Loading...
Report (10) �f�f Information LP.2MTo Build On Engineering•Consulting•Testing August 6,2014 Rev. August 12,2014 Mr. Eric Evenson Wal-Mart Stores, Inc. 2001 SE 10`h Street Mail Stop 5570 Bentonville,AR 72716-5570 Subject: Final Summary Report Wal-Mart Store No. 5935 7600 SW Dartmouth Street,Tigard,OR PSI Project No.0654138 ao/-.0Q p?O Dear Mr. Evenson: Professional Service Industries, Inc. (PSI) is writing this letter to document that, in accordance with Section 1704.1.2 of the State Building Code representative(s) from our firm has performed special inspections during construction of the limited remodel for the following project: Permit No: City of Tigard,OR—BUP2012-00067 Project Address: 7600 SW Dartmouth Street,Tigard,OR Project Description: On-Site Trench Backfill Our project file(s) indicate that PSI special inspection activities listed below were conducted as scheduled between June 10, 2013 and August 6, 2014 for the above referenced project. This letter represents a summary of work observed and reported by PSI representative(s) and the resolution of any documented non- compliance. • Soil Testing—On-site Trench Backfill including ADS pipe in traffic rated areas To the best of our knowledge,the special inspections referenced herein were performed by our firm in general accordance with the requirements, approved plans and specifications, provided change orders that impacted plans and/or specifications,and applicable workmanship provisions of the State Building Code and Standards. If you have any questions or we can be of further assistance,please do not hesitate to call. Sincerely, Professional Service Industries,Inc. Deborah Priest,P.E. Joe Morrissey Project Engineer Special Project Manager Professional Service Industries,Inc.•6032 N.Cutter Circle,#480•Portland,OR 97217•Phone 503/289-1778•Fax 503/289-1918•CCB#176269