Loading...
Permit CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit #: BUP2013 -00080 Date Issued: 06/03/2013 TIGARD 13125 SW Hall Blvd., Tigard OR 97223 503 718.2439 Parcel: 2S110AB00200 Jurisdiction: Tigard Site address: 14385 SW PACIFIC HWY Project: Harbor Freight Tools Subdivision: CANTERBURY PLACE, AMENDED Lot: PTS 1 -4 Project Description: Tenant improvement Contractor: MARCO CONTRACTORS INC Owner: KOLVE, G C 100 COMMONWEALTH DR 14389 SW PACIFIC HWY WARRENDALE, PA 15095 -0805 TIGARD, OR 97224 PHONE. 724 - 741 -0300 PHONE: FAX Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB Permit Fee - Additions, Alterations, 06/03/2013 $1,830.75 Demolition Occupancy Grp: M Occupancy Load: 391 12% State Surcharge - Building 06/03/2013 $219.69 Dwelling Units: 0 Plan Review 04 /16/2013 $1,189 99 Stories: 0 Height: 0 ft Plan Review - Fire Life Safety 04 /16/2013 $732.30 Bedrooms: 0 Bathrooms: 0 DC Provision Review, COM TI - Ping 06/03/2013 $256.00 Value: $220,000 DC Provision Review, COM TI - LRP 06/03/2013 $38 00 Info Process /Archiving - Lg $2.00 (over 06/03/2013 $66 00 11x17) Floor Areas: Info Process /Archiving - Sm $0 50 (up to 06/03/2013 $4 00 11x17) Total Area 0 Metro Const. Excise Tax - Commercial 06/03/2013 $264.00 Accessory Struct. 0 Use Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage' 0 Mezzanine. 0 Total $4,600 73 Required: Required Items and Reports (Conditions) Fire Sprinkler: Yes Parapet: Fire Alarm Yes Protected Corridors: Smoke Detectors Manual Pull Stations: Accessible Parking. 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR Specialty Codes and all other applicable law All work will be do.. - -• - r • = with approved plans This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 • • s ATTENTION Ore. • n law requires you to follow the rules adopted by the Oregon Utility Notification Center Those rules are set forth in OAR 952- 001 -0010 through OAR 9' -• • 090 - may obtain a copy of the rules or direct questions to OUNC by calling 5 .1987 or 1 800 332 2344 Issued By,. I # ;�� / Permittee Signature: Call 503.639.4175 by 7:00 a.m. for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project Approved plans are required on the job site at the time of each Inspection. Building Permit Applica ion Commercial HECEIVED FOlt OF FICE USE ONLY City of Tigard � Rcccwc 7 /G / � / Permit No.: 4 4 eve) � 8i 13125 SW Hall Blvd., Tigard, OR 972 ` 16 2013 Plan Revie • r � : C . • Phone: 503.718.2439 Fax: 503. 8 1 9960 Date/B : kr is Other Permit Ins ection Line: 503.639.4175 CITY OF TIGARD Date ReadyBy: lu See Page 2 for TIGARD P BUILDING DIVISION Nottfie - 1 "1r� Supplemental Information Internet: www.tigard or.gov on C�(Q a�rdQ'ti""� TYPE OF WORK REQUIRED DATA: I- AND 2- FAMILY DWELLING ❑ New construction ❑ Demolition Permit fees* are based on the value of the work performed. Indicate the value (rounded to the nearest dollar) of all ® Addition/alteration/replacement ❑ Other: equipment, materials, labor, overhead, and the profit for the - CATEGORY OF CONSTRUCTION work indicated on this application. ❑ I- and 2- family dwelling 0 Commercial/industrial Valuation: $ ❑ Accessory building ❑ Multi- family Number of bedrooms: - V ❑ Master builder ❑ Other: Number of bathrooms: N /q;s5 JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: L3a63SW PACIFIC HIGHWAY New dwelling area: square feet City/State/ZIP: TIGARD, OR 97224 Garage/carport area: square feet O Suite/bldg. /apt. no.: I Project name: HARBOR FREIGHT TOOLS Covered porch area: square feet Cross street/directions to job site: SW CANTERBURY LN/ FORMER DOLLAR STORE Deck area: square feet Other structure area: square feet REQUIRED DATA: COMMERCIAL -USE CHECKLIST h r f Subdivision: I Lot no.: Permit fees* are based on the value of the work performed. V Tax map/parcel no.: Indicate the value (rounded to the nearest dollar) of all equipment, materials, labor, overhead, and the profit for the DESCRIPTION OF-WORK work indicated on this application. TENANT REMODEL TO EXISTING SPACE FOR NEW HARBOR FREIGHT Valuation: 55220,000.00 TOOLS RETAIL STORE Existing building area: 17222 square feet New building area: N/A square feet ❑ PROPERTY OWNER - ® TENANT - . Number of stories: 1 Name: HARBOR FREIGHT TOOLS Type of construction: VB Address: 26541 AGOURA ROAD Occupancy groups: City/State/ZIP: CALABASAS, CA 91302 Existing: MERCANTILE Phone: (818)836 -5048 Fax: ( )• Li 9 COA#7 i!_TZ New: SAME ❑ APPLICANP - ONTACT PERSON: BUILDING PERMIT FEES* (Please Business name: -7aY ,27� -PSCP! Structural fee (or r deposit): te) ro uctural plan review fee (or deposit)osit): : Contact name: JOURDANNE CADAVONA L9• /9- z E � FLS plan review fee (if applicable): Address: 8913 WEST OLYMPIC BLVD, SUITE 102 £ e / ° //J 2. ,2 City/State/ZIP: BEVERLY HILLS, CA 90211 /y9 - /L /d e& iic -s fiT Total fees due upon application: Phone: (310) 275 -7774 I Fax: : (310) 881 -1135 RfruL Aa/7/17V't 1 Amount received: E -mail: JOURDANNE@.PERMITADVISORS.COM (..._ � �� PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* /� C orimercial and residential prescriptive installation of 1 - - ' - - CONTRACTOR 7 0 11 1 - 2/4, --- p3.6, H of top mounted Photo Voltaic Solar Panel System. Business name:L to/L/77141ere25 //V e_ , Submit two (2) sets of roof plan with connection details and fire department access, along with the 2010 Oregon Address: /QO tnd/`f/'1',./4 .64 , Solar Installation Specialty Code checklist. City/State/ZIP: i -LE / 09— ,5O 9 S - ofas Permit fee (includes plan review $180.00 and administrative fees): Phone: (7.2V) 74 /, -a5a ) Fax: ( ) State surcharge (12% of permit fee): $21.60 CCB lic.: /b g571 di/ 3/� Total fee due upon application: $201.60 Authorized signature: This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. I Print name: JOURD CADAVONA I Date: 04 /15/13 • Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP -COM PermitApp.doc 02/24/2011 440.4613T(l 1 /02 /COM/WEB) /__ - ■ 11111 a Building Division ° Development Code Provision Review T I c n ii D Commercial Projects - No Associated Land Use Case Building Permit No: (Lk. P ono 13 - OCO 80 ❑ Expedited Review Project Name: 1 )2e-c Q l 1 Site Address: s W pfte-t � b! , Suite /Bldg #: l Plans Routed: / /32 Original Plan Submittal Date: 4 c4 (3 Routed By: 1" Revision Submittal Date: Routed By: 2n Revision Submittal Date: Routed By: To the Applicant: > If the proposed use is not permitted within the zone, please contact the Building Division to cancel the permit application. Building Permit Technicians (503) 718 -2439. > If a land use is required and for all other questions, please contact the staff person listed above the Planning Review section. Staff: please check items along left only if approved. ,�!/ /�', Planning Review (contact at (503) 71824yor vG — @tigard- or.gov) Proposal: c ....--. c n •- Zoning C - Permitted Use Yes Er No ❑ Land Use Required: Yes ❑ No Notes: LJ Approved ❑ Npt Approved 0 DCPR Not Required - No DCPR Fees Due Date Routed to Building: `' '17 .- /3 1: \CURPLN\Masters\Development Code Provision RevievADCPR_COM_NoLandUse.doc Rev. 01/16/13 I�IE F Permit Advisors TRANSMITTAL RECEIVED April 15, 2013 APR 1 6 2013 CITY OF TIGARD BUILDING DIVISION FROM: TO: Jourdanne Cadavona Debbie Adamski Permit Advisors City of Tigard Building Department 269 S. Beverly Drive # 284 13125 SW Hall Blvd Beverly Hills, CA 90212 Tigard, OR 97223 (310) 275 -7774 (503) 718 -2439 RE: HARBOR FREIGHT TOOLS Project Address: 3651W Pacific Highway, Tigard, OR Please find the following in the attached package: • (3) set of plans • (1) Building Permit Application • (1) Lighting Compliance ComCheck • (1) Plan Check Fee of $ 1922.29 Should you have any questions or concerns, please feel free to contact me at (310) 275 -7774 or directly on my cell at (951) 965 -0594. Please fax receipt to me at (310) 881 -1135 or email it to me at jourdanne@permitadvisors.com. Regards, Jourdanne Cadavona Permit Advisors 269 S. Beverly Dr. #284, - Beverly Hills, CA 90212 - - - - p. 310.275.7774 f. 310.881.1135 e. info @PermitAdvisors.com w. PermitAdvisors.com RECEIVED in( COMcheck Software Version 3.9.2 APR 16 2013 Interior Lighting Complianc Lo , NG DIVISION Certificate 2010 Oregon Energy Efficiency Specialty Code Section 1: Project Information Project Type: Alteration Project Title : Harbor Freight Tools Construction Site: Owner /Agent: Designer /Contractor: 14365 SW PACIFIC HIGHWAY TIGARD, OR 97062 Section 2: Interior Lighting and Power Calculation A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts / ft2 (B x C) Retail (Retail:Sales Area) (Ceiling Height 0 ft.) 16257 1.5 24386 Total Allowed Watts = 24386 Section 3: Interior Lighting Fixture Schedule A B C D E Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixtures Watt. Retail ( Retail:Sales Area 16257 sq.ft.) Linear Fluorescent 1: A,AE: 2x4 Fixture - 3 Lamp: 48" T8 32W: Electronic: 3 9 96 864 Linear Fluorescent 2: BE: 2x4 Fixture - 2 Lamp: 48" T8 32W: Electronic: 2 2 64 128 Linear Fluorescent 3: C,CE: 8' Fixture - 4 Lamp: 48" T8 32W: Electronic: 4 26 114 2964 Linear Fluorescent 4: C1: 1X4 Fixture- 2 Lamp: 48" T8 32W: Electronic: 2 1 58 638 Linear Fluorescent 5: D,DE: 8' Fixture- 4 Lamp: 48" T8 32W: Electronic: 4 101 114 11514 Linear Fluorescent 6: Dl: 1X4 Fixture- 2 Lamp: 48" T8 32W: Electronic: 2 18 58 1044 Total Proposed Watts = 17152 Section 4: Requirements Checklist In the following requirements, blank checkboxes identify requirements that the applicant has not acknowledged as being met. Checkmarks identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page /section' identifies where in the plans/specs the requirement can be verified as being satisfied. Lighting Wattage: 1. Total proposed watts must be less than or equal to total allowed watts. Allowed Wattage: 24386 Proposed Wattage: 17152 Complies: YES Mandatory Requirements: LI 2. Exit signs. Internally illuminated exit signs shall not exceed 5 watts per side. Plans reference page /section: u 3. Daylight zone control. All daylight zones are provided with individual controls that control the lights independent of general area lighting in the non - daylight zone. In all individual daylight zones larger than 350 sq.ft., automatic daylight controls is provided. Automatic daylight sensing controls reduce the light output of the controlled luminaires at least 50 percent, and provide an automatic OFF control, while maintaining a uniform level of illumination. Contiguous daylight zones adjacent to vertical fenestration may be controlled by a single controlling device provided that they do not include zones facing more than two adjacent cardinal orientations (i.e., north, east, south, west). Daylight zones under skylights shall be controlled separately from daylight zones adjacent to vertical fenestration. Exception(s): Project Title: Harbor Freight Tools Report date: 04/12/13 Data filename: G:\ADA Architects \+ Harbor Freight Tools \Tigard OR \Engineering\ADA HF TigardOR- OREGON.cck Page 1 of 4 ❑ Retail spaces adjacent to vertical glazing (retail spaces under overhead glazing are not exempt). ❑ Display, exhibition and specialty lighting ❑ HID lamps 150 watts or less. ❑ Spaces required to have occupancy sensors. Plans reference page /section: TS� 4. Interior lighting controls. At least one local shutoff lighting control has been provided for every 2,000 square feet of lit floor area and 7 ' each area enclosed by walls or floor -to- ceiling partitions. The required controls are located within the area served by the controls or are a remote switch that identifies the lights served and indicates their status. Exception(s): ❑ Lighting systems serving areas designated as security or emergency areas that must be continuously lighted. ❑ Lighting in public areas such as concourses, stairways or corridors that are elements of the means of egress with switches that are accessible only to authorized personnel. ❑ Lighting for warehouses, parking garages or spaces using less than 0.5 watts per square foot. ❑ Lighting for contiguous, single- tenant retail spaces. i Plans reference page /section: 6G ( ( ❑ 5. Sleeping unit controls. Master switch at entry to hotel /motel guest room. Plans reference page /section: ❑ 6. Egress lighting. Egress illumination is controlled by a combination of listed emergency relay and occupancy sensors to shut off during periods that the building space served by the means of egress is unoccupied. Exception(s): ❑ Building exits as defined in Section 1002 of the Oregon Structural Specialty Code. Plans reference page /section: • ❑ 7. Additional controls. Each area that is required to have a manual control shall have additional controls that meet the requirements of Sections 505.2.2.1 and 505.2.2.2. • Plans reference page /section: 4( 8. Light reduction controls. Each space required to have a manual control also allows for reducing the connected lighting load by at least 50 percent by either 1) controlling (dimming or multi -level switching) all luminaires; or 2) dual switching of alternate rows of luminaires, alternate luminaires, or alternate lamps; or 3) switching the middle lamp luminaires independently of other lamps; or 4) switching each luminaire or each lamp. Exception(s): ❑ Only one luminaire in space. ❑ An occupant- sensing device controls the area. ❑ The area is a corridor, storeroom, restroom, public lobby or sleeping unit. ❑ Electrical and mechanical room. ❑ Areas that use less than 0.6 Watts /sq.ft. Plans reference page /section: E1.1 / E O 0(9. Buildings larger than 2,000 square feet are equipped with an automatic control device to shut off lighting in those areas. This automatic control device shall function on either: 1) a scheduled basis, using time -of -day, with an independent program schedule that controls the lighting in areas that do not exceed 10,000 square feet and are not more than one floor; or 2) an occupant sensor that shall turn lighting off within 30 minutes of an occupant leaving a space; or 3) a signal from another control or alarm system that indicates the area is unoccupied. Exception(s): ❑ Sleeping units, patient care areas; and s ces where automatic shutoff would endanger safety or security. Plans reference page /section: If4 c / L `• 6 ❑ 10.Occupancy sensors in rooms that include daylight zones are required to have Manual ON activation. Plans reference page /section: 11.An occupant sensor control device is installed that automatically turns lighting off within 30 minutes of all occupants leaving a space. Exception(s): Project Title: Harbor Freight Tools Report date: 04/12/13 Data filename: G:\ADA Architects \+ Harbor Freight Tools \Tigard OR \Engineering\ADA HF TigardOR- OREGON.cck Page 2 of 4 • Classrooms and lecture halls. O Conference, meeting and training rooms. p ig Employee lunch and break rooms. O Rooms used for document copying and printing. 0 Office spaces up to 300 square feet. Restrooms. O Dressing, fitting and locker rooms. I. / Plans reference page /section: E/' / /( 0 • 12.Additional controls. An occupant sensor control device that automatically turns lighting off within 30 minutes of all occupants leaving a space or a locally activated switch that automatically turns lighting off within 30 minutes of being activated is installed in all storage and supply rooms up to 1000 square feet. _ . Plans reference page /section: • 13.Occupant override. Automatic lighting shutoff operating on a time -of -day scheduled basis incorporates an override switching device that: 1) is readily accessible, 2) is located so that a person using the device can see the lights or the area controlled by that switch, or so that the area being lit is annunciated, 3) is manually operated, 4) allows the lighting to remain on for no more than 2 hours when an override is initiated, and 5) controls an area not exceeding 2,000 square feet. Exception(s): O In malls and arcades, auditoriums, single- tenant retail spaces, industrial facilities and arenas, where captive -key override is utilized, override time is permitted to exceed 2 hours. O In malls and arcades, auditoriums, single- tenant retail spaces, industrial facilities and arenas, the area controlled shall not exceed 20,000 square feet. Plans reference page /section: 14. Holiday scheduling. Automatic lighting shutoff operating on a time -of -day scheduled basis has an automatic holiday scheduling feature that turns off all loads for at least 24 hours, then resumes the normally scheduled operation. Exception(s): O Retail stores and associated malls, restaurants, grocery stores, places of religious worship, theaters and exterior lighting zones. O Single zone electronic time control devices and self- contained wall box preset lighting controls. Plans reference page /section: K15. Exterior lighting controls. Lighting not designated for dusk -to -dawn operation shall be controlled by either a combination of a photosensor and a time switch, or an astronomical time switch. Lighting designated for dusk -to -dawn operation shall be controlled by an astronomical time switch or photosensor. ! Plans reference page /section: E/ • / / (2- Il/ O 16.Tandem wiring. The following luminaires located within the same area shall be tandem wired: 1. Fluorescent luminaires equipped with one, three or odd - numbered lamp configurations, that are recess- mounted within 10 feet center -to- center of each other. 2. Fluorescent luminaires equipped with one, three or. any odd - numbered lamp configuration; that are pendant- or surface- mounted within 1 foot edge- to -edge of each other. Exception(s): - O Where electronic high- frequency ballasts are used. 0 Luminaires on emergency circuits. O Luminaires with no available pair in the same area. Plans reference page /section: O 17. Medical task lighting or art/history display lighting claimed to be exempt from compliance has a control device independent of the control of the nonexempt lighting. Plans reference page /section: • 18. Each dwelling unit in a building is metered separately. Plans reference page /section: Interior Lighting PASSES Section 5: Compliance Statement Project Title: Harbor Freight Tools Report date: 04/12/13 Data filename: G:\ADA Architects \+ Harbor Freight Tools \Tigard OR \Engineering\ADA HF TigardOR- OREGON.cck Page 3 of 4 Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed lighting system has been designed to meet the 2010 Oregon Energy Efficiency Specialty Code requirements in COMcheck Version 3.9.2 and to comply with the mandatory requirements in the Requirements Checklist. �/f��� /M /le g$ G(ict4Pr`C1x Gr'y. /����'�.e�%6Yi 'f•/2/20 Name - Title J Signature Date Project Title: Harbor Freight Tools Report date: 04/12/13 Data filename: G:\ADA Architects \+ Harbor Freight Tools \Tigard OR \Engineering\ADA HF TigardOR- OREGON.cck Page 4 of 4 COMcheck Software Version 3.9.2 I L Com p liance Certificate 2010 Oregon Energy Efficiency Specialty Code Section 1: Project Information Project Type: Alteration Project Title : Harbor Freight Tools Construction Site: Owner /Agent: Designer /Contractor: 14365 SW PACIFIC HIGHWAY TIGARD, OR 97062 Section 2: Interior Lighting and Power Calculation A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts / ft2 (B x C) Retail (Retail:Sales Area) (Ceiling Height 0 ft.) 16257 1.5 24386 Total Allowed Watts = 24386 Section 3: Interior Lighting Fixture Schedule A B C D E Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixtures Watt. Retail ( Retail:Sales Area 16257 sq.ft.) Linear Fluorescent 1: A,AE: 2x4 Fixture - 3 Lamp: 48" T8 32W: Electronic: 3 9 96 864 Linear Fluorescent 2: BE: 2x4 Fixture - 2 Lamp: 48" T8 32W: Electronic: 2 2 64 128 Linear Fluorescent 3: C,CE: 8' Fixture - 4 Lamp: 48" T8 32W: Electronic: 4 26 114 2964 Linear Fluorescent 4: C1: 1X4 Fixture- 2 Lamp: 48" T8 32W: Electronic: 2 11 58 638 Linear Fluorescent 5: D,DE: 8' Fixture- 4 Lamp: 48" T8 32W: Electronic: 4 101 114 11514 Linear Fluorescent 6: Dl: 1X4 Fixture- 2 Lamp: 48" T8 32W: Electronic: 2 18 58 1044 Total Proposed Watts = 17152 Section 4: Requirements Checklist In the following requirements, blank checkboxes identify requirements that the applicant has not acknowledged as being met. Checkmarks identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page /section' identifies where in the plans/specs the requirement can be verified as being satisfied. Lighting Wattage: A 1. Total proposed watts must be less than or equal to total allowed watts. Allowed Wattage: 24386 Proposed Wattage: 17152 Complies: YES Mandatory Requirements: u 2. Exit signs. Internally illuminated exit signs shall not exceed 5 watts per side. Plans reference page /section: u 3. Daylight zone control. All daylight zones are provided with individual controls that control the lights independent of general area lighting in the non - daylight zone. In all individual daylight zones larger than 350 sq.ft., automatic daylight controls is provided. Automatic daylight sensing controls reduce the light output of the controlled luminaires at least 50 percent, and provide an automatic OFF control, while maintaining a uniform level of illumination. Contiguous daylight zones adjacent to vertical fenestration may be controlled by a single controlling device provided that they do not include zones facing more than two adjacent cardinal orientations (i.e., north, east, south, west). Daylight zones under skylights shall be controlled separately from daylight zones adjacent to vertical fenestration. Exception(s): Project Title: Harbor Freight Tools Report date: 04/12/13 Data filename: G:\ADA Architects \+ Harbor Freight Tools \Tigard OR \Engineering\ADA HF TigardOR- OREGON.cck Page 1 of 4 ❑ Retail spaces adjacent to vertical glazing (retail spaces under overhead glazing are not exempt). ❑ Display, exhibition and specialty lighting ❑ HID lamps 150 watts or less. ❑ Spaces required to have occupancy sensors. Plans reference page /section: X4. Interior lighting controls. At least one local shutoff lighting control has been provided for every 2,000 square feet of lit floor area and each area enclosed by walls or floor -to- ceiling partitions. The required controls are located within the area served by the controls or are a remote switch that identifies the lights served and indicates their status. Exception(s): ❑ Lighting systems serving areas designated as security or emergency areas that must be continuously lighted. ❑ Lighting in public areas such as concourses, stairways or corridors that are elements of the means of egress with switches that are accessible only to authorized personnel. ❑ Lighting for warehouses, parking garages or spaces using less than 0.5 watts per square foot. ❑ Lighting for contiguous, single- tenant retail spaces. et Plans reference page /section: v Kv J ' ❑ 5. Sleeping unit controls. Master switch at entry to hotel /motel guest room. Plans reference page /section: ❑ 6. Egress lighting. Egress illumination is controlled by a combination of listed emergency relay and occupancy sensors to shut off during periods that the building space served by the means of egress is unoccupied. Exception(s): ❑ Building exits as defined in Section 1002 of the Oregon Structural Specialty Code. Plans reference' page /section: ❑ 7. Additional controls. Each area that is required to have a manual control shall have additional controls that meet the requirements of Sections 505.2.2.1 and 505.2.2.2. Plans reference page /section: pk8. Light reduction controls. Each space required to have a manual control also allows for reducing the connected lighting load by at least 50 percent by either 1) controlling (dimming or multi -level switching) all luminaires; or 2) dual switching of alternate rows of luminaires, alternate luminaires, or alternate lamps; or 3) switching the middle lamp luminaires independently of other lamps; or 4) switching each luminaire or each lamp. Exception(s): ❑ Only one luminaire in space. ❑ An occupant- sensing device controls the area. ❑ The area is a corridor, storeroom, restroom, public lobby or sleeping unit. ❑ Electrical and mechanical room. ❑ Areas that use less than 0.6 Watts /sq.ft. Plans reference page /section: (t'1 it Ez A 9. Buildings larger than 2,000 square feet are equipped with an automatic control device to shut off lighting in those areas. This automatic control device shall function on either: 1) a scheduled basis, using time -of -day, with an independent program schedule that controls the interior lighting in areas that do not exceed 10,000 square feet and are not more than one floor; or 2) an occupant sensor that shall turn lighting off within 30 minutes of an occupant leaving a space; or 3) a signal from another control or alarm system that indicates the area is unoccupied. Exception(s): ❑ Sleeping units, patient care areas; and spaces where automatic shutoff would endanger safety or security. Plans reference page /section: E/ / lay Zv ❑ 10.Occupancy sensors in rooms that include daylight zones are required to have Manual ON activation. Plans reference page /section: 1x 11.An occupant sensor control device is installed that automatically turns lighting off within 30 minutes of all occupants leaving a space. f � Exception(s): Project Title: Harbor Freight Tools Report date: 04/12/13 Data filename: G :\ADA Architects \+ Harbor Freight Tools \Tigard OR \Engineering\ADA HF TigardOR- OREGON.cck Page 2 of 4 ❑ Classrooms and lecture halls. ❑ Conference, meeting and training rooms. ❑ Employee lunch and break rooms. ❑ Rooms used for document copying and printing. ❑ Office spaces up to 300 square feet. ❑ Restrooms. ❑ Dressing, fitting and locker rooms. Plans reference page /section: ❑ 12.Additional controls. An occupant sensor control device that automatically turns lighting off within 30 minutes of all occupants leaving a space or a locally activated switch that automatically turns lighting off within 30 minutes of being activated is installed in all storage and supply rooms up to 1000 square feet. • Plans reference page /section: ❑ 13.Occupant override. Automatic lighting shutoff operating on a time -of -day scheduled basis incorporates an override switching device that: 1) is readily accessible, 2) is located so that a person using the device can see the lights or the area controlled by that switch, or so that the area being lit is annunciated, 3) is manually operated, 4) allows the lighting to remain on for no more than 2 hours when an override is initiated, and 5) controls an area not exceeding 2,000 square feet. Exception(s): ❑ In malls and arcades, auditoriums, single- tenant retail spaces, industrial facilities and arenas, where captive -key override is utilized, override time is permitted to exceed 2 hours. ❑ In malls and arcades, auditoriums, single- tenant retail spaces, industrial facilities and arenas, the area controlled shall not exceed 20,000 square feet. Plans reference page /section: ❑ 14. Holiday scheduling. Automatic lighting shutoff operating on a time -of -day scheduled basis has an automatic holiday scheduling feature that turns off all loads for at least 24 hours, then resumes the normally scheduled operation. Exception(s): ❑ Retail stores and associated malls, restaurants, grocery stores, places of religious worship, theaters and exterior lighting zones. ❑ Single zone electronic time control devices and self- contained wall box preset lighting controls. Plans reference page /section: A 15. Exterior lighting controls. Lighting not designated for dusk -to -dawn operation shall be controlled by either a combination of a photosensor and a time switch, or an astronomical time switch. Lighting designated for dusk -to -dawn operation shall be controlled by an astronomical time switch or photosens r. Plans reference page /section: • ` / 0• 0 ❑ 16.Tandem wiring. The following luminaires located within the same area shall be tandem wired: 1. Fluorescent luminaires.equipped with one, three or odd - numbered lamp configurations, that are recess - mounted within 10 feet center -to- center of each other. 2. Fluorescent luminaires equipped with one, three or any odd - numbered lamp configuration, that are pendant- or surface- mounted within 1 foot edge- to -edge of each other. Exception(s): ❑ Where electronic high- frequency ballasts are used. ❑ Luminaires on emergency circuits. ❑ Luminaires with no available pair in the same area. Plans reference page /section: ❑ 17.Medical task lighting or art/history display lighting claimed to be exempt from compliance has a control device independent of the control of the nonexempt lighting. • Plans reference page /section: ❑ 18. Each dwelling unit in a building is metered separately. Plans reference page /section: Interior Lighting PASSES Section 5: Compliance Statement Project Title: Harbor Freight Tools Report date: 04/12/13 Data filename: G:\ADA Architects \+ Harbor Freight Tools \Tigard OR \Engineering\ADA HF TigardOR- OREGON.cck Page 3 of 4 Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed lighting system has been designed to meet the 2010 Oregon Energy Efficiency Specialty Code requirements in COMcheck Version 3.9.2 and to comply with the mandatory requirements in the Requirements Checklist. ./ lectSs ac..4A-ca I eavy ;4etry Name - Title Signature Date • Project Title: Harbor Freight Tools Report date: 04/12/13 Data filename: G:\ADA Architects \+ Harbor Freight Tools \Tigard OR \Engineering\ADA HF TigardOR- OREGON.cck Page 4 of 4