Loading...
Report (17) 5 tT9 ` -ado /(, /FA SAKE R PLANNING ENGINEERING SURVEYING ASSOCIATES INC. FROM: MATTHEW J. DOLAN, PE TO: DAVE SCOTT FILE: 100103 CITY OF TIGARD PO BOX 23397 DATE: 05/12/94 TIGARD, OR 97223 SUBJECT: U.S. VAN FILL SITE ENCLOSED HEREWITH: PRELIMINARY COST ESTIMATE FINAL COMPUTER DISK CONSTRUCTION PLANS DRAWING NO. GRADING PLANS OTHER ENCLOSED FIND COPIES OF OUR OBSERVATION REPORTS FOR THE ABOVE REFERENCED PROJECT. SHOULD YOU HAVE ANY QUESTIONS, CONTACT OUR OFFICE. Yours very truly, WAKER ASSOCIATES, INC. BY i� /.�.- ,/, 11080 S.W. ALLEN BOULEVARD / SUITE 100 / BEAVERTON, OREGON 97005 / PHONE (503) 643 -9410 / FAX (503) 643 -0625 • • • , WAKER ASSOCIATES, INC. 11080 S.W. Allen Blvd., Suite #100 BEAVERTON, OR 97005 Inspector's Doily Report — DATE 5/ 5 / 9454 ' PROJECT NAME 4 - 1 . ./A/ CONTRACTOR.A HA c- PROJECT NO i Obi 0 TEMP. css 0 WEATHER 8 4 e 4 Ii i e .°1 - ) O' SUPERVISOR MEN (Do Not Include Operators) BACKHOE GRADER BULLDOZER X ROLLER LOADER TURNAPULL PAVER DUMP TRUCK X DAMAGE TO UTILITIES (TYPE) TIME LOCATION REPAIRS COMPLETED TIME DAMAGE OTHER THAN UTILITIES TIME LOCATION General information covering Progress of Work. Details of any Damage done by the CONTRACTORS, important development instructions to CONTRACTORS, instructions from ENGINEER. Time lost by CONTRACTOR'S EQUIPMENT due to breakdown. etc. 05 sceVei) POnip 1-1-A0 17.1 LOA - F?IZ )1 4 A AID /4 Do tA), 4+4 A Ss isoccee 5pR eAbiNe GUM PAGili■16 • - INSPECT If Additional Space Is Required Use Other Side ENGINEER / 7 % .1(t V /1.4 WAKER ASSOCIATES, INC. 11080 S.W. Allen Blvd., Suite #100 BEAVERTON, OR 97005 Ins -pe t-o-r-'s Daily Report 7 i( 11 ' DATE / PROJECT NAME . - CONTRACTOR.,-/ • PROJECT NO /' ' 4 1 C - TEMP. / WEATHER SUPERVISOR ;� MEN (Do Not Include Operators) BACKHOE GRADER BULLDOZER i • ROLLER LOADER TURNAPULL PAVER DUMP TRUCK � DAMAGE TO UTILITIES (TYPE) t'1,4 TIME LOCATION REPAIRS COMPLETED . TIME DAMAGE OTHER THAN UTILITIES -'/ . TIME LOCATION General information covering Progress of Work. Details of any Damage done by the CONTRACTORS, important development. instructions to CONTRACTORS, instructions from ENGINEER, Time lost by CONTRACTOR'S EQUIPMENT due to breakdown, etc. /e _. /i /L ['rw NJ . /ie tr. - _ 7 INSPECTOR If Additional Space Is Required Use Other Side ENGINEER "/„,/ • " WAKER ASSOCIATES, INC. 11080 S.W. Allen Blvd., Suite *100 BEAVERTON, OR 97005 Inspector's Daily Report • f DATE 5/0 PROJECT NAME � S. VANS CONT 1F f PROJECT NO / 0() 143 ! TEMP 7b WEATHER C LC' SUPERVISOR MEN (Do Not Include Operators) BACKHOE GRADER BULLDOZER X ROLLER k LOADER TURNAPULL PAVER DUMP TRUCK X DAMAGE TO UTILITIES (TYPE) TIME LOCATION REPAIRS COMPLETED TIME DAMAGE OTHER THAN UTILITIES TIME LOCATION . .. .... ....... .... ... . General information covering Progress of Work„ Details of any Damage done by the CONTRACTORS, important development. instructions to CONTRACTORS, instructions from ENGINEER, Time lost by CONTRACTOR'S EQUIPMENT due to breakdown. etc. ( 3 S VED ` J u g ? 4-21-1 c 6 /-tA L, J c IN m4 7 "-eem L.. ,4 A DOZ I) 41-1 P, SHE "tP� fa* cempAc }qC� > fl E,tDiruC, qr.1© INSPEC 1 If Additional Space Is Required Use Other Side ENGINEER. - -, %" ' « OW 5 4 - ;POI!' '15 , WAKER ASSOCIATES, IN-C. 11080 S.W. Allen Blvd., Suite #100 BEAVERTON, OR 97005 Inspector's Daily Report DATE 5/ 4 PROJECT NAME 1 -- ) ' 5. VAJ 5 CONTRACTOR Ai --t3 4 PROJECT NO 10 0 I 0 TEMP 7 WEATHER C L SUPERVISOR AkA/6- MEN (Do Not Include Operators) BACKHOE GRADER BULLDOZER E LOADER TURNAPULL PAVER DUMP TRUCK / DAMAGE TO UTILITIES (TYPE) TIME LOCATION REPAIRS COMPLETED TIME DAMAGE OTHER THAN UTILITIES TIME LOCATION General information covering Progress of Work. Details of any Damage done by the CONTRACTORS, important development. instructions to CONTRACTORS, instructions from ENGINEER. Time lost by CONTRACTOR'S EQUIPMENT due to breakdown, etc. _ Or' A c - i - , v, y — ONE aimp -1 LOAD oF /IN soi-1-15,54.4 & ti olist • A roez. - reuce AND Corelpptc+oe.._ ( pfvx.e c 1;nu+1-4 oF Sq.+ FEIJCe wAs PiNhAtr) 1:)04oN LASE _APP0X F2 L4. 5LopE Loos fv1020 Se V6,e6 _444A 1:1 'CA Fiace O AND $o+ CompAc-1-61> /4 x iv 7 sLopc OF +He Top sisFp■ce OI +14E FILL DEct.17./ES - frotuAw---„ TH Is I +He 0 ? Po o DESJ&r.) o /■1 4- NE- (A) fri EC E- 5L& LS % Ai2Ds soof4 -i- Ce66<- A 44ecnE .AA (50 x ±-) I 6:x cAim4-62 h.) 4-i4e N E. HSFLL S,4E. ( C)6E . 'OP A 75' i-ALL INSPEC R / If Additional Space Is Required Use Other Side ENGINEER