Loading...
Report ( Q II °� 5k) J/r,w10✓s, e 50- Main Office Salem Office Bend Office P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918 • Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708 Carlson Testing Inc • Phone (503) 684 -3460 FAX (503) 684 -0954 Phone (503) 589 -1252 Phone (541) 330 -9155 FAX (503) 589 1309 FAX (541) 330 -9163 Special Inspection FINAL SUMMARY LETTER April 6, 2006 T0601554 City of Tigard 13125 SW Hall Blvd., Tigard, OR 97223 -8199 Attn: Dan Nelson Re: My Gym 10115 SW Nimbus Avenue- Tigard, OR Permit# BUP2006-00073 Dear Mr. Nelson: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Shear Testing of Anchors Torque Testing of Anchors Structural Steel - (Includes verification of welder certifications, weld procedures and material certifications. ** Above inspections were per VLMK Consulting Engineer's letter dated March 29, 2006. All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are - ' further questions regarding this matter, please do not hesitate to contact this office. Respectf , submitted, CARLS • TESTING, INC. Jam :'. . Hietpas O • ' ations Manager i /ks c: BA & S International LLC- Tim Schlabach APR -06 -2006 THU 03:01 PM CARLSON TESTING INC. FAX NO. 5036840954 P. 03 FROM BASS, LLC FAX NO. : 5036704712 Mar. 30 2006 08 :41em P4 loit9 - 10601ssL(' V IJ 4 K E C O N G 5 I 1 I NE T ER 5 503,24t9253 vh ICOVIMkcom 3933 SW Kelly Avenue • Portland • Oregon 97239.4393 weNw.vlmk+:om March 29, 2006 MEMORANDUM TO City of Beaverton 4755 S.W. Griffith Drive P.O. Box 4755 PROM: � Scherer 97076 VLMK Consutt1r g Engineers CC: Tim Schleybsoit RE! $.A. & S. International °Me•Gyrr," (Children's Pitney Center) t have been Informed that the City of Beaverton has Inspected and signed off on installation of . the equipment for the above referenced oredect with the exception ot'the two items hated below. We feel that apeafa; inspection of these two items is excessive given the actual Wade to be resisted by tug* C r rletalorie. 1. . eigm/edhe&ve. but ware r "soecia( ineneaatgc( tip time of Installation - Allhvgh adhesive anchors were used, the required conneotion only needed to be drilled wedge/expeneion anchors. The tr1edmurn design load et the column baea is a °hoar Toad of epprcdr'ly 2,200 lbs (Fer a ado sheet -1). The capacity of an int peed base connection Is on the order of 20,000 lbs. Therefore, as long as the nuts can be snug tight without spinning the anchor, the connection will be more than ad 2 . we d t t b ee° elpt s h„ .�...... s with SDe amJ 2_11 Per _ Per a bade connection lead of 2,200 lbs. only one inch of'311 r ttliet weld is needed. Thera is about 20 inches of 3116U fillet weld on these columns. Therefore, we feel that tree welds do not need to be inspected. In summary, we feel that installation of the equipment is adequate as Installed and that the requirement for specter ins ectipn would be excessive based on the design load requirei'ents for these elements. Please can me if you have any questions or If you would like to discuss. 1� cD pRO' 'final ^^ 1 d' *lc cagy Stru:ture+le Sngtneering•:.lull Enq,naaring• ;ntluatrlal EnginearIng •Plannlgg.Stcdlaai6•ra ep i,Entltlement c :tccaaRt.101?:36 %)to .ouithsPonliiNCEl.% 4) Dl Maw*, L,ep,Doc