Loading...
Permit .14 CITY OF TIGARD BUILDING PERMIT . COMMUNITY DEVELOPMENT Permit#: BUP2013-00117 Date Issued: 08/08/2013 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S 114AA00500 Jurisdiction: Tigard Site address: 16375 SW 85TH AVE Project: Clean Water Services Co-Generation Facility Subdivision: 1993-078 PARTITION PLAT Lot: 2 Project Description: Cogeneration and brown grease. Construction of(2)new buildings for co-generation facility. Contractor: JAMES W FOWLER CO Owner: CLEAN WATER SERVICES 12775 WESTVIEW DR ATTN:ACCOUNTS PAYABLE DALLAS,OR 97338-9632 2550 SW HILLSBORO HWY HILLSBORO,OR 97123 PHONE: 503-623-5373 PHONE: FAX: 503-623-9117 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: NEW Type of Const: IIIB Permit Fee-COM-New Construction 08/01/2013 $44,811.42 Occupancy Grp: U Occupancy Load: 13 12%State Surcharge-Building 08/01/2013 $5,377.37 Dwelling Units: 0 Plan Review 05/20/2013 $29.127.42 Plan Review-Fire Life Safety 08/01/2013 $17,924.57 Stories: 1 Height: 0 ft Metro Const.Excise Tax-Commercial 08/01/2013 $11,880.00 Bedrooms: 0 Bathrooms: 0 Use Value: $9,900,000 Info Process/Archiving-Sm$0.50(up to 08/01/2013 $540.00 11x17) Tig-Tual School CET-Non Residential 08/01/2013 $3.817.55 Floor Areas: DC Provision Review,COM New-Bldg 08/01/2013 $139.00 Total Area: 6941 DC Provision Review,COM New-Ping 08/01/2013 $139.00 DC Provision Review,COM New-LRP 08/01/2013 $41.00 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $113,797.33 Required: Required Items and Reports(Conditions) Fire Sprinkler: No Parapet: Fire Alarm: No Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance. or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: Permittee Signature: O. . /-.1 '`L//_____ _64:2:dy.e_211c:=,_ Call 503.639.4175 by 7:00 a.m.for the next available Ins• on date. This permit card shall be kept In a conspicuous place on the job site u completion of the project Approved plans are required on the job site at the time of each Inspection. t Building Permit Application Commercial 7 / F(1R o HIc1: uSI-:()NIA City of Tigard f 4.1' 1 4 2O! Dateked 6I(L( 13 " Permit No.BJ p c O(3 -00/1-7 ° 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Re ew►.. " y �'((��r !I ���� (� Other Permit: Phone: 503.718.2439 Fax: 503.598.1960 CITY QF�K/ Date/B t'I C.n It I� Inspection Line: 503.639.4175 BU�I,�[ �(� to Remy :y: Juris: El See Page 2 for Internet: www.tigard-or.gov "�' �/�lNotified/Method: 11.00 Supplemental Information TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING X New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ I-and 2-family dwelling �J Commercial/industrial Valuation: $ `1 }7a9) t ❑Accessory building '❑` Multi-family Number of bedrooms: v ❑Master builder ❑Other: Number of bathrooms: /-te 37 5-- JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: , S L/ 'VS—Ci � `+ ,i e_ New dwelling area: square feet City/State/ZIP: �l, 9 rl t )4 17 a a, ! Garage/carport area: square feet Suite/bldg./apt.no.: Project name: 60 —6 Ph 5 D 2 Covered porch area square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(routded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Valuation: $ Existing building area square feet New building area: square feet PROPERTY OWNER ❑ TENANT Number of stories: Name: C /e9,1 tile??P r 3.en/► e fS Type of construction: Address: /G 0 6 6 S Li/ ?-4-4-6- 4 va- Occupancy groups: City/State/ZIP: �S 1 eel/ 64 17 a a l'/ Existing: Phone:(,-6_3 sLl7— V/ 7 7 Fax:( ) New: ❑ APPLICANT CONTACT PERSON BUILDING PERMIT FEES* (Please refer to fee schedule) Business name: Structural plan review fee(or deposit): Contact name: .. --...c I /3, l-, /)..'r --S Address: 16 d 6 s' 9S.° FLS plan review fee(if applicable): Total fees due upon application: City/State/ZIP: l 5,.� Q 7 7 x 3 U/ Phone:(S-0 S y .7 g 1 '7,7 Fax::( ) Amount received: E-mail: b 6r-c, Q r5 J ® c 14 n n wq+( Sri t es , o r q PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* J Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System. Business name: ��H t'/t) 4 elo Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: /0?.7 i/tiTEr/ •e.e_ Solar Installation Specialty Code checklist. ���"S , �� �� 2� Permit fee(includes plan review $180.00 City/State/ZIP: 7 J and administrative fees): Phone:63)fp a3—5-373 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB Iic.: 4. P 3 '7 Total fee due upon application: $201.60 Authorized signature: C This permit application expires if a permit is not obtained -{� within 180 days after it has been accepted as complete. Print name: J v e 1 o r c Aj,fs Date: .5-7///4 • Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/W EB) ' • 11111 Building Division e Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per-cent(25%), VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entiance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2]of Valuation Computation): $ • I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011 • ', 1 I o ° Building Division • Development Code Provision Review T I V A R° J Commercial Projects with Approved Land Use Building Permit No.: PuP Jo( 3-o-D I I -7 °r , ,-r---0201 s_ _D t 3 Land Use Casefile No.: tki//4— C, 1v L34-T12 , 7L C_ _5 Routed Plans: Submittal Date: 51/4/3 CO -6 f A) C4-a`L--1 7.-Y Submittal Date: Submittal Date: To the Applicant: Each review type must be approved. If the plan is not approved, please revise and resubmit three (3) copies to the Building Division. Only checked (✓) items are approved. Items not approved and those listed in the notes must be revised prior to re-submittal. For questions please contact the appropriate staff person(s) listed above each section. STAFF: please only mark those items on the left side that are approved. Planning Review(contact 3O 1 v1 at 503-718-2 5 or_Old/ @tigard-or.gov) ❑ Land Use Approval 000 ❑ Building Plans Match Approved Plan: Yes ❑ No ❑ ❑ Maximum Building Height 5-0 ❑ Conditions Met ❑ Street Trees ❑ Protected Trees Notes: ina--r .): '+`ii'Ii ^i.M(��'i7• M.-,ice. -m u.e:1..m.,iraiv •. "WI= 1411M. la.filrflMilletWiirrirlffilrJ1)FARTar Original Plan: Approved ❑ Not Approved i. Date: 3 0 Revision 1: Approved p Not Approved ❑ Date: Revision 2: Approved ❑ Not Approved ❑ Date: (Review Continues on Page 2) Page 1 of 2 • Engineering Review(contact Mike White at 503-718-2464 or MikeW @ tigard-or.gov) fd'Actual Slope: V 4114 e % ❑ PFI Permit# M 0 (did-14., r Ty 'T'I r a C- ❑ Conditions Met Notes: W I Ld, N ►26b G N `k ' tt- (AXA J7NZ- C }t'7 1c)Z-IZ41 Original Plan: Approved Not Approved ❑ Date: , Revision 1: Approved ❑ Not Approved O Date: Revision 2: Approved ❑ Not Approved ❑ Date: Permit Coordinator Review(contact Albert Shields at 503-718-2426 or albert@tigard-or.gov) ❑ Planning Okay to Issue Permit ❑ Arborist Okay to Issue Permit ❑ Engineering Okay to Issue Permit Notes: Original Plan: Date Sent to Applicant: Revision 1: Date Sent to Applicant Revision 2: Date Sent to Applicant • Okay to Issue Permit: Yes - No ❑ Date Routed to Building: 9// , 3 • • • Page 2 of 2 MEMO CH2MHILL® Clean Water Services - Durham Cogeneration and Brown Grease Receiving Facilities Project - Tigard Planning Dept. - Off-Site Impact Standards Documentation PREPARED FOR: Randy Naef/Clean Water Services FROM: Lynne Chicoine/CH2M HILL PREPARED BY: Brett Reistad/CH2M HILL, Ryan Harbert/CH2M HILL REVIEWD BY: Lynne Chicoine/CH2M HILL DATE: June 18, 2013 PROJECT NUMBER: 6471 (Clean Water Services);422389/240211(CH2M HILL) Purpose This memo serves to meet the requirement of Chapter 18.650.070, Item G,for documentation that the proposed development will be in compliance with the Off-Site Impact Standards specified in Chapter 18.650.070. All facilities are located in the Operations Sub-District. 18.650.070, Item D - Noise Standards Noise levels were modeled by CH2M HILL using CadnaA, (by DataKustik)and by Sparling in Lynnwood,WA. Brown Grease Receiving Facility Sources: Brown Grease Mixers and Air Conditioning Unit Mitigation: Equipment selection criteria and facility roof parapet wall are provided so that sound levels at the Plan District Boundary meet standards defined in Table 18.650.2. Cogeneration Facility Sources: Engine Radiators,Supply Air Fans,Air Conditioning Unit, Engine Switchgear,Transformer,Cogeneration Engines(indoors), and engine exhaust pipes. Mitigation: Facility construction includes features to contain the noise from the cogeneration engines and reduce noise transmission outside of the facility. These features include fully grouted exterior concrete masonry unit (CMU)walls,sound control masonry unit(SCMU)veneer on the interior side of engine room walls, concrete roof, and acoustical doors. The facility air supply fans are provided with intake sound attenuators, insulated ductwork, and duct sound attenuators at each engine room. The facility exhaust air fans are provided with duct sound attenuators and acoustical louvers. Engine exhaust noise for each engine is reduced by a heat exchanger silencer (indoors)and muffler(outdoors). The above facility construction features together with equipment selection criteria provide sound levels at the Plan District Boundary that meet standards defined in Table 18.650.2. Gas Purification Facility Sources: Gas Blower and Glycol Chiller Mitigation: The gas blowers are housed within an acoustical enclosure. The glycol chiller is provided with slow speed fans and two cooling circuits.The acoustical enclosure for the gas blowers together with equipment selection criteria provide sound levels at the Plan District Boundary that meet standards defined in Table 18.650.2. TIGARD PLANNING DEPT MEMO 06182013 • • CLEAN WATER SERVICES-DURHAM COGENERATION AND BROWN GREASE RECEIVING FACILITIES PROJECT-TIGARD PLANNING DEPT.-OFF-SITE IMPACT STANDARDS DOCUMENTATION 18.650.070, Item E - Odor Standards Sources: Brown grease waste receiving tanks at the Brown Grease Receiving Facility Mitigation: Tanks are enclosed and the free air space is ventilated. Air withdrawn from the tanks is routed to an existing odor control biofilter. Tank enclosure, air ventilation,and odor control system are such that detectable off-site odors will not be generated from the brown grease receiving tanks. 18.650.070, Item F - Glare Standards Sources: Exterior building and site roadway lighting Mitigation: Lighting will be controlled via photocell and time switch so that lights are not on during the day. Luminaires are LED with full cutoff optics. Luminaires are located far enough from the Plan District Boundary and are of low enough wattage,such that light levels at the boundary meet specified Glare Standards. The lighting design was modeled by CH2M HILL using AGI32 software. 2 TIGARD PLANNING DEPT MEMO 06182013 C Location: Record Type: Inspection Type: Result: Comments: Inspection Date: Record ID: Inspector: City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 16375 SW 85TH AVE, TIGARD, OR, 97224 Commercial - Building 299 Final inspection PASS - C of O BUP2013-00117 Chip Barnett Violation Summary: Inspector Contractor