Loading...
Correspondence Memo TO: Phil Waymire Bergelectric FROM: Steve Lockhart, P.E. .L aod 6003 Principal SUBJECT: Fanno Creek Buildings A 80 Electrical Plan Review Corrections DATE: February 20, 2007 Please forward the following responses to the electrical plan review comments to the City of Tigard along with the attache revised drawings. 1. The receptacles have been accounted for in "miscellaneous" category at the main service level. Any applicable receptacle code factors are applied at the branch panel level and taken at that point. 2. 480 volt bus and main information was added to the panel schedules. 3. Grounding detail and code references were added to the one -line diagram. If you have any questions, please feel free to call. SLIvs 2372 ElecPlanRevuCorrections.doc Attachment 6915 SW MACADAM AVE , SUITE 200 PHONE 503.892.1188 ENGINEERING@MKE - INC.COM PORTLAND, OREGON 97219 FAX 503 892 1190 WWW MKE -INC COM