Correspondence 7555 a...'. j ck Ce,,,.t.o.. Pr 4 9700 SW Capitol Hwy., Suite 150 "' TM RIPPEY Portland, Oregon 97219 CONSULTING ENGINEERS Phone: (503) 244-0266 Fax: (503) 244-0191 June 30, 1996 • • Summit Properties • Attention: Yoshio Kurosaki 4444 N.W. Ycon Avenue Portland, OR 97210 • • Re: Roof Evaluation - 7555 S.W. Tech Center Drive, Tigard, OR Project Number: 96172 • Dear Kuro: At your request a representative of T.M. Rippey Consulting Engineers performed a limited structural analysis on the roof at the above referenced address. The purpose of our analysis was to determine if an additional roof can be placed over the existing roof. Based on our analysis, we have the following findings: 1. All roof members appear to be adequate for the expected additional loading of the new roof. ?. The typical 8 -3/4' x 9" glu -lam columns appear to be satisfactory with the exception that the columns located on grid line D appear to be approximately 5 %- 10% overstressed. There are approximately four of these columns and in these . areas the normal factors of safety would be slightly reduced. 3. The typical footings appear to be satisfactory with the new load. We did note that there are a number of 4'- 6 "x4_ -6 "x 17" unreinforced footings. Having unreinforced footings for commercial buildings is no longer accepted by the code. • There were some firms designing unreinforced footings of this size at the time this building was constructed. Based on reviewing these footings in accordance with provisions of the Uniform Building Code that were in effect at the time the building was constructed, these footings appear to be satisfactory. • • • Roof Evaluation - 7555 S.W. Tech Center Drive, Tigard, OR June 30, 1996 Page 2 If you have any questions or require any additional information, please do not hesitate to call. Sincerely, ' i ; G89 ` � �P 9 Timothy M. Rippey, P.E. OREGON Principal s 19.`90 c` ` Q TMR/sj I EXPIRES: 12/311'R2 I • • •