Loading...
Permit CITY OF TIGARD BUILDING PERMIT I.' COMMUNITY DEVELOPMENT Permit#: BUP2012-00107 IL GAP,0 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 08/22/2013 Parcel: 1S 134AB03300 Jurisdiction: Tigard Site address: 10330 SW SCHOLLS FERRY RD Project: Muslim Educational Trust Subdivision: ENGLEWOOD Lot: 88 Project Description: New 2-story building and partial basement for private school,including a gym,indoor pool,cafeteria,classrooms and administrative spaces. Contractor: TS GRAY CONSTRUCTION Owner: MUSLIM EDUCATIONAL TRUST INC 12705 SW HERMAN RD PO BOX 283 TUALATIN, OR 97062 PORTLAND,OR 97223 PHONE: 503-692-4675 PHONE: FAX: 503-692-9292 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: NEW Type of Const: IIB Permit Fee-COM-New Construction 08/22/2013 $26,137.51 Occupancy Grp: E Occupancy Load: 1766 Plan Review 05/23/2012 $16,989.38 Dwelling Units: 0 Plan Review-Fire Life Safety 08/22/2013 $10,455.00 12%State Surcharge-Building 08/22/2013 $3,136.50 Stories: 2 Height: 0 ft DC Provision Review,COM New-Bldg 08/22/2013 $129.00 Bedrooms: 0 Bathrooms: 0 DC Provision Review,COM New-Ping 08/22/2013 $129.00 Value: $5,740,971 DC Provision Review,COM New-LRP 08/22/2013 $38.00 Info Process/Archiving-Lg$2.00(over 08/22/2013 $298.00 11x17) Floor Areas: Info Process/Archiving-Sm$0.50(up to 08/22/2013 $600.00 Total Area: 36041 11x17) Metro Const.Excise Tax-Commercial 08/22/2013 $6,889.17 Accessory Struct: 0 Use Basement: 2266 Additional Plan Review 08/22/2013 $200.00 Carport: 0 Park-Commercial and Industrial 08/22/2013 $4,946.58 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $69,948.14 Required: Required Items and Reports(Conditions) Fire Sprinkler: Yes Parapet: 1 Ersn Cntrl 503-639-4175 Fire Alarm: Yes Protected Corridors: No 2 Special Inspection(see plans) Smoke Detectors: Yes Manual Pull Stations: Yes Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: ����c7s�/_/LCJ iP Permittee Signature: 17 If Call 503.639.4175 by 7:00 a.m.for the next available Inspection date. This permit card shall be kept in a conspicuous place on the Job site until completion of the project. Approved plans are required on the job site at the time of each Inspection. Building.Permit Application / dr `.00 o`hO Commercial �� +'��� FOR OFFICE USE ONLY , � City of Tigard s n G rved Permit No.: ''Y 2�t2 /r^' or '+te/By: ���� uPde jig../41/40 1,1 ° 13125 SW Hall Blvd.,Tigard,OR 9722 W� �an Revi•% (1i tai 0 : . Phone: 503718.2439 Fax: 50,3/5 8�1 T'T I Date/By: /J�� Other Permit: Inspection Line: 503.639.4.175 - Ilr-+ Date Ready: p �JJ Jul-is' ® See Page 2 for T[GARD Internet: www.tigard-or.gov ;_„�t�r\\l -"� �y Notified/Methodt7 /� .Q�jr Supplemental Information 0 TYPE OF WORK / REQUIRED DATA:1-AND 2-FAMILY DWELLING ®New construction ❑ Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement El Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. Valuation: $ El 1-and 2-family dwelling ®Commercial/industrial ❑Accessory building 11 Multi-family Number of bedrooms: El Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 10330 SW Scholls Ferry Road New dwelling area: square feet City/State/Z1P:Tigard,OR 97223 Garage/carport area: square feet Suite/bldg./apt.no.: Project name: MET Community Center Covered porch area: square feet Cross street/directions to job site:SW Scholls Ferry&SW Conestoga Drive Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: 1S134AB03300 Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF %'ORK work indicated on this application. New two-story+partial basement private school.Building includes a gym, Valuation: $$5,740,971.00 indoor pool,cafeteria,classrooms and administrative spaces. Existing building area: square feet The buildig will also be used for prayer services. New building area: 36041 square feet ® PROPERTY OWNER ❑ TENANT Number of stories: 2 Name:Muslim Educational Trust Type of construction: 11-B Address: 10330 SW Scholls Ferry Road Occupancy groups: City/State/ZIP:Tigard,OR 97223 Existing: I Phone:(503)579-6621 Fax:( ) New: E,A-3 ® APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES* U Business name:Otak Architects,Inc (Please refer to fee schedule) f Structural plan review fee(or deposit): $16,979.00 II Contact name:Jennifer Nye FLS plan review fee(if applicable): 10454 Address: 17355 SW Boones Ferry RD City/State/ZIP: Lake Oswego,OR 97035 Total fees due upon application: $27,434.00 Phone:(503)699-2456 Fax: :(503)635-5395 Amount received: E-mail:jennifer.nye @otak.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* CONTRACTOR iD Commercial and residential prescriptive install. .)n of /� ^ roof-top tinted PhotoVoltaic Solar P.• ystem. Business name: —r 5 G/�.H-y Ck,uSGT10A1 Submit two -ts of roof plan . . connection details Address: { , A and fire departmen : cess, • . g with the 2010 Oregon /.2 20� JA) /� A7/97V /tC s Solar Installation Spect.. . Code checklist. _ City/State/ZIP: _,9 . 77/\j/J Q-� 9 7 9 6� Permit fee(in des p •- eview $180.00 Phone:(.$ 4 9A , % 75 Fax:L3!G y,..2-9.2.9?.... an. administrative ������ Statesurc••rge(12%ofpermitfee): $21.60 CCB tic.: — Total fee due upon application: $201.60 Authorized signature: -y This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: L.3 A: 71) A- 99 1 1) Date: 5/Z31Zo I Z * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUN-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) • M536 o acs ' 4 >' 4 J "/u4G/N &iue - T/ st" 1111. o Building Division Development Code Provision Review T i c R° Commercial Projects with Approved Land Use Building Permit No.: •'( i • P No 12,-DO /07 • Land Use Casefile No.: 1`-1 k-() 901 o,-GO51 Q Routed Plans: Submittal Date: 5 3 /' Submittal Date: /S/1?_ Submittal Date: To the Applicant: Each review type must be approved. If the plan is not approved, please revise and resubmit three (3) copies to the Building Division. Only checked (✓) items are approved. Items not approved and those listed in the notes must be revised prior to re-submittal. For questions please contact the appropriate staff person(s) listed above each section. (r STAFF: please only mark those items on the left side that are approved. . Planning Review(contact ' - at 503-718- ZLt34( or @tigard-or.gov) ,0' Land Use Approval Z Building Plans Match Approved Plan: Yes ❑ No ❑ .13- Maximum Building Height ';5- , 3 r k.‘"71)°).5 ❑ Conditions Met fr/ Notes: 5 Z' Ec- os j n 1 vi k ,'J 1.43(L -- ,9,„, C LP 2662-d6zt3 1• 3}en+i T jvFo,r'af1-71c-w 7o tie T C'a- t 17/ vs vest) m i c 4-1.1,0 016''-fse--T -jc /stop g0p/L I,YT� pzsi.0I euoY & ei zze.e>2 rw YvO-i�t cey',1t.- crc Crri�j Pkiz i.dk• /y i w P( A,,-b,� Original Plan: Atproved $lot Approved 2 Date: -25 -12— Revision 1: Approved ❑ Not Approved 12' Date: 12- Revision 2: Approved H' Not Approved ❑ Date: 7 - /7- I Z Engineering Review(contact Mike White at 503-718-2464 or MikeW @tigard-or.gov) ❑ Actual Slope: cyo ❑ PFI Permit# ❑ Conditions Met Notes: Original Plan: Approved ❑ Not Approved Date: ?'/2 Revision 1: Approved `�Not Approved ❑ Date: �/.2/ /Z� Revision 2: Approved ❑ Not Approved ❑ Date: (Review Continues on Page 2) Page 1 of 2 ./ cal) c. h City Arborist Review(contact Todd Prager at 503-718-2700 or todd @tigard-or.gov) 171//Street Trees Protected Trees Notes: Pe G7 3 (% t- Original Plan: Approved ❑ Not Approved la/y Date: a 2 Revision 1: Approved ❑ Not Approved ai Date: _ Revision 2: Approved ..Er Not Approved ❑ Date: Yrr, 7 Permit Coordinator Review(contact Albert Shields at 503-718-2426 or albert @tigard-or.gov) ❑ Planning Okay to Issue Permit ❑ Arborist Okay to Issue Permit ❑ Engineering Okay to Issue Permit Notes: Original Plan: Date Sent to Applicant: - Revision 1: Date Sent to Applicant Revision 2: Date Sent to Applicant / Okay to Issue Permit: Yes '1 No A5/ Date Routed to Building: , 9 /7-J_ • • Page 2 of 2 Construction Excise Tax Exemption Application Exemption Description (check applicable exemption): 1. Private School Improvements. NI 2. Public Improvements as defined in ORS 279A.010 0 3. Residential housing that is guaranteed to be affordable,under guidelines 0 Established by the United States Department of Housing and Urban Development, to households that earn no more than 80% of the median Household income for the area in which the construction tax is imposed, for a period of at least 60 years following the date of construction of the residential housing. 4. Public or Private hospital improvements. 0 5. Non-profit long term care facilities; non-profit residential care facilities; or Q non-profit continuing care retirement communities. 6. Improvements to religious facilities primarily used for worship or O education associated with worship. 7. Agricultural buildings as defined in ORS 455.315(2)(a). Q Application for any of the above exemptions provides consent for the District to audit the applicant's records to verify the legal statues and compliance with the exemption prerequisites. I do hereby certify that by signing I am verifying eligibility for the above Exemption to the Construction nE ise Tax. l O∎try der QAb\tr_Zeka630$ At t I rized Signature Title Jurisdiction Issuing Permit: C/77 OF 7/679i b Permit No. 46/4/°02.4042 *-0W/O 7 School District in which Construction is Planned: eg—#9I4672.7V A/S e ted L 6/.S7721e Address of Construction for which Exemption is Claimed: /0330. Sa.1 SelfOLL-S Ft71/Ey 2d i 77 ,9-/1.IS, 02 9 7 A a 3 Permit Holder: /yuSL//J EI I C9-770/✓$L TRUST Permit Ilolder Phone DS—s79—lol00?/ Permit Holder E-Mail: CET Exemption Application I/I3/21)10 /O 3 3d Sti✓ S,--kw//5 >✓✓ry S ..ZO'/2- /o7 COMcheck Software Version 3.9.0 r,,�, s,�i-�- ,_7) Interior Lighting Compliance .``��' 2 Certificate MAY Oregon Energy Efficiency Specialty Code . Section 1: Project Information Project Type: New Construction Project Title : Construction Site: Owner/Agent: Designer/Contractor: Section 2: Interior Lighting and Power Calculation A OFFICE COPY B C D Floor Area Allowed Allowed Watts Watts lft2 school building(School/University) 37448 1.01 37822 Total Allowed Watts= 37822 Section 3: Interior Lighting Fixture Schedule A B C D E Fixture ID :Description I Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. school building(School/University 37448 sq.ft.) LED:A1:Other 1 119 50 5950 Linear Fluorescent:B1:48"T8 32W(Super T8)/Premium efficiency 1 28 30 840 Linear Fluorescent:B2:48"T8 32W(Super T8)/Premium efficiency 2 6 58 348 Linear Fluorescent:B3:48"T8 32W(Super T8)/Premium efficiency 2 5 58 290 Linear Fluorescent:B4:48"T8 32W(Super T8)/Premium efficiency 1 10 30 300 Linear Fluorescent:B5:48"T8 32W(Super T8)/Premium efficiency 2 32 58 1856 Linear Fluorescent:Cl:48"T8 32W(Super T8)/Premium efficiency 2 86 58 4988 Linear Fluorescent:C2:48"T8 32W(Super T8)/Premium efficiency 2 19 58 1102 Linear Fluorescent:C4:48"T8 32W(Super T8)/Premium efficiency 1 4 30 120 LED:Dl:Other 1 26 14 364 Compact Fluorescent 1:D2:Triple 4-pin 32W/Electronic 1 1 36 36 LED:D3:Other 1 24 27 648 LED:D4:Other 1 3 14 42 LED:D5:Other 1 33 36 1188 LED:D6:Other 1 14 36 504 • Linear Fluorescent:Fl:46"T5 28W/Electronic 1 7 30 210 Linear Fluorescent:G1:48"T8 32W(Super T8)/Electronic 2 7 58 406 Linear Fluorescent:H1:46"T5 28W/Electronic 1 2 30 60 LED:K1:Other 1 20 50 1000 LED:K2:Other 1 60 3 180 LED:K3:Other 1 20 50 1000 Linear Fluorescent 12:Ml:48"T8 32W(Super T8)/Premium efficiency 6 20 174 3480 Linear Fluorescent 13:M2:48"T8 32W(Super T8)/Premium efficiency 2 10 58 580 Compact Fluorescent 2:N2:FT4ODL28W/BIAX 40W/Electronic 2 4 60 240 Linear Fluorescent 14:N3:36"18 25W/Premium efficiency 4 11 90 990 Compact Fluorescent 3:P1:Triple 4-pin 13W/Electronic 4 15 58 870 Compact Fluorescent 3 copy 1:P2:Triple 4-pin 32W/Electronic 4 11 128 1408 LED:R1:Other 1 3 25 75 Compact Fluorescent 5:Triple 4-pin 26W/Electronic 2 8 60 480 Project Title: Report date: 02/24/12 Data filename:C:\Users\markg\Dropbox\MET energy\MET energy code.cck Page 1 of 5 Track lighting 1:Wattage based on circuit breaker capacity(4 amps x 120 volts) 0 0 0 480 Total Proposed Watts= 30035 Section 4: Requirements Checklist In the following requirements, the relevant code section reference is shown in(J. '+'denotes that more details exist in the specified code section. Checkboxes identify requirements that the applicant has not acknowledged as being met. Check marked requirements identify those the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in the plans/specs the requirement can be verified as being satisfied. Lighting Wattage: 1. [505.1 +]Total proposed watts must be less than or equal to total allowed watts. Allowed Wattage:37822 Proposed Wattage:30035 Complies:YES Mandatory Requirements: . M 2. [505.4]Exit signs.Internally illuminated exit signs shall not exceed 5 watts per side. Plans reference page/section: EO.O1 1i 3. [505.2.2.3+]Daylight zone control.All daylight zones are provided with individual controls that control the lights independent of general area lighting in the non-daylight zone.In all individual daylight zones larger than 350 sq.ft.,automatic daylight controls is provided. Automatic daylight sensing controls reduce the light output of the controlled luminaires at least 50 percent,and provide an automatic OFF control,while maintaining a uniform level of illumination.Contiguous daylight zones adjacent to vertical fenestration may be controlled by a single controlling device provided that they do not include zones facing.more than two adjacent cardinal orientations (i.e.,north,east,south,west).Daylight zones under skylights shall be controlled separately from daylight zones adjacent to vertical fenestration. E2.01, E2.02 Plans reference page/section: NI 4. [505.2.1 +]Interior lighting controls.At least one local shutoff lighting control has been provided for every 2,000 square feet of lit floor area and each area enclosed by walls or floor-to-ceiling partitions.The required controls are located within the area served by the controls or are a remote switch that identifies the lights served and indicates their status. Plans reference page/section: E2.00, E2.01, E2.02 D 5. [505.2.3+]Sleeping unit controls.Master switch at entry to hotel/motel guest room. Plans reference page/section: N/A xi 6. [505.2.1.1]Egress lighting.Egress illumination is controlled by a combination of listed emergency relay and occupancy sensors to shut off during periods that the building space served by the means of egress is unoccupied. Plans reference page/section: E2.01, E2.02 xi 7. [505.2.2+]Additional controls.Each area that is required to have a manual control shall have additional controls that meet the requirements of Sections 505.2.2.1 and 505.2.2.2. Plans reference page/section: E2.O 1, E2.02 xi 8. [505.2.2.1 +]Light reduction controls. Each space required to have a manual control also allows for reducing the connected lighting load by at least 50 percent by either • 1)controlling(dimming or multi-level switching)all luminaires;or 2)dual switching of alternate rows of luminaires,alternate luminaires,or alternate lamps;or 3)switching the middle lamp luminaires independently of other lamps;or 4)switching each luminaire or each lamp. Plans reference page/section: E2.01, E2.02 (g 9. [505.2.2.2]Buildings larger than 2,000 square feet are equipped with an automatic control device to shut off lighting in those areas.This automatic control device shall function on either: 1)a scheduled basis,using time-of-day,with an independent program schedule that controls the interior lighting in areas that do not exceed 10,000 square feet and are not more than one floor;or 2)an occupant sensor that shall turn lighting off within 30 minutes of an occupant leaving a space;or 3)a signal from another control or alarm system that indicates the area is unoccupied. Plans reference page/section: E2.00, E2.01, E2.02 _ • 10.[505.2.2]Occupancy sensors in rooms that include daylight zones are required to have Manual ON activation. Plans reference page/section: Specification 260923 • 11.[505.2.2]An occupant sensor control device is installed that automatically turns lighting off within 30 minutes of all occupants leaving a space. Plans reference page/section: E2.00, E2.01, E2.02, Specification 260923 Project Title: Report date: 02/24/12 Data filename: C:\Users\markg\Dropbox\MET energy\MET energy code.cck Page 2 of 5 ❑ 12.[505.2.2]Additional controls.An occupant sensor control device that automatically turns lighting off within 30 minutes of all occupants leaving a space or a locally activated switch that automatically turns lighting off within 30 minutes of being activated is installed in all storage and supply rooms up to 1000 square feet. Plans reference page/section: N/A • 13.[505.2.2.2.1]Occupant override.Automatic lighting shutoff operating on a time-of-day scheduled basis incorporates an override switching device that: 1)is readily accessible,2)is located so that a person using the device can see the lights or the area controlled by that switch,or so that the area being lit is annunciated,3)is manually operated,4)allows the lighting to remain on for no more than 2 hours when an override is initiated,and 5)controls an area not exceeding 2,000 square feet. Plans reference page/section: E2.01, E2.02, E6.00 • 14.[505.2.2.2.2]Holiday scheduling.Automatic lighting shutoff operating on a time-of-day scheduled basis has an automatic holiday scheduling feature that turns off all loads for at least 24 hours,then resumes the normally scheduled operation. Plans reference page/section: E2.01, E2.02, E6.00 15.[505.2.4+]Exterior lighting controls.Lighting not designated for dusk-to-dawn operation shall be controlled by either a combination of a photosensor and a time switch,or an astronomical time switch.Lighting designated for dusk-to-dawn operation shall be controlled by an astronomical time switch or photosensor. Plans reference page/section: E1.00, E6.00 16.[505.3]Tandem wiring.The following luminaires located within the same area shall be tandem wired: 1.Fluorescent luminaires equipped with one,three or odd-numbered lamp configurations,that are recess-mounted within 10 feet center-to-center of each other. 2.Fluorescent luminaires equipped with one,three or any odd-numbered lamp configuration,that are pendant-or surface-mounted within 1 foot edge-to-edge of each other. Plans reference page/section: Specification 265100 • 17. [505.5.1 +]Medical task lighting or arUhistory display lighting claimed to be exempt from compliance has a control device independent of the control of the nonexempt lighting. Plans reference page/section: N/A • 18.[505.7+]Each dwelling unit in a building is metered separately. Plans reference page/section: N/A w,� 9fi.g am,.,.,_w Ri66. . u betFer than code �A ` . . s E wt r Ear +_ Interior�l fitin PASSES�Dest�n 21 �,.u��..� ,,�.....� � '� - �',�'� � ���v .. ` , ,. Section 5: Compliance Statement Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the Oregon Energy Efficiency Specialty Code requirements in COMcheck Version 3.9.0 and to comply with the mandatory requirements in the Requirements Checklist. Mark K. O'Leary, PE - Electrical Engineer Off— 3/5/2012 Name-Title Signature Date Project Title: Report date: 02/24/12 Data filename: C:\Users\markg\Dropbox\MET energy\MET energy code.cck Page 3 of 5 ir., .COMcheck Software Version 3.9.0 ,,,,,,,.. _, Exterior Lighting Compliance Certificate Oregon Energy Efficiency Specialty Code Section 1: Project Information Project Type: New Construction Project Title : Exterior Lighting Zone: 2(Neighborhood business district) Construction Site: Owner/Agent: Designer/Contractor: Section 2: Exterior Lighting Area/Surface Power Calculation A B C D E F Exterior Area/Surface Quantity Allowed Tradable Allowed Proposed Watts Wattage Watts Watts /Unit (BxC) Parking area 35000 ft2 0.06 Yes 2100 1040 Plaza area 15000 ft2 0.14 Yes 2100 1010 Main entry 8 ft of door width 20 Yes 160 98 Other door(not main entry) 36 ft of door width 20 Yes 720 280 Stairway 150 ft2 1 Yes 150 0 Total Tradable Watts*= 5230 2428 Total Allowed Watts= 5230 Total Allowed Supplemental Watts**= 600 *Wattage tradeoffs are only allowed between tradable areas/surfaces. **A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Section 3: Exterior Lighting Fixture Schedule A B C D E Fixture ID: Description/Lamp I Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Parking area(35000 ft2):Tradable Wattage LED:SA1,SA2:Other 1 13 80 1040 Plaza area(15000 ft2):Tradable Wattage HID 1:SB1:Ceramic Metal Halide 20W/Pulse start 1 14 25 350 HID 1 copy 1:SP1:Ceramic Metal Halide 100W/Pulse start 1 6 110 660 Main entry(8 ft of door width):Tradable Wattage LED:SD1:Other 1 7 14 98 Other door(not main entry)(36 ft of door width):Tradable Wattage LED:SW1,SW2:Other 1 8 35 280 Stairway(150 ft2):Tradable Wattage Total Tradable Proposed Watts= 2428 Section 4: Requirements Checklist In the following requirements, the relevant code section reference is shown in[]. '+'denotes that more details exist in the specified code section. Checkboxes identify requirements that the applicant has not acknowledged as being met. Check marked requirements identify those the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in the plans/specs the requirement can be verified as being satisfied. Lighting Wattage: Project Title: Report date: 02/24/12 Data filename: C:\Users\markg\Dropbox\MET energy\MET energy code.cck Page 4 of 5 ill 1. [505.6.2+]Within each non-tradable area/surface,total proposed watts must be less than or equal to total allowed watts.Across all tradable areas/surfaces,total proposed watts must be less than or equal to total allowed watts. Complies:Passes. Controls, Switching, and Wiring: 2. [505.6.2+1 All exemption claims are associated with fixtures that have a control device independent of the control of the nonexempt lighting. Plans reference page/section: E1.00 E6.00 ca 3. [505.2.4+]Lighting not designated for dusk-to-dawn operation is controlled by either a a photosensor(with time switch),or an astronomical time switch. Plans reference page/section: E1.00, E6.00 Xi 4. [505.2.4+]Lighting designated for dusk-to-dawn operation is controlled by an astronomical time switch or photosensor. Plans reference page/section: E1.00, E6.00 • 5. [505.2.4+]All time switches retain programming and the time setting during loss of power for a period of at least 10 hours. Plans reference page/section: Specification 260920 Dit 6. [505.2.4+]Lighting designated to operate more than 2000 hours per year for Uncovered Parking Areas shall be equipped with motion sensors that will reduce the luminaire power by thirty-three percent or turn off one-third the luminaires when no activity is detected. Plans reference page/section: El.00, E6.00 Exterior Lighting Restrictions and Exceptions: NI 7. [505.6.1 +]Mercury vapor and incandescent lighting is not permitted for use as exterior lighting. izi 8. [505.6.1 +]Exempt lighting fixtures are equipped with a control device independent of the control of the nonexempt lighting and are identified in Section 3 table above. Plans reference page/section: Exterlo iti nfof iiikO Design 58%bet e ifkian3co. e: M aaily ~' Section 5: Compliance Statement Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans,specifications _ and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the Oregon Energy Efficiency Specialty Code requirements in COMcheck Version 3.9.0 and to comply with the mandatory requirements in the Requirements Checklist. Mark K. O'Leary, PE - Electrical Engineer -i% Dom— 3/5/2012 Name-Title Signature Date Project Title: Report date: 02/24/12 Data filename: C:\Users\markg\Dropbox\MET energy\MET energy code.cck Page 5 of 5 /d33O r6u 2 0/2.- ore/o7 ,rte. 4ir COMcheck Software Version 3.8.0 Envelope Compliance Certif. :, RIEJUjI MAY 23 7012. Oregon Energy Efficiency Specialty Code OFT1G«RD Section 1: Project Information luuILDING DI\IISION Project Type: New Construction Envelope Compliance Method: Simplified Trade-Off CITY Project Title : MET Community Center Construction Site: Owner/Agent: Designer/Contractor: 10330 SW Scholls Ferry Rd Jason Mooney Tigard,OR 97223 Interface Engineering 708 SW 3rd Portland,OR 97204 503-382-2264 Section 2: General Information Building Location(for weather data): Portland,Oregon Climate Zone: 4c Vertical Glazing/Wall Area Pct.: 30% Skylight Glazing/Roof Area Pct.: 2% Building Type Floor Area School/University 20950 Section 3: Requirements Checklist OFFICE COPY E velp PA,A 0011 sg 061:1iette than iri t:. •. .?fArti ,M' .SMOR Climate-Specific Requirements: Component Name/Description Gross Cavity Cont. Proposed Budget Area or R-Value R-Value U-Factor U-Factorta) Perimeter Roof 1: Insulation Entirely Above Deck 20952 --- 38.0 0.026 0.048 Skylight 1:Metal Frame with Thermal Break:Double Pane,Tinted, 331 -- --- 0.740 0.600 SHGC 0.42 Exterior Wall 1:Steel-Framed, 16"o.c. 17270 21.0 10.0 0.052 0.064 Window 1:Metal Frame with Thermal Break:Double Pane with 4867 -- --- 0.370 0.460 Low-E,Clear,SHGC 0.37 Door 1:Glass(>50%glazing):Metal Frame,Entrance Door,SHGC 294 --- --- 0.370 0.800 0.37 Floor 1:Slab-On-Grade:Unheated,Vertical 2 ft. 915 -- 10.0 --- (a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements. In the following requirements,the relevant code section reference is shown in[].'+'denotes that more details exist in the specified code section. Fenestration Product Rating: 71. [303.1.3]U-factors of fenestration products(windows,doors and skylights)are determined in accordance with NFRC 100 by an accredited,independent laboratory,and labeled and certified by the manufacturer or are determined using the commercial size category values listed in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.4 and shall include the effects of the window frame.The temporary label afixed to the fenestration products must not be removed prior to inspection. Exceptions: ❑ Site-built fenestration products shall have a single certificate specifying glazing type,special coatings,spacers,gas fills, center-of-glass and overall U-factor,and center-of-glass SHGC for every type of site built glass used.These certificates shall be maintained on the jobsite and made available to the inspector. Project Title: MET Community Center Report date: 03/06/12 Data filename: P:\2011\2011-0376\Support\Mech\MET.cck Page 1 of 8 Location in plans/specs where compliance can be identified(enter NA it not applicable): Specs : 0 8 4 11 3 , 0 8 4 413 , 0 8 4 5 2 3 , 0 8 8 0 0 0 • D 72. [303.1.3]Solar heat gain coefficient(SHGC)of glazed fenestration products(windows,glazed doors and skylights)shall be determined in accordance with NFRC 200 by an accredited,independent laboratory,and labeled and certified by the manufacturer or be determined using the Solar Heat Gain Coefficients(SHGC)in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.10.The overall values must consider type of frame material and operator for the SHGC at normal incidence. Exceptions: ❑ Site-built fenestration products shall have a single certificate specifying glazing type,special coatings,spacers,gas fills, center-of-glass and overall U-factor,and center-of-glass SHGC for every type of site built glass used.These certificates shall be maintained on the jobsite and made available to the inspector. Location in plans/specs where compliance can be identified(enter NA if not applicable): Specs : 0 8 4 1 13 , 0 8 4 413 , 0 8 4 5 2 3 , 0 8 8 0 0 0 Air Leakage, Insulation, and Component Certification: • 73. [502.4.3]Sealing of the building envelope.Openings and penetrations in the building envelope are sealed with caulking materials or closed with gasketing systems compatible with the construction materials and location.Joints and seams are sealed in the same manner or taped or covered with a moisture vapor-permeable wrapping material.Sealing materials spanning joints between construction materials allow for expansion and contraction of the construction materials. Location in plans/specs where compliance can be identified(enter NA if not applicable): Specs : 0 7 2 5 0 0 , 0 7 9 2 0 0, Arch Dwg s Li 74. [502.4.1 +]Window and door assemblies.The air leakage of window and sliding or swinging door assemblies that are part of the building envelope are determined in accordance with AAMA/WDMA/CSA 101/I.S.2/A440,or NFRC 400 by an accredited,independent laboratory,and labeled and certified by the manufacturer. Exceptions: Site-constructed windows and doors that are weatherstripped or sealed in accordance with Section 502.4.3. Location in plans/specs where compliance can be identified(enter NA if not applicable): n/a Li 75. [502.4.2+]Curtain wall,storefront glazing and commercial entrance doors.Curtain wall,storefront glazing and commercial-glazed swinging entrance doors and revolving doors are tested for air leakage in accordance with ASTM E 283.For curtain walls and storefront glazing,the maximum air leakage rate is 0.3 cubic foot per minute per square foot of fenestration area.For commercial glazed swinging entrance doors and revolving doors,the maximum air leakage rate is 1.00 cfm/ft2 of door area. Location in plans/specs where compliance can be identified(enter NA if not applicable):Specs : 0 8 4 1 13 , 0 8 4 413 , 0 8 4 5 2 3 , 0 8 8 0 0 0 • 76. [303.1.1 +]Building thermal envelope insulation.An R-value identification mark is applied(by manufacturer)to each piece insulation 12 • inches or greater in width.Alternately,the insulation installers have provided a signed,dated and posted certification listing the type, manufacturer and R-value of insulation installed.Refer to code section for blown or sprayed insulation installation/settling depths and marker requirements. Li 77. [303.1.2]Insulation mark installation.Insulating materials are installed such that the manufacturer's R-value mark is readily observable upon inspection. Li 78. [303.1.4]Insulation product rating.The thermal resistance(R-value)of insulation has been determined in accordance with the U.S. FTC R-value rule. ❑ 79. [303.2]Installation.All material,systems and equipment are installed in accordance with the manufacturer's installation instructions and the International Building Code. • 80. [502.4.4]Outdoor air intakes and exhaust openings.Stair and elevator shaft vents and other outdoor air intakes and exhaust openings integral to the building envelope shall be equipped with not less than a Class I motorized,leakage-rated damper with a maximum leakage rate of 4 cfm per square foot at 1.0 inch water gauge when tested in accordance with AMCA 500D.Stair and shaft vent dampers shall be capable of being automatically closed during normal building operation and interlocked to open as required by fire and smoke detection systems. drawings/specs Location in plans/specs where compliance can be identified(enter NA if not applicable): me c h • 81. [502.4.5]Loading dock weatherseals.Cargo doors and loading dock doors are equipped with weather seals to restrict infiltration when vehicles are parked in the doorway. Location in plans/specs where compliance can be identified(enter NA if not applicable): n/a D 82. [502.4.7+]Recessed lighting.Recessed luminaires installed in the building thermal envelope are sealed to limit air leakage between conditioned and unconditioned spaces.All recessed luminaires are IC-rated and labeled as meeting ASTM E 283.All recessed luminaires are sealed with a gasket or caulk between the housing and interior wall or ceiling covering. Location in plans/specs where compliance can be identified(enter NA if not applicable): n/a • 83. [502.4.6+]Vestibules.Doors that separate conditioned space from the exterior are protected with an enclosed vestibule,with all doors of the vestibule equipped with self-closing devices.Vestibules are designed so interior and exterior doors to not operate simultaneously. Exceptions: Project Title: MET Community Center Report date: 03/06/12 Data filename: P:\2011\2011-0376\Support\Mech\MET.cck Page 2 of 8 • Doors not intended to be used as a building entrance door,such as doors to mechanical or electrical equipment rooms. D Doors opening directly from a sleeping unit or dwelling unit. • Doors that open directly from a space less than 3000 sq.ft.in area. • Revolving doors. • Doors used primarily to facilitate vehicular movement or material handling and adjacent personnel doors. Location in plans/specs where compliance can be identified(enter NA if not applicable): Tl/a 84. [103.2+]'Other components have supporting documentation for proposed U-Factors. Location in plans/specs where compliance can be identified(enter NA if not applicable): n[ a Section 4: Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed envelope system has been designed to meet the Oregon Energy Efficiency Specialty Code requirements in COMcheck Version 3.8.0 and to comply with the mandatory requirements in the Requirements Checklist. Jennifer Nye - Architect .� 5/17/2012 Name-Title S Date • Project Title: MET Community Center Report date: 03/06/12 Data filename: P:\2011\2011-0376\Support\Mech\MET.cck Page 3 of 8 eNY( r COMcheck Software Version 3.8.0 E y 1, Mechanical Compliance Certificate Oregon Energy Efficiency Specialty Code Section 1 : Project Information Project Type: New Construction Envelope Compliance Method: Simplified Trade-Off Project Title : MET Community Center Construction Site: Owner/Agent: Designer/Contractor: 10330 SW Scholls Ferry Rd Jason Mooney Tigard,OR 97223 Interface Engineering 708 SW 3rd Portland ,OR 97204 503-382-2264 Section 2: General Information Building Location(for weather data): Portland,Oregon Climate Zone: 4c Section 3: Mechanical Systems List Quantity System Type&Description 1 HVAC System 1:Rooftop Packaged Heat Pump,Heat Capacity 140 kBtu/h Cool Capacity 350 kBtu/h,Heat efficiency:3.30 COP,Cool efficiency: 13.30 EER,Cool efficiency:13.30 EER/Single Zone 1 HVAC System 2:Rooftop Packaged Heat Pump,Heat Capacity 6 kBtu/h Cool Capacity 12 kBtu/h,Heat efficiency:7.70 HSPF,Cool efficiency: 13.00 SEER,Cool efficiency:13.00 SEER/Single Zone 1 HVAC System 3:Rooftop Packaged Heat Pump,Heat Capacity 32 kBtu/h Cool Capacity 44 kBtu/h,Heat efficiency:7.70 HSPF,Cool efficiency: 13.00 SEER,Cool efficiency:13.00 SEER/Single Zone 1 HVAC System 4:Rooftop Packaged Heat Pump,Heat Capacity 62 kBtu/h Cool Capacity 106 kBtu/h,Heat efficiency:3.50 COP,Cool efficiency: 11.00 EER,Cool efficiency:11.00 EER/Single Zone 1 HVAC System 5:Rooftop Packaged Heat Pump,Heat Capacity 48 kBtu/h Cool Capacity 142 kBtu/h,Heat efficiency:3.20 COP,Cool efficiency: 11.00 EER,Cool efficiency:11.00 EER/Single Zone 1 HVAC System 6:Rooftop Packaged Heat Pump,Heat Capacity 50 kBtu/h Cool Capacity 99 kBtu/h,Heat efficiency:3.30 COP,Cool efficiency: 11.00 EER,Cool efficiency: 11.00 EER/Single Zone 1 HVAC System 7:Rooftop Packaged Heat Pump,Heat Capacity 42 kBtu/h Cool Capacity 82 kBtu/h,Heat efficiency:3.50 COP,Cool efficiency: 11.00 EER,Cool efficiency: 11.00 EER/Single Zone 1 HVAC System 8:Packaged Terminal Heat Pump,Heat Capacity 7 kBtu/h Cool Capacity 8 kBtu/h,Heat efficiency:3.40 COP,Cool efficiency:11.40 EER,Cool efficiency: 11.40 EER/Single Zone Section 4: Requirements Checklist In the following requirements,the relevant code section reference is shown in[].'+'denotes that more details exist in the specified code section. Requirements Specific To: HVAC System 1 : d1. [503.2.3+]Equipment meets minimum efficiency: Heat Pump: 3.2 COP 9.5 EER(9.6 IPLV) Requirements Specific To: HVAC System 2 : DA. [503.2.3+]Equipment meets minimum efficiency: Heat Pump: 7.7 HSPF 13.0 SEER Requirements Specific To: HVAC System 3 : Ia . [503.2.3+]Equipment meets minimum efficiency: Heat Pump: 7.7 HSPF 13.0 SEER Requirements Specific To: HVAC System 4 : Project Title: MET Community Center Report date: 03/06/12 Data filename: P:\2011\2011-0376\Support\Mech\MET.cck Page 4 of 8 [503.2.3+]Equipment meets minimum efficiency: Heat Pump: 3.3 COP 11.0 EER(11.2 IEER) Requirements Specific To: HVAC System 5 : &1. [503.2.3+]Equipment meets minimum efficiency: Heat Pump: 3.2 COP 10.6 EER(10.7 IEER) Requirements Specific To: HVAC System 6 : Er/1. [503.2.3+]Equipment meets minimum efficiency: Heat Pump: 3.3 COP 11.0 EER(11.2 IEER) Requirements Specific To: HVAC System 7 : Eirf. [503.2.3+]Equipment meets minimum efficiency: Heat Pump: 3.3 COP 11.0 EER(11.2 IEER) Requirements Specific To: HVAC System 8 : A. [503.2.3+]Equipment meets minimum efficiency: Heat Pump: 3.0 COP 10.6 EER Generic Requirements: Must be met by all systems to which the requirement is applicable: EV [503.2.1 +]Calculation of heating and cooling loads.Design loads are determined in accordance with the procedures described in the ASHRAE/ACCA Standard 183.Alternatively,design loads have been determined by an approved equivalent computation procedure. [503.2.2+]Equipment and system sizing.Heating and cooling equipment and systems capacity do not exceed the loads calculated in accordance with Section 503.2.1. ❑ Exception: Required standby equipment and systems provided with controls and devices that allow such systems or equipment to operate automatically only when the primary equipment is not operating. ❑ Exception: Multiple units of the same equipment type with combined capacities exceeding the design load and provided with controls that have the capability to sequence the operation of each unit based on load. M0.01 Rooftop Heat Pump Schedule Location in plans/specs where compliance can be identified(enter NA if not applicable): 3. [503.2.3+]HVAC Equipment Performance Requirements.Reported efficiencies have been tested and rated in accordance with the applicable test procedure.The efficiency has been verified through certification under an approved certification program or,if no certification program exists,the equipment efficiency ratings are supported by data furnished by the manufacturer. . [503.2.4.1 +]Thermostatic Controls.The supply of heating and cooling energy to each zone is controlled by individual thermostatic controls that respond to temperature within the zone. Spec 230900 Location in plans/specs where compliance can be identified(enter NA if not applicable): ®'"5. [503.2.4.1.1]Heat pump supplementary heat.Heat pumps having supplementary electric resistance heat have controls that,except • • during defrost,prevent supplementary heat operation when the heat pump can meet the heating load. • Location in plans/specs where compliance can be identified(enter NA if not applicable):Spec 230900 D [503.2.4.2]Set point overlap restriction.Where used to control both heating and cooling,zone thermostatic controls provide a temperature range or deadband of at least 5°F(2.8°C)within which the supply of heating and cooling energy to the zone is capable of being shut off or reduced to a minimum. ❑ Exception:Thermostats requiring manual change over between heating and cooling modes. Spec 230900 Location in plans/specs where compliance can be identified(enter NA if not applicable): s7. [503.2.4.3]Optimum Start Controls.Each HVAC system has controls that vary the start-up time of the system to just meet the temperature set point at time of occupancy. Location in plans/specs where compliance can be identified(enter NA if not applicable): Spec 230900 hJ/8. [503.2.4.4+]Off-hour controls.Each zone is provided with thermostatic setback controls that are controlled by either an automatic time clock or programmable control system. ❑ Exception:Zones that will be operated continuously. ❑ Exception:Zones with a full HVAC load demand not exceeding 6,800 Btu/h(2 kW)and having a readily accessible manual shutoff switch. Location in plans/specs where compliance can be identified(enter NA if not applicable):Spec 230900 . [503.2.4.5+]Shutoff damper controls.Both outdoor air supply and exhaust are equipped with not less than Class I motorized dampers. ❑ Exception:Gravity dampers shall be permitted for outside air intake or exhaust airflows of 300 cfm or less. Location in plans/specs where compliance can be identified(enter NA if not applicable):Spec 230900 ❑ 10. [503.2.4.6+]Freeze Protection and Snow melt system controls.Freeze protection systems,such as heat tracing of outdoor piping and heat exchangers,including self-regulating heat tracing,include automatic controls capable of shutting off the systems when outdoor air temperatures meet code criteria. NA Location in plans/specs where compliance can be identified(enter NA if not applicable): Project Title: MET Community Center Report date: 03/06/12 Data filename: P:\2011\2011-0376\Support\Mech\MET.cck Page 5 of 8 • 11. [503.2.4.7+]Zone Isolation Controls.A system serving multiple occupancies or floors in the same building is independently zoned and equipped with isolation devices. Location in plans/specs where compliance can be identified(enter NA if not applicable): NA ▪ 12. [503.2.4.8]Separate air distribution systems.Zones with special process temperature requirements and/or humidity requirements are served by separate air distribution systems from those serving zones requiring only comfort conditions;or shall include supplementary control provisions so that the primary systems may be specifically controlled for comfort purposes only. Li Exception: [503.2.4.8+]Zones requiring only comfort heating or comfort cooling that are served by a system primarily used for process temperature and humidity control. Location in plans/specs where compliance can be identified(enter NA if not applicable):NA d13. [503.2.4.9]Humidity control.If a system is equipped with a means to add or remove moisture to maintain specific humidity levels in a zone or zones,a humidity control device is provided. /� Location in plans/specs where compliance can be identified(enter NA if not applicable)"Spec 230900, Sheet M2.01 ❑ 14. [503.2.4.9.1]Humidity control.Where a humidity control device exists it is set to prevent the use of fossil fuel or electricity to produce relative humidity in excess of 30 percent.Where a humidity control device is used for dehumidification,it is set to prevent the use of fossil fuel or electricity to reduce relative humidity below 60 De4xception: Hospitals,process needs,archives,museums,critical equipment,and other non-comfort situations with specific humidity requirements outside this range. Location in plans/specs where compliance can be identified(enter NA if not applicable): - -- --- - • • 15. [503.2.4.9.2]Humidity control.Where a humidity control device exists it is set to maintain a deadband of at least 10%relative humidity where no active humidification or dehumidification takes place. M.Ezception: Heating for dehumidification is provided with heat recovery or heat pumping and the mechanical cooling system efficiency is 10 percent higher than required in section 503.2.3,HVAC equipment performance requirements. Location in plans/specs where compliance can be identified(enter NA if not applicable): d6. [503.2.5]Ventilation.Ventilation,either natural or mechanical,is provided in accordance with Chapter 4 of the International Mechanical Code.Where mechanical ventilation is provided,the system has the capability to reduce the outdoor air supply to the minimum required by Chapter 4 of the International Mechanical Code. M0.01 Rooftop Heat Pump Schedule Location in plans/specs where compliance can be identified(enter NA if not applicable): • 17. [503.2.5.1 +]Demand controlled ventilation(DCV).DCV is required for spaces larger than 500 ft2 for simple systems and spaces larger than 150 ft2 for multiple zone systems. <eption:Systems with energy recovery complying with Section 503.2.6 Li Exception:Spaces less than 750 ft2(69.7 m2)where an occupancy sensor turns the fan off,closes the ventilation damper,or closes the zone damper when the space is unoccupied. //�� {� Heat L Location in plans/specs where compliance can be identified(enter NA if not applicable):M0.01 Rooftop Heat Recovery Ve ntl la or S Cl led u le • 18. [503.2.5.2+]Kitchen hoods.Kitchen makeup is provided as required by the Oregon Mechanical Specialty Code. .ception: Where hoods are used to exhaust ventilation air that would otherwise be exhausted by other fan systems. 0 Exception: Kitchen exhaust systems that include exhaust air energy recovery complying with section 503.2.6. Location in plans/specs where compliance can be identified(enter NA if not applicable):S heet 12.01 ▪ 19. [503.2.5.3+]Enclosed parking garage ventilation controls.In Group S-2,enclosed parking garages used for storing or handling automobiles employs automatic carbon monoxide sensing devices. Location in plans/specs where compliance can be identified(enter NA if not applicable): '�' A - 0. [503.2.6+]Energy recovery ventilation systems.Individual fan systems that have both a design supply air capacity of 5,000 cfm or greater and a minimum outside air supply of 70 percent or greater of the design supply air quantity have an energy recovery system. Li Exception:Where energy recovery systems are prohibited by the International Mechanical Code. Li Exception:Systems serving spaces that are not cooled and are heated to less than 60°F. Li Exception:Where more than 60 percent of the outdoor heating energy is provided from site-recovered or site solar energy. LI Exception:Type 1 kitchen exhaust hoods. Li Exception:Cooling systems in climates with a 1-percent cooling design wet-bulb temperature less than 64°F(18°C). 0 Exception:Systems requiring dehumidification that employ series-style energy recovery coils wrapped around the cooling coil when the evaporative coil is located upstream of the exhaust air stream. Li Exception:Systems exhausting toxic,flammable,paint exhaust,corrosive fumes,or dust. Project Title: MET Community Center Report date: 03/06/12 Data filename: P:\2011\2011-0376\Support\Mech\MET.cck Page 6 of 8 D Exception: Laboratory fume hood systems that include qualifyi e u e • ❑ .0 I Rooftop Heat Recovery Ventilator Schedule Location in plans/specs where compliance can be identified(enter NA if not applicable):MO 01 Rooftop Heat♦ Pi tip Schedule [503.2.7+]Duct and plenum insulation and sealing.All supply and return air ducts and plenums are insulated with the specified insulation.When located within a building envelope assembly,the duct or plenum is separated from the building exterior or unconditioned or exempt spaces by a minimum of R-8 insulation.All ducts,air handlers and filter boxes are sealed.Joints and seams comply with Section 603.9 of the International Mechanical Code. • Exception:When located within equipment. • Exception:When the design temperature difference between the interior and exterior of the duct or plenum does not exceed 15°F (8°C). L2. [503.2.7.1.1 +]Low-pressure duct systems.All longitudinal and transverse joints,seams and connections of low-pressure supply and return ducts are securely fastened and sealed with welds,gaskets,mastics(adhesives),mastic-plus-embedded-fabric systems or tapes installed in accordance with the manufacturer's installation instructions. ❑ Exception:Continuously welded and locking-type longitudinal joints and seams on ducts operating at static pressures less than 2 inches w.g.pressure classification. S !� Location in plans/specs where compliance can be identified(enter NA if not applicable):Spec pec 233 1 00 • 23. [503.2.7.1.2+]Medium-pressure duct systems.All ducts and plenums designed to operate medium-pressure are insulated and sealed in accordance with Section 503.2.7.Pressure classifications specific to the duct system are clearly indicated on the construction documents. ^' Location in plans/specs where compliance can be identified(enter NA if not applicable): NA V A ❑ 24. [503.2.7.1.3+]High-pressure duct systems.Ducts designed to operate at high-pressure are insulated and sealed in accordance with Section 503.2.7.In addition,ducts and plenums are leak-tested in accordance with the SMACNA HVAC Air Duct Leakage Test Manual. Location in plans/specs where compliance can be identified(enter NA it not applicable):NA "25. [503.2.9.1 +]Air system balancing.Each supply air outlet and zone terminal device is equipped with means for air balancing in accordance with the requirements of IMC 603.17.Discharge dampers intended to modulate airflow are prohibited on constant volume fans and variable volume fans with motors 10 horsepower. Location in plans/specs where compliance can be identified(enter NA if not applicable).pec 230593 g46. [503.2.9.3+]Manuals.The construction documents require that an operating and maintenance manual be provided to the building owner by the mechanical contractor.See long description for specifications. Location in plans/specs where compliance can be Identified(enter NA if not appllcable)`���Nec 230000 LI 27. [503.2.10+]Air System Design and Control.Each HVAC system having a total fan system motor nameplate hp exceeding 5 hp meets the provisions of Sections 503.2.10.1 through 503.2.10.2. t�' Location in plans/specs where compliance can be identified(enter NA if not applicable):'V~ O 28. [503.2.10.1 +]Allowable fan floor horsepower.Each HVAC system at fan system design conditions does not exceed the allowable fan system motor nameplate hp(Option 1)or fan system bhp(Option 2)as shown and calulated in requirement details. LI Exception:Hospital and laboratory systems that utilize flow control devices on exhaust and/or return to maintain space pressure relationships necessary for occupant health and safety or environmental control shall be permitted to use variable volume fan power limitation. O Exception: Individual exhaust fans with motor nameplate horsepower of 1 hp or less. Location in plans/specs where compliance can be identified(enter NA if not applicable):' "A .29. [503.2.10.2+]Motor nameplate horsepower.For each fan,the selected fan motor is no larger than the first available motor size greater than the brake horsepower(bhp). • Exception:For fans less than 6 bhp,where the first available motor larger than the brake horsepower has a nameplate rating within 50 percent of the bhp,selection of the next larger nameplate motor size is allowed. • Exception:For fans 6 bhp and larger,where the first available motor larger than the bhp has a nameplate rating within 30 percent of the bhp,selection of the next larger nameplate motor size is allowed. Location in plans/specs where compliance can be identified(enter NA if not applicable): '•A • 30. [503.2.10.3.1]Large Volume Fan Systems.Fan systems over 8,000(7 m3/s)cfm without direct expansion cooling coils that serve single zones reduce airflow based on space thermostat heating and cooling demand.A two-speed motor or variable frequency drive reduces airflow to a maximum 60 percent of peak airflow or minimum ventilation air requirement as required by Chapter 4 of the International Mechanical Code,whichever is greater. Li Exception: Systems where the function of the supply air is for purposes other than temperature control,such as maintaining specific humidity levels or supplying an exhaust system. Project Title: MET Community Center Report date: 03/06/12 Data filename: P:\2011\2011-0376\Support\Mech\MET.cck Page 7 of 8 Location in plans/specs where compliance can be identified(enter NA it not applicable): NA -4'31. [503.2.10.3.2+]All air-conditioning equipment and air-handling units with direct expansion cooling and a cooling capacity at ARI conditions greater than or equal to 110,000 Btu/h that serve single zones have their supply fan operation controlled according to code specific requirements. D Exception: Systems where the function of the supply air is for purposes other than temperature control,such as maintaining specific humidity levels or supplying an exhaust system. Spec 237401, 2.06 Location in plans/specs where compliance can be identified(enter NA if not applicable): 32. [503.2.10.4]Series fan-powered terminal unit fan motors.Fan motors for series fan-powered terminal units are electronically-commutated motors and have a minimum motor efficiency of 70 percent when rated in accordance with NEMA Standard MG 1-2006 at full load rating conditions. NA Location in plans/specs where compliance can be identified(enter NA if not applicable): Section 5: Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed mechanical systems have been designed to meet the Oregon Energy Efficiency Specialty Code requirements in COMcheck Version 3.8.0 and to comply with the mandatory requirements in the Requirements Checklist. Jason Mooney, Project Engineer ° ••••- I• 3-5-12 Name-Title Date • Project Title: MET Community Center Report date: 03/06/12 Data filename: P:\2011\2011-0376\Support\Mech\MET.cck Page 8 of 8 i FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 114 a Transmittal Letter -r I GAR n 1312 all Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: DATE m V L'.lJ DEPT: B G DIVISION JUL. 08 2013 FROM: A-5 AtTCHAWD CITYOFTIGARDN COMPANY: TS G(2-61 Cc* T 1ZLi (-T T-c*•) BUILDINGDIVISIO PHONE: c' 03 69' �— x(6`75 By RE: l0 3 Sw 4-°. 190i�—vo/o7 (Site Address) (Permit Number) MOT • (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: Additional set(s) of plans. Revisions: Cross section(s)and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other(explain): • REMARKS: Pte_ a., r A.,2�...„ FOR OFFICE USE ONLY Routed to Permit Technician: Date: `7 I z ,I (� Initial . Fees Due: El Yes ©' . _ Fee Description: Amount ue: $ $ $ Special Instructions: Reprint Permit(per PE): ❑ Yes ❑ No ❑ Done Applicant Notified: Date: Initials: (:\Building\Forms\TransmittalLetter-Revisions.doc 05/25/2012 ,,, ,,r RECEIVED Letter of Transmittal Li AUG 1 6 2012 Kittredge Engineers, LLC CITY OF TIGARD PLANNING/ENGINEERING Date: 08-16-2012 RE: Muslim Educational Trust- 15` Eng. Submittal (revised w/tree plans) MMD2012-00010 8 CUP2002-00003 To: Gary Pagenstecher From: Chris Kittredge, P.E. 13125 SW Hall Blvd. Kittredge Engineers, LLC Tigard, OR 97223 6565 SW 207th Avenue Aloha, Oregon 97007 Gary, please find attached Lset of revised engineering plans for the Muslim Educational Trust. The plans are the same as the first submittal to Mike White, with the exception of the addition of Tree Protection Plan (Sheet C115) and Tree Protection Table (C116). The other plan sheets have been re-plotted so that all sheets match the latest tree protection plans. Other than this, there are no modifications to the previous drawing set submittal. If you have questions or require anything additional, please contact me at (503) 708-3942. A. PL E*SE FWO JC JJ 4 ) thank you, — OZ 1 to% N.N4-i. 4,13.34.4A.s•r 0..•—e ILT to .1 - Lott Chris Kittredge .- Wheat,.C> 0M.3ort.tST e800r 4. B -IS - 7.v •t ae- 01/ . , OFFICE COPY Chris Kittredge, P.E. - Principal KITTRE 1- IR EERS,LLC 6565 SW 207th Avenue, Aloha, Oregon 97007 503-708-3942 Page 1 of 1 RECEIVED Letter of Transmittal AUG 16 2012 Kittredge Engineers, LLC CITY OF TIGARD PLANNING/ENGINEERING Date: 08-16-2012 RE: Muslim Educational Trust - 1st Eng. Submittal (revised w/tree plans) MMD2012-00010 & CUP2002-00003 To: Mike White From: Chris Kittredge, P.E. 13125 SW Hall Blvd. Kittredge Engineers, LLC Tigard, OR 97223 6565 SW 207t Avenue Aloha, Oregon 97007 Mike, please find attached 1 set of revised engineering plans for the Muslim Educational Trust. The plans are the same as the first submittal, with the exception of the addition of Tree Protection Plan (Sheet C115) and Tree Protection Table (C116). The other plan sheets have been re-plotted so that all sheets match the latest tree protection plans. Other than this, there are no modifications to the previous drawing set submittal. If you have questions or require anything additional, please contact me at (503) 708-3942. thank you, Chris Kittredge OFFICE COPY _OLIV!. ._ Chris Kittredge, P.E. - Principal IF KITTRE I t.i EERS, LLC A. 6565 SW 207`h Avenue, Aloha, Oregon 97007 503-708-3942 Page 1 of 1 Location: Record Type: Inspection Type: Result: Comments: Inspection Date: Record ID: Inspector: City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 10330 SW SCHOLLS FERRY RD, TIGARD, OR, 97223 Commercial - Building 299 Final inspection PASS - C of O BUP2012-00107 Chip Barnett Violation Summary: Inspector Contractor