Loading...
Permit CITY OF TIGARD MECHANICAL PERMIT COMMUNITY DEVELOPMENT Permit #: MEC2013 -00173 T tGARD 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 04/23/2013 Parcel: 1S 1260000300 Jurisdiction: TIGARD Site address: 9585 SW WASHINGTON SQUARE RD OFFICE Project: Washington Square Mall Chiller Plant Subdivision:VASHINGTON SQUARE ESTATES NO. Lot: S Project Description: Replace (3) 700T chillers, (3) cooling towers and (6) pumps Contractor: MCKINSTRY COMPANY LLC Owner: PPR WASHINGTON SQUARE LLC 16790 NE MASON ST., STE. 100 PO BOX 847 PORTLAND, OR 97230 CARLSBAD, CA 92018 PHONE: 503 - 331 -0234 PHONE: FAX: 503 - 331 -6907 FEES Specifics: Description Date Amount Type of Use: COM Permit Fee 04/23/2013 $48,744.71 Class of Work: ALT Type of Const: IIB Plan Review 04/23/2013 $12,186.18 Occupancy Grp: B Occupancy Load: 12% State Surcharge - Mechanical 04/23/2013 $5,849.37 Stories: Info Process /Archiving - Lg $2.00 (over 04/23/2013 $14.00 11x17) Project Valuation: $1,680,000.00 Info Process /Archiving - Sm $0.50 (up to 04/23/2013 $0.50 11x17) Fuel Air Handlers Fuel Types: Units < 10000 cfm: Gas Pressure: Units > 10000 cfm: Furnaces Boilers & Compressors Furnaces < 100K BTU: 0 -3 HP: Furnaces >= 100K BTU: 3 -15 HP: Floor Furnaces: 15 -30 HP: Unit Heaters: 30 -50 HP: Vents w/o Appliances: 50 or Greater HP: Air Conditioning: Heat Pump: Appliances • Vent Fans: Vent Systems: Total $66,794.76 Hoods: Comm Incinerators: Woodstoves: Gas Fireplaces: Required Items and Reports (Conditions) Clothes Dryers: Other Mech Units: Gas Outlets: Other Desc: (3) chillers, Duct Work: (3) cooling Fire /Smoke Dampers: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952 - 001 -0010 through OAR 952 - 001 -0090. You may obtain a copy of the rules or direct questions to OUNC UNC by calling 503.232.1987 or 1.800.332.2344. Issued By: „(j jn Q Permittee Signature: Call 503.639.4175 by 7:00 a.m. for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Mechanical Permit Applicati To pp FOR OFFICE USE ONLY City of Tigard B ECEIVED Date/By. 3/e & 1 3 sr" Permit No. j „1 G & )v ( 3- p 73 II .1 1 3125 SW Hall Blvd., Tigard, OR 9722 Plan Ri L an evew Phone: 503.718.2439 Fax: 503.598.1960 q A4 (. 6 ( Other Permit: Inspection Line: 503.639.4175 �+ 20 13 DatDate/By: ( � Ins TIGARD P MAR Date Ready: / Juris ® See Page 2 for Internet: www.tigard CITY OF TIGARD Notified/Method: Zit �/ / 3 17 G Supplemental Information • . • • a .1 -. ... ((( ^'Itp a ♦ COMMERCIAL FEE* SCHEDULE – USE CHECKLIST TYPE OF W• * Mechanical permit fees* are based on the value of the work ❑ New construction ® Addition /alteration/replacement performed. Indicate the value (rounded to the nearest dollar) of all ❑ Demolition ❑ Other: mechanical materials, equipment, labor, overhead, and rofit. Value: $$3,50 000AO i � / UC,C) �p CATEGORY OF CONSTRUCTION RESIDENTIALEQUWMEN.1` /SYSTE MS FEES* ' ❑ 1- and 2- family dwelling ® Commercial /industrial ❑ Accessory building For special information use checklist. ❑ Multi - family ❑ Master builder ❑ Other: Description I Qty. I Ea. Total JOB SITE INFORMATION AND LOCATION Heating/cooling: Air conditioning Job site address: 9585 SW Washington Square Rd (requires site plan showing placement) 46.75 City /State /ZIP: Tigard, OR 97223 Furnace 100,000 BTU (ducts/vents) 46.75 Furnace 100,000+ BTU (ducts/vents) 54.91 Suite/bldg. /apt. no.: Project name: Wa Sq Mall Chiller Plant Heat pump (requires site plan showing placement) 61.06 Cross street/directions to job site: Duct work 23.32 — Hydronic hot water system 23.32 Residential boiler (radiator or hydronic) 23.32 Unit heaters (fuel -type, not electric), in -wall, in -duct, suspended, etc. 46.75 Flue /vent for any of above 23.32 Subdivision: Lot no.: Other: 23.32 Tax map /parcel no.: Other fuel appliances: DESCRIPTION OF WORK Water heater 23.32 Gas fireplace /insert 33.39 Replace (3) 700T Chillers, (3) Cooling Towers & (6) Pumps Flue vent for water heater or gas fireplace 23.32 Log lighter (gas) 23.32 Wood/pellet stove 33.39 Wood fireplace /insert 23.32 Chimney /liner /flue /vent 23.32 ® PROPERTY OWNER ❑ TENANT Other: 23.32 Name: PPR Washington Square LLC Environmental exhaust and ventilation: Range hood/other kitchen Address: 9585 SW Washington Square Rd equipment 33.39 City /State /ZIP: Tigard, OR 97223 Clothes dryer exhaust 33.39 Single -duct exhaust (bathrooms, Phone: (503)639 -8865 Fax: (503)620 -5612 toilet compartments, utility rooms) 23.32 ® APPLICANT ® CONTACT PERSON Attic /crawlspace fans 23.32 Other: 23.32 Business name: McKinstry Fuel r m P P� g: Contact name: 1�lelisa Garwood $14.15 for first four; $4.03 for each additional Furnace, etc. Address: 16790 NE Mason St. #100 Gas heat pump City /State /ZIP: Portland, OR 97230 Wall /suspended/unit heater Water heater Phone: (503) 407 -8124 Fax: : (503) 331 -6907 Fireplace E -mail: melisagvmckinstry.com Range CONTRACTOR Barbecue Clothes dryer (gas) Business name: McKinstry Other: . l4�#E Address: 16790 NE Mason St #100 �;•.. , �_, CAL,PERMIT �_ * , , : � ' Subtotal City /State /ZIP: Portland, OR 97230 Minimum permit fee ($90.00) Phone: (503) 407 -8124 Fax: (503) 331 -6907 Plan review (25% of permit fee) CCB lic.: 172811 State surcharge (12% of permit fee) TOTAL PERMIT FEE . This permit application expires if a permit is not obtained within 180 Authorized sigpature: days after it has been accepted as complete. Print name: Melisa Ga d Date: 3/28/13 * Fee methodology set by Tri -County Building Industry Service Board 1:\ Building \Permits\MEC- PermitApp.doe 03 /07/12 440 -4617T (11 /02/COM/WEB) COMcheck Software Version 3.8.1 (ft Mecha Comp Certificate RECEI V ED 2009 IECC MAR 28 2013 Section 1: Project Information CITY OFTIGARD BUILDING DIVISION Project Type: Alteration Project Title : Washington Square Mall Chiller Replacement Construction Site: Owner /Agent: Designer /Contractor: 9585 SW Washington Square Melisa Garwood Portland, OR 97223 McKinstry 16790 NE Mason St Portland, OR 97230 503 - 278 -3904 melisag @mckinstry.com Section 2: General Information Building Location (for weather data): Tigard, Oregon Climate Zone: 4c Section 3: Mechanical Systems List Quantity System Type & Description 3 Plant 1: Cooling: Water Chiller, Capacity 2100 tons, Condenser Water - Cooled, Efficiency: 0.56 kW /ton, Standard Centrifugal Chiller, with Propeller or Axial Fan Cooling Tower Section 4: Requirements Checklist Requirements Specific To: Plant 1 : 1. Equipment minimum efficiency: Chiller. 0.570 kW /ton (0.539 IPLV) or (0.590 kW /ton,0.400 IPLV) 2. Cooling tower performance >38.2 gpm/hp )1y 3. Air cooled condenser and cooling tower fan motors >7.5 HP equipped with multiple -speed motors or single speed motors and variable r � speed drives X 1(4. '4. Hot gas bypass prohibited unless system has multiple steps of unloading or continuous capacity modulation Generic Requirements: Must be met by all systems to which the requirement is applicable: 1. Plant equipment and system capacity no greater than needed to meet loads ❑ Exception: Standby equipment automatically off when primary system is operating ❑ Exception: Multiple units controlled to sequence operation as a function of load Isi 2. Minimum one temperature control device per system jj/Zi 3. Minimum one humidity control device per installed humidification /dehumidification system m f lo 4. Load calculations per ASHRAE/ACCA Standard 183 ^ ',EP t. k C E 6 T 0 MATCH f id577,1)G . i\)/ 5. Automatic Controls: Setback to 55 °F (heat) and 85 °F (cool); 7-day clock, 2 -hour occupant override, 10 -hour backup ❑ Exception: Continuously operating zones ❑ Exception: 2 kW demand or less, submit calculations Oa 6. Outside -air source for ventilation; system capable of reducing OSA to required minimum N ik❑ 7. Hot water pipe insulation: 1.5 in. for pipes < =1.5 in. and 2 in. for pipes >1.5 in. Chilled water /refrigerant/brine pipe insulation: 1.5 in. for pipes < =1.5 in. and 1.5 in. for pipes >1.5 in. Steam pipe insulation: 1.5 in. for pipes < =1.5 in. and 3 in. for pipes >1.5 in. ❑ Exception: Piping within HVAC equipment. ❑ Exception: Fluid temperatures between 55 and 105 °F. Project Title: Washington Square Mall Chiller Replacement Report date: 03/28/13 Data filename: T: \Construction \Projects \700 OR Majors \7705 Washington Sq Cental Plant Renovation \060 Engineering \Coordination \Energy Code Forms.cck Page 1 of 4 ❑ Exception: Fluid not heated or cooled with renewable energy. ❑ Exception: Piping within room fan -coil (with AHRI440 rating) and unit ventilators (with AHRI840 rating). D Exception: Runouts <4 ft in length. X 8. Operation and maintenance manual provided to building owner N/Ar. 9. Demand control ventilation (DCV) present for high design occupancy areas ( >40 person /1000 ft2 in spaces >500 ft2) and served by systems with any one of 1) an air -side economizer, 2) automatic modulating control of the outdoor air damper, or 3) a design outdoor airflow greater than 3000 cfm. • Exception: Systems with heat recovery. LI Exception: Multiple -zone systems without DDC of individual zones communicating with a central control panel. LI Exception: Systems with a design outdoor airflow less than 1200 cfm. Li Exception: Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm. J\ f 0 10.Automatic controls for freeze protection systems present 10/AD 11. Exhaust air heat recovery included for systems 5,000 cfm or greater with more than 70% outside air fraction or specifically exempted LI Exception: Hazardous exhaust systems, commercial kitchen and clothes dryer exhaust systems that the International Mechanical Code prohibits the use of energy recovery systems. • Exception: Systems serving spaces that are heated and not cooled to less than 60 °F. LI Exception: Where more than 60 percent of the outdoor heating energy is provided from site - recovered or site solar energy. • Exception: Heating systems in climates with less than 3600 HDD. LI Exception: Cooling systems in climates with a 1 percent cooling design wet -bulb temperature less than 64 °F. D Exception: Systems requiring dehumidification that employ energy recovery in series with the cooling coil. LI Exception: Laboratory fume hood exhaust systems that have either a variable air volume system capable of reducing exhaust and makeup air volume to 50 percent or less of design values or, a separate make up air supply meeting the following makeup air requirements: a) at least 75 percent of exhaust flow rate, b) heated to no more than 2 °F below room setpoint temperature, c) cooled to no lower than 3 °F above room setpoint temperature, d) no humidification added, e) no simultaneous heating and cooling. Section 5: Compliance Statement • Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed mechanical alteration project has been designed to meet the 2009 IECC, Chapter 8, requirements in COMcheck Version 3.8.1 and to comply with the mandatory requirements in the Requirements Checklist. • . • i s . Fi GI/ f cue.° 3 -2,- -20/3 Name - Title Signature Date Project Title: Washington Square Mall Chiller Replacement Report date: 03/28/13 Data filename: T: \Construction \Projects\700 OR Majors \7705 Washington Sq Centel Plant Renovation \060 Engineering \Coordination \Energy Code Forms.cck Page 2 of 4