Loading...
Correspondence ,. cket 0' 7 / la g LI% W ASHINGTON CO O De partment of Land Use a nd Transp Land Development Services VW 155 North First Avenue, Suite 350 -13, Hillsboro, Oregon 97124 (503) 846 -8761 FAX: (503) 846 -2908 March 21, 2005 Meng- Hannan Construction Co. ID IVJ E fl lE John Failor 5906 SE 122 Avenue 1 1 MAR 3 2 2005 I Li) Portland, OR 97236 _ CITY OF TIGARD Re: SPACE AGE FUEL - Project No. 02918 Bond No. 212 37 48 FISCHER RD ©SW PACIFIC'- King City . A field inspection of the public improvements for the above noted development was made on March 4, 2005 and deficiencies that must be corrected. Our records indicate your Maintenance Agreement and Assurance is dated April 29, 2004 and states that you agree to correct any defects for a period of one year. Please be advised that the following item constitutes a defect of your street project that you are required correct prior to release of your Maintenance Agreement and Assurance. Prior to release of the Maintenance Agreement and Assurance, the following must be completed: 1. Complete deficiencies as described on the attached punch list. Questions contact Philip Trecker at 503- 793 -1994. 2. Inform this office upon completion and request inspection of corrected deficiencies. 3. Submit a check to Washington County for the administration costs in excess of the original Administration Deposit. The current administrative balance is $85.00. The Administration Deposit is used by Washington County to cover the costs of processing this project (plan approval, field inspections, and contract administration). The County's costs have exceeded the deposit. As mentioned in the letter to you, dated May 5, 2003, if the County's costs are higher than the amount deposited, prior to acceptance of the project, Washington County will bill the applicant for the amount needed to cover its costs. Please call Lenor Solberg, Engineering Division at (503) 846 -7958 if you have questions regarding the Administration Deposit balance. The Assurances Staff can be reached at (503) 846 -3843. • oy L. Chan • � ` ssociate' Attachment: Punchlist c: Insurance Company of the West, 6950 SW Hampton S #302; Tigard, OR 97223 — Bond No. 212 37 48 DL Design, Inc., 9045 SW Barbur Blvd. Ste. 101, Portland, OR97219 City of King City, Engineering/Inspection, 15300 SW 116th Avenue, King City, OR 97224 City of Tigard, Attn: Susan R., Engineering/Inspection, 13125 SW Hall, Tigard, OR 97223 City of Tigard, Attn: Al Shields, Engineering/Inspection, 13125 SW Hall, Tigard, OR 97223 Lenor Solberg, Engineering, MS 17 -A • 02918rrtndt2/0 • k } PUNCH LIST SUBDIVISION /DEVELOPMENT: SPACE AGE FUEL #02 -918 INSPECTION DATE: 3/4/05 The following items are deficient and need correction in order to complete this project to County Standards: 1. Repair settled pavement in West bound travel lane on Fischer 2. Repair heaved sidewalk to the east of eastern driveway. If you have any questions regarding the road deficiencies, please call Philip Trecker 503 - 793 -1994. If you have questions regarding the striping or signing deficiencies, please call Dave Brown at 503 - 846 -7951. • • j- yea2,°0a — azf),_ 1 7 R ECEIVED 4111% WASHINGTON COUNTY, OREGON NOV 1 5 100 Department of Land Use and Transportation, Land Development Services 4 155 North First Avenue, Suite 350 -13, Hillsboro, Oregon 97124 OF (503) 846 -8761 • FAX: (503) 846 -2908 CITY T /GqA �ICDING p IVISI 0 ON November 9, 2004 Meng- Hannan Construction Co. John Failor 5906 SE 122 Avenue Portland, OR 97236 Re: SPACE AGE FUEL - Project No. 02918 Bond No. 212 37 48 FISCHER RD @ SW PACIFIC - King City A field inspection of the public improvements for the above noted development was made on November 3, 2004 and found safety deficiencies that must be corrected immediately. Our records indicate your Maintenance Agreement and Assurance is dated April 29, 2004 and states that you agree to correct any defects for a period of one year. Please be advised that the following item constitutes a defect of your street project that you are required correct prior to release of your Maintenance Agreement and Assurance. Prior to release of the Maintenance Agreement and Assurance, the following must be completed: 1. Complete deficiencies as described on the attached punch list. Questions contact Philip Trecker at 503- 793 -1994. 2. Inform this office upon completion and request inspection of corrected deficiencies. 3. Submit a check in the amount of $300.00 to Washington County for the administration costs in excess of the original Administration Deposit. The current administrative balance is a deficit of $107.24. The Administration Deposit is used by Washington County to cover the costs of processing this project (plan approval, field inspections, and contract administration). The County's costs have exceeded the deposit. As mentioned in the letter to you, dated May 5, 2003, if the County's costs are higher than the amount deposited, prior to acceptance of the project, Washington County will bill the applicant for the amount needed to cover its costs. Please call Lenor Solberg, Engineering Division at (503) 846 -7958 if you have questions regarding the Administration Deposit balance. The Assurances Staff can be reached at (503) 846 -3843. VIM/LW Joy L. C • iat -jail?1110 Attachment: Punchlist c: Insurance Company of the West, 6950 SW Hampton S #302, Tigard, OR 97223 — Bond No. 212 37 48 DL Design, Inc., 9045 SW Barbur Blvd., Ste. 101, Portland, OR97219 City of King City, Engineering/Inspection, 15300 SW 116th Avenue, King City, OR 97224 City of Tigard, Attn: Susan R., Engineering/Inspection, 13125 SW Hall, Tigard, OR 97223 City of Tigard, Attn: Al Shields, Engineering/Inspection, 13125 SW Hall, Tigard, OR 97223 Lenor Solberg, Engineering, MS 17 -A 02918mdl V 0 PUNCH LIST SUBDIVISION /DEVELOPMENT: SPACE AGE FUEL #02 -918 INSPECTION DATE: 11/3/04 The following items are deficient and need correction in order to complete this project to County Standards: 1. Repair settled pavement at east side of east driveway on Fisher Road. This is a safety problem— correct immediately. If you have any questions regarding the road deficiencies, please call Philip Trecker 503 -793 -1994. If you have questions regarding the striping or signing deficiencies, please call Dave Brown at 503 - 846 -7951. • 05/13/2004 08:56 FAX 5035981960 CITY OF TIGARD Z001 $ *$ *$$$$$$$$$$$$$$$$$ ta c 2 _ 0602 / 7 $$$ TX REPORT $$$ TRANSMISSION OK TX /R% NO 0923 CONNECTION TEL 15417532264 SUBADDRESS CONNECTION ID ST. TIME 05/13 08:53 USAGE T 02'43 PGS. SENT 7 RESULT OK ���i�p,dl I 4111k) F ;\ SETTING THE STANDARD FOR SERVICE EXCELLENCE �''Nli����;� 1 = --� Facsimile To: Debra Martisak Company: Clair Company Phone: Fax: 541- 753 -2264 From: Sue Ross, Permits Coordinator Company: City of Tigard Phone: (503) 718 -2453 Fax: (503) 684 -7297 Date: 05 -13 -04 Pages including this page: 7 COMMENTS: _ Hi Debra: As much as I review the Space Age Fuel project and TIF questions, I still am stuck on the fact that the number one criteria for credit (see attached) is that the improvement takes place on a designated arterial or collector facility in the county's base report (attached). Pacific Highway is not a designated street for credits but a state highway. I cannot say one way or another if they are eligible for credit as there may be other factors, but I would have a problem saying yes. Unless the county says otherwise, I would go ahead and have Jane proceed with either the Bancroft payment approval or full payment of the TIF fees for certificate of occupancy. JUN -30 -04 16:04 FROM- T -044 P.01 /05 F -186 Posit -ir Fax Note yy 7671 Pa 00/9114 Os') ` � f �t r -. _ _ — __ = To Tt�'�p ' r MS From Kr ''Ti fJf e w a E - - coiDepr. T � & -p co. Pnone a Pnone a Fax a 6 pet — 36 g Fax* Murray Snll h &Assudales,Inc. Engineeis/lianners 121 s.w Salmon, Suite 900 a Yordand, Oregon 972 ' P1104 503.225.9010 • FAX 503125.9022 92- 0251. * ** June 29, 2004 Mr. Jim Pliska Space Age Fuel P.O. Box 607 Gresham, OR 97303 Re: Space Age Fuel, Traffic Impact Fee (TIF) and Fee Credit Determination Dear Jim: This letter serves to present the determination of Traffic Impact Fee (TIF) Credit, and thus the total fee amount, associated with the site development at 16825 SW Pacific Highway. Certain work appears to be eligible for credit as per the attached Washington County letter, dated March 17, 2004. We have coordinated with the contractor, Meng-Hannan Construction, Inc., for street improvements on the project to clarify the costs of the eligible credit portion of the project. The attached revised spreadsheet for quantities and costs, as prepared by the contractor identifies the total cost for that portion of the work that is eligible for TIF credits (see attached Meng - Hannan fax dated June 28, 2004). We agree with the revised spreadsheet and the total credit amount is $53,565.71. It is our understanding that the Traffic Impact Fee for the project has been calculated at $68,096.00, and payment of the fee has been deferred; therefore, a total TIF payment in the amount of $14,530.29 is due to the City of King City. It is also our understanding that payment of the fee is a requirement prior to the City of Tigard issuing the occupancy permit. Following receipt of payment to the City of King City, we will notify the City of Tigard of such so that the occupancy permit may be completed. Please do not hesitate to contact our office if you should have any questions or comments in this regard. Thank you. Sincerely, MURRAY, SMITH & ASSOCIATES, INC. Kyle P. McTeague, P. . Senior Engineer F WIWl6CTS192 O25I 4O4L13TTERS'PIi.k. 629.04 dlIC • 411% WASHINGTON COUNTY, OREGON Department of Land Use and Transportation, Land Development Services 155 North First Avenue, Suite 350 -13, Hillsboro, Oregon 97124 (503) 846 -8761 • FAX: (503) 846 -2908 RELEASE OF PERFORMANCE ASSURANCE START OF THE ONE -YEAR MAINTENANCE PERIOD June 18, 2004 Insurance Company of the West 6950 SW Hampton S #302 Tigard, OR 97223 Re: SPACE AGE FUEL - Project No. 02918 FISCHER RD @ SW PACIFIC - King City Bond No. -212 37 48 for $61,612.00 The agreement and assurance dated October 1, 2003, entered by Meng -Hanna Construction Co., Inc. as developer, and Washington County for the construction of public improvements required for the above - referenced development can now be terminated. The project has been accepted and a one- year Maintenance Agreement and assurance has been executed. The Washington County Department of Land Use and Transportation hereby informs and authorizes you to release all funds held as financial assurance under the Public Improvement Contract 02918. If you have any questions, please contact the Assurances Staff at (503) 846 -3843. S( 141(/ Mark E. Brown Land Development Manager C: Meng- Hannan Construction Co., John Failor, 5906 SE 122 Avenue, Portland, OR 97236 DL Design, Inc., 9045 SW Barbur Blvd., Ste. 101, Portland, OR97219 City of King City, Engineering/Inspection, 15300 SW 116th Avenue, King City, OR 97224 City of Tigard, Attn: Susan R., Engineering/Inspection, 13125 SW Hall, Tigard, OR 97223 City of Tigard, Attn: Al Shields, Engineering/Inspection, 13125 SW Hall, Tigard, OR 97223 02918rta /jc 41 KING CITY 15300 SW 116th Avenue, King City, Oregon 97224 -2693 INNE■mi Phone: (503) 639 -4082 • FAX (503) 639 -3771 :1 —.; •' ° _�, =' - _. May 21, 2004 `' , =`'''. �,::-_ , 1 L), Space Age Fuel ' P.O. Box 607 Gresham, OR 97303 .:.1 4 ' ,`�T i (503) 665-5693 , Attn.: Jim Pliska In response to the fax received from DL Design, Inc regarding TIF creditable fees for the street improvements on Fischer Road and Highway 99W. WA County provided written acknowledgement of eligibility as stated below. Letter Dated: March 17, 2004 Authored by: Gregory Miller, WA County, County Engineer "The construction of the left -turn lane on Fischer Road at Highway 99W meets the requirements in Section 3.17.070 A for credits for a capacity improvements. TIF credits would be provided that would include asphalt and rock used outside the center 28' of the road to widen for the turn lane, and necessary curb, stripping, signing,_ and saw cutting along the length of the turn lane and transition into it. " - In order for the City of King City to determine the TIF creditable fees for the street improvements, all receipts relating to the eligible portion of the work must be submitted to King City for review. Upon receipt, the City Engineer of King City will review the receipts and provide a determination of the TIF fee credit amount. Upon which a voucher will be issued by WA County for such amount. If you have any questions, please do not hesitate to contact me. Sincerely, 2 V _,Ga/X.e/) ane Turner, City Manager City of King City Cc: Gary Lampella, City of Tigard, Building Official Albert Shields, City of Tigard, Building Codes Enforcement Officer Gregory S. Miller, WA County, County Engineer Steven L. Kelley, WA County, County Planner Kyle McTeague, City of King City, Engineer Allan Clair, CLAIR Deborah Martisak, CLAIR 00/00.2va -tea /7 SETTING THE STANDARD FOR SERVICE EXCELLENCE 4906l I Facsimile To: Debra Martisak Company: Clair Company Phone: Fax: 541 - 753 -2264 • From: Sue Ross, Permits Coordinator Company: City of Tigard Phone: (503) 718 -2453 Fax: (503) 684 -7297 Date: 05 -13 -04 Pages including this page: 7 COMMENTS: Hi Debra: As much as I review the Space Age Fuel project and TIF questions, I still am stuck on the fact that the number one criteria for credit (see attached) is that the improvement takes place on a designated arterial or collector facility in the county's base report (attached). Pacific Highway is not a designated street for credits but a state highway. I cannot say one way or another if they are eligible for credit as there may be other factors, but I would have a problem saying yes. Unless the county says otherwise, I would go ahead and have Jane proceed with either the Bancroft payment approval or full payment of the TIF fees for certificate of occupancy. Thanks, Sue City of Tigard, 13125 SW Hall Blvd., Tigard, OR 97223 ** PLEASE DELIVER THIS FAX IMMEDIATELY ** 04l3e/ IIiIi4 ny: na one D/o - -' i oo LA- 1-1,,1 - - p • 2 DESIGN, INC. FAX COVER SHEET 9045 SW Barber Boulevard, Such 101 Portland. Oregon 97219 (503) 225.1679 FAX: (503) 245 -2094 Email: gid(.dlena ,. To The Clair Company From Gary Darling Attention Deborah Marbisak Date April 30, 2004 Fax Number 541- 753 -2264 Regarding FEE SCHEDULE Project SPACE AGE FUELS • DL Job l) SPC002 Number of Pages Including Cover Sheet: 2 Deborah, Attached is the schedule of TIF creditable fees, This schedule is the result of two reviews by Norm Rindal of Washington County. I did not get this to you sooner because he was reviewing this and I was awaiting his response, This schedule reflects his final comments. When I spoke with him on Wednesday, be gave me his comments but also mentioned that it - ltimately was up to the permitting agency to make the determination. Washington County will only be brought in if there is a disagreement Gary Cc; Shin Stohr, Space Age Fuels 503 -665 -1741 174/ 4n /Inns n7: cm 10p • 3 . 0 L DESIGN COST ESTMATE FOR•TWF CREDITABLE IMPROVEMENTS PROJECT: SPACE AGE FUELS - KING CITY. OREGON OWNER Engineer: date: SPACE AGE FUELS DL DESIGN. INC _ 4/28/2004 ITEM _ IESTIMATE14 UNIT SCHEDULE °A STREET /4fPROVF - Al -1 Excavation and Disposal Of Soil In area beyond 14' (rpm oenledine — CV 376 $18.00 $6.786.00 Al -2 Furnish Matortal and install �- 12' 2'-O' Rock SY 706 $11.16 571178.96 A1-3 Furnish Material and Install Y 314" -0" Rock SY 706 $2.76 $1,948.58 A1-4 Furnish Material end Install 2• Class B AC SY 706 $0.14 $6,452 -84 Al -S Furnish Material and Install 1 1/2' Class CAC SY ' 706 $7.76 $5,478.56 A1-6 Furnish Material and Install .......�. Standard Curb LF 474 $17.00 0.058.40 Al -7 Simian Existing AC LF 744 $3.00 $2,232.00 Al-8 Furnish material and install Striping LS 1 $5,797.00 $5,797.00 — Al -9 Relocation of Signal Pole, re Are and loops LS 1 510.010.00 $10,010.00 Al -10 Traffic Control LS _ 1 $1,00.00 $1,100.00 'SCHEDULE A ": STREETIMPROVENENTS 1 TAL. , $48955.92 SCHEDULE '14': ENGINEERING AND SURVEWNGJIS%i) _ 81 -1 Provide r _En9Ineerind and Surveying I LS 1 _ $6,364.27- $6,364.27 SCHEDULE ERING AND suRVEYLNG TOTAL $6,384.27 Schedule A" - Street Improvements Subtotal $48,955.92 Schedule TY - EngIneering and Sulveylftg Subtotal x6,384.27 Total TIF Creditable Coats $65,320.19 SPCOGZ COST ESTIMATETIFrev 1 4/30/2004 , 2S 1 10CA 2S 1 10CA § ASPEN / i - �° ---- -, ' i'd.' awn,.. : - ( •- ti / 1 . .- 7 --. ' ..,•. �' MN. •, aIMN • _ V NC,a fMM nY„10A - l - •,,' - `1 t,,,,� 'y 4.- \ � � ¢a ) . ; .s + � ”?'" Rm: mrmom .�n��&'1�- �'�fl }�n >mrt,manmr 1 - _ a1Ctl ""•n;® .^J.}. ' Yr y " = i16N. I. IMi - ypN • -a 7700 •. .' 1 �,.. •• wvm. s y w - . � �� �' y�f,ar= -Isu'•�". mnao ;, I p�' N, • - 3701 R. 3800 - , is'' a�* '� t ' . . ' , o Q a,5, -7I a, I -'- i I ..•' • � \� ,P � 9 ,.-...74)::-.....,,,' , Nar �j ° 1.5,4:1;.8 �. I - �3. - _�• �1, N. • °., 1 p / _ $ n ef t st` d:r E ‘4°—.44711.1 A, °' / ,.� : ;' , 'Ye„ao , A � .n .- t +w® ,, � ;(5‘5.-i;-..) Sl 9 P --- ° �-_ - �' 8 r .°OrI l 1 4200 L y '3'3' c ;i . 4 .0 2 „e, ra.> ©. ;'.�' +� 8 58 / p ` G °—_` a., T � °\40 ° O / ) it m N - 3e0 \' 1 3 . .�±e �i O 'r °eon,.' ° %.1 11 ' '_ �94�L >a W f . '. a. q. 3900 4 *' „,.• .E m ,\ emi, .am., �a •� ,y 23 -78 ` ; � � _ � , �. ;� ; z� t o j; a�Nj .. �4 ,� • . x` � s 'o /' - / ,9omi ee`zei) , °1 a'oa _ 2 ....\ yY .,,S> ; N t / io s2..a e wm�' 0 f iea .�1 „ j� pp WASHINGTON COUNTY OREGON �' / ” v�oia,,' '�1 t NE1 /4 SW1 /4 SECTION 10 T2S R1 W W.M. / v- tm � ' °, % ° e 6.j v A S '�` ' d ' / scALE,- a tDD 3500 O/ � 4001 \ GG ��o" , , 'am .2 J Box. 1 I r , 2 7 � `r { �_' \.).'67. SEE 25110G '��9Z ' y . .% �� / i •• 4? ^7, \ \a000 J { ° . . _ ". P.}...- " +•+ war wnv NO1 ° , 8/I / �3i�1�2:��9 .94� 35•I 3e 8fy ` r ^ • `1! , ,m`" Y 9 ' ' :m. c . Z , 1T1 n° q r r I - ■ '" 7 i s' I c � ,�c` %; s1o1 a� 9 L °blioeg,- +'I 1 r • x y x ,, ` ', • I ' /+ a � _ c y ' � 2 a k' � y b � oq ��� ` � N 8ia, ''a / I / _ i a 70 7 r X / �f • 3400 Z`IF \ 410p B Cy � - ') - - - 5� \, CJ �5yq ,_4401 OaJ r?�" „,,,,\C,,,. ° - � / '�° 13 1eK Ian 1 4 '73 pi —�� a ' ' . °� • tea” e y, o -° any .'� 0 Z(`' Q / i (X) x CA // r -,.. :: '' ., 1400 Iwo • .. ` `r : ,- .9 - 0 1 / 4 ‘... ,:- ( '�% 1z 13 pry VJ ":(4' _es-) meo,' x � x _ \ A �) �� 200 \ J 4 b•W \4 O 7. p w7a, s O • 2 , �. ..1 J. , Mord . 0 \ *' y� e , ' "5'c \ 'y j •°/: 'Ia\ \I, j -- ' ' °� 14 w»,J U N U . ''' 9 % I N , e C N > 6 'OCT ^""1 I / I' l " 6' '� %�/3� i'� 1 �± BJ ° '-,„ � ,- .1�). \6 0„.2„,.. \t. „ d . 1 ? ace 1 I I i r iI;. y.v 0 \ ry'/ \ 12;00 9 r" ) 25110CA � i � 3 / � , 1 ; ; • & 5 FOR ADDITIONAL YAPS VISIT OUR WEBSITE AT / 3?=' ' 2 \ ,,. n c j �G 4 1 °1 03 1. y -� t waaww NO i ew J / I� I Ny N wr eoanlnpmaol.us \ „� i i i r . • :, V �, BA . A9 �? ,a ° u' p d0 �, 2 3 8 6 \G l "' } ' . w ?'3.- e' A ,� s �, _ � e "1/2.,=-9/0/ am I= g •, 1 �•, ��� ,; • 4J -.,'..4� %j 1 '� `ry � Q g �� 2 5 B2 8 g 2100 / �,// r _,.e"' S,4 1 — 9 % /I �...- ...... - CV / f A J B „),,,./.--- . B 1800 ` e ° g ' •x r i' •'. .'. l ♦ / l w /vim + 2800 g Fes° I60a ` A �r * ' l i ..aa 4c \ 1 ' �..,,. / g '.1 • CB. ca .;.613.•' .'D9 .1.111):g': • 401: ; „::,, ° V' 0° t 0.4-1 0.4-1 , 7• ) I' _ � 1 . : '::j. 0“ �B �/�53� � / 69 ssao 1 102 a� i \, I a Ii - 1 L anc " . - '.\. . • ,} : s, % 1: ,:7i ' •c' OD.+' DC. DD :'. t .: . -• "/ Ada 7 VP °p'• iraK .m sc I r �R`.� - .. . g r (y � N , 3200 0 d ! •z.. .. Q(i 61 d ty -- a ' -... M•.. Ta . 9 F � � i i `� �� Cancelled Taxi= For: 2S110G ` , • 1 ! 5 " 101.1700.3.90D.3301.3a0t SJ013:1D1.000. • tu: r , f 4B J " i m .. o . / . - K _ a " • 2 ± � r ' 6 0. - -- �_�'—^ B l l fin . , :,e• • s ; rei8�ti .¢ a7 � nm. 1 - --!? '� . " "Z a° 9• , •,te - :f .o. �s .i..• : . - �PLTY r 7-.:,.° , /_ :. • 1 :1;_ • � O b it �o V � , •• tvy y 0 / . . .:4 1 - •• d''''''. 4 % • ; p a• "'' ' K 'wI c / c— ssy‘^.:arnei (Y ' } . „ \\ '•'J - _ .1.- . y ' . - . aro -c . ` 9 \ "a` ;ue / • `y"•� / / - / . . '. ;». • .. .c. - , A s �,el B " m 43i �) • ' 9\ ' 3 ,` €� ev F, ::.� CARTOGRAPHY ,.el 44 l � •, - . �r, Rba. - - .' 1° .7en :• -. .t ! ate ■ • hro' \ n -> fc - � * ' g § no f / 1- '�. ,, . , = a. ". ' - • i - ........ . � ® ® 4 I 3 . C "°..�� b •*• - seas - '..'' . R �sy����' g7 � �- 8 . - A -- / 'B SW •� .>.m PLOT DATE: December 23, 2003 • q ��� r �P m n '� a ' 4,14w 'a^— F ASSESSMENT PURPOSES • <'' '•l if d \ -jam / •7 .. _ 'y�'. ' •/ 1 21 ".af∎ r Vro • •', '.: " _ aTM / _ £• '.: " ' : ' ' T'• w ONLY - DO NOT RELY ON • ' . I ' •. ,00 + m. a, (/ ,.a�. ° p � :a•_ ° tea,' ? fi e" i FOR OTHER USE % ' 1 A 0 e 1 rV / /� y(A Br .' /+m ersel tl....eeM mnv oar .,asq>eam.r...., . Y l -26 �„ — � . g ..44.=,.., = T -' . nm '', '1Y • a Mlo'ntl.,sreN 0010 • V.PM nrthbmeYm. Nmep { . 4 �•• - .. _ j / - . �'4 `4,,,;.3,-, 2 - , bre,a aa V ' z �s9•� e 11 ern • - 4 e � `s • a. . - - y . >ai r ' � ( n , .� : i \.. -� P\ ® - �. � : • , ��` . fv. '.. ,. ' . • 6\ 4� 16 ... , .�.. a;'' lF aa ._ h'... r - .•.�, i / 1, .. .. .. .�'.`. KING CITY 2S 1 10CA 2S 1 10CA 019231110 , 1 1008 2S 1 1008 _ — 9 a e r>s,/ .! aso C '• a 2S ,ao/a 9"B am,.msmarmn o>. _ _ — / - .. I + �(�" L : Y�ow ' iiv :4/n.- n•,:m: :rn�rr. - - II ':g .I • �II .' � � -! ',� .,-� :, _ ,-" ;,. _ " , p+..-- u.+w,....( •..: „ +.- •- s....= ..= .ww " ' ° ' ° n�Sy 4,;4 1,,,•.14/ ura '°'°°I: I� / " "• i . c. ;: .... .,.mow ;.. —..r • '' " ° ao. ` ' ` � r .t..rww l .'iiow rub, -. � ' �,; pce. / µr4 % E 9 y ,.: °`" ' 4. ° ` = I I p J:': .nr� • raJw• a., a;..;�i ,� 1 ri - � am, , : :. : : : ' ?; u l m 1 1 I l • .I �°, � J' t .e�i..q .,y'.',.ami � ' aj 4� / 0 !' � 52 .,,_ : ?'.mom': , /Q I Z /s + I IR ... . eEUC 5,51....1 1 : ', • p / I • � „,;' :- ::• � :/ a' ' ) D •• � WASHINGTON COUNTY OREGON Z '' . NW1l4 SE1 /4 SECTION 10 •C SCALE 1' 0 R1 W W.M. SEE Z St10fX p u4,_:,. ,.'6 a 100• a9en�l s EI I _ i8 . _ - ` :_ C I , /. o ' IPRda.. / a. - /e 300 200 ,g. -' . Q:'. , , X35 -8' st/ 4 6. .,`., -'4„7 ._. � 4/c i 9 n.r.ad 1 6 ` • ' ) . ... ...j - /; e.a,ac r �, I � f S Ix x 3 2 <.8" % o�� `�, L/ / >. / .e / SI � J J � i S J Z .9,. m xf K '' /7 J' ) ,<.•'. 2d-, Q / . ° I ;a _a <�► - x x, -,5 --xl i-/ Q 1. / r [� � ] y. CY p , ......„,-,x , • 0 , � r / I' / 1 1 , cl E. .. ; " { TTY D� 1, 1 I I ', .•!. ,. .,. -. .„' 1 '4 x92 elni ' dm ; a m_ ' � e d ocE �'.) e ! ..,/ S� g I � � 67. �,� / ® nrc <.3v', > 1. ',� aE'E•lstto . ' : �' � M " \' °�� :E2 % 3 f t�1 3 f - z ../ i /: suE«a�.o ,... r = 23 74 � ;.: , :.: ' + s M 7 - >ti FOR ADDITIONAL YAPS VISIT OUR WEBSITE AT s lro , :- / 4/l `^`+ 'V, , . -- . /. .. Y "", 1Y F, , 4'n 6, „ 4/ o F_ / . $ S \ �' a ' `L www.co.wasAlngton.or.us ,zoo ..,, a ,. ” • 10) ' F ,,", — -�. a I *i : -: ARKW p;_24________../1 ,I' ( ; - ,•.. B • _ ) .L / � ! / • 4/ : . • h � . ��''l' b ---- ./.1 a," ey a 1 = 1 �' � � •, : ..A : • •a 4 I9 a 4 N , �� 7 e v .-i'5 . - i i 4/J 1, a 1 t11 - FR f $ C. •° Y .. rn l . l w, CL l - S_4 --- " ,, . __ , ' I ~ I :3' , e ce :,,i .ca ? De Ail:: e L0 - - 500 �lP .> / K • ' , • i. I 1.a /// / f � � - N o . 1 9 � w �i n. a , . . ... - cn:: ' DC:: DD.: - o V Cancelled T,udote For. 2511008 / /< 'fie - - - , ao -- / ,, • • ,w,G 9 . , ,,, I 4/r Or a{ r _ 7'1� 0 R o a ,e3 1 pinozl "".,,, S�` 44....0... I , l .. • • .... �.. � • r ma .,m ,. . mA, . m0. ,m0.,,0a,,aa..ae • .. s+, d Fcc � I 1 ��..# ! J 703 I 1+ g I P 1 9 9 t3o0 •ap! i, aa , � N 5 " �,�R + �- 3 ,e � 1. _ _, roo a V U N i iii ,,,,,J10 14`'� T 1 ' 11 ..: . h'`h',ui .. % ? 9 ; • 2 • � 1 , (� .I I L , a'W: NZw. ,. \ 'C 4! , deer' 4- a" / r . •"et, .---C-A, 18 I I 3 y 3 N 0 _ 15 x" 2 � oow,l - Vo c e fn 9 ( � ..a.nc• .a' ^° •a I I `s3 11 }w ia e - 1.1'1 0 13 ' :' 4 p �,'V, I Z-',-. , :L ' :: ` • 3 �� / h — r ' „ � ..:21.,...1 �eE 2 4. .: su J a€ 8 1 }p�oe � T �� / � I / � ♦,.c — ..lw , v . +.�..M -. °' -, w ,ao, �m a +.w, elR.., c U.e'•. - 1 .,.._....4V1, Tit' - , 'op AY,p , 10 z 44 ie Y " aza,i,e °'°oEl ^B / ` r, .inc ., .i' 9 9 20 Sae 20a l aw d d end e �. 8 = . 8 ! 9 n m el x,o3 r7.5 mr .. � ,.. . ' > ,.J. -:^5 ■.r. ".. ' �ur `" 1 ,- A0.5 � J>L 1- d 10 be rae , 1 ® ' .. \2 .=a': ..,, .,1: '] k S m �1^ F b � g 4I.. 4 E NO.J1 ynzm �1� u :. 7°s - ,,, s g SW ya, a .:k CARTOGRAPHY I --°"i ica m04 �9 • W "'"° f 5 g , OM 4/ 203, 1M 4/3aa 4,9J 708 e } w " • / `4 L�" t n S ' �,� wa , e ., . ?aT" - _ R o.^ �11 , 8 j� 0 . 01 8I I p ! dPO2L 4/s 021301 ,021301 1. °� a "'4/ ,7.... k: ' mi = PLOT DATE: December 23, 2003 S' x '. ; ' - .�' - . , . 4/ 1 f ,p.. A C 3 fd . e 7,,-- ¢� . a e� ASSESSMENT DO NRELYES ON f - - - - • ..�Y ..ww, .... w .. ! r_ 4/ . x g ' :. a a ?. F :...� FOR ONLY N., / FOR OTHER USE + y a / nm rme yl o ff'" . • "' - ®� i ' e..e �'}. : �. � I ew .omaawaeaww.ver rw�gar aoeaaemreo . 11 ., 7 i 706 g �. . 1: ff ' "mslWle' ¢. '.6sIIJ �£ ''P' Y ' ' aeamn ere a• rwem aa mnmerbr. me mon E6 el , � ' - � - .., n. repgcenyta rbMea Mute martl a. gym. =0 %/ n � �, . ' I1 r " w 9 " . - 4" FA0'.7 gt %9'',•.. ?' • •r j } O es,: - " o� x wawoavn,aawaaa.m , "dt -�.a, �• -, , - q''p it ' ?. V .. "'• f� V .- d! t -ees • , • ;< : " :• .� : - � - � N " 5." • : ' :,rma qS a "m0i • a e; :p N .01,?' ' . -. } otc Y; }��I an s r �= .•.•.: •. . ,t�' "'"' .. . ' ' ".1'A . - .• €; d" e , I .- ifF4 - 41 . :- '''•- " :• • :-:•''s ,.-PA 1.G m;,,wi. %°. 1: .4 TIGARD 2S 1 1008 2S 1 1008 dIg2s1w10 Page 1of1 Susan Ross - Status Space Age Fuel Traffic Impact Fee From: "Deborah Martisak" <dmartisak @claircompany.com> To: "Jane Turner" <jturner @ci.king - city.or.us> Date: 04/21/2004 5:11 PM Subject: Status Space Age Fuel Traffic Impact Fee CC: "Allan Clair" <aclair @claircompany.com >, "Gary Lampella (E- mail)" <gary@ci.tigard.or.us >, <susanr @ci.tigard.or.us >, "Keith Liden (E- mail)" <Liden @pbworld.com> Hi Jane, I've received no additional information from Space Age Fuel and /or Gary Darling with DL Design regarding the credit analysis for the money owed. I've called Gary Lampella and Sue Ross regarding holding the Final Certificate of Occupancy until the money for the TIF fees are paid. I called Stan Stolr with Space Age Fuel and he indicated that WA County has been working on the credit analysis with Space Age Fuel for eligibility of credit. Gary with DL Design will be faxing me the updated paperwork from WA County for review. I will fax all information received to both City of Tigard and yourself upon receipt. So I'm still at a stand -still on this issue. As previously discussed I think a letter should be written to Space Age Fuel indicating that the TIF fees are outstanding & the Final Certificate of Occupancy will not be issued until the TIF fees are paid. I hope this helps. Please call me if you have additional questions or need more support. Deborah Martisak CLAIR Phone: (541) 758 -1302 Fax: (541) 753 -2264 dmartisak @claircompany.com Original Message From: Jane Turner [ mailto :jturner @ci.king- city.or.us] Sent: Wednesday, April 21, 2004 1:56 PM To: Deborah Martisak Subject: Status Space Age Fuel Traffic Impact FEe Debbie, Am just curious as to the status of the traffic impact fee for Space Age Fuel. Thanks. Jane gtv /o -23 - D R S- sS -o3 file: / /C:\ Documents% 20and% 20Settings \Susanr\Local %20Settings \Temp \GW } 00001.HTM 04/22/2004 I WASHINGTON COUNTY, OREGON Department of Land Use and Transportation, Land Development Services 155 North First Avenue, Suite 350 -13, Hillsboro, Oregon 97124 (503) 846 -8761 FAX: (503) 846 - 2908 April 19, 2004 Meng- Hannan Construction Co. 5906 SE 122 Avenue Portland, OR 97236 Re: SPACE AGE FUEL - Project No. 02918 Bond No. 212 37 48 FISCHER RD © SW PACIFIC - City of King City A field inspection of the above noted development was made (February 20, 2004 and April 6, 2004) and the attached list of items was found to be in need of correction/completion. Our records indicate the expiration - date on your Public Improvement Contract is April 30, 2004. Please be advised that you are required to complete the listed items by that date. NOTE: The enforcement provisions of the contract will commence May 1, 2004. This list will be considered valid for the next fifteen (15) days. Should you fail to notify this office that correction has been made of said items within this time period, another inspection may be made and deficiencies which may have occurred since the original inspection shall be added to the list. Prior to final building inspection approval and occupancy, final approval and terminating the agreement and assurance, the following must be completed: • 1. Correct all deficiencies on attached list. Contact David Whitehead at 503 - 846 -5884 and Dave Brown at 503 - 846 -7951 with further questions. 2. Inform this office upon completion and request inspection of corrected deficiencies. A FINAL INSPECTION HAS BEEN REQUESTED AS OF TODAY. 3. Submit engineer's inspection reports including compaction reports (soil, rock & asphalt). 4. Submit two copies of as -built plans and receive approval. 5. Submit an executed Engineer's Construction Certification form. 6. , Submit an executed Maintenance Agreement and Assurance form. Original documents are accepted only. Please call Kimberly Hoyt at (503) 846 -3843, if you have any questions. d p- 4111 L. ha: Associate rant - Attac ment: Punc 1st Enclosures: Maintenance Agreement and Assurance form, Engineer's Construction Certification form, c: Insurance Company of the West, 6950 SW Hampton S #302, Tigard, OR 97223 — Bond No. 212 37 48 • DL Design, Inc., 9045 SW Barbur Blvd., Ste. 101, Portland, OR97219 City of King City, Engineering/Inspection, 15300 SW 116th Avenue, King City, OR 97224 City of Tigard, Attn: Susan R., Engineering/Inspection, 13125 SW Hall, Tigard OR 97223 02918x2 /jc • (P j I PRELIMINARY PUNCH LIST SUBDIVISION/DEVELOPMENT: SPACE AGE FUEL 02 -918 INSPECTION DATE: 2/20/04 (Construction Management) 4/6/04 (Traffic Engineering) The following items are deficient and need correction in order to complete this project to County Standards: 1. Submit As -Built Drawings and Engineer Reports. 2. Submit Compaction Reports (soil, rock & asphalt). 3. Remove Utility Poles along the site frontage of Fisher Road, per plan. 4. Back fill said Utility Pole holes. 5. Pave over said Utility Pole holes. 6. Complete signing and striping per approved plans. If you have any questions regarding the road deficiencies, please call Dave Whitehead 503 -849 -5884. If you have questions regarding the striping or signing deficiencies, please call Dave Brown at 503 - 846 -7951. Page l of 1 Susan Ross - Space Age Fuel - Code Enforcement - Conference Call Meeting From: "Deborah Martisak" < dmartisak @claircompany.com> To: <gary@ci.tigard.or.us >, <susanr @ci.tigard.or.us >, <jturner @ci.king- city.or.us> Date: 04/22/2004 7:30 PM Subject: Space Age Fuel - Code Enforcement - Conference Call Meeting CC: "Allan Clair" <aclair @claircompany.com> Space Age Fuel — Code Enforcement — Conference Call Meeting Overview Attendees: Sue Ross, City of Tigard, Gary Lampella, City of Tigard, Hap Watkins, City of Tigard, Jane Turner, City of King City, Allan Clair, CLAIR & Deborah Martisak, CLAIR Gary please forward this email to Hap, / do not have his email address. — Thank you As per the conference call held today, the following was discussed regarding the roles and responsibilities of closing out the final certificate of occupancy for Space Age Fuel. 1) Hap Watkins will be the primary contact for the code enforcement issues outstanding for the Space Age Fuel project. - - 2) City of Tigard will be the primary lead for following- through with code enforcement policies to finalizing the Certificate of Occupancy for the Space Age Fuel Project. 3) Current outstanding issues include; a. WA County list of items found to be in need of correction /completion. b. City of King City — Payment for TIF Fees owed c. City of King City — Payment for SDC fees owed 4) City of Tigard will take primary role for completing the Building Permit requirements for finalizing the Certificate of Occupancy once the outstanding issues are taking care of. 5) Hap Watkins will assign such code enforcement responsibilities to the City of Tigard — Code Enforcement Personnel. Letter of warning and processing through courts will be the responsibility of the City of Tigard. If any statements above are found to be incorrect or misrepresented, please contact me and I will update all parities accordingly and change the documentation to file. Thanks for the help in resolving the above noted code issues. If there is anything that I can do, please do not hesitate to contact me. Deborah Martisak CLAIR Phone: (541) 758 -1302 Fax: (541) 753 -2264 • dmartisak @claircompany.com file: / /C:\ Documents% 20and% 20Settings \Susanr\Local %20Settings \Temp \GW }00001.HTM 04/23/2004 Thursday, April 29, 2004 CITY OF TIGARD Harold & Jim Pliska OREGON POBox 607 Gresham, OR 97030 Meng - Hannan Construction Co. 5906 SE 122n Ave. Portland, OR 97236 RE EXPIRATION OF TEMPORARY CERTIFICATE OF OCCUPANCY, OCCUPATION WITHOUT CERTIFICATE OF OCCUPANCY, NOTICE OF VIOLATION: Space Age Fuel, 16875 SW Pacific Hwy., King City, OR 97224. WACO Project No. 02918, Tigard Permit BUP2002- 00217. We have received, as you have, a copy of a letter from Joy Chang at Washington County regarding the above project, detailing the fact that various documents have not yet been filed with the County and that certain work on the site has not yet been completed or inspected and approved by them. That letter cautioned you that your Public Improvement Contract expires tomorrow, Friday, April 30, 2004, that all of the items listed in that letter must be completed by that date, and that, should you fail to complete them, enforcement provisions of that contract will commence the next day, on Saturday, May 1, 2004. • Receipt of the above letter caused us to review our own files and we have found that: 1. The Temporary Certificate of Occupancy (C of 0) that you requested and that was issued to you on February 25, 2004, for a period of 30 days expired five weeks ago on March 25, 2004. This Temporary C of 0 was issued because construction was substantially complete by February 25 but certain requirements for Final Approval, issuance of a permanent C of 0, and Occupancy had not yet been met, including the submission to this office of various engineering approval and acceptance letters. 2. A second Certificate of Occupancy document dated earlier, on February 19, 2004, was clearly issued in error, as you are doubtless aware, having yourselves requested the February 25 Temporary C of 0. The approval and acceptance letters noted above, which had not been submitted by the 25 had certainly not been submitted by the 19 Although the actual construction work received approval by our inspector on February 19 the permit itself, BUP2002- 00217, should not have received Final Inspection Approval until all of the outstanding construction requirements had been met. Final Inspection Approval under permit BUP2002 -00217 is hereby rescinded. That permit is no longer "Finalled" but has been returned to "Active, Issued" status. 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 Pliska /Space Age Fuels 4/29/04, p. 3 of 3. Because the February 19, 2004 Certificate of Occupancy document was issued in error, because the underlying requirements for its issuance were not then and have not yet been met, and because the lack of completion was known to you, we declare it to be invalid and it is herewith revoked. The Temporary Certificate of Occupancy that expired on March 25 recited the following: "It is further understood that this Temporary Occupancy Permit shall only be valid for the number of days from date of issuance listed above and that the owner /tenant will no longer be authorized to occupy the structure after the period specified, unless and until all the conditions - of approval imposed under the City's or County's Notice of Decision for the project's land use case(s) issued by the City's Development Services Department or the County's Department of Land Use and Transportation and /or the Clean Water Services and all building and related code requirements and any other applicable requirements have been completely fulfilled and complied with to the City's or County's satisfaction." The letter from Washington County establishes that the County's requirements have not been met and that their deadline for your meeting them is Friday, April 30. We have also confirmed that King City's requirements have not been met, either, specifically, payment of the Traffic Impact Fees (TIF.) It is my understanding that the amount in question is $68,096.00, according to the Payment Option Form executed by Jim Pliska on October 20, _ 2003. For the thirty-four days since Thursday, March 25` 2004, you have been operating and occupying the subject premises without a valid Certificate of Occupancy. Therefore, since that date you have been in and remain in violation of the following: FAILURE TO SECURE CERTIFICATE OF OCCUPANCY BEFORE OCCUPYING BUILDING. This is a violation of Oregon Structural Specialty Code Section 109.1: OSSC 109.1 Use and Occupancy: No building or structure shall be used or occupied, and no change in the existing occupancy classification of a building or structure or portion thereof shall be made until the building official has issued a certificate of occupancy therefor as provided herein." This constitutes a violation of Tigard Municipal Code Chapters 14.04.030(1) State Codes Adopted, and 14.04.090(1) Violation — Penalty- Remedies: TMC 14.04.030 State Codes Adopted (1): Except as otherwise provided in this chapter, the following codes ... are adopted and shall be in - force and effect as part of this Municipal Code: (a) ... the Structural, Mechanical, Plumbing, Electrical, and One and Two Family Dwelling Specialty Codes .... • TMC 14.04.090 Violation — Penalty Remedies (1): No person shall erect, construct, enlarge, ... equip, occupy, or maintain a building or structure in the city, or cause the same to be done contrary to or in violation of this chapter. • Pliska /Space Age Fuels 4/29/04, p. 3 of 3. Such violations are Class 1 Civil Infractions with a maximum possible civil penalty of $250.00 per day, per violation. Any such penalties may accrue daily until the violation has been corrected. This letter constitutes a formal Notice of Violation and you are herewith ordered to: 1. No later than close of business at 4:30 pm on Friday, April 30, advise this office and appropriate representatives of King City and the County in writing of your commitment to meet all of the outstanding requirements by close of business the following Friday, May 7, 2004; and 2. No later than close of business at 4:30 pm on Friday, May 7, meet all of those outstanding requirements including the payment of any and all outstanding fees and submission of any and all outstanding reports, letters, or other documents. If you fail to meet either of these timelines - e.g., April 30 or May 7 - we will immediately serve you with a summons to an appearance in Tigard Municipal Court on the above violation and in that case we will seek an award of penalties, which by April 30 will total at least and approximately $9,000, representing $250.00 per day for the then 36 days of violation. In addition, if you fail to meet either of these deadlines we reserve the right to immediately and without further delay order the premises closed until such time as compliance is achieved. Alternatively, if you - meet these timelines promptly and without any need on our part to take - - - further enforcement action we will be able to accept a voluntary payment by you of a significantly reduced penalty amount, that amount to be agreed upon with and by us. The sooner you come into compliance the more accommodating we will be able to be regarding the amount of a voluntary penalty. If you have any questions about the above, do not hesitate to call me at 503- 639 -4171. Hap Watkins Albert Shields Inspections Supervisor Building Codes Enforcement Officer cc: Joy Chang, Washington County; Deborah Martisak, Claire Company; Insurance Company of the West; DL Design, Inc.; City of King City; Gary Lampella; Sue Ross. • . 40 1% WASHINGTON COUNTY, OREGON Department of Land Use and Transportation, Land Development Services 155 North First Avenue, Suite 350 -13, Hillsboro, Or on 97124 (503) 846 -8761 FAX: (503) 846 -2908 EeglInVe May 5, 2004 Meng- Hannan Construction Co. (, b Ma y 1 01 00 John Failor I ( . T 5906 SE 122 Avenue Wifto f Portland, OR 97236 Re: SPACE AGE FUEL - Project No. 02918 Bond No. 212 37 48 FISCHER RD © SW PACIFIC - City of King City A field inspection of the above noted development was made on April 28, 2004 and the attached list of items was found to be in need of correction/completion. Our records indicate the expiration date on your Public Improvement Contract was April 30, 2004. Please be advised that you were required to complete the listed items by that date. NOTE: We are under the enforcement provisions of the contract. This list will be considered valid for the next fifteen (15) days. Should you fail to notify this office that correction has been made of said items within this time period, another inspection may be made and deficiencies which may have occurred since the original inspection shall be added to the list. Prior to final building inspection approval and FINAL occupancy, final approval and terminating the agreement and assurance, the following must be completed: 1. Correct all deficiencies on attached list. Contact Dave Brown at 503 - 846 -7951 with further questions. 2. Inform this office upon completion and request inspection of corrected deficiencies. 3. Submit a check in the amount of $5,000.00 to the County for the administrative costs in excess of the original Administration Deposit. The current deficit is $4,566.00. The Administration Deposit is used by Washington County to cover the costs of processing this project (plan approval, field inspections, and contract administration). The County's costs have exceeded the deposit. As mentioned in the letter to you, dated May 5, 2003, if the County's costs are higher than the amount deposited, prior to acceptance of the project, Washington County will bill the applicant for the amount needed to cover its costs. Please call 1 berly Hoyt at (503) 846 -3843, if you have any questions. _ walk . .111164111.p. Associa su trws Attachment: Punch List of 4 -28 -04 c: Insurance Company of the West, 6950 SW Hampton S #302, Tigard, OR 97223 — Bond No. 212 37 48 DL Design, Inc., 9045 SW Barbur Blvd., Ste. 101, Portland, OR97219 City of King City, Engineering/Inspection, 15300 SW 116th Avenue, King City, OR 97224 City of Tigard, Attn: Susan R., Engineering/Inspection, 13125 SW Hall, Tigard, OR 97223 City of Tigard, Attn: Al Shields, Engineering/Inspection, 13125 SW Hall, Tigard, OR 97223 02918DC3/Jc PUNCH LIST SUBDIVISION /DEVELOPMENT: SPACE AGE FUEL #02 -918 INSPECTION DATE: 4/28/04 The following items are deficient and need correction in order to complete this . roject to County Standards: l \ ' Vi Submit As - Built Drawings, Engineer Reports, and Compaction Reports (soil, asphalt, eil Pan d roc 2. Install Sign NO TRUCKS Sign at Station 5 +00, per Norm Rindal April 30, 2003. (RX1) = (RI 1). 3. Paint entire width of median noses with Traffic Yellow paint and reflective glassbeads, as show on April 29, 2003 Approved Plans. 4. Restrip striping on Fischer Rd., per April 29, 2003 Approved Plans. 5. Grind striping before restriping. - If you have any questions regarding the road deficiencies, please call Philip Trecker 503 - 793 -1994. If you have questions regarding the striping or signing deficiencies, please call Dave Brown at 503 - 846 - 7951. • • 7 P • 1 T E Lair L Ut FACSIIVICLE TRANSTMETTAL To: Sue Ross From: Deborah Martisak Fax: 503-598-1960 p Ten (10) Phones Date: May 12, 2004 Re: Space Age Fuel - Credits CC: Jane Turner Comments: Thanks for your help in this matter. . BUILDING COPE CONSULTANTS • ARCHITECTS • ENGINEERS • INSPECTION *TESTING SERVICES 1:1trol; 1' g• T$ IY. '41 i';'• www niaacomminvocato p.4 "5PA'C - AGE The Company of Tomorrow Serving You Today April 30, 2004 Albert Shields Building Codes Enforcement Officer City of Tigard • 13125 SW Hall Blvd. Tigard, OR. 97223 RE: Space Age Fuel site at 16875 SW Pacific flvvy. , King City, OR. 97224 Mr. Shields: This is acknowledge receipt of your fax date April 29, 2004 notifying us to the expiration of temporary certificate of occupancy, occupancy without certificate of occupancy, notice of violation. As 1 stated to you on the phone, I have no record of receiving the letter you referred to from Joy Chang of Washington County. Therefore, your fax came as a complete surprise. We have been in contact with John Failor of Meng- Hannan Construction who is our general contractor for this location. I believe he has been in touch with you to expedite the handling of the occupancy issues. Also, Gary Darling of DI. Design, Inc, our engineering contractor, will be in touch with you to update his activities. It appears may of the items can be addressed within the first time frame you requested of April 29. We are trying to get all appropriate parties involved the TIF matter to report to you their respective positions relative to '11F, this would include Gary Darling of DI, Design, Norm Rindal of Washington County and Deborah Martisak representing King City. We will endeavor to get all these parties to move expeditiously on the T1F matter to meet your second deadline of May 7, 2004. I can be reached at 503- 665 -5693. Respec vely, .� 1. • ,ri tan Stohr Cc: Jim Pliska. John bailor, Gary Darling, Norm Rindal, Deborah Martisak. Space Age Fee, inc. • 90iw SW Highland Drive • PO Box 607 - Gresam. OR 97030.Orrice: SO3.665 -5693 • /mac 503 - 665-1741 -.. -- - p. 5 • 4 SPACE - AGE The Company of Thinorrow Serving You 7odoY COVER SHEET DATE: Y--- -Ja '° `f # OF PAGES: 2 (INCLUDING COVER) TO: /J e 4 4- COMPANY: __ TL aa 4 ' 6-11.4 '' FAX #: S ( ( � FROM: ST'n N STD 1' PAX # 503- 665 - 1741 MESSAGE: j e (--.c ,V�,uv __ h0✓L C rwl. Please ca // (503)665 -5693 if you do not receive all pages. Thank you! Kpar- Age F,IeJ Inc. • 90IW SW l/lghlafU Drive • PO Box 607 • Gresham, OR 91030. 503- 665 -5693 • Fax 503-665 -U41 October 15, 2003 / l'���� ��\ �2tir CITY OF TIGARD Space Age Fuel PO Box 607 OREGON Gresham, OR 97030 RE: NEW COVENIENCE STORE & PUMP ISLAND with CANOPY Project Information Building Permit: BUP2002 -00217 Construction Type: VN Tenan ame: Space Age Occupancy Type: M/S -3 • • dress 16875 SW Pacific Highway Occupant Load: 48 Area: 2,600 Sq Ft Stories: 1 Mechanical Permit: MEC2002 -00226 The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 1998 edition; the State of Oregon Mechanical Specialty Code (OMSC) 2002 edition; and the Tualatin Valley Fire & Rescue Ordinance 99 -01 (TVFR99 -01) 1999 edition. The submitted plans are approved subject to the following conditions. BUILDING 1. A property line has been assumed between the Convenience Store and the Pump Island. Due to location of the structures in relation to the assumed property line, no Occupancy Separation is required and wall and openings may be non - rated. 2. Provide 2 -A rated fire extinguishers in the new area. The extinguishers shall be located so that no usable space has a distance greater than 75 feet to the extinguisher. Standard 10 -1, Chapter 3 TVFR99 -01. 3. Deferred submittals such as Fire Alarm, Fire Sprinkler, Truss Joist Shop Drawings, etc, will be charged a deferred submittal fee based on the valuation of the portion of the work being deferred. The minimum fee shall be $200.00. MECHANICAL 1. Each appliance shall be provided with a shutoff valve separate from the appliance. The shutoff valve shall be located in the same room and within six feet of the appliance served. Access shall be provided to the shutoff valve. C409.5 OMSC 2. Equipment and appliances regulated by this code requiring electrical connections shall have a positive means of disconnect in accordance with the Electrical Code. 301.7 OMSC 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 3. Permanent equipment supported by the structure, 400 lbs and over, shall have their attachments designed in accordance with the Building Code. 301.16 OMSC 4. Appliances shall be accessible for inspection, service, repair or replacement without removal of permanent construction. 306.1 OMSC 5. Manufacturer's installation instructions shall be available on the jobsite at the time of inspection. 304.1 OMSC 6. Condensate from cooling coils or evaporators shall be collected and discharged to an approved plumbing fixture or disposal area. 307.1 OMSC 7. Smoke detectors shall be installed in return air systems with a design capacity greater than 2000 cfm. Upon activation, the smoke detector shall shut down the air • distribution system. Smoke detectors shall be connected to a fire alarm system and shall activate an audible and visible alarm at a constantly attended location. 606.2, 606.4 & 606.4.1 OMSC FYI UNDERGROUND FUEL STORAGE TANKS REQUIRE PERMITS F1 OM TVF &R. CONTACT ERIC MCMULLEN @ 503 - 612 -7010. American with Disabilities Act (ADA): It shall be the responsibility of the Architect, Engineer, Designer, Contractor, Owner and Lessee to research the applicability of the ADA requirements for the structure. The City of Tigard reviews the plans and inspects the structure only for compliance with Chapter 11 of the OSSC which may not include all of the requirements of the ADA. Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp, shall be maintained 'on the jobsite. The plans shall be available to the Building Division inspectors throughout all phases of construction. 106.4.2 OSSC Certificate of Occupancy: No building or structure shall be used or occupied until the Building Official has issued a certificate of occupancy 109.1 OSSC Premises Identification: Approved numbers or addresses shall be provided for all new buildings in such a position as to be plainly visible and legible from the street or road fronting the property. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respe Ily, ria . : lalock, Senior Plans Examiner 41111% WASHINGTON COUNTY, OREGON Department of Land Use and Transportation, Land Development Services 155 North First Avenue, Suite 350 -13, Hillsboro, Oregon 97124 (503) 846 -8761 - FAX: (503) 846 -2908 RELEASE OF PERFORMANCE ASSURANCE START OF THE ONE -YEAR MAINTENANCE PERIOD June 18, 2004 Insurance Company of the West 6950 SW Hampton S #302 Tigard, OR 97223 Re: SPACE AGE FUEL - Project No. 02918 FISCHER RD @ SW PACIFIC - King City Bond No. 212 37 48 for $61,612.00 The agreement and assurance dated October 1, 2003, entered by Meng -Hanna Construction Co., Inc. as developer, and Washington County for the construction of public improvements required for the above - referenced development can now be terminated. The project has been accepted and a one- year Maintenance Agreement and assurance has been executed. The Washington County Department of Land Use and Transportation hereby informs and authorizes you to release all funds held as financial assurance under the Public Improvement Contract 02918. If you have any questions, please contact the Assurances Staff at (503) 846 -3843. 11 4/C411A/- • Mark E. Brown Land Development Manager C: Meng - Hannan Construction Co., John Failor, 5906 SE 122 Avenue, Portland, OR 97236 DL Design, Inc., 9045 SW Barbur Blvd., Ste. 101, Portland, OR97219 City of King City, Engineering /Inspection, 15300 SW 116th Avenue, King City, OR 97224 City of Tigard, Attn: Susan R., Engineering/Inspection, 13125 SW Hall, Tigard, OR 97223 City of Tigard, Attn: Al Shields, Engineering/Inspection, 13125 SW Hall, Tigard, OR 97223 02918rta/jc SPA-CEAGE The Company of Tomorrow Serving You Today December 18, 2002 1 , f q - O 2— Gary Lampella Building Official 4a ` _ I Tigard City 13125 SW Hall Blvd l 0 d6,1 e f ��� $ (0 9 ra 4 Ee Tigard, Oregon 97223 Re: Space Age Fuel — King City Dear Mr. Lampella, Space Age Fuel is requesting an extension on thean er view your department has preformed on the Convenience Store / Gas Sales building located at 16875 SW Pacific Highway King City. The extension is required due to the lack of progress in requiring State DOT and Washington County approvals. 'Alp If you have any questions or concerns please call. 0 O : pill' 4,4kPli IL O Sincerely ;; Space Age Fuel Lafa ette Feller • Space Age Fuel. Inc. • 901W SW Highland Drive • PO Box 607 • Gresham, OR 97030 • Office: 503- 665 -5693 • Fax 503 - 665 -1741 FILE Copy September 19, 2003 V L Space Age Fuel PO Box 607 Gresham, OR 97030 RE: NEW COVENIENCE STORE & PUMP ISLAND with CANOPY Project Information Building Permit: BUP2002 -00217 Construction Type: VN Tenant Name: Space Age Occupancy Type: M/S -3 Address: 16875 SW Pacific Highway Occupant Load: 48 Area: 2,600 Sq Ft Stories: 1 The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 1998 edition; and the Tualatin Valley Fire & Rescue Ordinance 99 -01 (TVFR99 -01) 1999 edition. The following information is required prior to the issuance of a Building Permit. GENERAL 1. Provide Oregon Energy Code compliance forms for Envelope, Lighting and HVAC. 2. Provide manufacturer's installation instructions for the "Quad Lock" system. 3. Provide Walk -in cooler construction details. Oregon Label is required for closed panel construction. 4. Site plan does not indicate an accessible route to the public way. See section 1103 OSSC for additional requirements pertaining to an accessible route including detectable warnings and slopes. 5. The location of the window in office 102 scales close to 24 inches from the door and is not indicated as safety glazing. See note 1 on sheet A601. STRUCTURAL 6. Provide calculations and construction drawings for the pump island canopy. 7. Pump canopy size is different on sheet G101 and A202. Provide consistent plans. 8. Provide construction/connection details for the soffits framing shown on sheet A401. 9. Clarify the length of the anchor bolt shown in detail 6/S -4. • 10. Clarify the attachment for the top chord of the truss to the exterior wall plate. 11. Provide calculations and details for the anchorage of roof top mechanical unit RT1. See section 1632 OSSC for design requirements. 12. The calculations identify members as "worst case canopy beam" or "primary cantilevered canopy Beam ". Revise calculations and sheet S -3 to clearly describe which members compare to which calculation. Numbers or Alphabetical. 13. Provide truss calculations that indicate the uplift imposed by the cantilevered members as shown in details 1 /S5, 4/S5 & 5/S6. 14. The negative reaction at the cantilevered canopy framing exceeds the capacity of the 8 - 16D nails indicated on the drawings. Provide an analysis for the connections. PLUMBING 15. Plan note 2 on sheet C4.1 indicates the use of C900 for drainage pipe. C900 is not listed for drainage pipe. Revise all sheets with reference to C900 as drainage pipe and resubmit the drawings indicating a material approved for drainage piping. FYI UNDERGROUND FUEL STORAGE TANKS REQUIRE PERMITS FROM TVF &R. CONTACT ERIC MCMULLEN @ 503- 612 -7010. FYI Deferred submittals such as Fire Alarm, Fire Sprinkler, Truss Joist Shop Drawings, etc, will be charged a deferred submittal fee based on the valuation of the portion of the work being deferred. The minimum fee shall be $200.00. Please provide an item by item response. Provide 4 complete sets of all revised drawings and 2 copies of supporting information such as calculations and cut sheets. When submitting revised drawings please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectfully, Brian Blalock, Senior Plans Examiner FILE COPY October 15, 2003 114ga f�h� CITY OF TIGARD Space Age Fuel PO. Box 607 OREGON Gresham, OR 97030 RE: NEW COVENIENCE STORE & PUMP ISLAND with CANOPY Project Information Building Permit: BUP2002 -00217 Construction Type: VN Tenant Name: Space Age Occupancy Type: M/S -3 Address: 16875 SW Pacific Highway Occupant Load: 48 Area: 2,600 Sq Ft Stories: 1 Mechanical Permit: MEC2002 -00226 The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 1998 edition; the State of Oregon Mechanical Specialty Code (OMSC) 2002 edition; and the Tualatin Valley Fire & Rescue Ordinance 99 -01 (TVFR99 -01) 1999 edition. The submitted plans are approved subject to the following conditions. BUILDING 1. A property line has been assumed between the Convenience Store and the Pump Island. Due to location of the structures in relation to the assumed property line, no Occupancy Separation is required and wall and openings may be non - rated. 2. Provide 2 -A rated fire extinguishers in the new area. The extinguishers shall be located so that no usable space has a distance greater than 75 feet to the extinguisher. Standard 10 -1, Chapter 3 TVFR99 -01. 3. Deferred submittals such as Fire Alarm, Fire Sprinkler, Truss Joist Shop Drawings, etc, will be charged a deferred submittal fee based on the valuation of the portion of the work being deferred. The minimum fee shall be $200.00. MECHANICAL 1. Each appliance shall be provided with a shutoff valve separate from the appliance. The shutoff valve shall be located in the same room and within six feet of the appliance served. Access shall be provided to the shutoff valve. C409.5 OMSC 2. Equipment and appliances regulated by this code requiring electrical connections shall have a positive means of disconnect in accordance with the Electrical Code. 301.7 OMSC 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 3. Permanent equipment supported by the structure, 400 lbs and over, shall have their attachments designed in accordance with the Building Code. 301.16 OMSC 4. Appliances shall be accessible for inspection, service, repair or replacement without _ . _ removal of permanent construction. 306.1 OMSC , 5. Manufacturer's installation instructions shall be available on the jobsite at the time of inspection. 304.1 OMSC 6. Condensate from cooling coils or evaporators shall be collected and discharged to an approved plumbing fixture or disposal area. 307.1 OMSC 7. Smoke detectors shall be installed in return systems with a design capacity greater than 2000 cfm. Upon activation, the smoke detector shall shut down the air distribution system. Smoke detectors shall be connected to a fire alarm system and shall activate an audible and visible alarm at a constantly attended location. 606.2, 606.4 & 606.4.1 OMSC FYI UNDERGROUND FUEL STORAGE TANKS REQUIRE PERMITS FROM TVF &R. CONTACT ERIC MCMULLEN @ 503- 612 -7010. American with Disabilities Act (ADA): It shall be the responsibility of the Architect, Engineer, Designer, Contractor, Owner and Lessee to research the applicability of the ADA requirements for the structure. The City of Tigard reviews the plans and inspects the structure only for compliance with Chapter 11 of the OSSC which may not include all of the requirements of the ADA. Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp, shall be maintained on the jobsite. The plans shall be available to the Building Division inspectors throughout all phases of construction. 106.4.2 OSSC Certificate of Occupancy: No building or structure shall be used or occupied until the Building Official has issued a certificate of occupancy 109.1 OSSC Premises Identification: Approved numbers or addresses shall be provided for all new buildings in such a position as to be plainly visible and legible from the street or road • fronting the property. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respe lly, ria I : lalock, Senior Plans Examiner FROM :MENG— HANNAN FAX NO. :5037614912 Feb. 19 2004 08:03PM P3 D . DESIGN, INC. DBE / WIDE FIRM February 18, 2004 Mr.rimPliska E copy Space Age Fuels 901W SW Highland Drive Gresham, OR 97080 Re: Pinal Approval for Site Utilities and Grading -- King City Station Dear Jim, This letter is a confirmation that we have visited and inspected the site and have determined that the site I,r ;tiding and site utilities were c oustruCted Per the plans a d spr ifcations prepared by our flan. Sincerely, DI. D • Itic Gary Darling, 904,5 SW Barbur Boulevard. Suite 101 • Portland. Oregon 972)9 • Phone; 503.225.1679 • F ax! 5 Z.0 39 9NI833NI9N3 la 99Z6-- 9ZS - -EOS S9 :6Z 0603/81/Z0 • STRUCTURAL SOLUTIONS INC. CIVIL & STRUCTURAL ENGINEERING SERVICES 24 February, 2004 RECEIVED FILE COPY Architectural Design West FEB 2 6 2004 % Don Knighton 255 South 300 West Logan, UT 84321 RE: Final report for the Space Age Fuel Building project in King City, OR. Building Permit # 2002 -00217 Don, As per the request of the contractor and Building Official for the above mentioned project, we have reviewed all provided construction photographs and special inspection reports, provided to us by the contractor. B on review of the provided items provided and correspondence with the contractor, the building's structure appears to have been constructed per the plans and specifications, to the best of our knowledge. We are not aware of any outstanding issues with any part of the structural system that have not been resolved. Please note that we did not conduct any onsite Structural Observation. Our report is based solely on information obtained from review of the provided photographs and inspection reports. Many items in the structural system were not able to be observed. Therefore, this report shall not be interpreted as any warrantee or guarantee regarding full compliance with the drawings and specifications. This responsibility remains solely with the contractor. If you have any additional questions, please let me know. Respectfully Submitted, Joshua C. Maughan, P.E. Structural Solutions Inc. Q D 45 NORTH MAIN, SUITE B LOGAN, UT 84321 435.787.2789 structurall@qwest.net ifitA WASHINGTON COUNTY, OREGON Department of Land Use and Transportation, Land Development Services 155 North First Avenue, Suite 350 -13, Hillsboro, Oregon 97 t �" �\J E D � �. y � illV 503- 846$761 FAX 5034846 -2908 [ 4 OCT 0'; 06" 7.. s CVTV OF - I October 2, 2003 Zpo Meng-Hannan Construction Co. BUILDING G d 5906 SE 122 Avenue Portland, OR 97236 Re: SPACE AGE FUEL - Project No. 02918 FISCHER RD @ SW PACIFIC - City of King City Enclosed is your copy of the executed Public Improvement Contract for improvements to a Washington County Road. Outlined below is the procedure you will need to follow in completing your public improvements and obtaining a release of your financial assurance. 1. Construct the improvements now that you have obtained a Facility Permit. Public improvements must be completed prior to occupancy of any site building or prior the date found in paragraph I.B, whichever occurs first. If for good cause, you cannot complete your public improvements before the completion date on the contract, you may request an extension of the contract under paragraph IV.A. Any request for contract extension must be made to this office, in writing, from both the Applicant and the Assurance Provider. The extension cannot be approved beyond occupancy. 2. Request a final inspection and submit as - built plans. Contact the Assurances staff at 503 - 846 -3843 to request a final inspection when you feel your improvement is complete. If the inspection shows deficiencies, details will be sent to you in writing as soon as possible. 3. Complete related paperwork. The following items are routinely required prior to acceptance of the improvements by Washington County. Other items may apply to your specific project. Forms will be provided by the Assurance Staff after the requested final inspection. a. Submit and obtain approval of as -built plans. b. Submit an engineer's certification (on County form) c. Provide Engineer's Certification of Adequate Sight Distance (per County format),' d. Pay any Administration Deposit deficits. e. Execute a one -year maintenance assurance. , These improvements require a one year maintenance assurance to insure that work performed under the Public Improvement Contract will hold up. The maintenance assurance amount is 10% of the total assurance amount. Under the terms of the contract (paragraph III.E) the county will hold back 10% of the total assurance amount until a maintenance assurance has been executed and filed with this office. When you request your final inspection, you will be mailed the standard maintenance agreement to be executed.} Upon completion of your Public Improvement Contract as outlined above, a letter of acceptance and release of assurance will be provided to you, the city and your assurance provider. If you have any questions, please call th- ' ssurances at 503 - 846 -3843. (l , d Carol A. Pollard Planning Assistant, Assurances (Note: enclosures are not necessarily Included with copies of letter distributed to recipients at bottom) c: Insurance Company of the West, 6950 SW Hampton S#302, Tigard, OR 97223 — Bond No. 212 37 48 DL Design, Inc., 9045 SW Barbur Blvd., Ste. 101, Portland, OR97219 atrofIWCityr Engineering/Inspection, 15300 SW 116th Avenue, King City, OR 97224 02918 conx -Dev /cap 1 , °% WA$1 9NGTO N COUNTY Fee: $ 5/W7, Permit No.: Oa9�E( . DEPARTMENT OF LAND USE AND TRANSPORTATION ECP from USA .. Date: /D/ 3 1LAND DEVELOPMENT SERVICES DIVISION NORTH FIRST AVENUE Inspection Option I. L I - HILLSBORO, OREGON 97124 OgEcO PHONE 503-846-3843 FAX 503 - 846 -2908 ' Grading Permit:. � i, i 1 . _ _ C‘ �-/ FACILITY PERMIT • ° • , ' te 'ssu APPLICANT I Application and Permit to occupy or Name: �1✓1 _ 1/411 thee, ( 3 +. A PP J perform operations within the existing Ad ress: S 5 /oPa E �� • and /or future right -of -way of County and � 7 Co dedicated roads. �� ¢IC �` Phone: S7) 3- ?!e I .. 90 APPLICATION Applicant hereby applies to the Washington County Department of Land Use and Transportation for permission to perform the following operations within the rights -of way under Washington County's jurisdiction. Types of operation and location are as follows: Type of work: nyfi e : , Gc.)id ei,: ,,, - � < L ), (ur� J. t? <4 " L Pt ' 1 Address of work: Ni, Cp c4A1" O F 7L or • " Project name: < (r4 P I-,., ,., D / PERMIT yy nyi 2 l <i/i �►1`�'( The appropriate general provisions contained in Washington County, 1 partment of Use and- Transportation, Rules and Regulations for Pole Line, Buried Cable, Pipe Line and Miscellaneous Operations and/or Facility Permits July, 1970 as supplemented and modified by the attached standards and the following special provisions, shall apply to this permit, and by this reference, are made a part hereof. It shall be the obligation of the applicant to obtain said rules and regulations from the Department of Land Use and Transportation and to determine which of the various provisions are applicable before commencement of work under this permit. SPECIAL PROVISIO Contact Construction Ins •. =' . ( lc : ' • 7840 - for to starting any work on project, with the following information: Also see attachment regarding '- r • - - ark inspections (hold points) / - Start date of project: 0 r f ? - . 3 -,- PrimeContractor: in e ..vk 14 4v■ nah < V s. - FGr503 - Y7it ` ,— 24 hour emergency phone number. _S 3 - 7 6. I - J Z R0 This permit is issued by the Department of Land Use and Transportation subject to terms and provisions contained herein and/or attached hereto. This permit is accepted and approved subject to said terms and provisions. Improvement cost: $ (�� l / ha • Applicant ¢'.1 AJ p.2.e&f. By EA ui co .,f Pedu^so. Assurance amount: $ La/ / 6/. Title FS- h...,,- Received: ( I D 20 �.9 Washington County Department of Land Use Expires: N���P� bec .� O , 20 (93 and TrB ati l , � egI // 'f L059 -060 Title 6,/if, R al f, 4,--,S iS 7 -/ _ (4-74---- P designwest I architecture 255 South 300 West, Logan UT 84321 (435) 752 -7031 Plan Review Comments for NEW CONVENIENCE STORE & PUMP ISLAND WITH CANOPY S.W. PACIFIC HIGHWAY AND S.W. FISCHER ROAD Builder: MENG - HANNAN CONSTRUCTION, Inc. Building Permit: BUP2002 -00217 Construction Type: VN Tenant Name: Space Age Occupancy Type: M /S -3 Address: 16875 SW Pacific Highway Occupant Load: 48 Area: 2,600 Sq Ft. Stories: 1 The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 1998 edition; and the Tualatin Valley Fire & Rescue Ordinance 99- 01(tvfr99 -01) 1999 edition. The following information is required prior to the issuance of a Building Permit. A: written comments have been duplicated here, and are shown in italics. Answers follow each comment designated by an "A:" and indicates where the requested information is contained. GENERAL • 1 1. Provide Oregon Energy Code compliance forms for Envelope, Lighting and HVAC. A: Completed forms attached. V 2. Provide manufacturer's installation instructions for the "Quad Lock" system. A: Quad Lock has been replaced by 8" CMU, please refer to revised sheets A101, A102, A201, A301, A401, A501, A601, and F101 delta No. 1 3. Provide Walk - in cooler construction details. Oregon Label is required for closed panel construction. _ A: Shop drawings to be provided by Walk - in cooler manufacturer. J 4. Site plan does not indicate an accessible route to the public way. See section 1103 OSSC for additional requirements pertaining to an accessible route including detectable warnings and slopes. A: Refer to revised civil engineering drawings and sheet G101. PieGE‘ SEP 30 vn A Ro � N�' v,s `o N B U n � 5. The location of the window in office 102 scales close to 24 inches from the door and is not indicated as safety glazing, see note 1 on sheet A601. A: Window "AA" dimensions have been revised indicate a 24" separation from striking jamb of door No. 102, refer to sheet A101. • STRUCTURAL �6. Provide calculations and construction drawings for the pump island canopy. e 1, 114P A: Pump island canopy construction drawings to be provided by manufacturer. 4 7. Pump canopy size is different on sheet G101 and A202. Provide consistent plans. A: Pump island canopy is shown for Reference only on sheet A202, but has been revised to match the owners intent as shown on sheet G101. �8. Provide construction/ connection details for the soffit framing shown on sheet A401. A: See our revised details 1/s - 5. We have indicated Simpson H - 4 connectors @ each joist. ✓ 9. Clarify the length of the anchor bolt shown in detail 6/S - 4. A: See revised detail 6/S - 4. We have indicated 7" minimum embedment. 10. Clarify the attachment for the top chord of the truss to the exterior wall plate. A: See our revised detail 1/S -5. We have indicated Simpson H -4 connector each side and (2) Simpson SDS 1/4x3 wood screws. • 11. Provide calculations and details for the anchorage of roof top mechanical unit RT1. See section 1632 OSSC for design requirements. • A: This shall be b rovided the unit manufacturer and contractor. P by 12. The calculations identify members as "worst case canopy beam" or "primary cantilevered canopy beam ". Revise calculations and sheet S -3 to clearly describe which members compare to which calculation, Numbers or Alphabetical. A: We have revised our calculations to match the labels shown on sheet S -3. See the attached revised calculations. 13. Provide truss calculations that indicate the uplift imposed by the cantilevered members as shown in details 1/S5, 4/S5 & 5/S6. S / A: We have revised the roof framing plan (sheet S -3) to indicate the uplift forces. We have also 0 included dead and snow load profiles for the roof joist manufacturer. Roof joists shall now be designed by the joist manufacturer. 14. The negative reaction at the cantilevered canopy framing exceeds the capacity of the 8 - 16D nails indicated on the drawings. Provide and analysis for the connections. A: (8) 16 nail have adequate capacity as shown on detail 1/S -5, and 5 &6/S -6. We have revised detail 11/S -7 to show (8) Simpson SDS 1/4x3 wood screws. PLUMBING 15. Plan note 2 on sheet C4.1 indicates the use of c900 for drainage pipe. C900 is2isted for drainage pipe. Revise all sheets with reference to C900 as drainage pipe and resubmit the drawings indicating a material approved for drainage piping. A: There are no references to C900 pipe on the plumbing drawings nor the mechanical specifications. Civil engineer to address references on site plans. FYI UNDERGROUND FUEL STORAGE TANKS REQUIRE PERMITS FROM TVF &R. CONTACT ERIC MCMULLEN @ 503 - 612 -7010. FYI Deferred submittals such as Fire Alarm, Fire Sprinkler, Truss Joist Shop Drawings, etc, will be charged a deferred submittal fee based on the valuation of the portion of the work being deferred. The minimum • fee shall be $200.00. Please provide an item by item response. Provide 4 complete sets of all revised drawings and 2 copies of supporting information such as calculations and cut sheets. When submitting revised drawings please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the C8ity of Tigard in tracing and processing the documents. • • • •