Loading...
Permit P t a CITY OF TIGARD !pi BUILDING PERMIT PERMIT #: BUP2008 -00378 COMMUNITY DEVELOPMENT DATE ISSUED: 1/2/2009 TIGARD 13125 SW Hall Blvd., Tigard, OR 97223 503.639.4171 PARCEL: 25101 DD -00101 SITE ADDRESS: 06975 SW SANDBURG ST ZONING: C -P SUBDIVISION: TIME SQUARE LOT: JURISDICTION: TIG PROJECT: VERIZON WIRELESS Project Description: Installation of back -up generator to existing site. REISSUE: FLOOR AREAS EXTERIOR WALL CONSTRUCTION CLASS OF WORK: ALT FIRST: sf N: S: E: W: TYPE OF USE: COM SECOND: sf PROJECT OPENINGS? TYPE OF CONST: 5N sf N: S: E: W: OCCUPANCY GRP: U2 TOTAL AREA: 0 sf ROOF CONST: FIRE RET? OCCUPANCY LOAD: BASEMENT: sf AREA SEP. RATED: STOR: HT: ft GARAGE: sf OCCU SEP. RATED: BSMT ?: MEZZ ?: REQD SETBACKS REQUIRED FLOOR LOAD: psf LEFT: ft RGHT: ft FIR SPKL: Y SMOK DET: DWELLING UNITS: FRNT: ft REAR: ft FIR ALRM : HNDICP ACC: BEDRMS: BATHS: IMP SURFACE: PRO CORR: PARKING: VALUE: $ 27,000.00 Owner: Contractor: WESTON HOLDING CO LLC TECHNOLOGY ASSOCIATES INTL. CORP. 2154 NE BROADWAY 15618 SW 72ND AVE PORTLAND, OR 97232 PORTLAND, OR 97224 Phone: Contact #: PRI 503 - 549 - 0001 FAX 503 - 626 -9239 Reg #: LIC 172067 FEES Description Date Amount REQUIRED ITEMS AND REPORTS [BUPPLN] Pln Rv 11/24/200E $154.78 [BUILD] Permit Fee 1/2/2009 $238.13 [TAX] 12% State Surch 1/2/2009 $28.58 Total $421.49 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more than 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952 - 001 -0010 through OAR 952 - 001 -0100. You may obtain a copy of these r - • ect questions to OUNC by calling 503.246.6699 or 1.800.332.2344. Issued : : ` i /. /VK l-j Permittee Signatur >. • Call 503.639.4175 by 7:00 a.m. for an inspection that ,� mess day. This permit card shall be kept in a conspicuous place on the job si until completion of the project. Approved plans are required on the job site at the ti e of each inspection. r , ' Building Permit Application Commercial E� FOR OFFICE USE ONLY �E�1 Received �j� City of Tigard ^ "��� Date /13 • • , ( Permit No.: u / /`: — %A 13125 SW Hall Blvd., Tigard, OR 97223 q Plan Revie C Phone: 503.639.4171 Fax: 503.598.1960 NOV 2 4 2008 Date/B :I�L� ` ll Other Permit: TI C. A R D Inspection Line: 503.639.4175 Date Ready t, : / p HI See Page 2 for Internet: www.tigard- or.gov r ® �Tt!!�� Notifted/Method:�'Z /�/I (d Supplemental Information 1 11V ay r TYPE OF REQUIRED DATA: 1- AND 2- FAMILY DWELLING New cons ction ❑ Demolition Permit fees* are based on the value of the work performed. Indicate the value (rounded to the nearest dollar) of all ition/alteration/replacement ❑ Other: equipment, materials, labor, overhead, and the profit for the CATEGORY OF CONSTRUCTI N work indicated on this application. El 1- and 2- family dwelling mmercial /industrial Valuation: S El Accessory building El Multi-family Number of bedrooms: ID Master builder El Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address;, .o6/75 3 114 ,1 9. New dwelling area: square feet City /State /ZIP: L iG�✓J Rtr -2Z G1 / < Garage /carport area: square feet Suite/bldg. /apt. no.: Project name: Q�, - r w Covered porch area: square feet Cross street/directions to job site: ..bi / . i J d Deck area: square feet 5e-e- 4- e A Cam,, K 7•t.�,�"'}!C, - d_ Vtv..±tt Other structure area: square feet REQUIRED DATA: COMMERCIAL -USE CHECKLIST Subdivision: Lot no.: Permit fees* are based on the value of the work performed. Tax map /parcel no.: W1.�� Indicate the value (rounded to the nearest dollar) of all equipment, materials, labor, overhead, and the profit for the DESCRIPTION OF WORK work indicated on this application. Valuation: $ ..q- QG Existing building area: square feet New building area: square feet ❑ PROPERTY OWNER I NANT Number of stories: Name: Ve t,6 r1 1.Js 5 Type of construction: Address: v 50v - 1`) 12Zild. Au-P, - Occupancy groups: City /State /ZIP: g r 4-1 4 I c 2 - q 7- j) Existing: Phone: ( ) Fax: ( ) New: wrPLICANTNTACT PERSON NOTICE Business name: "1" � L A-git5oG4 All contractors and subcontractors are required to be Contact name: '�,�, 1i ,u 7 V e y , , , , , t t„_ licensed with the Oregon Construction Contractors Board under ORS 701 and may be required to be licensed in the Address: 1 6(0 5 L.) 72.4 jurisdiction in which work is being performed. If the City/State/ZIP: n q n applicant is exempt from licensing, the following reasons Ci ty �O►' A�, b ,`- L q 2-7» apply: Phone: (GIG) 3 1`t -76-51 Fax: : (6 ‘,2.0-12,Y1 E -mail: 6e 1 - 6 IA., w( -i ti CONTRACTOR Business name: �e41,11 j 7� 5.5 0C44 BUILDING PERMIT FEES• Address: l6 L 18 1,J .,d kitt.s refer ro fee sc e City /State /ZIP: ' , �-t J d op_ } 2 Lt j Structural plan review fee (or deposit): y . ? FLS plan review fee (if applicable): Phone: ( cd3) 6 --cool Fax: ( 661 Q.4) -I 2 ?ti CCB lie.: 1,1- j,�`�- Cc te 6 , d ! � "6 Total fees due upon application: C .76 Amount received: 15 L( • 78' Authorized signatur: ` // _ �� This permit application expires if a permit is not obtained � w within 180 days after it has been accepted as complete. Print name: �Y��t1A4 _e„_ t�a * Fee methodology set by Tri- County Building Industry J / Service Board. I: \Building \Permits \BUP -COM PermitApp.doc 2/23/07 440- 4613T(I I/02 /COM/WEB) ��� ,_.,02:9--g— c 3 -g ,, . ,, RECEIVED i . . COLLOCATION NOV 2 4 2008 Supplemental Questionnaire C • ITY OF TIGARD 7 1 C: A r I) City of Tigard, 13125 SW HallBlvd, Tigard, OR 9722 01..ANPIIP° /ERCINEERING Phone: 503.639.4171 Pax. 503.598.1960 IF YOU ARE APPLYING FOR A PERMIT TO COLLOCATE ANTENNAS, PLEASE COMPLETE THE INFORMATION BELOW. Name of Provider: .e-v' *,. (- 1,-e, , 55 . Property Address /Location of ollocasion: 5+. Zone: C — V j n Collocating antennas on: ❑ Existing tower ❑ Existing non -tower structure l FC Is this a new provider? ❑ Yes ❑ No . Ifyes, list other providers currently collocating on same tower or structure, if any: If no, indicate the previous approval (SDR, MMD or B UP#): e /4_ Height of antenna(s): ft. . Color of antenna(s) and accommodating equipment (i.e. dishes): Color of existing tower or structure: Will new accessory equipment be installed? .2 Yes . ❑ No . Ifyes, please answer the folloudng: 4 4i N- hml, a,.ya b C7,cbt. e„1. 4 i.;_ Location of accessory equipment Within fenced area previously approved Within existing structure M Other location (Please describe below.) 5e . . . ., . , .: A . 1 N. . • , - .( l m. , s c • - Spo --12- . Will andscaping be removed to accommodate the accessory equipment? . a Yes (Please desc below.) ❑ No _ D L ' -47.)1 livw's k b 1, `PNe 4. 1, (8 • 4 , ,; 144. ....G / 47,9 i 7 Applicant's Signature: �� / Date: ) 21 6 4. Name Printed: y l Phone: 56, - 3)q-?-g6irct:,) i f - � uernit.. IP . ❑ Do not issue p rxnit _ Refer to planner. / // 2._ . ccb P • : Staff S • , cure Date 1: \ CUR4LN \Martcrs \CotocattAntairms.doc • Commercial Application Checklist RECEIVED City of Tigard NOV 2 4 2008 13125 SW Hall Blvd., Tigard, OR 97223 D Phone: 503.639.4171, Fax: 503.598.1960 CrY OFTIGAR i c n P. I) Internet address: www.tigard- or.gov I3UILD1NG DIVISION PROJECT INFORMATION Project n a m e : b � " ' C 4 } ;,� Date: 11' 2 I 0g Address: ( q _ SQ vi d b u,r �}, I City11/ State: 0g_ ZIP: 17 Scope of work: j,_,, 11 a ,,, Q --� _ lir Reference no.: Map and tax -lot no.: w aka L 9a Contact person name: E J Company: '"r0.1 Phone: 563 — —65`1 / 3 - 6 061 X4olq Fax: 663 - 6,245_ 111 Cellular phone: 6 3 .956 E -mail: b e - .F',, „` ®4 - 4Lic • wC� NOTES AND INSTRUCTIONS • The purpose of this checklist is to help define a complete submittal package for the scope of work. Plan review will not take place until a complete package is submitted. • This checklist can be used for all commercial construction projects, including new construction, additions, alterations and tenant improvements. • For complex projects, applicants should use the "location" space to note the item's location and page number from the plans or the specification book. • It is not necessary to duplicate submittal information, even if it is asked for in multiple sections. • In the checklist, "Required" means that the applicant must provide this information for plan review. • In the checklist, "P" means — • if checked by the applicant — the information is provided for the plan review. • if checked by the plans reviewer — this information is required for the plan review. • In the checklist, "NA" means that the information does not apply. • Choose only those sections of the checklist that apply to your scope of work. Section 1.0, "General Project Data," must be included with each •roject submitted. PRE - SUBMITTAL PROCESS An applicant may request a pre - submittal meeting with representatives of the jurisdiction in which the project will be built. The meeting may take place during the conceptual, schematic, or in- progress phase, or when the applicant has completed plans. INDEX OF CHECKLIST SECTIONS 1.0 General project data Page 2 7.0 Mechanical data (Types I and II 2.0 Civil data Page 2 kitchen -hood permits) Page 6 3.0 Architectural data Page 3 8.0 Plumbing data Page 7 4.0 Structural data Page 4 9.0 Electrical data Page 8 5.0 Mechanical data (new construction, tenant 10.0 Fire - suppression data Page 9 improvement, gas - piping permits) Page 5 11.0 Fire - detection and fire -alarm data Page 9 6.0 Mechanical data (additional or replacement 12.0 Re -roof installation data Page 10 rooftop- equipment installation permits) Page 6 13.0 Jurisdictional requirements Page 10 This checklist is for building department jurisdictions in Clackamas, Multnomah, and Washington counties. 440 -2734 (8 /01/WEB /COM) I:\ Building \Forms \COM- Checklist.doc 11/20/08 SECTION 1.0 — GENERAL PROJECT DATA Construction documents Location (sheet number or spec section) 1.1 ® Required No. of sets of plans: New: 1 TI: g 1.2 ® Required Cover sheet title block ._ 1 1.3 ® Required Cover sheet vicinity map ✓ , 1.4 ® Required Cover sheet plan index • • ✓ 1 ti Z 1.5 ❑ P []'NA Code summary 1.6 [VP ❑ NA Deferred submittal summary i,I . 1.7 (ZVP ❑ NA Professional stamp and signature ti.- 1.8 ❑ P CIA Fire and life - safety plan 1.9 11.1 ❑ NA Landscape plan _ 1.10 E4 ❑ NA Landscape specifications ✓ 3 Supporting d�ocu� nts Notes 1.20 ❑ P L�e �N Land -use or planning actions 1.21 ❑ P L'NA Required fire -flow calculations 1.22 ❑ P pA Fire- hydrant flow -test report 1.23 ❑ P [NA Fire department or fire district building survey report 1.24 ❑ P lirgA Erg Material safety data sheets (MSDS) SECTION 2.0 — CIVIL DATA Construction documents Location (sheet number or spec section) 2.1 El Required Site plan -/ Co �0, 2.2 ® Required Site utility plan 6 2.3 ® Required Grading plan (.s 2.4 ® Required Erosion - control plan G. 2.5 ❑ P Ill -- A Utility -vault location and details Supporting docu ents • Notes • 2.20 ❑ P [NA Geotechnical /soil engineer report 2.21 ❑ P ^� Storm -water calculations 2.22 ❑ P LAN . Site retaining -wall structural calculations 2.23 ❑ P A "Assurance of Compliance" with environmental rules .... 440 - 2734 (8/01 /WEB /COM) Tri- County Commercial Application Checklist 2 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties . (:\Building \Fortes \COM- Checklist.doc • SECTION 3.0 — ARCHITECTURAL DATA Construction documents Location (sheet number or spec section) 3.1 ® Required Floor plan(s) Ii! Cp XO. 3.2 ® Required Transverse and longitudinal cross sections _3 3.3 ® Required OSSC Chapter 11 accessibility requirements �. 3.4 ❑ P E4 A Interior elevations 3.5 ❑ NA Exterior elevations 3.6 ❑ P E NA Roof plans 3.7 g P ❑ NA Exterior wall sections and details, 3.8 ❑ P pMNA Reflected ceiling plan(s) 3.9 ❑ P Q.- Fire -rated construction details 3.10 Q'P ❑ NA Energy code compliant construction details and specifications 3.11 ❑ P [�N k Door schedule 3.12 ❑ P � Glazing schedule 3.13 ❑ P L- NA Furniture plan Supporting docu eats Notes 3.20 ❑ P EA Energy code compliance forms /calculations 3.21 ❑ P E 1 A Material safety data sheets (MSDS) 3.22 ❑ P Itk1VA Hazardous materials inventory statement (HMIS) 3.23 ❑ P E1 K Hazardous materials management plan (HMMP) 3.24 ❑ P [-NA Written fire and life - safety evacuation plan for area � of rescue assistance 3.25 ❑ P P. ANA Active and passive smoke - control information • • 440 -2734 (8 /01/WEB /COM) Tri- County Commercial Application Checklist 3 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i:\ Building \Forms \COM- Checklist.doc • SECTION 4.0 — STRUCTURAL DATA Construction documents Location (sheet number or spec section) 4.1 ® Required Structural cover sheet _.2,_ 4.2 ❑ P ❑ NA Foundation plan , i 4.3 [rP ❑ NA Under -slab mechanical plan 9 r 1 0, 4.4 ii2/P ❑ NA Under -slab electrical plan 9_10, 4.5 [ErNA Under -slab plumbing plan 4.6 ❑ P [1A Floor framing plan 4.7 ❑ P [41A Roof framing plan 4.8 ❑ P I"NA Structural elevations . 4.9 ❑ P 111'1GA Structural details and cross sections 4.10 ❑ P ©' A Standpipe information 4.11 ❑ P �NA Special inspector /structural observation matrix • Supporting docum is Notes 4.20 ❑ P Geotechnical /soil engineer report 4.21 ❑ P Site - specific seismic hazard report 4.22 ❑ P L� N� Design narrative 4.23 ❑ P LJAA Structural calculations • • • • • • • • 440 -2734 (8 /01 /WEB /COM) Tri- County Commercial Application Checklist 4 For use in building department jurisdictions in Clackamas, Multno►nah, and Washington Counties l: \Building \Forms \ COM -Check l ist.doc SECTION 5.0 — MECHANICAL DATA (New construction, tenant improvement, gas piping permits) Construction documents Location (sheet number or spec section) 5.1 ® Required Floor plan 5.2 ® Required Equipment schedule 5.3 ❑ P ❑ NA Site plan 5.4 ❑ P ❑ NA Under -slab mechanical plan 5.5 ❑ P ❑ NA Roof plan 5.6 ❑ P ❑ NA Fuel gas piping plan 5.7 ❑ P ❑ NA HVAC equipment and duct plan(s) 5.8 ❑ P ❑ NA Roof access details 5.9 ❑ P ❑ NA Duct smoke detector plans 5.10 ❑ P ❑ NA Fire /smoke damper locations 5.11 ❑ P ❑ NA Smoke control plan 5.12 ❑ P ❑ NA Outside air (OSA) table 5.13 ❑ P ❑ NA Refrigeration equipment and piping plan 5.14 ❑ P ❑ NA Kitchen equipment plan 5.15 ❑ P ❑ NA Type I and/or Type II kitchen hood plan (see, Section 7.0 — Mechanical Data) 5.16 ❑ P ❑ NA Fume /vapor hood plan 5.17 ❑ P ❑ NA Process piping/product and/or exhaust - conveying duct plan 5.18 ❑ P ❑ NA Fire -rated construction details 5.19 ❑ P ❑ NA Equipment hanger /fastener details Supporting documents Notes 5.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 5.21 ❑ P ❑ NA Equipment manufacturers' catalog "cut sheets" or specifications 5.22 ❑ P ❑ NA • Outside air (OSA) calculations 5.23 ❑ P ❑ NA- Smoke - control calculations 5.24 ❑ P ❑ NA Combustion air calculations 5.25 ❑ P ❑ NA Fuel gas piping sizing calculations 5.26 ❑ P ❑ NA Make -up air calculations 5.27 ❑ P ❑ NA Energy code compliance forms 5.28 ❑ P ❑ NA Boiler information 440 -2734 (8/01 /WEB /COM) Tri -County Commercial Application Checklist 5 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties is \Building \Fortes \COM- Checklist.doc • • SECTION 6.0 — MECHANICAL DATA (Additional or replacement rooftop installation permits) Construction documents Location (sheet number or spec section) 6.1 ® Required Roof plan 6.2 ❑ P ❑ NA Roof framing plan • 6.3 ❑ P ❑ NA Fuel gas piping plan 6.4 ❑ P ❑ NA Roof access details • Supporting documents Notes 6.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 6.21 ❑ P ❑ NA Equipment manufacturers' catalog "cut sheets" or specifications 6.22 ❑ P ❑ NA Fuel gas piping sizing calculations 6.23 ❑ P ❑ NA Energy code compliance forms SECTION 7.0 — MECHANICAL DATA (Type I and Type II kitchen hood permits) Construction documents • Location (sheet number or spec section) 7.1 ® Required Site plan 7.2 ® Required Floor plan(s) 7.3 ® Required Kitchen equipment plan 7.4 ® Required Kitchen equipment and hood elevations 7.5 ❑ P El NA Roof plan 7.6 ❑ P ❑ NA Cross sections through hoods, ducts and shafts 7.7 ❑ P ❑ NA Fire -rated construction details 7.8 ❑ P ❑ NA Fire suppression details Supporting documents Notes 7.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 7.21 ® Required Make -up air calculations 7.22 ❑ P ❑ NA Equipment manufacturers' catalog "cut sheets" • or specifications 7.23 ❑ P ❑ NA Hood/grease extractor listing documentation 7.24 ❑ P ❑ NA Hood/grease duct sizing calculations 7.25 ❑ P ❑ NA Fire suppression information • • 440 -2734 (8/01 /WEB /COM) Tri- County Commercial Application Checklist 6 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties I: \Bu ilding \Fortis \COM- Checkl ist.doc • SECTION 8.0 — PLUMBING DATA Construction documents Location (sheet number or spec section) 8.1 ® Required Floor plan(s) 8.2 ® Required Piping and material schedule 8.3 ® Required Equipment layout plan 8.4 ® Required Fixture schedule 8.5 ❑ P ❑ NA Site utility plan 8.6 ❑ P ❑ NA Building cross section 8.7 ❑ P ❑ NA Rise diagram 8.8 ❑ P ❑ .NA Roof plan 8.9 ❑ P ❑ NA Back flow prevention location 8.10 ❑ P ❑ NA Irrigation plan 8.11 ❑ P ❑ NA Fire -rated construction details 8.12 ❑ P ❑ NA Under -slab plumbing plan Supporting documents Notes 8.20 ®. Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 8.21 ❑ P ❑ NA Equipment manufacturers' catalog "cut sheets" or specifications 8.22 ❑ P ❑ NA Utility maintenance agreements 8.23 ❑ P ❑ NA Water supply calculations 8.24 ❑ P ❑ NA Sanitary system calculations 8.25 ❑ P ❑ NA Irrigation demand calculations • 8.26 ❑ P ❑ NA Roof drain and storm water calculations • 440 -2734 (8/01 /WEB /COM) Tri- County Commercial Application Checklist 7 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i:\Building\Forms\COM-Checklist.doc • SECTION 9.0 — ELECTRICAL DATA Construction documents Location (sheet number or spec section) 9.1 ® Required No. of sets of plans: 2 9.2 ® Required Floor plan(s) 9.3 ® Required Electrical load calculations 9.4 ® Required One line diagram 9.5 ® Required Feeder riser diagram 9.6 ® Required Available fault current information 9.7 ® Required Panel schedule(s) 9.8 ❑ P ❑ NA Site electrical plan 9.9 ❑ P ❑ NA Fire -rated construction details 9.10 ❑ P ❑ NA Lighting plan 9.11 ❑ P ❑ NA Emergency power system and emergency lighting plan 9.12 ❑ P ❑ NA Under -slab electrical plan Supporting documents Notes 9.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 9.21 ❑ P ❑ NA Energy code compliance forms and calculations for lighting 9.22 ❑ P ❑ NA Emergency power system specifications 9.23 ❑ P ❑ NA Feeder riser information 9.24 ❑ P ❑ NA Lighting equipment manufacturers' catalog "cut sheets" or specifications • 440 - 2734 (8/01 /WEB /COM) Tri- County Commercial Application Checklist 8 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties 1: \Bu i1 d ing \Forms \COM- Checkl i st.doc SECTION 10.0 - FIRE SUPPRESSION DATA Construction documents Location (sheet number or spec section) 10.1 ® Required Floor plan(s) 10.2 ® Required Sprinkler piping plan(s) 10.3 ❑ P ❑ NA Site plan 10.4 ❑ P ❑ NA Standpipe information 10.5 ❑ P ❑ NA Back flow prevention information 10.6 ❑ P ❑ NA Reflected ceiling plan(s) 10.7 ❑ P ❑ NA Transverse and longitudinal cross sections 10.8 ❑ P ❑ NA Fire -rated construction details 10.9 ❑ P ❑ NA Specialty fire suppression system plans and list of systems Supporting documents Notes 10.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 10.21 ® Required Equipment manufacturers' catalog "cut sheets" 10.22 ❑ P ❑ NA Hydraulic calculations 10.23 ❑ P ❑ NA Specialty fire suppression system information SECTION 11.0 - FIRE DETECTION AND ALARM DATA Construction documents Location (sheet number or spec section) 11.1 ZRequired Floor plan(s) 11.2 ❑ P ❑ NA Site plan 11.3 ❑ P ❑ NA Reflected ceiling plan(s) 11.4 ❑ P ❑ NA Transverse and longitudinal cross sections 11.5 ❑ P ❑ NA Wiring schematic 11.6 ❑ P ❑ NA Elevator recall information 11.7 ❑ P ❑ NA Operational matrix 11.8 ❑ P ❑ NA Fire -rated construction details 11.9 ❑ P ❑ NA Standard electrical notes Supporting documents • Notes 11.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 11.21 ® Required Equipment manufacturers' catalog "cut sheets" 11.22 ® Required Installer certification information 11.23 ❑ P ❑ NA Battery calculations 11.24 ❑ P ❑ NA Sample fire alarm log book 11.25 ❑ P ❑ NA Emergency power system specifications . 11.26 ❑ P ❑ NA Monitoring station information • 11.27 ❑ P ❑ NA Voltage drop calculations 440 - 2734 (8/01 /WEB /COM) Tri- County Commercial Application Checklist 9 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties is \Building \Forms \COM- Checkl ist.doc • • SECTION 12.0 — RE -ROOF INSTALLATION DATA Construction documents Location (sheet number or spec section) 12.1 ® Required Site plan or building location map 12.2 ® Required Occupancy classification 12.3 ® Required Type of construction 12.4 ® Required Minimum roof class required 12.5 ® Required Class of roofing to be installed 12.6 ® Required Roof plan 12.7 ❑ P ❑ NA Parapet and scupper cross section(s) Supporting documents Notes 12.20 ® Required Pre -re -roof inspection report 12.21 ® Required Roofing system listing information 12.22 ® Required Roofing manufacturer's catalog "cut sheets" 12.23 ❑ P ❑ NA Structural calculations 12.25 ❑ P ❑ ,NA Structural engineer's report SECTION 13.0 — JURISDICTIONAL – SPECIFIC REQUIREMENTS Construction documents Item Location (sheet number or spec section 13.1 ❑ P ❑ NA ❑ Required 13.2 ❑ P ❑ NA ❑ Required 13.3 ❑ P ❑ NA ❑ Required 13.4 ❑ P ❑ NA ❑ Required 13.5 ❑ P ❑ NA ❑ Required 13.6 ❑ P ❑ NA ❑ Required 13.7 ❑ P ❑ NA ❑ Required 13.8 ❑ P ❑ NA ❑ Required 13.9 ❑ P ❑ NA ❑ Required 13.10 ❑ P ❑ NA ❑ Required 440 -2734 (8 /0I/WEB /COM) Tri- County Commercial Application Checklist 10 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties I: \B ui I d ing \Forms \COM- Checkl i st.doc Letter of Transmittal Date: Tuesday, December 30, 2008 International Corporation To: From: City of Tigard, OR Technology Associates International Corp. 13125 SW Hall Blvd. Benjamin Freeman, Project Coordinator Tigard, OR 97223 15618 SW 72n Ave. 503 - 639 - 4171 Portland, OR 97224 (503)549- 0001x4019 (503)620-9239 FAX RE: Please accept the attached supplemental items regarding BPU2008 -00378 Enclosed please find 3 copies of the structural report for the generator attachment to the concrete footing, Also enclosed is 3 copies of a drawing showing the footing and it's attachment. If you have any further requirements please do not hesitate to contact me. Kind regards, 4 ECG ee, min 'Freeman DEC 3 0 zoos Project Coordinator, c t ( OF TIG g O T Associates International Corporation 8U1L D1�G° 15618 SW 72n Ave: Portland, OR 97224 (Ofc. 503 -549 -0001 x4019) (Mobile: 503.319.7554) (Fax: 503.620.9239) Email: bfreeman taic.net Website: www.taic.net r From: 06/15/2009 12:13 #755 P.001/001 Letter of Transmitta Date: Q Monday, June 15, 2009 To: \'(`� t A �j \rom: City of Tigard \ � \\ , �+ N Technology Associates International Corp. Attn: Mark VanDomelen Benjamin Freeman, Project Coordinator 13125 SW Hall Blvd 15618 SW 72 Ave. Tigard, OR 97223 Portland, OR 97224 503- 639 -4171 (503)549- 0001 x4019 - FAX: 503 - 598 -1960 (503)620 -9239 FAX Re: POR Tualati 97� 5-SW Sandburg St., Tigard, OR> Please accept extend the two following building /mechanical • - mits. (BUP20 88 -00378 d MEC2008- 00578). I'm sorry to have to ask for an extension for this permit but ,`e leasin po h as dr gged ou a l l onger than we'd care for it to. I hope that the extra 180 days sh , 1 d do it. I know the pr 'ect actually went out to bid even before we had the permit but they can't even t ' uch • - site until easing portion is fully agreed to. But if it helps it should be any day now. If you have any further requirements please do not hesitate to contact me Kind regards, �3e amin rreeman (A\LP • Project Coordinator, Technology Associates International Corporation 15618 SW 72 Ave. Portland, OR 97224 (Ofc. 503-549-0001x4019) (Mobile: 503.319.7554) (Fax: 503.620.9239) Email: bfreeman@taic.net Website: www.taic.net 7 71 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMEN Et . 4 Request Permit Action JUL 16 2012 -I- i c_i ;\ I: r) 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard -or. Ann TO: CITY OF TIGARD BUILDING DIVISION Building Division Services Supervisor 13125 SW Hall Blvd., Tigard, OR 97223 EXP I E D Phone: 503.718.2430 Fax: 503.598.1960 www.tigard- or.gov 9AP /Z � FROM: El Owner El Applicant El Contractor City Staff � ,( � `f � J (check one) REFUND OR Name: (v INVOICE TO: (Business or Individual) / Mailing Address: r City/State /Zip: Phone No.: PLEASE TAKE ACTION FOR THE ITEM(S) CHECKED ( ✓): CANCEL /VOID PERMIT APPLICATION. ❑ REFUND PERMIT FEES (attach copy of original receipt and provide explanation below). ❑ INVOICE FOR FEES DUE (attach case fee schedule and provide explanation below). ❑ REMOVE /REPLACE CONTRACTOR ON PERMIT (do not cancel permit). Permit #: '13L& — CEO 57 g Site Address or Parcel #: LA, 5 Q tJ� P-40 Project Name: 1,1L24 7.,0 L)1 LE C-165 Subdivision Name: Lot #: .-------- EXPLANATION: &p, a P Q.N ► T' — it::. /4c7/ iJ, TY r - Pwl I -r ex ri A15/o &) f n Pi Q E,7 54/'b . it)o Watt ex ri .J 5.0,05 ON.) iii 5 C ' - lPgz H. JRNo rt f.. Signature: — 40 _L.., ,. Date: 7 /€ /, Print Name: k fflah K ptI...tg(. Refund Policy 1. The Director or Building Official may authorize the refund of: a) any fee which was erroneously paid or collected. b) not morc than 80% of the land use application fee when an application is withdrawn or canceled before any review effort has been expended. c) not more than 80% of the land use application fee for issued permits. d) not morc than 80% of the building plan review fee when an application is canceled before any plan review effort has been expended. c) not more than 80% of the building permit fcc for issued permits prior to any inspection requests. 2. Refunds will be returned to the original Payer in the same method in which payment was received. Please allow 2 -4 weeks for processing refunds. FOR OFFICE USE ONLY Rte to S s Admin: Date ANT' G CII Rte to Bid: Admin: Date Amps B g Refund Processed: Date At/ 4" By Invoice Processed: Date By Permit Cad: a Date 7 /f B ,, Parcel Tat Added: Date B Receipt # Date Method Amount $ I: \ Building \Forms \RegPcrmitAction.doc Rev 05/25/2012