Loading...
Correspondence February 13, 2004 Craig C. LaVielle LaVIELLE GEOTECHNICAL, P.0 2313 NE Alameda Portland, OR 97212 Re: SIT2004 -00004 Dear Mr. LaVielle, The above site work permit application has been recently submitted for the construction of a rockery wall in the City of Tigard. As the engineer of record for this project, please include the following items in your final structural observation report for the retaining wall project located at 13991 SW Ridgefield In. in Tigard Oregon. 1). Soil compaction for the placement of the base course of retaining wall boulders. 2). Placement of drain lines at the . base of the wall. 3). Granular fill placement and compaction behind the wall. 3). Final acceptance of wall construction including any required slope set-backs. Sincerely, • Mark VanDomelen Plans Examiner cc: Mr. Paul Carney ;Paul R. Carney, Inc. r: