Loading...
Permit v CITY OF TIGARD BUILDING PERMIT s • - COMMUNITY DEVELOPMENT " / Permit #: BUP2012 -00047 T I G A R D 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 03/30/2012 Parcel: 251136000600 Jurisdiction: Tigard Site address: 16580 SW 85TH AVE Project: Clean Water Services Subdivision: ROSEWOOD ACRE TRACTS Lot: D Project Description: Sturvite recovery reactor - Install new reactor, remove roof section and replace with removable section. install framework for reactor support and new jib. 404 1 3 a -w 1 JQQ , Contractor: STETTLER SUPPLY CO INC Owner: CLEAN WATER SERVICES 1810 LANA AVE NE 16060 SW 85TH AVE SALEM, OR 97303 -3198 TIGARD, OR 97224 PHONE: 503 - 585 -5550 PHONE: 503 -547 -8177 FAX: 503 - 581 -6799 FEES Specitrtcs: Description Date Amount Type of Use: COM Permit Fee - Additions, Alterations, 03/13/2012 $1,709.95 Class of Work: ALT Demolition Dwelling Units: 0 Plan Review 03/13/2012 $1,111.47 Stories: 0 Height: 0 ft Plan Review - Fire Life Safety 03/13/2012 $683.98 Bedrooms: 0 Bathrooms: 0 12% State Surcharge - Building 03/30/2012 $205.19 Value: $200,000 Info Process /Archiving - Sm $0.50 (up to 03/30/2012 $126.50 11x17) Metro Const. Excise Tax - Commercial 03/30/2012 $240.00 Use Floor Areas: Building Permit - COM 04/26/2012 $60.40 Total Area: 0 12% State Surcharge - Building 04 /26/2012 $7.25 Accessory Struct: 0 Plan Review - Building 04 /26/2012 $39.26 Basement: 0 FLS Plan Review 04/26/2012 $24.16 Carport: 0 Info Process /Archiving - Sm $0.50 (up to 04/26/2012 $11.00 Covered Porch: 0 11x17) Metro Const Excise Tax - COM Use 04/26/2012 $12.00 Deck: 0 Garage: 0 Mezzanine: 0 Total $4,231.16 Required: Required Items and Reports (Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 160 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0011 - . • R 952- 001 -0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.3.2344. Issued = Permittee Signature: GQ/fl r/R Call 503.839.4175 by 7:00 a.m. for the next available Inspection e. This permit card shall be kept in a conspicuous place on the Job site until completion of the project. Approved plans are required on the job site at the time of each Inspection. This form is recognized by most Building Departments in the Tri- County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard _ • Buildin g Division TIGARD TRANSMITTAL LETTER TO: 0/ Of � // Qt ve DATE RECEIVED: DEPT: BUILDING DIVISION RECEIVED FROM: ---10 L -2 :( 07Lc APR 13 2012 COMPANY: e (A ) s CITY OF TIGARD _ BUILDING DIVISION . PHONE: D3 5 4/7 - 0 X 77 B 5 RE: " ,! .• 5w 8s fret, Ea , A. JO° V7 ( t e Ad, ress (Permit Number) = I -ita es-/ P roject name or su division n e and lot number)/ ATTACHED ARE THE FOLLOWING ITEMS: Copies:4 Description: DiA Copies: Description: Additional set(s) of plans. Revisions: Cross section(s) and details. Wall bracing and/or lateral analysis. Floor /roof framing. Basement and retaining walls. Beam calculations. //� >( Engineer's calculations. Other (explain): �- {r a A/q eX -rz€ P Lr✓t� REMARKS: e 664/C klvt FOR FFIE USE ONLY R uted to Pe . chnician: Date: `t/ t`7 t Initials: Fe- Due: 0 es ❑ No Fee Description: Amount Due: AtlYnocOP.c___Vitt_oi $ 15 $ $ $ Special nstructions: _ e rint Permit (per PE): es I ❑ No ❑Done Applicant S rolif ed. Date: rf /!3- 4 14, Initials: a 1:\Building\ Forms\ TransmittalLetter - Revisions.doc 02/08/2011 • CITY OF TIGARD BUILDING PERMIT ' COMMUNITY DEVELOPMENT Permit #: BUP2012 -00047 TIGARD 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 03/30/2012 • Parcel: 2S 1138000600 Jurisdiction: Tigard Site address: 16580 SW 85TH AVE Project: Clean Water Services Subdivision: ROSEWOOD ACRE TRACTS Lot: D Project Description: Sturvite recovery reactor - Install new reactor, remove roof section and replace with removable section, install framework for reactor support. Contractor: STETTLER SUPPLY CO INC Owner: CLEAN WATER SERVICES 1810 LANA AVE NE 16060 SW 85TH AVE SALEM, OR 97303 -3198 TIGARD, OR 97224 PHONE: 503 - 585 -5550 PHONE: 503 - 547 -8177 FAX: 503 - 581 -6799 FEES . Specifics: Description Date Amount Type of Use: COM Permit Fee - Additions, Alterations, 03/13/2012 $1,709.95 Class of Work: ALT Demolition Dwelling Units: 0 Plan Review 03/13/2012 $1,111.47 Stories: 0 Height: 0 ft Plan Review - Fire Life Safety 03/13/2012 $683.98 Bedrooms: 0 Bathrooms: 0 12% State Surcharge - Building 03/30/2012 $205.19 Value: $200,000 Info Process /Archiving - Sm $0.50 (up to 03/30/2012 $126.50 11x17) Metro Const. Excise Tax - Commercial 03/30/2012 $240.00 Floor Areas: Use Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 • Deck: 0 Garage: 0 Mezzanine: 0 • Total $4,077.09 Required: Required Items and Reports (Conditions) Fire Sprinkler: Parapet: • Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code. State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire ,if work is not started within 180 days of issuance, or- if work is suspended for more the 180 days. A . 1 • Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952 -00 0010 through • • R : 2 -00 14 • 0. You may obtain a copy of the rules or direct questions to OUNC by calling 503.2 v 1987 or 1.800.332.2344. Issu =d By: /t !� Permittee Signature: , 4 , Call 503.639.4175 by 7:00 a.m. for the next available inspection date. This permit card shall be kept In -a conspicuous place on the job site until completion of the project. Approved plans are required on the Job site at the time of each inspection. • — Building Permit Application Commercial RECEIVED FOR OFFICE USE ONLY ec eived City of Tigard R Date/B / Permit No.: U PI ° 13125 SW Hall Blvd., Tigard,OR 97223 Plan Revie /� l• / � /a + 0 Phone: 503.718.2439 Fax: 503.598.1960 MAR 13 2012 `� � ' therPermit: Date/B T I G A R D Inspection Line: 503.639.4175 Date Rea y :y / hills. El See Page 2 for Internet: www.tigard or.gov CITY OF TIGARD Notified/Method:..5/ //» /y li g"' Supplemental Information VALDDINGDIVISION £Pofu)/ 7 /A y TYPE OF WORK REQUIRED DATA: 1- AND 2- FAMILY DWELLING ❑ New construction ❑ Demolition Permit fees* are based on the value of the work performed. Indicate the value (romded to the nearest dollar) of all Addition/alteration/replacement ❑ Other: equipment, materials, labor, overhead, and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1- and 2- family dwelling ❑ Commercial/industrial Valuation: $ ❑ Accessory building ❑ Multi - family Number of bedrooms: ❑ Master builder ❑ Other: Number of bathrooms: 1 , (1)51'6 � JOBB SITE INFORMATION AND LOCATION Total number of floors: /4.4 Job site address: , h y s g 1 F.-:- New dwelling area: square feet City/State /ZIP: 77 QAq/ )J / / 7 247 Garage /carport area: square feet Suite/bldg./apt. no.: Project name: porch area square feet s g• / aP Project © PGA L z04a /'/0��,� Covered P 4 Cross street/directions to job site: 5011 e / i ! / S ¢, Deck area: square feet P .S r• / ,� f y/ /, �,;e ( 7 V 7 4o g -f` Other structure area: square feet R rI AI I TCP rlipw7_I Subdivision: , Lot no.: ermit fees* are based on the value of the work performed. Tax map /parcel no.: Indicate the value (romded to the nearest dollar) of all 1 equipment, materials, labor, overhead, and the profit for the I DESCRIPTION OF WORK indicate /A/51 Ale ! ,S-tu. i, �7-- /GPGOLe g?A� / OK 1e/jl4OUe Valuation: $ 7..D0) OOO.. QU • 6/ =C: e L._: / AL _ AI l_ ,u,.„6....3_ Ate, L ._, Existing building area 4 s - 6 9 , square feet ar New building area: square feet ❑ PROPERTY OWNER ❑ TENANT Number of stories: k�/ /ase,ot Name: C D (, J 4 p - 5 Le ic4:73 Type of construction: 4,,,,„ Address: 6 ( 6 0 -5V g /4 v ('t -. -- TE c�Atz - .x ! 0 Lmv < Occupancy groups: City/State /ZIP: 1 , al 0 4 9 7 2 Z 14---- Existing: u 4-k -7- H� �x mess Phone: (S 4 7- 2 77 Fax:( ) New: Su /Po/c7 S traaa F.,,se s5 ❑APPLICANT ❑CONTACT PERSON UILDING PERMIT FEES* , / ��" "7 � Business name: _ 4 14� 1 � t J loll' (Please refer lo fee deposit): /v J � Structural plan review fee (or deposit): ��J Contact name: �U ~L ,jQ� ens A' , ec, /6 06 O s w gS .0'� � , FLS plan review fee (if applicable): Address: Ci /State /ZIP: Total fees due upon application: ty `' G ?� �, OK Amount received: f✓:' /, 0 • 7 9 Phone: ( S 0 3 ) 54 _c? l 7 7 I Fax:: ( ) t_—/ E -mail: gO n c-4 e4 5 42 C In h N/4 t rr-S r f V , , r f S. 0 6 c PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* CONTRACTOR �.S Commercial and residential prescriptive installation of roof -top mounted Photo Voltaic Solar Panel System. Business name: S - / - e L evL S u Submit two (2) sets of roof plan with connection details [[�� and fire department access, along with the 2010 Oregon Address: / g / d 64 �, Ati c A /hr Solar Installation Specialty Code checklist. City /State /ZIP: 3 A"Le /.,1 Oft ! 73 p / Permit fee (includes plan review $180.00 CI' and administrative fees): Phone: c5') S gs SS p Fax: (5 r O3) $ - &In _/ State surcharge (12% of permit fee): $21.60 CCB lic.: 3 3 z 2 0_ Total fee due upon application: $201.60 Authorized signatu • This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print Warn 4,4C1174.-- Date: ! { �Q 3 /�D * Fee methodology set by Tri -County Building Industry �t� Service Board. I: \Building\Permits\BUP -COM PermitApp.doc 02/24/2011 440- 4613T(11/02 /COM/WEB) . 114 Building Division • Plan Submittal Requirements T I GARD Commercial & Multi -Family - New, Additions or Alterations • 1. SITE PLAN (fully dimensional, drawn to scale) labeled with: I A. map & tax lot # ' project name ® --site address ❑ suite number j - zoning applicant name J"+ phone number yl( North arrow. C. Scale (architectural or engineering only). D. Street names. . E. Setbacks. ,t/ F. Parking, including disabled access: // /Ff N � s � FL� z �-K, 5-7-"14) G. Finished floor elevations. AO — 56.-_ C - PL' FO''` f.- 2. EROSION CONTROL PLANS AND DETAILS. /VA . 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape -ons accepted). All details listed below shall be incorporated into the plans: . A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. _ I. Structural calculations, plans, details and specifications. J. Accessibility barrier removal worksheet. K. Deposit - based on valuation of project. 4. EXTRA SET OF THE FOLLOWING: A. Two (2) copies of site plan to include vicinity map. B. One (1) copy of erosion control plan with details. /J / C. Fire Department Building Survey, and full set of architecture drawings. /0 I: \Building \Permits \BUP -COM PermitApp.doc 03/03/2011 • . . 11, _ ° Building Division Accessibility: Barrier Removal Improvement Plan TIGARD • REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation, alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, • telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. . (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per -cent (25 %). VALUATION: Total of all renovation, alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER (25% barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEME ► • In choosing which accessible elements to provide under this section, priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the l I �.� following order: (a) Parking i5 1/ (� jC / n/ STc !7 ) $ V (b) An accessible entrance: 6:-A/ STin/c) $ (c) An accessible route ,to the altered area:Cxr ST';.1/6> $ • (d) At least one accessible restroom for each sex or a single unisex restroom: 577/V67) $ (e) Accessible telephones: 4.. r ST /N ) $ • .(f) Accessible drinking fountains: and, ( ( ' S 77 -7) $ • (g) When possible, additional accessible elements such as storage and alarms: 6:4 r S r # ) $ • TOTAL (shall equal line [2] of Valuation Computation): $ • • I: \Building \Permits \BUP -COM PermitApp.doc 03/03/2011 :. • I N . Building Division Plan Submittal Requirement Matrix T I G A R D Commercial & Multi-Family - New, Additions or Alterations . Type of Submittal . # of Plans (Includes new, additions and alterations.) Required at . Submittal Demolition Permit (site plan required showing location and square footage of all buildings to be demolished) • Site Work 3 (must include location of all accessible parking) / • • Plumbing (site utilities) 2 Building • Fire Protection System 3 AiA Mechanical 0 Plumbing (building fixtures) 2 • Ni Electrical 2 TB • Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard, Washington County, and Tualatin Valley Fire & Rescue), if applicable. I. \ Building \ Permits \BUP -COM PermitApp.doc 03/03/2011