Loading...
ROW2014-00058 CITY OF TIGARD RIGHT OF WAY PERMIT MI COMMUNITY DEVELOPMENT Permit#: ROW2014-00058 TI G A R D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 06/09/2014 Parcel: SEG3571 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Project Description: Adjacent to 11400 SW Fonner Street. Occupay approximately 300'of customer conduit within 1-#2 AL XLP JKT primary from pole 2090 to PD 66. SEG 3571 Owner: FEES Description Date Amount ROW Permit Fee 06/09/2014 $300.00 PHONE: Contractor: PHONE: FAX: Applicant: LORRAINE KATZ 2213 SW 153RD DRIVE BEAVERTON, OR 97006 PHONE: 503-672-5484 Total $300.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Q / c ••1 Signature: • , ilir/Ar, Issued By: / _ Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for ROW2014-00058 Tvce: Condition Name: Status: Severity: ROW 01-CUSTOM CONDITION Applied Notice <Custom Condition goes here> ROW 02-PERMIT&PLAN REQ ON SITE Applied Notice A copy of the permit and all attachments,and a copy of the approved construction plan and all amendments shall be available at the work area. All work shall conform to the permit terms,conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's Standards and Specifications and to these General Conditions. Changes to any of the aforesaid must be approved by the City, in advance of work performance. ROW 03-TRAF CTRL-SPECIF(CITY) Applied Notice The City's standard specification for traffic control is"Manual on Uniform Traffic Control Devices for Streets and Highways", U.S. Dept.of Transportation, F.H.A., 1988 Ed. ROW 04-TRAF CTRL-CONTR RESPON FOR Applied Notice Traffic control shall be provided for by the contractor in accordance with the City's standard specification and, also, in accordance with a City(job specific)approved traffic control plan. A copy of the approved traffic control plan shall be available at the work area. ROW 05-TRAF CTRL-ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic,at any time,without having first obtained written approval from the City Engineer. The permit holder is responsible for provision of timely notification of traffic flow disruptions to area wide Emergency Services(Tigard Police Dept., Tualatin Fire& Rescue)and to Tri-Met and Tigard School District. ROW 06-TRAF CTRL-ADVANCE WARNING Applied Notice Advance warning of imminent traffic disruption shall be provided to the general motoring public by placement of an advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. ROW 07-TRAF CTRL-PRIV PROP ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service and if not, shall be cause for work stoppage until effective access is established. ROW 08-TRAF CTRL-DEVICES IN PLACE Applied Notice Traffic control devices,flagpersons,etc.,shall be in place prior to initiation of construction work and shall be effectively maintained. ROW 09-TRAF/NOISE CTRL-WORK HRS Applied Notice No work will be permitted during the hours of darkness, nor between 9:00 p.m.to 7:00 a.m. Monday through Friday, nor between 9:00 p.m.to 8:00 a.m. Saturday, nor between 9:00 p.m. to 9:00 a.m. Sunday. ROW 10-TRAF CTRL-MIN LANE WIDTH Applied Notice Minimum travel lane width shall be eleven(11)feet; pedestrian travel shall also be provided for. ROW 11-TRAF CTRL-CITY CAN MODIFY Applied Notice The City reserves the right to add to or modify traffic control requirements as may be necessary to effectively control traffic and to assure public safety. ROW 12-INSP 24 HR NOTICE REQUIRED Applied Notice The permit holder or his contractor shall notify the City's inspector Kenny Fisher at 503-816-6146 or email at kenny @ tgard-or.gov, twenty-four(24)hours prior to commencing work,twenty-four(24)hours prior to any staged inspection, and after completing work covered by the permit. ROW 13-HAZARDS-CERT OF INS Applied Notice Maintenance of the work area and approach roads is the responsibility of the permit holder.The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards.A copy of the permit holders Certificate of Insurance shall be available at the work area. ROW 14-DEBRIS-MATERIALS Applied Notice The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit.The City may at any time order immediate cleanup and stoppage of work to accomplish cleanup. ROW 15-EROSION CTRL REQ Applied Notice Effective erosion control is required. Erosion control devices must be installed and maintained meeting D.E.Q. requirements. The City may at any time order corrective action and stoppage of work to accomplish effective erosion control. ROW 16-REPAIRS-LIKE MATERIALS REQ Applied Notice Property disturbed by construction activity shall be seeded with a standard grass mix; shrubs, flowers, barkdust,existing signs, pavement markings, mailboxes,etc., shall be reestablished, reinstalled or replaced,with like kind and material. ROW 17-DRAINAGE CONTROL REQ Applied Notice Effective drainage control is required. Drainage shall be controlled within the work site and shall be so routed that adjacent private property, public property and the receiving system is not adversely impacted. The City may, at any time, order corrective action and stoppage of work to accomplish effective drainage control. ROW 18-UTILITIES PRELOCATION REQ Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0010 through OAR 952-001-0080. Copies of the rules may be obtained from the Center by calling(503)232-1987. If you have questions about the rules,contact the Center. NOTE: Damage to utilities shall be corrected at the permit holders expense. ROW 19-UTILITY LOCATIONAL CONFLICT Applied Notice Contractor must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the permit holders expense. Changes must be approved by the City in advance of work performance. Contractor shall coordinate the work with affected utility agencies. ROW 20-TRENCH-PATCH/SAFETY/LBILITY Applied Notice A temporary hard-surface patch(Cold mix A.C.or Hot mix A.C. base paving) shall be placed on trenches within roadways at the end of each day's work. No trench,on site or off site, shall be left at any time in an unsafe condition.The permit holder is responsible for and is liable for hazards or damage resulting from the work. ROW 21-REPAIRS REQ-INSPTR OPINION Applied Notice Work provided for under the permit shall include repair of existing facilities(roads,ditches, etc.)as may be necessary, in the City Inspectors opinion,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the permit holders expense. ROW 22-AS-BUILT/ENGR CERTIF REQ Applied Notice At the end of each year, or an a mutually agreeable yearly date, any entity making changes to its facilities in the public right-of-way shall submit complete"as-built"drawings showing all new public improvements, including any revision made to the previously approved construction plans and, also,any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineers certification of installation compliance(form attached). ROW 23-DAILY INSP REPORTS REQ Applied Notice The permit holders Engineer/Inspector shall submit daily inspection reports,on a weekly basis, to the City's Inspector. (see Developer-Engineer Agreement note#5). ROW 24-TESTS/REPTS TO VALIDT CLMS Applied Notice The City's Inspector may, at their discretion, require provision of tests and or reports from the permit holder, permit holder's engineer or contractor to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the permit holder's expense. ROW 25-RELEASE-WAIVER REQ Applied Notice The permit holder shall provide a copy of a properly executed Release&Waiver document to the City for each ownership disturbed by construction activity, as evidence of disturbance resolution and owner satisfaction. ROW 26-MONUMENT PROTECTION REQ Applied Notice Existing monuments, property corners,and survey markers shall be protected. Replacement shall be at the permit holders expense. ROW 27-PROB SOLVING-RESPON PARTY Applied Notice The permit holder shall provide to the City Inspector, in writing, the names and 24-hour emergency telephone number of two (2)persons who have authority to resolve problems,take corrective action and, in general, will be responsible in case of an emergency. The permit holder shall notify the City Inspector, in writing, of any/all assignment changes. ROW 28-CONSTR SAFETY-RESPON PARTY Applied Notice The permit holder shall cause his contractor to provide to the City Inspector, in writing, the name and 24 hr emergency telephone number of a designated"Competent Person"responsible for construction safety as per OR-OSHA, Chap.437, Div. 3 Construction, Subdivision P-Excavations. The contractor shall notify the City Inspector of any/all assignment changes. ROW 29-ESMT/RT OF ENTRY-RESPON Applied Notice It is the sole responsibility of the permit holder to provide for proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry, or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the permit holder's failure to obtain or provide for proof of right-of-entry or easements. RECE;VED JUN 0 2 2014 City of f Tigard PLANNING/ENGINEER��rl�gR� ING =:y Application For Work In The Right-Of-Way analt ROW Permit 4 FOR STAFF USE ONLY Property Address/Location(s): // //�//1) .rL(/ �4iL;{i;:-� ;S i Seq 35-i I ( gct-.. [.tz4 o r/v `/') Right-of-WaK,�,-I Case No.: I "WI 4- 5e *Applicant's Name: P1 rI':.9avd 6- 74/1'4,1- /._`.Let s''c Application Accepted: U/� By: A.K... Address: 21 43 ,5'1 V /S 3.t ) d f< Application Reviewed:.( s a t By,:1412, City/State: /3e'i►-1---6".CTC�,✓ 4,47 Zip: %74 el 4, Application Fee Due: Primary Contact: Z.I/Z e2/-i.✓F X-4TZ. Applicant Notified: �Q� (`i Phone: (;0 i) -7.L.- -5-464 Fax: �' '3� 471- —5`7 S- Receipt No.: I� o Email: ri 0 sop,.a, .t / i c e-' e cpl. c'aAl REQUIRED SUBMITTAL Contractor's Name: INFORMATION CCB# 'q'iration: • Application form,completed and signed Address: • Submit one(1) copy of scaled sketch of City/Stare: Zip: the proposed work to be done Phone: Fax: • Submit one(1)copy of traffic control plan Email: Professional Engineered Plans are required Plans By: 7?t-7 for: Address: • Street Widening City/State: Zip: • Subdivision Infrastructure Phone: Fax: • Main utility line extension Email: Rev.6/24/2013 I:curplo\masters\Lind use apphcauons\row app.doa Description of work: /J c e.e,/a}/ .4/9.--,w/.t/ /7.tx.4 y -3 6!/' ,ey e0.3 77,--/ezz L'-div.,,,. -' c✓r T)1 /- # 2. .4-L AL/4' Jkr "rfi/-1.--.11 f/ti I ' ' F 7.‘,1 TV Estimated value of work(within the public right-of-way): $ Is work related to a LAND-USE DECISION? YES NO If so, please specify(MLP,SDR,SUB,etc.)case#: /--O.fi-Ar..' 'f' 5r/6s:Fa" / l/ T/ ri b V - 3 L v r..5' Is the work related to a BUILDING PERMIT? YES U NO If so, please specify(BUILDING PERMIT)case#: Signature of Applicant/Permittee: / 114-4-461- Jr'Y i4.-•rte-:<-si /'1 Date: '../.2-//4 Ij Print Name: L.. A-1/i L A', ',./.•.e Z diek".� '/.f X472..Title: ,/.42:7 r'Y'x'6' e:F_.5feAl I i . City of Tigard I 13125 SW Hall Blvd.,Tigard,OR 97223 I 503-718-2464 I www.tigard-or.gov 1111 CITY OF TIGARD RECEIPT ! 13125 SW Hall Blvd.,Tigard OR 97223 503.639.4171 TIGARD Receipt Number: 196388 - 06/09/2014 CASE NO. FEE DESCRIPTION REVENUE ACCOUNT NUMBER PAID R0W2014-00058 ROW Permit Fee 100-0000-43114 $300.00 Total: $300.00 PAYMENT METHOD CHECK# CC AUTH.CODE ACCT ID CASHIER ID RECEIPT DATE RECEIPT AMT Credit Card 090216 TLEHRBACH 06/09/2014 $300.00 Payor: Linda M. Miller Total Payments: $300.00 Balance Due: $0.00 Page 1 of 1 SUBDIVISION LEGEND NEW PGE FACILITIES TO BE INSTALLED INSTAt1 r POLE CONCUR IR'MT I /MISS OTHERWISE SPEC/RED) ON MR 12 sRAOOT;1-142 00 NT .+•' WA,.P &110MIMX3 ARRESTER MIL'"r` i ` ..I woo.. my MR akt P.'DRDYD 01622- \` I" I ti m/NMa�rr 7 N01ED „ �� �'� FF SOn ccoNMRv+aEPN. Aa 1 0 FRONDED n NM a MULLED PO CUSTOM 1`• 1 MALL MOM OOlD mV �• It., 02090 WALL-Al AL-111 A NOM 84 I-2.PVC CONCOT K02090 R.OHD®a 8MTA1/EC er CUSTOM CONDUIT + »,,, 6` �01 o IT r+IN'NC COMET • 0 CUOMO to MIM1 3-+IC 00$WT 3 3111E-1M �y,. _ 1 FOR FUME 1-#40 ANN SERYQ 1 AM-:AOR A 37.5 7031 C µ AN.N GM COMM 1St, • COMM PR0Am a anAUa COMM s KNOWS FONNER ST . , Al._ I TOM - I Uv. POI WWI OF NO'OR LESS -a r rut CONCWI 00045 O NA 1 MICROPAD GRAM Mfg the roa.9016 ogee NO' 21N- .' CONCUR COI' O*ATION -IS r NC corcvr : 00' ROR IeM -MAIL INN(MANNY iEewin POLE To aO Nas I A-2 AL XLP 1K7-0 PO-00066 -tar r rsC COMM NOM Saar To ROLE TO WWII 1 O N munueu.OaACT1oN sac CM MC COMM TO ALL•AN saw aoaA CUSTOM DO MOTH SLCST W#692001 PD 00068 1202190 1 200AMP �� . -- NP/AC: r aw ;, NWN CONSTRUCT,-61 N 75 � NW w� �NATURAL AA APC MIMSIE b V.NN.1:zebu, �M�Taa:/ CONSTRUCTION NOTES: twee ---- PD 00067 r-/ 1 , • 00066 Yrio ra•�r P R as.1.1. 120419 4aiid l osoom m NM.u.MOM,�•n.-41 M IDES UN NOM 110 SA IIO.1,r••Noe oar No n NOW Mg•90115 n0M 200AMP PAD Y00066 Y.Rom!..b podaiep P.ME MW w Wan Wit=r NI.•a el fro Mom/IM NP/AC. aVD /11010-PAD 7 fE.+r+,Rte.014..a p.m .M L..r.r6 THINK a .0 IS aow•lnC To al Nn•um N rut•sDSUI.aEMO . XVO 25 API 1202490 �� W.W MC 0054 my.Mar.NM U ara Na IS Sty 2 OATCNERS aWiair MEd 16Ne Mb To a d Mr My M.w SAFETY .010 ornnr TM a no WWI 0P COMM,MUM A AFC LOAD:MEW laWW•4.41 a Me,dS..&..a w -W M N WWI. NOW N N IIOMAt LOW CWWW2 real FIRST! rlsMS NO ONO MUM NE-MsOW•NEN a awa.To r N 10.WIN • Y SOS MCI r MOM WWI AU MOAN WWI PEN•NW IC r •.. j 411.' Levy as MOM MS NW n IS AMMO.1rrOI/roa ARE MAIM MM Mar a In Mn a..WNW,a POP AM W.ON ON 510 Atli.MI IN NOM M S5 9 POWAY 0 SS Ae Ott TO•■• O+ ._ - ye nor coUMin AMWI.I.FOWL WO N WI Walt Cal a Vo MINS WR O$CKIlST moo WCO DAPY Lila M]atN REM YB COMAIHI! a 415 m.WOMra PM•o O MINIM NIL MEWS WIN IMO MOM MOW,WO 1O.11.•17 ra kW OW 0805w/t M MINIM YMCA OWN NC COWL OMNI=110 r 0 IOW WI.MOUND DOY AD..raW/aW 1,T,„ __ � a.WE! 4 16WO..A rDWn LN 1.111......MYl NN•u.WaS COMt a. •e• RiWgl Lan,a/A,na aaaa as w NO MOWN...POWWOW WOW 1� .Wr�NM -. ::^ `. 0000$FO r/E NIaML nMr-aaad FOE-. . Ai:.1L IN IxAW a ma no N3.WONWa TO r•SMIW II1R 054 NOW ANY COr.4a.1lr AIL MONO NU a ONNINa NO•1E-NM Mao AW 4,...1E-1R...NMI • ,r, • ,\�� RRM.MWW C�TI. ._; e SNOW .WnArruMrn NUN fE-W• ME IM Mk M.RNWOaIW nA1Wa E MN A.rrrAN a AR Cowan I.R N I.olf a AM taorO.lWa r� � `\(♦/ -. AS 7 <� MICA 100E-1aa E. AM noon IOM we MONO NOUN NOMMWI 1N.AM LIMEN �'� w amass \ MWa f lio, I VOLT �[a7iW. �5W/�J .M E iaU Qr P. ANL Inn COMM M FD War 111IW OW MN.I No.aNa on.ou _` ROW n.N O) Ma ON M MR FW N.a1 w WNW wo0[oun(.lN+a10q �+Oar o..m r�>...w LME aENa tw DoE \\� grr.r."="e"�e...�.M.w°.'M 0.001011 a/ O a WOW UN WIC WWI WOW"(PAY TO r..Nr►Ma .•.0.I.M r�:.Mro ///ly..m. W cam. aMW/WnWOi �I1yM1�oo�S11 a <r�r .WE-roma WAWA!Clean Ks MOW C4141M1R71 � rWOrM.1o.o11r NO vatuoE ow C11Oa•aa.s IMO a.. aw r S raWMa •r• L� w F—r a CAWOY WIN NM.40.00010 E 1111116 WOW Q.■rM LW PC1. iRIi01 DEAL A• I COMOCIr1r _ MOON a.• COMM!ISle N/1E-5555 PWMrVAIW1 -• ► j % ..r O In INN. COMKT WE-r ru'•Ea+..oE.as WV.NW as 1 i SW FONNER ST �Y.. / ®�a..► WI CI a=ON■NM aN nro•n.RaM.a.a.aN Inman...a]osDVrrn A, /a.r ®� MNa.0ea1M EgfM.Wr r AN ONION AT EN MOM CM • // �~ ON Y 10 PM CUSTOM lo,R ♦*PAL QRM.a POE CONSTRUCTION WANING e• R 'WI r I�w SDPMWRS■IIEVA IASINAT SY DEMMER: / votary MO \ J ANY DEVIATION FROM THIS DESIGN MUST v+.*+AWNWia•MMME•MO , `""^"r AS-BUILT VERIFICATION & NESC NOLATION$CORRECTED r.r eo..k,r..P.M..b mom*END ay.rrrin.n. W•IJTIUT ' B!AP ROYED BY POE PROJECT MANAGER POWWOW Doh: + EOIiq M KS=V TO IS WNW Gq Mbt Doh: a0HT O4T WAY PROM'!NOTICi` ro ROYWIOMLrRaMar a/Mac'11oN aaEam PMD1 r0 14016.5. w,a yypq rilN".61Mr Sp. IL'Ltllarl:pn I,1M Z 700p1p79 'Nl w.6911,,A/WIFE MaM TIM LOCH AI1r01CTi0$M MVIE.M)WOW AM' hr eY lIDT Milt MNE 1E•il T.eKN r ad 14'a1Z1.Q� MOWN ire MOIR-d 7040 MSr Y RENOM•D, alit PW AMR01� �Warm S1f a se / SMR1 PAR11EpN la CONTRACTO AND CONTRACTORS M1EO ITO MRDE OMW ea7L Pl W a141Ra.alu gLOli MW7D-••D• AN EW-E•►ffra \ T7#2 J08$ITE AWWIWp MTN IOW Mal W AMMO TC WON MOE/ONE aNM ED IEE62 EMIy Cifd TTe CONTRACTOR YRT NO M Me tact 400100 MC01 As NOUN GE///J)) WON MOW r 10 1[SC A COPT'09.1e'PSI!YEPW Or.3.E-. A}lerlTDla CALL Sfl 018008 YOU DKi PVC ,� UN/ �0�01/lAW 110111 M7Y b 104014 11RW A001/EU D EN'PON.N Ef,71DAaD I/ PGE FACILRIES NOT DRAWN TO SCALE 1~4190190 ME W VINT i oEMNO�"iE a"W°NiW°mma`6SN 8 ` Evc ro E wn ET. DON�ATLE/ TIIiiM�FAQIR W 11/IsiD.TMi AW LL{RIR 15 i/CTRRAL nranEE asaaFWM.t'oY Aur a►Aw at'Mel aP r I JQ0- �,/� �E� a�.M� 175 MM.n nu.W l0 D1.D11 W.MY r VMRYE JE CONICTMTY,TOPS AND NLi1MR/OF CONOUC/O1 NA FUaiu PRT OF ig1aRA JA NIMW AWrWIM1RU1 M MMSNn1 a ow Waw IOIRMINT IVITIMI THE OITM11R10N SYSTR1l i RlCOANINDlD THAT a RSO1laT 0T1m loom CAU f1n oEEOC.4 6..WAIY lM.lw. r r.M.ar. oil sao-..07 1 041171 04(1 TIE lien NOT R0.Y ON TIMS DLAORAM FOR OEOOMAMMCAL LOGIION4 I^1^r M DA M0N ONAIIT ID AT ON. vMrU..w 2 Mme DAYS MOP 70 eGSVAfgµ 1•a�. 0 P'OR/LANO seem loom Co.-La AOM11 1®0118