Loading...
Permit ir I CITY OF TIGARD BUILDING PERMIT 71 u ��J Permit#: BUP2014-00009 • COMMUNITY DEVELOPMENT TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 03/12/2014 Parcel: 2S113AB00700 Jurisdiction: Tigard Site address: 16255 SW UPPER BOONES FERRY RD Project: The Circuit Subdivision:COUNCIL VIEW ACRES(LOTS 21-44) Lot: 30 Project Description: TI and change of occupancy. 3/13/2014: REPRINT permit for correction of owner information. Contractor: DAVID MCGEE CONTRACT SERVICES LLC Owner: COLEMAN BOULDERING LLC 6624 N CAMPBELL AVE ATTN:ANDY COLEMAN PORTLAND, OR 97217 16255 SW UPPER BOONES FERRY RD TIGARD, OR 97224 PHONE 503-380-8144 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB DC Provision Review,COM TI -Ping 03/12/2014 $278.00 Occupancy Grp: A-3 Occupancy Load: 244 DC Provision Review,COM TI-LRP 03/12/2014 $41.00 12%State Surcharge-Building 03/12/2014 $205.19 Dwelling Units: 0 Plan Review 01/16/2014 $1,111.47 Stories: 1 Height: 0 ft Plan Review-Fire Life Safety 01/16/2014 $683.98 Bedrooms: 0 Bathrooms: 0 Permit Fee-Additions,Alterations, 03/12/2014 $1,709.95 Value: $200.000 Demolition Info Process/Archiving-Lg$2.00(over 03/12/2014 $24.00 11x17) Floor Areas: Info Process/Archiving-Sm$0.50(up to 03/12/2014 $27.50 11x17) Total Area: 0 Park-Commercial and Industnal 03/12/2014 $1,181.61 Accessory Struct. 0 Metro Const.Excise Tax-Commercial 03/12/2014 $240.00 Basement: 0 Use Carport 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $5,502.70 • Required: Required Items and Reports(Conditions) Fire Sprinkler Yes Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days ATTENTION. Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503 232.1987 or 1.800 332 2344 4$452)7‘4 Issued By: >4- Permittee Signature: CiAi /97.9/°L/C' T7n,\./ Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project Approved plans are required on the job site at the time of each inspection. v CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit#: BUP2014-00009 Date Issued: 03/12/2014 TIGARD 13125 SW Hall Blvd.Tigard OR 97223 503 718 2439 Parcel: 2S113A800700 Jurisdiction: Tigard Site address: 16255 SW UPPER BOONES FERRY RD Project: The Circuit Subdivision:COUNCIL VIEW ACRES(LOTS 21-44) Lot: 30 Project Description: TI and change of occupancy Contractor: DAVID MCGEE CONTRACT SERVICES LLC Owner: TIGARD INVESTORS LLC 6624 N CAMPBELL AVE 500 E BROADWAY#110 PORTLAND. OR 97217 VANCOUVER, WA 98660 PHONE 503-380-8144 PHONE FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB DC Provision Review.COM TI-Ping 03/12/2014 $278.00 Occupancy Grp: A-3 Occupancy Load: 244 DC Provision Review,COM TI- LRP 03/12/2014 $41.00 12%State Surcharge- Building 03/12/2014 $205.19 Dwelling Units: 0 Plan Review 01/16/2014 $1,111.47 Stories: 1 Height: 0 ft Plan Review-Fire Life Safety 01/1612014 $683 98 Bedrooms: 0 Bathrooms: 0 Permit Fee-Additions,Alterations, 03/12/2014 $1,709.95 Value: $200,000 Demolition Info Process/Archiving-Lg$2 00(over 03/12/2014 $24.00 11x17) Floor Areas: Info Process/Archiving-Sm$0.50(up to 03/12/2014 $27 50 11x17) Total Area 0 Park-Commercial and Industrial 03/12/2014 $1,181 61 Accessory Struct. 0 Metro Const. Excise Tax-Commercial 03/12/2014 $240 00 Basement: 0 Use Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine' 0 Total $5 502 70 Required: Required Items and Reports(Conditions) Fire Sprinkler Yes Parapet. Fire Alarm. Protected Corridors Smoke Detectors Manual Pull Stations Accessible Parking 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR Specialty Codes and all other applicable law All work will be done in accordance with approved plans This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090 You may obtain a copy of the rules or direct questions to OUNC by calling 503 232 1987 or r11 800 332 2344 Issued By: >- �TPermittee Signature: /��i �� i ........ .4011". .f � Call .y 7:00 a.m.for the nest available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. . Budding Permit Application Commercial y\ It)R01-tit I I SI0\1.1 City of Tigard Y' ; ' 13125 SW Hall Blvd.,Tigard,OR 9T21# �5�R � I �� �• - •Si • �p °dirt Pernur i More: 503.T 18.2439 Fu: 503.59Q.t �1 ' � . : �'��� /Y1�� 3 _� ) 7 i t;a it n Inspection Ltmtr�-or.go 75 �P f_w i N +� S 'a"pt i t Internet: www.tigard-or.gov 4�`�? i�� ,, '.�.•.. /]E J` Lfarraosa / / 'K TYPE OF WORK " % - 'twill' r I I TA:I-AND 2-FAMILY DWELLING 0 New coreaructico I-.�Demolition Pamir fees'are basal cat the value of the work performed. , ittalicate the value(rounded to the nearest dollar)of all ,,AdditioNalteretion/replacement ❑Other: equipment,materials,labor,overhead.atoll the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ I-and 2-family dwelling El Commacia�ncl ial Valuation: 3 D Accessory building ❑Multi-family Number of bedrooms- ❑Master builder 0 Other. Number of bat moms: JOB SITE INFORMATION AND LOCATION Total number of Floors: Job site address:/6 Z.% 514 4 E t'H E 'AD New dwelling area: square feet City/StatelZIP: a ./.. or. • Garage/carport area: square feet Suite/bldg./apt.no.: t Project name: C UZ(J r j'G14 ii Covered porch area: square feet Cross streetldirections to job site: y a i lig ' . Ij `. A Deck area: square feet 1 t.1.1-1) 9TULX7S Sri I{�bt o(1 l I FPt-le other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: I Lot no.: Permit fees'are based on the value of the work performed. I Indicate the value(rounded to the nearest dollar)of all Tax masp/parcel no.: .05113 d0-100 equipment,ntaterials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Valuation: $ r()C IVid te- OatirkeX F oN 'N t0 A- 14/ (a1 - • Existing b"` X27 D e -TEt 4At I T (t1rR,t K - o cl.-;T b J f3f EN • L eu ! New building arcs 24 , 0 squire feet c$ PROPERTY OWNER ❑ TENANT Number of armies: I Name: pA C ti. - I C 1:. Type of construction:- Y _13 Address:CO 57 #t C., e.- W (`Calf AYe. _ Occupancy groups City/State/ZIP: p - i_,,�.,► ' 7 4) Existing: pi p`3-I Phone:( )&I4,tf�otr ZO Fax:( ) New: I"\— 3 El APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES* Business name: SM. EN 61E12/5E-FE- , -1T r osiit): Structural plan review fee(or deposit): Contact name: C..nt-PH 61e.17-tl ----- 3.0 e. 't]U 4(,i� a RILL KeAr) FLS plan review fee(if applicable): Address: C) city/staterziP: Plc-- 1 I N 1C��f OR, 9 17 Total fees due upon application: Amount received Phone:(lj e6) ��-`� . 773-7 l Fax: ( ) E-mail: e-7 ter` e 1 e r,� y,�' ,� PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* �ij ONE CTS ' CJ k Commercial and residential prescriptive installation of roof-top mounted PhotoVoltaic Solar Panel System.. - Submit two(2)sets of roof plan with connection details Business name: p ii ig_ y air;i .a .- and fire department access,along with the 2010 Oregon Address: ‘62.4 [ 6 1}LI A\. Solar Installation , -, Code checklist. Permit fec(includes plan review City/State/ZIP: Fa Fri,. 0, dr 47?.I" and adotinisaauvc fees: slao.00 Phone:(. ,23) 330. -4 Fax:( ) State surcharge(12:'Gof permit foe): 5.21.60 see lip.: / 7lag ' I t 1 Total fee due upon application: $201.60 Authorized signature: / 1 This perish application expires it a permit is not obtained t� � withia 180 days after it has bee.accepted as complete. Print raarrae: J Date: I(1 [ Z2 14 ' Fee methodology set by Tri-County Building Industry Service Board. I:IBuildotg\P rmits\BUP-COM PernutApp,doc 02/24/2011 440.4613T(I Ifi2JCOM/WEB1 Building Permit Number: 8,,,z;i c1 k W y , .11111 ' Building Permit Review Commercial Projects with Approved Land Use FIGARD Site Address: /(0015'5 5&0 / ' � S Fe-e-r� ,P-i. ❑Verify site address is valid. y�~ Project Name : 77i, G,rC4 ,.y- Planning Review ❑ Land Use Case Number: /7p1/ 01013--oet=410 l v�122Or�j-�D2Li Plans Match Approved Land Use: 1 ❑ Site Plan ❑ Landscape Plan El Urban Forestry Plan ❑ Elevation Plan ❑ Building Height: Maximum Height Actual Height Conditions Met: ❑ Prior to Permit Submittal ❑ Prior to Permit Issuance Approved by: 4 f ` f Date: Notes: 5e)9i 64-............ Revisions (after Building Submittal only) Reviewer Date Revision 1 Approved X Not Approved ❑ J J,QQ c/(,l, art 3iit Revision 2 Approved ❑ Not Approved I=1 '((�� Revision 3 Approved Cl Not Approved ❑ Building Permit Submittal Original Plan Submittal: Date: ///%4//1 BY: 'r3rziwlii-v Site Plans: # /IS Building Plans: # Create Case Record#: LQ ter case#above for Building Permit Number. Workflow Routing [manning ia-' ngineering aire--rmit Coordinator Siding Workflow Sign-off: off for Planning staff,including notes from planning review(page 1) Route Application Documents: E Engineering: (1) copy of permit application,(1) site plan, (1) building plan and on al plan review routing form. L -Building: original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Reviewed By: Date: Notes: 1:\Building\Forms\BldgPermitRvw_COM_W ithLandUse_l23013.docx ■ J Engineering Review — reviewed by: ,St. 4' ❑ Actual Slope: ❑ PFI Permit# ❑ Conditions Met Notes: f — Approved by: /!9 j,Gc ' ' i. /11-6r-49?_. r Date: j d-1q Revisions (after Building Submittal only) / ,/ ewe Date Revision l Approved ❑ Not Approved LId' ,/1{ t-f.� �_4L/' Revision 2 Approved Not Approved ❑ / *' /�� /r -r 3�l f -144 Revision 3 Approved ❑ Not Approved ❑ Permit Coordinator Review ❑ Conditions Met-Prior to Issssuannce of Building Permit Notes: �1p'a-sl�v 1' Gv-L1.7 freo 1r41.4 Revision Notice 1: Date Sent to Applicant: SAX/4 / Revision Notice 2: Date Sent to Applicant Revision Notice 3: Date Sent to Appli /, rAIV a//144- Okay to Issue Permit- ai Date: I:\Bu i ldinglForms\BldgPermitRvw_COM_W ilhL and Use_1230I 3.docx /.. ' I. Building Permit Number: pUPaD I ti-00X0 1 " Building Permit Review Residential Projects I1(1ARD Site Address: iV2-1 Sw Uptzr ettrus - mod. ❑Verify site address is valid. Project Name & Lot #: 1116 CArW AI- e i Clean Water Services—Service Provider Letter: (lot platted prior to 9/10/1995) Required: Yes ❑ No ❑ Received: Yes ❑ No ❑ Site lan Elements; 2Site plan must be on 8-1/2"x 11"or 11"x 17"paper free(3)copies of site plan brawn to scale(standard architect or engineer scale) North arrow lBtap and tax lot number,site address,project or subdivision Geootprint of new structure(including decks)with finished name,lot number,and zoning floor elevations l(pplicant information(name and phone number) Q'6it and building setback dimensions ❑Property corner elevations(2 foot contour lines if more than Cwt area,building coverage area,percentage of coverage and 4 foot differential) impervious area. ❑U "' 'ty locations ation of wells/septic systems. Et'fisting structures on site urface drainage glireet names D5lieet tree size,type and location [Erosion control(including drainage-way protection,silt fence Ct' xisting trees to be retained with drip line,and tree design,location of catch basin,etc.) protection measures Planing Review E2L,and Use Case Number: J M D W t '- 00940 Zoning: l !P ❑'setbacks: , Front 36 Rear 0' Side d Street Side _01 Garage NiA- EVLandscape Requirement: 15 Efr1,_..91 Coverage Maximum: i C- Building Height: Maximum Height 4- Actual Height l C_,,�V' ual Clearance L7 Easements E Sensitive Lands: ❑ Yes Type [ rban Forestry Plan E Conditions Satisfied Approved by: Ijres_ F-OVkZc-t- Date: 01 ji 01 I4 Notes: Revisions (after Building Submittal only) Reviewer Date Revision 1 Approved ❑ Not Approved ❑ Revision 2 Approved ❑ Not Approved ❑ Revision 3 Approved ❑ Not Approved ❑ 1:1 Building\Forms\BldgPermitRvw_RES_123013.docx ` • . , Building Permit Submittal Original Plan Submittal: Date: 44/4 By: az/t��.l�„ Site Plans: # (fly p Iris, Building Plans: # Create Case Record#: Enter case#above for Building Permit Number. Workflow Routing. tanning [ gineering LrI unit Coordinator [ —BTding Workflow Sign-off: �S' off for Planning staff,including notes from planning review(page 1) ,,_, Route Application Documents: ! ' Engineering: (1) copy of permit application, (1) site plan, (1) building plan and oo al plan review routing form. 0" Building: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Reviewed By: Date: Notes: Engineering Review- reviewed by: ,II,P, 1-1.Lt I r Actual Slope: ❑ Conditions Satisfied Notes: CI) ; f►0nS Nv Ye+ A+; (id Approved by: Date: Revisions (after Building Submittal only) Reviewer Date Revision 1 Approved ❑ Not Approved t/+Y /3Cf I y Revision 2 Approved ❑ Not Approved ❑ Revision 3 Approved ❑ Not Approved ❑ Permit Coordinator Review 0 Conditions Met-Prior to Issuance of Building Permit Notes: Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant Revision Notice 3: Date Sent to Applicant Okay to Issue Permit- Date: I:1 Building\FormslBldgPermitRvw_RRS_123U I 3.docx ( 11 By ' av ; Li - 00007 STEPHEN GERBER ARCHITECT Date Submitted: January 13, 2014 / Revised February 19, 2014 Appeal of: Occupant load factor for The Circuit SWii Bouldering Gym Building Address: 16255 SW Upper Boones Ferry Road Tigard, Oregon Applicant: Stephen J. Gerber 9340 SW Youngberg Hill Rd. McMinnville, Oregon 97128 sgerber©gerberarch.com Business Owner: Andy Coleman The Circuit, Inc. 6050C SW Macadam Ave. Portland, Oregon 97232 andy@thecircuitgym.com This Appeal Involves: Change of Occupancy from M/S-1 to A-3 Maximum Floor Area per Occupant Number of Stories: 1 Existing Building Occupancy Group: M & S-1 Construction Type: Type V-B Fire Sprinklers: Yes, building has full coverage 9340 S W Y O U N G B E R G HILL R O. M C M I N N V I L L E, OREGON 9 7 1 2 8 RHONE: 503.459.7737 E-MAIL: SGERBER@ IERBERARCH.CONI STEPHEN GERBER ARCHITECT Code Section being appealed: Table 1004.1.1 Maximum Floor Area Per Occupant Regulation Requirement: To determine the occupancy for an A-3 Bouldering gym, a function of the space must be selected from Table 1004.1.1. The only applicable label for this unique gymnasium is the "Exercise Room," which has an occupant load factor of 50 square feet for the gross square footage. Proposed Design: The Circuit Bouldering Gym is a specialized, unique exercise facility for a specific type of free climb rock climbing. Typical climbing gyms provide vertical faceted surfaces with hand holds requiring harnesses, ropes, and a bolle person at the base for fall protection.The Bouldering gym is different. It is comprised of 3 dimensional faceted forms with adjustable hand holds to be able to practice climbing boulder formations freely without fall protection except for the padded floor. This freestyle bouldering requires extra available space in, around, and below the area of climber/client, The climber needs the larger open space for the freedom to navigate and ascend the different formations. The amount of space required depends also on the experience level of the user and complexity of the hand hold layout configurations. Reason for Alternate: Per Table 1004.1.1, the "exercise room" function and its maximum floor area allowance per occupant (50sgft/occ.) is tailored for a typical exercise gymnasium, where the equipment is lined up in rows. (See attachment-K,L) The Circuit Bouldering Gym is a different type of exercise gym. It has custom built 2 & 3 dimensional freestanding boulder formations that take up substantial floor space with its foot and overhang print (See attachment-C,D,E,F) in order to create similar natural climbing conditions; they support themselves. Due to the specialized nature of the Bouldering Gym and this type of free climbing exercise, the number of people who are interested in and able to participate is far less than your typical exercise gym. This fact, coupled with the amount of space the climbing equipment occupies and the understanding of how much free space is needed for a user to exercise/practice the skills to safely navigate the man-made boulder forms, (See attachment-G.H,I) tend to make the 50 square feet per person a denser allowance for calculating the occupancy. The climbing paths are not a direct vertical path. They require lots of open space in all directions for adjusting ones path per the ever changing hand hold configurations and boulder obstacles/formations. This in turn requires the additional floor space with fall protection in all directions at the base of the formations. The Circuit Bouldering Gym is a unique exercise gym and needs to either have the allowance per occupant modified for the gross square footage under consideration or have the foot and overhang print deducted from the gross square footage since the users are either occupying the floor space below the formations in preparation of assent or already on the formation with the floor space below cleared due to the free climb nature and fall protection located on the floor. 9340 S W YOUNG BERG HILL RD. M CM INN V ILLS. OREGON 97128 PHONE: 503.459.7737 E-MAIL: SGERBER(Q'GERBERARCH.COI1 STEPHEN GERBER ARCHITECT Conclusion: The maximum floor area allowances per occupant for a typical exercise room should be allowed to be modified to show compliance of the current local and state codes for this type use within the proposed building suite. (See attachment-A, B) We propose the occupant load to be reduced by deducting the bouldering formation foot and overhang print from the gross square footage and apply the 50 square feet per occupant to the net square footage, which can be approved by the building official per Section 1004.1.1, Exception 1. My client has proved to himself, through a survey within his existing Portland Bouldering Gym, (See attachment-J) that the 50 square feet per occupant allowance far surpasses the reality of the required square feet per user for this type of facility. Thank you for your time and consideration. 9340 5W YOUNGBERG HILL RD. MCMINNVILLE. OREGON 971213 PHONE: 503.459.7737 E-MAIL: S G E R B E R@ G E R B E R A R C H.C O M i Albert Shields From: Mike McCarthy Sent: Tuesday, March 11, 2014 11:54 AM To: Albert Shields Cc: 'Andy Coleman'; 'Matt Circuit'; 'David McGee'; 'sgerber @gerberarch.com'; Al Dickman Subject: RE: BUP2014-00009 Attachments: Mike McCarthy P E .vcf Go ahead with the BUP. All remaining work must be completed before final inspection and before occupancy. Mice McCarthy P.E. IN City d • Senior r Project Engineer Streets and Transportation 13125 SW Hall Blvd 1'1 G A R U Tigard,OR 97223 (503)718-2462 'e-- (503)624-0752=_ micern gtgard or.gov From: Albert Shields Sent: Tuesday, March 11, 2014 9:53 AM To: Mike McCarthy Cc: 'Andy Coleman'; 'Matt Circuit'; 'David McGee'; 'sgerber @gerberarch.com'; Al Dickman Subject: RE: BUP2014-00009 Mike,OK with Engineering for us to issue the BUP before the PFI in this case? Albert. From: Al Dickman Sent: Tuesday, March 11, 2014 9:50 AM To: 'sgerber @gerberarch.com'; Albert Shields; Mike McCarthy Cc: 'Andy Coleman'; 'Matt Circuit'; 'David McGee' Subject: RE: BUP2014-00009 Albert/ Mike, Stephen has been understanding with respect to the PFI process and the plan adjustments he has been required to make. We have one outstanding issue to resolve which should already have been resolved had it not been for a misunderstanding. In my opinion issuance of the building permit is acceptable prior to the PFI. In my opinion! Al From: Stephen Gerber [mailto:sgerber @ gerberarch.com] Sent: Tuesday, March 11, 2014 9:33 AM To: Al Dickman; Albert Shields Cc: 'Andy Coleman'; 'Matt Circuit'; 'David McGee' Subject: RE: BUP2014-00009 AI, Thanks for the update, but unfortunate we have to wait a week until he gets back. I have an anxious owner, contractor, and sub-contractors 1 a and our lender is withholding funds until the Building Permit is officially issued. Since we are close to finalizing the PR submittal is there any way we could get the building permit issued prior to the PFI permit? Stephen From: Al Dickman [mailto:AL©tigard-or.gov] Sent: Tuesday, March 11, 2014 9:18 AM To: 'sgerber@ @gerberarch.com' Subject: RE: BUP2014-00009 Stephen, My request was misinterpreted so the work still needs performed. The operator who performs the work is attending training this week. When he returns on Tuesday he'll get it done. I apologize for the wait. Al.. From: Stephen Gerber [mailto:sgerber@gerberarch.coml Sent: Tuesday, March 11, 2014 8:25 AM To: Al Dickman Cc: Albert Shields; Mike McCarthy; 'Andy Coleman'; 'Matt Circuit'; 'David McGee' Subject: RE: BUP2014-00009 Good Morning Al, Checking in on the open storm pipe lateral condition? FYI: 1. The Building department's site plan should match the 1311 application since Agnes looked at it when I turned in the PFI revision. She had me tweak the revised PFI site plan A0.2 and the revised Permit set site plan A0.2 when I turned in the revised PFI drawing set on 3/3/2014. 2. I stopped by your office yesterday to submit the Site/EC Permit application and fees but was informed I needed to submit a Utilities permit as well as answer a couple additional items and include another site plan sheet for the Site Permit Application. I am in the process of getting those two applications filled out/finalized and will get them submitted later today. 3. We are working with our bonded paving/site improvements sub-contractor to get the estimate for the work in the R-O-W produced and submitted to you for review. Stephen Gerber 2 Location: Record Type: Inspection Type: Result: Comments: Inspection Date: Record ID: Inspector: City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 16255 SW UPPER BOONES FERRY RD, TIGARD, OR, 97224 Commercial - Building 299 Final inspection PASS - C of O BUP2014-00009 Chip Barnett Violation Summary: Inspector Contractor