Loading...
Correspondence June 15, 2006 .� ,L : CITY OF TIGARD OREGON Evergreen Engineering LLC Steve Cruft 20827 NW Cornell Rd Suite 200 Hillsboro, OR 97124 RE: HEMCON — MEZZANINE, CLEANROOM, LAB SERVICE AREA - REVIEW Project Information Building Permit BUP2006 -10036 Construction Type: 5B Tenant Name: Hemcon Occupancy Type: F 2 Address: 10575 SW Cascade Ave # 130 Stories: 1 The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2004 edition; and the State of Oregon Fire Code (OFC) 2004 edition. The submitted plans are approved subject to the following conditions. 1. The structural was reviewed and approved by Miller Consulting Engineers June 14, 2006. (review doc. attached). 2. Special inspection is required for concrete, welding reinforcing steel, bolting welded studs, embed plates, bolts in concrete, steel fabrication and erection, adhesive and expansion anchor installation. The special inspection agency of record shall furnish inspection reports to the Engineer of Record, the General Contractor, and the City of Tigard, Building Division, attention Hap Waddns. All discrepancies shall be brought to the immediate attention of the general contractor for correction. The special inspector shall submit a final signed report stating whether the work requiring special inspection was, to the best of the inspector's knowledge, in conformance with • the approved plans and specifications and the applicable workmanship provisions of the code. 1701.3, 1704 OSSC 3. Live Loads Posted: The live loads for which each floor has been designed to exceed 50 psf shall be conspicuously posted by the owner in that part of each story in which they apply, using durable metal signs, and it shall be unlawful to remove or deface such notices. The occupant of the building shall be responsible for keeping the actual load below the allowable limits. 1603.3 OSSC FIRE LIFE AND SAFETY / GENERAL 4. All exit doors shall be operable from the inside without the use of a key or any special knowledge or effort. Sec. 1008.1.8 5. Access to exits shall be marked by readily visible exit signs in cases where the exit or the path of 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 egress travel is not immediately visible to the occupants. Sec. 1011.1 • 6. The means of egress shall be provided with illumination of not less than 1 foot candle at the floor . level anytime the building is occupied. The means of egress illumination shall be provided with a second source of power in case of primary power loss. Sec. 1006.2 7. Safety glazing including but not limited to: the following locations: Each unit of glazing shall be permanently identified by the manufacturer. Sec. 2406. Some of these locations are as follows: a. Glazing in ingress and means of egress doors. b. Glazing in an individual fixed or operable panel adjacent to a door where the nearest vertical edge is within a 24" arc of the door in a closed position and whose bottom edge is less than 60" above the floor or walking surface except when there is an intervening wall or other permanent barrier between the door and the glazing. 8. Provide 2 -A rated fire extinguishers in the new area. The extinguisher shall be located so that no usable space has a distance greater than 75 feet to the extinguisher. OFC 906.3 9. Deferred submittals such as Truss Joist Shop Drawings, suspended ceiling system etc, will be charged a deferred submittal fee based on the valuation of the portion of the work being deferred. The minimum fee shall be $200.00. This fee is in addition to the project plan review fee based on the total project value. OAR 918-050-0150 Deferred Items: None listed "Documents for deferred submittal items shall be submitted to the registered design professional in responsible charge who shall reu%ew them and fonvani them to the building official with a notation indicating that the d fened submittal documents have been reviewed and been found to be in general conformance to the design of the building. The deferred submittal items shall not be installed until the design and submittal documents hare been appsv eed by the building off daL Oregon Structural Spedalty Code Section 106.3.4.2" NOT PART OF THIS REVIEW: * Electrical * Fire Sprinklers * Mechanical System * Plumbing American with Disabilities Act (ADA): It shall be the responsibility of the Architect, Engineer, Designer, Contractor, Owner and Lessee to research the applicability of the ADA requirements for the • structure. The City of Tigard reviews the plans and inspects the structure only for compliance with Chapter 11 of the OSSC, which may not include all of the requirements of the ADA. Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp, shall be maintained on the jobsite. The plans shall be available to the Building Division inspectors throughout all phases of construction. 106.3.1 OSSC Certificate of Occupancy: No building or structure shall be used or occupied until the Building Official has issued a certificate of occupancy 109.1 OSSC Premises Identification: Approved numbers or addresses shall be provided for all new buildings in such a position as to be plainly visible and legible from the street or road fronting the property. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of TransmittaL The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectfull ' al Henze!, Senior Plans Examiner • • r JOB NAME: Facility R &D Expansion — Hemcon CITY OF TIGARD JOB ADDRESS: 10575 SW Cascade Ave., Ste. 130, Tigard, Oregon 13125 SW HALL BLVD. DATE: May 25, 2006 TIGARD, OR 97223 SHEET 1 OF 1 Project No. 060452 STRUCTURAL PLAN REVIEW # 4 Plans Dated 5/26/06 BUILDING PERMIT BUP2006 -10036 • Corr. Item Page No. Comments Code Section Made No. 5/26/06 1 Calculations, pages 2 and Submit calculations and details for bracing 106.1.1 11 per Code including type of brace, R Factor, • Omega Factors, overturning factor of safety, connections, welds and load transfer. Provide engineering for the shear connection at the base of the braced frame. In addition, load factors are not in compliance with Section 1605.3.2 for the brace and footing. 5/25/06 2 Calculations, pages 4 Submit calculations for beams and spans 106.1.1 through 9 shown on plans. 5/25/06 3 Calculations, pages 10 Clarify 52 PSF framing load and 83 PSF D.L. 106.1.1 • and 11 for uplift. 5/25/06 4 Calculations, page 10 Submit information on soils for 2500 PSF 106.1.1 bearing. 5/25/06 5 Calculations, page 11 Submit calculations for anchor bolts at 106.1.1 and Detail E braced frames. 5/25/06 6 Detail A Submit calculations and details for the bolted 106.1.1 beam — column connection including eccentricity and bending of column. 5/25/06 7 Detail K Submit calculations and details for the guard 1607.7.1 rail connection. 5/25/06 8 Special Inspection Special inspection per Section 1704 is 1704 required for bolting, welding, anchor bolts, concrete, and steel decking, reinforcing steel and steel fabrication. Submit Special Inspection Program with specific times for Periodic Special Inspection. 9 General Submit one set of miscellaneous steel shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. • 10 General Submit one set of miscellaneous steel decking drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 11 General Submit one set of miscellaneous reinforcing steel shop drawings, which have been reviewed and initialed by the project • JOB NAME: Facility R&D Expansion — Hemcon CITY OF TIGARD JOB ADDRESS: 10575 SW Cascade Ave., Ste. 130, Tigard, Oregon 13125 SW HALL BLVD. DATE: May 25, 2006 TIGARD, OR 97223 . SHEET 2 OF 1 Project No. 060452 STRUCTURAL PLAN REVIEW # 4 Plans Dated 5/26/06 BUILDING PERMIT BUP2006 -10036 Corr. Item Page No. Comments Code Section Made No. engineer, to be filed with the City of Tigard before placement. • Val Henzel - FW: Plan Check #4 Page 1 eu,6206 - From: "Steve Cruft" <scruft@eepdx.com> To: "'Val Henzel'" <Val @tigard- or.gov> Date: 6/1/2006 9:00:25 AM Subject: FW: Plan Check #4 Steve Cruft, PE, CEM Evergreen Engineering 503 -439 -8777 Fax 503 -439 -8767 Mobile 503 - 407 -4755 scruft @eepdx.com From: Eric Watson [mailto:eric@millerengrs.com] Sent: Friday, May 26, 2006 10:49 AM To: 'Brian Blalock (brianb @ci.tigard.or.us)' Cc: 'Steve Cruft'; 'Ben Riehl' Subject: Plan Check #4 Brian: Enclosed is the plan check for the mezzanine addition based on the plans dated 5/26/06. My understanding is that the engineer will forward a complete stamped package for permit issuance. By the way, the epoxy work at the footings needs to be added to the special inspection requirements listed on Sheet 51. If you have any questions with the above, please call or email. Eric R. Watson, SE Principal Val Henze! - FW: Plan Check #4 Page 2 Miller Consulting Engineers, Inc. 9570 SW Barbur Blvd. Suite 100 Portland, Oregon 97219 Phone: (503)246 -1250 Fax: (503) 246 -1395 EMAIL: eric©millerengrs.com Web: www.millerengrs.com JOB NAME: Facility R&D Expansion — Hemcon CITY OF TIGARD JOB ADDRESS: 10575 SW Cascade Ave., Ste. 130, Tigard, Oregon 13125 SW HALL BLVD. DATE: May 25, 2006 TIGARD, OR 97223 SHEET 1 OF 1 Project No. 060452 STRUCTURAL PLAN REVIEW # 4 Plans Dated 5/26/06 BUILDING PERMIT BUP2006 -10036 Corr. Item Page No. Comments Code Section Made No. 5/26/06 1 Calculations, pages 2 and Submit calculations and details for bracing 106.1.1 11 per Code including type of brace, R Factor, Omega Factors, overturning factor of safety, connections, welds and load transfer. Provide engineering for the shear connection at the base of the braced frame. In addition, load factors are not in compliance with Section 1605.3.2 for the brace and footing. 5/25/06 2 Calculations, pages 4 Submit calculations for beams and spans 106.1.1 through 9 shown on plans. 5/25/06 3 Calculations, pages 10 Clarify 52 PSF framing load and 83 PSF D.L. 106.1.1 and 11 for uplift. 5/25/06 4 Calculations, page 10 Submit information on soils for 2500 PSF 106.1.1 bearing. 5/25/06 5 Calculations, page 11 Submit calculations for anchor bolts at 106.1.1 and Detail E braced frames. 5/25/06 6 Detail A Submit calculations and details for the bolted 106.1.1 beam — column connection including eccentricity and bending of column. 5/25/06 7 Detail K Submit calculations and details for the guard 1607.7.1 rail connection. 5/25/06 8 Special Inspection Special inspection per Section 1704 is 1704 required for bolting, welding, anchor bolts, concrete, and steel decking, reinforcing steel and steel fabrication. Submit Special Inspection Program with specific times for Periodic Special Inspection. 9 General Submit one set of miscellaneous steel shop • drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 10 General Submit one set of miscellaneous steel decking drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 11 General Submit one set of miscellaneous reinforcing steel shop drawings, which have been reviewed and initialed by the project JOB NAME: Facility R&D Expansion — Hemcon CITY OF TIGARD JOB ADDRESS: 10575 SW Cascade Ave., Ste. 130, Tigard, Oregon 13125 SW HALL BLVD. DATE: May 25, 2006 TIGARD, OR 97223 SHEET 2 OF 1 Project No. 060452 STRUCTURAL PLAN REVIEW # 4 Plans Dated 5/26/06 BUILDING PERMIT BUP2006 -10036 Corr. Item Page No. Comments Code Section Made No. engineer, to be filed with the City of Tigard before placement. e Val Henzel - FW: Plan Check #3 Page 1 From: "Steve Cruft" <scruft@eepdx.com> To: "'Val Henze!'" <Val @tigard- or.gov> Date: 6/1/2006 9:00:45 AM Subject: FW: Plan Check #3 Steve Cruft, PE, CEM Evergreen Engineering 503 -439 -8777 Fax 503 -439 -8767 Mobile 503 - 407 -4755 scruft @eepdx.com From: Eric Watson [mailto:eric@millerengrs.com] Sent: Thursday, May 25, 2006 5:08 PM To: 'Brian Blalock (brianb @ci.tigard.or.us)' Cc: 'Steve Cruft'; 'Ben Riehl' Subject: Plan Check #3 Brian: Enclosed is the plan check for the mezzanine addition based on the plans dated 5/22/06 and 5/23/06. If you have any questions with the above, please call or email. Eric R. Watson, SE Principal Miller Consulting Engineers, Inc. 9570 SW Barbur Blvd. Suite 100 Portland, Oregon 97219 Phone: (503)246 -1250 Fax: (503) 246 -1395 Val Henzel - FW: Plan Check #3 Page 2 EMAIL: eric©millerengrs.com Web: www.millerengrs.com Val Henzel - Plan Check #2 Page 1 From: Eric Watson <eric@millerengrs.com> To: "'Brian Blalock (brianb @ci.tigard.or.us) " ' <brianb @ci.tigard.or.us> Date: 5/8/2006 5:29:15 PM Subject: Plan Check #2 Brian: Enclosed is the plan check for the mezzanine addition based on the plans dated 4/21/06. I was not sure what to call this, as it is a new set of plans and calculations. If you have any questions with the above, please call or email. Eric R. Watson, SE Principal Miller Consulting Engineers, Inc. 9570 SW Barbur Blvd. Suite 100 Portland, Oregon 97219 Phone: (503)246 -1250 Fax: (503) 246 -1395 EMAIL: eric@millerengrs.com Web: www.millerengrs.com JOB NAME: Facility R &D Expansion — Hemcon CITY OF TIGARD JOB ADDRESS: 10575 SW Cascade Ave., Ste. 130, Tigard, Oregon 13125 SW HALL BLVD. DATE: May 8, 2006 TIGARD, OR 97223 SHEET 1 OF 1 Project No. 060452 STRUCTURAL PLAN REVIEW # 2 Plans Dated 4/21/06 BUILDING PERMIT BUP2006 -10036 Corr. Item Page No. Comments Code Section Made No. 1 Calculations, pages 2 and Submit calculations and details for bracing 106.1.1 11 per Code including type of brace, R Factor, Omega Factors, overturning factor of safety, connections, welds and load transfer. 2 Calculations, pages 4 Submit calculations for beams and spans 106.1.1 through 9 shown on plans. 3 Calculations, pages 10 Clarify 52 PSF framing load and 83 PSF D.L. 106.1.1 and 11 for uplift. 4 Calculations, page 10 Submit information on soils for 2500 PSF 106.1.1 bearing. 5 Calculations, page 11 Submit calculations for anchor bolts at 106.1.1 and Detail E braced frames. 6 Detail A Submit calculations and details for the bolted 106.1.1 beam — column connection including eccentricity and bending of column. 7 Detail K Submit calculations and details for the guard 1607.7.1 rail connection. 8 Special Inspection Special inspection per Section 1704 is 1704 required for bolting, welding, anchor bolts, concrete, and steel decking, reinforcing steel and steel fabrication. Submit Special Inspection Program with specific times for Periodic Special Inspection. 9 General Submit one set of miscellaneous steel shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 10 General Submit one set of miscellaneous steel decking drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 11 General Submit one set of miscellaneous reinforcing steel shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard JOB NAME: Facility R &D Expansion — Hemcon CITY OF TIGARD JOB ADDRESS: 10575 SW Cascade Ave., Ste. 130, Tigard, Oregon 13125 SW HALL BLVD. DATE: May 8, 2006 TIGARD, OR 97223 SHEET 2 OF 1 Project No. 060452 STRUCTURAL PLAN REVIEW # 2 Plans Dated 4121/06 BUILDING PERMIT BUP2006 -10036 Corr. Item Page No. Comments Code Section Made No. before placement. April 15, 2006 O �C� N t Miller Consulting Engineers 9570 Barbur Boulevard Portland, OR 97219 RE: PERSONAL SERVICES CONTRACT Project Information Building Permit: BUP2006 -10036 Occupancy Type: F2 Tenant Name: Hemcon Construction Type: VB Address: 10575 SW Cascade Avenue Occupant Load: NA To whom it may concern, Please review the accompanying structural plans for the construction of a mezzanine. The project is to be reviewed under the Oregon Structural Specialty Code, 2004 edition. Enclosed are 11 full size plan sheets, the structural calculations and a copy of the permit application. Assess fees based on the percentage of the structural plan review fee indicated on the permit application per the Personal Service Contract. Thank you! Please contact the applicant for review questions and copy the City of Tigard with any correspondence. If you need additional information please call me at 503 - 718 -2759. Respectfully, Brian Blalock, Plans Examination Supervisor Val H9nzel - Plan Review 5- 8- 06.doc Page 1 JOB NAME: Facility R&D Expansion — Hemcon CITY OF TIGARD client address ®� JOB ADDRESS: 10575 SW Cascade Ave., Ste. 130, Tigard, Oregon c 1� 1 55C5�,IV HALL BLVD._. DATE: May 8, 2006 ' ,`- 2T1GARD, OR 97223 y SHEET 1 OF 1 Project No. 060452 STRUCTURAL PLAN REVIEW # 2 y Q Plans Dated 4/21/06 BUILDING PERMIT BUP2006 -10036 Corr. Item Page No. Comments Code Section Made No. 1 Calculations, pages 2 and Submit calculations and details for bracing 106.1.1 11 per Code including type of brace, R Factor, Omega Factors, overturning factor of safety, connections, welds and load transfer. ) Calculations, pages 4 Submit calculations for beams and spans 106.1.1 2 1 through 9 shown on plans. (3) Calculations, pages 10 Clarify 52 PSF framing load and 83 PSF D.L. 106.1.1 and 11 for uplift. l� Calculations, page 10 Submit information on soils for 2500 PSF 106.1.1 bearing. ( 5 ) Calculations, page 11 Submit calculations for anchor bolts at 106.1.1 `� and Detail E braced frames. 6 Detail A Submit calculations and details for the bolted 106.1.1 beam — column connection including eccentricity and bending of column. 7 Detail K Submit calculations and details for the guard 1607.7.1 rail connection. 8 Special Inspection Special inspection per Section 1704 is 1704 required for bolting, welding, anchor bolts, concrete, and steel decking, reinforcing steel and steel fabrication. Submit Special Inspection Program with specific times for Periodic Special Inspection. 9 General Submit one set of miscellaneous steel shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 10 General Submit one set of miscellaneous steel decking drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before 'placement, Val Henzel - Plan Review 5- 8- 06.doc Page 2 I JOB NAME: Facility R &D Expansion — Hemcon CITY OF TIGARD client address JOB ADDRESS: 10575 SW Cascade Ave., Ste. 130, Tigard, Oregon 13125 SW HALL BLVD. DATE: May 8, 2006 TIGARD, OR 97223 SHEET 2 OF 1 Project No. 060452 STRUCTURAL PLAN REVIEW # 2 Plans Dated 4121/06 BUILDING PERMIT BUP2006 -10036 11 General Submit one set of miscellaneous reinforcing steel shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. JOB NAME: Facility R &D Expansion — Hemcon CITY OF TIGARD JOB ADDRESS: 10575 SW Cascade Ave., Ste. 130, Tigard, Oregon 13125 SW HALL BLVD. DATE: April 18, 2006 (� ' TIGARD, OR 97223 SHEET 1 OF 1 ,� 11 y ., l .4 Project No. 060452 STRUCTURAL PLAN REVIEW # 1 9002 �' 644 Plans Dated 3/27/06 BUILDING PERMIT BUP2006 -10036 CON 13938 Corr. Item Page No. Comments Code Section Made No. 1 Calculations CM 7,9 & 10 Submit calculations for anchor bolts 106.1.1 BF 3,4,5,6 &7 considering equation D -18 for headed bolts, equation D -24 for break -out strength for a Drawing 1/S4 -1 single anchor and interaction equation D -29 Detail 1/S4 -1 considering breakout capacity in lieu of the pryout capacity as used in the calculations. 2 Drawing 1/S2.3 Submit calculations for steel decking with 106.1.1 11' -7" end span. 3 Drawing S2.4 Submit calculation for method used to get 106.1.1 Details 2/S4.1 and 2/S6.3 lateral load into braced frames. 4 Details A, B & G / S5.3 Submit details with reinforcing steel noted. 106.1.1 5 Detail 2/S6.2 Studs noted on both sheets but not on plans 106.1.1 Legend Sheet S2.4 or in calculations. Clarify. 6 Detail 2/S6.3 beam to Submit calculations for HSS column wall with 106.1.1 column load from plate on face of steel. 7 Detail 1/S6.4 Submit details for anchor location, anchor 106.1.1 size, plate dimensions and anchor pull -out value at W8X28. 8 Special Inspection Submit specific times under "Periodic" for Table 1704.3 special inspection. 9 Special Inspection Special inspection per Section 1704 is 1704 required per special inspection on Sheet S0.1. 10 General Submit one set of miscellaneous steel shop drawings, which have been reviewed and initialed by the project engineer, to be filed • with the City of Tigard before placement. 11 General Submit one set of steel decking shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 12 General Submit one set of reinforcing steel shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. ,JOB NAME: Facility R &D Expansion — Hemcon CITY OF TIGARD JOB ADDRESS: 10575 SW Cascade Ave., Ste. 130, Tigard, Oregon 13125 SW HALL BLVD. DATE: May 25, 2006 TIGARD, OR 97223 SHEET 1 OF 1 Project No. 060452 STRUCTURAL PLAN REVIEW # 3 • Plans Dated 5/22/06 and 5/23/06 BUILDING PERMIT BUP2006 -10036 Corr. Item Page No. Comments Code Section Made No. 1 Calculations, pages 2 and Submit calculations and details for bracing 106.1.1 11 per Code including type of brace, R Factor, Omega Factors, overturning factor of safety, connections, welds and load transfer. Provide engineering for the shear connection at the base of the braced frame. In addition, load factors are not in compliance with Section 1605.3.2 for the brace and footing. 5/25/06 2 Calculations, pages 4 Submit calculations for beams and spans 106.1.1 through 9 shown on plans. 5/25/06 3 Calculations, pages 10 Clarify 52 PSF framing load and 83 PSF D.L. 106.1.1 and 11 for uplift. 5/25/06 4 Calculations, page 10 Submit information on soils for 2500 PSF 106.1.1 bearing. 5/25/06 5 Calculations, page 11 Submit calculations for anchor bolts at 106.1.1 and Detail E braced frames. 5/25/06 6 Detail A Submit calculations and details for the bolted 106.1.1 beam — column connection including eccentricity and bending of column. 5/25/06 7 Detail K Submit calculations and details for the guard 1607.7.1 rail connection. 5/25/06 8 Special Inspection Special inspection per Section 1704 is 1704 required for bolting, welding, anchor bolts, concrete, and steel decking, reinforcing steel and steel fabrication. Submit Special Inspection Program with specific times for Periodic Special Inspection. 9 General Submit one set of miscellaneous steel shop drawings, which have been reviewed and • initialed by the project engineer, to be filed with the City of Tigard before placement. 10 General Submit one set of miscellaneous steel decking drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 11 General Submit one set of miscellaneous reinforcing steel shop drawings, which have been reviewed and initialed by the project .JOB NAME: Facility R&D Expansion — Hemcon CITY OF TIGARD JOB ADDRESS: 10575 SW Cascade Ave., Ste. 130, Tigard, Oregon 13125 SW HALL BLVD. DATE: May 25, 2006 TIGARD, OR 97223 SHEET 2 OF 1 Project No. 060452 STRUCTURAL PLAN REVIEW # 3 Plans Dated 5/22/06 and 5/23/06 BUILDING PERMIT BUP2006 -10036 Corr. Item Page No. Comments Code Section Made No. engineer, to be filed with the City of Tigard before placement.