Loading...
Permit CITY OF TIGARD BUILDING PERMIT Rt IN COMMUNITY DEVELOPMENT Permit#: BUP2013 00302 TIGARD 13125 SW Hall Blvd., Tigard OR 97223 503.718 2439 Date Issued: 12/03/2013 Parcel: 1S135AB01003 Jurisdiction: Tigard Site address: 10300 SW GREENBURG RD 200 Project: KPD Insurance Subdivision: METZGER. TOWN OF Lot: 9 Project Description: TI: Minor demolition, constructing three offices and storage room for existing tenant 1/15/14: Reprinted to correct suite number from 250 to 200 Contractor: RUSSELL CONSTRUCTION INC Owner: LINCOLN CENTER LLC 20915 SW 105TH AVE BY SHORENSTEIN PROPERTIES LLC TUALATIN, OR 97062 555 CALIFORNIA ST 49TH FL SAN FRANCISCO, CA 94104 PHONE: 503-692-9002 PHONE: FAX: 503-692-9008 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: IIB DC Provision Review,COM TI-Ping 12/03/2013 $70.00 Occupancy Grp: B Occupancy Load: 17 DC Provision Review,COM TI-LRP 12/03/2013 $10.00 Dwelling Units: 0 Permit Fee-Additions.Alterations, 12/03/2013 $301.85 Demolition Stories: 5 Height: 0 ft 12%State Surcharge- Building 12/03/2013 $36.22 Bedrooms: 0 Bathrooms: 0 Plan Review 12/03/2013 $196.20 Value: $15,000 Plan Review - Fire Life Safety 12/03/2013 $120.74 Info Process/Archiving -Lg$2 00(over 12/03/2013 $4.00 11x17) Floor Areas: Info Process/Archiving-Lg$2 00(over 12/03/2013 $2.00 11x17) Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage- 0 Mezzanine: 0 Total 5/41 0 Required: Required Items and Reports(Conditions) Fire Sprinkler: No Parapet: Fire Alarm: Yes Protected Corridors: Smoke Detectors Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code. State of OR Specialty Codes and all other applicable law All work will be done in accordance with approved plans This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days ATTENTION Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090 You may obtain a copy of the rules or direct questions to OUNC by calling 503 232 1987 or 1 800 332 2344 Issued By:�;;:; �, � Permittee Signature: /2 • a .639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. CITY OF TIGARD BUILDING PERMIT 1 _ COMMUNITY DEVELOPMENT Permit #: BUP2013 -00302 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 12/03/2013 TIC g Parcel: 1 S 135AB01003 Jurisdiction: Tigard Site address: 10300 SW GREENBURG RD 250 Project: KPD Insurance Subdivision: METZGER, TOWN OF Lot: 9 Project Description: TI: Minor demolition, constructing three offices and storage room for existing tenant. Contractor: RUSSELL CONSTRUCTION INC Owner: LINCOLN CENTER LLC 20915 SW 105TH AVE BY SHORENSTEIN PROPERTIES LLC TUALATIN, OR 97062 555 CALIFORNIA ST 49TH FL SAN FRANCISCO, CA 94104 PHONE: 503 - 692 -9002 PHONE: FAX: 503 - 692 -9008 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: IIB DC Provision Review, COM TI - Ping 12/03/2013 $70.00 Occupancy Grp: B Occupancy Load: 17 DC Provision Review, COM TI - LRP 12/03/2013 $10.00 Dwelling Units: 0 Permit Fee - Additions, Alterations, 12/03/2013 $301.85 Demolition Stories: 5 Height: 0 ft 12% State Surcharge - Building 12/03/2013 $36.22 Bedrooms: 0 Bathrooms: 0 Plan Review 12/03/2013 $196.20 Value: $15,000 Plan Review - Fire Life Safety 12/03/2013 $120.74 Info Process /Archiving - Lg $2.00 (over 12/03/2013 $4.00 11x17) Floor Areas: Info Process /Archiving - Lg $2.00 (over 12/03/2013 $2.00 11x17) Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $741.01 Required: Required Items and Reports (Conditions) Fire Sprinkler: No Parapet: Fire Alarm: Yes Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code. State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952- 001 -0010 through OAR 952- 001 -0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232 987 • 1.800 332 2344 Issued By: ' ermittee Signature: AMA" ��,� a 639.4175 by 7:00 a.m. for the next available inspection . _ This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Commercial aCtINVA) OFFICE. USE ONLY City of Tigard Received // Permit No.: 5 r SW Hall Blvd., Tigard, OR 97223 �] Date/B � c) I i , • 1312 8 201 J Plan Review �� Phone: 503.718.2439 Fax: 503.598.1960 DEC J Dates : A � Fj, �r:' T l G n R D Inspection Line: 503.639 R 1 D ace Ready Juris: E See Page 2 for Internet: www.tigard- or.gov GF TI No 'fi ed/M e thod : 'T Supplemental Information CITY °Y DI \A I . TYPE OF WORT W i1 .- I REQUIRED DATA: 1- AND 2- FAMILY DWELLING ❑ New construction ❑ Demolition Permit fees* are based on the value of the work performed. Indicate the value (rounded to the nearest dollar) of all ® Addition/alteration/replacement ❑ Other: equipment, materials, labor, overhead, and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1- and 2- family dwelling ® CommerciaUindustrial Valuation: $ El Accessory building ❑ Multi - family Number of bedrooms: El Master builder El Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 1 Lincoln - 10300 SW Greenburg Road New dwelling area: square feet City / State/ZIP: Portland, OR 97223 Garage/carport area: square feet Suite/bldg. /apt. no.: 250 Project name: KPD Insurance Covered porch area: square feet Cross street/directions to job site: Project located north of SW oak street, Deck area: square feet south of SW Locust Street and east of Greenburg Road Other structure area: square feet REQUIRED DATA: COMMERCIAL -USE CHECKLIST Subdivision: I Lot no.: Permit fees* are based on the value of the work performed. Tax map/parcel no.: Indicate the value (rounded to the nearest dollar) of all equipment, materials, labor, overhead, and the profit for the DESCRIPTION OF WORK work indicated on this application. Work to include minor demolition, new walls, doors and cabinetry Valuation: $$15,000.00 Existing building area: 2370 square feet New building area: 2370 square feet ® PROPERTY OWNER ❑ TENANT Number of stories: 5 Name: Shorenstein Type of construction: I -B Address: One SW Columbia Street Suite 500 Occupancy groups: City / State/ZIP: Portland, OR 97258 Existing: B Phone: (503)412 -4902 Fax: (503)412 -4903 New: B ® APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES* Business name: Mackenzie (Please refer to fee schedule) Structural plan review fee (or deposit): Contact name: Kim Ford FLS plan review fee (if applicable): Address: 1515 SE Water Ave Suite 100 Total fees due upon application: City /State/ZIP: Portland, OR 97214 Phone: (503) 224-9560 Fax: : (503) 228 -1285 Amount received: E -mail: kford @mcknze.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* CONTRACTOR Commercial and residential prescriptive installation of roof -top mounted PhotoVoltaic Solar Panel System. Business name: Russell Construction Submit two (2) sets of roof plan with connection details and fire department access, along with the 2010 Oregon Address: 20915 SW 105'" Ave Solar Installation Specialty Code checklist. City /State/ZIP: Tualatin, OR 97062 Permit fee (includes plan review $180.00 and administrative fees): Phone: (503) 692 -9002 Fax: (503) 692 -9008 State surcharge (12% of permit fee): $21.60 CCB lic.: 58918 Total fee due upon application: $201.60 Authorized signature: • This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. I Print name: Kim Ford I Date: 12/03/2013 I * Fee methodology set by Tri- County Building Industry Service Board. I:1Building\Permits\BUP -COM PermitApp.doc 02/ 24/2011 440- 4613T(11/02/COM/WEB) 1 , 1 « Building Division Development Code Provision Review T I G A it iD Commercial Projects - No Associated Land Use Case Building Permit No: (L(P( ) 63 - 000 _ - xpedited Review Project Name: V P 0 -rni Si .t krfAiV ce— Site Address: ID 3 0 0 3 t.J 4 r u.. 17,0 t '(Z 1 , Suite /Bldg #: Z5D Plans Routed: Original Plan Submittal Date: /43/ Routed By: /- % 1st Revision Submittal Date: Routed By: 2 Revision Submittal Date: Routed By: To the Applicant: If the proposed use is not permitted within the zone, please contact the Building Division to cancel the permit application. Building Permit Technicians (503) 718 -2439. ➢ If a land use is required and for all other questions, please contact the staff person listed above the Planning Review section. Staff: please check items along left only if approved. Planning Review (contact.) tA. :41A at (503) 718 -2 for IA d @tigard- or.gov) Proposal: IAA • e 'r 1 o , , 4 LI/4 (v ;f'i'u) ND 6), 'sue ; try- G . L Zoning Y) IA. E I ,/ Permitted Use Yes LET No ❑ Land Use Required: Yes ❑ No LA Notes: Q' Approved ❑ Not Approved ❑ DCPR Not Required — No DCPR Fees Due Date Routed to Building: 1:\CURPLN\Masters\Development Code Provision RevievADCPR_COM_NoLandUse.doc Rev. 01/16/13 III 1 II Building Division Over- The - Counter (OTC) Building Permit T l G n li D Check List Project Description: 1. APPLICATION SPECIFIC INFORMATION GENERAL INFORMATION Class of Work *: Occupancy Group: Type of Construction: Type of Use * *: (1 . Occupancy Load: 7 ' - Oregon Specialty Code: 2�) 1 Q SPECIFICS Number of Stories: PS' Building Height: Mixed Use: Number of Dw Units: Number of Bathrooms: Number of Bedrooms: BUILDING SQ FT - SCHOOL CET OTHER SQUARE FOOTAGES Story Square Footage: Accessory Structure: Covered Porch: Basement: Garage: Deck: Total Square Footage: Carport: Mezzanine: SETBACKS Sideyard Setback — Left Sideyard Setback — Front Sideyard Setback — Right _ Sideyard Setback — Back CONSTRUCTION Exterior Walls: Openings Protected: Firewall Separation: N: S: N: 5: Occupancy Separation: E: W: E: W: Access. Parking Spaces: REQUIRED ITEMS Fire Sprinklers: Fire Alarms: c Smoke Detectors: Parapet: Manual Pull Stations: Protected Corridors: _ Total Project Valuation: $ ( C I FEES DUE $ aD DC Prov Rvw, COM TI — Ping $ ( cb.) DC Prov Rvw, COM TI — LRP DC Provision Review Fee for COM TI (effective 7/1/2013) $ . I S ermit Fee — Add, Alt, Demo Project Valuation Planning LRP $ . 1 .... 2212% State Surcharge Up to $4,999 $0.00 $0.00 $ 4. , ale Plan Review, Structural $5,000 - $74,999 $70.00 $10.00 $ riiv& Plan Review, Fire Life Safety $75,000 - $149,999 $174.00 $26.00 $ b , Info Proc /Arch, Lg (over 11x17 $2.00) $150,000 and over $278.00 $41.00 $ Info Proc /Arch, Sm (up to 11x17 $0.50) $ Metro Construction Excise Tax $ School Construction Excise Tax $ Hourly Rate Fee Planning Staff: $ Hourly Rate State Surcharge $ Misc. Admin Fee Permit Coordinator: $ Other: $ Other: Building Staff: $ Other: Date /Time: $ - 1-4i1 , ) ( TOTAL FEES DUE 'KI'YPE OF USE: COM = commercial; CMS = commercial manufactured structure. *CLASS OF WORK ACS = accessory; ADD = addition; ADU = accessory dwelling unit; ALT = alteration; DEM = demo; NEW = new; OTR = other (use for fences, decks, retaining walls, signs, awnings or canopies). I: \Building\ Forms \ OTC-BUP.docx 07/01/2013 Location: Record Type: Inspection Type: Comments: Inspection Date: Record ID: Result: City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 10300 SW GREENBURG RD 200, TIGARD, OR, 97223 Commercial - Building 299 Final inspection 2014-02-28 00:00:00 BUP2013-00302 PASS - C of O Violation Summary: Inspector Contractor