Loading...
Specifications CRSS � LINCOLN CENTER TOWER 10260 SW GREENBURC ROAD SUITE 1000 MECHANICAL ABBREVIATIONS MECHANICAL LEGEND ccrs PORTLAND. OREGON 97223 503 452 5700 A Js $ C NIP Iy FAX 503 452 5701 - - AD ACCESS DOOR LAT LEAVING AIR TEMPERATURE j AFF ABOVE FINISHED FLOOR MAX MAXIMUM MANUAL VOLUME DAMPER ROUND DUCT SECTION AHU AIR HANDLING UNIT MBH BTU PER HOUR (X 1000) AL ACOUSTICAL LINING MECH MECHANICAL APPROX APPROXIMATE MVD MANUAL VOLUME DAMPER OFF -SET UP OR DOWN —► AIR FLOW (SUPPLY) AP ACCESS PANEL (N) NEW .— WITH RESPECT TO FLOW 05 ISSUED FOR APO AIR PRESSURE DROP NC NORMALLY CLOSED 0 30 CONSTRUCTION o r. BEM BACKDRAFT DAMPER NIC NOT IN CONTRACT 4 _ _ _ - INTERNALLY LINED DUCTWORK --$,-'' AIR FLOW (RETURN OR EXHAUST) 97 BOO BOTTOM OF DUCT NO NORMALLY OPEN txsaltonON BOS BOTTOM OF STEEL NTS NOT TO SCALE N0 Nor( L' BTU/H BRITISH THERMAL UNITS/HOUR OA OUTSIDE AIR MARK ctO Au R EVIS ONS • MARINO • p � L•' w'111. O[LIA R[NOV[ 01RT CIR 9 e ELBOWS WITH AIR DEVICE MARK up... N[ *' R[ws10M MARINO wt n. w CC COOLING COIL OBD OPPOSED BLADE DAPPER a � N T F ccs sr � a„cl `"c io � IN oa "A"2 ii CO CEILING DIFFUSER PCF POUNDS PER CUBIC FOOT TURNING VANES .. _ • • CFF CAP FOR FUTURE' PLCS PLACES CFM CUBIC FEET PER MINUTE PRESS PRESSURE Jr [A.D] f ACCESS DOOR IN ELEVATION 0T THERMOSTAT SEAL • CONN CONNECTION RA RETURN AIR C • ' DB DRY BULB RG RETURN AIR GRILLE • : • , \ DEC or DEGREES RH RELATIVE HUMIDITY RECTANGULAR TO ROUND ` POINT OF CONNECTION DWG DRAWING RHC REHEAT COIL TRANSITION �� � ' 1 1 i l J • (E) EXISTING RPM REVOLUTIONS PER MINUTE l. .` :� EA EXHAUST AIR RR RETURN REGISTER RECTANGULAR OR FLAT OVAL �' i!! �j �� EAT ENTERING AIR TEMPERATURE SA SUPPLY AIR DUCTWORK FIRST •.tGU)J ER EXHAUST REGISTER S/D SPLITTER DAMPER NUMBER SIZE, `� • ` r .. N U EXF EXHAUST FAN SD SMOKE DAMPER NUMMBER IS SIDE SHOWN O -fir, �► a 1. O. a G .I Q 01'1 ,•? EL ELEVATION SP STATIC PRESSURE • L O � i �,' L CENTERLINE ELEVATION STRUCT STRUCTURAL d•.• � d�[\• ELEC ELECTRICAL THD TOP HORIZONTAL DISCHARGE FLEXIBLE DUCTWORK -retied"' '' 10Ve G (1 ESP EXTERNAL STATIC PRESSURE TOO TOP OF DUCT A \y o% •S de s r � '�� 5 -- I EXPIRES. 12 3/ -4 I. EXH EX TOS TOP OF STEEL CO w oe (F) FUTURE TSP TOTAL STATIC PRESSURE r; SUPPLY DIFFUSER . p \ _ v+ "' / / FBO FURNISHED BY OWNER TYP TYPICAL �l F01 0�y AM{1 r1O t0 i;*. :(1 t on. M. ALLEN SATE OS 25 97 FSD FIRE /SMOKE DAMPER VEL VELOCITY P N t 6°1 Pak • « G. OwE / c nu I A 51478M01 FLEX FLEXIBLE CONNECTOR V /tr/HZ VOLTS/PHASE/HERTZ OPE. M. MONTEITH _me No RIAWEL03 FOB FLAT ON BOTTOM wB , WET BULB RETURN REGISTER �e S S ' FOT FLAT ON TOP wG WATER GAGE ado N = P JACOBS ENGINEERING FPM FEET PER MINUTE V GROUP INC. FT FEET POS D ' C OR BOX 97 -5210 HC HEATING COIL f503) 62' - 3000 HOR HORIZONTAL ® fAX (503) 62. -3001 HP HORSEPOWER WELLS D HTP HEAT PUMP IP17 W ET i S FARGO IN INCHES SCALE KW KILOWATT DO NOT SCALE DRAWINGS. USE DIMENSIONS PROVIDED. GRAPHIC SCALE INDICATIONS ARE SHOWN AS 15570 SE PACIFIC HWY A GUIDE FOR INTERPRETATION OF REDUCED SIZE DRAWINGS. TIGARD, OR • STORE #S1478 _ FIELD VERIRCAT1ON KING CI TY CONTRACTOR TO FIELD VERIFY ALL CONDITIONS AND DIMENSIONS. CONTRACTOR TO BRING ALL DISCREPANCIES TO THE ATTENTION OF THE ARCHITECT/ENGINEER PRIOR TO CONSTRUCTION. THE CONTRACTOR WILL COMPLY WITH ALL CURRENT OREGON STATE ADMINISTRATIVE CODES AND REGULATIONS, THE 1994 DRAWING TITLE a UNIFORM BUILDING CODE (UBC), UNIFORM MECHANICAL. CODE (UMC), & ALL OTHER APPLICABLE CODES IN THE JURISDICTION OF THE PROJECT. FABRICATED UNITS INDICATED IN SCHEDULES SHALL BE COORDINATED WITH MECHANICAL FRAMING SUPPORT AND ADJUST END UNIT IN DIMENSION TO FIT ROUGH OPENING. FIELD MEASURE LEGEND AND BEFORE FABRICATION. ABBREVIATION SHEET DIMENSIONING CONVENTION CLIENT DRAWING NUMBER REV. NO. DIMENSIONS ARE FINISH DIMENSIONS TO FACE OF CONCRETE, MASONRY, STEEL AND FACE OF STEEL STUD TO CENTERLINES OF COLUMNS. UNLESS OTHERWISE NOTED. M 0 1 0 • • CRSS � � LINCOLN CENTER IOW R 10260 Sw GREENBURG ROAD SUITE 1000 PORTLAND. OREGON 97223 MECHANICAL GENERAL NOTES Constructors 503 452 5700 A awls& Cowpony FAX 503 452 5701 • - - 1. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE LOCAL. STATE AND FEDERAL CODES, LAWS AND REGULATIONS. 2. CONTRACTOR SHALL VISIT SITE AND BE FULLY COGNIZANT OF ALL CONDITIONS PRIOR TO SUBMITTING PROPOSAL. ADJUST EXISTING PIPING AND DUCT WORK IF REOUIRED TO ACCOMMODATE NEW WORK. 3. COORDINATE ALL WORK WITH ARCHITECTURAL, MECHANICAL, AND STRUCTURAL 05, ISSUED FOR DRAWINGS. INSTALL ALL WORK TO CLEAR NEW AND EXISTING ARCHITECTURAL AND 0 3QCONSTRUCTION Si u STRUCTURAL MEMBERS. NO MECHANICAL ITEM SUCH AS PIPE, DUCT. ETC. TO BE IN 97 CONTACT WITH ANY EOUIPMENT. ocsarIPTION Non ► • ' • 4. COORDINATE ALL CUTTING AND PATCHING WITH GENERAL CONTRACTOR. SUB— $ k w ln. 0u t: o o k I 0 ( TIry AW ° CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING. etroaE NEXT REwSION DRI MITN g ° ALPHA REVISIONS ARE PRELIMINARY & S 1y • ARE NOT roR cONs+RUCTIDN CR r O 5. OBTAIN WRITTEN PERMISSION FROM ARCHITECT/ENGINEER BEFORE PROCEEDING rAeRICATIO. WITH ANY CUTTING OR PATCHING OF STRUCTURAL SYSTEMS. INSTALL ALL PIPING s • AND DUCT AS HIGH AS POSSIBLE IN THE SPACE PROVIDED. SEAL _ 6. COORDINATE NEW ROOF OPENINGS AND PENETRATIONS UNLESS OTHERWISE ; .;' ~ ��r. INSTRUCTED BY ARCHITECT WITH ORIGINAL ROOFING CONTRACTOR. .. • • 7. FURNISH AND INSTALL MATERIALS, EQUIPMENT AND LABOR AS SHOWN AND AS �. =: •� I '; NECESSARY FOR COMPLETE WORKABLE SYSTEM. 8. RESTORE ALL DAMAGES RESULTING FROM NEW WORK AND LEAVE PREMISE IN ' � CLEAN CONDITION WHEN FINISHED WITH WORK. � '`� GON 9. CONNECT ALL EOUIPMENT FURNISHED UNDER OTHER TRADES AS REOUIRED. 10. NOTIFY OWNER 48 HOURS IN ADVANCE BEFORE ANY EXISTING SYSTEM IS G L. 0` SHUT DOWN. 11. PROVIDE TWO SETS OF 'AS— BUILT' DRAWINGS AND TWO BOUND SET OF ALL I F,,`.PIRES Ii2 3I—q0 OPERATIONS MANUALS. DIAGRAMS, SERVICES CONTRACTS, GUARANTEES, ETC., ONE FOR THE OWNER AND ONE FOR THE BUILDING OPERATIONS DEPARTMENT. 12. PROVIDE AND COORDINATE WITH ARCHITECT /ENGINEER INSTALLATION OF ACCESS 'or T. M. ALLEN oAn 05/25/97 PANELS REQUIRED FOR MAINTENANCE AND INSPECTION OF ALL EOUIPMENT. osoc D. CRAGIN SCALE N/A ac. G. OWEI1 i CAD rlu g S1478&102 13. OBTAIN A COMPLETE SET OF AS —BUILT DRAWINGS OF EXISTING CONSTRUCTION � opc. M. MONTEITH ,roe No RIAWEL03 FROM THE LANDLORD FOR INFORMATION ON EXISTING CONDITIONS. VERIFY AU. CONNECTIONS TO EXISTING WORK. JACOBS ENGINEERING GROUP INC. 14. LOCATE NEW HEAT PUMP UNIT ON CURB TO SPREAD WEIGHT ON EXISTING POST orrlcE eox 5210 ROOF STRUCTURE, COORDINATE WITH ROOFING CONTRACTOR. PORTLAND. OR 97706 -5710 15. EACH SYSTEM OF DUCTWORK SHALL BE PRESSURE TESTED IN �so3) 62. -3000 3001 Ax (503) 62. - ACCORDANCE WITH SMACNA STANDARDS. E T S FA A RGO D ^� 16. EACH SYSTEM OF PIPING AND DUCTWORK SHALL BE CLEANED OF ALL FOREIGN MATERIAL AND ROUGH SPOTS PRIOR TO BEING PLACED IN SERVICE AND BEFORE OPERATIONAL TESTS ARE PERFORMED. 15570 SE PACIFIC HWY 17. CONTRACTOR SHALL RETAIN INDEPENDENT TESTING AGENCY FOR TESTING. TIGARD, OR • ADJUSTING AND BALANCING AIR SYSTEM. BALANCE AIR FLOW AT ALL SUPPLY STORE #S1478 GRILLS AND RETURN AIR REGISTERS TO AIR QUANTITIES INDICATED. AGENCY SHALL BE A MEMBER OF THE ASSOCIATED AIR BALANCE COUNCIL (AABC) OR THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB). SUBMIT FINAL BALANCE KING CITY REPORT FOR APPROVAL. 18. DURING ENTIRE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL MAINTAIN • ADEQUATE FIRE EXTINGUISHERS READY FOR USE IN CASE OF FIRE. DRAWING TITLE 19. PROTECTION OF PUBLIC: THE CONTRACTOR SHALL PROTECT THE GENERAL MECHANICAL PUBLIC FROM INJURY DURING PROGRESS OF THE WORK BY POSTING WARNING GENERAL NOTES SIGNS. GUARD LIGHTING AND BARRICADES. 20. ALL WORK AND MATERIALS SHALL CONFORM TO OWNERS BUILDING STANDARDS. CLIENT DRAWING NUMBER REV. NO. 21. PROVIDE ROUND DUCT STRAP HANGER PER INDUSTRY STANDARD PRACTICE AND BRACING PER SMACNA HVAC DUCT CONSTRUCTION AND RESTRAINT STANDARDS. M 0 2 0 CRSS MECHANICAL EQUIPMENT AND ACCESSORIES SCHEDULES ooAsbu.t r, 5o 4S5D 00 25700 972? A Amin Ca1loaip FM( 503 452 5701 I - - -% HEAT PUMP SCHEDULE HEATING COOLING 05 ISSUED FOR SYMBOL MANUFACTURER - - CFM MINIMUM SEER EXTERNAL SUPPLY ELECTRICAL OPER WEIGHT 0 30 CONSTRUCTION Si 81 /MODEL HEATING CAPACITY COP TOTAL POWER COOLING CAPACITY SENSIBLE TOTAL POWER OUTSIDE AIR S.P. FAN V o/H= LBS 97 'o 0 1T (Cal) DB (BTU/h) INPUT (KW) 0 95' DB (BTU/h) 0 95' DB (BTU/h) INPUT (KW) (C) IN WC. HP / 9 otsalPTNN • • HTPI CARRIER 12.000 1.8 2.0 24.000 16.000 2.7 800 80 10.0 0.6 1/4 208- 230/1/60 256 g CIRCLE AL Rl 1 NS 6 I T Y ... ° 501.5024 r too. o NEXT REws10N y C wins 2 6 n ALPHA REV1S1DNS ARE PRELIMINARY t S ARE NOT FOR COMs TR U CTIOI OR >! rABRIC•IID>. • SEAL } <<.! `1 � ' 1 1 'i s i s { , • - AIR DEVICE SCHEDULE 5,' 1 ` `•• r= I, r 17375 F � . v Z21 40000 r" UNIT SERVICE MANUF./ DESCRIPTION FACE NECK BLOW REMARKS 4 _'? .. NO. MODEL NO. SIZE SIZE I � ' . ' N r G< 1' 19.'c?- r' C SA - SUPPLY AIR KREUGER 1102 CEILING SUPPLY DIFFUSER 24x24 6x6 2 —WAY NOTES 1, 2. & 3 '9k• L O\I�1 SA -2 SUPPLY AIR KREUGER 1102 CEILING SUPPLY DIFFUSER 24x24 8x8 2 —WAY NOTES 1, 2. & 3 I EXPIRES: 12- 31 - 9r1 SA -3 SUPPLY AIR KREUGER 1104 CEILING SUPPLY DIFFUSER 24x24 8x8 4 -WAY NOTES 1, 2. & 3 RA -1 RETURN AIR KREUGER 1190 CEILING RETURN REGISTER 24x24 1000 — NOTES 1. 2. & 3 'on M. ALLEN DATE 05/25/97 osa D. CRACIN scAU N/A RA -2 RETURN AIR KREUGER 1190 CEILING RETURN REGISTER 24x24 12x12 - NOTES 1. 2. & 3 a. C. 0 cAO FILE i S1478M03 C opt M. MON ITH .roe NP RIAWELD3 JE JACOBS ENGINEERING GROUP INC. POST OFFICE 80x 5210 PORTLAND. OR 97208 -5210 (503) 3000 `Ax (503) 624 - 624 -3001 NOTES: n� (ID W/ ROUND NECK REDUCER WELLS FARGO O STEEL CONSTRUCTION 15570 SE PACIFIC HWY TIGARD, OR • O STANDARD 490 WHITE FINISH STORE #S1478 • KING CITY . DRAWING TITLE MECHANICAL EQUIPMENT SCHEDULE ' CLIENT DRAWING NUMBER REV. NO. M03 0 E. \ 111C1 I C\ 01 A%ATCI n E\ r An\ Ar1 tn\ Ar1 Sn►rn: 1 z_1n_fl1 fig nn. in. An 1 751 IA I n,... r.....:., v_ •)■I CRSS C "�` � LINCOLN CENTER TOWER 10260 SW GREENHURG ROAD SJITE 1000 GENERAL NOTES VORTLAND. OREGON 97223 503 452 5700 A Joeobs Company FAX 503 452 5701 1. CONTRACTOR SHALL PLACE ROOM THERMOSTAT AT 48 ABOVE 4 - FINISHED FLOOR IN ACCORDANCE WITH ADA. 2. INSULATE ALL DUCTWORK NOT INTERNALLY LINED IN ACCORDANCE WITH STATE ENERGY CODE REQUIREMENTS. 05 ISSUED FOR �s 0 3QCONSTRUCTION c • 97 DcsDRrona • NOR m m o ' pp mac ALL REVISIONS r IDENTIrY L+ WIT• DEL 1A REMOVE CONY CIRCL( ° I r > A BEFORE N(IF REVISION DRAWINGS grim ii O ANNA RCN/15104S ARE VR(LIUINARY k S ARC NOT KR CONSIRUCIION OR r 0 FABRICATION • - - i SEAL • + c - ' Y 1737:1 ` - ,�,�, V q :_ ON a 6 1 50 / ',A, Y 19 .' V G L. O \ i .1! � _ I I l EXPIpES: r \ _ _ � \ \ =1_- - L fI / - _ -- 6 i ../ ��I i 1 / '� ' / �� ` / 1 1 t ' - - ` - ' - v — - - - - - : - - - 6'e / s ; ,� i ' ® JACOBS ENGINEERING i 6 e • I �� it0• �:.���', `� ♦ 1 o • e ' 6•e , , GROUP INC. ENG 4 1�. I �` / 7 POSI o O R D 9 208 -5210 -- " - -- _ - -- , <- , . ___ PORTLAND. 7 — i - �� 1D a 11�� - r 14 \ r / ill p 1 (503 1504) 673001 ailgall dl ,- -Iv. , ;- „,. g rwAl Erta h— _ i w: 12 m r -� / I II ;;'� </, ' FARGO \__ !— ' i 10 : r \ _._ , = 1 15570 SE PACIFIC HWY �r I / TIGARD, OR I �' `- i STORE #S1478 I I � l il' I �.._ r I ! \1 ; _ % '`�- � - KING CITY - - -- - -- - - - -- - - -- - - -- -- - - - - -- - — + - -- - - -- - - - - -- -- - - - -- - -- - - �� •t - MIN. B 9 OD 9 - MIN. BOD DRAWING 711LE 1 �� ABOVE DROP CEILING ABOVE DROP CEILING . MECHANICAL - - -- ----- -- -" " -" - " - -- 14•x16" _ RETURN - - - 14 - LINED SUPPLY - - - - - - DUCT LAYOUT PLAN AIR DUCT UP THRU ROOF AIR DUCT UP THRU ROOF CONNECTED W/ FLEX, CONN. CONNECTED W/ FLEX, CONN. TO UNIT RETURN OPENING TO UNIT SUPPLY OPENING - ■ -- - - -- -- -- -" — - - - - - - ._ - - - --- - - - - - __ _- CLIENT DRAWING NUMBER REV. NO. • 0 4' 8' 12' M41 0 1 1 1 1 E I I % - • .. \�.f \•..ff. n \, �.n \f..wf,.lwf, . l_Y -N • ,L fL . 1 M.1w 1 "-- .� f.•Mf ..\ CRSS �C�` INC. LINCOLN CENTER LOWER 10260 SW GREENBURG ROAD SUITE 1000 PORTLAND. OREGON 97223 503 452 5700 A Jacobs Carman, FAX 503 452 5701 T URN LEAD FLASHING DOWN INSIDE PLUMBING VE NT PIPE 2' • = WHERE APPLICABLE N • HEAT PUMP PACKAGE UNIT. SET LEVEL. _ SEALANT 05 ISSUED FOR ' DRAW BAND 0 3OCONSTRUCTION c tti- PRE-FABRICATED CURB WITH TREATED ' I I 97 NAILER AND RIGID INSULATION. CON- 4 LB LEAD PIPE JACK, ocsc iPTloN STRUCTED TO MATCH SLOPE OF ROOF. 1 FURNISHED BV TRADE Mpn. m a' limmolI�C�] / mac Au REV1siiS s I RESPONSIBLE FOR K WI TN DELTA 1 CRAY CIROI ° ° Z I I PENETRATION. SET G :PHA NETT REVISIOR oRAW1NCS .ITN 'v IS i PHA REVISIONS ARC PRELIUINAR• 4: S I I TR FLANGES IN ASHPHALT ARE NOT roR CONSUCTION OR i 1y O - PLASTIC ROOF CEMENT rAeRICATION 1/2' X 1 1/2" NEOPRENE GASKET. ALL `= OVER ROOFING PLIES AROUND. SEAL 2 PLY COMPOSITION ..or - f n: .,',. I STRIPPING ' ' • . 1; . 1 ►, I ROOF INSULATI , ' 1 • .• . , FLEXIBLE CONNECTION - SIZED I t;` J / � I TO MA TCH UNIT OPENING ►.I vr. ‘..... / ..... ii •. �I ' ' I ROOF DECK ��`REG�IJ , . , _ � I C � � T om: i a II I c 01 L. 0 ' i V 18 GAx2' WIDE SHT. MIL. CLIP WITH (4) NO. 10 x 1/2" TEK SCREWS ON. THRU TOP OF 1 EXPIRES: ja - .3/ -'7rl CURB AND (4) NO. 10 x 1/2" TEK SCREWS UP THRU UNIT BASE RAIL, AT 6' FROM AL ROOF PENETRATION DETAIL CORNERS & 24" O.C. MAX., ALL AROUND. NTS ' Du M. ALLEN DATE 05/25/97 0 i, DSO+ D. CRAGIN sc a. G. OWE cAD FILE I 51478M71 • • DPE M. LION ITN .roe He RIAWEL03 I JACOBS ENGINEERING GROUP INC. POST OFFICE EIOx 5210 FOR ROOF CONSTRUCTION AND ( 503) 624 OR 97206 -5210 PENETRATION DETAILS SEE A77 • ® w3 03) woo �+ AX (503) 62 -3001 — G MECHANICAL EQUIPMENT WELLS Q LLw7 Lail i' A RGO ^ I VENT 6' ABOVE TRAP � UNION z— CLEANOUT CAP 15570 SE PACIFIC HWY ACOUSTICALLY LINED DUCT. ' TIGARD. OR STORE #S1478 • < KING CITY MECHANICAL HVAC ROOF CURB PARTIAL SECTION DETAIL - NTS '— CONDENSATE DRAIN LINE SHALL RUN TO OR PENETRATE ROOF & DRAWING TITLE • TRAP BE ROUTED TO NEAREST DRAIN MECHANICAL • DETAILS • HVAC CONDENSATION DRAIN CONNECTION CLIENT DRAWING NUMBER REV. NO. � MECHANICAL HV /"6Lr V\JI�LJG I ��M N NT TS r VfVVI� �/Ir 1 M, DETAIL M71 0 • R �• `SS 1026E 000GREfNeuORG ROAD PORTLAND. OREGON 97223 Constructors 503 452 5700 A FAX 503 452 5701 05 ISSUED FOR Se��i c3 0 30000NSTRUCTION 97 0 asalPnc• > - wort > • m m € mac A u RBV1sms • IDENTIFY y r &r REMOVE pY CIRQ[ I% i BEPHRE DEL,A (V15 RCSISION & DRAWI WITH §, 5 b k' n ALPHA REVISIONS ARE PRELIMINARY • S ¢ ARE NOT FOR CONSTRUCTION OR r O FABRICATION MECHANICAL FASTENERS SEAL • (TYP.) DUCT SEALER CONTINUOUS ROOF BRANCH WITH DAMPER DECK UNDER UNITS 4 <t f:Cr, EXCEPT AT ROOF PENETRATIONS. , ,t j: 11 �,, . COVER DECK i.: 1. 1 17375 9 INSULATED COMPLETELY INSIDE � - r j/— SUPPLY DUCT SEE CONDENSATE DRAIN CURB WI 2 ". 3 PCF ROUND NECK ADAPTER PUMP SHEETCM71 DETAIL RIGID RUCC�T � & / OPPOSED BLADE DAMPER _ \ DUCTS TIGHTLY W/ % /� - / N jj � y �O INSULATION TO SAFETY WIRE— FASTEN r s jj FL EX IBLE AND LEAKS. NOISE G' 19 � TO MAT --'- TO STRUCTURE ABOVE ` CONNECTION G L. O MOUNT ON DIAGONALLY ` — UNIT OA HOOD OPPOSITE CORNERS IN SEISMIC ZONES 2. 3 & ` .‘, 1 EXPIRES. g- 3 /— /el n ROOF CURB 4 PER UBC. ROOF INSULATED a�� — — FLEXIBLE DUCT 5 , DFT M. ALLEN DATE 05/25/97 (MAX. LENGTH —0") 1 I 1 I Elsa D. CRAGIN GALE N/A SHEET METAL SCREW / \ I 1 D(�p? "G T —BAR WITH HANGER I I ,DPE a U. u ITH / roe AO He WILE RIA/ 05/25/97 YYE L03 TO 72 COORDINATE WITH ' i i SOUND ATTENUATING JACOBS ENGINEERING AT (4) SIDES ARCH. DRAWINGS 'I� I __÷...1. H OR ZONTAL D TAKEOF S GROUP INC. CEILING TILE SEE DWG. M41. PosT Orr. Box 5210 PORTLAND. OR 97206 -5210 CEILING DIFFUSER TO 0 fA ( 6 3 2° - BE COORDINATED W/ CEILING TILE CEILING WELLS FARGO 15570 SE PACIFIC HWY TIGARD. OR STORE #51478 • KING CITY . MECHANICAL HVAC FLEX DUCT CONNECTION DETAIL ROOFTOP HEAT PUMP UNIT INSTALLATION DETAIL . NTS NTS DRAWING TITLE MECHANICAL DETAILS --/ . CLIENT DRAWING NUMBER REV. NO. M72 0 . \mil „f. y. •./. w. ♦�M \. \„nYrM • -M.wl � •�IW w< vW 1 t —. .— 1,.. . -., .n CRSS CONSTRUCTORS. INC. GENERAL MECHANICAL SPECIFICATIONS PART 2 PRODUCTS eaarq 2 North Sub Rot Constructors Pduana OR 97223 A J10.4b. cw.•■ (503) 452.5700 SECTION 15180 2.1 DUCT INSULATION Fax (503)452.5701 INSULATION A. Insulate new supply and return air ductwork with 1 inch fiberglass insulation, 1.5 -3.0 lb/cu ft density with aluminum foil vapor barrier. Tape joints. . PART 1 GENERAL B. Insulation shall be 1- inch -thick type 200 or approved equal, Owens - Corning Fiberglass Aeroflot. 05 ISSUED FOR 1.1 SUMMARY . 0 30 CONSTRUCTION C. Where ducts are internally lined, exterior insulation is not required. Duct All work to be furnished and installed under this section shall include, but not dimensions on drawings are inside, net effective area size. Increase metal sizes • necessarily be limited to the following: as required to allow for 1 inch thickness of duct liner. Duct liners shall be CertainTeed Ultralite Type 150, or approved equal. A. Supply air ductwork. SEAL r . i� D. Apply and fasten insulation in strict conformance with manufacturer's published . !!i i 1 " : . • t; . B. Return air ductwork recommendations. FF• 17375 9 C. Acoustical duct lining where shown on drawings. / �� • PART 3 EXECUTION I/� ,, o t. 1.2 RELATED WORK IN OTHER SECTION (,� �'' Y 19. ‘ 3.1 DUCTS AND PIPE L. L. 0` Section 15600, Heating, Ventilating. and Air Conditioning A. Clean and dry surfaces before installing insulation. [EXPIRES: /,z-3/ -48' I 1.3 APPROVALS B. Butt joints of insulation together with vapor barrier overlap to obtain full DFT 0 Cragn DATE 05,30,97 A. Materials shall be fire retardant, tested by an independent testing laboratory in coverage. Do not compress the insulation. DSGN D Craw, SCALE WA compliance with Oregon Non - Residential Energy Code, 1996. CK G OwoCAO FILESPEC_MECDOC C. Staple all flaps. DPE M Mordenn JOB NO R1AWEL03 B. Duct covering, duct lining, and equipment insulation shall have a maximum flame spread rating of 25 and a maximum smoke developed rating of 50. D. For rectangle ducts 20 inches or larger in width secure the flexible insulation to ENGINEERING P g Pe g g g � GROUP JACOBS INC. the bottom of the duct by adhesive applied in 6 -inch square dabs on 24 -inch P.o. Box 5210 C. These ratings are per test method ASTM E84 and are to be composite ratings centers in each direction. ® Portland, OR 97208.5210 (503) 624 -3000 (jacket, insulation, and adhesive). Ratings are to be shown on the products or on Fax (503) 624 -3001 their carton labels, or they may be verified by a report from an independent testing laboratory. END OF SECTION 15180 WELLS FARGO 1.4 SUBMITTALS 15570 SE PACIFIC HWY TIGARD, OR A. Prior to construction, submit for approval the following material: STORE # S1478 1. Pipe insulation. . KING CITY 2. Duct Insulation: , PECIFICATION TITLE: a. Supply ducts. Mechanical b. Return ducts. Sheet 1 of 6 3. Duct lining material. DRAWING NO. REV M91 0 WWI U ic CRSS CONSTRUCTORS. WC. U Gao SECTION 15325 L. The entire sprinkler system must be restored to full operation at the end of each day .' `~~ 10220 SW Green°rrp Rd P Y Pe Y 1 Budding 2 N°R Suae 301 during the duration of the project construction. constructors Pardons OR 97223 • JM. .V cvw 0031452.5700 SPRINKLERS Fa. (503) 452.5701 M. Areas outside the construction are protected by general pattern sprinkler heads (per base contract drawings). A. Scope: Design, furnish. and install required labor, materials, equipment, testing, and contractor services necessary for complete sprinkler system throughout tenant space. N. Coordinate location of sprinkler heads with all other trades. Install to best suit field Add new or relocate existing heads to new ceiling. Design and lay out piping as required conditions. Coordinate layout of piping with ductwork and existing piping, and offset for architectural layout. including areas outside this tenant. piping as required. Install new and relocate existing branch tin as high as possible to 05 ISSUED FOR �y avoid other trades. Y g P P g 8 piping g 8h Po : Q 3o CONSTRUCTION r 97 B. Determine size of existing piping and proper sizing of new piping. Provide any hydraulic calculations required by local authority having jurisdiction or Owner's O. Locate new sprinkler heads at the center of the tile and along the centerline of an axis in • insurance underwriter. both directions with maximum deviation of t 1" where applicable (unless otherwise , noted on plans or required by code). C. Standards: NFPA 13, 14, and 318, the latest UFC, and rules, codes, orders, regulations, SEAL • Pi10 f. � ordinances, and laws imposed by jurisdictional authorities related to the work. . .c'` � w 17375 '` ' ' D. Approvals, inspections, examinations, and tests required by the authorities and /or /� r agencies shall be arranged and paid for by the sprinkler contractor as necessary to obtain complete and final acceptance of the fire protection system. The sprinkler contractor _ , v t. GON shall deliver certificates of all such inspections to the Architect. � ■y 19 °`' C . ‘i,&.- F G O E. Sprinkler work must be done by state licensed sprinkler contractor. L ;;r ,.. 1.2 3/ 991 F. Basis for Design: Light hazard for office areas. , OFT D Crape DATE 05/30197 G. Sprinklers: New and relocated sprinkler heads shall be quick response type; temperature OSGN D Crap SCALE NA rating 160 °F. Adjustable sprinkelr drops are not allowed. Escutcheons shall be of metal CK G O w D FILE SPEC MEC DOC construction. DPE MJOB NO RIAWEL03 Area Type Chrome Pendent Orifice K Factor GROUP S NC. GINEERtNG Office With white escutcheon 1/2" 5.6 P.O. Box 5210 Portland, OR 97208 -5210 1 (503) 624-3000 H. Piping: Conform to requirements of the ASA safety code; ensure piping is free from Fax (503) 624 -3001 defects and is identified. Piping material: Black steel, Schedule 40 per ASTM A53. WELLS FARGO I. Hangers and Supports: Install per NFPA No. 13 sections on hangers; protect piping against damage where subject to earthquake. Bending of threaded hanger rod is not 15570 SE PACIFIC HWY allowed. Power driven anchor pins in concrete are not allowed. All new hanger `C' TIGARD, OR clamps shall have retaining straps per code. STORE # S1478 J. Sprinkler System Joints: Made with Victaulic Style 77, 75, 07, or 005 grooved KING CITY couplings; threaded or welded joints. Victaulic style 99 "Roust -A- Bout" or style 90 plain lock couplings are not acceptable. Mechanical tees shall be Victaulic Style 920 or PECIFICATION TITLE: approved equal. Victaulic Style 921 or 922 mechanical tees are not acceptable. Mechanical K. Shutting and opening of valves must be witnessed by building engineer or project Sheet 2 of 6 architect. Notify local fire department. Contractor shall maintain sprinkler systems operational in areas outside this tenant. DRAWING NO. REV M91 0 ppipini C RSS CONSTRUCTORS. INC. SECTION 15400 SECTION 15600 ♦ i'I 1Q220 � """an0"° R0 eu+a.w 2 wac, swa 30, Constructors PO OR 97223 • J..cA. c...-..,,, (503) 452-5700 • PLUMBING HEATING, VENTILATING, AND AIR CONDITIONING Fs. (5031152.5701 PART I GENERAL PART 1 GENERAL 1.1 SUMMARY 1.1 SCOPE 05 30 ISSUED FOR 0- A. Water piping, waste, and vent. A. Heat pump. 30 CONSTRUCTION B. Connections to mechanical equipment. B. Air distribution ducts. C. Plumbing fixtures. C. Equipment isolation. • SEAL • 1.2 RELATED WORK IN OTHER SECTIONS D. Motors for equipment of this section. S `�F.' i'RPrt, Section 15180, Insulation. E. Thermostats and controls. - 17375 ` ..' ; C r - F. Testing of heating and cooling work. "toll'''. N PART 2 PRODUCTS - OL' G. Instruction of Owner's personnel for maintenance of system. �, � : a 2.1 PIPING • 'Q� 'G L. O H. Layout drawings. A. Existing piping on site to be relocated shall be replaced with identical material to rvr'i CT • /2-1/-71- I match existing. 1.2 RELATED WORK IN OTHER SECTIONS T 0 crape DATE 05r3a97 SGN 0 Crape SCALE WA B. Soil and Waste Pipe: Cast iron; ANSI A21.6 service weight, Tyler "No Hub ". A. Section 15180, Insulation. K G a $V FILE SPEC MEC DOC Bituminous coating, ANSI A21.10 fittings "No Hub ", Tyler "No Hub" neoprene PE M M h JOB NO RIAWELO3 sleeve, stainless steel shield conforming to AISPI 301 and ASTM C564. B. Section 15620, Testing, Adjusting, and Balancing. JACOBS ENGINEERING GROUP INC. C. Vent Piping Above Grade: Same as for soil and waste. C. Division 16000, Electrical. P.O. Box 5210 � Portland. OR 97208 -5210 _ D. Condensate Drain Lines: Type L hard drawn copper per ASTM B88. 1.3 SUBMITTALS (503) 624 -3000 ype ppe pe Fax (503) 624 -3001 Prior to construction, submit for approval the following materials and equipment: WELLS FARGO END OF SECTION 15400 A. Ductwork, acoustical linings. 15570 SE PACIFIC HWY TIGARD, OR B. Fire and smoke dampers. STORE # S1478 ,. C. Registers and diffusers. KING CITY D. Heat pump. . PECIFICATION TITLE: E. Vibration isolation. Mechanical F. Air testing equipment. Sheet 3 of 6 G. Thermometers and gauges. DRAWING NO. REV M91 0 CRSS CONSTRUCTORS, INC. Lncoon Corder B. Pressure Classifications: Construct supply ductwork for +1 inch WG and ♦ ~ ~ t0220s"' Greenmail RO &dam 2 Norm. Sour 301 H. Layout drawings. return/exhaust ductwork for -1 inch WG per the current HVAC duct construction Constructors Po4Un0 OR 97223 A....w.:o•...-, 15031.52 -5700 standards published by SMACNA. Fo (503) 452.5701 1. Seismic bracing and anchorages. - C. Duct Sealing Requirements: All supply ducts Class A; return and exhaust ducts, 1.4 LAYOUT (SHOP) DRAWINGS Class B. per SMACNA. Prior to the start of installation, submit to the Architect/Engineer for approval, layout D. Flexible Ducts: Cody West No. N.I.L acoustical, round, insulated, fully lined, drawings (to scale). Coordinate with all building systems and lists of materials, fixtures, flexible duct; UL 181 listed, complying with NFPA Standards 90A and 90B. 05 ISSUED FOR 0 and equipment to be incorporated in the work. The layout drawings shall consist of Factory- fabricated assembly shall be composed of an inner duct or woven and 90 CONSTRUCTION plans and sections, with elevations and sections showing clearly the locations and size of coated fiberglass proving and air seal bonded to steel wire helix, and a thick major items of equipment, and ductwork as listed below, and clearances for maintenance fiberglass insulating blanket enclosed with a vapor barrier metalized film • withdrawals of removable components. The general arrangement of the systems to be laminate. Maximum length, 5 feet. installed, coordination with other work, and all requirements for installation shall be met. Layout drawings shall show all ducts, fans, air outlets, and thermostat locations. 2.2 DUCTWORK SPECIALTIES SEAL � OD L ? f Minimum scale of layout drawings shall be 1 /4 inch to the foot. N E� mac" �' A. Volume and Splitter Dampers: Galvanized sheet metal with Young regulator, �J 17"375 < St), 1 .5 T he mechanical contractor shall include the costs of dampers, pulleys, and belt changes Ventfabrics Inc., Ventlok, or approved equal operating hardware. For ' / :pr.. to meet the air balance requirements. Refer to Section 15620, Testing. Adjusting. and accessible dampers, provide No. 620, 635, or 637 dial regulators, No. 635, or Balancing. 637 square end bearing, as applicable. For accessible dampers, provide No. 666 . �- . ECON g q g v, concealed damper regulator with bearings as above. G , 4 Y 19. M FG L. O' PART 2 PRODUCTS . B. Flexible Connections: Q Industries, Consolidated Kinetics; Elgen "Silent Duct ", Type Sda Vent fabrics, or approved equal. 1 r , l 0,- 3 / -9ri 2.1 DUCTWORK 2.3 GRILLES, REGISTERS, AND DIFFUSERS DFT D Crmaen DATE 05/30197 A. General: Construct all ductwork and plenums with joints, bracing, reinforcing, DSGN D Cra°n SCALE N/A required gauges, and other construction details, in accordance with the latest Shoemaker as noted, or approved equal by Metal Aire, Kreuger; sizes, capacities, and CK G Ower), j SPEC_MECDOC ASHRAE (American Society of Heating Refrigeration and Air Conditioning pattern as shown on the drawings. Install all outlets flushed, squared, and entirely DPE M Mortal JJOBNO RIAWELO3 Engineers) guide and data book, and SMACNA (Sheet Metal Air Conditioning covering sheet metal ductwork and gaskets. Thread sheet metal mounting screws tightly National Association) duct manual, unless specified otherwise. Comply with into sheet metal. All frames to fit ceiling type (see drawings). Diffusers to provide JACOBS ENGINEERING GROUP INC. requirements of NFPA (National Fire Protection Association) pamphlet No. proper air distribution at NC 30 or less. Install with opposed blade dampers. P.o. Box 5210 90A, 90B, and UL (Underwriters Laboratories Inc.) Standard No. 181 as JE4, Portland. OR 97208 -5210 applicable. 2.4 VIBRATION ISOLATION F (503) ax 6 (5003) 3) 624-3001 1. Construct duct of United States Steel, Kaiser, or approved equal; Heat pump fan to be internally mounted on spring vibration eliminators. WELLS FARGO galvanized sheet metal. Aluminum, fiberglass, or knockdown ductwork is not acceptable. 2.5 SPACE THERMOSTATS 15570 SE PACIFIC HWY TIGARD, OR 2. Include manufacturer, sheet metal type, gauge, and hardness in Multistage with integral time clock, 2- position OA damper control; capable of automatic STORE # S1478 - submission. change -over between cooling and heating modes, with a 5 -degree change -over differential. Thermostat to be "White Rodgers" model 1F94 -71, or approved equal with KING CITY 3. Diagonally crossbreak all panels on ducts 30- inches wide and larger, or digital programmable automatic changeover. Install each thermostat with locking cover. bead, using automatic bead machine, with beads at 12 inches on center or less. 2.6 HEAT PUMP UNIT PECIFICATION TITLE: 4. Duct dimensions indicated on drawings are net, inside, clear dimensions. A. "Carrier" or approved equal, factory assembled, single piece, air -to-air heat Mechanical For internally lined ducts, add lining thickness to determine metal duct pump. Contained within the unit enclosure shall be all factory wiring, piping, Sheet 4 of 6 dimensions. controls, and refrigerant charge (R -22). DRAWING NO. REV M91 0 i • CRSS CONSTRUCTORS. INC. ti�~ 10220 SW Greenb�+p Rd SECTION 1 &kW Busking 2 North Sune 301 B. Features to Include: Down discharge arrangement, field - installed roof curb, constructors Pon,ana OR 97223 A,.A.All;A„_1 15031452•5700 base rail, and 2- position damper to provide minimum OA requirements during TESTING, ADJUSTING, AND BALANCING Fan ,503,452.5701 Occupied periods and 100 percent recirculation during unoccupied periods. Vertical ducts penetrating the roof to be acoustically lined from heat pump down to horizontal takeoffs on duct plan layout. PART 1 GENERAL - , 1.1 SUMMARY PART 3 EXECUTION 05 ISSUED FOR All work to be furnished and installed under this section shall include, but not 3o CONSTRUCTION 97 . ° 3.1 DUCTWORK necessarily be limited to the testing and balancing of the following: ' • A. General: Construct ducts and plenums with joints, bracing, reinforcing, required A. Air distribution and air outlets. gauges, and other construction details in accordance with the latest ASHRAE • guide and data book and SMACNA manual, and unless herein specified B. Automatic temperature control system. SEAL `tv !:!;,1,-, .. t otherwise, comply with requirements of NFPA pamphlet No. 90A. _' = �'; , (� • • C. Air balancing reports. � a c, 11 15 -r• B. Joints, Rectangular Ducts: Drive slip joints or standard seams. Seal standing r transverse seams and concealed drive slip joints on supply and return air ducts 1.2 WORK RELATED IN OTHER SECTIONS / with arabol and canvas. l c* ..- -ON Section 15600, Heating, Ventilating, and Air Conditioning.. C v4 .19. As' - a C. Joints, Round: Swage type with minimum of three sheet metal screws each '9 6-- G L 0 I1- joint. Seal joints on supply and return air ducts with arabol and canvas exhaust ducts with duct tape. PART 2 PRODUCTS ISXPIRES. /..1-3/1t I D. Elbows and Transitions: 2.1 TESTING, ADJUSTING, AND BALANCING DFT D Crape DATE 05/30197 DSGN D Crape SC� WA 1. Construct radius elbows with inside radius not less than duct width. A. Testing, adjusting, and balancing of air distribution shall be performed by an CK G O AD FILE SPEC_MECDOC independent agency with AABC or NEB certification, that specializes in, and DPE M Monteith JOB NO RIAWELO3 2. Use square elbows in all cases where exposed, unless otherwise whose business is limited to, testing, adjusting, and balancing of air conditioning indicated, and in lieu of radius elbows where required to facilitate systems,. - GROUP INC. JACOBS ENGINEERING installation. P.O Box 5210 I. Instruments used by this agency shall be accurately calibrated and ® Portland, OR 97208 -5210 e of 1 to 5 ratio. maintained in good working order. (503) 623 -3000 3. Construct transitions with minimum slope g g Fax (503) 624-3001 4. All square elbows in supply ducts shall have turning vanes. 2. Agency includes an extended warranty of 90 days after completion of WELLS FARGO the test and balance work, during which time the engineer may request 1 END OF SECTION 15600 readjustment of the system to comply with comfort, sound conditions, or 15570 SE PACIFIC HY W relative space pressure requirements. TIGARD, OR STORE # S1478 ° B. Testing, adjusting, and balancing agency, as part of its contract, acts as authorized inspection agency responsible to Architect/Engineer and Owner, and KING CITY during the test and balance, lists all items that are installed incorrectly, require correction, or have not been installed in accordance with contract drawings 1 and/or specifications. PECIFICATION TITLE: i C. The testing, adjusting, and balancing agency provides, with his bid, a Mechanical performance guarantee covering all phases of the work as herein specified. Sheet 5 of 6 DRAWING NO. REV M91 0 i WWI CRSS CONSTRUCTORS. INC. D. The mechanical contractor cooperates with the selected test and balance agency PART 3 EXECUTION 111. S'NGrsenS�pRO 8 0220 2 Non. Sufis 30, in the following manner: Constructors PtxnUnd OR 97223 .,._.. ; (5031452.5700 A. Report to the Architect/Engineer any noted deviations from contract documents. Fax (503) 452 -5701 1. Provides sufficient time before final completion dates so that tests and . - balancing can be accomplished. B. Report deficiencies in control system, damper leakage, mixing box leakage, thermostat malfunction, excessive noise in the HVAC system, and other deficiencies. 2. Provides immediate labor and tools to make corrections as required by test and balance agency. 05 ISSUED FOR . , 3. Include the costs of dampers, pulleys, and belt changes in his contract. END OF SECTION 15620 30 CONSTRUCTION 97 E. Upon completion of the air conditioning system, contractor performs tests, r compiles test data, and submits four copies of the complete test data to the Owner for evaluation, verification, and approval. EAL .%.O � ,�I l). • F. Air System Test and Balance Procedure: c�� r c J .i I. Test and adjust fan rpm to design requirements. 1.,c-9 �`, 1137 `� � / ■ tr 2. Test and record motor full load amperes. OR GO 3. Make picot tube traverse of main supply ducts and obtain design cfm at '9 L 041 fans. 4. Test and record system pressures, suction, and discharge. EXPIRE• 1 -31- • y Dfl D Crspn BATE 0513097 5. Test and adjust system for design recirculated air, cfm. DSGN o Craps" SCALE N/A CK G OwCAD FILE SPEC MEC DOC 6. Test and adjust system for design cfm outside air. DPE N t.torssa. JOB NO RIAWELO3 JACOBS ENGINEERING 7. Adjust main supply and return air ducts to proper design cfm. GROUP INC. P.O Box 5210 8. Test and adjust each diffuser and register to within 10 percent of design - JE® Portland. OR 97208 -5210 (503) 624-3000 requirements. Fax (503) 624 -3001 9. Identify each diffuser and register as to location in the report. WELLS FARGO 10. Readings and tests of diffusers and registers shall include required 15570 SE PACIFIC HWY velocity and test resultant velocity, required cfm and test resultant cfm TIGARD, OR . after adjustment. STORE # S1478 , ' 11. Check all controls requiring adjustment. Check room thermostat for KING CITY cooling and heating response. 12. Adjust diffusers and registers to minimize drafts in all areas. PECIFICATION TITLE: Mechanical Sheet 6 of 6 I DRAWING NO. REV M91 0