/2015 $149.50 Covered Porch: 0 DC Provision Review,COM New-Ping 09/01/2015 $149.50 Deck: 0 DC Provision Review,COM New-LRP 09/01/2015 $44.00 Garage: 0 Mezzanine: 0 Total $36,973.38 Required: Required Items and Reports(Conditions) Fire Sprinkler: No Parapet: Fire Alarm: Yes Protected Corridors: Smoke Detectors: Yes Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification C=• Those rul-: are set •rth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.2 or 1.800.34. 00000 Issued By: Permittee Signature: / al Call 503.639.4175 by 7:00 a.m.for the next available inspection• te. / This permit card shall be kept in a conspicuous place on the job site until completion•f the project. Approved plans are required on the job site at the time of each inspection. • B>I ilding Permit Application 38 Commercial Kt‘N , QR OFFICE. USE ONLY City of Tigard Received Permit No.: t 13125 SW Hall Blvd.,Tigard,OR 97223 Zp15 aUPx Cb/l,l. '1 i AQ� 1 Date/B: /011,!' ® Related Permit: - _ Phone: 503-718-2439 Fax: 503-598-1960 ` J :, T I GA R l Inspection Line: 503-639-4175 ei1 j�" Dnte Ready : /I, / ® See Page 2 for Internet: www.tigard-or.gov ��` .��1 ;.tified/Method: V Supplemental Information 1 AN �1_ TYPE OF WOR o , 2" / ,' `� ;,_4 . REQUIRED DATA:1-AND 2-FAMILY DWELLING N_ ►= ew construction ❑Demolition d Permit fees*are based on the value of the work performed. 1 Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement Cl Other: equipment,materials,labor,overhead,4nd the profit to \r, CATEGORY OF CONSTRUCTION work indicated on this application. Arc Valuation ,2 �^ ❑ 1-and 2-family dwelling ommercial/industrial �16i r_:>`�� ►�I Number of bedrooms: El Accessory building El Multi-family (0 t' ❑Master builder ❑Other: Number of bathrooms: 'Z J1/ic/i l `� JOB SITE INFORMATION AND LOCATION Total number of floors: 7f /3 7- 4, Job site address: es, 6-,Q) si � J� <S ' .7 - New dwelling area: square feet `� City/State/ZIP: �J ,/� Garage/carport area: square feet ,� / ` 9'/ T� r Ol� ��{ 7 Suite/bldg./apt.#: Project name:�J_ Covered porch area square feet t ' Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: I Lot#: Permit fees*are based on the value of the work performed. \h Tax map/parcel#: Indicate the value(rounded to the nearest dollar)of all 4 equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Valuation: $ Sc J k J �/ ilsn �Gx/i��' 1 in S Existing building area square feet irs L New building area: square feet ❑ PROPERTY OWNER ❑ TENANT A- o1/4),,_ad7.0A,,,,,r4 Number of stories: Name:Thaw/es -N-rZAjAri Type of construction: Address: eScC) SW �171,6PD S c Occupancy groups: City/State/ZIP: Trpip/0 I!7 Z Z Existing: \ Phone:( ) Fax:( ) New: APPrCANT ❑ CONTACT PERSON BUILDING PERMIT FEES* Q. Business name: r'" T`� (Please refer to fee schedule) �..LA `LS7rilC Structural plan review fee(or deposit): �- Contact name: e /r..42, r/ FLS plan review fee(if applicable): Address: /�S r? L/� �N C. City/State/ZIP: ?�� , -ri � ErT 77,v7- Total fees due upon application: WA) Amount received: r}-- Phone:(5.S) W A)__a j/8 Fax: :,(c43 ) O, 437 — E-mail: �7�,, 0 �j! �iC, M j ! PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Q-•• '�'��-� CONTRACTOR Commercial and residential prescriptive installation of roof-top mounted PhotoVoltaic Solar Panel System. Business name: Submit two(2)sets of roof plan with connection S V •ils and fire department access,along with the 20 : Oregon Address: Solar Installati• .ecialty Code checkl•-. City/State/ZIP: Permit fee(t udes plan rev' ' $180.00 and adm trati V ees): Phone:( ) Fax:( ) State surcharge(12° 1 p • it fee): $21.60 CCB Lie.: $201.60 Total due upon appicat . Authorized signature: This permit application expires if a per 's not obtained I within 180 days after it has been accepte' .s complete. Print name: F�` . Date. - "'� - — * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB) IA City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations T I G A R[D 13125 SW Hall Blvd. •Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Pemvts\BUP_COM_PennitApp.doc Rev.12/18/2014 • City of Tigard 1114 q COMMUNITY DEVELOPMENT DEPARTMENT ■ TI c ARD Building Permit Review — Commercial - With Land Use .I Building Permit #: u Q c 10 15 - CO 1 12--, Site Address: $500 SW Spruce- Si-, Suite/Bldg#: Project Name: \Japan eZ e. In-}e.rncrk-1 o(10.1 1 Savki s I Chu,r r i (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: co,nr;+,A {-- 7000 ,tare. -'oat ac.c,.„SOtV \OV:1'01Y.13 Verify site address/suite# exists and active in permit syste . Aver Terrace Plan District: ❑ Yes MNo Land Use Case#: CUP?0 11-1-0cOD3 ler Platch Approved Land Use: NA/ Site Plan ' andscape Plan ❑ Other: N Urban Forestry Plan L`i" Elevation Plan Lg uilding Height: M ximum Height i-�J AAial Height 27 g & onditions Met: Prior to Submittal ELI Prior to Permit Issuance ige Cor rt∎on -'4 t tllh bc� cn pc,or 4b Business Licen : s'11-,t wb -k Exists:. (Yes n Ne,a.YY1icaant t?tt fted to obtain huwe .s.lkceaut 11/Public Facilitie Improvement (PFI) Permit: / Required: g Yes,applicant was notified ❑ No Applied For: [1" Yes ❑ No,stop intake Notes: Approved by Planning: •41 . ti -,• 101, ,iii Date: L{ 'QI 1 S. Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: g fy /5-- (//09/46-- Site Plans: # Building Plans: # Building Permit#: } 'En r building permit#above. Workflow Routing: a-flanning ❑ E gineering R1 ermit Coordinator lg-11uilding Workflow Sign-off: Sign-off for Planning(include notes from planning review) Route Application Documents: 2Building: original permit application,site plans,building plans,engineer and ----- &---t . beam calculations and trust details,if applicable,etc. Notes: V. 1 ��� dL _By 1. ..x.40 By Permit Technician: d �7 -,1 Date: I:1BuildinglForms\BIdgPermitRvw_COM_W ithLandUse_040115.docx Engineering Review 0 yk Slope at building pad: El PFI Permit#: El Conditions "Met"prior to issuance of building permit ❑ Easements (encroachments) per engineering conditions of approval and plat (not typical on SDR/CUP) ❑ Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes El No Assess Water Quantity Fee in-lieu: ❑ Yes El No LIDA Facility on lot: El Yes El No ❑ NOT Approved by Engineering: / Date Notes: „So vG y a GO yid'/o43 S t,/l h e e4 40 he. /296- pip-lo y io issciiiij GL 6(1,/ding Approved by Engineenng: - Date: 1.9/'S Revisions (after Building Submittal only) Reviewer /Date Revision 1: ❑ Approved El Not Approved Revision 2: ❑ Approved El Not Approved Revision 3: ❑ Approved El Not Approved Permit Coordinator Review El Conditions "Met"prior to issuance of building permit ❑ Approved, NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: 76 K to Issue Permit Approved by Permit Coordinator: ./ Date: /. ?S' I.\Building\Forms\BldgPermitRvw_COM_W ithLandUse_040115.docx June 25, 2015 RE: JIBC Project Information Building Permit: BUP2015-00112 Construction Type: 2B Tenant Name: JIBC Occupancy Type: E/A3 Address: 8500 SW Spruce St. Occupant Load: 413 Area: 9567 Sq Ft Stories: 2 The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2014 edition and 2014 Oregon Fire Code as amended by TVF&R. The submitted plans are approved subject to the following conditions. 1 ) Please revise plans to show current details of 2nd floor construction. 2) Please provide complete details of 2 hour fire wall to beso nstructed in lieu of elevator requirement. t`' ���F� «' E�z� n t( i }lt �°`J �az� "7-_ 3) Please show fire partition on south side of north stairway. 4) Please provide alternative to wood floor decking which would not be allowed in type 2B construction. 5) Please redo plumbing facility requirements showing accurate occupancy numbers and anticipated non completion of 2nd floor. 6) Please complete 2nd page of site permit application. Respectfully, Dan Nelson, Senior Plans Examiner (503) 718-2436 dann @tigard-or.gov /y /W/9 r City of Tigard :. • TDT—COUNTYWIDE TRANSPORTATION DEVELOPMENT TAX e1/1 S T,GA D Rate Calculation Worksheet �£✓4sfb 3-1 -7-As APPLICANT /4 utj 1 1/0 ko^gyp DATE /��` /, 3 MAILING ADDRESS//,G 5- �If `-�A,r{s_ PREPARED BY /, CITY/ZIP/PHONE �/ j2/7` B� 9v 12 PLANS CHECK 'r )/3-00403 J� p 1TAXMAP# / S/3� bO2,7OD/!S/3,ej3O4400 ,J� AETSI-E %FtN��L SITUS#ADDRESS FrSI 2 i �S0,0 5I4/S d�SS— iS---z^ iecry- clwpOL FORMER_USE(S) fSY'S ED Tv SH0 W /o//i=II ` A D65 USE ITE # TDT 1 # CODE UNITS X RATE _ AMOUNT 70' DESCRIPTION/NOT SA,01.- 43q'57-=,_ 0I/‘3 Y.Cam"`LL ttu-•• S DDl .,,l M� `/ "' c,c-r"C Cam._ X 1t4 =_ /, H TOTAL TDT,FORMER USE(S) / 7 5 PROPOSED USE(S) • iii ITE # TDT CODE UNITS© RATE AMOUNT DESCRIPTION/NOTE 0 e cbo '7. 2 © N111 s?B -O ' ,zoo h a K III IIIIIPMIIIIIIII III UMME / / 9s-/ TOTAL TDT,PROPOSED USE(S) .2. ,-o-5-2.:- "//p,0 3 4 // q I"1 le LESS TOTAL TDT,FORMER USE(S) - Rai© . 1,/ 5-3 �' -- /1 91 1/1' r lel 6 E `U/ f$7-_TDT INCREASE/DECREASE) % (INCREASE DU PAYMENT METHOD CASH/CHECK CREDIT OZP�7 7D /3 CO :Tr:: G£F s �/ /o2 /of vu .vv /3v 51 tE BANCROFT AGREEMENT iQK�j 7/?� � d� // 3 ero (A':f-' (PROMISSORY NOTE) G/tzRSe ?—p r <1•4 E DEFER TO OCCUPANCY )1/ /x 1r4/11.71 _ /' g. 4. Z_ 1/OFS/CD/FORMS/TDT Rate Calculation Worksheet.ndd(Rev.4/22/09) 'X 4,,q,,,/a/ _ ,16 1. Prior to site work, the project arborist shall perform a site inspection for tree protection measures, document compliance/non-compliance with the urban forestry plan and send written verification with a signature of approval directly to the city manager or designee within one week of the site inspection. 2. The project arborist shall perform twice monthly site inspections for tree protection measures during periods of active site development and construction, document compliance/non-compliance with the urban forestry plan and send written verification with a signature of approval directly to the project planner within one week of the site inspection. 3. Prior to site work, the applicant shall submit to the City of Tigard the current Inventory Data Collection fee for urban forestry plan implementation. The inventory fee is $958.00 ($147. first tree; $28 x 22 additional planted (16) and existing (7)trees; $195 for 1 stand of trees). 4. Prior to site work, the applicant shall provide a tree establishment bond that meets the requirements of the Urban Forestry Manual Section 11, Part 2. The bond amount is$7,056. (16 planted trees x $441/tree) 5. The applicant shall provide a franchise hauler service provider letter confirming the existing facility has adequate capacity. Submit to the Engineering Department (Greg Berry, 503-718-2468 or greg @tigard- or.gov) for review and approval: 6. Prior to any work on site, a Public Facility Improvement (PFI) permit is required for this project to cover street improvements, public utility issues, and any other work in the public right-of-way. Six (6) sets of detailed public improvement plans shall be submitted for review to the Engineering Department. The PFI permit plan submittal shall include the exact legal name, address and telephone number of the individual or corporate entity who will be designated as the "Permittee", and who will provide the financial assurance for the public improvements. Failure to provide accurate information to the Engineering Department will delay processing of project documents. 7. Prior to any work on site, the applicant shall obtain approval from the City Engineer for the street design which is anticipated to include a 16-foot paved half width plus an 5-foot planter, 5-foot sidewalk street trees, lights and any required signs. 8. Prior to any work on site, the applicant shall obtain approval from the City Engineer of a design access report. 9. Prior to any work on site, the applicant shall obtain approval from the City Engineer and other appropriate agencies for the final design of the storm drainage >( system to serve the site and any downstream impacts. Revise plans to show Spruce Street draining to existing drainage along the north side of the street. Submit the area of untreated runoff. CUP 2014-00003 Hearings Officer Final Order (Japanese International Baptist Church) Page 7 10. Prior to any work on site the applicant shall obtain city and CWS approval of the complete design of the stormwater detention facilities and maintenance plans for them, including maintenance requirements and provisions for any treatments used. 11. Prior to any work on site, the applicant shall provide documented approval from the Tualatin Valley Water District (TVWD) of the design of the proposed water and fire service. 12. Prior to any work on site, the applicant shall provide approval from Tualatin Valley Fire & Rescue (TVF&R) for the planned access and hydrant location. 13. Prior to any ground disturbance on the site, the applicant shall obtain an erosion control permit issued by the City of Tigard pursuant to ORS 468.740 and the Federal Clean Water Act. The plan shall conform to the "Erosion Prevention and Sediment Control Design and Planning Manual, February 2003 edition (and any subsequent versions or updates)." THE FOLLOWING CONDITIONS SHALL BE SATISFIED PRIOR TO ISSUANCE OF A BUILDING PERMIT: Submit to the Engineering Department (Greg Berry, 503-718-2468 or greg @tigard- or.gov) for review and approval: 14. Prior to issuance of building permits, the applicant shall obtain all permits and service provider letters necessary from all appropriate agencies(such as Washington County, Tualatin Valley Water Department and Clean Water Services) for all work to be done on site. 15. Prior to issuance of building permits, the applicant shall obtain approval from Tualatin Valley Firc and Rescue. 16. Prior to issuance of building permits, the applicant shall demonstrate that the reconstructed sewer lateral, including portions that are not replaced, meet standards. 17. Prior to issuance of building permits, the applicant shall obtain city approval of plans for the construction of the stormwater treatment facilities and a Storm Water Connection Authorization. THE FOLLOWING CONDITIONS SHALL BE SATISFIED PRIOR TO A FINAL BUILDING INSPECTION: The applicant shall contact the COMMUNITY DEVELOPMENT DEPARTMENT ATTN: Gary Pagenstecher 503-718-2434. 18. Prior to a final building inspection, the applicant shall call for a final planning inspection to ensure the project was completed as shown on the approved plan. Submit to the Engineering Department (Greg Berry, 503-718-2468 or greg @tigard- or.gov)for review and approval: CUP 2014-00003 Hearings Officer Final Order (Japanese International Baptist Church) Page 8 19. Prior to final inspection, all elements of the proposed infrastructure (such as transportation, sanitary sewer, storm drainage, water, etc.) shall be in place and operational with accepted maintenance plans. The developer's engineer shall provide written certification that all improvements, workmanship and materials are in accord with current and standard engineering and construction practices, and are of high grade, prior to city acceptance of the development's improvements or any portion thereof for operation and maintenance. 20. Prior to final inspection, the applicant shall obtain an approved Washington County Facility Permit for the complete construction of required street improvements. 21. Prior to final inspection, the applicant shall obtain city and CWS approval of the complete construction of the stormwater treatment facilities and maintenance plans. (Contact Brian Wheatley at 503-718-2610). 22. Prior to final inspection, the applicant shall provide a final sight distance report. 23. Prior to final inspection, the applicant shall provide approval from Tualatin Valley Fire & Rescue (TVF&R) for access and hydrant location and any other necessary construction. 24. Prior to final inspection, the applicant shall submit payment of$5,950 for the fee in-lieu of relocating utilities underground. OPERATION OF THE FACILITY SHALL COMPLY WITH THE FOLLOWING CONDITION: 25. The gymnasium shall not be used between 10 p.m. and 7 a.m. the following day. THIS APPROVAL SHALL BE VALID FOR EIGHTEEN (18)MONTHS FROM THE EFFECTIVE DATE OF THE HEARINGS OFFICER'S DECISION. t DATED this 7 day of January 2014. Joe Turner, Esq., AICP City of Tigard Land Use Hearings Officer CUP 2014-00003 Hearings Officer Final Order (Japanese International Baptist Church) Page 9 FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 111 t Transmittal Letter I , 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: 1 ,Gli:.v`� DATE RECEIVED: DEPT: BUILDING DIVISION al 91//(° FROM: p COMPANY: 6.-a/ 5 ✓u.ztO PHONE: 6D3 — :4c?— !/ • By: RE: 2500 t_o P. ak, --(3(.rti'ao 5-Ct!%' 1 i (Site Address) (Permit Number) / lt P.-. / I I r14/ . ,4 .. 0 t.6r Cit e1� (Pro ct ame or subdiv'.ion name and lot n b ATTACHED ARE THE F I LOWING ITE . S: T : Additional se s) of plair Revisions: Cross sectio (s) and detdi Wall bracing and/or lateral analysis. Floor/roof aming. Basement and retaining walls. Beam c.+ ulations. Engineer's calculations. Other(explain): REMARKS: Routed to Permit Te Date: Initials: I Fees Due: ❑ Y-m..1'.� s Fee Description: Amount Due: $ Special Instructions: Reprint Permit(per PE): ❑ Yes ,9 ElDo Applicant Notified: Date: 2 /(":4--7\IM2----2/6, ,,,� �a , { Initia U 1.\Building\Forms\TransmivalLetter-Revisions.doc 05/25/2012 Location: Record Type: Inspection Type: Result: Comments: Inspection Date: Record ID: Inspector: City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 8500 SW SPRUCE ST, TIGARD, OR, 97223 Commercial - Building 299 Final inspection PASS - No C of O BUP2015-00112 Chip Barnett Shell only Received structural engineer final approval letter Received Third party (Carlson Testing) final summary letter Final shell inspection approved as agreed per the building official Mark VanDomelen Violation Summary: Inspector Contractor