Loading...
ROW2014-00069 y CITY OF TIGARD RIGHT OF WAY PERMIT lig I COMMUNITY DEVELOPMENT Permit#: ROW2014-00069 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 06/23/2014 Parcel: SEG1054 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Project Description: Adjacent to SW Lukar Street and SW Fern Street. Install 1-#2 AL-XLP primary from pole 2139 120 feet to pad 240. Install 14350 AL-TX secondary 60 feet near pad 244. SEG 1054, 2813. Owner: FEES Description Date Amount ROW Permit Fee 06/23/2014 $300.00 PHONE: Contractor: PHONE: FAX: Applicant: TOD SHATTUCK 2213 153RD DRIVE BEAVERTON, OR 97006 PHONE: 503-672-5466 Total $300.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. ttue/Applicant Sign not-p- Signature: -A-pd Ye0,4- Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for ROW2014-00069 Type: Condition Name: Status: Severity: ROW 01-CUSTOM CONDITION Applied Notice <Custom Condition goes here> ROW 02-PERMIT&PLAN REQ ON SITE Applied Notice A copy of the permit and all attachments,and a copy of the approved construction plan and all amendments shall be available at the work area. All work shall conform to the permit terms,conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's Standards and Specifications and to these General Conditions. Changes to any of the aforesaid must be approved by the City, in advance of work performance. ROW 03-TRAF CTRL-SPECIF(CITY) Applied Notice The City's standard specification for traffic control is"Manual on Uniform Traffic Control Devices for Streets and Highways", U.S. Dept. of Transportation, F.H.A., 1988 Ed. ROW 04-TRAF CTRL-CONTR RESPON FOR Applied Notice Traffic control shall be provided for by the contractor in accordance with the City's standard specification and,also, in accordance with a City(job specific)approved traffic control plan.A copy of the approved traffic control plan shall be available at the work area. ROW 05-TRAF CTRL-ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic,at any time,without having first obtained written approval from the City Engineer. The permit holder is responsible for provision of timely notification of traffic flow disruptions to area wide Emergency Services(Tigard Police Dept.,Tualatin Fire&Rescue)and to Tri-Met and Tigard School District. ROW 06-TRAF CTRL-ADVANCE WARNING Applied Notice Advance warning of imminent traffic disruption shall be provided to the general motoring public by placement of an advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. ROW 07-TRAF CTRL-PRIV PROP ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service and if not, shall be cause for work stoppage until effective access is established. ROW 08-TRAF CTRL-DEVICES IN PLACE Applied Notice Traffic control devices,flagpersons,etc.,shall be in place prior to initiation of construction work and shall be effectively maintained. ROW 09-TRAF/NOISE CTRL-WORK HRS Applied Notice No work will be permitted during the hours of darkness, nor between 9:00 p.m.to 7:00 a.m. Monday through Friday, nor between 9:00 p.m.to 8:00 a.m. Saturday, nor between 9:00 p.m.to 9:00 a.m. Sunday. ROW 10-TRAF CTRL-MIN LANE WIDTH Applied Notice Minimum travel lane width shall be eleven(11)feet;pedestrian travel shall also be provided for. ROW 11-TRAF CTRL-CITY CAN MODIFY Applied Notice The City reserves the right to add to or modify traffic control requirements as may be necessary to effectively control traffic and to assure public safety. ROW 12-INSP 24 HR NOTICE REQUIRED Applied Notice The permit holder or his contractor shall notify the City's inspector Kenny Fisher at 503-816-6146 or email at kenny @tigard-or.gov,twenty-four(24)hours prior to commencing work, twenty-four(24)hours prior to any staged inspection, and after completing work covered by the permit. ROW 13-HAZARDS-CERT OF INS Applied Notice Maintenance of the work area and approach roads is the responsibility of the permit holder.The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards.A copy of the permit holders Certificate of Insurance shall be available at the work area. ROW 14-DEBRIS-MATERIALS Applied Notice The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit.The City may at any time order immediate cleanup and stoppage of work to accomplish cleanup. ROW 15-EROSION CTRL REQ Applied Notice Effective erosion control is required. Erosion control devices must be installed and maintained meeting D.E.Q. requirements. The City may at any time order corrective action and stoppage of work to accomplish effective erosion control. ROW 16-REPAIRS-LIKE MATERIALS REQ Applied Notice Property disturbed by construction activity shall be seeded with a standard grass mix;shrubs,flowers, barkdust, existing signs,pavement markings, mailboxes,etc., shall be reestablished, reinstalled or replaced,with like kind and material. ROW 17-DRAINAGE CONTROL REQ Applied Notice Effective drainage control is required. Drainage shall be controlled within the work site and shall be so routed that adjacent private property,public property and the receiving system is not adversely impacted.The City may,at any time, order corrective action and stoppage of work to accomplish effective drainage control. ROW 18-UTILITIES PRELOCATION REQ Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center.Said rules are set forth in OAR 952-001-0010 through OAR 952-001-0080.Copies of the rules may be obtained from the Center by calling(503)232-1987. If you have questions about the rules,contact the Center. NOTE: Damage to utilities shall be corrected at the permit holders expense. ROW 19-UTILITY LOCATIONAL CONFLICT Applied Notice Contractor must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the permit holders expense. Changes must be approved by the City in advance of work performance. Contractor shall coordinate the work with affected utility agencies. ROW 20-TRENCH-PATCH/SAFETY/LBILITY Applied Notice A temporary hard-surface patch(Cold mix A.C.or Hot mix A.C. base paving) shall be placed on trenches within roadways at the end of each day's work. No trench,on site or off site,shall be left at any time in an unsafe condition.The permit holder is responsible for and is liable for hazards or damage resulting from the work. ROW 21-REPAIRS REQ-INSPTR OPINION Applied Notice Work provided for under the permit shall include repair of existing facilities(roads,ditches,etc.)as may be necessary, in the City Inspectors opinion,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the permit holders expense. ROW 22-AS-BUILT/ENGR CERTIF REQ Applied Notice At the end of each year,or an a mutually agreeable yearly date, any entity making changes to its facilities in the public right-of-way shall submit complete"as-built"drawings showing all new public improvements, including any revision made to the previously approved construction plans and, also,any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineers certification of installation compliance(form attached). ROW 23-DAILY INSP REPORTS REQ Applied Notice The permit holders Engineer/Inspector shall submit daily inspection reports, on a weekly basis,to the City's Inspector. (see Developer-Engineer Agreement note#5). ROW 24-TESTS/REPTS TO VALIDT CLMS Applied Notice The City's Inspector may, at their discretion, require provision of tests and or reports from the permit holder, permit holder's engineer or contractor to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the permit holder's expense. ROW 25-RELEASE-WAIVER REQ Applied Notice The permit holder shall provide a copy of a properly executed Release&Waiver document to the City for each ownership disturbed by construction activity,as evidence of disturbance resolution and owner satisfaction. ROW 26-MONUMENT PROTECTION REQ Applied Notice Existing monuments, property corners,and survey markers shall be protected. Replacement shall be at the permit holders expense. ROW 27-PROB SOLVING-RESPON PARTY Applied Notice The permit holder shall provide to the City Inspector,in writing,the names and 24-hour emergency telephone number of two (2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of an emergency. The permit holder shall notify the City Inspector, in writing,of any/all assignment changes. ROW 28-CONSTR SAFETY-RESPON PARTY Applied Notice The permit holder shall cause his contractor to provide to the City Inspector, in writing,the name and 24 hr emergency telephone number of a designated"Competent Person"responsible for construction safety as per OR-OSHA, Chap. 437, Div. 3 Construction, Subdivision P-Excavations.The contractor shall notify the City Inspector of any/all assignment changes. ROW 29-ESMT/RT OF ENTRY-RESPON Applied Notice It is the sole responsibility of the permit holder to provide for proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry, or properly executed easements,shall be provided to the City.The City shall in no way be construed to be liable for the permit holder's failure to obtain or provide for proof of right-of-entry or easements. RECEIVED JUN 17 2014 City of Tigard cm : rlGARD v Application For Work In The Riglit'20f--W `vING � ROW Permit Property Address/Location(s): 5 W L K ku r �- 'i /yi -,574 FOR STAFF USE ONLY Right-of-Wax *Applicant's Port/a no/ / / E l eGfy`�'G Case No.: X20l4-oa�toGl Applicant s Name: v L° Application Accepted:(O I g,Ill By: Address: 2 2 /3 /53 re,' Dr;vc Application Reviewed:b i 8 By;,11 g City/State: 3eot vP r few) , Q R zip: 970D Application Fee Due: s 340 Primary Contact: 1 ad Sh a 1- c Applicant Notified: F6 Phone:J5O3-- 67 2- `f'//U Fax: 5-45-(a 72-S5 Receipt No.: 161695-1 Email: `T-D5u ppor+Bi @ p., 1 corn �t/ REQUIRED SUBMITTAL Contractor's Name: NA INFORMATION CCB# Expiration • Application form,completed and signed Address: • Submit one (1)copy of scaled sketch of City/State: Zip: the proposed work to be done Phone: Fax: • Submit one (1)copy of traffic control plan Email: Professional Engineered Plans are required Plans By: PG F for: Address: • Street Widening City/State: Zip: • Subdivision Infrastructure Phone: Fax: • Main utility line extension Email: acv.6/24/2013 I:cuepin\masters\land use applications\row app.doa Description of work: .54a1 I /r x',Z AL _x1 P Pr,Jietry f{1,'i we .2/0 7O pad .z 44A l ri s/- // /-$F 5 A L-7'x Se-con.ch ry CQD f+ 41.ear Pad.2 51.4 Estimated value of work(within the public right-of-way): $ Is work related to a LAND-USE DECISION? YES u NO la If so, please specify(MLP,SDR,SUB,etc.)case#: Is the work related to a BUILDING PERMIT? YES n NO E If so, please specify(BUILDING PERMIT)case#: Signature of Applicant/Permittee: 'l? Cam/? mil' fr V J Az GrC12)Date: WV/i 4. Print Name: kq th ry"1 Va vnde rza nden Title: T°E D Su Pia r� .6� -for Tod Sya-�tuC/ City of Tigard 1 13125 SW Hall Blvd.,Tigard,OR 97223 I 503-718-2464 I www.tigard-or.gov Np l(`--ry Az B 00 00177 ND I J SUBDMSION LEGEND �" '; ou_ sl s2 117 I 1=I 11 I p i, 0 e�aM`r p OW CT NEW PGE FACILITIES TO BE INSTALLED LLED nNS 0714110•51 EE wars* —.-•=4,1 x 1 PO 00170 --- PD 00177 414%1, MD a..rrr 0,00. 01'v.Nr.W..720-OM.a.TOP c-:g.','; . 00,11 NIA IMAM ix 47b S ro..ar.um..canons NC.,_ue rut�N�R ` - i..ix 4T \111 SW EEAV i) O woi ^:M i�w _� tiro n-0 14 JOB SITE ti c m�w..a`"a"M Wordy 0-z rL-08 +� V. TO SEW 4 VT 00242 r• !'---•. 1-142 N110 E O 1 #001wi•Ni.�reirAUm nawra.w u APO n noor 2eio .i1 Tx PD 0044 iO ]0 MN 47 Iv�wl m�l �) �r n'OA ," :' q, -e.NC c iarr'r°„PIM=OLD MOT aro Tx , - 1 1-FAT O A RK47 l 42 PK Cer•Mr J12264-95 810 o CT 11 1 i M, r/ PL0211- ► 654 13 VICINITY MAP MT:as MM.n 0054 i'- _ •01100.1.110-10 CU-TX ha9a0V ANT S6YM'M 5YM COW# NO.Cx•IraM.•MOM. NILLSNIRE WOOS \\\ • - A ISM PLAINER 0.x4 ' • rr°.ar i.0i7000DTrr MATurw roc OW., / P2)- .: Oro Tx 1' R�9.•IV AT E Tar A ��, B 10341 a w -� •sn.-I. AT TAO R•III -2 41.-JRTD-00 p *1v M•- r VT NN\ \N MU .ro T7 \ O 1 PAD #00244 cwro-ra wwao a•Errwro Cr u Pa.an A us ' s) M 7 1 y O INSTALL 7200V w. rwr N' �� '\1._rTx 0 A 1p PAD MT sru p°OM. e �' ue n ;� 50 80 PEAK _ Oro n -t G IL ooi ` \ 644 VT PFAK LOAD 36KW I WSW.r� _re WE W- 2w • o °ran'°re "' .v y roMN) .D .TEN CONOW,.Au0 » AO PD 00250 s. -,/i r roc cowu.ro.0.n>°Naml WO Tx °l uT- •v LAD #00240 ppp2"S'e WO Tx WO Tx r NC INSTALL 7200V DO WITH SLCST W00759460 AUIOITP 1TIR Al O- O7 V PAD MT 25 841 EXIST 0V igt Ir%-20 - DO WEEK TOCJIf W1077310 J 4 w .- .),,, �, 111 I EXIST DEM 7.OXW —� _. CONSTRICTION NOTES:n P7Dd 1ST/_ 4 m,`.- I-10 OP-TX IME-A P 017) 0032201 M NM 9l2 n r r nor sr.r•oa.rt.....M w.. PL SOI lS B ..M�1..�d w _ �yy \ / `l / r.gam P<aawxw..r a[r lirra� DTI ` F r - 00 33 r POLE MAC51 OW 6T r ea 0 �+-' I rrr off DITMIG 4 3170 )S.Luz co E VT 00011 I I%'p ,�� B 15 39269 a 4GNTNwc MONSTER 60'NW o °° ... •�— ..".L°�'pF. .y .. 144-POE VAULT L■ j f...... MIL. THINK Q �,"r r•r,.u. Ro "m"'.,o.b r...,«r.....o.re W/PAD MOUNT LID f .7� 0""r SAFETY CONDUn PO-00240 AAA. -�~ FIRSTt a«..Mon —,....r .-...•...0.. "'.'-' pe00100 1 4nIn,Ma,era&Oa 101.0.1.0 RCN KC ND NC..nimouros `/\/ / ;�°r® POE FACILRIES NOT DRAWN TO SCALE „Q ,o - .wa ra... iNi OMN•A f A RV TNT P 0•11MATIOH LO E6 73 VLE ONNNML r rarw..a.e WA...-.r r wow PMUt- PI7C1K MOURN N S AID.11 C NaaP OItASTR1414 ELECTRICAL I ri.YAM.POPS 03AP40 4?0 056 AM MI•IR@E OP CONDUCT AND NACMIENT OP ROUPT64IT 0,00 M 061Y0DON MIEN IT 6 RECOMMENDED 076 Me •y'4 'i TNT 1�NOT MY ON 1X6 OMORAM POP OEOGRMN CAI LOCATIONS - E,P A 1ATl:RAL1 tamp=r.......0.......+s..aMn �� _ I f ..-WaWr• .wnyl w•••••••.l of rnlu�ro ow rp wee��.6 /y_ RIOIa-oN-wA./Mar NOT/CT: Or Aro '- Sr.6.r^.•••I•Ma 60 r� ,- IS.AS CONTRACIM A.CONTIOROSE.0 PAW M.Or.MCIal r Moor WOW MG P1.0 Am sr nwww VS 11.-o goy•pO OLL .row.<.r n O 6...owr A CO LOP 4fl sw_eta r 0 ON SM 0 r r r.r Tr r MOO••"M w;WOWW 00... 5°: ••NO. . .. # . . „ m, E.r.VYAT MON 3-701-110471 NIX 7EC0NDART VW'MEDAL =11/ = I WWI I MOUT!U0 TN TO POLE 021.19 rM.M AY OUr - m;�.+."°�.u'M 4.�M. N 4 wr rre.r.a r r PEV# 611E OISCOPOON ' as MOM 0.r M.P. =4"..1%17.22 B ....N.... - - 0= CVMRRprr..r.� araNDNs ` r0aiRpn.w.v.0 ••• ~ PY 30- 1 EOf WMTNC700 DRAM'Y41 Or MST } N,em ou o AS-BUILT VERIFICATION 6 NESC VIOLATIONS CORRECTED All ��- _ OAMTIDN IiOM lN6 DESIGN MUST ,1/4010111 n Dow �� M� „ 1 ©_— OE AMOOVm 1Y 1GE PROJECT MANAGER owlw rw«r.: D,r,, ii M n^!- -_ (9lrrMr..ME rWt'b b Md m.Frcron sAwwr.) 7�JO0 .o nor '� o.'�carane SDMINNG RENEWAfRllllT ry DFSTR:MOW.V TO 00 �� I..o''�o \/ ISO A euw cvMnMO1 �rc. o n PAW .rrr r..p. f.aw,p I..o 1r.�o WON Px.0 M Parr .'�F.0 1 �I�11 •M 4)44+.r Luca MOE \ • —ra•�r N- - l : _ OM.VW/.MUM Mu w,1O`�n1�aG PGE/ AY WIN cr.rTUM ern-.. 1J''" N.P SMOMMMM '•'• == Tree SAM.N m PO. Pry...CCnc M:fO Lm wnTON mar DM •r m M MUM.M r•o•wrw Ms.•M 1r.unm MOWN L. L ,or:ur N awry.NwnMnw a 001272 T Ww°' MT: I r'x^' r. �rr� .rte rw sun•ro 10416 WNW Or M n.altar. - - R.r Jrrq Y.Yar. 101 01070GI 411 I pYMIPY 042 • rm•rw n p!. - M Call 6.6.'6.46 •••••�•• •ronuro avow mom -AU MMIM