Loading...
Correspondence E TEV tylAGNIO / &i ue A PROFESSIONAL CORPORATION JULY 2, 1998 CITY OF TIGARD COMMUNITY DEVELOPMENT DEPARTMENT 1312.5 S.W. HALL_BLVD. TIGARD, OR 97223' ATTN: ROBERT 'POSKIN, C.B.O. • SENIOR PLANS. EXAMINER RE: DAKOTA MEADOWS TOWNHOMES PC #6 -94R 25 UNIT DEVELOPMENT • MST 98 0263,02,64,0265 BOB: I HAVE. RECEIVED YOUR. PLAN CORRECTION LETTER AND. REVIEWED #1 • THRU #7, AND HAVE A QUESTION RE ITEM #3 YOU HAVE REQUESTED THAT WE PROVIDE R =2'1 BATT INSULAT -ION WITH, 2x6 STUDS AT 16" ON . CENTER FOR OUR DOUBLE' PARTY WALLS. WE HAVE ' SHOWN ON OUR PLANS R -11 INSULATION WITH 2x4 STUDS 16" ON :CENTER. IT IS MY UNDERSTANDING FROM THE DISCUSSIONS I HAVE HAD DURING . DESIGN AND PLANNING STAGES OF THIS PROJECT WITH YOURSELF AND JIM FUNK THAT THE R -11' INSULATION IN COMBINATION _WITH TWO -SIDED DRYWALL AND 1 1/2" AIR. SPACE (DOUBLE -WALL ASSEMBLY) EXCEEDS R -21 VALUE. ADDITIONALLY, .I HAVE:CONFIRMED THE USE_ OF•DOUBLE 2x4 WALLS WITH R -11 INSULATION.AS A'PARTY_WALLASSEMBLY IN ROWHOUSE . WITH A COLLEAGUE, AND'PLANS EXAMINER WITH THE CITY. OF PORTLAND,.ANN' KIEM (503) 823 -7653. ANN HAS CONSIDERABLE EXPERIENCE WITH ROWHOUSE CONSTRUCTION FOR THE CITY OF PORTLAND AND HAD A HAND IN DEVELOPING . THE ROWHOUSE STANDARDS WHICH THE CITY OF TIGARD HAS ADOPTED. -1- 10570 S.W.. Citation Drive' • Beaverton, Oregon 97008 • (503) 579 -2421 • .1 • HER EXPLANATION AND MY UNDERSTANDING ALLOWING 2x4 PARTY WALLS WITH R -11 BATT INSULATION IS PRIMARILY FOR SOUND CONTROL TO ACHIEVE THE STC RATING OF 50. IT WAS EXPLAINED TO ME THAT THE STATE OF OREGON VIEWS THE PARTY WALLS AS. HEATED, INTERIOR WALLS AND. NEED NO - INSULATION HOWEVER EXTERIOR WALLS SHALL BE PROVIDED WITH R-21 - BATT INSULATION. IT IS OUR REQUEST THAT YOU CONSIDER THE ALTERNATE PARTY WALL ASSEMBLY CONSISTING OF 2x4 STUDS AT 16" ON CENTER WITH R -11 INSULATION - AS MEETING'THE INTENT OF THE CODE AND IN THE SPIRIT OF GOOD QUALITY CONSTRUCTION; . • . R SPELT' ,LY SUBMITTED, - PE R MAG.'•; •'ESIDENT . • ON BE 1" LF ADF PET :A' MAGARO ARCHITECTURE,. INC. • -2- -