Loading...
Permit ?be. i ' CITY OF TIGARD BUILDING PERMIT II '1 2 COMMUNITY DEVELOPMENT Permit#: BUP2012-00266 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 12/19/2012 Parcel: 2S102AC00700 Jurisdiction: Tigard Site address: 12550 SW MAIN ST 100 Project: Pacific Paint&Supply Subdivision: BURNHAM TRACT Lot: 1 Project Description: TI-demising wall and new exit door. 2/10/14,reprinted to add suite address and correct project name. Contractor: CANDEN DEVELOPMENT LLC Owner: DOLAN&CO LLC 2546 NE 45TH AVE BY FLORENCE T DOLAN PORTLAND,OR 97213 4523 NE DAVIS ST PORTLAND, OR 97213 PHONE: 503-307-9321 PHONE: FAX: 503-281-1676 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB DC Provision Review,COM TI-Ping 12/19/2012 $67.00 Occupancy Grp: M Occupancy Load: DC Provision Review,COM TI-LRP 12/19/2012 $10.00 Permit Fee-Additions,Alterations, 12/19/2012 $225.80 Dwelling Units: 0 Demolition Stories: 1 Height: 0 ft 12%State Surcharge-Building 12/19/2012 $27.10 Bedrooms: 0 Bathrooms: 0 Plan Review 12/19/2012 $146.77 Value: $10,000 Plan Review-Fire Life Safety 12/19/2012 $90.32 Info Process/Archiving-Lg$2.00(over 12/19/2012 $4.00 11x17) Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $570.99 Required: Required Items and Reports(Conditions) Fire Sprinkler: No Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By I, Permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project Approved plans are required on the job site at the time of each inspection. CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit #: BUP2012 -00266 T [G A R D 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 12/19/2012 Parcel: 2S102AC00700 Jurisdiction: Tigard Site address: 12550 SW MAIN ST Project: Spec Space Subdivision: BURNHAM TRACT Lot: 1 Project Description: TI - demising wall and new exit door. Contractor: CANDEN DEVELOPMENT LLC Owner: DOLAN & CO LLC 2546 NE 45TH AVE BY FLORENCE T DOLAN PORTLAND, OR 97213 4523 NE DAVIS ST PORTLAND, OR 97213 PHONE: 503 - 307 -9321 PHONE: FAX: 503 - 281 -1676 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: Vg DC Provision Review, COM TI - Ping 12/19/2012 $67.00 Occupancy Grp: M Occupancy Load: DC Provision Review, COM TI - LRP 12/19/2012 $10.00 Permit Fee - Additions, Alterations, 12/19/2012 $225.80 Dwelling Units: 0 Demolition Stories: 1 Height: 0 ft 12% State Surcharge - Building 12/19/2012 $27.10 Bedrooms: 0 Bathrooms: 0 Plan Review 12/19/2012 $146.77 Value: $10,000 Plan Review - Fire Life Safety 12/19/2012 $90.32 Info Process /Archiving - Lg $2.00 (over 12/19/2012 $4.00 11x17) Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $570.99 Required: Required Items and Reports (Conditions) Fire Sprinkler: No Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR Specialty Codes and all other applicable law. All work will be d.. - . - -- - .• .. nce with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 - =ys. ATTENTION: • -. •n law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952- 001 -0010 through OAR 9 -001 -• • •0. You may obtain a copy of the rules or direct questions to OUNC by calling 50 1987 or 1.800.332.2344. Issued By: , 4 Permittee Signature: ii i Call 503.639.4175 by 7:00 a.m. for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project Approved plans are required on the Job site at the time of each inspection. ' Building Permit Application Commercial R E C E I V E D F OR Of I I C I : Si . t)11 City of Tigard Received ��� Date/B i Permit No.: 6, i -QOv�o • 13125 SW Hall Blvd., Tigard, OR 9722 _C 1 9 VA Plan Review m a Phone: 503.718.2439 Fax: 503.598.1960 I c ;� I: a Inspection Line: 503.639.4175 .1'1GARD Date Ready 7 .orris: ® See Page 2 for Internet: www.tigard - or.gov CM 0. - lnl Notified/Method: Supplemental Information BO DING L l � TYPE OF WORK REQUIRED DATA: 1- AND 2- FAMILY DWELLING w construction ❑ Demolition Permit fees* are based on the value of the work performed. Indicate the value (rounded to the nearest dollar) of all Addition /alteration/replacement ❑Other: equipment, materials, labor, overhead, and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. 1 —�/ Valuation: $ El I- and 2- family dwelling ommercial/industrial ❑ Accessory building ❑ Multi- family Number of bedrooms: ❑ Master builder ❑ Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: / Z...---i2 l�J / 57-2001— New dwelling area: square feet City /State/ZIP: Tj t2 Garage/carport area: square feet Suite/bldg. /apt. no.: I Project name: Petit;tir T 4 Covered porch area: square feet Cross street/directions to job site: Deck area: square feet N 57/ , ge '4'- -,'m - , g Other structure area: square feet REQUIRED DATA: COMMERCIAL -USE CHECKLIST Subdivision: Lot no.: Aj0 Permit fees* are based on the value of the work performed. Tax map /parcel no.: 0/—Z—AC.. equipment, the value (rounded to the nearest dollar) of all equipment, materials, labor, overhead, and the profit for the DESCRIPTION OF WORK work indicated on this application. /VA.., 7 / v-- 0LP/s♦.vh t,.i.4 -GL ,6ik`r,-- s�,e _ Valuation: $ it?00 ♦9 Existing building area: �� square feet New building area: a square feet - PROPERTY OWNER I ❑ TENANT Number of stories: / Name: / b 4G.iO4.0 Type of construction: 5 aim, - 59,14/c/e44 Address: /9f`�AA✓ /9/11 ,fl-,£ Occupancy groups: City /State/ZIP: ,„. dve 7 &7 ( Existing: Phone: ( ) zzr Qo p 9 Fax: ) New: J APPL / g CONTACT PERSON BUILDING PERMIT FEES* Business name: / /..r C (Please refer to fee rckedrle) Structural plan review fee (or deposit): Contact name: A,it nti Iry -Li S,G FLS plan review fee (if applicable): Address: r- _ ?Q.''t'• 4,,..E t /l' t7 �n� i 9,7.ez y Total fees due upon application: City / State/ZIP: Phone: () 2 ?.. rg _ , — Fax: : (94 ) z� ,/6„ Amount received: /, PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* E-mail: tjrhoi ie ,....,:z4..,,.,....,_ i l CON,RACTOR Commercial and residential prescriptive installation of roof -top mounted Photo Voltaic Solar Panel System. Business name: f , ���.v /�.f� Submit two (2) sets of roof plan with connection details and fire department access, along with the 2010 Oregon Address: ZCY', ,,, 4.5.- e �y E. Solar Installation Specialty Code checklist. i Permit fee (includes plan review City/ State/ZIP: � /2p't'r, o� 7 ?'7 and administrative fees): $180.00 Phone: (57,3 707_ _- 9 ?Z Fax State surcharge (12% of permit fee): $21.60 CCB lic.: /6, ya Total fee due upon application: $201.60 Authorized signature: ' / This permit application expires if a permit is not obtained ' within 180 days after it has been accepted as complete. Print name: Date: Z �, * Fee methodology set by Tri-County Building Industry �' ....r...: Service Board. I:\Building\Permits\BUP -COM PermitApp.doc 02/ 24/2011 440- 4613T(11 /02 /COM/WEB) i ° Building Division II Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation, alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per -cent (25 %). VALUATION: Total of all renovation, alteration or modification being done, excluding painting and wallpapering: [1] $ /0 v MULTIPLIER (25% barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ Z� fie.' ELEMENTS: In choosing which accessible elements to provide under this section, priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains: and, $ (g) When possible, additional accessible elements such as storage and alarms: $ TOTAL (shall equal line [2] of Valuation Computation): 14 $ C7 'ie 7 ,- )etsn" 1 /t.e9/A 1 /4/GGc/ °C p,P /teele, wags 1 11/rh e 6-eiidG .Fit r f104 a.cvt s.440 IS • 4/d ,frev2/...y25 -e A /U ,ssq •fir I: \Building \Permits \BUP -COM PermitApp.doc 03/03/2011 Er Building Division Development Code Provision Review TIGARD Commercial Projects - No Associated Land Use Case Building Permit No: I it u P — 0Do2Loev Expedited Review Plan Submittal Date: / / /9 / /P— To the Applicant: > If the proposed use is not permitted within the zone, please contact the Building Division to cancel the permit application. Building Permit Technicians (503) 718 -2439. > If a land use is required and for all other questions, please contact the staff person listed above the Planning Review section. Staff: please check items along left only if approved. Planning Review (contact J v di h, CI r4y at 503 -718- 155 7 or ' LA d 41. @tigard - or.gov) Proposal: W w r'2+L1 ■ I U S c ; .+ Vc. t- .4 t t e I .1''(fJ. e Zoning 09 U L l) Permitted Use Yes E No ❑ ,,_/ Land Use Required: Yes ❑ No L7 Notes: n -// Approved ❑ Not Approved Date: / 0 .Z REVISED 10/4/12 1 ' Building Division Over- The - Counter (OTC) Building Permit TIGARD Check List Project Description: ( ( APPLICATION SPECIFIC INFORMATION GENERAL INFORMATION /�'y *Class of Work: 1 Occupancy Group: / v ` Type of Construction: �rJ *Type of Use: ' _ Occupancy Load: _ Oregon Specialty Code: _ ZlJC) SPECIFICS Number of Stories: ( Building Height: Mixed Use: Number of Dw Units: Number of Bathrooms: Number of Bedrooms: BUILDING SQ FT - SCHOOL CET OTHER SQUARE FOOTAGES Story Square Footage: Accessory Structure: Covered Porch: Basement: Garage: Deck: Total Square Footage: Carport: Mezzanine: SETBACKS Sideyard Setback - Left Sideyard Setback - Front Sideyard Setback - Right Sideyard Setback - Back CONSTRUCTION Exterior Walls: Openings Protected: Firewall Separation: N: S: N: S: Occupancy Separation: E: W: E: W: Access. Parking Spaces: REQUIRED ITEMS Fire Sprinklers: i0© Fire Alarms: Smoke Detectors: Parapet: Manual Pull Stations: Protected Corridors: Total Project Valuation: $ tQ j MO I FEES DUE $ , Gb DC Prov Rvw, COM TI - Ping $ DC Prov Rvw, COM TI -LRP DC Provision Review Fee for COM TI $ Permit Fee - Add, Alt, Demo Project Valuation Planning LRP $ Z7, 12% State Surcharge Up to $4,999 $0.00 $0.00 $ mar Plan Review, Structural $5,000 - $74,999 $67.00 $10.00 $ 41 1%..'3 ` Z Plan Review, Fire Life Safety $75,000 - $149,999 $167.00 $25.00 $ ' . ' • Info Proc /Arch, Lg (over 11x17 $2.00) $150,000 and over $268.00 $39.00 $ Info Proc /Arch, Sm (up to 11x17 $0.50) $ Metro Construction Excise Tax $ School Construction Excise Tax $ Hourly Rate Fee Planning Staff: $ Hourly Rate State Surcharge $ Misc. Admin Fee Permit Coordinator: $ Other:. $ Other: Building Staff: - - _ Other: Date /Time: $ 5-X.) ( TOTAL FE S DUE *OPTIONS: TYPE OF USE: COM = commercial; CMS = co mercial manufactu structure. CLASS OF WORK ACS = accessory; ADD = addition; ALT = alteration; . - - . :.:. n; EM = demo; FND = foundation; FPS = fire protection system; NEW = new; OTR = other (use for fences, decks, retaining walls, signs, awnings or canopies); REP = repair. I: \ Building \ Forms \CH'I'C- BUP.docx 07 /01/2012 Commercial Application Checklist City of Tigard ■ 13125 SW Hall Blvd., Tigard, OR 97223 Phone: 503.718.2439, Fax: 503.598.1960 TI G A R D Internet address: www.tigard - or.gov PROJECT INFORMATION Project name: /D0/.4,A, 7�1dzeX,h 4,6cfG ,%vr TZ Date: /2 /9A Address: / Z 53^0 //147ti SpZircr I City: Cii0l State: 2, ZIP: 7ZZZ7 Scope of work: dcti, ,444 . 144, Reference no.: Map and tax -lot no.: z/_ tot" Contact person name: A t . 17N � fft40--v Company: G,�i4- Phone: (c''.9-0 ZZG – / ?, gI -- Fax: 6 5) Z Z L _;g �o Cellular phone: A E -mail: of • 1 • The purpose of this checklist is to help define a complete submittal package for the scope of work. Plan review will not take place until a complete package is submitted. • This checklist can be used for all commercial construction projects, including new construction, additions, alterations and tenant improvements. • For complex projects, applicants should use the "location" space to note the item's location and page number from the plans or the specification book. • It is not necessary to duplicate submittal information, even if it is asked for in multiple sections. • In the checklist, "Required" means that the applicant must provide this information for plan review. • In the checklist, "P" means — • if checked by the applicant — the information is provided for the plan review. • if checked by the plans reviewer — this information is required for the plan review. • In the checklist, "NA" means that the information does not apply. • Choose only those sections of the checklist that apply to your scope of work. Section 1.0, "General Project Data," must be included with each .ro'ect submitted. PRE - SUBMITTAL PROCESS An applicant may request a pre - submittal meeting with representatives of the jurisdiction in which the project will be built. The meeting may take place during the conceptual, schematic, or in- progress phase, or when the applicant has completed plans. INDEX OF CHECKLIST SECTIONS 1.0 General project data Page 2 7.0 Mechanical data (Types I and II 2.0 Civil data Page 2 kitchen -hood permits) Page 6 3.0 Architectural data Page 3 8.0 Plumbing data Page 7 4.0 Structural data Page 4 9.0 Electrical data Page 8 5.0 Mechanical data (new construction, tenant 10.0 Fire - suppression data Page 9 improvement, gas - piping permits) Page 5 11.0 Fire - detection and fire -alarm data Page 9 6.0 Mechanical data (additional or replacement 12.0 Re -roof installation data Page 10 rooftop- equipment installation permits) Page 6 13.0 Jurisdictional requirements Page 10 This checklist is for building department jurisdictions in Clackamas, Multnomah, and Washington counties. 440 -2734 (8 /01/WEB /COM) (:\Building \Forms \COM- Checklist.doc 12/19/12 SECTION 1.0 — GENER.u. PRZO.JI ('T DATA Construction documents Location (sheet number or spec section) 1.1 ® Required No. of sets of plans: New: 1 TI: 2 1.2 ® Required Cover sheet title block 1.3 ® Required Cover sheet vicinity map 1.4 ®squired Cover sheet plan index 1.5 P ❑ NA Code summary 1.6 Ey ❑ NA Deferred submittal summary 1.7 .. P ❑ NA Professional stamp and signature 1.8 [rP ❑ A Fire and life- safety plan 1.9 ❑ P Q NA Landscape plan 1.10 ❑ P A Landscape specifications Supporting documents Notes 1.20 ❑ P A Land -use or planning actions 1.21 ❑ P g. NA Required fire -flow calculations 1.22 ❑ P [► " I A Fire - hydrant flow -test report 1.23 ❑ P [rNA Fire department or fire district building survey report 1.24 ❑ P 10,--NA Material safety data sheets (MSDS) SECTION 2.0 — CIVII. DATA Construction documents Location (sheet number or spec section) 2.1 ® Required Site plan 2.2 ® Required Site utility plan 2.3 ® Required Grading plan 2.4 ® Require Erosion - control plan 2.5 ❑ P [j] NA Utility -vault location and details Supporting docu ents Notes 2.20 ❑ PA Geotechnical/soil engineer report 2.21 ID [�A Storm -water calculations 2.22 El P A Site retaining -wall structural calculations 2.23 ❑ PIA "Assurance of Compliance" with environmental rules 440 -2734 (8 /01/WEB /COM) Tri- County Commercial Application Checklist 2 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties I:\B uilding\Forms \COM- Checklist.doc SECTION 3.0 — ARCHITECTURAL DATA Construction documents Location (sheet number or spec section) 3.1 ® Required Floor plan(s) 3.2 ® Required Transverse and longitudinal cross sections 3.3 ® Required OSSC Chapter 11 accessibility requirements 3.4 ❑ P " Interior elevations 3.5 ❑ P Exterior elevations 3.6 ❑ P NA Roof plans 3.7 ❑ P [241A Exterior wall sections and details 3.8 [1 ❑ NA Reflected ceiling plan(s) 3.9 ❑ P ilk1'�A Fire -rated construction details 3.10 ❑ P [ /NA Energy code compliant construction details and specifications 3.11 ❑ P iA Door schedule 3.12 ❑ P [, Glazing schedule 3.13 ❑ P A Furniture plan Supporting do is Notes 3.20 1:1 P Lti" N Energy code compliance forms /calculations 3.21 ❑ P A Material safety data sheets (MSDS) 3.22 ❑ P N Hazardous materials inventory statement (HMIS) 3.23 CI [ IVA . Hazardous materials management plan (HMMP) 3.24 ❑ P [a-NA Written fire and life- safety evacuation plan for area of rescue assistance 3.25 ❑ P A Active and passive smoke - control information 440 -2734 (8 /01/WEB /COM) Tri- County Commercial Application Checklist 3 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i:\B uilding \Forms \COM- Checklist.doc SECTION 4.0 — STRUCTURAL DATA Construction documents Location (sheet number or spec section) 4.1 ® Require Structural cover sheet 4.2 ❑ P �� Foundation plan 4.3 ❑ P Lam" NA Under -slab mechanical plan 4.4 ❑ P M''NA Under -slab electrical plan 4.5 ❑ P ANA Under -slab plumbing plan 4.6 ❑ P [c —NA Floor framing plan 4.7 ❑ P E1---PciA Roof framing plan 4.8 ❑ P p A Structural elevations 4.9 ❑ P I -NA Structural details and cross sections 4.10 ❑ P la.-NA Standpipe information 4.11 ❑ P a-WA Special inspector /structural observation matrix Supporting docu is Notes 4.20 ❑ P NA Geotechnical/soil engineer report 4.21 ❑ P []_ITA Site - specific seismic hazard report 4.22 ❑ P EKIA Design narrative 4.23 El P EWA Structural calculations 440 -2734 (8 /01/WEB /COM) Tri- County Commercial Application Checklist 4 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties I:\Bui (ding \Forms \COM- Checklist.doc SECTION 5.11 — \IE('It \I('.1I. I) 1'I'1 ( \uNN contiUFuction. tenant intprmenwilt. gas piping perntils( Construction documents Location (sheet number or spec section) 5.1 ® Required Floor plan 5.2 ® Required Equipment schedule 5.3 ❑ P ❑ NA Site plan 5.4 ❑ P ❑ NA Under -slab mechanical plan 5.5 ❑ P ❑ NA Roof plan 5.6 ❑ P ❑ NA Fuel gas piping plan / 5.7 ❑ P ❑ NA HVAC equipment and duct plan(s) 1 460V'tC/' 4- 5.8 ❑ P ❑ NA Roof access details /v' l 5.9 ❑ P ❑ NA Duct smoke detector plans 5.10 ❑ P ❑ NA Fire /smoke damper locations ' ✓w,24-(01 5.11 ❑ P ❑ NA Smoke control plan 5.12 ❑ P ❑ NA Outside air (OSA) table 5.13 ❑ P ❑ NA Refrigeration equipment and piping plan 5.14 ❑ P ❑ NA Kitchen equipment plan 5.15 ❑ P ❑ NA Type I and/or Type II kitchen hood plan (see Section 7.0 — Mechanical Data) 5.16 ❑ P ❑ NA Fume /vapor hood plan 5.17 ❑ P ❑ NA Process piping /product and/or exhaust - conveying duct plan 5.18 ❑ P ❑ NA Fire -rated construction details 5.19 ❑ P ❑ NA Equipment hanger /fastener details Supporting documents Notes 5.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 5.21 ❑ P ❑ NA Equipment manufacturers' catalog "cut sheets" or specifications 5.22 ❑ P ❑ NA Outside air (OSA) calculations 5.23 ❑ P ❑ NA Smoke - control calculations 5.24 ❑ P ❑ NA Combustion air calculations 5.25 ❑ P ❑ NA Fuel gas piping sizing calculations 5.26 ❑ P ❑ NA Make -up air calculations 5.27 ❑ P ❑ NA Energy code compliance forms 5.28 ❑ P ❑ NA Boiler information 440 -2734 (8/01/WEB /COM) Tri- County Commercial Application Checklist 5 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i:\Building \Forms \COM- Checklist.doc SECTION 6.0 — MECHANICAL DATA (Additional or replacement rooftop installation permits) Construction documents Location (sheet number or spec section) 6.1 ® Required Roof plan 6.2 ❑ P ❑ NA Roof framing plan 6.3 ❑ P ❑ NA Fuel gas piping plan 6.4 ❑ P ❑ NA Roof access details Supporting documents Notes .� 6.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 6.21 ❑ P ❑ NA Equipment manufacturers' catalog "cut sheets" or specifications 6.22 ❑ P ❑ NA Fuel gas piping sizing calculations 6.23 ❑ P ❑ NA Energy code compliance forms SECTION 7.0 — MECHANICAL DATA (T .e I and T .e II kitchen hood permits) Construction documents Location (sheet number or spec section) 7.1 ® Required Site plan 7.2 ® Required Floor plan(s) 7.3 ® Required Kitchen equipment plan 7.4 ® Required Kitchen equipment and hood elevations 7.5 ❑ P ❑ NA Roof plan 7.6 ❑ P ❑ NA Cross sections through hoods, ducts and shafts 7.7 ❑ P ❑ NA Fire -rated construction details 7.8 ❑ P ❑ NA Fire suppression details Supporting documents Notes 7.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 7.21 ® Required Make -up air calculations 7.22 ❑ P El NA Equipment manufacturers' catalog "cut sheets" or specifications 7.23 ❑ P ❑ NA Hood/grease extractor listing documentation 7.24 ❑ P ❑ NA Hood/grease duct sizing calculations 7.25 ❑ P ❑ NA Fire suppression information 440 -2734 (8 /01/WEB /COM) Tri- County Commercial Application Checklist 6 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties l.•\Building\Forms \COM- Checkli st.doc SI':( 8.0 — PIA \IBIN(: Construction documents Location (sheet number or spec section) 8.1 ® Required Floor plan(s) 8.2 ® Required Piping and material schedule 8.3 ® Required Equipment layout plan 8.4 ® Required Fixture schedule 8.5 ❑ P ❑ NA Site utility plan 8.6 ❑ P ❑ NA Building cross section / 8.7 ❑ P ❑ NA Rise diagram k ) Y rl_� � , 8.8 ❑ P ❑ NA Roof plan �V 8.9 ❑ P ❑ NA Back flow prevention location 8.10 ❑ P ❑ NA Irrigation plan 8.11 ❑ P ❑ NA Fire -rated construction details 8.12 ❑ P ❑ NA Under -slab plumbing plan Supporting documents Notes 8.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 8.21 ❑ P ❑ NA Equipment manufacturers' catalog "cut sheets" or specifications 8.22 ❑ P ❑ NA Utility maintenance agreements 8.23 ❑ P ❑ NA Water supply calculations 8.24 ❑ P ❑ NA Sanitary system calculations 8.25 ❑ P ❑ NA Irrigation demand calculations 8.26 ❑ P ❑ NA Roof drain and storm water calculations 440 -2734 (8/0l/WEB /COM) Tri- County Commercial Application Checklist 7 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i:\BuildingWorms\COM-Checklistdoc SECTION. 9.0 1. :I1:(''FRl('. 1).11 1 Construction documents Location (sheet number or spec section) 9.1 ® Required No. of sets of plans: 2 9.2 ® Required Floor plan(s) 9.3 ® Required Electrical load calculations 9.4 ® Required One line diagram 9.5 ® Required Feeder riser diagram 9.6 ® Required Available fault current information 9.7 ® Required Panel schedule(s) 9.8 ❑ P ❑ NA Site electrical plan 9.9 ❑ P ❑ NA Fire -rated construction details 9.10 ❑ P ❑ NA Lighting plan 9.11 ❑ P ❑ NA Emergency power system and emergency lighting plan 9.12 ❑ P ❑ NA Under -slab electrical plan Supporting documents Notes 9.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 9.21 ❑ P ❑ NA Energy code compliance forms and calculations for lighting 9.22 ❑ P ❑ NA Emergency power system specifications 9.23 ❑ P ❑ NA Feeder riser information 9.24 P NA Lighting equipment manufacturers' catalo ❑ ❑ g g catalog "cut sheets" or specifications 440 -2734 (8/01/WEB /COM) Tri- County Commercial Application Checklist 8 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties 1:\Bui (ding \Forms \COM- Checklist.doc SECTION 111.11 - FIRE SUPPRESSION DATA Construction documents Location (sheet number or spec section) 10.1 ® Required Floor plan(s) 10.2 ® Required Sprinkler piping plan(s) 10.3 ❑ P ❑ NA Site plan 10.4 ❑ P ❑ NA Standpipe information 10.5 ❑ P ❑ NA Back flow prevention information /Pr 10.6 ❑ P ❑ NA Reflected ceiling plan(s) It 1 10.7 ❑ P ❑ NA Transverse and longitudinal cross sections I " 10.8 ❑ P ❑ NA Fire -rated construction details 10.9 ❑ P ❑ NA Specialty fire suppression system plans and list of systems Supporting documents Notes 10.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 10.21 ® Required Equipment manufacturers' catalog "cut sheets" 10.22 ❑ P ❑ NA Hydraulic calculations 10.23 ❑ P ❑ NA Specialty fire suppression system information SECTION 1 1.1►- 1 1111: 1)1.1 :(4IU\ .1 \I) . 11. . 1101 1) .11'.1 Construction documents Location (sheet number or spec section) 11.1 Required Floor plan(s) 11.2 ❑ P ❑ NA Site plan 11.3 ❑ P ❑ NA Reflected ceiling plan(s) 11.4 ❑ P ❑ NA Transverse and longitudinal cross sections 11.5 ❑ P ❑ NA Wiring schematic 11.6 ❑ P ❑ NA Elevator recall information 11.7 ❑ P ❑ NA Operational matrix N //4- 11.8 ❑ P ❑ NA Fire -rated construction details 11.9 ❑ P ❑ NA Standard electrical notes Supporting documents Notes 11.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 11.21 ® Required Equipment manufacturers' catalog "cut sheets" 11.22 ® Required Installer certification information 11.23 ❑ P ❑ NA Battery calculations 11.24 ❑ P ❑ NA Sample fire alarm log book 11.25 ❑ P ❑ NA Emergency power system specifications 11.26 ❑ P ❑ NA Monitoring station information 11.27 ❑ P ❑ NA Voltage drop calculations 440 -2734 (8 /01/WEB /COM) Tri- County Commercial Application Checklist 9 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i:\ Building \Forms \COM- Checklist.doc SECTION 12.0 — RE -ROOF INSTALLATION DATA Construction documents Location (sheet number or spec section) 12.1 ® Required Site plan or building location map 12.2 ® Required Occupancy classification 12.3 ® Required Type of construction 12.4 ® Required Minimum roof class required 12.5 ® Required Class of roofing to be installed 12.6 ® Required Roof plan 4/4- 12.7 ❑ P ❑ NA Parapet and scupper cross section(s) Supporting documents Notes 12.20 ® Required Pre -re -roof inspection report 12.21 ® Required Roofing system listing information 12.22 ® Required Roofing manufacturer's catalog "cut sheets" 12.23 ❑ P ❑ NA Structural calculations 12.25 El P ❑ NA Structural engineer's report SECTION 13.0 — JURISDICTIONAL - SPECIFIC REQUIREMENTS Construction documents Item Location (sheet number or spec section) 13.1 ❑ P ❑ NA El Required 13.2 ❑ P ❑ NA ❑ Required 13.3 ❑ P ❑ NA ❑ Required 13.4 El P ❑ NA El Required 13.5 ❑ P ❑ NA ❑ Required N lA 13.6 ❑ P El NA ❑ Required 13.7 El P ❑ NA ❑ Required 13.8 ❑ P El NA ❑ Required 13.9 ❑ P El NA ❑ Required 13.10 ❑ P El NA ❑ Required 440 -2734 (8 /0l/WEB /COM) Tri- County Commercial Application Checklist 10 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties 1:\ Building \Forms \COM- Checklist.doc