Loading...
Correspondence / 3 70 7 54, A January 6. 1997 CITY OF TIGARD OREGON ed.," e ' -o ��L — / 37G �) RE: � c y� � -Seto Our records indicate that either no inspections have been conducted on the project authorized by the above noted permit OR inspection(s) have been conducted but we have no record of any subsequent or final inspections within the past 15 days. Oregon Administrative Rule (OAR) 918 - 260 -270 requires initial inspections be requested within 24 hours of completion of installation and inspections for corrections to be made within 15 days. Permits and inspections required by the Tigard Municipal Code are an important part of your project Permits help to ensure that work is done in compliance with mt:umum code requirements. Inspections are intended to protect the occupants of buildings and building owners. As the electrical contractor, you are responsible for obtaining the required inspections. •The City would like to work with you to close out this project with steps taken to assure that at least minimum code compliance has been achieved. If you are ready to schedule the next inspection please call our 24 -hour Inspection Recorder at 639 -4175 within 15 days. Be prepared to provide the following information: Permit number, address of property, your name, your phone number, and the date you are requesting the inspection (inspection times cannot be guaranteed, but you may request a.m. or p.m.). If you need additional time to complete your project please respond, IN WRITING, within 15 days. You may request an additional 15 days. Please provide the following information: Permit number, address of property, your name, a day time phone number, and an explanation for the request. IF YOU ARE UNSURE ABOUT WHAT PROJECT THIS LETTER IS REGARDING, OR HAVE ANY QUESTIONS, please contact the Building Division at 6394171 ezt. 610 (voice mail). To better serve you. please have the following information: Permit number. address of property, your name and a day time phone number. Thank you for your cooperation in this matter. Please note that the City may pursue civil enforcement locally and at the state level, if work has proceeded without inspections or if an unfinished project is outstanding. Your prompt attention will resolve this matter and enable us to provide you with the required inspections. Jeanne Temple Building Division iamacsiv6elmi sppeodoc 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772