Specifications (2) /1P g3 [/r 2.e-r 3-ez ,� ,,,g 6ed o /? Form 2a Project Name: Fanno Creek Place Bldg B ill Page: SUMMARY t Project 1. Project Name Fanno Creek Place Bldg B 2. Project Address Upper boones Ferry Road 3. City/Town Tigard 5. County I Washington J 4. Building, Gross Area (ft2) 54,648 6. No. of Floors I 3 7. Construction Site Elevation Above 2,000 ft? ❑ YES 12 NO Attached Chapter Type ID Description Attach Forms and Building Envelope Form 3a Building Envelope - General El 3b Prescriptive Path - All Climate Zones Worksheets * CodeComp Report for Simplified Trade -off ❑ * In lieu of 3b * Floppy disc with .occ CodeComp file ❑ Check boxes to Worksheet 3a Wall U- factor Li indicate attached 3b Roof U- factor ❑ forms and 3c Floor U- factor ❑ worksheets 3d Window /Skylight Schedule El �� S9 stems Form 4a Systems - General U 4b Complex Systems El �0 ` \ , \,, Worksheet 4a Unitary Air Conditioners - Air Cooled 0 � 4b Unitary Air Cond. - Water & Evap Cooled ❑ 4 4c Unitary Heat Pump - Air Cooled ❑ �,�0* 4d Unitary Heat Pump - Water Cooled ❑ $ 4e Packaged Terminal A.C. - Air Cooled ❑ 4f Packaged Terminal Heat Pump - Air Cooled ❑ 4g Water Chilling Pkgs - Water & Air Cooled ❑ 4h Heat Rejection Equipment ❑ 4i Boiler - Gas -Fired and Oil -Fired ❑ 4j Furnace & Unit Heaters - Gas and Oil -Fired ❑ 4k Simultaneous Heating and Cooling El 41 Air Transport Energy El 4m Natural Ventilation ❑ Lighting Form 5a Lighting - General ❑ 5b Interior Lighting Power - Tenant Method ❑ 5c Int. Ltng. Power - Space -by -Space Method . ❑ Worksheet 5a Lighting Schedule ❑ 5b Interior Lighting Power ❑ Applicant 7. Name Diane Gardner 10. Telephone 503 - 462 -4822 8. Company HVAC, . Li&tj 11. Date 09/26/06 9. Signature Attached No. of Pages Description of Documentation Document 4 I Trane Equipment Data ation 4- PPG Glass Data a Mitsubishi Equipment Data t,ompnancewrm uao ., errecuve 1, iiu IMO Form 3a Project Name: Fanno Creek Place Bldg B Page: BUILDING ENVELOPE - GENERAL Check all boxes 1. Exceptions (Section 1312) that apply. ❑ No Envelope Components. The building plans do not call for new or altered building envelope components, e.g., walls, floors or roof /ceilings. ❑ A Non - conditioned Building. The proposed structure has no spaces heated or cooled by an HVAC system. Exceptions ❑ Exception. All new or altered building envelope components do not comply with the Discussion of qualifying requirements, Section 1312, but qualify for Exception: 0 0-2 0-3 0 0-5 exceptions in Portions of the building that qualify: instructions section. Plans /Specs Show compliance by The plans /specs show compliance in the following locations: , including a drawing sheet, detail number, 2. Air Leakage (Section 1312.1.1) and su bsection p subparagraph. 9 Complies. Plans require penetrations in building and /or subparagraph. P � P 9 envelope are sealed and windows and doors are caulked, gasketed or weatherstripped. The plans /specs show compliance in the following locations: Sheet A0.2, details on sheets !2.6 & A3.2 and D5/A5.3 - spec section 07 9200 3. Suspended Ceiling (Section 1312.1.2.1) 9 Complies. Building plans do not show suspended ceilings used to separate conditioned space from unconditioned space. No exceptions permitted. 4. Recessed Light Fixtures (Section 1312.1.2.2) El Complies. The building plans do not show recessed light fixtures installed in ceilings separating conditioned spaces from unconditioned spaces. ❑ Exception. The building plans require that fixtures installed in direct contact with insulation be insulation coverage (IC) rated. The plans /specs show compliance in the following locations: 5. Moisture Control (Section 1312.1.4) 0 Complies. A one -perm vapor retarder is installed on the warm side (in winter) of all exterior floors, walls and ceilings, and a ground cover installed in the crawl space of both new and existing buildings where insulation is installed. The plans /specs show compliance in the following locations: Sheet A0.2, details on sheets !2.6 & A3.2 and D5 /A5.3 - spec section 07 2616 ❑ Exception. All new or altered building envelope components do not comply with the vapor retarder requirements of the code, but qualify for an exception. Note applicable exception. Section 1312.1.4, Exception: 0 -1 0-2 Portions of the building that comply: Climate 6. Climate Zones Zones 0 Zone 1 - A building site is in Climate Zone 1 if its elevation is less than 3000 feet above sea level and it is in one of the following counties: Benton, Columbia, Clackamas, Clatsop, Coos, Curry, Douglas, Jackson, Josephine, Lane, Lincoln, Linn, Marion, Multnomah, Polk, Tillamook, Yamhill, or Washington. } ❑ } Zone 2 - Building sites not in Zone 1, or where construction site elevation is 3000 feet or �Y ,f higher in Zone 1, are in Zone 2. 3 -1 Compliance with OSSC, effective 01/01/05 4, ' Form 3b Project Name: Fanno Creek Place Bldg B Page: PRESCRIPTIVE PATH Part 1 of 4 CLIMATE ZONE 1 Exterior Wall Window Area Area Glazing Maximum Glazing • (total rough frame ft2) (gross ft2) % Fraction Complies Glazing Conditioned 10,790 + 27,900 X 100 = 38.7% Yes Percent Space Calc- $emi- ulation Conditioned + X 100 = Yes Space See instruction section for a Conditioned discussion of Mechanical t X 100 = Yes glazing percent Penthouse calculation Windows Window Max Minimum Window Shading Minimum From Work (from Worksheet 3d) U- Factor' Assembly (from Worksheet 31) Coefficient Assembly sheet 3d, place PPG - 0.290 ❑ PPG - 0.340 ❑ the highest Overall Window U - Value Complies Yes SC Complies Yes U- factor and highest Center - of Required Minimum Glass SC. Or Assembly (Fixed N/A Required Minimum N/A check minimum Windows) Assembly assembly and identify window. Required Mini- mum Assembly (Operable N/A Windows and Curtainwall) The plans/specs show window compliance in the following locations: Section 08 8000 . Notes 'From Worksheet 3d, place the highest Overall Window U -factor or check (Minimum Assembly) See "Window Requirements" in table on the following page for specific MA requirements. Excel version will automatically insert minimum assembly requirements or greatest U -value from Worksheet 3d. 2 From Worksheet 3d, place the highest "center-of-glass" shading coefficient (SC) for glass or check MA (Minimum Assembly). See "Window Require- ments" in following table for specific MA requirements. Excel version will automatically insert minimum assembly requirements or greatest SC from Worksheet 3d. Shading Coefficient (SC) can be calculated from Solar Heat Gain Coefficient using the equation. SC = SHGC + 0.87. Manufacturers data may also be used to document SC. Walls R -Value Wall / Insulation Type rr R - or Insulation Only U - Factor See instructions I Masonry or concrete, wfinterior insulation - J I for a discussion of wall require- ments. J or J or I J or I J or I J or Below- R Value Grade Walls . Insulation Only U- Factor See instructions Below - Grade Walls (Min. R -7.5) (Max. 0.11) for a discussion of or ;.s, � requirements. . ' `'s„ i 4-r pe Notes 3 Submit Worksheet 3a for each calculated assembly U- factor 3 -2 Compliance with OSSC, effective 01/01/05 Form 3b Project Name: Fanno Creek Place Bldg B Page: PRESCRIPTIVE PATH Part 2 of 4 Code Requirements - Zone 1 Discussion of these requirements in the instruction section. ZONE 1 Wall Requirements Window Requirements Max. Max. Glazing R -Value Shading Fraction Wall / Insulation Type Insulation Only U- Factor Max. U- Factor Coefficient Up to 15% CMU 'Masonry w/integral loose fill insulation N/A or 0.300 0.540 0.57 Masonry or concrete 5 , w /cunt. exterior insulation 1.4 or 0.300 CMU Masonry w/integral rigid fill insulation N/A or 0.210 Masonry or concrete wfinterior insulation 11 or 0.130 Up to 30% Masonry or concrete w /cont. exterior insulation 2.8 or 0.210 0.540 0.57 Frame (wood or metal framing) 13 or 0.130 Other (provide short description) 13 or 0.130 CMU Masonry wrintegral rigid fill insulation N/A or 0.210 Masonry or concrete wfinterior insulation 11 or 0.130 Up to 40% Masonry or concrete w /cunt. exterior insulation 2.8 or 0.210 0.37010 0.3570 Frame (wood or metal framing) 13 or 0.130 Other (provide short description) 13 or 0.130 Code Requirements - Zone 2 Discussion of these requirements in the instruction section. ZONE 2 Wall Requirements Window Requirements Wall / Insulation Type Max. Max. Glazing R -Value U- Factor Max. U- Factor Shading Fraction Insulation Only Coefficient Up to 15% CMU 'Masonry wrintegral loose fill insulation N/A or 0.300 0.500 71 0.57 11 Masonry or concrete w /cont. exterior insulation 1.8 or 0.270 CMU Masonry w/integral rigid fill insulation N/A or 0.160 Masonry or concrete wfinterior insulation 13 or 0.090 Up to 25% Masonry or concrete w /cont. exterior insulation 4.3 or 0.160 0.500 0.57 Frame (wood or metal framing) 19 or 0.090 Other (provide short description) 19 or 0.090 CMU Masonry w/integral rigid fill insulation N/A or 0.160 Masonry or concrete w/interior insulation 13 or 0.090 Up to 33% Masonry or concrete w /cunt. exterior insulation 4.3 or 0.160 0.370 0.43 Frame (wood or metal framing) 19 or 0.090 Other (provide short description) 19 or 0.090 Notes 4 The Simplified Trade-off Approach must be used if glazing fraction exceeds allowable percentages 5 Minimum weight of masonry and concrete walls = 45 lb/ft2 of wall face area 6 All cores to be filled At least 50% of cores must be filled with vermiculite or equivalent fill insulation 7 Prescriptive MA (Minimum Assembly) - For Fixed Windows: double -glazed window with a 0 5 inch air space, low-e coating and aluminum frame MA shading coefficient descnption is a tinted outboard pane of glass. For Operable Windows or Curtainwall: double - glazed window with a 0 5 inch air space, low-e coating and thermally broken frame MA shading coefficient description is a tinted outboard pane of glass. 8 All cores except bond beams must contain rigid insulation inserts approved for use in reinforced masonry walls 8 Batt insulation installed in metal or wood frame walls shall be insulated to the full depth of the cavity, up to 6 inches in depth. 10 Prescriptive MA (Minimum Assembly) - For Fixed Windows: double-glazed window with a 0.5 inch argon filled space, low-e coating (e <= 0 05) and thermal break frame. For Operable Windows or Curtainwall: only use Max U- Factor. MA shading coefficient description is a 0.25 -inch thick glass with low-e coating (e<= 0.05) with a tinted outboard pane. 11 Prescriptive MA (Minimum Assembly) - For Fixed Windows: double- glazed window with a 0.5 inch air space, low-e coating and aluminum frame. For Operable Windows or Curtainwall: double- glazed window with a 0.5 inch air space, low-e coating (e <= 0.1) and thermally broken frame. MA alas& maximum with lowo shading coatino coeffife<= cient 0 051 description is a tinted outboard pane of glass. r0 .7. 12 Prescriptive MA (Minimum Assembly) - For Fixed Window°, a double- glazed window with a 0 5 inch argon filled space, lav -a coating (e<= 0.05) A and thermal break frame. For Operable Windows or Curtainwall, only use Max U-Factor. MA shading coefficient description is a 0.25 inch thick 3 -3 Compliance with OSSC, effective 01/01/05 • Form 3b Project Name: Fanno Creek Place Bldg B Page: PRESCRIPTIVE PATH Part 3 of 4 Roofs/ R -Value 72 Ceilings Insulation Only U- Factor g Roof / Ceiling" (Min. R -19) (Max. 0.050) See instructions Built up roofing R -19 or for a dicussion of P g roofs/ceilings Notes 11 Write -in a short description for assembly with the lowest insulation R -value or the highest assembly U- factor 12 Submit Worksheet 3b for each calculated roof /ceiling assembly U- factor Skylight Area Roof Area Skylight Maximum Skylight (total rough frame ft2) (gross ft2) % t3 Fraction Complies Skylights Conditioned X 100 = N/A Includes glazed Space smoke vents. Semi - See instructions Conditioned + X 100 = N/A for a dicussion of Space skylights. Conditioned Mechanical + X 100 = N/A Penthouse Skylight Area Roof/Ceiling Area Skylight (total rough (gross ft2) Percent" frame ft2) Skylights Skylights Max Minimum Skylights Shading Minimum From Worksheet (from Worksheet 3d) U- Factor' Assembly (frorn worksheet 3a) Coefficient Assembly 3d, place highest Overall Vertical #N/A - ❑ #N/A - N/A Window U -factor and highest U Complies Yes SC Complies Yes Center - of - Glass SC Required Minimum N/A Required Minimum N/A (must use SC) Assembly Assembly The plans /specs show window compliance in the following locations: NA Code Compliance Thermal Performance Shading Coefficient Require- Option Overall Vertical U Factor Center of Glass SC Performance U -1.230 for overall assembly in overhead plane SC-0.47 center -of -glass meats Min. Assembly Double glazed, 0.5 -inch airspace N/A (MA) Notes 13 Skylight percentage area is based on total skylight and smoke vent rough frame area divided by total conditioned roof area. Percentage must not exceed 6 percent of total roof /ceiling area in conditioned building space. The Simplified Trade-off Approach must be used if glazing fraction exceeds allowable percentages. 14 From Worksheet 3d, place the highest Overall Vertical U- factor or write -in MA (Minimum Assembly). See "Skylight Requirements" in table above for specific MA requirements. 15 From Worksheet 3e, place the highest "center-of -glass" shading coefficient (SC) for glass. See "Skylight Requirements" in table above for specific MA requirements. Shading Coefficient (SC) can be calculated from the Solar Heat Gain Coefficient using the equation: SC = SHGC * 0.87. Manufacturers data may also be used to document SC. 3 Compliance with OSSC, effective 01/01/05 . Form 3b Project Name: Fanno Creek Place Bldg B Page: PRESCRIPTIVE PATH Part 4 of 4 Floors tio See instructions 1e R l n O for a dicussion Floors over Unconditioned Spaces Insulation Only U Factor of floors. NA or Heated Concrete Slab Edge R - Value Insulation Only NA Heated Slab -on -Grade (Section 1312.1.2.4) ❑ Complies. Building plans show insulation extending downward from the top of the slab a minimum distance of 24 inches or downward and under the slab for a combined minimum distance of 24 inches or to the bottom of the thickened edge of the of slabs used as a foundation. The plans /specs show compliance in the following locations: Notes 16 Write -in a short description for assembly with the lowest insulation R -value or the highest assembly U- factor. 17 Submit Worksheet 3c for each calculated floor assembly U- factor. 18 Write -in a short description for Heated Slab, which has heat, integrated into slab such as hydronic heat If more than one floor type, enter the lowest insulation R -value or the highest component U -factor of any floor. Code Compliance Options Require- Min. R -Value Max. U- Component Insulation Only Factor meats Floor over Unconditioned Spaces I 11 I or I 0.070 Climate Climate Component Zone 1 Zone 2 Heated Concrete Slab Edge, Min. R -Value I 7.5 I or I 10.0 Doors R -Value U- Factor See instructions Doors Insulation Only Center-of -Panel for a dicussion of opaque, with leaf width greater than 4' (Min. R -5) (Max. 0.20) doors. NA a I Notes 79 Wnte -in a short description for Doors. If more than one door type, enter the lowest insulation R -value or the highest center -of- panel U -factor of any door. The following doors are exempt from door and window U -factor and shading coefficient requirement ;,t-s...10;,, Lam P . f 3 -5 Compliance with OSSC, effective 01/01/05 Worksheet 3d Project Name:IFanno Creek Place Bldg B J Page' Window Schedule Window Properties • List All Window Types In Project (a) (b) (c) (d) - (a) (I) (0) (h) W ID (u Madded. Center of Overall Center of Documentation urefs Model! Window Frame Glass Glass Window Glass Name Sovroe No. Tvoe/Class Type _ QJattIInI T!ld -tea Other he_parre!,alLsesoe prgog,Lova)_ _ Al-factor U - factor SC , PPG - ASHRAE Dotard W/ Mfg COO U-Value a SC . VLtiacool (2) Curtalnwar Akedrum with Thermal Sra Sluepreen 1 /1• = Dotb a Glazing 12' airspace e.0 05 on surface 2 029 0.34 _ Axurle ASHRAE Default WI Mlp COG lJ -Value 8 SC Vistatool (2) Fined Aluminum wen Thermal Break T Bknpresn 1H• _ I Double Glazing 1/Y airspace e•l1 1 on surface 2 029 0.34 PPG - Azuda J _ J ! I J J _ 1 =1 { - J 1 7 . J J a 5 , J I J A 5 , :1 J H J J _ : :1 Column bntruetlons (a) Enter the name of the window product It Is recommended that you choose a name that corresponds with that used on project plans and specifications. (b) Provide documentation source. Write- in 'NFRC' If window Is rated through NFRC 100-97 Procedure for Determining Fenestration Product Themral Performance. Enter all columns except (I) Wme- In'ASHRAE Default W/Mfg COG' If Center -of -Glass U -factor and Shading Coeffidem Is available from glass manufacturer. Enter all columns. Columns (I) and (k) from manufacturers data sheet. Write-In 'ASHRAE Default" If only descriptive parameters of window are known. Enter all columns Columns (p, (1), and (k) from ASHRAE default table (e) If Document Source is either "NFRC' or 'ASHRAE Default W/Mfg COG.' enter the manufacturers model number. (d) Choices ere Fixed. Oparade. or Curtain Wall. (a) Choices are wood, vinyl, reinforced vinyl, aluminum dad, Insulated fiberglass, aluminum, aluminium w/thermal break (see definitions for thehnal break requirements.) (f) Enter glass (Int Write "deaf If there Is no tint (9) Enter glass thldrness (h) Include window properties such as argon fill. low-a coating, insulating spacer,, etc. (q COO U -factor from manufacture's data or ASHRAE 2001 Fundamentals Handbook, Chapter 30, Table 4. For NFRC rated products leave blank (I) Overall U - factor from NFRC rating orASHRAE 2001 Fundamentals Handbook. Chapter 30, Table 4 For skylights value must be for horizontal position (It) COO Shading Coeffldent from manufacture's data or ASHRAE 2001 Fundamentals Handbook, Chapter 30, Table 4 For NFRC rated products SHGC Is provided To convert SHGC to SC. SC r, SHGCIO 87. 3-11 =orm 4a Project Name: 3553 FANNO CREEK B Page: 1 SYSTEMS - GENERAL Applicability Plans/ Specs Discussion of qualifying Show compliance by including a drawing sheet, detail number, exceptions on page 4 -25 specification section and subparagraph. 1. Applicablity (Section 1317) Is this form required? El Form Required. Complete form if a new HVAC system is being installed, or components of an existing HVAC system are being replaced (I.e., equipment, controls, ductwork, and insulation.) ❑ Exception. The building or part of the building qualifies for an exception from HVAC code requirements. Applicable code exception is Section 1317.1. Portions of the building that qualify: Area: Exception ❑ - El - CI -3 Area: Exception ❑ -1 El -2 ❑ -3 Exception El - CI -2 CI -3 Area: ❑ Form Not Required. This project does not contain work required to comply with code. 2. Simple or Complex Systems (Section 1317.9 or 1317.10) El Simple System. Building contains only Simple HVAC System(s). Complete this form (4a) and equipment efficiency worksheets as required. Form 4b is not required. Complex System. Project includes a Complex System. Complete this form (4a), form 4b and equipment efficiency worksheets as required. 3. Equipment Performance (Section 1317.5) ❑ No New HVAC Equipment. The building plans do not call for new electrical HVAC equipment, combustion heating equipment, or heat - operated cooling equipment. o Complies. All new HVAC equipment have efficiencies not less than those required by code. The following equipment efficiency worksheets are attached: GI -4a ❑ -4b ❑ -4c ❑ -4c ❑ -4e ❑ -4f ❑ -4g ❑ -4h ❑ -41 ❑ -4 4. Duct Insulation and Sealing (Sections 1317.7 & 1317.8) ❑ No Ducts. The building plans and specifications do not call for new HVAC ducts or plenums. is Complies. The plans and specifications call for all air - handling ducts and plenums to be insulated and sealed as reauired by Sections 1317.7 &1317.8. 5. Distribution Transformers (Section 1316.1) El No Distribution Transformers. The plans /specs do not call for new distribution transformers. ❑ Complies. All new distribution transformers comply with efficiency, testing, and labeling requirements of Section 1316.1.1. ❑ Exception. The project qualifies for an exception per Section 1316.1.1, Exceptiion: 0 -1 0 -2 0 -3 0 -4 0 -5 ❑-s 0 -7 ❑-s ❑ -s ❑ -io 0 -1 0 - 120 -12 0 -14 Attach relevant documentation for appropriate exception. The plans /specs show compliance in the ,f ... following locations: 4 -1 April 2005 Compliance with OSSC, effective 01/01/05 • Form 4a Project Name: 3553 FANNO CREEK B Page: 3 SYSTEMS - GENERAL 7. Economizer Cooling (Section 1317.3) ❑ No Cooling. The building plans do not call for a new fan system with mechanical cooling. Complies. Each new fan system has an air economizer capable of modulating outside -air and return -air dampers to provide up to 100 percent of the design supply air as outside air. ❑ Exception At least one new fan system qualifies for an exception. The applicable code exception is Section 1317.3, Exception ❑ -1 ❑ -2 ❑ -3 ❑ -a ❑ -5 ❑ -6 If Exception 3 is selected complete the following: (a) Total cooling capacity of exempt units (Btu /hr) (b) Total installed building cooling capacity (Btu /hr) El Complies. Sum of exempt units rated at less than 54,000 Btu /hr is <240,000 Btu /hr or a/b < 0.10 (10% of total building cooling capacity). Unit Identifier of exempt units: The plans /specs show compliance in the following locations: M1 8. Economizer Pressure Relief & Integration (Section 1317.3.1 and 1317.3.2) ❑ No Economizers Required. Project does not contain a new fan system requiring economizers. ❑ Overpressurization Complies. The drawings specifically identify a pressure relief mechanism for each fan system that will relieve the extra air introduced by the economizer. El Integration Complies. Economizer is capable of providing partial cooling even when additional mechanical cooling is required to meet the remainder of the cooling load. ❑ Exception. The applicable exception is Section 1317.3.2, Exception ❑ -1 ❑ -2 The plans /specs show compliance in the following locations: 9. Hot Gas Bypass (Section 1317.5) E No Hot Gas Bypass ❑ Complies. See allowable amount of hot gas bypass as a percentage of total cooling capacity in table below. Unit ID Rated Cooling Capacity Hot Gas Bypass Capacity Allowable Hot Gas Bypass Rated Cooling Capacity Max Hot Gas Bypass <240,000 Btu /hr 50% >240,000 Btu /hr 25% ❑ Exception. Unitary packaged system with cooling capacity no greater than 90,000 Btu /h = 4 -3 April 2005 Compliance with OSSC. effective 01/01/05 Form 4a Project Name: 3553 FANNO CREEK B Page: 4 SYSTEMS - GENERAL 10. Shutoff Dampers (1317.4.3.3) ❑ Not Required. Shutoff dampers are not required on this project. o Complies. Each outdoor air supply & exhaust system shall be equipped with motorized dampers. ❑ Exception. The building qualifies for an exception to the motorized damper requirement. The applicable code exception is Section 1317.4.3.3 Exception ❑ -1 ❑ -2 ❑ -3 ❑ - ❑ -5 ❑ -6 The plans /specs show compliance in the following locations: 10.1. Shutoff Damper Controls (Section 1317.4.3.3.1) El Complies. Outdoor air supply and exhaust systems shall be provided dampers that automatically shut when systems or spaces served are not in use or during building warm -up, cooldown, or setback. ❑ Complies. Stair and shaft vents are capable of being automatically closed during normal building operation and interlocked to open as required by fire and smoke detection systems. The plans /specs show compliance in the following locations: M10 10.2. Motorized Damper Leakage (1317.4.3.3.2) El Complies. Motorized outdoor air supply and exhaust air dampers have a maximum leakage rate of 4 cfm /ft2 at 1.0 in w.g. when tested in accordance with AMCA Standard 500 -1998. ❑ Exception. Packaged HVAC equipment may have maximum leakage rate of 20 cfm /ft at 1.0 in w.g. when tested in accordance with AMCA Standard 500 -1998. The plans /specs show compliance in the following locations: M10 11. Piping Insulation (Section 1314) El No New Piping. The building plans and specifications do not call for new piping serving a heating or cooling system or part of a circulating service water heating system. ❑ Complies. All new piping serving a heating or cooling system or part of a circulating service water heating system complies with the requirements of the Code, Section 1314.1. ❑ Exception. New piping qualifies for exception: Section 1314.1, Exception ❑ -t ❑ -2 12. Occupancy Ventilation El Complies. Mechanical ventilation systems provide the required amount of ventilation is indicated in plans /specifications as specified in Chapter 4 of the Oregon Mechanical Specialty Code. ❑ Complies. Natural ventilation systems provide required amount of ventilation as certified by a reg- istered architect or engineer as specified by Section1203.4.1, Exception. Attach worksheet 4m. The plans /specs show compliance in PRESCRIPTIVE: OFFICE SHELL OSA @ 30% UNIT the following locations: CAPACITY The plans /specs show compliance . r on the following pages: 4 -4 April 2005 Compliance with OSSC, effective 01/01 /05 • Form 4a Project Name: 3553 FANNO CREEK B Page: 5 SYSTEMS - GENERAL 13. High Occupancy Ventilation (Section 1317.2.2) ❑ Complies. HVAC systems with ventilation air capacities of 1,500 CFM or greater that serve areas having an average occupant load of 20 square feet per person or less from Table 1004.1.2 have a means to automatically reduce outside air intake. Identify applicable systems: Plans /specs indicate where equipment (i.e. carbon dioxide sensor) and sequence is specified: ❑ Exception. HVAC systems are equipped with an energy recovery device with at least 50% recovery effectiveness. ❑ No High Occupancy Systems. Project does not contain an HVAC system as described above. 14. Exhaust Air Heat Recovery (Section 1318.3) 2 Not Regulated. HVAC system does not have: 1) design supply air cap. of >10,000 cfm, and 2) min. outside air supply >70 %, and 3) at least 1 exhaust fan rated at 75% of min outside air supply. ❑ Complies. Heat recovery system increases outside air temperature by 20 °F (Climte Zone 1) or 30 °F (Zone 2) and has provision to provide bypass during air economizer mode. ❑ Exception. An HVAC system qualifies for an exception to this requirement. Applicable exception from Section 1318.3 Exception 0- 0-2 0-3 0-4 0-5 0-6 ❑ -7 The plans /specs show compliance in the following locations: 15. Large Volume Fan Systems (Section 1318.4.2.4) • Not Regulated. The building plans or specifications do not call for fan systems over 15,000 CFM that serve a single zone and function for the purpose of temperature control. ❑ Complies. Fan systems are equipped with variable frequency drive or two speed motor to reduce airflow as required by Section 1318.4.2.3. The plans /specs show compliance in the following locations: 16. Variable Speed Drives (Section 1317.10.3.1) • Not Regulated. The building plans or specifications do not call for fan and pump motors 10 horsepower and greater that serve variable -flow air or liquid systems. ❑ Complies. All fan and pump motors 10 hp and greater which serve variable -flow air or liquid systems are controlled by a variable -speed drive. ❑ Exception. The building qualifies for an exception to the variable -speed drive requirement. Portions of the building that qualify: Applicable code exception is Section 1317.10.3.1, Exception The plans /specs show compliance in the following locations: 17. Service Water Heating (Sec. 1315) • No New Water Heating. The building plans and specifications do not call for new water heaters, hot water storage tanks or service hot water distribution systems. ❑ Complies. All new water heaters, hot water storage tanks or service hot water distribution systems comply with the requirements of the Section 1315. p Exception. The applicable code exception is Section: Exception: Portions of the building that qualify: Y The plans /specs show compliance in the following locations: 4 -5 April 2005 Compliance with OSSC, effective 01/01/05 10 • Form 4a Project Name: 3553 FANNO CREEK B Page: 6 SYSTEMS - GENERAL 18. Swimming Pools, Spas and Hot Tubs (Section 1315.5) G No New Pools. The building plans and specifications do not call for new, swimming pools, spas or hot tubs. 111 On /Off Controls Complies. Spa and hot tub heaters are equipped with a readily accessible ON /OFF switch as required by Section 1315.5.1. ❑ Ventilation Controls Complies. Pool ventilation system is controlled based on humidity. CI Cover Complies. All heated pools, hot tubs and spas are equipped with a cover. El Heat Recovery Complies. Pools, Spas, and hot tubs, over 200 ft utilize recovered heat as required by Section 1315.5.3. ❑ Exception. Heat recovery is not necessary as pool is heated by renewable energy or waste heat recovery sources capable of providing at least 70 percent of the heating energy required over an operating season. 19. Fume Hoods (Section 1317.2.1.) El No Fume Hoods. The building plans do not call for fume hood systems that have a total exhaust rate greater than 15,000 cfm. El Complies. Fume hood systems have at least one of the following features: ❑ Variable air volume hood exhaust and room supply systems capable of reducing exhaust and makeup air volume to 50% or less of design values. ❑ Direct makeup (auxiliary) air supply equal to at least 75% of the exhaust rate, heated no warmer than 2° F below room set point, cooled no cooler than 3° F above room set point, no humidification added, and no simultaneous heating and cooling used for dehumidification control. ❑ Heat recovery systems to precondition makeup air from fume hood exhaust in accordance with 1318.3 - Exhaust Air Energy Recovery, without using any exception. The plans /specs show compliance in the following locations: 20. Parking Garage Ventilation (Section 1317.2.3) 0 No Enclosed Garages. The building plans and specifications do not call for enclosed Group S -2 parking garages with a ventilation exhaust rate greater than 30,000 CFM. ❑ Complies. The plans and specifications call for carbon monoxide sensing devices as required by Section 1317.2.3. ❑ Exception. Open parking garages. 21. Kitchen Hoods (Section 1317.11) El Not Regulated. The plans /specs do not call for any new kitchen hoods with exhaust capacity greater than 5,000 cfm each. El Complies. All new kitchen hoods with a total exhaust capacity greater than 5,000 cfm have at least 50 percent of the required makeup air; (a) unheated or heated to no more than 60 °F; and (b) uncooled or evaporatively cooled. ' ' T he p lans /specs show compliance in the following locations: 22. Outside Heating Systems (Section 1317.12) El No Outside Heating Systems. The plans /specs do not call for new permanently installed heating systems outside the building. ❑ Complies. All new permanently installed outside heating systems are radiant gas fired systems controlled by an occupancy sensor or timer switch as required by Section 1317.12. 4 -6 April 2005 Compliance with OSSC. effective 01/01/05 . Form 4b Project Name: 3553 FANNO CREEK B Page: ` '7 COMPLEX HVAC SYSTEMS Applic 1. Simple or Complex Systems (Section 1317.9, 1317.10 and 1318) ability Note: This form is required for complex systems only. If your plans qualify as a simple system Discussion of as defined by the code, this form is not required. qualifying excep- tions in instructions 2. Air Transport Energy (Section 1318.4.2) section. ❑ Not Regulated. Each HVAC system does not have total fan nameplate horsepower of 7.5 HP Fan Motor or greater (include sum of all supply, return, & exhaust fans operating at design conditions). Energy ❑ Brake Horsepower Complies. The energy demand of all HVAC fan systems meets code See Section requirements. Complete and attach Worksheet 41. 1318.4.2 for q p maximum horse- 0 Nameplate Horsepower Complies. Selected fan motors have nameplate ratings no larger power allowed. than is allowed by Section 1218.4.2.3. (Complete Worksheet 4L.) ❑ Exception. Section 1318.4.2, Exception ❑.i 0 -2 0 -3 0-4 Portions of the building that qualify: The plans /specs show compliance in the following locations: M1 Cooling 3. Cooling Tower Fans (Section 1317.5.4.1) Tower 0 No Cooling Tower There is no cooling tower in this project. Fans ❑ Complies. Cooling tower fans have control devices that vary flow by controlling leaving fluid temperature or condenser temperature /pressure of the heat rejection device. The plans /specs show compliance in the following locations: 4. Simultaneous Heating and Cooling (Section 1318.2.1) ❑ No Cooling. The building HVAC system has no cooling. ❑ Complies. Controls prevent reheating, recooling or mixing of mechanically heated and mechanically cooled air. O Exception. Code exception is Section 1318.2.1, Exception 0 - 0 -2 0 -3 0 -4 0 -5 If exception 1 is used, complete and attach Worksheet 4k Portions of the building that qualify: ALL The plans /specs show compliance in Ml the following locations: 5. Electric Motor Efficiency (Section 1317.10.3 & Table 13 - T) ❑ Not Regulated. There are no NEMA Design A &B squirrel cage,T -frame induction, permanently wired polyphase motors of one horsepower or more which serve built up HVAC systems. O Complies. The efficiency of all regulated motors meets code requirements. Exceptions ❑ Exception. Section 1317.10.3, Exception ❑ -t 0-2 Discussion of qualifying Portions of the building that qualify: exceptions in instructions section. The plans /specs show compliance in the following locations: 6. VAV System Static Pressure Reset Controls (Section 1318.2.3) ❑ Not Regulated. The building plans or specifications do not call for a VAV system controlled by a static pressure sensor or direct digital control of individual zone boxes. El Complies. The system static pressure set point automatically resets to the lowest point * possible while still providing the required air flow to the zones with the greatest demand. ti ,ni , ❑ Exception. Section 1318.2.3, Exception ``' The plans/specs show compliance in r-- the following locations: 4 -7 April 2005 Compliance with oSSC, effective 01/01/05 Form 4b Project Name: 3553 FANNO CREEK B Page: I 8 . COMPLEX HVAC SYSTEMS 7. VAV Terminal Units (Section 1317.4.2.1) ❑ Not Regulated. Project does not contain VAV terminal units. O Complies. VAV terminal units are programmed to operate at the minimum airflow setting without addition of reheat when the zone temperature is within the set deadband. Complete Worksheet 4k. ❑ Exception. Section 1317.4.2.1, Exception 0 - 0 -2 The plans /specs show compliance in the following locations: 8. Supply - Air Temperature Reset Controls (Section 1318.2.5) ❑ Not Regulated. The building plans or specifications do not call for multiple zone HVAC systems. O Complies. Multiple zone HVAC systems include controls that automatically reset the supply -air temperatures in response to building loads or outside air temperature. ❑ Exception. The building qualifies for an exception to the supply -air reset controls requirement. Applicable code exception is Section 1318.2.5, Exception ❑ -1 0 -2 0 -3 Portions of the building that qualify: The plans /specs show compliance in the following locations: 9. Chilled and Hot Water Temperature Reset Controls (Section 1318.2.4) El Not Regulated. The building plans or specifications do not call for chilled or hot water systems with a design capacity exceeding 300,000 Btu /hr. ❑ Complies. Chilled and hot water systems include controls that automatically reset supply water temperatures by representative building loads or by outside air temperature. ❑ Exception. Section 1318.2.4, Exception 0 -1 0 -2 Portions of the building that qualify: The plans /specs show compliance in the following locations: 10. Separate Air Distribution Systems (Section 1318.2.7) El Not Regulated. The building plans or specifications do not call for zones with special process temperature or humidity requirements. ❑ Complies. Separate air distribution systems serve zones with special process temperature or humidity requirements from those zones serving only comfort conditions, or supplementary control provisions are included so primary systems are specifically controlled for comfort purposes only. ❑ Exception. Section 1318.2.7, Exception 0 - 0 -2 Identify zones with special process requirements: The plans /specs show compliance in the following locations: 11. Zone Isolation Controls (Section 1318.2.6) ❑ Not Regulated. Building plans or specifications do not call for HVAC systems serving multiple occupancies or floors with >240,000 Btu /hr cooling capacity, or > 300,000 Btu /hr heating capacity. O Complies. HVAC systems serving multiple occupancies or floors with > 240,000 Btu /hr cooling capacity, or >300,000 Btu /hr heating capacity are equipped with isolation devices capable of automatically shutting off supply air to and from each isolated area. Each isolated area is controlled independently and satisfies temperature setback (Section 1317.4.2) and optimum start control requirements. Central fan system air volume is reduced through fan speed reduction. The plans /specs show compliance in the ,/ v. following locations: M2, M3, M4 c _. y 4 -8 April 2005 Comohance with OSSC" effective 01/01/05 Form 4b Project Name: 3553 FANNO CREEK B Page: 9 COMPLEX HVAC SYSTEMS 12. Humidity Controls (Section 1318.2.2) El No Moisture Added to Building. The building plans do not call for means to add moisture to maintain specific humidity levels. ❑ Complies. All new humidity control systems equipped with a humidistat when required. All humidifier preheating devices have an automatic value to shut off preheat when humidification is The plaris /specs show compliance in ' the following locations: 13. Hydronic System Controls (Section 1318.2.8) • No Hydronic System. The building plans or specifications do not call for a new hydronic system. ❑ Complies. The hydronic system complies as follows: • 13.1 Variable Flow, Controls (Section 1318.2.8.4) ❑ System does not have a 10 hp or greater motor ❑ Complies. System has controls capable of varying pump flow The plans /specs show compliance in the following locations: - 13.2 Three -Pipe System (Section 1318.2:8.1) ❑ System does not have a common return system (a three -pipe system) for both hot water . and chilled," water. • 13.3 Two -Pipe Changeover System (Section 1318.2.8.2) ❑ System is not a Two -Pipe Changeover System ❑ Complies. System is: a. Designed to allow :a deadband between changeover from one mode to the other of at least 15 °F outside air temperature. b. Designed to operate and provided with controls that will allow operation in one mode for at least four hours before changing over to the other mode. c. Provided with reset controls that allow heating and cooling supply temperatures at the changeover point to be no more than 30 °F apart. The plans /specs show compliance in the following locations: - 13.4 Hydronic (Water Loop) Heat Pump System (Section 1318.2.8.3) ❑ System is not a Hydronic (Water Loop) Heat Pump System ❑ Complies. Hydronic heat pumps connected•to a common heat pump water loop with central devices for heat rejection (e.g., c ooling tower) and heat addition (e.g., boiler) have the following: a. Controls installed capable of providing a heat pump water supply temperature deadband of at least 20 °F between initiation of heat rejection and heat addition by the central devices (e.g., tower and boiler). b. Closed- circuit tower (fluid cooler) has either an automatic valve installed to bypass all but a minimal flow of water around the tower (for freeze protection), or low- leakage positive closure dampers. c. Open- circuit tower installed directly in the heat pump loop has an automatic valve installed to bypass all heat pump water flow around the tower. Open - circuit towers used in conjunction with a separate heat exchanger to isolate the tower from the heat pump loop are controlled by shutting down the circulation pump on the cooling tower loop. d. A two- position valve at each hydronic heat pump for hydronic systems 410. having a total pump system power exceeding 10 hp. V .- ;; ;:i The plans /specs show compliance in the following locations: �..::.;{ .✓. .! V !"rn, .. ,. ; -[. .. t.i. : - ,..,.;� .., ,,.',. ?a,: i. r...,.a. `a4 a, �'... .- - ':r ... r.Y -a.., or,,.iL'. _. ., •,,:.r ',. ... r, <� ..,. .e :� , 4 -9 April 2005 Compliance with oSSC. effective 01/01/05 <`r • Worksheet 4a Project Name: 3553 FANNO CREEK B Page: 06 UNITARY AIR CONDITIONER - AIR COOLED Equipment (a) (b) ( c) (d) (e) Proposed Performance Discussion of equipment Cooling Seasonal or Compliance ratings and equipment Equip. ID Model Designation Capacity Steady State Part Load Schedule (A -E) definitions on page 4 -19. RTU -1 SFHGC754 835,830 9.4 C RTU -2 SFHGC754 835,830 9 4 C ANI\col msy A24NA- 22000 I la B Required Indicate source of information Document- ❑ ARI Unitary Directory, Section AC, page: ation ❑ ARI Applied Products directory, Section ULE, page: 0 Product data (Attach data furnished by the equipment supplier, I.e , "cut sheets ") Code Required Cooling Capacity (btu /hr) Minimum Rating Efficiencies Compliance Seasonal or Schedule Equipment Type Over But not over - Steady State Part Load 0 65,000 na 9.7 SEER Single Package Without a 65,000 135,000 10.3 EER n/a This schedule of equip- A Heating Section or With Electric 135,000 240,000 9.7 EER n/a ment efficiencies was Resistance Heat 240,000 760,000 9.5 EER 9.7 IPLV reformatted from code, 760,000 - 9.2 EER 9.4 IPLV Table 13 - L. 0 65,000 na 10 SEER Split System Without a Heating 65,000 135,000 10.3 EER n/a B Section or With Electric 135,000 240,000 9.7 EER n/a Resistance Heat 240,000 760,000 9.5 EER 9.5 IPLV 760,000 - 9.2 EER 9.2 IPLV 0 65,000 na 9.7 SEER Single Package With a Heating 65,000 135,000 10.1 EER n/a C Section Other Than Electric 135,000 240,000 9.5 EER n/a Resistance 240,000 760,000 9.3 EER 9.5 IPLV 760,000 - 9.0 EER 9.2 IPLV sit: 0 65,000 na 0 10 SEER �'^ Split System With a Heating _ 65,000 135,000 10.1 EER n/a Or ii '7..15 c. - D Section Other Than Electric 135,000 240,000 9.5 EER n/a Resistance 240,000 760,000 9.3 EER 9.7 IPLV l - ' 760,000 - 9.0 EER 9.4 IPLV E Condensing Unit Only 135,000 - 10.1 EER 11.2 IPLV 4 -11 Compliance with OSSC. effective 01/01/05 • I . Worksheet 4k Project Name: 3553 FANNO CREEK B Page: - II I Simultaneous Heating and Cooling * Additional pages may be necessary if building has more terminal units than there are lines in this form. If needed use Add New Worksheet button Complete this form for all terminal units with reheat to verify compliance with Section 1318.2.1 exception 1. Terminal Unit (Variable Air Volume (VAV) Box) CFM Design Conditions Required Information Comply Max. Ht CFM Ht. CFM Ht. CFM Maximum Cooling Occupancy < or = to < or = to < or = to Airflow is Terminal Unit ID or Sq. ft Area Airflow- Max. Heating Ventilation- 30% of 0.4 CFM Occupancy < or = to Description /Location Served CFM Airflow -CFM CFM Max per sq. ft Ventilation 300 CFM FPB1 -1 3082 1200 840 NO YES NO FPB1 -2 2945 1200 1340 NO YES NO FPB1 -3 4940 1200 840 NO YES NO FPB1-4 2570 1200 Boo NO YES NO FM-5 775 500 310 130 NO YES NO NO FPB16 793 500 310 132 NO YES NO NO VAV1 -1 360 o YES NO VAV1 -2 650 455 550 NO YES NO FPB2 -1 3696 1200 840 NO YES NO FPB2 -2 3370 1200 840 NO YES NO FPB2 -3 5479 1200 840 NO YES NO FPB2-4 3708 1200 840 NO YES NO VAV2 -1 350 245 550 NO YES NO FPB3 -1 3696 1 200 8 NO YES NO FPB3 3370 1200 840 NO YES NO FPB3 -3 5479 1200 840 NO YES NO FPB3 -4 3708 1200 840 NO YES NO VAV3 -1 350 245 550 NO YES NO 4 -21 Compliance with OSSC. effective 01/01/05 Worksheet 41- Project Name: 3553 FANNO CREEK B Page: L l a AIR TRANSPORT ENERGY Complete one worksheet for each fan system > 7.5 horsepower. Fan system horsepower is the sum of motor brake horsepower of all supply, return, and exhaust fans (including series fan - powered terminal units) that operate during design conditions. Fan System 1D:IRTU -1 AND 2 Areas Served:IBUILDING B O System serves hospital or laboratory and include flow control device for maintaining precise pressure control. Maximum Fan Type (Supply, Nameplate Fan Identifier Return, Exhaust, Series Constant Volume Motor Brake Nameplate Motor HP (Tag) VAV) CFM or VAV HP Motor HP Allowed RTU Supply 30.000 VAV 39.62 40 60.0 RTU Return 26.000 VAV 13 2 15 20 0 The Plans /Specs show brake hp, nameplate hp, and CFM in the following locations: I Ml AND ATTACHED MFG DOCUMENTS Total System Total Total System Supply Fan Constant Volume, VAV, System Max Brake HP Brake HP Nameplate CFM or Hospital /Lab Brake HP Allowed Complies HP Complies 30,000 Hospital /Lab 52.8 43.6 No Yes Additional Pressure Drop Credit (all systems). Complete the section below if system contains filtration with a pressure drop at design flow in excess of 1" w.c ( when filters are clean), heat recovery, or direct evaporative humidifier /cooler. Additional Pressure Drop Credit for Hospitals and Laboratories. Complete the section below if system serves a hospital or laboratory and contains rully ducted return /exhaust, return /exhaust air flow control devices, or individual filter system efficiencies. Additional Pressure Drop Credits Pressure Drop, Inches, W.C. ❑ Filtration Pressure Drop >1" w.c. All Systems ❑ Heat Recovery ❑ Direct Evaporative Humidifier /Cooler Hospital and ❑ Fully Ducted Return /Exhaust (0.5" credit) Laboratory ❑ Return /Exhaust Flow Control Device (0.5" credit) Systems Only ❑ Individual Filter Efficiency > or = 85% (0.5" credit) Total Additional Pressure Drop Credit: ❑ Manufacturer's product data sheet(s) is attached and design values are shown in plans /specs in the following locations Adjusted Total Brake Constant Volume or VAV (Use VAV Total Additional Max Allowed HP (from Adjusted Brake Supply CFM for Hospital or Lab Systems) Pressure Drop Brake HP above) HP Complies Add New Worksheet 41 1-22 .1 1 Compliance with OSSC, effective 01l01A5 i 4 5` ° o 2 ‘ J V(4 - Cr) Si 9 Fire Marshal's Offices , /L North Division - 14480 SW Jenkins Rd., Beaverton, OR 97005 • PH (503) 356 -4700 • Fax (503) 644 -2214 1ti181 Valley South Division - 7401 SW Washo Ct., Ste. 101, Tualatin, OR 97062 • PH (503) 612 -7000 • Fax (503) 612 -7003 Fire & Rescue FILE COPY , . Building Survey Report • •`• FMZ : (to be filled out by TVF &R) Code Edition: C9 Name of Facility: r N r Li I kl. 6 $ Name of Building: kLa LDi l4 6 L E. Address: _1 6 _ Q _ c b a __EIA f e _ e L _ NES fEeley • 2 1 / - Owner: t c - N 4 (A Telephone No. (5 ` tt ee - & C'S Architect: /: 26.441� I KC-- Telephone No. (003) 22.-L 11 ZI Architect Address: 112 t 6GO 6A-t Da } .Sw TE - IOC) � 2 'f7� i ,5 =r?i . #4.1 : M i 1;it,';', :? 4 C OMIVf 1 s, . ig,S, )R0110i: , s ° .;: gin - i.` 1. Occupancy Type !2 I Use G e . Capacity 2. Construction Type - Ty .... �� Year Built EA 3. Area (Sq. Ft.) a 1 c , � Total .•5 L a est Floor 5 � 4. Stories Basement No 9` , n 1/006 No. 3 Height L j l_oh High Rise ❑Y �N • 5 a. Exterior Wall Construction �� u � - �t �, p►A� � Co�ceET� Ti lam if 44.44e45- Opening Protection � cAv w N of 1 - t 6. Interior Wall Constructi .4Nt 5r N Q't -ts - Gg oN sF � a 0114 SSAdM 7. Floor Construction 641?-+f: E Q,, .. �/r e , PEc - c, STEEL. 5 f (A- �/�,2. 'G�$ cam. Gi �,r_ _ 8. Roof Construction 11-4 Jr7L MEMt oWE. P-COF - C4...0,2,4, 'VFW t , 1246110 Itsvtc44`�lou avv..e. Pj �'F ta. 2.91 L S "N.S�ISS.ATf� q 9. Attic Draft Stops No. D g j 10a. Occ. Sep. Wall Construction No. O NINE- PEC , I �� D b. Opening Protection ND�I (2 "�- C ,) Imo' � -1^^- l la. Fire Wall Construction No. 0 ''-�` I t40/4 E- ��u b. Opening Protection 1�I bt4 a . 1 — ' I2a. Smoke Barrier Wall Construction No. 1 } e2 I Not E. 12 E`-t � r 0 b. Opening Protection N N E- 1 2 r g,., � 13a. Corridor Wall Construction e F 14 rn-i I'VE_ x 61 13 E 5 IDE_ b. Opening Protection ' 1 -'14 I R. - 14a. Corridor Ceiling Construction TYpa =K 4B C5'/ - smt . b. Opening Protection 1 H 15a. Shafts No. Type I N R I b. Opening Protection I N R • building survey Report FMZ : (to be filled out by TVF &R) Name of Facility: ;'rL1—:ti,,,- 7,1: 47: ;a:.* ,. Irh�; : ; Mts; Q 1 _ c= dr"�,"6a ,' .`,`. :".J'? ., . -t •.. � lay i i .,; # .,;.c...., 5 y e.� '' 'u�<t�- r.rtrx..� .e,•n._ _yh..n _�. )<��, ,. ,r ..•dt�f`.w,e4 �':. C . l ,h l : J `,�`; �., �n �..3� I 6a. Stair Enclosure No 2. I i -12. (I E.Q. DBL. STUD g 1 b. Opening Protection I 1412-- .rc7 17. Stairs No. 2 +'1 18. Ramps No. 40 14 04 19. Interior Finish Class Room R Corridor ps,4 Exit Enclosure ,- 20. Exits ' 'No. i1 T'otal' VVidtli2 1 � F II 21. Exit Hardware Type P` NPcZ4D1-0"9-E--- 22a. Exit Signs/Illumination b. Emergency Lighting 23. Auto Sprinkler Coverage 24. Standpipe Class /Locations 25. Fire Alarm Type/Coverage 26. Heating, Ventilation & Air Conditioning Type IFucl 27. Electrical Installation 28. Stage/Platform 11 a. 29. Hazardous Area NONE 30. Other Comments: Alternate Materials & Methods TVF &R Use Only Inspected By: • ' I Date I No. Attachments Reviewed By: . I Date Updated Fire Marshal's Offices .0 North Division - 14480 SW Jenkins Rd., Beaverton, OR 97005 • PH (503) 356 -4700 • Fax (503) 644-2214 Tual atin Valley South Division - 7401 SW Washo Ct., Ste. 101, Tualatin, OR 97062 • PH (503) 612 -7000 • Fax (503) 612 -7003 Fire & Rescue Building Survey Report FMZ • (to be filled out by TVF &R) Code Edition: Name of Facility: r NO PAC— gUJL.c I 14,4 13 Name of Building: kiA- (-DI 1 4 6 1_ E. Address: _ j_C?_Q_2B __6k/ fe Eg_ 500pes FE 22y - (Z owner: S No Telephone No. ( 5 c ii ee r 6 Architect: � ' � AVec14 m D I N _. Telephone No. (503 22-L-112-1 Architect Address: 112 <L-D 6 c m c4 r Scu 1 O R-A2nittlbQrL g7W5 ' r '�a._ Zx�yS3'• �'•. :• Z: ;xc_ , ;!:;1 :i rF c;3r, ;.�a.,:py �•,. Si? . •� .. " u I <`e ^3' rt xn `'`v :.it0 ,� %, ', ^5 :it nit - w ,>t ..-�.,x 1. ra' •�k. � .. Z:i.;' � ^ "am t ..., '= ;tti:: i�'�.:' �Jra7l.rFr 4i�1 \ �,t�ia �'y G � 1. Occupancy Type 15 IUse ‘ Capacity 2. Construction Type 7-WV, Q -8 Year Built N 3. Area (Sq. Ft.) Total 551 7 Lar Basement No 4. Stories No. Height L..SL ptt High Rise ❑Y IgN 5 a. Exterior Wall Construction CouCpx.TE._ Ti lam- "`I E. b. Opening Protection al a- 6. Interior Wall Construction — �3 Ohl D — Gg op.( s q.e LATI4 S5ACI4 7. Floor Construction ST /57C&1E oi) L e'v S AEC,IL O 71✓EL 5 Fth' 8. Roof Construction 11-IE JMO42t pr M rW E f200F - C4.A622.4 aVE- POD INS1. t _ Ri61 4►�r1oA1 avtie. � G+��.1� �r�.tz 7.� LW 5 TV.IdSs� 9. Attic Draft Stops No. 0 ( -Tric.-. 10a. Occ. Sep. Wall Construction No. NOWE PE< , IU D A' b. Opening Protection D14 E . I '� �+�^ I Ia. Fire Wall Construction No. 0 N0N� 1`F 1 b. Opening Protection n t n' 12a. Smoke Barrier Wall Construction No. � 0 I t4014 E. p b. Opening Protection 4 j 1 E_ 12-g i-EC) 13a. Corridor Wall Construction F IT-1 r C X , e1k IDE_ b. Opening Protection H R - 14a. Corridor Ceiling Construction -TYPES B CV£ta. sm.( b. Opening Protection 1 Hz- I 15a. Shafts No. Type I N R I b. Opening Protection I f-I 12.. building Survey Deport FMZ : (to be filled out by TVF &R) Name of Facility: �' �,� " �:t y � ,.�; t�'?.$•`; s .. y �.2f � •�' E�A�3 -�'; �..., .9k • - .. .�,. {��1'�� / ��• 7 s� p i� A 'i�rr: c; .: h 4�"`- i '� ...,_,,� w e '�" "fr 1 _ ; S� t p Y4' ..,�` ?_`- �"'i +> ^ ,�t�,� . � 1 r'k a?2 r 4 r {, ),. _�- i.�., •t . : b' =%.�?;'��: ^°'i'. t�,,�._ b.- � L ...- :�.n;S -t:� s SY'A, 16a. Stair Enclosure No. 2 I 1 Pita 1 F_A pg(�, b. Opening Protection I 1412- �(C� 2 . �� "11 17. Stairs No. 18. Ramps No. O g t7� 19. Interior Finish Class Room 4-1— Corridor F4 Exit Enclosure 20. Exits ' ' 'N&. " ° if 9 ' Total W idtb 2 , I I ' 21. Exit Hardware Type PAt4 , NP47--pLCDPa2-E--- 22a. Exit Signs/Illumination b. Emergency Lighting 23. Auto Sprinkler Coverage 24. Standpipe Class /Locations 25. Fire Alarm Type/Covcrage 26. Heating, Ventilation & Air Conditioning Type I Fuel 27. Electrical Installation • 28. Stage/Platform go 14, e. 29. Hazardous Area NOS 30. Other Comments: Alternate Materials & Methods TVF &R Use Only Inspected By I Date . I No Attachments • Reviewed By: . I Date _ Updated • • r. (Z ° 6,- •UO 5rc7 1 7., ,, 4!,, , ,,;;-\, /thog el,.//d-e-t_ge-z7x4-g-A f-e7 . No E :ception Taken ❑ Make Correction_ Noted (� � � � s. ; F.evi � e 8� Resubmit ❑ Record Only ' "y ,� .4;1 Y `: Arcritect's review is for the limited purpose of checking for `; „ .: 0 convrrnance with information given and the design concept exp'essed in the Contract Documents. Any action indicated E LEVATOR APPROVALS is sjb;ect to the requirements of the Contract Documents. Cot: rm,ning the accuracy and completeness of submittals, inc` 'ding dimen quantities, fabrication and techniques Submitted By: of c onstruction, installation requirements. and coordination of ' ie Work remain the responsibility of the Contractor as Otis Elevator Company reeuired by the Contract Documents. 7216 SW Durham Road, Portland, OR 97224 LF 5 NO f iit °Gt Ir ulttal No. Prepared by: Ann Pauly - Anderson rc i s Approval Stem Ph: (503) 624 -3861 • — n�'e; °'� ' ,!�. Fax: (503) 684 -5427 8v _' l�►. ._ t , . 421TrIFF27o For Project NAY 8 2007 Fanno Creek Building B CITY O$, 11u1 , Tigard, OR 97224 �, Ph: .. - 0 6 Fax: (003 Wg -ebse TWSTON Contractor: OPUS NW Architect: LRS Architects, Inc. Owner: OPUS NW LLC ❑Contact : Jim Sheppard ❑Contact : 7;73 A mle„.1/ ❑Contact :4?VJss deoorn67`� 1500 NW,First Avenue; Suite 1100, Portland, 1121 SW Salmon, Suite 100, Portland, OR 1500 SW First Avenue; Suite 1100, Portland, OR 97201 97205 OR 97201 Ph: (503) 916 - 8963 Fax: (503) 478 - 8038 Ph: ) - /iii Fax: (o.2./- y17 Ph: (03)0 /«f1JFax: (Sad) 9%! 1v Six (6) Sets of Approvals Submitted - Return two (2) sets to Otis - Retain one (1) set on Job Site - Disburse remaining three (3) sets to the; General Contractor, Architect, Owner 01/19/07 i Date Submitted Approval Signature 02/26/07 L R.e6 U e w� u , +� et n . e S ,9 v �C ,❑ R;:11i A Date Returned A IrD RESUBMIT � dl/ FEJECTED MAKE CORRECTIONS AS NOTED ` ;� Vender is entirely reaporie " le for perfrrmanoe of his produC (s). ComT lions or co�m;rrar+ made on the shop _irk OPUS SUBMITTAL REVIEW r.rawings dorir this review do not relieve contractor R BY OPUS NORTHWEST C016TR11CT1011 1.1.0 IS FOR DESIGN INTENT s oe feta tn t it ' . r : e i r r the drawings f e and ONLY SUBCONTRACTOR MOOR SUPPLIER IS RESPONSIBLE FOR DIMENSION, s c�f�'.a` . This. , r� _., s; on;v for rev of generz*J �, N , : ,�,, r COMPLIANCE WITH THE REOVIREMENTS OF THE g l co ■ . ` =`' th I T T i i t "`' Ar'� and QUANTITIES AND FULL COMPLIA general crrroE•a: will +. � i: .! t O r r S cr; fvan in the CONTRACT DOCLIVENTS. REVIEW BY OPUS NORTHWEST. LLC DOES NOT cvv yact os :Bun , ;l:,• r' , .,,.. `tr�;.to mr.portsible tor. RELIEVE SUBCONTRACTOR AN010R SUPPLIER OF THE RESPONSIBILITY conton. in: a,': i co.i 3tir,g 3!i . u mliiie's all (*mansion; REQUIRED BY T1E TERMS MD CONDfTIONS OF THEIR CONTRACT selecting fa:; '-i rI nroccs .es anti techniques of OPUS NORTHWEST. LLC. �e c strtcItnn; Q,or ina''r.q h:s work with that of ail other manner. �l trades; and perrr;rtnIi g his work in a safe and sa e„ tisiactor)L r'� -0' � " VLMK CONSULTING (50) 222- ENGINEERS fl" 47**-"”` DA r' e (503) 222 -4453 �/ OWS S 18MITTAL 0 /9 yer,',� p(� 1 , OF- Date 3. ? -o`� BY ! ' " OQ�"ti °�`� F r I Project/NES Number: S164330 Page 1 of 26 Project Name: Fanno Cre k Buildin B Contract/Elevator Number: 296456 -457 Date: 1/19/2007 Customer Signature• me x _ CRITICAL CONSTRUCTION INFORMATION Customer: OPUS NW Project: Fanno Creek Building B DContact : Jim Sheppard, , Tigard, OR 97224 1500 SW First Avenue; Suite 1100, Portland, OR Ph: (So ?) 421- Fax: (f03) 4!8 X 97201 Ph: (503) 916 -8963, Fax: (503) 478 -8038 Invoicing Information Please advise as to the date invoices must reach your office each month to be processed in a timely manner. Invoices are due on the v � ' of each month. Job Site Information °-/? - Name of Superintendent: le 2y6 �csse Phone #: 3 'SW �0�5� Driving Directions: I -5 South, Exit 291 toward Carmen Dr./ King City, Turn right onto SW Upper Boones Ferry Rd., Turn Left - onto SW 72' Ave/ SW Upper Boones Ferry Rd., Continue to follow SW Upper Boones Ferry Rd. .1 miles, - Turn Right at first light. Project on Right. Please provide the following dates Date you would like elevator material delivered 5e, io a.eea'7 Date you would like the Plunger & Cylinder Delivered Se /4 p.007 Date elevator installation to be completed by /a4ie..•4 e.- ' aov7 . Note: If any changes in the shipping schedule are necessary there is only an eight (8) week window within which we can change the date with our factory. Any changes to ship date must be made eight (8) weeks prior to the original material delivery date. Changes requested less than eight weeks before shipping date may result in additional costs. Consult your Otis Representative. Job -site must be ready for installation when material is delivered (see below for details). If the site is not ready when material arrives, the material needs to be placed inside the building in a dry, safe area. Contractor must provide roll -able access to move material from the truck into the building, provide a forklift and an operator to move material at no cost to Otis. If the material cannot be stored inside the building, you will be required to pay for additional handling and/or storage until the building is ready. If the material is not stored in a dry, safe place, or outside exposed to the elements, Otis is not liable for any damages to the material, and you will be required to pay for any necessary repairs or replacements. Provide sufficient on -site refuse containers for the proper disposal of elevator packaging material. Should sufficient refuse containers not be provided, packaging material shall become the responsibility of the owner. If Otis is directed in writing to install elevator equipment early (such as rails), and building is exposed to the weather, there is a possibility of rust forming on the equipment. If fireproofing is applied, there is a possibility it will adhere to our equipment. Should clean up be required for either fireproofing or rust formation, it will be backcharged to the General Contractor. The following must be provide& by others, prior to Otis manning the job -site 1. 3 -Phase Power and Disconnect per Confirmation of Power Form 2. Hoistway, Pit, and Machine Room dry & clean 3. Storage space close to elevator with roll -able access 4. Inserts and fastenings provided per our approval package 5. Steel safety beam with a minimum net live load of 5000 Lbs. (2268KG) 7500 lbs. Roped Hydraulic requires a maximum net live load of 7500 lbs. (2835 kg) 6. Freestanding Removable Barricades Comments: We are pleased you have selected Otis Elevator Company for your upcoming project. In order for on time installation of your elevator(s), please provide the information and requirements requested above. sa, cntHyddot REV 8/2001 011 ■ • Project/NES Number: 5164330 Page 2 of 26 Project Name: Fanno Creek Building By a� Contract/Elevator Number: 296456 -457 Date: 1/19/2007 Customer Signature: Gp�`5 ELEVATOR HOISTWAY APPROVAL DATA _ Customer: OPUS NW Project: Fanno Creek Building B, III Contact : Jim Sheppard, , Tigard, OR 97224 1500 SW First Avenue; Suite 1100, Portland, OR 97201 (5o3) WeMtvL, e3)f - grOZ - (503) 916-8963, (503) 478-8038 ❑ Sprinkled Hoistway — If sprinkler system is installed in the hoistway, weatherproof (NEMA4- Traction only) equipment and wiring will be provided in the pit by Otis to comply with ASME A17.1 102.2 (c) 5 (a) & (b). Product Confirmation Please sign the attached approval layout (Drawing #AA.A2801 ODZ) in the space provided confirming the dimensions, opening arrangement, coordination notes, etc., shown therein. ® Firefighter's Service Operation (Required by ASME A17.1) We will provide phase I & II control provisions. You must provide the Phase I designated floor designation (egress) that the elevator will return to in event of fire, as well as an alternate floor designation which the elevator will park at in the event that the fire is a the designated landing. The egress landing is the floor level that occupants of the building will exit at in case of fire. Designated Phase I Stop: Alternate Phase I Stop is: Select Main Egress Designated Stop /opening: (may differ from Designated Phase 1 stop) Changing the Phase 1 designated egress, Phase 1 alternate egress, or Main egress landings after the elevator is ordered will cost a minimum $500 extra to cover software changes, Braille markings, and floor markings. The above landing designations are confirmed. SIGNED BY: DATE: r`i ES Landing Designations and a eights YAI l f �T Hoistway Front Floor Rear Floor Configuration Designation Fe nche Fractions Designation Feet Inches Fractions Overhead 14 0 3 Stop 3 2 Stop 2 13 06 1 Stop 1 14 06 Pit 7 0 Total Rise :28' 0" Comments: Please verify the floor desi nations as shown and the vertical travel as shown. Please select the Designated Phase I an Alternate Phase I stop. SA hotstmtpdot REV 8/2001 yr Ve 1 1 4_* 4 Project/NES Number: S 164330 Page 3 of 26 Project Name: Fanno Creek Building B 'C �o ‘.‘ Contract/Elevator Number: 296456 -457 Date: 1/19/2007 Customer Signature: 09 CP Entrance Door, Frame, and Sill Finish per Floor Front Floor Entrance Entrance Rear Floor Entrance Entrance Designation Door Finish Frame Finish Sill Finish Designation Door Finish Frame Finish Sill Finish • 3 Satin Stainless Satin Stainless Aluminum Steel Steel 2 Satin Stainless Satin Stainless Aluminum Steel Steel 1 Satin Stainless Satin Stainless Aluminum Steel Steel SA ENTFIN dot REV 8 /2000 4 0® S ANf 0f1 Project/NES Number: S 164330 Page 4 of 26 Project Name: Fanno Creek Building B �� �o op' 0 Contract/Elevator Number: 296456 -457 Date: 1/19/2007 Customer Signature: 0 NO CPS'S-7j Confirmation of Power Supply - Hydraulic Approval . Customer: OPUS NW OTIS ELEVATOR COMPANY ❑Contact : Jim Sheppard Otis Elevator Company 1500 SW First Avenue; Suite 1100, Portland, OR 97201 7216 SW Durham Road, Portland, OR 97224 Project: Fanno Creek Building B Contact: Ann Pauly- Anderson , Tigard, OR 97224 Phone: (503) 624 -3861, Fax: (503) 684 -5427 NOTE: Manufacture will not be started until the owner or the owner's representative signs and returns this form to Otis Elevator Company. This form must be completed, signed and returned by to meet the scheduled completion date of A. POWER CONFIRMATION Our records indicate the supply to be as indicated below. You are requested to verify (or correct) this information and confirm its accuracy by your signature in the space provided. Should a change in the information provided subsequently occur, immediate notification of the change is necessary. Mt> 1. _248 volts, three - phase, 60 hertz and a separate equipment - grounding conductor. 2. Wiring to be sized in accordance with maximum lug sizes. 3. Voltage variations to be within ±5% of normal. Frequency variations to be within ±2 hertz. If voltage or frequency variation exceeds these limits, please give details. 4. Car Lighting: 125 volt, single - phase, 15 ampere, 60 Hertz dedicated branch circuit. The above power - supply characteristics are confirmed. j'e SIGNED BY: DATE: B. ELECTRICAL REQUIREMENTS (SEE ANSI/NFPA 70) To assist you in the planning of the electrical requirements to be provided by other trades prior to the installation of our equipment, we are pleased to supply the AC current data as detailed below. The following data are based upon the power supply as noted above. Should your confirmed power supply be of a different characteristic than that shown, please request revised data from your local Otis representative. Additional electrical requirements are listed on the next page. The AC line current data below are based on the power su ply information provided in Part A, item 1, above. REFER TO ANSI /NFPA 70, SECTION 620 -13 (For Code Versions Prior to 1996 Refer to Section 620 -14) NAMEPLATE ELEVATOR ELEVATOR RATED PEAK STARTING OR NAME OR CONTRACT CAR NUMBER DUTY SPEED HORSE NEC MOTOR ACCELERATING UMBER NUMBER(S) POWER LETTER CURRENT CURRENT 1 &2 296456 -457 3500 125 30 E 100 230 Elevator controller terminations for 3 -phase wiring is rated for 75 °C. Refer to NEC ANSI/NFPA70 Section 110 -14. To assist you in providing proper electric service, items required by others have been checked below: ❑ Elevator Management System (EMS) - a dedicated 125 volt 30 ampere single -phase power supply with DPST disconnect switch or circuit breaker with duplex outlets at any location where a Security Station and/or Fire Station is furnished. ❑ Car Air Conditioning & Heating - a dedicated branch circuit with suitable characteristics to power car heating and air conditioning provided by others [620- 22(b)]. Comments: Please verify the 3 -phase power as shown above. If different, please revise and the correct power requirements shall be provided. SA Pwsuplvm doc REV 08/06 Cyr 0 ti • ti � e4" Project/NES Number: S164330 Page 5 of 26 Project Name: Fanno Creek Building B �� 40 0 Contract/Elevator Number: 296456 -457 Date: 1 /19/2007 Customer Signature: �Qv`' Confirmation of Power Supply - Hydraulic Approval Ts) assist you in providing proper electric service, the items required BY OTHERS have been checked below: ALL HYDRAULIC ELEVATORS X All 125 volt, 15 or 20 ampere single -phase receptacles installed in pits, machinery spaces and elevator -car tops shall be of ground- ' fault circuit - interrupter type. All 125 volt, 15 or 20 ampere single -phase receptacles installed in machine rooms shall have ground -fault circuit - interrupter protection [620 -85]. A separate single -phase receptacle supplying a permanently installed pit sump pump shall not require GFCI protection X A three (3) phase, electrical- feeder system must be enclosed in EMT with a separate equipment grounding conductor terminating in the machine room. Feeder conductors and grounding conductor must be copper. Size of the feeders and grounding conductor to suit elevator power characteristics. A fused disconnect switch or circuit breaker, capable of being locked in the `off" position, for each elevator per the National Electrical Code (ANS1/NFPA 70) with feeder or branch wiring to controller [620 -51]. Fuses are to be current limiting class RK1 or equivalent. Circuit breakers are to have current limiting characteristics equivalent to class RK1 fuses. Fuses or circuit breakers are to be time delay to cover the full load up accelerating current as listed in Section B above. Where practical, the disconnect means shall be located adjacent to the door of the machine room enclosure. A separate 125 -volt AC, 15 ampere single phase branch circuit and SPST fused disconnect switch or circuit breaker, arranged to be locked in the "off' position, to supply the car lights, receptacles, auxiliary lighting power source and ventilation on each car in compliance with the National Electrical Code. Branch circuit wiring to each controller [620 -53]. Suitable light and convenience outlets in machine room with light switches located within 18" of lock jamb side of machine room door and a convenience outlet and light fixture in pit with switch located adjacent to the access door [620 -23]. Electric power for light, tools, hoist, etc.; during installation as well as electric current for starting, testing and adjusting the elevator. X Refer to National Electrical Code, Article 430 -52, "Exceptions" to select applicable ratings for protective devices. This exception should be fully utilized in order to provide the maximum capacities listed for the various type protective devices. EMERGENCY RETURN UNIT The disconnecting means required by the National Electrical Code shall be provided with an auxiliary contact with wiring to the controller [see ANSI/NFPA70 -1996, section 620- 91(c)]. The auxiliary contact is to be positively open when the main disconnecting means is open. The auxiliary contact shall cause the ERU power source to be disconnected from its load when the disconnecting means is in the open position. Size of main contacts to suit elevator power characteristics. Heat sensors, when used to automatically disconnect the main line power supply prior to the application of water from sprinklers, shall be provided with a normally closed contact with wiring from the sensing device to a controller designated by Otis. The normally closed contact shall be closed when the heat sensor is not activated and shall be open when the heat sensor is activated. STANDBY -POWER REQUIREMENTS ❑ A power - transfer switch to monitor both normal and standby -power conditions and to perform the transfer from one to the other. Switch to have an inhibit function which will delay the completion of the transfer to normal and/or standby power by an adjustable period of 0 - 5 seconds. Switch to have a phase monitor feature that will prohibit the transfer of power between "live" sources unless the sources are in phase with each other. ❑ When more than one elevator is subject to the same standby power system and the standby power system is not large enough to run all elevators at once, the transfer switch must include one set of normally closed dry contacts that open when the switch is in the standby power position ❑ A 125 -volt, 15- ampere, single -phase car -light supply. .0,„<C ti Project/NES Number: S 164330 Page 6 of 26 Project Name: Fanno Creek Building B Contract/Elevator Number: 296456-457 457 Date: 1/19/2007 Customer Signature: O ` ' � G Confirmation of Power Supply - Hydraulic Approval COMMUNICATION REQUIREMENTS [] Telephone instrument or means within the car for communicating or signaling to an accessible point outside the hoistway or to a central exchange system or approved emergency service. ❑ Separate 125 volt, 15 amp. single -phase power supply with fused SPST disconnect switch or circuit breaker with duplex outlet in the machine room, located as required for inter - communicating system power supply. Circuit to be arranged for feeding from the building standby or emergency lighting supply if provided. Conduit and wiring for remotely located inter - communicating stations (in Engineer's office, etc.). X One (1) dedicated outside "Analog" (i.e. capable of carrying voice and data) telephone line to the elevator machine room must be furnished. The telephone line must meet the following requirements: Loop Current: Min 20mA, Max 120mA Nominal AC Line Impedance = 600 ohms Line Voltage: On Hook — Min 15Vdc, Max 56.5Vdc Ring Voltage: Min 40Vac(rms), Max 150Vac(rms) Off Hook — Min 8.75Vdc Ring Frequency: 15 -68Hz SMOKE DETECTORS Smoke detectors, located as required, with wiring from the sensing devices to the controller(s) designated by Otis. X I. For each group of elevators, provide a normally closed contact representing the smoke detector at the designated return landing. X II. For each group of elevators, provide a normally closed contact representing all smoke detectors located in lobbies, hoistways, or machine rooms, but not the smoke detector at the designated return landing (see above) or the smoke detectors as described in a & b below: a) If a smoke detector is located in the hoistway at or below the lower of the two recall landings, it shall be wired to activate the same normally closed contact as the smoke detector located in the lobby at the lower of the two recall landings. b) If machine rooms are located at the designated return landing, the smoke detectors located therein shall be wired to activate the same normally closed contact as the smoke detector at the designated landing. ❑ III a. For a single unit, or group of elevators having one common machine room and one common hoistway, provide one additional normally closed contact representing all machine room and hoistway smoke detectors. ❑ III b. If the group contains more than one hoistway, and hoistway smoke detectors are installed, or if the group has more than one machine room, provide one normally closed contact for each elevator. The contact is to represent the smoke detector in the machine room for that particular elevator, and any smoke detectors in the hoistway containing that particular elevator. HEATING, VENTILATION, AIR CONDITIONING X Temperature in the machine room shall be maintained between 60 °F and 100 °F. The relative humidity in the machine room should not exceed 95% non - condensing. Temperature to be measured 6' above the floor and 1' out from car controller. Ventilation to suit Otis heat release requirements shown below. The temperature and humidity range shall be permanently posted in the machine room. Local codes may require tighter temperature ranges and higher ventilation levels. Please check with your local code authority for the exact requirements in your area. Heat release includes allowance for average service of 40 elevator starts per hour in the up direction. ELEVATOR NAME OR NUMBER ELEVATOR CONTRACT DUTY HEAT RELEASE PER CAR NUMBER (BTU/HR) 1&2 296456 -457 3500 11455 TOTAL BTUs SA Pwsuplvm doc REV 08/06 do Project/NES Number: S164330 Page 7 of 26 Project Name: Fanno Creek Building B e 6 Contract/Elevator Number: 296456 -457 Date: 1/19/2007 Customer Signature: „ 0_O 07 ict Goys Confirmation of Door Protection As part of your elevator system you will receive the following standard door protection system: The LAMBDA door protection system detects obstructions in the doorway using a web of infrared beams of light to create an invisible safety "curtain" across the elevator entrance. If any beam is interrupted, the lambda will send a signal to the door controller to open the doors. As an option, enhanced door protection can be purchased for incremental cost by checking the box: The LAMBDA 3D door protection system detects obstructions in the doorway using a web of infrared beams of light to create an invisible safety curtain across the elevator entrance. In addition to the curtain protection, LAMBDA 3D adds a triangular protection system with beams that project into the hallway to detect passengers as they approach or leave the elevator. If either protection system detects an obstruction, the lambda will send a signal to the door controller to open the doors. LAMBDA 3D is available on most door arrangements subject to job site conditions. 01 Project/NES Number: S 164330 Page 8 of 26 Project Name: Fanno Creek Building B 01\ 060'3 p, Contract/Elevator Number: 296456 -457 Date: 1/19/2007 Customer Signature: FiN� 09 VO G° CITY OF TIGARD BUILDING DIVISION ! PERMIT #: BUP20U6 00519 13125 SW Hall Blvd., Tigard, OR 97223 DATE ISSUED: 2715/ ?007 Phone: (503) 639 -4171 ',1r'I� Inspection Requests (24 Hrs.): (503) 639 -4175 INSPECTION WORKSHEET FOR DATE: 2/6/2000 TIME: 7 :00AM PAGE: 30 SITE ADDRESS: 16083 SW UPPER BOONES FERRY RD CLASS OF WORK: SUBDIVISION: FANNO CREEK PLACE LOT #: TYPE OF USE: PROJECT NAME: FAWN() CREEK PLACE DESCRIPTION: Uldq. B OWNER: OPUS NORTHWEST LLC, PHONE #: 503.916 -8963 CONTRACTOR: OPUS NORTHWEST CONST LLC PHONE #: 503 - 916 -f3963 Inspection Request Scheduled For: Date: 2/8/2000 Pour Time: Code # Inspection Description Confirm # Contact # Messa 239 Final inspection 054595 -U1 503 - 572 -6422 Y C ections /Comments /Instructions: i 0 ` z00 — a CD z: P A- L A-V-1 F SLR U P z o 0 -,- 00 X3 P fZ n/44,( -- �s 1 4,7A PASS / P' 'TIAL APPROVAL ❑ CANCEL ❑ NO ACCESS ❑ FAIL / L FOR INSPECTION ❑ ADDITIONAL FEES ASSESSED Inspector: Date: 7...44G Phone #: (503) 718 - Z-64/y CITY OF TIGARD BUILDING DIVISION PERMIT #: BUP7006.00519 13125 SW Hall Blvd., Tigard, OR 97223 DATE ISSUED: 2/1Y2..007 Phone: (503) 639 -4171 i l l Inspection Requests (24 Hrs.): (503) 639 -4175 " ° :_.. INSPECTION WORKSHEET FOR DATE: 2J1/2008 TIME: 7:02AM PAGE: 77 SITE ADDRESS: 16083 SW UPPER BOONES FERRY RD CLASS OF WORK: SUBDIVISION: FANNO CREEK PLACE LOT #: TYPE OF USE: PROJECT NAME: FANNO CREEK PLACE DESCRIPTION: Bldg. B OWNER: OPUS NORTHWEST LLC, PHONE #: 603.916 CONTRACTOR: OPUS NORTHWEST CON ST LI.C`171001 PHONE #: 503 - 916.8963 Inspection Request Scheduled For: Date: ?J 1/2008 Pour Time: Code # Inspection Description Confirm # Contact # Message 299 Final inspection 064327 -02 603.572 -6422 N Corrections /Comments /Instructions: c2r—z ? -- ' q 7 c y -e�-- il R= M i t A e L 0� i �rz�-- 1 �; - V �n A---AM .,1 , tc a- -t- S /-- -. Fi4 Z-- l i'L `( S A`Pri____, hq 6 © AF _ ((S 0 c `S ❑ P' IM PARTIAL APPROVAL ❑ CANCEL ❑ NO ACCESS ,;F . ALL FOR INSPECTION 111 ADDITIONAL FEES ASSESSED Inspector: Date: 2 11 / Phone #: (503) 718 - Z6 ' - dlo I=1ifilo� l�Il loNNI NJ� LJ D I00 10 � • a. - INSPECTION TYPE Report of Inspection ,44' ^+�: , .•�;. Y P INSTALLATION EDP: 1 ; (;. - - .M-., � Department of Consumer & Business Services . ci_ " ` Building Codes Division • •Elevator Safety Program ELEVATOR # INSP II DOCUMENT r a g ty gr .'"' 1535 Edgewater NW, Salem, OR PXH '86549 3 of 4 ' Mailing address: PO Box 14470, Salem, OR 97309 -0404 Inspection information: (503) 373 -1298, TTY: (503) 373 -1358 AREA I INSP DUE BY I LAST INSP BY Permits: (503) 378 -8559 • Web site: www.oregonbcd.org - 9 =1/31/89 28 RESPONSIBLE PARTY NAME AND ADDRESS I SITE NAME AND ADDRESS I INSPECTION RESULTS - SEE REVERSE SIDE _2143 15185 • a SATISFACTORY INSPECTION . )PITS NORTHWEST ? LC FANf10 CREEK BLDG 9 • • OD UNSATISFACTORY INSPECTION ;580 SN 1ST AVE STE 1100 , 1 , 6944= SN UPPER BOOTIES FERRY 160g11 CD WRITTEN VERIFICATION ACCEPTED 'ORTLAND, OR 97201 -5853 TIGARD, OR 97224- ® PROVISIONAL: EXPIRES _Li (570 REQUIRED BY NEXT ANNUAL _ 8i. : 1 OF 2 - ® REMOVED FROM SERVICE INSPECTION REQUIREMENTS (Nl /R = MACHINE ROOM) I NO LOAD FULL LOADI ELEVATOR INFORMATION MD Fire service test is overdue (8.11.2.2.6) mo I year mo year IFS. SERIAL NUMBER OTIS 211 ® Annual safety test is overdue (8.11.2.2.2) ® ® CD ® CSI) CD APACETY 3,588 LANDINGS 3 CD Full load safety test overdue (8.11.2.3.1) Co CD CD ® CD CD r 1E DATE 06/87 MODERNIZED MD Keep M/R access doors dosed & locked (8.6.4.8.4) CD m m OD CD C1) AI6'ERS: ® Test & seal pressure relief valve (8.11.3.2.1) ® CD CID ® CID CD CO Maintain min. illumination level in M/R (8.11.2.1.2/8.11.3.1.2) ® ® ®® C4) GD CD Providepropersignage; see below (8.6.1.6.7) CD QD CD MD ('I) CID SPECIAL INSTRUCTIONS ® Emergency light/bell is inoperative (8.11.3.1.1) ® ® aD ® CD ® ONTACT: MD 24 -hour communication device is inoperative (8.11.2.1.1/8.11.3.1.1) ® CD CD ® CD CD ® Verify /reduce kinetic energy on doors (8.6.4.13.2) MD QD ® ® COD CO 17.31 Cl]) Provide/update record of oil usage (8.6.5.7) ® CO ® ® OD CID (12) Maintain a clean & dry elevator pit (8.11.2.1.5/8.11.3.1.5) ® ® • • ® Elevator M/R has unrelated storage (8.11.2.1.2/8.11.3.1.2) OD ® • (13) Maintain min. illumination level In pit (8.112.1.5/8.11.3.1.5) . PRIOR INSPECTION REQUIREMENTS OD Bldg. and/or M/R not accessible (ORS 460.135) REQUIREMENTS: NONE - • QD Seismic tests overdue (OR amendments 8.11.22.10) • OD Maintain/provide M/R fire extinguisher (8.6.1.6.5) ® Anti-egress device requires repair or adjustment (8.6.4.13.1) - ® ' • P'4 tnr't I .L. 0.--k .PAtlA 415 ft-___ `--' - • INSPECTION DATE I NO T hrs mins I hrs mins mo day year S ® CID A ® S CO".) ::c1 t rr Ca) ari . p CD CD v CD " p CD X OD CID CD CD E dp G1) _ E - CD E (2) ® (3) m CD . • C ® L CD C a) as • ® CD MD ®® ® T ® ® CD MD . R CID CD ®® ®® OD ii) MD ® CO QD ® CO ap CD CD CD T OD T CD® MD CD ',T.∎ 4 ,,,,,,. Gi,�urllu k,. ,,ot] „ki ori,-.r o- r�(bCI'ti -2C 0 . , h . / C wt e ? liiJOD �, ® -±� I ® I ® CD CD ® ' cli ff :C�4 ' -iii c ;t. _: 1,_ lnC�loltK0 (g1C47? C5_ ,G , , S m,D M M 7a . ^, c . ..,,. ...[:, r.^_.:.... tw; — — ® ® • E CD E CO am act CONTACT' SIGNATURE INSPECTOR'S SIGNATURE DATE (ED E A I L _/C it 440- 2536(09/02/COM): AN - L . r/• TOR WHICH HAS CAUSED AN INJURY SHALL NOT BE OPERATED UNTI APPROVED BY THE ELEVATOR SECTION, PER ORS 460.045(7) CUSTOMER COPY SEE REVERSE SIDE FOR INSTRUCTIONS - ill El dl ID ED Diit 0� RIM NE aME o 0 OLD o r'vIIII - - - -- . INSPECTION TYPE Report of Inspection INSTALLATION EXP; • -- ;• - Department of Consumer & Business Services • -;�- - Building Codes Division • • Elevator Safety Program ELEVATOR # I INSP # I DOCUMENT ci _ `�" •.' 1535 Edgewater NW, Salem, OR PI H -17812 4 of 4 Mailing address: PO Box 14470, Salem, OR 97309 -0404 Inspection information: (503) 373 -1298, TTY: (503) 373 -1358 AREA I INSP DUE BY I LAST INSP BY Permits: (503) 378 -8559 • Web site: www.oregonbcd.org ' 9 01/31.419 28 RESPONSIBLE PARTY NAME AND ADDRESS I SITE NAME AND ADDRESS I INSPECTION RESULTS - SEE REVERSE SIDE :2143 - 15105 ® SATISFACTORY INSPECTION ?PUS NORTHWEST U.0 FANNO CREEK BLDG 8 ® UNSATISFACTORY INSPECTION 1580 EN 1ST AVE STE 1100. - 46845 -SN UPPER BOOKS FERRY 14 093 CD WRITTEN VERIFICATION ACCEPTED PORTLAND, OR 97201-5853 TIGARD, OR 92224- CD PROVISIONAL: EXPIRES __Li ® REQUIRED BY NEXT ANNUAL 1. ; 1 _ ® REMOVED FROM SERVICE INSPECTION REQUIREMENTS (M /R = MACHINE ROOM) I NO LOAD FULL LOADI ELEVATOR INFORMATION all Fire service test Is overdue (8.11.2.2.6) ' moI year mo I year IFS. SERIAL NUMBER OTIS 211 ' CO Annual safety test is overdue (8.11.2.2.2) ® CO ® ® at' ® APAC 1 TY 3.500 LANDINGS 3 ® Full load safety test overdue (8.11.2.3.1) ® CD a ® ®" m ODE DATE 06/07 MODERNIZED ® Keep M/R access doors closed & locked (8.6.4.8.4) ® m (2) ' ® ® - RIVERS: ® Test & seal pressure relief valve (8.11.3.2.1) ® t) ® Maintain min. Illumination level in M/R (8.11.2.1.2/8.11.3.1.2) CD Provide proper signage; see below (8.6.1.6.7) ® ® ® ® ® ® SPECIAL INSTRUCTIONS ® Emergency light/bell is inoperative (8.11.3.1.1) ®® ® ® ® ® ONTACT; ® 24 -hour communication device is Inoperative (8.11.2.1.1/8.11.3.1.1) ® CD CD ® m CD CD Verify /reduce kinetic energy on doors (8.6.4.13.2) ® ® ® ® ® ®1 17.3: ® Provide/update record of oil usage (8.6.5.7) ® ® (2) a ® ® - ® Maintain a clean & dry elevator pit (8.112.1.5/8.11.3.1.5) ® ® ' ® Elevator M/R has unrelated storage (8.11.2.1.2/8.11.3.1.2) ® . ® Maintain min. Illumination level in pit (8.11.2.1.5/8.11.3.1.5) . PRIOR INSPECTION REQUIREMENTS ® Bldg. and/or M/R not accessible (ORS 460.135) REQUIREMENTS; NONE ' • ® Seismic tests overdue (OR amendments 8.11.2.2.10) ® Malntain/provide M/R fire extinguisher (8.6.1.6.5) . - . • ® Anti-egress device requires repair or adjustment (8.6.4.13.1) • ti - 4 i S 4C.- `/r,.{ J • r IA -S, pe G i o t 1, - -- pQ r friA , + 4 r e c • '-o (2_.,,. --- INSPECTION DATE I NO T hrs mins 1 hrs mins mo day year S (0) CO A® S® " 4 0 ® p m® v m® p m® ®®tD® E EiR ® E m E ® ® ® C ® ® L ® ® C ® ® _ ® ® ® T OD ® ® ON • R ®® ® ®® ® a ® . ®® ® ® ® ®® mm T m ® T m® ® CD , .1. , d . 3 A C W c� �� b kz ar r4� . u Q1:QU ® .:1 M ® M ® CO ® ® 2 tY� , ii - , _- ;T'tstili._�'tt��Ut� cl�,�, ����[- id�r7ri e r.r : .c 0 .1qIiiii , I. .. _ ..a.„1. ... Ma=r, ® ® E ® E ® ® ® . I CONTACT'S SIGNATURE INSPECTOR'S SIGNATURE DATE ® E - u. I / o 440- 2536(09/02/COM): AN ELE ATOR WHICH HAS CAUSED AN INJURY S • LL NOT BE OPE: T D UNTIL APPROVED BY THE ELEVATOR SECTION, PER ORS 460.045(7) CUSTOMER COPY SEE REVERSE SIDE FOR INSTRUCTIONS • Otis A United Technologies Company FINAL ACCEPTANCE • City 1 i9tt /t OTIS ELEVATOR COMPANY Date V/ Ladies and/or Gentlemen: . We have examined the Elevator furnished and completed by you in Building in this city. The elevator appears to be satisfactory and in accordance with your contract and we hereby accept it. Note: Elevator Cab (enclosure) and Hoistway Entrances have been thoroughly inspected and found satisfactory. Yours truly, P t 1 Sales No. 07 L S 7 l am ! (" q / �V .W (company) By7 ( ignature and fldeof accepting) - Contract with • By riC?A ue'. / T (Printed name of person accepting) KEY ACKNOWLEDGMENT The following keys, necessary for the proper operation of the above named elevator, have been turned over to me along with complete instructions on the operations of the elevator. QUANTITY QUANTITY Emergency Side Exit Keys Lobby Panel Keys UTA Keys Emergency Door Key (Under Glass) Z UTF Keys Utility cabinet keys UTB Keys Hoistway Unlocking device (w/ Brochure) L Light Switch keys O.M.M.S Manuals • Fan Switch Keys OTIS SERVICE EQUIPMENT Any counters, meters, tools, remote monitoring devices, or communication devices which we may use or install under this Contract remain our property, solely for the use of Otis employees. Such service equipment is not considered a part of the Units. You grant us the right to store or install such service equipment in your building and to electrically connect it to the Units. You will restrict access to the service equipment to authorized Otis personnel. You agree to keep the software resident in the service equipment in confidence as a trade secret for Otis. You will not permit others to use, access, examine, copy, disclose or disassemble the service equipment or the software resident in the service equipment for any purpose whatsoever. If the service is terminated for any reason, we will be given access to your premises to remove the equipment, including the resident software, at our expense. CUSTOMER - PLEASE NOTE THE FOLLOWING: The New Installation Service (N.I.S.# ) will begin immediately and will continue for months. The warranty period will begin immediately and will continue for months. Should any problem develop in the operation of this elevator, please call Otis Elevator Company at 1 - 800 - 233 - 6847. (Operator will request the name and address of the building, and the elevator number -- should there be more than one elevator in the building.) SIGNED: 4 � i 5 /;,� kA) By r Wit ' / Gv✓ (company) M (Person Accepting) From 426 (REV 3/99)