Loading...
Correspondence (2) 0,4a ar s'- cr-o z.T__ Rick Bolen 1 From: Albert Shields Sent: Thursday, January 08, 2009 11:20 AM To: 'Matt Hubel'; 'Jeff Bringenberg'; 'Michael Krecklow' Cc: Dick Bewersdorff; Kim McMillan; Cheryl Caines; Brian Blalock; Rick Bolen; Gary Noble Subject: RE: TVF &R Open Items Update Attachments: image001.jpg Gentlemen ... Congratulations! The last open Condition, #21, is now satisfied and we are ready to schedule the Final Building Inspection under BUP2008 -00022 at your convenience. Since we have rolled the Electrical Final over to tomorrow, 1/9/09, we would be happy to perform the Building Final tomorrow as well if you would call in and schedule it on the system. From: Albert Shields Sent: Wednesday, January 07, 2009 4:04 PM To: Matt Hubel; 'Jeff Bringenberg'; 'Michael Krecklow' Cc: Dick Bewersdorff; Kim McMillan; Cheryl Caines; Brian Blalock; Rick Bolen; Gary Noble Subject: TVF &R Open Items Update Gentlemen, thanks for your prompt responses to my note yesterday about the items that remained open on the TVF &R project. permit application and issued BUP2009 -00004 hser �We received the f r p pp ay o the Fire Alarm System and case finalled it this morning with Final Inspection Approval. ›P We received and accepted the Final Sight Distance Certification yesterday: Condition #26 f CUP 07 -00003 is satisfied. _� We received today copies of the Final Observation Letter rom Lewis & Van Vleet and the Final Summary Letter from Carlson Testing, which were the two documentation items needed under BUP2008- 00022. The only item now remaining before a Final Inspection on BUP2008 -00022 can be re- scheduled is that Condition #21, Recorded Tree Deed Restriction, be satisfied. ,' However, before Final Approval of BUP2008 -00022 can be awarded ELC2008 -00594 must receive Fin ./. 21 -1/34.—k- --- Inspection Approval. It failed a reinspect Final today and I see it hafbeen re- scheduled again for tomorrow. Unfortunately, our Senior Electrical Inspector, Gary Noble, will not be in tomorrow so we will reschedule the inspection for Friday, 1/9. Please keep me posted on your progress in recording the Tree Deed Restriction and let me know if you have any questions. 1 Albert Shields 111 ' City of Tigard i ;' Permits /Projects - Coordinator I16.‘11.1) Albert4tigard- or.gov (503) 718 - 2426',' ',Vol (543) 624 -3681 Fa?: 13125 SW Hall Blvd. Tigard, OR 97223 2 Rick Bolen From: Cheryl Caines Sent: Thursday, January 08, 2009 9:56 AM To: Brian Blalock; Albert Shields; Matt Hubel; 'Jeff Bringenberg'; 'Michael Krecklow' Cc: Dick Bewersdorff; Kim McMillan; Rick Bolen; Gary Noble Subject: RE: TVF &R Open Items Update Attachments: image001.jpg I signed that off yesterday and put the case note in that says okay for final and C of 0. Cheryl From: Brian Blalock Sent: Thursday, January 08, 2009 9:55 AM To: Albert Shields; Matt Hubel; 'Jeff Bringenberg'; 'Michael Krecklow' Cc: Dick Bewersdorff; Kim McMillan; Cheryl Caines; Rick Bolen; Gary Noble Subject: RE: TVF &R Open Items Update The Building Division has been contacted to perform Electrical Final today. Our Electrical inspector is not available today , so he will do the Electrical Final on Friday. The Building Division can't perform the Building Final inspection until condition 21 is satisfied and the Planning Division gives the go ahead. From: Albert Shields Sent: Wednesday, January 07, 2009 4:04 PM To: Matt Hubel; 'Jeff Bringenberg'; 'Michael Krecklow' Cc: Dick Bewersdorff; Kim McMillan; Cheryl Caines; Brian Blalock; Rick Bolen; Gary Noble Subject: TVF &R Open Items Update Gentlemen, thanks for your prompt responses to my note yesterday about the items that remained open on the TVF &R project. We received the permit application and issued BUP2009 -00004 yesterday for the Fire Alarm System and case finalled it this morning with Final Inspection Approval. We received and accepted the Final Sight Distance Certification yesterday: Condition #26 of CUP2007 -00003 is satisfied. We received today copies of the Final Observation Letter from Lewis & Van Vleet and the Final Summary Letter from Carlson Testing, which were the two documentation items needed under BUP2008- 00022. The only item now remaining before a Final Inspection on BUP2008 -00022 can be re- scheduled is that Condition #21, Recorded Tree Deed Restriction, be satisfied. However, before Final Approval of BUP2008 -00022 can be awarded ELC2008 -00594 must receive Final Inspection Approval. It failed a reinspect Final today and I see it has been re- scheduled again for tomorrow. Unfortunately, our Senior Electrical Inspector, Gary Noble, will not be in tomorrow so we will reschedule the inspection for Friday, 1/9. 1 I Please keep me posted on your pr..,,. ess in recording the Tree Deed Restric,..,,n and let me know if you have any questions. Albert Shields 1111 -, City of Tigard a Permits/Projects Coordinator I 14..i 4 Rt f) AlbertCbgard- or.gov (503) 718- 2426'.';c (503) 624-3681 13125 SW Hall Blvd. Tigard, OR 97223 2 1 Rick Bolen From: Brian Blalock Sent: Thursday, January 08, 2009 9:55 AM To: Albert Shields; Matt Hubel; 'Jeff Bringenberg'; 'Michael Krecklow' Cc: Dick Bewersdorff; Kim McMillan; Cheryl Caines; Rick Bolen; Gary Noble Subject: RE: TVF &R Open Items Update Attachments: image001.jpg The Building Division has been contacted to perform Electrical Final today. Our Electrical inspector is not available today , so he will do the Electrical Final on Friday. The Building Division can't perform the Building Final inspection until condition 21 is satisfied and the Planning Division gives the go ahead. From: Albert Shields Sent: Wednesday, January 07, 2009 4:04 PM To: Matt Hubel; 'Jeff Bringenberg'; 'Michael Krecklow' Cc: Dick Bewersdorff; Kim McMillan; Cheryl Caines; Brian Blalock; Rick Bolen; Gary Noble Subject: TVF &R Open Items Update Gentlemen, thanks for your prompt responses to my note yesterday about the items that remained open on the TVF &R project. We received the permit application and issued BUP2009 -00004 yesterday for the Fire Alarm System and case finalled it this morning with Final Inspection Approval. We received and accepted the Final Sight Distance Certification yesterday: Condition #26 of CUP2007 -00003 is satisfied. We received today copies of the Final Observation Letter from Lewis & Van Vleet and the Final Summary Letter from Carlson Testing, which were the two documentation items needed under BUP2008- 00022. The only item now remaining before a Final Inspection on BUP2008 -00022 can be re- scheduled is that Condition #21, Recorded Tree Deed Restriction, be satisfied. However, before Final Approval of BUP2008 -00022 can be awarded ELC2008 -00594 must receive Final Inspection Approval. It failed a reinspect Final today and I see it has been re- scheduled again for tomorrow. Unfortunately, our Senior Electrical Inspector, Gary Noble, will not be in tomorrow so we will reschedule the inspection for Friday, 1/9. Please keep me posted on your progress in recording the Tree Deed Restriction and let me know if you have any questions. Albert Shields I N IQ : City of Tigard . : Permits/ Projects ,,f Coordinator T Albert4tigard- or.gov (503) 718 -2426 '' ,, (503) 624-3681 Fa› 13125 SW Hall Blvd. Tigard, OR 97223 1 Rick Bolen From: Albert Shields Sent: Wednesday, January 07, 2009 4:04 PM To: Matt Hubei; 'Jeff Bringenberg'; 'Michael Krecklow' Cc: Dick Bewersdorff; Kim McMillan; Cheryl Gaines; Brian Blalock; Rick Bolen; Gary Noble Subject: TVF &R Open Items Update Attachments: Albert Shields.vcf; image001.jpg Gentlemen, thanks for your prompt responses to my note yesterday about the items that remained open on the TVF &R project. We received the permit application and issued BUP2009 -00004 yesterday for the Fire Alarm System and case finalled it this morning with Final Inspection Approval. We received and accepted the Final Sight Distance Certification yesterday: Condition #26 of CUP2007 -00003 is satisfied. We received today copies of the Final Observation Letter from Lewis & Van Vleet and the Final Summary Letter from Carlson Testing, which were the two documentation items needed under BUP2008- 00022. The only item now remaining before a Final Inspection on BUP2008 -00022 can be re- scheduled is that Condition #21, Recorded Tree Deed Restriction, be satisfied. However, before Final Approval of BUP2008 -00022 can be awarded ELC2008 -00594 must receive Final Inspection Approval. It failed a reinspect Final today and I see it has been re- scheduled again for tomorrow. Unfortunately, our Senior Electrical Inspector, Gary Noble, will not be in tomorrow so we will reschedule the inspection for Friday, 1/9. Please keep me posted on your progress in recording the Tree Deed Restriction and let me know if you have any questions. Albert Shields City of Tigard Permits /Projects , Coordinator Albert . tigard -or ,gov ;503) 718-2426 624 -3681 Fa, . 13125 SW Hall Blvd. Tigard, OR 97Z23 1 Rick Bolen From: Albert Shields Sent: Tuesday, January 06, 2009 2:44 PM To: 'matth @firstcascade.com' Cc: Dick Bewersdorff; Kim McMillan; Cheryl Caines; Brian Blalock; Gary Noble; Rick Bolen Subject: TVF &R, CUP2007 -00003 -- Remaining Open Items Attachments: TVF &RConditions010609.pdf; Albert Shields.vcf; image001.jpg Matt, reviewing the bidding on the TVF &R project, here's an update on the status of outstanding items: • Two permits require Final Inspection approval: o Re- inspection on the final for ELC2008 -00594 can be scheduled as soon as corrections from 1/5/09 are complete; o Re- inspection on the final for BUP2008- 00022, the overall building permit, may NOT be re- scheduled until all Conditions of Approval are met; further, before a "pass" can be awarded on this permit two Final Letters are required: a Final Summary Letter from Carlson Testing and a Final Observation Letter from the Structural Engineer. We have no record of receiving either of these. • Two remaining Conditions of Approval need to be satisfied: o #21 is the Tree Deed Restriction we discussed yesterday in emails. o #26 is the Final Sight Distance Certification which we have no record of receiving. Please supply same. o These two Not -Met Conditions are the primary hold -ups and must be completed before we can schedule a Building Final re- inspection. As you may know, Metro submitted plans and a permit app and paid fees this morning for BUP2009 00004, Fire Alarm System. This could have been taken care of earlier but, for our colleagues at TVF &R, we are expediting Plan Review. Dan Nelson expects to complete review this afternoon and, if the plans are approved, the permit should be issued by the end of the day. We have already inspected this system and will "pass" the Final as soon as the permit is issued. Please forward the missing Final Letters to me as soon as possible and please let me know if your records disagree with ours as to the status of the above items. I'm attaching an updated Status List of the Conditions of Approval. Ms Albert Shields w City of Tigard � Permits /Projects Coordinator .� _ Albert itgard- or.gov (503) 718 -2426 (503) 624-3681 f '. 13125 SW Hall Blvd, Tigard, OR 97223 1 Rick Bolen From: Brian Blalock Sent: Wednesday, January 07, 2009 2:18 PM To: Rick Bolen Subject: RE: COSCO (Early morning inspection) Sounds great. Thanks for keeping in the loop. You may want to give Chip and Gary heads up. From: Rick Bolen Sent: Wednesday, January 07, 2009 1:02 PM To: Brian Blalock Cc: Rick Bolen Subject: COSCO (Early morning inspection) Brian, I've been asked to perform a 06:00 AM inspection at COSCO. As usual, it is so that they can get the inspection and cover before the public comes in. I stated that I would be there. I should be able to make the inspection and get back to the office before 07:00 AM. I will adjust my time card to reflect this time. Thanks, Rick 1 Rick Bolen From: Rick Bolen Sent: Wednesday, January 07, 2009 1:02 PM To: Brian Blalock Cc: Rick Bolen Subject: COSCO (Early morning inspection) Brian, I've been asked to perform a 06:00 AM inspection at COSCO. As usual, it is so that they can get the inspection and cover before the public comes in. I stated that I would be there. I should be able to make the inspection and get back to the office before 07:00 AM. I will adjust my time card to reflect this time. Thanks, Rick 1 Rick Bolen From: Brian Blalock Sent: Tuesday, January 06, 2009 2:37 PM To: Rick Bolen Cc: Walter Barnett; Gary Noble Subject: RE: Plumbing Chief's Monthly Meeting I think you should go. The inspections can be done when you get back to the office if Chip and Gary get a high inspection load. From: Rick Bolen Sent: Tuesday, January 06, 2009 1:10 PM To: Brian Blalock Cc: Rick Bolen Subject: Plumbing Chiefs Monthly Meeting Brian, Mike Ditty called me yesterday and asked if I was going to participate in the monthly chiefs meetings. I think it would be a good idea if we continue doing this. That is, if our inspection count will permit us to do so. I realize that since we are at an all- morning inspection schedule, this will interfere somewhat, but I will either do my inspections in the PM hours or not take any inspections depending on the inspection count of course. Please let me know what you think so that I can get back to Mike. Or, you can call him direct at 503 - 527 - 1274 if you would rather speak to him about this situation. Thanks, Rick 1 Rick Bolen From: Rick Bolen Sent: Tuesday, January 06, 2009 1:10 PM To: Brian Blalock Cc: Rick Bolen Subject: Plumbing Chiefs Monthly Meeting Brian, Mike Ditty called me yesterday and asked if I was going to participate in the monthly chief's meetings. I think it would be a good idea if we continue doing this. That is, if our inspection count will permit us to do so. I realize that since we are at an all- morning inspection schedule, this will interfere somewhat, but I will either do my inspections in the PM hours or not take any inspections depending on the inspection count of course. Please let me know what you think so that I can get back to Mike. Or, you can call him direct at 503 - 527 -1274 if you would rather speak to him about this situation. Thanks, Rick 1 Albert Shields From: Albert Shields Sent: Wednesday, January 07, 2009 4:04 PM - To: Matt Hubei; 'Jeff Bringenberg'; 'Michael Krecklow' Cc: Dick Bewersdorff; Kim McMillan; Cheryl Caines; Brian Blaloc , Rick Bolen; G.ry Noble Subject: TVF &R Open Items Update III am— Attachments: Albert Shields.vcf; image001.jpg r y / Gentlemen, thanks for your prompt responses to my note yesterday about the items that remained open n the TVF &R project. We received the permit application and issued BUP2009 -00004 y to ay for the Fire Alarm Sys em and case finalled it this morning with Final Inspection Approval. We received and accepted the Final Sight Distance Certification yee n C��U,,��P2007 -00003 is satisfied. 10' We received today copies of the Final Observation Letter from Le is : an VI + and s - Final Summary Letter from Carlson Testing, which were the two documentation _ - : • • under BUP200 - 022. The only item now remaining before a Final Inspection on BUP2008 -00022 can be re- scheduled is that Condition #21, Recorded Tree Deed Restriction, be satisfied. However, before Final Approval of BUP2008 -00022 can be awarded ELC2008 -00594 must receive Final Inspection Approval. It failed a reinspect Final today and I see it has been re- scheduled again for tomorrow. Unfortunately, our Senior Electrical Inspector, Gary Noble, will not be in tomorrow so we will reschedule the inspection for Friday, 1/9. Please keep me posted on your progress in recording the Tree Deed Restriction and let me know if you have any questions. Albert Shields City of Tigard 111 X Permits /Projects Coordinator TI Albert gbgard -or .gcv (503) 718-2426 (503) 624 -3681 - - 13125 SW Hall Blvd. Tigard, OR 97223 1 11-14/Pa 0V - 01102-2- / Albert Shields V g t/ ... c ,, fi From: Albert Shields Sent: Tuesday, January 06, 2009 2:44 PM To: 'matth @firstcascade.com' Cc: Dick Bewersdorff; Kim McMillan; Cheryl Caines; Brian Blalock; Gary Noble; Rick &41en Subject: TVF &R, CUP2007 -00003 -- Remaining Open Items Attachments: TVF &RConditions010609.pdf; Albert Shields.vcf; image001 .jpg Matt, reviewing the bidding on the TVF &R project, here's an update on the status of outstanding items: • Two permits require Final Inspection approval: o Re- inspection on the final for ELC2008 -00594 can be scheduled as soon as corrections from 1/5/09 are complete; o Re- inspection on the final for BUP2008- 00022, the overall building permit, may NOT be re- scheduled until all Conditions of Approval are met; further, before a "pass" can be awarded on this permit two Final Letters are required: a Final Summary Letter from Carlson Testing and a Final Observation Letter from the Structural Engineer. We have no record of receiving either of these. • Two remaining Conditions of Approval need to be satisfied: o #21 is the Tree Deed Restriction we discussed yesterday in emails. o #26 is the Final Sight Distance Certification which we have no record of receiving. Please supply same. o These two Not -Met Conditions are the primary hold -ups and must be completed before we can schedule a Building Final re- inspection. As you may know, Metro submitted plans and a permit app and paid fees this morning for BUP2009- 00004, Fire Alarm System. This could have been taken care of earlier but, for our colleagues at TVF &R, we are Ito) expediting Plan Review. Dan Nelson expects to complete review this afternoon and, if the plans are approved, the permit should be issued by the end of the day. We have already inspected ' system and will "pass" the Final as soon as the permit is issued. ik. Ott. i 1.4—A._ 1.4—A._ 4 i :" — A� Please forward hd m'ssin O Fi na'tetters to me a oon as ossible and p lease let me know i g p please ow f your records disagree with ours as to the status of the above items. I'm attaching an updated Status List of the Conditions of Approval. 7 � Albert Shields 1 , v City of Tigard i po 1 s Permits /Projects b 6 /(16 ; cm ;.,: Coordinator 7 TI A Alber or.go�d I? ev (503) 718- 2426'6'vrc,i:_ ;503) 624 -3681 .� ■ `� I' / i=ax 13125 SW Hall Blvd. Tigard, OR 97223 1 FULC SERVICE FIRE PROTECT' "•' EQUIPMENT • SYSTEMS �yq I I • SERVICE �I��Z�v , - oov PERMIT #: E- c +, ;(' =2.00 m. m. : Wayne Elmore DATE ISSUED: . + Alarm Division Manager l C � 1AETR0 Cell (503) _____ / O AMY & FIR$ INC. 'hone (503) 231 -2999 • Fax (503) 256 -4691 12131/2D08 TIME: f. ()tA,;,, PAGE: i `% 4324 SE Stark Street • Portland, OR 97233 APA ij®;4J vww.metrosafetyandfire.com - s k1 1 :�1Y MIAINU t 151 CLASS OF WORK: SUBDIVISION: Tv;:.ap FIRE SfA!" ot4 LOT #: TYPE OF USE: PROJECT NAME: TUALATIN VALLEY FIRE AND RESCU DESCRIPTION: 11,700 d. firo station. • OWNER: TUALATIN VALLEY FIRE & RESCUE, PHONE #: 603-649.8677 CONTRACTOR: 14IRST CASCADE CORPORATION PHONE #: 603.699..8970 v Inspection Request Scheduled For: Date: 12 /31ng Pour Time: ? 6 ,�- Code # Inspection Description Confirm # Contact # Me- -ge 1 .. 9% Alorrl� final g7: () _ €4:3-M1.763 Y 4V( Corrections /Comments /Instruct'ons: i G ! 0:06 . It 1 • 3 f- ------- i__________-------", p it-LA 51X.,...* 1 -/ /2-30 t - "7 ", - 571 , 1- 6 7>r-L-4-iL-r--#-C 1 . f 7,1.-1, ‘''ZCC s. I ) \ / 2 - - i ,. ( 4 -- -- c „.. ,, , ,,,_ _ —______._ __ . • . _ ,...f_._ _______.1: : _____4____L... _ - (......_( C; ) \ , ______ ,� - (DO W . ( .`",f ) ,_ i / rl t✓ . (( t-; I /Z 2-t 6 k- 06 ,.>-)—---- — -- :.„..--< - /e,-. .....::::_ 5.-/ t El FAIL - C ION ❑ ADDITIONAL FEES ASSESSED Inspector: V O Date: al/.)k t ‘ #: (503) 718 - ' f Rick Bolen From: Joy Koss Sent: Wednesday, December 31, 2008 9:14 AM To: Rick Bolen Cc: Mark Decastro Subject: RE: Gas Card Problem Mark suggested contacting him directly next time you need gas, so he can observe the pump messages. Then we can have Bretthauer fix whatever the problem may be. Thank you. Joy Koss Fleet /Public Works Administration (503) 718 -2721 From: Rick Bolen Sent: Wednesday, December 31, 2008 8:25 AM To: Joy Koss Subject: RE: Gas Card Problem Joy, It's the vehicle card. The using of both cards was not permitted years ago. Since that time I haven't tried to use both cards due to this, but my personal card works to get into the system to pump gas all by it's self. Next time I go to the pump, I will try both cards and report back to you what it says. Thanks, Rick From: Joy Koss Sent: Tuesday, December 30, 2008 3:19 PM To: Rick Bolen Subject: Gas Card Problem Rick, I've been covering past couple weeks at the Public Works front desk and am just getting back to Fleet issues. You say your personal gas card does not work. It would help if you could tell me what the pump message says when you try to use it, because Bretthauer will need that information to solve the problem. Is this a new problem you are experiencing or one that never got resolved in the past. Let me know. Thanks. Joy Koss Fleet /Public Works Administration (503) 718 -2721 1 d, l I . 6 14 fti 411v_4s_o y kew*Iii 1104. L/kk I .__. ad - avozZ . kkri"01.- Cke-c-r 4+ NI i') Rick Bolen From: Cheryl Caines Sent: Monday, January 05, 2009 2:04 PM To: Albert Shields; Rick Bolen Subject: TVF &R I went out to the site. Once the revised deed restriction is done, Planning will be okay for Bldg Final and C of O. I'll sign off that last condition once the corrected deed restriction is received. Cheryl Caines Associate Planner City of Tigard (503) 718 -2437 1 Rick Bolen From: Albert Shields Sent: Monday, January 05, 2009 2:57 PM To: Debbie Adamski; Rick Bolen; Walter Barnett; Gary Noble Cc: Bethany Stewart; Brian Blalock; Cheryl Caines; Dick Bewersdorff; Kim McMillan Subject: TVF &R, CUP2007- 00003, - -- No Final Approvals, No C of 0 yet. Thanks very much for the head's up, Debbie. Sorry I wasn't here Friday to catch it earlier. The Conditions of Approval under CUP2007 -00003 have NOT all been met for either Planning or Engineering so tection$ (or re- inspections if any were made today) should not be scheduled until we have releases s febn1 both departments. We're not clear about the background on Brandon's Case Note that Mike had given an OK for finals. We'll resolve that after Mike gets back on Tuesday, but please ee: Albert. From: Debbie Adamski Sent: Friday, January 02, 2009 12:14 PM "1%4'1 To: Rick Bolen; Walter Barnett Cc: Bethany Stewart; Albert Shields Subject: TVF & R, CUP2007- 00003, 12617 FYI — It looks like the finals have been called in for this project on Monday, 1/5/09. Engineering has case notes in that they are ok for building finals but, I don't see a note from the Planning Department. Debbie Adamski City of Tigard Senior Permit Technician 503.718.2450 t I Rick Bolen From: Bethany Stewart Sent: Monday, January 05, 2009 3:01 PM To: Albert Shields; Debbie Adamski; Rick Bolen; Walter Barnett; Gary Noble Cc: Brian Blalock; Cheryl Caines; Dick Bewersdorff; Kim McMillan Subject: RE: TVF &R, CUP2007- 00003, - -- No Final Approvals, No C of 0 yet. Attachments: image001.jpg Not Branden - Bethany Mike called from home on Friday asked me to put in the case note & tell Debbie they were f Thanks, Bethany O ( 1 0 11) Bethany Stewart Ct, of Tigara Ilk ql Engineerng Tech I a Development Engineering i io (503) 718 - 2459'.`: or' TIGARD ;503)639- 4171SMtc •nogsd (503) 624 -0752 Fax Bethany atigard- or.gov :3125 SW Hall Blvd Tigard, OR 97223 From: Albert Shields Sent: Monday, January 05, 2009 2:57 PM To: Debbie Adamski; Rick Bolen; Walter Barnett; Gary Noble Cc: Bethany Stewart; Brian Blalock; Cheryl Caines; Dick Bewersdorff; Kim McMillan Subject: TVF &R, CUP2007- 00003, - -- No Final Approvals, No C of 0 yet. Thanks very much for the head's up, Debbie. Sorry I wasn't here Friday to catch it earlier. The for either Planning or Engineering so final inspections (or re- inspections if any were made today) should not be sche a unti we av ases from both departments. We're not clear about the background on Brandon's Case Note that Mike had given an OK for finals. We'll resolve that after Mike gets back on Tuesday, but please consider that "OK" suspended until further notice. Albert. From: Debbie Adamski Sent: Friday, January 02, 2009 12:14 PM To: Rick Bolen; Walter Barnett Cc: Bethany Stewart; Albert Shields Subject: TVF & R, CUP2007- 00003, 12617 FYI — 1 1 It looks like the finals have been cal._ in for this project on Monday, 1/5/09. _i gineering lls case notes in that they are ok for building final #but, I don't see a note from the Planning Department. Debbie Adamski City of Tigard Senior Permit Technician 503.718.2450 • 4 ile • • • • 2 I Rick Bolen From: Albert Shields Sent: Monday, January 05, 2009 3:10 PM To: Bethany Stewart; Debbie Adamski; Rick Bolen; Walter Barnett; Gary Noble Cc: Brian Blalock; Cheryl Caines; Dick Bewersdorff; Kim McMillan Subject: RE: TVF &R, CUP2007- 00003, - -- No Final Approvals, No C of 0 yet. Attachments: image001.jpg O000ps ... I apologize, Bethany. I'm sorry for misreading the Tidemark sign -off initials. I'd better take home a list to study. Still — pending discussions tomorrow, TVF &R has unmet conditions and is not yet released for finals or C of 0. From: Bethany Stewart Sent: Monday, January 05, 2009 3:01 PM To: Albert Shields; Debbie Adamski; Rick Bolen; Walter Barnett; Gary Noble Cc: Brian Blalock; Cheryl Caines; Dick Bewersdorff; Kim McMillan Subject: RE: TVF &R, CUP2007- 00003, - -- No Final Approvals, No C of 0 yet. Not Branden - Bethany Mike called from home on Friday asked me to put in the case note & tell Debbie they were ok for final. Thanks, Bethany Bethany Stewart C,tr o`Trcarc - Engineer ng Tecr I rilp Developmen Ergrr eerng 1 :,5u3; 18-2459 ;503' o39-4.71 ` T. �,, 7,» 4503 ; 624- 10752 5 Bettany c Bard- or.gov 13125 S,': Hai, Biva Trgarc, OR 9'223 From: Albert Shields Sent: Monday, January 05, 2009 2:57 PM To: Debbie Adamski; Rick Bolen; Walter Barnett; Gary Noble Cc: Bethany Stewart; Brian Blalock; Cheryl Caines; Dick Bewersdorff; Kim McMillan Subject: TVF &R, CUP2007- 00003, - -- No Final Approvals, No C of 0 yet. Thanks very much for the head's up, Debbie. Sorry I wasn't here Friday to catch it earlier. The Conditions of Approval under CUP2007 -00003 have NOT all been met for either Planning or Engineering so final inspections (or re- inspections if any were made today) should not be scheduled until we have releases from both departments. We're not clear about the background on Brandon's Case Note that Mike had given an OK for finals. We'll resolve that after Mike gets back on Tuesday, but please consider that "OK" suspended until further notice. 1 1 Albert. From: Debbie Adamski Sent: Friday, January 02, 2009 12:14 PM To: Rick Bolen; Walter Barnett Cc: Bethany Stewart; Albert Shields Subject: TVF & R, CUP2007- 00003, 12617 FYI — It looks like the finals have been called in for this project on Monday, 1/5/09. Engineering has case notes in that they are ok for building finals but, I don't see a note from the Planning Department. Debbie Adamski City of Tigard Senior Permit Technician 503.718.2450 2 o c)c)Z L - 4 � 1 Z ereS LEWIS & S \.) L - FIELD REPORT TO: Jeff Bringenberg RECEIVED VAN VLEET Peck Smiley Ettlin Architects Incorporated 44125W Corbett Ave AUG 1 2 7' Portlnad, OR. 97239 principals CITY OFTIGARD Chris c. van vleet. p.e. DATE: August 7, 2008 JOB NO. 07132 BUILDING DIVISION ganjj. levels. p.e. PROJECT: TVF &R Station 50 LOCATION: Tigard, Oregon CONTRACTOR: First Cascade Construction OWNER: TVF &R WEATHER: TEMP/TIME: deg. F at . PRESENT AT SITE: Lance Cerny, Lewis & Van Vleet Inc. , Matt Hubel, First Cascade THE FOLLOWING WAS NOTED: I visited the jobsite to perform an inspection of the construction completed thus far. At the time of the ' inspection, wall framing the main roof framing was largely completed. Some of the apparatus bay end walls and some roof overframing was not yet completed. At all shear walls, the IBC /OSSC requires a minimum .2 29 "x3 "x plate washer at all sill plate anchor bolts. These plate washers will need to be added at all shear w s. t the east /west shear wall line midway across building, on the east side, there is a to steel column at ties the low roof to the high roof per detail 9/S2.3. It would be acceptable to us 4x6 strut at this location in lieu of a high roof truss. There were two loc . ' . o r ,-.: (4 _ • • • me y tt where shear wall holdowns need to be installed, a southmo ho • o AI• e type ear wall along grid D, and one at the east end of the type A a wall on the no 17 e.. • e 1. way between the bathrooms. At the northwest most of the HSS5x5x3 /16 posts adjacent to the apparatus bay overhead doors, one of the anchor bolts per 9/S1.2 was located immediately adjacent to an isulated plumbing penetration which will not allow the anchor bolt to develop any significant load carrying carrying capacity. The contractor spliced an e • - �tiy: �i t• the post base plate to an adjacent wood wall . s. • acceptable, however the — inspected and the weld P was not ins � ,. � • >. ��:,.. v . � ... leeize type. Therefore 4le sp7 p be iefr osced per the accompanying etch ' All field welding requires speeini inspection. All other observed and completed work appeared to comply with the plans and specifications. Signed, X , 1 Lance Cemy, P.E. r le I , CC: Matt Hubei consulting engineers 18650 s.w. boones ferry road tualatin. oregon 97 062 (503] 865.8605 phone (503) 6E15.1206 fax w LEW!5 & L consulting engineers Job IVri" $0 18660 s.w. domes ferry road Client I' S� kualakln, Oregon 97062 Job No. 0 t1 37 - By L.C. [503] 995.5505 phone [503] 965.1206 fax VAN VLEET Date eiob Sheet No. Incarporot ®d a I l i' a .. .. .. .... ... 1 11 . 't �f 1/y X X" RAI ]3►1rt ii 1 i?CI1AOUtr I3AbE F 12L ' GXitwi] .) ii it h I I 34 i y ii 43 i tillir ff I i : —(.kl__— R 3/ i i. `1f iI $f Flag imseec too good" I li F ; a g , . j i 0 6 ii s H a [ ..wt�._._.a.t..__. ^ 'S• .H' "` _.ia3.:...� -a.._. V =_ -" %.+m'E' + e:; - ..".. ""=.3 . - -_ = ^.='3.X..17_` ."."-- ..__.... r.L_' ' :. LEWI5 memorandum RECEIVED VAN VLEET AUG 12 2008 Incorporated CITY OFTIGARD principals BUILDING DIVISION chrls c. van vleet. p.e. garw J. lewls. p.e. TO: Jeff Bringenberg – PSE Architects CC: Matt – First Cascade FROM: Lance Cerny P.E. DATE: 8/07/08 RE: — — -a,-R -Station SO shear Walt Bottom 'fate - Per a conversation with Matt at First Cascade, the typical holdown anchor bolts were either too short or embedded too deeply to allow for the holdown installation. Therefore, the typical shear wall bottom plate was notched at holdown locations. This is structurally acceptable. Please call if you have any questions. consulting engineers 18660 s.w. boones ferry road tualatin, oreg❑n 97062 (503] 665.6605 phone (503]1385.1206 fax LEWIS & memorandum L i.h. VAN VLEET Incorporated principals chrls C. van vleet. p.e. wry j. lewls. p.e. TO: Jeff Bringenberg — PSE Architects CC: Matt — First Cascade FROM: Lance Cerny P.E. DATE: 8/07/08 RE: TVF &R Station 50 — Shear Wall Bottom Plate Per a conversation with Matt at First Cascade, the typical holdown anchor bolts were either too short or embedded too deeply to allow for the holdown installation. Therefore, the typical shear wall bottom plate was notched at holdown locations. This is structurally acceptable. Please call if you have any questions. consulting engineers 18660 5.W. boones ferry road tualatin. oregon 97062 (5133] 885.8605 phone (508] 0E15.1206 fax . ozro Job Name. TVF &R Station 50 CITY OF TIGARD Job Address: 12585 SW Walnut Road, Tigard, OR 13125 SW HALL BLVD March 19, 2008 TIGARD, OR 97223 SHFET 1 OF 3 BUP2008 00022 ML,E Project No.: 080111 STRUCTURAL PLAN REVIEW #3 Plans Dated 2/20/08 Calculations Dated 3/12/08 Correction Ite Page No. Comments Code Reference Made m r No. Completed 1 A1.2 — Site Submit calculations and details for the trash 1805.5 and 1609 3 -7 -08 Details; Details 7 enclosure retaining wall and the pylon sign and 10/A1.2 foundation. Completed 2 S1.0 — Structural 1997 UBC wind provisions are not allowed 1609.1.1.2 3 -7 -08 Notes; Design for Building Occupancy Category 4 Criteria 2.a structures. Submit wind calculations in accordance with the ACSE 7 provisions. Completed 3 S1.0 — Structural Submit the soils report from Carlson 1802.2 3 -7 -08 Notes; Testing for review. Foundations Completed 4 S1.0 — Structural Clarify bolt requirement as the information 106.1.1 3 -7 -08 Notes; Steel was cut off. Item #4 Completed 5 S1.0 — Structural Indicate when structural observation will be 1709.2 3 -7 -08 Notes conducted as required by the code. Completed 6 S1.1 — Clarify the concrete slab thickness at the 106.1.1 3 -7 -08 Foundation exercise room and storage room areas, as Plan Detail 6/S1.2 indicates that the slab is the same depth as the Apparatus Bay. Completed 7 S1.1 — Submit calculations for the shear wall at 1605.3.1 3 -7 -08 Foundation Plan Grid D that resists the mezzanine loads in Calc's page L -8 combination with the overall building seismic loads. Completed 8 S1.2 — Detail Submit calculations for the hex head 1901.2 and D.2.1 3 -7 -08 8/S1.2 anchor bolts embedded in the concrete stem wall in accordance with ACI. Completed 9 S1.2 — Detail 10 Clarify the difference between the two 106.1.1 3 -7 -08 and 10/S1.2 details labeled as 10/S1.2. Completed 10 S2.1 — Roof Clarify how the continuity strap at Grid 2 -C ASCE 12.1.3 3 -7 -08 Framing Plan connects at the double top plate given the different wall heights. Completed 11 S2.1 — Roof Clarify the truss spacing at the day room 106.1.1 3 -7 -08 Framing Plan area. In addition, clarify what supports the last truss in the vicinity of Grids 2.1 -D.2. Completed 12 S2.2 — Detail 1 Clarify the bracket spacing. In addition, 106.1.1 and 1605.3.1 3 -7 -08 and 2/S2.2 provide calculations for the wall framing considering eccentric loads in combination with wind and seismic. Job Name: TVF &R Station 50 CITY OF TIGARD Job Address: 12585 SW Walnut Road, Tigard, OR 13125 SW HALL BLVD. March 19, 2008 TIGARD, OR 97223 SHFET 2 OF 3 BUP2008 -00022 MLE Project No.: 080111 STRUCTURAL PLAN REVIEW #3 Plans Dated 2/20/08 Calculations Dated 3/12/08 Correction Ite Page No. Comments Code Reference Made m No. Completed 13 S2.2 — Detail Clarify the hurricane tie connection at the 106.1.1 3 -7 -08 7/S2.2 manufactured truss. Completed 14 S2.2 — Detail Clarify the through bolt connecting the 106.1.1 3 -7 -08 18/S2.2 angle to the bracket. In addition, clarify why the angle is 11" long. Completed 15 S2.4 — Detail Provide a connection detail at the vertical 106.1.1 3 -7 -08 1/S2.4 leg on the right side of the truss to the bottom chord. Completed 16 S2.4 — Detail 13 Provide calculations for the ledger 106.1.1 and 1605.3.1 3 -19 -08 and 14/S2.4 connection and wall framing considering eccentric loads in combination with wind and seismic. Note: Wall Framing not Submitted 3 -7 -08 Completed 17 Calculations Submit wind calculations in accordance 1609.1.1.2 8 with the ACSE 7 provisions. Completed 18 Calculations, Provide calculations for the drift loading 1608.1 3 -7 -08 page R -32 considering the importance factor. Completed 19 Calculations, Clarify the material used for the studs as 106.1.1 3 -7 -08 page PS1 -2 the calculations indicate LSL as well as DF. In addition, the information on the plans does not match either material in the calculations. Completed 20 Calculations, Provide calculations for the foundation 1605.3.1 3-7-08 page FT -1 considering the mezzanine load in combination with the roof loading. Completed 21 Calculations, Clarify the height of the wall used in 106.1.1 3 -7 -08 page L -8 developing the North -South wind force. Completed 22 Calculations, Clarify the tributary length used for shear 106.1.1 3 -7 -08 page L -8 wall V2. 23 Special Special inspection is required for concrete, 1704 Inspection reinforcing steel, bolts in concrete, bolting, 1705 epoxy and mechanical anchors, steel 1707 construction and soils. 1708 24 Structural Structural observation shall be indicated on 1709 Observation Sheet S1.0. Job Name: TVF &R Station 50 CITY OF TIGARD Job Address: 12585 SW Walnut Road, Tigard, OR 13125 SW HALL BLVD. March 19, 2008 TIGARD, OR 97223 SHFET 3 OF 3 BUP2008 -00022 Mum Project No.: 080111 STRUCTURAL PLAN REVIEW #3 Plans Dated 2/20/08 Calculations Dated 3/12/08 Correction Ite Page No. Comments Code Reference Made + m 1 v 25 Gm s s y (Shop eneral drawings Sub it one , which et ho been reviewed reinforcing teel and Drawings) initialed by the project engineer, to be filed with the City of Tigard before placement. 26) General Submit one set of wood roof trusses shop (Shop drawings, which have been reviewed and Drawings) initialed by the project engineer, to be filed with the City of Tigard before placement. 27 General Submit one set of engineered wood joist (Shop shop drawings, which have been reviewed Drawings) and initialed by the project engineer, to be filed with the City of Tigard before placement. 28 General Submit one set of structural and (Shop miscellaneous steel shop drawings, which Drawings) have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 29 General Approved resolution of the above items shall be incorporated into submittal plans before a permit will be issued. Submit four (4) sets of revised plans 'to the city of Tigard. Tidemark Advantage [Rick Bolen - RB] _ 16 File Edit Options Window Help Gig Exit New Open T List GIBE GIS Case Browse Query I GIS I Help Qancel 1. Case# zx.. Fr - 2 A.icfr r _ :_ I 1 .�J 3. Master # 4. Name 5. Parcel # !walnut 6. Project Name Case No Status Address Project Al PRE2007 -00014 C 12585 SW WALNUT ST TUALATIN VALLEY FIRE AND f TUB PRE2006 -00001 P 12585 SW WALNUT ST TRIGG TRI 1E N G 2008-00010 I 12585 SW WALNUT ST TUALATIN VALLEY FIRE AND f TUB E SGN2007 -00171 C 12585 SW WALNUT ST TUALATIN VALLEY FIRE AND f TU/ VAR2007 -00036 A 12585 SW WALNUT ST TUALATIN VALLEY FIRE AND f TU, SLR2007 - 00004 A 12585 SW WALNUT ST TUALATIN VALLEY FIRE AND f TUB CUP2007 -00003 A 12585 SW WALNUT ST TUALATIN VALLEY FIRE AND f TUB BUP2007 -00239 F 12585 SW WALNUT ST D .o TUALATIN VALLEY FIRE AND f Tile PLM2006 -00490 X 12600 SW WALNUT ST CARLTON CAF !Ready story Tidemark. Advantage ... Search Desktop 00 '< : 1 :2. PM a z First Cascade Corporation P.0, Box 2158, Lake Oswego, OR 97035 (503) 699 -8970 Fax (503) 699 -8985 REQUEST FOR INFORMATION PROJECT NAME: TVF &R Station - 50 Walnut RFI #: 17 PROJECT #: 2602 DATE: 5/14/2008 RFI TITLE: Slope for footing drain ST11 REQUEST: The footing drain ST11 on sheet C1.1 shows the perforated strom pipe being installed at a 1% slope. There is concern that the sloping this pipe may put it below the footing in places. Is it possible to install the footing drain level with the bottom of the footing? Please review and advise. RESPONSE REQUIRED BY: As soon as possible COST IMPACT: No cost impact anticipated SIGNATURE: 71ic(acPKreckfow RESPONSE: Per review by Kendra Laminack at PBS Engineering, the drains do not need to maintain a 1% slope, but must have positive drainage. It can be placed at the bottom of the footing as long as positive drainage is maintained. SIGNATURE: Jeff Bringenberg, PSE Architects DATE: 5.19.08 12/3/2008 Conditions Associated With 7 : 30 : 25 AM CCEL id/2,0,20-6e_ Case #: CUP2007 -00003 ° Z Z Condition Status Updated Code Title Hold Status Changed By Tag Date By 0001 MEET BUFFER REQUIREMENT None Met 3/5/2008 CAC 3/5/2008 CAC 1. Prior to site work the applicant shall submit a revised site plan for review and approval that shows a buffer along the eastern parking lot that meets the standards of Table 18.745.2 (buffer requirement "C "). 0001 SCREENING DETAIL FOR ROOFTOP A/C None Met 3/21/2008 CAC 3/21/2008 CAC 2. Prior to the issuance of building permits, the applicant shall submit a screening detail plan for the rooftop air conditioner. 0001 FULLY OPERATIONAL TRAFFIC SIGNAL None NOT MET KSM 1/29/2008 MSB 27. Prior to final building inspection, the emergency vehicle traffic signal shall be fully operational and accepted by the City Engineer. 0001 WTR QUAL FAC IN COMPLIANCE None NOT MET KSM 1/29/2008 MSB 28. To ensure compliance with Clean Water Services design and construction standards, the applicant shall employ the design engineer responsible for the design and specifications of the private water quality facility to perform construction and visual observation of the water quality facility for compliance with the design and specifications. These inspections shall be made at significant stages, and at completion of the construction. Prior to final building inspection, the design engineer shall provide the City of Tigard Engineering staff with written confirmation that the water quality facility is in compliance with the design and specifications. 0001 TRAFFIC FLOW PLAN None Met 3/21/2008 CAC 3/21/2008 CAC 3. Prior to the issuance of building permits, the applicant shall submit plans for review and approval to ensure that traffic flow is clear to all users. 0001 CONSTRUCTION DRAWINGS -TREE ISSU None Met 3/21/2008 CAC 3/21/2008 CAC 4. Prior to commencing site work, the applicant shall submit construction drawings to both Planning and Engineering that include: A. Protection measures for all trees to be retained on -site including street trees. B. A note prohibiting equipment, vehicles, machinery, grading, dumping, storage, burial of debris, or any other construction- related activities in any tree protection zone; and C. A note stating that only those trees identified on the approved Tree Removal plan are authorized for removal by this report. Notwithstanding any other provision of this title, any party found to be in violation of this chapter [ 18.790] pursuant to Chapter 1.16 of the Tigard Municipal Code shall be subject to a civil penalty of up to $500 and shall be required to remedy any damage caused by the violation. Such remediation shall include, but not be limited to, the following: 1) Replacement of unlawfully removed or damaged trees in accordance with Section 18.790.060 (D) of the Tigard Development Code; and 2) Payment of an additional civil penalty representing the estimated value of any unlawfully removed or damaged tree, as determined using the most current International Society of Arboriculture's Guide for Plant Appraisal. 0001 ESTABLISH TPZ - INSPECTION None Met CAC 4/16/2008 TEP 5. Prior to commencing site work, the applicant shall establish fencing as directed by the project arborist to protect the trees to be retained. The applicant shall call for an inspection and allow access by the City Arborist for the purpose of monitoring the tree protection to verify that the tree protection measures are performing adequately. 0001 BI -WKLY ARBORIST REPORTS None NOT MET CAC 1/29/2008 MSB 6. The applicant shall have an on -going responsibility to ensure that the Project Arborist has submitted written reports to the City Arborist, at least once every two weeks, as the Project Arborist monitors the construction activities from initial tree protection zone (TPZ) fencing installation through the building construction phases. The reports shall evaluate the condition and location of the tree protection fencing, determine if any changes occurred to the TPZ, and if any part of the Tree Protection Plan has been violated. If the reports are not submitted to the City Arborist at the scheduled intervals, and if it appears the TPZ's or the Tree Protection Plan are not being followed by the contractor or a sub - contractor, the City can stop work on the project until an inspection can be done by the City Arborist and the Project Arborist. Prior to issuance of any Certificates of Occupancy, the Project Arborist will submit a final certification indicating the elements of the Tree Protection Plan were followed and that all remaining trees on the site are healthy, stable, and viable in their modified growing environment. 0001 NO CONST WITHIN TPZ W/O PERMISSIO None Met 3/21/2008 CAC 3/21/2008 CAC Page 1 of 3 CaseConditions..rpt 12/3/2008 CCEL/ Conditions Associated With 7:30:25AM Case #: CUP2007 -00003 Condition Status Updated Code Title Hold Status Changed By Tag Date - By 7. If work is required within an established tree protection zone, the project arborist shall prepare a proposal detailing the construction techniques to be employed and the likely impacts to the trees. The proposal shall be reviewed and approved by the City Arborist before proposed work can proceed within a tree protection zone. The City Arborist may require changes prior to approval. The project arborist shall be on site while work is occurring within the tree protection zone and submit a summary report certifying that the work occurred per the proposal and will not significantly impact the health and/or stability of the trees. 0001 POST -SITE WORK ARBORIST SUMMARY None Met 3/21/2008 CAC 3/21/2008 CAC 8. Prior to issuance of building permits, the applicant (developer or builder) shall: A. Submit site plan drawings showing the accurate location of the trees that were preserved, the location of tree protection fencing. B. Submit a statement and signature of approval from a certified arborist regarding building and infrastructure siting techniques to be employed in construction with respect to any protected trees on site. 0001 PFI REQUIRED None Met 3/4/2008 KSM 3/4/2008 KSM 9. Prior to issuance of a site permit, a Public Facility Improvement (PFI) permit is required for this project to cover street improvements and any other work in the public right -of -way. Six (6) sets of detailed public improvement plans shall be submitted for review to the Engineering Department. NOTE: these plans are in addition to any drawings required by the Building Division and should only include sheets relevant to public improvements. Public Facility Improvement (PFI) permit plans shall conform to City of Tigard Public Improvement Design Standards, which are available at City Hall and the City's web page (www.tigard- or.gov). 0001 DESIGNATE LEGAL PERMITEE ON PFI None Met 3/28/2008 KSM 3/28/2008 MSB 10. The PFI permit plan submittal shall include the exact legal name, address and telephone number of the individual or corporate entity who will be designated as the "Permittee ", and who will provide the financial assurance for the public improvements. For example, specify if the entity is a corporation, limited partnership, LLC, etc. Also specify the state within which the entity is incorporated and provide the name of the corporate contact person. Failure to provide accurate information to the Engineering Department will delay processing of project documents. 0001 ACCESS/PKG PLAN - PFI PHASE None Met 3/28/2008 KSM 3/28/2008 MSB 11. The applicant shall provide a construction vehicle access and parking plan for approval by the City Engineer. The purpose of this plan is for parking and traffic control during the public improvement construction phase. 0001 PAY ADDRESSING FEE None Met 3/31/2008 KSM 3/31/2008 BRS 12. Prior to issuance of the Site Permit, the applicant shall pay the addressing fee. (STAFF CONTACT: Bethany Stewart, Engineering). 0001 EMERGENCY SIGNAL PLANS None Met 3/28/2008 KSM 3/28/2008 MSB 13. Prior to issuance of the PFI Permit the applicant shall submit plans for the emergency vehicle traffic signal for review and approval. 0001 MOVE DRVWY 10 FT TO THE WEST None Met 3/28/2008 KSM 3/28/2008 MSB 14. The applicant shall revise the plans to move the westerly driveway 10 feet to the west to align with the driveway across Walnut Street. 0001 OBTAIN 400 FT OF SIGHT DISTANCE None Met 3/28/2008 KSM 3/28/2008 MSB 15. The applicant shall work with the adjacent property owner to remove a portion of the existing fence to obtain a minimum 400 feet of sight distance from the westerly driveway. 0001 TVF &R APPROVAL /HYDRANTS None Met 3/28/2008 KSM 3/28/2008 MSB 16. The applicant shall obtain approval from the TVF &R Deputy Fire Marshall II for the proposed number and placement of hydrants prior to issuance of the City's Public Facility Improvement permit. 0001 WTR QUAL AND DETENTION FACILITY None Met 3/28/2008 KSM 3/28/2008 MSB 17. Final design plans and calculations for the proposed private water quality and detention facility shall be submitted to the Engineering Department (Kim McMillan) as a part of the Public Facility Improvement (PFI) permit plans. Included with the plans shall be a proposed landscape plan and maintenance plan. 0001 EROSION CONTROL PLAN None Met 3/28/2008 KSM 3/28/2008 MSB Page 2 of 3 CaseConditions..rpt 12/3/2008 Conditions Associated With 7:30:25AM CGEL Case #: CUP2007 -00003 Condition Status Updated Code Title Hold Status Changed By Tag Date By 18. An erosion control plan shall be provided as part of the Public Facility Improvement (PFI) permit drawings. The plan shall conform to the "Erosion Prevention and Sediment Control Design and Planning Manual, February 2003 edition." 0001 1200 -C GENERAL PERMIT None Met 3/10/2008 LAF 3/11/2008 LAF 19. The applicant shall obtain a 1200 -C General Permit issued by the City of Tigard pursuant to ORS 468.740 and the Federal Clean Water Act. 0001 SHIELD LIGHT POLE None NOT MET CAC 1/29/2008 MSB 20. Prior to final building inspection, the applicant shall install a shield on the light pole adjacent to tax lots 4700 and 4800 or direct light away from neighboring residential uses. 0001 TREE DEED RESTRICTION None NOT MET CAC 1/29/2008 MSB 21. Prior to final building inspection, the applicant shall record a deed restriction to the effect that any existing tree greater than 6 inches diameter may be removed only if the tree dies or is hazardous according to a certified arborist. The deed restriction may be removed or will be considered invalid if a tree preserved in accordance with this decision should either die or be removed as a hazardous tree. 0001 SUMMARY OF ARBORIST REPORTS None NOT MET CAC 1/29/2008 MSB 22. Prior to final building inspection, the applicant shall submit a summary of the biweekly arborist reports prepared by the Project Arborist. The summary shall document the effect of the approved tree protection plan, account for any violations, and certify the condition of protected trees. 0001 COMPLETE THE REQ PUB IMPROV None NOT MET KSM 1/29/2008 MSB 23. Prior to a final building inspection, the applicant shall complete the required public improvements, obtain conditional acceptance from the City, and provide a one -year maintenance assurance for said improvements. 0001 DEDICATE ADD'L ROW - WALNUT ST None NOT MET KSM 1/29/2008 MSB 24. Additional right -of -way shall be dedicated to the Public along the frontage of SW Walnut Street to increase the right -of -way to 35 feet from the centerline for the full length of the frontage (including the east and west ends). The description shall be tied to the existing right -of -way centerline. The dedication document shall be on City forms. Instructions are available from the Engineering Department. 0001 RESTORE BIKE STRIPING None NOT MET KSM 1/29/2008 MSB 25. Prior to final building inspection, the applicant shall restore the striping of the bike lane along the frontage of SW Walnut Street. 0001 FINAL SIGHT DIST CERT None NOT MET KSM 1/29/2008 MSB 26. Prior to final building inspection, the applicant's engineer shall provide final sight distance certification for the westerly driveway. Page 3 of 3 CaseConditions..rpt I w Job Name: TVF&R Station 50 CITY OF TIGARD Job Address: 12585 SW Walnut Road, Tigard, OR 13125 SW HALL BLVD. March 19, 2008 TIGARD, OR 97223 SHEET 1 OF 3 BUP2008 -00022 MCE Project No.: 080111 STRUCTURAL PLAN REVIEW #3 Plans Dated 2/20/08 Calculations Dated 3/12/08 Correction Ite Page No. Comments Code Reference Made m No. Completed 1 A1.2 — Site Submit calculations and details for the trash 1805.5 and 1609 3 - - 08 Details; Details 7 enclosure retaining wall and the pylon sign and 10/A1.2 foundation. Completed 2 S1.0 — Structural 1997 UBC wind provisions are not allowed 1609.1.1.2 3 - - 08 Notes; Design for Building Occupancy Category 4 Criteria 2.a structures. Submit wind calculations in accordance with the ACSE 7 provisions. Completed 3 S1.0 — Structural Submit the soils report from Carlson 1802.2 3 -7 -08 Notes; Testing for review. Foundations Completed 4 S1.0 — Structural Clarify bolt requirement as the information 106.1.1 3 -7 -08 Notes; Steel was cut off. Item #4 Completed 5 S1.0 — Structural Indicate when structural observation will be 1709.2 3 - - 08 Notes conducted as required by the code. Completed 6 S1.1 — Clarify the concrete slab thickness at the 106.1.1 3 -7 -08 Foundation exercise room and storage room areas, as Plan Detail 6/S1.2 indicates that the slab is the same depth as the Apparatus Bay. Completed 7 S1.1 — Submit calculations for the shear wall at 1605.3.1 3 - - 08 Foundation Plan Grid D that resists the mezzanine loads in CaIc's page L -8 combination with the overall building seismic loads. Completed 8 S1.2 — Detail Submit calculations for the hex head 1901.2 and D.2.1 3 -7 -08 8/S1.2 anchor bolts embedded in the concrete stem wall in accordance with ACI. Completed 9 S1.2 — Detail 10 Clarify the difference between the two 106.1.1 3 - - 08 and 10/S1.2 details labeled as 10/S1.2. Completed 10 S2.1 — Roof Clarify how the continuity strap at Grid 2 -C ASCE 12.1.3 3 -7 -08 Framing Plan connects at the double top plate given the different wall heights. Completed 11 S2.1 — Roof Clarify the truss spacing at the day room 106.1.1 3 -7 -08 Framing Plan area. In addition, clarify what supports the last truss in the vicinity of Grids 2.1 -D.2. Completed 12 S2.2 — Detail 1 Clarify the bracket spacing. In addition, 106.1.1 and 1605.3.1 3 - 7 - 08 and 2/S2.2 provide calculations for the wall framing considering eccentric loads in combination with wind and seismic. Community Development Building Plans Route Slip To: P ik Coordinator (PC) Date Routed: 41(0i ec3 By: ' `7,(/, Project Name: TV F( 5 Tl. , Building Permit #: I:3U P -2 8 -oco 2a Site Work Permit #: 6(T - LZ ) C Land Use Case #: CC)(: 2_0O`7 - CCCO3 Engineering Case #: C CO( O Building plans meet conditions of approval: !- � Planning (initials): Date: U lam' Engineering (initials): �,0 Date: D'og PC returns plans to: Notes: 1:\ Budding \Forms \RteSlip- BldgPlans.doc 2/21/08 e Job Name: TVF &R Station 50 CITY OF TIGARD Job Address: 12585 SW Walnut Road, Tigard, OR 13125 SW HALL BLVD. March 19, 2008 TIGARD, OR 97223 SHEET 2 OF 3 BUP2008 -00022 MCE Project No.: 080111 STRUCTURAL PLAN REVIEW #3 Plans Dated 2/20/08 Calculations Dated 3/12/08 Correction Ite Page No. Comments Code Reference Made m No. Completed 13 S2.2 — Detail Clarify the hurricane tie connection at the 106.1.1 3 - - 08 7/S2.2 manufactured truss. Completed 14 S2.2 — Detail Clarify the through bolt connecting the 106.1.1 3 - - 08 18/S2.2 angle to the bracket. In addition, clarify why the angle is 11" long. Completed 15 S2.4 — Detail Provide a connection detail at the vertical 106.1.1 3 - - 08 1/S2.4 leg on the right side of the truss to the bottom chord. Completed 16 S2.4 — Detail 13 Provide calculations for the ledger 106.1.1 and 1605.3.1 3 - 19 - 08 and 14/S2.4 connection and wall framing considering eccentric loads in combination with wind and seismic. Note: Wall Framing not Submitted 3 - - 08 Completed 1 7 Calculations Submit wind calculations in accordance 1609.1.1.2 3 - - 08 with the ACSE 7 provisions. Completed 18 Calculations, Provide calculations for the drift loading 1608.1 3 - - 08 page R -32 considering the importance factor. Completed 19 Calculations, Clarify the material used for the studs as 106.1.1 3 - - 08 page PS1 -2 the calculations indicate LSL as well as DF. In addition, the information on the plans does not match either material in the calculations. Completed 20 Calculations, Provide calculations for the foundation 1605.3.1 3 - - 08 page FT -1 considering the mezzanine load in combination with the roof loading. Completed 21 Calculations, Clarify the height of the wall used in 106.1.1 3 - - 08 page L -8 developing the North -South wind force. Completed 22 Calculations, Clarify the tributary length used for shear 106.1.1 3 - - 08 page L -8 wall V2. 23 Special Special inspection is required for concrete, 1704 Inspection reinforcing steel, bolts in concrete, bolting, 1705 epoxy and mechanical anchors, steel 1707 construction and soils. 1708 24 Structural Structural observation shall be indicated on 1709 Observation Sheet S1.0. f .. Job Name: TVF &R Station 50 CITY OF TIGARD Job Address: 12585 SW Walnut Road, Tigard, OR 13125 SW HALL BLVD. March 19, 2008 TIGARD, OR 97223 SHEET 3 OF 3 BUP2008 -00022 MCE Project No.: 080111 STRUCTURAL PLAN REVIEW #3 Plans Dated 2120108 Calculations Dated 3/12/08 Correction Ite Page No. Comments Code Reference Made m No. 25 General Submit one set of reinforcing steel shop (Shop drawings, which have been reviewed and Drawings) initialed by the project engineer, to be filed with the City of Tigard before placement. 26 General Submit one set of wood roof trusses shop (Shop drawings, which have been reviewed and Drawings) initialed by the project engineer, to be filed with the City of Tigard before placement. 27 General Submit one set of engineered wood joist (Shop shop drawings, which have been reviewed Drawings) and initialed by the project engineer, to be filed with the City of Tigard before placement. 28 General Submit one set of structural and (Shop miscellaneous steel shop drawings, which Drawings) have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 29 General Approved resolution of the above items shall be incorporated into submittal plans before a permit will be issued. Submit four (4) sets of revised plans to the city of Tigard. City of Tigard, Oregon • 13125 SW Hall Blvd. • Tigard, OR 97223 March 24, 2008 i i • RE: NEW FIRE STATION FOR TVFR Project Information T I GARD Building Permit: BUP2008 -00022 Occupancy: B /S2 /A3 /R2 Tenant Name: TVFR Type of Construction: 5B Address: Occupant Load: 91 Area: 11,694 Sq. Ft. Stories: 1 Z(t t c. r The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2007 edition; and the State of Oregon Fire Code (OFC) 2007 edition. 1) Please provide details for property line water protection. Show on site utility page the location of vault. 2) Provide details for installation of ceiling grid complying with State of Oregon installation standards. 3) Provide complete drawings of grease and gasoline containment including front and rear wash areas, vehicle bays and vehicle fueling area. Provide cut sheets for oil /water separator. 4) When all corrections have been addressed two complete sets of plans will be required for site and office copy. When responding, provide an itemized letter stating in what way each numbered issue has been addressed in the revision. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectfully, Dan Nelson, Senior Plans Examiner (503)718 -2436 dann @tigard- or.gov Phone: 503.639.4171 • Fax: 503.684.7297 • www.tigard or.gov • TTY Relay: 503.684.2772 Dan Nelson From: Jeff Bringenberg [Jeff ©psearchs.com] Sent: Monday, March 24, 2008 10:31 AM To: Dan Nelson Subject: Permit No. BUP2008 -00022 Dan: can you fill me in on the status of the outstanding items? 1) I thought that Mike White was OK with what we last submitted for the water protection. Is this just a situation where you haven't gotten his go -ahead yet, or do we still have an issue you know of? 2) As I mentioned when I was out there a couple of weeks ago - we'd like to do the lay -in ceiling design as a deferred submittal. Is there a specific process I need to follow now to do this? 3) Do you know what we are missing for this item? As I last understood it the site issue of the containment for the washdown area and the fueling station were taken care of with the latest Civil plans submitted, and those also included a cut sheet for the oil water separator. The interior trench drains in the Apparatus Bays have been routed to the separator as shown on Sheet RP -03 in the addendum drawings we submitted. Again is the due to a delay in getting the sign -off from Mike or something else that I need to do? 4) If the above are all taken care of I can get the revised plans to you. Thanks, Jeff Bringenberg 1 f I' City of Tigard, Oregon • 13125 SW Hall Blvd. • Tigard, OR 97223 February 14, 2008 • RE: NEW FIRE STATION FOR TVFR Project Information T I GARD Building Permit: BUP2008 -00022 Occupancy: B /S2 /A3 /R2 Tenant Name: TVFR Type of Construction: 5B Address: Occupant Load: 91 Area: 11,694 Sq. Ft. Stories: 1 5t:3 C The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2007 edition; and the State of Oregon Fire Code (OFC) 2007 edition. 1) Please provide details for property line water protection. Show on site utility page the location of vault. 2) Provide statement of special inspection as per OSSC 1704.1.1.5+ 3) Provide details for installation of ceiling grid complying with State of Oregon installation standards. 4) Provide complete drawings of grease and gasoline containment including front and rear wash areas, vehicle bays and vehicle fueling area. Provide cut sheets for oil /water separator. 5) Please show on plans all tempered glass in hazardous locations. —4 6) Planning requires a 20ft. setback for this building. Please revise site plan and provide planning and building with copies. c- 7) Please provide a copy of page A2.1. Original plans have printing error on that page —. 8) Please pull permit and provide details for rain water recovery systemc — 9) An electrical plan review is required for this structureC When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respec ully, 1 n, anJlelson Senior Plans Examiner (503)718 -2436 dann @tigard- or.gov *ice Phone: 503.639.4171 • Fax: 503.684.7297 • www.tigard- or.gov • TTY Relay: 503.684.2772 I TRANSMISSION VERIFICATION REPORT TIME : 02/27/2008 15:27 NAME : TIGARD BUILDING DEPT FAX : 5036243681 TEL SER.# : BROD4J479592 DATE,TIME 02/27 15:27 FAX NO. /NAME 5032480223 DURATION 00:00:16 PAGE(S) 01 RESULT OK MODE STANDARD ECM • City of Tigard, Oregon • 13125 SW Hall Blvd. • :Figard, OR 97223 February 14, 2008 II 1 El • RE: NEW FIRE STATION FOR TVFR - Project Information TIGARD Building Permit: BUP2008 -00022 Occupancy: BIS21A31R2 Tenant Name: TVFR Type of Construction: 5B Address: 11462 SW Pacific Hwy. Occupant: Load: 91 Area: 11,694 Sq. Ft. Stories: 1 The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2007 edition; and the State of Oregon Fire Code (OFC) 2007 edition_ 1) Please provide details for property line water protection. Show on site utility page the location of vault. 2) Provide statement of special inspection as per OSSC 1704.1.1. 3) Provide details for installation of ceiling grid complying with State of Oregon installation standards. 4) Provide complete drawings of grease and gasoline containment including front and rear wash areas, vehicle bays and vehicle fueling area. Provide cut sheets for oilfwater separator. 5) Please show on plans all tempered glass in hazardous locations. 6) Planning requires a 2Oft. setback for this building. Please revise site plan and provide planning and building with copies. 7) Please provide a copy of page A2.1. Original plans have printing error on that page. 8) Please pull permit and provide details for rain water recovery system. 9) An electrical plan review is required for this structure. When submitting revised drawings or additional information, please attach a copy of the l — � . , /,� 4 vs jzt o� 7 _z � WAR Fire Marshal'sihtision Offices Tualatin Valley North - 14480 SW Jenkins Rd., Beverton, OR 97005, (503) 356 -4700 Fire & Rescue South - 7401 SW Wash Ct., Tualatin, OR 97062, (503) 612 -7010 Fire Flow and Hydrant Worksheet This worksheet is required to be submitted to and approved by the Authority Having Jurisdiction (AHJ) before any permits for new building construction, building expansion or fire hydrants will be issued by any building department within the TVF &R District. See the instructions for assistance completing this form or call one of the above numbers. Preparer Information I Preparer Name: IJohn K. Dalby, Deputy Fire Marshal II, TVF &R Phone: 1503- 356 -4723 1 Fax:1503- 644 -2214 Architect / Engineer of Record: (Peck, Smiley, Ettlin Architects Phone: 1503- 248 -9170 I Fax: 1503- 248 -0223 I General Building Information Project Name: ITVF &R Fire Station 50 I Project Address: 112585 SW Walnut Street City:ITigard I County:IWashington I Zip:197223 I Construction Type(s): (Type V -B I Total Bldg Area: I 11,8821 sgft Total Fire Area: 1 11,8821 sgft Bldg Fire Flow: 1 2943IGallons Per Minute (Light Hazard) Describe Fire Area: (if more than one fire area, include an 8 1/2 x 11 or 11 x 17 drawing indicating the various fire areas) Type of Occupancy or Use of Building: IB Fire Station 1. A. Occupancy Hazard Al Determine percent of each occupancy hazard in the fire area. Occupancy Hazard Class Fire Area 1 Total Fire Area Percent of Fire Area Light Hazard 5756 SF / 11,882 SF x 100 = 48.44 Ordinary Hazard Grp 1 0 SF / 1 SF x 100 = 0 Ordinary Hazard Grp 2 6126 SF I 11,882 SF x 100 = 51.56 % Extra Hazard Grp 1 0 SF I 1 SF x 100 = 0 % Extra Hazard Grp 2 0 SF / 1 SF x 100 = 0 % Total Must equal 100% I 100 % I A2 Calculate Fire Flow Occupancy Hazard Class Factor Fire Area Fire Flow Bldg Fire Flow Light Hazard 1.0 x 48.44 % x 2943 GPM = 1426 GPM Ordinary Hazard Grp 1 1.2 x 0 % x 2943 GPM = 0 GPM Ordinary Hazard Grp 2 1.3 x 51.56 % x 2943 GPM = 1973 GPM Extra Hazard Grp 1 1.4 x 0 % x 2943 GPM = 0 GPM Extra Hazard Grp 2 1.5 x 0 % x 2943 GPM = 0 GPM A3 Required Fire Flow I 3399 GPM I B. Minimum Number of Fire Hydrants Required Required Fire Flow 3399 = I 3 I No. of Hydrants Required I C. Reduction of Fire Flow - Reductions are based on the following: I Cl - Reduced by 25% for all Group R Occupancies without fire sprinklers (multiply by .75) C2 - Reduced by 25% for a NFPA 72 Fire Alarm System (multiply by .75) C3 - Reduced by 75% for NFPA 13 Automatic Sprinklers (multiply by .25) I D. Required Fire Flow I D1 - Group R occupancy I No Ix I 1 I = I 3399 GPM (Max. 3000 - Min. 1500 gpm) I D2 - Fire Flow 3399 GPM X I 0.25 I = I 1500 GPM (Max. 3000 - Min. 1500 gpm) I E. Available Fire Flow to the Building I Test Results: I GPM Manually enter available fire flow here. Please attach documentation of the flow test that was made. It shall include date, time, location of static /residual and flow hydrants, and the tester's name, phone number and address. r Job Name: TVF&R Station 50 CITY OF TIGARD Job Address: 12585 SW Walnut Road, Tigard, OR 13125 SW HALL BLVD. March 19, 2008 TIGARD, OR 97223 SHEET 1 OF 3 BUP2008 -00022 MCE Project No.: 080111 STRUCTURAL PLAN REVIEW #3 Plans Dated 2120108 Calculations Dated 3/12/08 Correction Ite Page No. Comments Code Reference Made rn No. Completed 1 A1.2 — Site Submit calculations and details for the trash 1805.5 and 1609 3 - - 08 Details; Details 7 enclosure retaining wall and the pylon sign and 10/A1.2 foundation. Completed 2 S1.0 — Structural 1997 UBC wind provisions are not allowed 1609.1.1.2 3 -7 -08 Notes; Design for Building Occupancy Category 4 Criteria 2.a structures. Submit wind calculations in accordance with the ACSE 7 provisions. Completed 3 S1.0 — Structural Submit the soils report from Carlson 1802.2 3 - 7 - 08 Notes; Testing for review. Foundations Completed 4 S1.0 — Structural Clarify bolt requirement as the information 106.1.1 3 -7 -08 Notes; Steel was cut off. Item #4 Completed 5 S1.0 — Structural Indicate when structural observation will be 1709.2 3 -7 -08 Notes conducted as required by the code. Completed 6 S1.1 — Clarify the concrete slab thickness at the 106.1.1 3 -7 -08 Foundation exercise room and storage room areas, as Plan Detail 6/S1.2 indicates that the slab is the same depth as the Apparatus Bay. Completed 7 S1.1 — Submit calculations for the shear wall at 1605.3.1 3 - - 08 Foundation Plan Grid D that resists the mezzanine loads in Calc's page L -8 combination with the overall building seismic loads. Completed 8 S1.2 — Detail Submit calculations for the hex head 1901.2 and D.2.1 3 -7 -08 8/S1.2 anchor bolts embedded in the concrete stem wall in accordance with ACI. Completed 9 S1.2 — Detail 10 Clarify the difference between the two 106.1.1 3 -7 -08 and 10/S1.2 details labeled as 10/S1.2. Completed 10 S2.1 — Roof Clarify how the continuity strap at Grid 2 -C ASCE 12.1.3 3 -7 -08 Framing Plan connects at the double top plate given the different wall heights. Completed 11 S2.1 — Roof Clarify the truss spacing at the day room 106.1.1 3 -7 -08 Framing Plan area. In addition, clarify what supports the last truss in the vicinity of Grids 2.1 -0.2. Completed 12 52.2 — Detail 1 Clarify the bracket spacing. In addition, 106.1.1 and 1605.3.1 3 - - 08 and 2/S2.2 provide calculations for the wall framing considering eccentric loads in combination with wind and seismic. Job Name: TVF&R Station 50 CITY OF TIGARD Job Address: 12585 SW Walnut Road, Tigard, OR 13125 SW HALL BLVD. March 19, 2008 TIGARD, OR 97223 SHEET 2 OF 3 BUP2008 -00022 MCE Project No.: 080111 STRUCTURAL PLAN REVIEW #3 Plans Dated 2120108 Calculations Dated 3/12/08 Correction Ite Page No. Comments Code Reference Made m No. Completed 13 S2.2 — Detail Clarify the hurricane tie connection at the 106.1.1 3 -7 -08 7/S2.2 manufactured truss. Completed 14 S2.2 — Detail Clarify the through bolt connecting the 106.1.1 3 -7 -08 18/S2.2 angle to the bracket. In addition, clarify why the angle is 11" long. Completed 15 S2.4 — Detail Provide a connection detail at the vertical 106.1.1 3 -7 -08 1/S2.4 leg on the right side of the truss to the bottom chord. Completed 16 S2.4 — Detail 13 Provide calculations for the ledger 106.1.1 and 1605.3.1 3 -19 -08 and 14/S2.4 connection and wall framing considering eccentric loads in combination with wind and seismic. Note: Wall Framing not Submitted 3 - - 08 Completed 17 Calculations Submit wind calculations in accordance 1609.1.1.2 3 -7 -08 with the ACSE 7 provisions. Completed 18 Calculations, Provide calculations for the drift loading 1608.1 3 -7 -08 page R -32 considering the importance factor. Completed 19 Calculations, Clarify the material used for the studs as 106.1.1 3 - - 08 page PS1 -2 the calculations indicate LSL as well as DF. In addition, the information on the plans does not match either material in the calculations. Completed 20 Calculations, Provide calculations for the foundation 1605.3.1 3 -7 -08 page FT -1 considering the mezzanine load in combination with the roof loading. Completed 21 Calculations, Clarify the height of the wall used in 106.1.1 3 -7 -08 page L -8 developing the North -South wind force. Completed 22 Calculations, Clarify the tributary length used for shear 106.1.1 3 - - 08 page L-8 wall V2. 23 Special Special inspection is required for concrete, 1704 Inspection reinforcing steel, bolts in concrete, bolting, 1705 epoxy and mechanical anchors, steel 1707 construction and soils. 1708 24 Structural Structural observation shall be indicated on 1709 Observation Sheet S1.0. Job Name: TVF&R Station 50 CITY OF TIGARD Job Address: 12585 SW Walnut Road, Tigard, OR 13125 SW HALL BLVD. March 19, 2008 TIGARD, OR 97223 SHEET 3 OF 3 BUP2008 -00022 MCE Project No.: 080111 STRUCTURAL PLAN REVIEW #3 Plans Dated 2/20108 Calculations Dated 3/12/08 Correction Ite Page No. Comments Code Reference Made m No. 25 General Submit one set of reinforcing steel shop (Shop drawings, which have been reviewed and Drawings) initialed by the project engineer, to be filed with the City of Tigard before placement. 26 General Submit one set of wood roof trusses shop (Shop drawings, which have been reviewed and Drawings) initialed by the project engineer, to be filed with the City of Tigard before placement. 27 General Submit one set of engineered wood joist (Shop shop drawings, which have been reviewed Drawings) and initialed by the project engineer, to be filed with the City of Tigard before placement. 28 General Submit one set of structural and (Shop miscellaneous steel shop drawings, which Drawings) have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 29 General Approved resolution of the above items shall be incorporated into submittal plans before a permit will be issued. Submit four (4) sets of revised plans to the city of Tigard. • — Job Name: TVF &R Station 50 CITY OF TIGARD Job Address: 12585 SW Walnut Road, Tigard, OR 13125 SW HALL BLVD. March 7, 2008 TIGARD, OR 97223 SHEET 1 OF 3 BUP2008 -00022 MCE Project No.: 080111 STRUCTURAL PLAN REVIEW #2 Plans Dated 2/20/08 Calculations Dated 2/22/08 Correction Ite Page No. Comments Code Reference Made rp No. Completed 1 A1.2 — Site Submit calculations and details for the trash 1805.5 and 1609 3 -7 -08 Details; Details 7 enclosure retaining wall and the pylon sign and 10/A1.2 foundation. Completed 2 S1.0 — Structural 1997 UBC wind provisions are not allowed 1609.1.1.2 3 -7 -08 Notes; Design for Building Occupancy Category 4 Criteria 2.a structures. Submit wind calculations in accordance with the ACSE 7 provisions. Completed 3 S1.0 — Structural Submit the soils report from Carlson 1802.2 3 -7 -08 Notes; Testing for review. Foundations Completed 4 S1.0 — Structural Clarify bolt requirement as the information 106.1.1 3 -7 -08 Notes; Steel was cut off. Item #4 Completed 5 S1.0 — Structural Indicate when structural observation will be 1709.2 3 -7 -08 Notes conducted as required by the code. Completed 6 S1.1 — Clarify the concrete slab thickness at the 106.1.1 3 -7 -08 Foundation exercise room and storage room areas, as Plan Detail 6/S1.2 indicates that the slab is the same depth as the Apparatus Bay. Completed 7 S1.1 — Submit calculations for the shear wall at 1605.3.1 3 -7 -08 Foundation Plan Grid D that resists the mezzanine loads in Calc's page L -8 combination with the overall building seismic loads. Completed 8 S1.2 — Detail Submit calculations for the hex head 1901.2 and D.2.1 3-7-08 8/S1.2 anchor bolts embedded in the concrete stem wall in accordance with ACI. Completed 9 S1.2 — Detail 10 Clarify the difference between the two 106.1.1 3 -7 -08 and 10/S1.2 details labeled as 10/S1.2. Completed 10 S2.1 — Roof Clarify how the continuity strap at Grid 2 -C ASCE 12.1.3 3 -7 -08 Framing Plan connects at the double top plate given the different wall heights. Completed 11 S2.1 — Roof Clarify the truss spacing at the day room 106.1.1 3 -7 -08 Framing Plan area. In addition, clarify what supports the last truss in the vicinity of Grids 2.1 -D.2. Completed 12 S2.2 — Detail 1 Clarify the bracket spacing. In addition, 106.1.1 and 1605.3.1 3 -7 -08 and 2/S2.2 provide calculations for the wall framing considering eccentric loads in combination with wind and seismic. — Job Name: TVF &R Station 50 CITY OF TIGARD Job Address: 12585 SW Walnut Road, Tigard, OR 13125 SW HALL BLVD. March 7, 2008 TIGARD, OR 97223 SHEET 2 OF 3 BUP2008 -00022 MCE Project No.: 080111 STRUCTURAL PLAN REVIEW #2 Plans Dated 2/20/08 Calculations Dated 2/22/08 Correction Ite Page No. Comments Code Reference Made m No. Completed 13 S2.2 — Detail Clarify the hurricane tie connection at the 106.1.1 3 -7 -08 7/S2.2 manufactured truss. Completed 14 S2.2 — Detail Clarify the through bolt connecting the 106.1.1 3 -7 -08 18/S2.2 angle to the bracket. In addition, clarify why the angle is 11" long. Completed 15 S2.4 — Detail Provide a connection detail at the vertical 106.1.1 3 - - 08 1/S2.4 leg on the right side of the truss to the bottom chord. 16 S2.4 — Detail 13 Provide calculations for the ledger 106.1.1 and 1605.3.1 and 14/S2.4 connection and wall framing considering eccentric loads in combination with wind and seismic. Note: Wall Framing not Submitted 3 -7 -08 Completed 17 Calculations Submit wind calculations in accordance 1609.1.1.2 3 - - 08 with the ACSE 7 provisions. Completed 18 Calculations, Provide calculations for the drift loading 1608.1 3 - - 08 page R -32 considering the importance factor. Completed 19 Calculations, Clarify the material used for the studs as 106.1.1 3 -7 -08 page PS1 -2 the calculations indicate LSL as well as DF. In addition, the information on the plans does not match either material in the calculations. Completed 20 Calculations, Provide calculations for the foundation 1605.3.1 3 -7 -08 page FT -1 considering the mezzanine load in combination with the roof loading. Completed 21 Calculations, Clarify the height of the wall used in 106.1.1 3 -7 -08 page L -8 developing the North -South wind force. Completed 22 Calculations, Clarify the tributary length used for shear 106.1.1 3 -7 -08 page L -8 wall V2. 23 Special Special inspection is required for concrete, 1704 Inspection reinforcing steel, bolts in concrete, bolting, 1705 epoxy and mechanical anchors, steel 1707 construction and soils. 1708 24 Structural Structural observation shall be indicated on 1709 Observation Sheet S1.0. L Job Name: TVF &R Station 50 CITY OF TIGARD Job Address: 12585 SW Walnut Road, Tigard, OR 13125 SW HALL BLVD. March 7, 2008 TIGARD, OR 97223 SHEET 3 OF 3 BUP2008 -00022 MCE Project No.: 080111 STRUCTURAL PLAN REVIEW #2 Plans Dated 2120108 Calculations Dated 2/22/08 Correction Ite Page No. Comments Code Reference Made m No. 25 General Submit one set of reinforcing steel shop (Shop drawings, which have been reviewed and Drawings) initialed by the project engineer, to be filed with the City of Tigard before placement. 26 General Submit one set of wood roof trusses shop (Shop drawings, which have been reviewed and Drawings) initialed by the project engineer, to be filed with the City of Tigard before placement. 27 General Submit one set of engineered wood joist (Shop shop drawings, which have been reviewed Drawings) and initialed by the project engineer, to be filed with the City of Tigard before placement. 28 General Submit one set of structural and (Shop miscellaneous steel shop drawings, which Drawings) have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 29 General Approved resolution of the above items shall be incorporated into submittal plans before a permit will be issued. Submit four (4) sets of revised plans to the city of Tigard. Job Name: TVF&R Station 50 CITY OF TIGARD Job Address: 12585 SW Walnut Road, Tigard, OR 13125 SW HALL BLVD. February 12, 2008 TIGARD, OR 97223 SHEET 1 OF 2 BUP2008 -00022 MCE Project No.: 080111 STRUCTURAL PLAN REVIEW #1 Plans Dated 1/21/08 Calculations Dated 9/1/07 Correction Item Page No. Comments Code Reference Made No. 1 A1.2 — Site Submit calculations and details for the 1805.5 and 1609 Details; Details 7 trash enclosure retaining wall and the and 10/A1.2 pylon sign foundation. 2 S1.0 — Structural 1997 UBC wind provisions are not 1609.1.1.2 Notes; Design allowed for Building Occupancy Criteria 2.a Category 4 structures. Submit wind calculations in accordance with the ACSE 7 provisions. 3 S1.0 — Structural Submit the soils report from Carlson 1802.2 Notes; Testing for review. Foundations 4 S1.0 — Structural Clarify bolt requirement as the 106.1.1 Notes; Steel information was cut off. Item #4 5 S1.0 — Structural Indicate when structural observation will 1709.2 Notes be conducted as required by the code. 6 S1.1 — Clarify the concrete slab thickness at the 106.1.1 Foundation exercise room and storage room areas, Plan as Detail 6/S1.2 indicates that the slab is the same depth as the Apparatus Bay. 7 S1.1 — Submit calculations for the shear wall at 1605.3.1 Foundation Plan Grid D that resists the mezzanine loads CaIc's page L -8 in combination with the overall building seismic loads. 8 S1.2 — Detail Submit calculations for the hex head 1901.2 and D.2.1 8/S1.2 anchor bolts embedded in the concrete stem wall in accordance with ACI. 9 S1.2 — Detail 10 Clarify the difference between the two 106.1.1 and 10/S1.2 details labeled as 10/S1.2. 10 S2.1 — Roof Clarify how the continuity strap at Grid 2- ASCE 12.1.3 Framing Plan C connects at the double top plate given the different wall heights. 11 S2.1 — Roof Clarify the truss spacing at the day room 106.1.1 Framing Plan area. In addition, clarify what supports the last truss in the vicinity of Grids 2.1- D.2. 12 S2.2 — Detail 1 Clarify the bracket spacing. In addition, 106.1.1 and 1605.3.1 and 2/S2.2 provide calculations for the wall framing considering eccentric loads in combination with wind and seismic. Job Name: TVF &R Station 50 CITY OF TIGARD Job Address: 12585 SW Walnut Road, Tigard, OR 13125 SW HALL BLVD. February 12, 2008 TIGARD, OR 97223 SHEET 2 OF 2 BUP2008 -00022 MCE Project No.: 080111 STRUCTURAL PLAN REVIEW #1 Plans Dated 1/21108 Calculations Dated 9/1107 Correction Item Page No. Comments Code Reference Made No. 13 S2.2 — Detail Clarify the hurricane tie connection at the 106.1.1 7/S2.2 manufactured truss. 14 S2.2 — Detail Clarify the through bolt connecting the 106.1.1 18/S2.2 angle to the bracket. In addition, clarify why the angle is 11" long. 15 S2.4 — Detail Provide a connection detail at the 106.1.1 1/S2.4 vertical leg on the right side of the truss to the bottom chord. 16 S2.4 — Detail 13 Provide calculations for the ledger 106.1.1 and 1605.3.1 and 14/S2.4 connection and wall framing considering eccentric loads in combination with wind and seismic. 17 Calculations Submit wind calculations in accordance 1609.1.1.2 with the ACSE 7 provisions. 18 Calculations, Provide calculations for the drift loading 1608.1 page R -32 considering the importance factor. 19 Calculations, Clarify the material used for the studs as 106.1.1 page PS1 -2 the calculations indicate LSL as well as DF. In addition, the information on the plans does not match either material in the calculations. 20 Calculations, Provide calculations for the foundation 1605.3.1 page FT -1 considering the mezzanine load in combination with the roof loading. 21 Calculations, Clarify the height of the wall used in 106.1.1 page L-8 developing the North -South wind force. 22 Calculations, Clarify the tributary length used for shear 106.1.1 page L -8 wall V2. 23 Special Special inspection is required for 1704 Inspection concrete, reinforcing steel, bolts in 1705 concrete, bolting, epoxy and mechanical 1707 anchors, steel construction and soils. 1708 24 Structural Structural observation shall be indicated 1709 Observation on Sheet S1.0. . Job Name: TVF &R Station 50 CITY OF TIGARD Job Address: 12585 SW Walnut Road, Tigard, OR 13125 SW HALL BLVD. February 12, 2008 TIGARD, OR 97223 SHEET 3 OF 2 BUP2008 -00022 MCE Project No.: 080111 STRUCTURAL PLAN REVIEW #1 Plans Dated 1121/08 Calculations Dated 9/1/07 Correction Item Page No. Comments Code Reference Made No. 25 General Submit one set of reinforcing steel shop (Shop drawings, which have been reviewed Drawings) and initialed by the project engineer, to be filed with the City of Tigard before placement. 26 General Submit one set of wood roof trusses (Shop shop drawings, which have been Drawings) reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 27 General Submit one set of engineered wood joist (Shop shop drawings, which have been Drawings) reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 28 General Submit one set of structural and (Shop miscellaneous steel shop drawings, Drawings) which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 29 General Approved resolution of the above items shall be incorporated into submittal plans before a permit will be issued. Submit four (4) sets of revised plans to the city of Tigard. 0,2 3 -aco 2 LEWIS & /2ot'7 5w Wa � f \., �'` °� - FIELD REPORT ``' TO: Jeff Bringenberg RECEIVE VAN VLEET Peck Smiley Ettlin Architects Incorporated 4412 SW Corbett Ave AUG 12 r5ud Portlnad, OR. 97239 principals CITY OFTIGARD [hris P. van vleet. p.e. DATE: August 7, 2008 JOB NO. 07132 BUILDING DIVISION garyj. lewis. p.e. PROJECT: TVF &R Station 50 LOCATION: Tigard, Oregon CONTRACTOR: First Cascade Construction OWNER: TVF &R WEATHER: TEMP/TIME: deg. F at . PRESENT AT SITE: Lance Cerny, Lewis & Van Vleet Inc. Matt Hubei, First Cascade THE FOLLOWING WAS NOTED: I visited the jobsite to perform an inspection of the construction completed thus far. At The time of the inspection, wall framing the main roof framing was largely completed. Some of the apparatus bay end walls and some roof overframing was not yet completed. At all shear walls, the IBC /OSSC requires a minimum .229 "x3 "x3" plate washer at all sill plate anchor bolts. These plate washers will need to be added at all shear walls. At the east /west shear wall line midway across building, on the east side, there is a tube steel column that ties the low roof to the high roof per detail 9/S2.3. It would be acceptable to use a 4x6 strut at this location in lieu of a high roof truss. There were two locations pointed out to me by Matt where shear wall holdowns need to be installed, the southmost holdown on the type C shear wall along grid D, and one at the east end of the type A shear wall on the north end of the hallway between the bathrooms. At the northwest most of the HSS5x5x3 /16 posts adjacent to the apparatus bay overhead doors, one of the anchor bolts per 9/S1.2 was located immediately adjacent to an isulated plumbing penetration which will not allow the anchor bolt to develop any significant load carrying carrying capacity. The contractor spliced an extension to the post base plate to an adjacent wood wall anchor bolt. This is acceptable, however the splice weld was not inspected and the weld appeared to be of a questionable size and type. Therefore the splice should be reinforced per the accompanying sketch A. All field welding requires special inspection. • All other observed and completed work appeared to comply with the plans and specifications. Signed, Lance Cerny, P.E. CC: Matt Hubei consulting engineers 18660 s.w. bo❑nes ferry road tualatin. ❑regon 97062 [503] 885.8605 phone [503) 885.1206 fax LEWIS & Li consulting engineers Job TU(¢� 5 Ct erlt PSC Y H 18660 s.w. boones ferry road `� tualatln, oregon 97062 Job No. O/ { LC [503] 865.13505 phone (503] 895.1206 fax VAN VLEET Date a /ob Sheet No. Incorporated ---^ '� ....s. ..z. =sz:. ^�z38s � ... g r- ...�.-2- r =-- •-- ... —' v- '-- 'r.-e- yr- +" — ._._.n s___-. i.= _,_..:._..,. ...15:r..----- __.±r.• • . _..... F 1. a I/ . ii 11 A5c R Al ! .. : .. t._ tkoutt (PALL Sti"allim- I I ac-9 �► 1 I -A(1attiN4. c ..... • i ' t (�� t i IIppI 1 1 "Pr 1 li Li i•1 - . il F 1. > tt c I 4 a i I I 4 e • c i f F F IS 6 { • 4 I k , i M • r. hs S i .. • n S t _..rev ' .—.-.. t=- ..- ._.s ='x� .._ --• ^< ^ =� ^*•-- _.,__._ ...... -:-/. - 3a — .. -^^ Isar ---- sc.:sra..: -x.===.- =wrssru• LEVI/15 & 46/ Z memorandum / 2!, l 7 5 W RECEIVED VAN VLEET AUG 12 2008 Incorporated principals CITY OF TIGARD dins C. van vleet. p.e. BUILDING DIVISION garb J. lewis. p.e. TO: Jeff Bringenberg — PSE Architects CC: Matt — First Cascade FROM: Lance Cerny P.E. DATE: 8/07/08 RE: TVF &R Station 50 — Shear Wall Bottom Plate Per a conversation with Matt at First Cascade, the typical holdown anchor bolts were either too short or embedded too deeply to allow for the holdown installation. Therefore, the typical shear wall bottom plate was notched at holdown locations. This is structurally acceptable. Please call if you have any questions. consulting engineers 18660 s.w. boones ferry road tualatin. oreg ❑n 97 062 (5 03] 885.8605 phone (503] BB5. 120 6 fax