Loading...
City Council Packet - 03/14/2000 Die/6 L- CITY F TIGARD TIGAR CITY COUNCIL FETING MARCH 14, 2000 COUNCIL MEETING ILL BE TELEVISED %adm~o%ccpkll doc 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639-4171 TDD (503) 684-2772 Revised 3/9/00 ~Ot~S~I~lES~ ~I~iEET1NG~ r ' ' t< Q 6 1? t TM R,CM `1i 4 200., 4+ 77,7' CITY OF TIGARD t'; TIGA' ~I ~-IA.LL :11!4 A00;1OREGQ;I~;~ °223 s l '~r.fin f , f ~T PUBLIC NOTICE: Anyone wishing to speak on an agenda item should sign on the appropriate sign-up sheet(s). If no sheet is available, ask to be recognized by the Mayor at the beginning of that agenda item. Visitor's Agenda items are asked to be two minutes or less. Longer matters can be set for a future Agenda by contacting either the Mayor or the City Manager. Times noted are estimated: it is recommended that persons interested in testifying be present by 7:15 p.m. to sign in on the testimony sign-in sheet. Business agenda items can be heard in any order after 7:30 o.m. Assistive Listening Devices are available for persons with impaired hearing and should be scheduled for Council meetings by noon on the Monday prior to the Council meeting. Please call 639-4171, Ext. 309 (voice) or 684-2772 (TDD - Telecommunications Devices for the Deaf). Upon request, the City will also endeavor to arrange for the following services: Qualified sign language interpreters for persons with speech or hearing impairments; and Qualified bilingual interpreters. Since these services must be scheduled with outside service providers, it is important to allow as much lead time as possible. Please notify the City of your need by 5:00 p.m. on the Thursday preceding the meeting date at the same phone numbers as listed above: 639- 4171, x309 (voice) or 684-2772 (TDD - Telecommunications Devices for the Deaf). SEE ATTACHED AGENDA COUNCIL AGENDA - MARCH 14, 2000 - PAGE 1 11131111111 111011111 SIEMENS AGENDA TIGARD CITY COUNCIL BUSINESS MEETING MARCH 14, 2000 6:30 PM STUDY SESSION ➢ EXECUTIVE SESSION: The Tigard City Council will go into Executive Session under the provisions of ORS 192.660 (1) (d), (e), (f) & (h) to discuss labor relations, real property transactions, exempt public records, and current and pending litigation issues. As you are aware, all discussions within this session are confidential; therefore nothing from this meeting may be disclosed by those present. Representatives of the news media are allowed to attend this session, but must not disclose any information discussed during this session. ➢ Update - Professional Services - Portland Water Contract Negotiations ➢ Update - Washington Square Regional Center Plan Implementation ➢ Update Taxpayer Protection Initiative #47 ➢ Review Request for Waiver of Potential Conflict of Interest Form - City's Bond Counsel, Preston, Gates, and Ellis, LLP ➢ Review Updated Citywide Personnel Policies ➢ Discuss Applications for First Citizen 7:30 PM 1. BUSINESS MEETING 1.1 Call to Order - City Council 8t Local Contract Review Board 1.2 Roll Call 1.3 Pledge of Allegiance and Patriotic Songs Y Brownie Troop 692 1.4 Council Communications 1.5 Call to Council and Staff for Non-Agenda Items 7:40 PM 2. VISITOR'S AGENDA (Two Minutes or Less, Please) 7:45 PM 3. 00" NSENT ~t:JENDA: These items are considered to be routine and may be enacted in one motion without separate discussion. Anyone may request that an item be removed by motion for discussion and separate action. Motion to: 3.1 Approve Council Minutes: January 18, 25 and February 8, 2000 3.2 Receive 81 File: a. Council Calendar b. Tentative Agenda COUNCIL AGENDA - MARCH 14, 2000 - PAGE 2 -on 3.3 Authorize the Finance Director to Sign a Disclosure and Waiver of Potential Conflict of Interest Form with the City's Bond Counsel, Preston, Gates, and Ellis, LLP Resolution No. 00 - 0"7 3.4 Adopt Updated Citywide Personnel Policies Resolution No. 00 - 0 3.5 Dedicate a Reserve Strip as Public Right of Way (Ashford Oaks Subdivision - SW 841 Avenue) Resolution No. 00 - Oq 3.6 Local Contract Review Board: Declare Blazer Industries Inc. as the Sole Source Vendor for the Construction of the Portable Mobile Restrooms for Cook Park, and Award the Bid Not to Exceed $601000.00. • Consent Agenda - Items Removed for Separate Discussion: Any items requested to be removed from the Consent Agenda for separate discussion will be r.r- :Idered immediately after the Council has voted on those items which do not need dfscL •n. 7:55 PM 4. PRESENTATION AND INFORMATION ON OREGON DEPARTMENT OF TRANSPORTATION (ODOT) OPEN HOUSE a. Staff Introduction: Administration Department b. Presentation: ODOT Staff c. Council Questions and Discussion 8:05 PM 5. PUBLIC HEARING - LOCAL LAW ENFORCEMENT BLOCK GRANT AS REQUIRED BY THE BUREAU OF JUSTICE AND TO APPROVE THE GRANT EXPENDITURES a. Open Public Hearing b. Summation by Staff: Police Department c. Public Testimony d. Recommendation by Staff e. Council Questions or Comments f. Close Public Hearing g. Council Consideration: Motion to approve grant expenditures as recommended by staff. 8:15 PM 6. CONSIDER RESOLUTION TO APPROVE BUDGET ADJUSTMENT NO. 7 TO THE FY 1999-00 BUDGET TO ACCEPT LOCAL LAW ENFORCEMENT BLOCK GRANT AND TO INCREASE APPROPRIATIONS TO ALLOW EXPENDITURE OF GRANT FUNDS a. Staff Report: Police Department b. Council Questions and Discussion c. Council Consideration: Resolution No. 00- lb COUNCIL AGENDA - MARCH 14, 2000 - PAGE 3 M . 8:20 PM 7. TRANSPORTATION BOND UPDATE a. Staff Report: Engineering Department b. Council Questions and Discussion 8:30 PM 8. REPORT ON SUMMER CREEK WETLANDS ENHANCEMENT PROJECT a. Staff Report: Engineering Department b. Council Questions and Discussion 8:40 PM 9. CONSIDER AN ORDINANCE ADOPTING THE WASHINGTON SQUARE REGIONAL CENTER PLAN WITH DELAYED IMPLEMENTATION AND ADOPTING FINDINGS AND CONCLUSIONS a. Staff Report: Community Development Department b. Council Consideration: Ordinance No. 00 - g 9:00 PM 10. CONSIDER AMENDMENTS TO LEGAL DESCRIPTIONS FOR THE 15 WALNUT ISLAND ANNEXATIONS, ORDNANCE NOS. 00-03 - 00-17 (THE WALNUT ISLAND ANNEXATION HEARINGS WERE HELD ON 2/8/00) a. Staff Report: Community Development Department b. Council Questions c. Council Consideration: Ordinance No. 00-IC/ 9:10 PM 11. COUNCIL LIAISON REPORTS 9:20 PM 12. NON AGENDA ITEMS 9:30 PM 13. EXECUTIVE SESSION: The Tigard City Council, will go into Executive Session under the provisions of ORS 192.660 (1) (d), (e), (f) 8L (h) to discuss labor relations, real property transactions, exempt public records, and current and pending litigation issues. As you are aware, all discussions within this session are confidential; therefore nothing from this meeting may be disclosed by those present. Representatives of the news media are allowed to attend this session, but must not disclose any information discussed during this session. 10:00 PM 14. ADJOURNMENT 1:\AD M\CATHY\C CA\000314. DOC COUNCIL AGENDA - MARCH 14, 2000 - PAGE 4 LM Agenda Item No. Meeting of l TIGARD CITY COUNCIL MEETING MINUTES - MARCH 14, 2000 • STUDY SESSION > McCouncil President Brian Moore called meeting to order at 6:30 p.m. > Council Present: Council President Brian Moore, Councilors Paul Hunt, Joyce Patton, and Ken Scheckla. > Staff Present: City Manager Bill Monahan; Finance Director Craig Prosser; Human Resources Director Sandy Zodrow; Public Works Director Ed Wegner; Police Chief Ron Goodpaster; Long Range Planning Manager Nadine Smith; Community Development Director Jim Hendryx; City Attorney Tim Ramis; City Engineer Gus Duenas; Associate Planner Laurie Nicholson The Council discussed the meals provided for Council and staff prior to the meetings. After discussion, it was determined that food would be provided for Councilor Patton to accommodate her schedule, since she comes to the Council meetings directly from work. 9 Councilor Hunt asked Council President Moore for clarification on his comments in the March 2, 2000, Tigard Times article on the Atfalati issue. Council President Moore clarified that he meant to convey that the Council made a recommendation to the County. the County would decide whether to refer the matter to the voters to make the final decision. i Councilor Scheckla asked staff to verify that the individual soliciting donations for the United Gospel Missions had the fundraising permit he claimed to have. Bill Monahan, City Manager, indicated that that organization has had fundraising permits in the past. He confirmed that people soliciting funds door-to-door should have a permit on their person. Y Cathy Wheatley, City Recorder, reported that the Mayor's business office advised that his health status is improving. Council President Moore mentioned his conversation with the Mayor's brother indicating that Mayor was doing better. > Update: Professional Services - Portland Water Contract Negotiations Ed Wegner, Public Works Director, reviewed the provisions of the proposed contract to hire a consultant to negotiate with Portland on behalf of Tualatin Valley Water District, Gresham, Tigard, Tualatin, Rockwood Utility District and West Slope. He explained that no matter what decision Tigard made with respect to its water supply, it needed to continue negotiations with Portland. Mr. Wegner said that this contract with Integrated Utilities Group paid $150,000 for six tasks over the course of 18 months to two years. He mentioned the background of the consulting firm. He indicated that Tigard's share came to $23,100. He said that City elected officials would attend the Westside meetings when the consultant made sufficient progress to present a report. He noted that the IWB supported the contract. CITY COUNCIL MEETING MINUTES -MARCH 14, 2000 - PAGE 1 Mr. Wegner confirmed to Councilor Scheckla that either he or Mike Miller would attend the monthly meetings as representatives of the IWB jurisdictions. At Councilor Patton's request, Mr. Wegner reviewed the six tasks included in the contract. Mr. Wegner explained to Councilor Scheckla that Tigard needed to continue negotiations with Portland as a potential secondary source. He said that they wanted to achieve a contract that was fair and equitable to the City. He pointed out that the City now had three water options to look at: Portland, South Fork and the Joint Water Commission. The Council agreed by consensus to direct staff to proceed with the contract. > Cook Park John Roy, Property Manager, reviewed the components he added to the scope of work in the contract with Consulting Engineering Services for the wetland mitigation design for the Cook Park expansion. He explained that, given the impacts that the new Title 3 requirements would have on their expansion plans, they needed to submit an application for a land use approval permit for the project before February 4; the consultant submitted the application on behalf of the City on February 3. Mr. Roy indicated that he included the irrigation design and inspection services components because the work would not be done in-house as originally anticipated. He asked Council to approve a new contract with Consulting Engineering Services for $44,243 (the original contract was $10,472). Mr. Monahan asked to add this item to tonight's agenda if the Council thought that staff provided sufficient information for it to take action tonight. Mr. Ramis commented that he did not see the City experiencing much risk on this item. Councilor Scheckla asked if they could use the money slated for mobile restrooms for the contract. Mr. Wegner reviewed the need for the mobile restrooms as part of the Phase 1 improvements. He noted that the budget already included the restrooms. The Council agreed to place this item on the agenda immediately following the consent agenda. Mr. Roy indicated to Councilor Scheckla that the wetlands project would start Julyl and finish in mid-October. He commented that without the land use approval pennit, they would not have been able to install restrooms, pathways, or parking lots in the park. Mr. Wegner stated that the project would not disrupt use of the park during the summer, as the mitigation was on the far eastern side of the park. > Update: Washington Square Regional Center Plan Implementation Jim Hendryx, Community Development Director, informed the Council that staff was ready to develop an RFP in accordance with the memo he sent to Council laying out the 12-month strategy staff would follow in developing the implementation strategy. Councilor Patton indicated that she had questions with respect to the ordinance that she would raise under the agenda item. CITY COUNCIL MEETING MINUTES -MARCH 14, 2000 - PAGE 2 Councilor Scheckla asked for clarification on the grant. Nadine Smith, Long Range Planning Manager, explained that staff had $80,000 from the TGM grant and needed another $90,000 for the total cost of $150,000 to develop the implementation strategy. She mentioned looking at parks SDCs, storm water SDCs, and the County as potential additional sources of funding. > Update: Taxpayer Protection Initiative #47 Craig Prosser, Finance Director, reviewed the potential impacts of Initiative #47 on the City's fees and charges, including building fees, water rates, Atfalati recreation district, and the Transportation Bond. He explained that the initiative required a vote by the people on all taxes and fee increases, allowed votes only in November of even-numbered years, and required an approval percentage equivalent to the approval percentage of Initiative 47. He said that every ballot title for a tax or fee increase must include the words "A yes vote on this measure is a vote to increase taxes," even for fees such as library fines that would not affect taxes. Mr. Prosser discussed the provision making the requirements retroactive to December 6, 1998. He explained that the City would have to hold elections on all fee increases since that date, and refund any fees with interest to individuals that did not meet all the election requirements. He indicated that the City Attorney would look at a possible exemption for incurred charges. Mr. Prosser confirmed to Councilor Hunt that this did affect Atfalati, allowing possible creation of the district with no funding to implement it. Mr. Prosser discussed the impacts on the City's building fund, noting that they needed to shore up the condition of the fund. He mentioned a concern with respect to how long they could wait to raise building fees. He indicated that the City has not increased its water rates since 1993 but it needed to do so soon in order to offset increased operating costs and to build a reserve for an alternate source of water. He said that staff needed to research the question of what happened if one jurisdiction in the water district did not pass a water rate increase but the other three did. He mentioned another question of whether the voters could pass multi-year rate increases. Mr. Prosser discussed the impacts on the transportation bond. He pointed out that they could not identify the total cost of the bond (principal plus interest) as required by Initiative 47 because they did not know what the future interest rate would be. He commented that Initiative 47 affected the potential library financing through the Oregon Economic Development Department by requiring any bond measure, including revenue bonds, to qualify with the requirements of a GO bond. Mr. Monahan indicated that staff would keep the Council updated with information as it came out from various groups. Mr. Prosser confirmed to Councilor Patton that Mr. Sizemore turned o in more than enough signatures to place the initiative on the ballot. > Review: Request for Waiver of Potential Conflict of Interest Form Mr. Monahan requested the Council to waive a potential conflict of interest for Preston Gates and Ellis, the law firm with attorneys representing the City on water issues, land use issues and as bond counsel. Mr. Prosser explained that one of the firm's attorneys was working for RCN, a telecommunications company with potential franchise issues with the City. The Council agreed to allow the waiver. CITY COUNCIL MEETING MINUTES -MARCH 14, 2000 - PAGE 3 > Review: Updated City wide Personnel Policies Sandy Zodrow, Human Resources Director reviewed the staff process used to update the 1987 personnel rules to reflect current policies, practices and philosophies. She said that the Union reviewed the proposed update and expressed concerns, primarily with respect to the smokeless tobacco prohibition. Mr. Monahan commented that their intent was to apply the policies uniformly throughout the organization and to incorporate new policies, such as the Internet policy. Councilor Scheckla asked if other cities had a smokeless tobacco prohibition. He said that he was willing to leave it out. Ms. Zodrow indicated that some cities did and some did not but the trend was moving towards prohibition of smokeless tobacco. She commented that the Police Department prohibited smokeless tobacco in its vehicles and facilities while the Public Works Department had a practice of discouraging its use in city vehicles. Councilor Hunt asked what the reason was behind the prohibition against smokeless tobacco. Ms. Zodrow mentioned trying to make their policies consistent citywide and health concerns. Mr. Wegner recalled how Public Works came to discourage its use. He indicated that they had aesthetic and sanitary reasons because they changed vehicles between people. Police Chief Ron Goodpaster reported that his department eliminated its use a couple of years ago due to officer complaints, health concerns, and a variety of other problems. He discussed the advantages of consolidated City personnel policies when administering rules and regulations. Councilor Scheckla stated that he would pull this item from the consent agenda. Councilor Patton pointed out that the policy cited the health hazards of smoking and then discussed smokeless tobacco. She suggested rewriting the policy to reflect the rationale behind a prohibition of smokeless tobacco. Mike Mills, OPEU President, said that he would provide his comments to the Council in writing. He indicated a rebuttal argument that anything spit out of the mouth was objectionable, not just smokeless tobacco. Ms. Zodrow suggested adopting the rules with the exception of Articles 57 and 58. The Council agreed with that suggestion. > Discuss: Applications for First Citizen Mr. Monahan indicated that the Council as a whole did not want to nominate any one but individual Councilors could do so. > Agenda Review Mr. Monahan indicated that staff met with the Pacific'Crest residents. He asked the Council to refer to staff if anyone addressed the matter under Visitors Agenda. He asked Council to refer to staff if anyone spoke on temporary sign. enforcement also. > Council President Moore adjourned the study session at 7:40 p.m. 1. BUSINESS MEE'T'ING 1.1 Call to Order - City Council & Local Contract Review Board Council President Brian Moore called the meeting to order at 7:46 p.m. CITY COUNCIL MEETING MINUTES -MARCH 14, 2000 - PAGE 4 1.2 Roll Call Councilor Ken Scheckla, Councilor Paul Hunt, Council President Brian Moore and Councilor Joyce Patton were present. 1.3 Pledge of Allegiance Brownie Troop #692 led the Council in the Pledge of Allegiance. They performed a medley of patriotic songs with a brief history of Tigard and why they liked living there. Council President Moore thanked the troop and presented troop members Tigard pins. 1.4 Council Communications Council President Moore urged citizens to return the Census 2000 forms, as the census count determine how many government funds the City would get in the future. Council President Moore welcomed the new Tigard 2000 Lions Club. 1.5 Call to Council and Staff for Non-Agenda Items Mr. Monahan mentioned a contract award for Consulting Engineering Services, which staff briefed Council on during the study session. 2. VISITOR'S AGENDA: None 3. CONSENT AGENDA Council President Moore noted that the Council would consider Item 3.4 with the exception of Articles 57 and 58. Mr. Monahan said staff would bring those articles for discussion next week. Councilor Hunt objected to the language in the Tentative Agenda (3.2b) speaking of a resolution of support for Atfalati. He commented that not all the Council supported Atfalati. After brief discussion, Mr. Monahan suggested rewording the item as a discussion of whether the Council should pass a resolution of support for the Atfalati Recreation District. The Council agreed to the rewording. Motion by Councilor Hunt, seconded by Councilor Patton, to approve the Consent Agenda, with the changes as noted. Motion was approved by unanimous voice vote of Council present. (Council President Moore, Councilors Hunt, Patton and Scheckla voted "yes.") [4-0] 3.1 Approve Council Minutes of. January 18, 25 and February 8, 2000 3.2 Receive & File: a. Council Calendar b. Tentative Agenda 3.3 Authorize the Finance Director to Sign a Disclosure and Waiver of Potential Conflict of Interest Form with the City's Bond Counsel, Preston, Gates, and Ellis, LLP - Resolution No. 00-07 3.4 Adopt Updated Citywide Personnel Policies - Resolution No. 00-08 3.5 Dedicate a Reserve Strip as Public Right of Way (Ashford Oaks Subdivision - SW 84'h Avenue) - Resolution No. 00-09 3.6 Local Contract Review Board: Declare Blazer Industries Inc., as the Sole Source Vendor for the Construction of Portable Mobile Restrooms for Cook Park, and Award the Bid Not to Exceed $60,000.00 CITY COUNCIL MEETING MINUTES -MARCH 14, 2000 - PAGE 5 III, EMS > Contract Award for Consulting Engineering Services Mr. Roy requested authorization to sign a contract with Consulting Engineering Services further identifying the scope of work and the costs for the Cook Park wetland mitigation 1 roject. He indicated to Councilor Scheckla that $10,872 would be paid in this fiscal year and the remaining $34,000 out of the FY 2000/01 budget. He said that the contractor would complete the work by mid-October 2000. Motion by Councilor Scheckla, seconded by Councilor Hunt, to award the contract to Consulting Engineering Services for the allotted money over two budget cycles, including the changes on the purchase order. Motion was approved by unanimous voice vote of Council present. (Council President Moore, Councilors Hunt, Patton and Scheckla voted "yes.") [4-0] 4. PRESENTATION AND INFORMATION ON OREGON DEPARTMENT OF TRANSPORTATION (ODOT) OPEN HOUSE Kathy Conrad, ODOT, noted that Mike Struebach, Assistant Project Manager, was here to answer questions. She presented information on the $2.2 million ODOT bridge joint and rail repair project along five miles of Highway 99, scheduled for mid-April to August 31. She reviewed the extensive public notification process used by ODOT to inform residents and businesses of the project. Mr. Struebach mentioned the open house tomorrow night with drawings and details of the construction available for public comments and questions. Councilor Hunt asked if they paved the portion they ground out that same night. Mr. Struebach indicated that generally, they did do so but in this case, they intended to start the grinding process one night ahead of time. He explained that the grinding did not remove all of the paving. Mr. Struebach indicated to Councilor Scheckla that the contractor was considering starting at the Tualatin River but his final schedule was not due until the end of the week. Councilor Scheckla suggested providing ear plugs to the residents in the apartments and homes down by the Tualatin. Ms. Conrad said that they discussed doing so but feared that the public would interpret it as a flippant offer. She said that she would take the Councilor's recommendation back to ODOT. i Ms. Conrad invited the City to link its website to ODOT's to provide the latest information. { Mr. Roy corrected his answer to Councilor Scheckla's question about the money budgeted each year for the wetlands mitigation project in Cook Park. He said that $30,437 for the first two { phases would come out of this fiscal year's budget and the remaining $14,000 out of the next fiscal year budget. 5. PUBLIC HEARING - LOCAL LAW ENFORCEMENT BLOCK GRANT AS a REQUIRED BY THE BUREAU OF JUSTICE AND TO APPROVE THE GRANT 1 EXPENDITURES a. Council President Moore opened the public hearing. CITY COUNCIL MEETING MINUTES -MARCH 14, 2000 - PAGE 6 solgam W M11 INN IM =J b b. Summation by Staff Chief Goodpaster reviewed the process staff went through to obtain the grant and to identify the six items recommended for purchase with grant funds, including citizen input. He discussed the enhanced youth summer camps that the department could offer this year because of these grant funds, including specialized training in youth camps for their Youth Service Officer. He mentioned the other recommended purchases listed in the staff report. Chief Goodpaster indicated that the additional $1,100 grant they received from the Department of Public Safety allowed them to send a second detective to homicide school. He mentioned that the Tigard Youth Association (the non-profit associated with the police department) agreed to donate $1,000 to the summer camp program. Chief Goodpaster explained to Councilor Scheckla that Community Partners for Affordable Housing ran a summer camp at Villa La Paz for children living at Metzger Manor and Villa La Paz. c. Public Testimony Council President Moore opened the hearing to public testimony. There was none. d. Recommendation by Staff Chief Goodpaster recommended approval of the expenditures. e. Council Questions or Comments: None. f. Council President Moore closed the public hearing g. Council Consideration Motion by Councilor Hunt, seconded by Councilor Scheckla to approve the grant expenditures. Motion was approved by unanimous voice vote of Council present. (Council President Moore, Councilors Hunt, Patton and Scheckla voted "yes.") [4-0] 6. CONSIDER RESOLUTION TO APPROVE BUDGET ADJUSTMENT NO. 7 TO THE FY 1999-00 BUDGET TO ACCEPT LOCAL LAW ENFORCEMENT BLOCK GRANT AND TO INCREASE APPROPRIATIONS TO ALLOW EXPENDITURE OF GRANT FUNDS Chief Goodpaster explained that the Council needed to put the $6,500 in the budget for this fiscal year in order to allow staff to expend it. He said that they would incorporate the funds for expenditure in the next fiscal year in the budget for 2000/01. Motion by Councilor Scheckla, seconded by Councilor Patton, to adopt Resolution 00-10. The City Recorder read the number and title of the resolution. RESOLUTION NO. 00-10, A RESOLUTION APPROVING BUDGET ADJUSTMENT NO. 7 TO THE FY 99/00 BUDGET TO ACCEPT A LOCAL LAW ENFORCEMENT BLOCK GRANT AND TO INCREASE APPROPRIATIONS TO ALLOW EXPENDITURE OF GRANT FUNDS. CITY COUNCIL MEETING MINUTES -MARCH 14, 2000 - PAGE 7 Motion was approved by unanimous voice vote of Council present. (Council President Moore, Councilors Hunt, Patton and Scheckla voted "yes.") [4-0] Councilor Hunt asked if staff would put Tigard's activities with photo radar on hold until the courts resolved the recently filed lawsuit on photo radar. Chief Goodpaster indicated that they would continue to work behind the scenes in preparing for the implementation of photo radar but they would wait on implementation until they knew what the court decision was. Councilor Scheckla asked if the discontinuation of the photo radar program by Vancouver, Washington, because it was not cost-effective made a difference. Chief Goodpaster explained that the program was not cost-effective in Vancouver because Washington State had different laws that required more personnel time and money to process photo radar. He said that what affected Washington State did not affect Oregon State. He concurred with Councilor Hunt that public safety was the major reason for their interest in photo radar. 7. TRANSPORTATION BOND UPDATE Gus Duenas, City Engineer, reviewed the public input process used by the Transportation Bond Task Force in working towards a recommendation for bond projects. He discussed the issues under discussion by the Task Force, including project selection, the size of the bond, and the term of the bond. He noted the final meeting of the Task Force scheduled for March 15, at which they hoped to develop a list of projects for presentation to the Planning Commission on April 17 and recommendation to the Council on May 9. He indicated that the Task Force members intended to promote the bond issue through the November election. Mr. Duenas commented that he has not yet been able to find out from the County what other money measures would be on the ballot in November but he would keep trying. Councilor Patton indicated that the Task Force at its last meeting had a good discussion of how to proceed. She said that she was hopeful that they could develop recommendations for a list of projects, the size of the bond and the term of the bond. Mr. Duenas clarified for Councilor Scheckla that the Task Force would probably eliminate many of the projects on the list right now, as the bottom line was the size of the bond issue. Council President Moore mentioned the importance of developing a package that they could sell to the community. Mr. Duenas indicated to Councilor Hunt that staff would get the recommended list of projects to Council as soon as possible, including any modifications made by the Planning Commission. 8. REPORT ON SUMMER CREEK WETLANDS ENHANCEMENT PROJECT a Mr. Duenas reported that they had a good brainstorming meeting with the different regulatory agencies on February 28 to discuss what was likely to be approved for this project. He said that the consultant was working on creating a concept plan that incorporated the points of general agreement. He indicated that staff scheduled an in-depth discussion for the Council April 18 workshop, following a review of the concept plan by the regulatory agencies and the neighborhood. He mentioned their intent to construct the project this summer. a Councilor Hunt asked about acceptance of the plan by the neighborhood. Mr. Duenas said that the neighborhood has followed the process closely. He clarified that this Task Force was for the Merestone Pond area, which was different from the Summerlake Task Force that dealt with the lake itself. CITY COUNCIL MEETING MINUTES -MARCH 14, 2000 - PAGE 8 Councilor Scheckla asked Mr. Hendryx for an update on the ESA meeting he attended in Portland. Mr. Hendryx explained that the meeting involved Oregon and Washington representatives discussing how to address the listing of salmon and steelhead in the lower Columbia River as endangered. 9. CONSIDER AN ORDINANCE ADOPTING THE WASHINGTON SQUARE REGIONAL CENTER PLAN WITH DELAYED IMPLEMENTATION AND ADOPTNG FINDINGS AND CONCLUSIONS Mr. Hendryx explained that this was the ordinance adopting the Council's decision in February to approve the Washington Square Regional Center Plan with its Comprehensive Plan and Development Code amendments while delaying its implementation until staff could identify specific milestones. He said that staff anticipated returning to Council next month with more details and a work program on how to implement the different components. Councilor Patton pointed out that the Planning Commission did not recommend approval (Item 2), it recommended endorsement. Mr. Ramis said that they would change the wording. Councilor Patton asked to make Item 4b more inclusive by specifically stating the environmental and natural resource considerations. Mr. Ramis suggested adding the language "environmental and natural resource issues" to the end of the phrase. Councilor Patton indicated that the language in Item 6 was not clear enough. She suggested referencing Item 4 in the sentence. Mr. Hendryx read the amended sentence as "The Council met on February 8, 2000, and voted to adopt the plan with implementation of the plan to take place when specific implementation measures noted above (4) are met." Councilor Scheckla mentioned his concern that upzoning in the Ash Creek area contradicted the Fanno Creek Watershed Management Plan adopted in June 1997. Council President Moore suggested that staff review the issue in light of Title 3 and return with more information. Mr. Hendryx indicated that staff could do so. He pointed out that the City had to meet all federal and state standards in effect at the time of the plan's adoption plus any subsequent regulations. Motion by Councilor Patton, seconded by Councilor Hunt to adopt Ordinance 00-18 with the revisions as discussed. The City Recorder read the number and title of the ordinance. ORDINANCE NO. 00-18, AN ORDINANCE ADOPTING THE WASHINGTON SQUARE REGIONAL PLAN, DELAYED IMPLEMENTATION AND ADOPTING FINDINGS AND CONCLUSIONS. Motion was approved by majority roll call vote of Council present. (Council President Moore, Councilors Hunt, and Patton voted "yes." Councilor Scheckla voted "no.") [3-1] 10. CONSIDER AMENDMENT'S TO LEGAL DESCRIPTIONS FOR THE 15 WALNUT ISLAND ANNEXATIONS, ORDINANCE NOS. 00-03 - 00-17 (THE WALNUT ISLAND ANNEXATION HEARINGS WERE HELD ON 2/8/00) Mr. Hendryx said that staff sent draft ordinances to the Revenue Department for review and prepared revised ordinances per their recommendations. He explained that when staff prepared the ordinances for Council adoption, they accidentally used the original ordinances, not the final revised ordinances. He indicated that the differences were clerical in nature, nothing substantive. He said that the Council had the final corrected version in their packets tonight. CITY COUNCIL MEETING MINUTES -MARCH 14, 2000 - PAGE 9 Mr. Hendryx confirmed to Councilor Hunt that the effective date of the annexations remained May 17. Mr. Ramis confirmed that the remainder of the annexation process was administrative. Mr. Monahan mentioned staff's intention to hold an open house on May 17 t provide updated information to the residents on what services the City would provide from that point forward. Motion by Councilor Scheckla, seconded by Councilor Hunt, to adopt Ordinance No. 00- 19. The City Recorder read the number and title of the ordinance. ORDINANCE NO. 00-19, AN ORDINANCE AMENDING ORDINANCES 2003-2017 TO CORRECT CLERICAL ERRORS IN THE LEGAL DESCRIPTIONS ATTACHED AS EXHIBITS TO THE ORDINANCES AND DECLARING AN EMERGENCY. Motion was approved by unanimous roll call vote of Council present. (Council President Moore, Councilors Hunt, Patton and Scheckla voted "yes.") [4-0] 11. ADJOURNMENT: 9:05 p.m. Ckyh&u.-u 04A=&t~ Attest: / therine Wheatley, City Record e(i r 109or, Cit of Tigard Date: - 1 avv~ I CITY COUNCIL MEETING MINUTES -MARCH 14, 2000 - PAGE 10 COMMUNITY NEWSPAPERS, INC. Legal P.O. BOX 370 PHONE (503) 684-0350 Notice TT 9 513 9 BEAVERTON, OREGON 97075 Legal Notice Advertising QCity of. Tigard ' ❑ Tearsheet Notice 3.3125 S[1 Hall Tilvd. `I?igard,Oregon 97223 ' ❑ Duplicate Affidavit 'Accounts Payable ' AFFIDAVIT OF PUBLICATION STATE OF OREGON, ) COUNTY OF WASHINGTON, )ss. being first duly sworn, depose and say that I am the Advertising Director, or his principal clerk, of thdPi ~a_._ Y -rilua1at i 1 -TE mes a newspaper of general circulation as defined in ORS 193.010 and 193.020; published at- Ti gnrd in the aforesaid county and state; that the T,r)r-a1 Cor racL 1',« v' S~ar.d i4eetinCl a printed copy of which is hereto annexed, was published in the entire issue of said newspaper for_ OrTF• successive and consecutive in the following issues: r1arch 9 , 2000 _ Subscribed and sworn t afore a thi , 2 0 0 0 - OFFICIAL SEAL ROSIN A. BURGESS a Nqbh Public for Oregon NOTARY PUBLIC-OREGON : COMMISSION N0. 062071 2001 s My Commission Expires: ti<y COIAMISSION cXPIRES MAY 16, AFFIDAVIT The following meeting highlights are published for your information. Full agendas may be obtained from the City Recorder, 13125 S.W. Hall Boulevard, Tigard, Oregon 97223, or by calling 639-4171. TIGARD CITY COUNCIL AND LOCAL CONTRACT REVIEW BOARD MEETING March 14, 2000 - 6:30 P.M. TIGARD CITY HALL - TOWN HALL 13125 SW HALL BOULEVARD, TIGARD, OREGON Study Meeting (6:30 p.m.) * Executive Session Business Meeting (7:30 p.m.) * Conduct Public Hearing Local Law Enforcement BI k Grant * Consider Adopting the Washington; ~quare Regional Center Plan with Delayed Implementation and Adopt4 g Findings and Conclusions * Consider Ordinances Amending t Legal Descriptions for the 15 Island Areas Previously Annexed t * Update on the Transportation Bond * Report on Summer Creek Wetlands nhancement Project * Presentation from Oregon Departme t of Transportation TT9589 -Publish March 9, 2000. q CITY OF TIGARD, OREGON AFFIDAVIT OF POSTING In the Matter of the Proposed STATE OF OREGON ) County of Washington ) ss. City of Tigard ) I~ begin first duly sworn, on oath, depose and y: That I posted in the following public and conspicuous places, a copy of Ordinance Number (s) ~'J © - Ck which were adopted at the Council Meeting dated 'a COO copy(s) of said ordinance(s) being hereto attached and by reference made a part hereof, on the _ - & a~ day of h 20 Ob 1. Tigard City Hall, 13125 SW Hall Blvd., Tigard, Oregon 2. Tigard Library, 13125 SW Hall Blvd., Tigard, Oregon 3. Tigard Water Department, 8777 SW Burnham, Tigard, Oregon Subscribed and sworn to before me this a?day of Y CI►/L~~ , 20, i i ti i Notary Public for Oregon OFFICIAL. SEAL WISE 7:~ COYP BLIC-ORECKM My Commission Expires: O~ My OMMISSfON EXPIRES FEB. 11. 2003 CITY OF TIGARD, OREGON ORDINANCE NO. 00- 18 AN ORDINANCE ADOPTING THE WASHINGTON SQUARE REGIONAL CENTER PLAN WITH DELAYED IMPLEMENTATION AND ADOPTING FINDINGS AND CONCLUSIONS WHEREAS: 1. Applicant City of Tigard has requested approval of amendments to the Comprehensive Plan Map, Comprehensive Plan Transportation Map, Comprehensive Plan and Community Development Code applicable to the Washington Square Regional Center; 2. The Planning Commission has recommended endorsernent of the amendments, with implementation delayed until further specific studies have been prepared; 3. The proposed amendments would incorporate a specific land use, urban design, and land use plan for the Washington Square Regional Center, amending the existing adopted twenty-year land use, transportation and urban design plan 4. Implementation of the text and map amendments should wait for: a. Development of recommendations for storm water drainage; b. Development of recommendations for open space, environmental and natural resource issues; C. Preparation of strategies and a financial plan for transportation improvements; 5. The proposed text amendments are consistent with all relevant criteria as stated in the Findings and Conclusions in Support of Washington Square Regional Center Plan (Exhibit F); and 6. The City Council met on February 8, 2000 and voted to adopt the Washington Square Regional Plan, with implementation of the plan to take place when specific implementation measures as noted above (item #4) are met. H i THE CITY OF TIGARD ORDAINS AS FOLLOWS: SECTION 1: The Washington Square Regional Center Plan (Exhibit A) is hereby 3 adopted. SECTION 2: The Comprehensive Plan is hereby amended as shown in the attached Exhibit B with the amendment to take place at the time stated in Section 7 of this ordinance. SECTION 3: The Comprehensive Plan zoning map is hereby amended, with the amended map to be in the form of Exhibit C. This amendment shall take place at the time stated in Section 7 of this ordinance. SECTION 4: The Comprehensive Plan transportation map is hereby amended, with the amended map to be in the form of Exhibit D. This amendment shall take place at the time stated in Section 7 of this ordinance. SECTION 5: The Community Development Code is hereby amended to add a new chapter, "Washington Square Regional Center," in the form of Exhibit E, with the amendment to take place at the time stated in Section 7 of this ordinance. SECTION 6: The Findings and Conclusions in Support of Washington Square Regional Center Plan (Exhibit F) are hereby adopted. SECTION 7: This ordinance shall be effective 30 days after its passage by the Council, signature by the Mayor and posting by the City Recorder. The amendments provided for in Sections 2, 3, 4 and 5 shall be made when the City Council by resolution finds that recommendations for storm water drainage, recommendations for open space and strategies and a financial plan for transportation improvements for the Washington Square Regional Center have been prepared and adopted by the City Council. PASSED: By ' 0(--1424 votes of all Council members present after being read by num er and title only, this l ~-/4A day of ~2000. Catherine Wheatley, City Recorqffr APPROVED: By Tigard City Council this /L/ day o , 2000. Approved as to form: Brian J. Moore, Council President ity Attorney 3116 Dater GAgff\washsgord.wpd Cat? D. CD-IS ' ~.e 2- "~'2+y .N l!b ~ ~~,~tf., 'j~ ~f's ~ .~t.'iti A j,t.1:r~ vf~.r [..f ~ } 1. j., ~ ~ .ixf ~ h~I,y.~:F.',~~ (H.i.j~1. ~ r ~r.•~~yA +-s ~~g k(~ ^~IYI~ ttfl frs.{ ~'af ''r~~ .L.S y 11 ~ it ~!^k. T~. S}+ 1~ tiL~4Y i+(~S ~ r I~ tr~. p~~,7JFi~ .ir 't: `N`~~i} at`~'s'r'~ ;i::r.iMtvrYr~.iOus.i:.~,.:~+'.'K'~:.t'4 :.w.Ll'r'i.~,:...«.~... i.:~:.. `<~~t~i li't~nn1'.,v','➢~~~:~r ..i i ~p ~T~ .~{xil.*^'5.~~1~ )w' .~r 'y'4. ~~r b:2 ~~t 37i r .>r'3-x'44 { . is T~NN,,.a Z, r~ ♦it ~ ~ i 1 ; I ~ ark; ~ .N~~ ~a .'~y` ~w +t,;r"` ,T,n. ~ :fr. of ~ _.,r~. ~ ~u~ k.ar, { . f r,,y~ sr ^3. n .4' ~~y~ ~ ~ I ,1'.~nA t i S ~ 4• ~ .T M`~ .t _ . - f ~ ~ ~ ' r I I I y i~:r I ; . ~ ~ ..~.~3~F ear ~ ~~r^. i+ 1 ~i>'r 4"' ya r ~ R i ~f =t G ~ 1f ` sN ~ i~~ t '.1`r FfYv~ ~ _ !y, 'e~ ~ ~f r~L~s~yy ~ ~ F.i;L F> '!1' ' r,.}`~ ~E i } ~ a o e e ~'Y~' ~ C' l7f rT1.,~ its `'-r~~ E ~J 3 fj 1 r S f}., f~{!~ ti c k' ri ~t !`n e _ ~ I~ r r r . e - v .-H r, t Y r: v 4,._ l rJ3+-.!~4f°•i ~f5' fist' r +1-'`.~y P• r ~,'r v< ~ f GT"~~~Yy.. oil WAS" I N CTO N SQUARE REGIONAL CENTER PLAN e SEPTEMBER 1999 CITY OF TIGARD PLANNING DIRECTOR, Jim Hendryx PLANNING MANAGER, Nadine Smith PROJECT MANAGER, Laurie Nicholson PREPARED BY: Spencer & Kupper, Project Management with Lloyd D. Lindley, ASLA Cogan Owens Cogan Kittelson & Associates Claire Levine Christine Rains Graphic Design This project is partially funded by a grant from the Transportation and Growth Management (TGM) Program, a joint program of the Oregon Department of Transportation and the Oregon Department of Land Conservation and Development. This TGM grant is financed, in part, by federal Intermodal Surface Transportation Efficiency Act, local government, and State of Oregon funds. Additional funding was provided by Metro and the City of Tigard. The contents of this document do not necessarily reflect the views or policies of the State of Oregon. f TABLE OIL CONTENTS 1. BACKGROUND 1 2. PROCESS AND STAKEHOLDER PARTICIPATION 5 Task Force Public Involvement Guiding Principles 3. REGIONAL CENTER DEVELOPMENT PLAN 13 Regional Expectations & Growth Targets Overall Vision Urban Design Concepts Urban Design by District Private Sector Involvement in Achieving the Vision 4. PARKS AND OPEN SPACE 29 The Washington Square Greenbelt Open Space Network Parks Recommendations 5. LAND USE INNOVATIONS 6. TRANSPORTATION SYSTEM PLAN 43 System Needs and Problems Recommended Improvements Overall District Improvements 7. PARKING STRATEGY 61 ' Key Findings - Existing Conditions Forecast Conditions Parking Strategies ` 8. PLAN IMPLEMENTATION 67 _ Coordination Next Steps Protection of Sensitive Areas Transportation Implementation, Priorities & Phasing Parking APPENDIX 75 YOpMIYMYRYY 1. BACKGROUND In 1995, Metro Council adopted a visionary plan The 2040 Growth Concept resulted from exten for regional development. The 2040 Growth Con- sive regional discussion about the future of the Port- cept describes strategies that make the most efficient land metropolitan area. Once the Growth Con- use of urban land in the face of cept was adopted, Metro dramatic population growth. OVERALL VISION working with the local juris- The 2040 Growth Concept will dictions, developed and help the region create and pre- The Washington Square adopted the Urban growth serve livable neighborhoods, Regional Center is a vital Management Funcdonpl Plan and promote a useful, acces- in 1996. Local citizens and regional center serving the sible, free-moving transporta- governments were then tion system with a wide variety needs of Washington County charged to determine the best of convenient transportation residents way to create regional centers choices. given the values, interests and • preserve residential needs of residents and busi- One of the key elements of the neighborhoods nesses. 2040 Growth Concept was the designation of regional centers. offer an innovative This regional center plan sum- These are areas containing con- transportation service that marizes the results of a thor- centrated commerce, local gov- makes it easy for people to ough public discussion about ernment and retail services, and the future of the Washington housing served by high-quality reach their destinations Square study area. It demon- transit. The Washington strates the way the people of Square area is one of three re- focus on Washington Square Tigard and Washington gional centers in Washington Mall as a community resource County incorporated their ex- County and one of eight in the pectations for the future into metropolitan region.. • feature a linked greenbelt of the regional framework plan. parks and open space easily The center of the Washington reached by residents and The resulting work creates an Square study area is Washing- employees exciting vision of a dynamic, ton Square Mall, a major re- compact and interconnected gional retail center. Office com- community. The Washington + plexes at Lincoln Center and nimbus provide com- Square Regional Center Plan acknowledges and pro- mercial and financial support to the region. Cur- motes the important role that this area plays in a rently, the area supports 18,000 jobs. About 5,000 Portland's metropolitan area and its position as a people live in approximately 2,300 housing units regional resource. It also recognizes the distinct de- within the area. velopment patterns and functions already estab- 3 ■ lished within the planning area, and suggests ways meat while maximizing the efficiency of space re- to build and enhance each district's unique charac- quired for parking and circulation. A green belt of teristics. parks and open space - linked by bike and pe- destrian trails - will ensure residents and employ- Residents of high density neighborhoods will have ees a nearby respite from the more intense urban easy access to nearby jobs, essential services and tre- landscape. mendous retail resources. Highway 217, the major freeway that bisects the study area, will be bridged by overpasses, allowing pedestrians and bicyclists, as Members of the Washington Square Regional Cen- well as cars and transit, to move back and forth be- ter Task Force are proud to present this vision of the tween destinations. future to the people o igazd, Improved transt- Beaverton and include a "people Washington mover servin .....:::::..e+ County who rely . . commute rail sta- on this vital dis- C i -will en- t on ' tact for housing, Nance circulation employment, within the area and shoPPingenter- help . fir..:. _ ..enter ac d es the tainment an ate more commod :+...,.,v..< sential services. Y>~< people and develop- Y X.-I" :n f.. t?:.:. . ^v" ttp. Off} ,n is?iY^Y:: i ....::.:..y5 dC~' g[ { 3 Study Area 2. PROCESS AND STAKEHOLDER PARTICIPATION Within the context of Metro's 2040 Growth Con- ington square Regional Study area would include cept and the Urban Growth Management Func- 1,250 acres, with Washington Square Mall ap- tional Plan, local governments in Washington proximately in the center. The area is bounded County initiated a study of land use, transporta- generally by Fanno Creek on the west, SW tion and other functions around Washington Greenburg Road and Hall Boulevard on the east, Square. Progress Downs Golf Course to the north, and Highway After considerable discus- 217, ir_cludizg the rash sion, a citizen task force Creek area on the southern (described below) reached border. consensus that the Wash- R" ,sA Task force members reached consensus during 17 meetings over more than a year. TASK FORCE In 1998, the Tigard City Council appointed 23 The task force met 18 times between June 3, 1998 people to serve on the Washington Square Re- and August 24, 1999. All meetings were open to gional Center Task Force. Task force members rep- the public. Early in the process, members and con- resent neighborhoods, schools, business and prop- sultants took a bus tour of the study area and re- erry owners, state viewed areas of in- and local govern- terest and concern. ments and public interest groups. The task force (Please see the title reached all agree- page of this docu- ments by consen- r ment for a com- sus. The group plete list of task agreed on decisions force members.) after extensive re- view of technical The task force's data, public input charge was to iden- from open houses tify issues and set and surveys, and general policy for discussion by task "IM recornmendati-VIs force members and about land use, others in atten- t r a n s p o r t a t i o n, Open house in Washington Square Mal, one of three public dance at task force open space, aes- meetings held meetings. thetics and other issues relevant to development around Washing- A Technical Advisory Committee (TAC) worked ton Square. Task force members kept in close con- closely with the consultants throughout the process. tact with the organizations or neighborhoods they TAC members represented staff of local and state represented to inform others about the process and government agencies that will be responsible for opportunities for participation. They reported on implementing the recommendations. Jurisdictions the concerns of their constituents at task force include the cities of Tigard, Beaverton, and Port- meetings. land, Washington County, the Oregan Department i of Transportation, Metro and Tri-Met. i i ' PUBLIC INVOLVEMENT A continuing task force • September 28, 1998 - goal was to engage as 10 a.m. to 4 p.m. Ap- many people as possible proximately 200 people in the planning process. dropped by during this To that end, the task two-hour meeting, and force, consultants and the staff received 81 writ- staff undertook a com- ten questionnaires from prehensive outrzach pro- those in attendance. Sep- gram. tember 28, 1998 - 6 p.m. to 8 p.m., Metzger They produced bro- Elementary School. Ap- V, chures and flyers distrib-r proximately 200 people uted by task force mem- attended, and staff re- bers and inserted inV ♦~,kM r ceived 160 written ques- newspapers and commu- tionnaires from those in nity newsletters. These Threepublic open houses were hosted by the task attendance. products informed the farce. March 8, 1999 - 5:30 community about the to 9 p.m., Tigard Water progress of the study, re- Building. Approximately - ported on issues arising at 90 people attended, and task force meetings and they returned 32 written notified the community questionnaires. about public involvement opportunities. A list of written responses and other relevant docu- The task force hosted r. ments from the public in- three public open houses, volvement process is in- with a final one sched- chided an the appendix to uled for September 15, this document. The docu- 1999. The meetings were ments are compiled under held: Members of the communityprovided written separate cover. questionnaires at the open houses. 0 aw«u a.na nw GUIDING PRINCIPLES r o In March of 1999, task force members agreed on a set o o eo . of principles that would guide development of all rec- ommendations. These principles, which had been affirmed previously by members of the public at a o series of open houses, are as follows: A ~ O 0 ~j Creation/Preservation of Area Identity • Reinforce a distinctive regional center while rec- o v ognizing and respecting the character of the # nearby residential community. ♦ • Facilitate transitions from one use to another; for example, single to multifamily residential uses. _ _ Preserve and enhance Metzger Park and consider additional parks. • Encourage environmentally-friendly development. • Try to keep historic trees. a Rtzt- P • Retain and develop quality housing, including af- fordable housing, for all income levels. ^ Build for our children: have a sense of steward- ship. a YGOW pN41YW • Think creatively and be innovative in improving/ 8 1 ®lB E13EE3 maintaining quality of life. ..eggs, eeee eea i,„ , ' . ° ®®MIE • Consider market forces and development patterns. : 11,2115 p p+siii 8660 8e 1, 6, „ e e r~ _ _ L! >-x • Consider transportation needs for the whole study area. } • Maintain and preserve floodplains and wetlands. Government/institutional issues • Consider-all political boundaries and facilitate co.- operation among jurisdictions. • Maintain neighborhood schools. f ice: ~fY • Identify and reinforce what makes the learning (educational) environment viable. Transportation .0-• • Strive for a self-sufficient, connected transporta- tion system. ~,yrq 9p~ ~G ~ 1 , M Plan for a multi-modal transportation system that accommodates increased auto and non-auto travel a ° needs. a Respect and enhance local street networks and • neighborhood livability. aao.w pwx nuw THE REGIONAL CENTER PLAN SHOULD: • Be understandable to lay people. • Be implementable within a reasonable, staged pe- riod of time. w • • Help develop a sense of community with a com- mon vision, hope and optimism. = • Be based on statistics and facts for population, - i employment and other factors. • Use existing resources as much as possible. • Encourage compatible and complementary uses. • Maintain an acceptable level of service and safety . Contain solutions to common problems. on regional roads, minimizing the effect on re- . Avoid conflict with-other regional centers. gional roads outside the study area. • Provide good transportation access to the rest of the region. • Make the community accessible for all people and modes with connections for cars, bikes, pe- destrians and transit. • Maintain a high level of accessibility within and to the regional center. • Use appropriate street and streetscape design. • Encourage attractive, high quality development. • Promote long-term viability for the area. Assure infrastructure is available prior to or with devel- opment. n N e 3. REGIONAL CENTER DEVELOPMENT PLAN !REGIONAL EXPECTATIONS AND GROWTH TARGETS Metro's 2040 - : ~r , i . I ' a ated a desired Urban Growth r r - development Management'-; scenario for the Functional L I_ z year 2020 Plan estab-;;.•Y aimed at ensur- f lished what it ing the Wash- called target ington Square growth capac- study areas ca- r ity" for each pacity to absorb jurisdiction in its share of re- the region. Ik I b~{ gional growth. The target fig- j - %'y- The task force I 1'`. FS ' ' A• ures are identi- /ti' used the 2040 fied both b Plans target ;7`'u.. - ~ ' S t; •.;;r--,-~-4 ' urisdiction numbers as a and, more nar- r~;:. ::4,• 1 f_ I j T t<I~!- basis for creat- rowly, for ';:,rj I rr rl~ 1` ing develop- : mixed use ar- 7~ R ' - ment scenarios eas in each ju- + 'ti 11 L V for the City of risdiction. The „s.''~= = : ;e !;t,;. ' r•' Tigard. The fi- t goal of setting nal numbers are these target 1,}_J larger than • those indicated numbers is to prepare the. for Tigard metropolitan ~~:%;r alone, recogniz- region for an- ing that the 1~ 1 a ticipated hous- study area fin- ing and job , - - cludes parts of growth. I - I Beaverton and unincorporated Working from LI Washington 1+ : ,r a variety of op- County. tions and pro- posals, the Re- Before looking i nal Center , at d g o Al Study Arca ®Englcwood Park Wcdands F__c 100-ycar Floodplain a projected Task Force cre- ; City Roundarics Grccnways .I0-foot Contours growth in the Enr.:ronnzental Featrtres rover r+n~,nw area, it is important to have an idea of existing job Total Employment: 9,804 jobs and housing concentrations. Currently, about 5,000 Retail/Service: 1,188 jobs people live in approximately 2,300 housing units Office: 8,436 jobs within the 1,250 acre planning area. About 18,000 Housing. 1,500 units people work inside the study area, which also has Residents: 2,530 people heavy retail and commercial development. Regional cen- _ ter planning was based on transportation 1_'`" r Lt and develop- _ - - - L T' ment capabil- ity and the Mi area's capacity to absorb the 4 R6 g minimum tar- gets within 20 I _T years: te, LH: 0.1 -~i).. _ y'._ .-b Gtt' =~•~`\j. ~ 1 t• I lacer _ '1- -i G. ~f 31 - - it -?^T ~,y~~y`_,_~, 7- . _ .i:• a•..,~ ~'Ti-~i i • II tom. pi4 { I . t Via- ' _ " 1_~ ' = -i. _ - -1~ Land Categories f Study Area Infill Potential 0 Vacant J\/ Analysis Sub-Arco 0 Parking Lots log Tigard Owned n/ City Boundary 0 Other Public M County Owned [-1 Redevelopment Opportunity 1W Title 3 100-ye2r Flood Plains Buildable Lands +.aa.iu a.w■ mw B The Washington Square Regional Center Task Force From this information, task force members identified based its work on the regions growth assumptions plus where within the study area growth should occur; what the estimates of new development necessary to accom- new development should look like; and what infra- modate this growth. The Task Force also considered structure would be necessary to preserve and enhance lands which should be preserved in their natural or livability throughout the district. enhanced state, such as wetlands, stream corridors and flood plains. Opportunities for development on va- The following pages describe a vision ofplanned growth cant land, infill for the entire re- on under-uti- Multi-modal bridge gional center lized properties Multi-modal and in each of Pedestrian such as surface Center - bridge the five districts parking lots, commuter Golf Course oftheWashing- and redevelop- rail, people ton Square Re- mover, transit ional Center ment possibili- g center Washing-ton ties were also _ D jade , study area. The .{i.. ,j considered. o°p ~$b Square Mall visions are in- O od Q S . t tended to help Research indi- d 9 4 .a o dove Amens 'the region ab- cates that 227 jn fu 8D sorb growth acres could po- du4w" Plaza while respect- tentially ac-' Metzger ing the values, comm'odate Park expectations new develop- D T and choices of ment within Q _ Washington the study area. - Od a a ■ a, ~County resi- This includes dents, employ- 42 vacant com- Redevelopnurnr ees, businesses mercial acres opportunity ~ ~ . © m • ' ~ and property and 17 acres owners. available for residential: infill; 129 acres Metz jn~u ger with redevelop- a~~ • . School ment opportu- nities; and 38 Greenbelt Greenbelt surface parking Fanno Creek Pedestria lots that could r- Greenbelt bridge r.~ J Ash Creek be built upon. Locust eztei:sion - multi-modal bridge New development New development Development Concept a OVERALL VISION Many of the basic elements of Washington Square The task force based its work on Metro's 2040 Regional Center are already in place. The area con- Growth Concept and Functional Plan guidelines, tains one of the state's largest and busiest retail cen- guiding principles adopted by the task force and rec- f ters; extensive job development in one-story and ognition of existing conditions, to create an overall taller office buildings; and an established residential vision that calls for: neighborhoods served by schools and parks. 71 • N , t • • 4~+ rr , , , ' Ga 6't• ~ fit. • • a dIt ~ pp • a vital regional center serving the needs of • preservation of residential neighborhoods Washington County residents for with some infill of single family and duplex employment, housing, shopping and housing where appropriate; professional services; r/uwiowrauw ' C O 0 ~ • 1 ■ O O O m■nw ■ O f, • a focus on Washington Square Mall as a F community resource with public space for • non-retail purposes; and s ,a ® o"` . Internal Pe tut 3 destrian was all • an innovative transportation system that onnecrio tral makes it easy for people to reach their lazy inside destinations in, out and around the district 3 bington q' re Mall by auto, rail, conventional transit, shuttles, vans, bicycle, commuter rail, people mover shuttle vans and on pedestrian pathways, Outdoor a with an emphasis on connecting the districts bU space within the regional center; P an Tanks P Greenbelt with continuous ? ' pedestrian bike system O greenspace and parks easily reached by residents and employees inside the area. tlOOW gMlM Rlw' S URBAN DESIGN CONCEPTS The previous section describes Lincoln Center. Densities will briefly the vision for Washington decrease toward the residential Square as a region- al center. The neighborhoods near the outer following paragraphs summarize edges of the study area. Design some of the major themes that will encourage open spaces and drove development of specific streets to create a livable and design concept elements. These friendly community environ- are based on the guiding prin- ment. ciples established by the task force early in the process. They Private property consider- reflect specific issue areas and the ations. Newland designations way the various geographic dis- will offer property owners flex- tricts within the regional center ibility to transition to higher will interconnect. pedestrian oriensedsrreeu densities and better uses while allowing existing uses to re- Parks and open space. An open space network pre- main. New streets will be located on property lines serves and enhances floodplain, wetland and wild- wherever practical. Street planning will try to avoid life habitat areas while creating creation of parcels that will not a green belt around the regional" be economical to develop. center. The plan calls for acqui- sition'of land for new parks; Regional/neighborhood char- preservation of Metzger Park d IS acteristics. The regional cen- and links to destinations in and ter contains a continuum of around the open space by paths r uses, from surrounding resi- and pedestrian-oriented streets; dential areas to the densely de- and preservation of Metzger veloped commercial and em- School as a community re- ployment center. New mixed- source. use zoning designations en- , courage each district within Environmentally-friendly de- the study area to evolve in a velopment. Development will way that is relevant to its par- be designed on a human scale ticular context, while support- and preserving open space, wet- j = ing a combination of housing, lands and floodplains. The commercial, retail and em- highest density development ployment uses. This mix will will occur around the mall and contribute to the vitality and A livable and friendly create desirable places to live community environment and work. 1-11 1 INN lllilloillill ilillimmilill I 11111~~ Jill "11111111111111 illi Jill 11-0 ramw+a rrr nuw Innovative features. The design nity resource, with better pedes- concept calls for a greenbelt, new p trian, bicycle and transit connec- mixed-use zones, a people mover tions to the rest of the regional system, bridges and other links center and other parts of the re- between parts of the study area. c gion. New plazas and entertain- All of these will contribute to an ment features will reinforce its enhanced quality of life by en- e, function within the larger area. couraging new developments to Better auto and pedestrian access integrate with the heritage and will also link the mall to retail fabric of the existing community. - opportunities across 217. Housing. The design concept Mixed-use development. encourages a variety of housing Mixed-use development is an im- types, including single family - portant feature of the regional detached, duplexes, fourplexes, : • center. Mixed use projects may rowhouses and new multi-fam- include a variety of retail, office, ily developments. Good bicycle, housing, light industrial and en- pedestrian and transit connec- tertainment facilities. Such tions and a mix of land uses en- projects reduce stress on transpor- sure convenient links to services tation systems by allowing people and employment. Good bicycle, pedestrian and transit to live close to jobs, services and connections assure convenient links entertainment. Mixed-use devel- Transitions. Building heights, to services and employment. opment also creates shared park- floor area ratios and building de- ing opportunities. Mixed-use sign guidelines will encourage e projects add to an areas round- workable transitions between the-clock vitality with more different land uses. Vegetation, people in buildings and on the setbacks and other design ele- o streets more hours every day. ments will create a. protective ' i First floor retail and food estab- buffer between development and lishments add charm and inter- environmentally sensitive areas. est to office and residential build- ings. New zoning regulations The Mall. Washington Square will facilitate mixed-use develop- ; Mall is an important regional fa- n ment. However, financing for cility and will be a focal point of such projects may be more c hal- the regional center. The mall will % I lenging to find than for conven- t become even more ofa commu- Mired useprojectsaddto the area's tional developments. vitality with morepeople in buildings and on streets more hours every day. roor r.rtr wuw Transportation and infrastructure. Achievement of During implementation, local governments will work the vision set forth in this document relies on sig- with property owners to set aside land for parks and n'ficant infrasructure investment and a regional com- open space. These areas will offer residents and mitment to financing needed projects. Transporta- employees balance in urban . living with easy access tion improvements are essential to accommodate an- to enjoy nature, sit quietly or engage in active recre- ticipated growth. This includes better auto access ation, offsetting the intensity of urban developments. and creating a truly multi-modal transportation sys- tem that promotes use of bicycles, transit and pe- destrian transportation. Infrastructure to manage The following sections discuss the way the vision stormwater and control flooding is also essential to and guidelines have been translated into specific the regional center's future. Parks and open space recommendations. are other infrastructure features that are supported by a parks master plan. Market forces and development patterns. When cre- ating a far-reaching plan for an emerging commu- nity it is essential to balance fiscal realities with vi- sionary thinking. Local governments and commu- nity members recognize that property owners and developers require realistic returns on investments if they are to build in a way that will accommodate the growth anticipated for this area. When imple- menting the framework plan, local governments i ' must avoid excessive development regulations that T" will stifle new construction. Communities must use creative strategies to prevent and remove obstacles ` to the type of development necessary to create a vi-....- brant regional center. Open space provides balance in urban living. e K110111111 101151 Masi YYOW PPP~PIIw' URBAN DESIGN BY DISTRICT On the 2040 Growth Concept map, the Washing- Each of these districts has a unique character, and ton Square area is designated as a regional center in each serves an easily identifiable function within which orderly new development and redevelop- the community. The task force's charge was to pre- ment would serve many functions for Washington serve the existing characteristics of these districts County residents. In reviewing existing land uses, while allowing and encouraging appropriate new the task force recognized that the area designated or redevelopment. The task force recognized the "Washington Square" is actually five distinct dis- need to learn more about the interactions of these tricts: The commercial core and the golf course; different neighborhoods and improve the social, the primarily residential Metzger neighborhood; economic, insfrastructure and transportation links the office and financial area around Lincoln Cen- between them. ter and Ash Creek; and two areas of The followin r,::: ,:x~:.:..~;~,.r, .~4,;t.~•~xM~:.~:~,.4,..,;;.~. g r.~.. hs de .::3<4y a -office and light Pragra flex scribe the riba tl a task industrial develo p'- ~V`<". for fu- nerallY re- force's vision fo y<:<><~ •<~4; ,,,"~>:~t>;: went ga tore development y Nimbus red to as fer of each district, rec-. w;.~"<~~;;R:},~~.~:<•>~:.: and Fanno Creek. m- Y f o g Although he N nizing the i im b f r'z W r orta Creek nce for them P bus/Fanno district is essential) 1='> '`fi :»<k'>3+ to function to- r to create an rac- gethe the ta e in cha } m , ter throughout, the igg, efficient regional center. Task Force viewed it as two separate districts, as one is << , a.;. H within the City of Tigard, the other within Beaverton. <_<>~?£*' y.~ 2E~tu ^.:L M1 :NSM" ntJ 4 _ . 4iX::#yS *Yt. }k a. c?:z' k ;"h Districts within the study area raorra=n~~nwr DISTRICT A: THE COMMERCIAL CORE AND GOLF COURSE Washington Square is noted throughout the Portland One of the urban design elements that can contrib- region for the Washington Square Mall and other dy- ute to an enhanced feeling of community in this part namic retail development. The framework plan calls of the study area is an emphasis on open space and for the 895 acres includ- pedestrian amenities that ing and immediately out- balance increased density. side the mall and encom- n The mall itself may pro- passino both sides of High- vide an opportunity for way 217 to accommodate 04,E developing a new public the highest densities of the plaza that offers a place five districts. to rest, sit, read, have lunch or visit with In addition to the mall and friends. In addition, the existing retail development • e r`' urban design concept in this area should include ? t calls for expanding the office towers housing many existing plaza next to the new jobs and high density, Concept sketch shouringstructures, transit center and better four to five-story residential new arterial and infi1l development linking all the pedestrian buildings. This dis- areas inside the mall trio will be highly area. urbanized, with sig- nificant transit, pc- The task force also destrian and bike has proposed creat- improvements, as iiig an entertainment z r 3' well as enhanced area within the com- N traffic access and mercial and retail circulation. core. Cinemas along the freewaywould be Q Today, this district coupled with a view contains nearly 89 ing area at the mall's acres of surface highest point. Typical mid-rise office and parking, of which 9 commercial development. 22 have been iden- District A also in- Development concept. i tified as potential dudes the Progress infill locations. These lots represent the single great- Downs GolfCourse. The task force recommends work- est opportunity for new development in the district. ing with the community to develop a pedestrian path a connecting to neighborhoods and ultimately linking to 3 other open spaces on the district's periphery. ■ DISTRICT 13: MERGER The Metzger area is an es- Retail development to tablished residential neigh- meet the needs of imme- borhood located east of diate neighborhood resi- Greenburg Road and north dents will be housed in of Locust Street. Hall Bou- two-story mixed-use levard is the district's north- buildings. New buildings ern and eastern boundary. provide parking at the rear The task force agreed thet - to preserve the pedestrian Metzger should remain pri- orientation of local streets. marily residential, with infill complementing exist- Metzger should be a ing uses. Densities would neighborhood that sup- increase approaching the ports children and fami- district's west end to create lies. Metzger School and a transition toward play fields will remain and Greenburg Road and the be enhanced as an impor- very high density mall Metzger is anestwblashedneighborhood comprised Of tant neighborhood asset. area. single family homes and undeveloped parcels on Metzger Park, although narrow streets. Higher density residential not in the study area, will New building would con- developments are occurring around the edges of the continue to provide open sist of single family units neighborhood space and recreation facili- and duplexes. Small apartment or condominium ties for Metzger residents. complexes could be built along the periphery of the district on Greenburg Road and Hall Boulevard. JA Inefficient development can place A simple layout can provide gFraterpre-aureeonsurroundinglan&. maximumpotentialwithoutcrowding. :::r'< }hryh tr; : :t .....,`:u#<?.:is3.f4i:SSw'T~2•."ai:'.'n:.f:a. I f010M1 N.rtN NYw DISTRICT C: LINCOLN CENTER - ASH CREEK Lincoln Center is buildings. Shops characterized by and restaurants office develop- will serve office ment. It is an em- workers. ployment center, housing many pro- South of Locust, fessional services the emphasis will and commercial be on residential enterprises. Imme- - development at a diately adjacent to j~ € density of about this office park and 100 units to an south of Locust is acre. The resi- a mixed-use resi- dentidential neighbor- . r al and com- .y f hood, which will mercial area that F. , t be somewhat less has the capacity to 1 + ~x ! a dense than the house more people office develop- and provide more Ash Creek District is planned to absorb the highest mixed use ment, will be- jobs and services. and office densities outside o~the retail core. come a transi- tional area ap- The task force envisions proaching Ash Creek the current nature of Lin- and the projected green 4 coin Center to continue belt that will surround - with more of they'"" the district. Plantings, same. It will expand on setbacks and other mitir its role as a commercial gation and enhance- and financial resource to ment techniques will Washington County, - e buffer Ash Creek and with construction of new adjacent sensitive areas buildings four stories or from disturbance. Wet- higher. Retail facilities lands and flood plains, will arise along kf Y already protected, will Greenburg Road in one become a part of a dis- or two-story mixed-use trict-wide open space ~ configuration. r' ><<'i[f{ Southwestl1alfofAsh Creek District showing Lincoln Center and frsture potential development a DISTRICTS D & E: NIMBUS - FANNO CREEK Districts D & E function as one neighborhood. They rail line and station to serve this employment area have been given different district designations because and the regional center. A commuter rail station they lie in two different jurisdictions: Tigard and near Scholls Ferry Road would offer tremendous de- Beaverton. The main de- velopment incentives, velopment features in as well as improving this area are one-story access to this busy light industrial and office Va commuter district. buildings created to ac- * The task force envi- commodate Washington sions the station as a County's high tech in- mixed-use facility with dustry and related ser- bus transfer access to vices. Densities here ¢ - the people mover, out- should be increased to a door plazas and a va- moderate density scale, riety of amenities serv- and this part of the study ing commuter needs. area should remain an employment center. The Commuter rail would improve access to this busy district. An important aspect task force believes that of development in this many of these buildings have Q: area is improved pedestrian, the potential to be redeveloped and transit access. The task into more efficient and taller of- force wants to reinforce and fire and mixed-use facilities to „ strengthen the districts' rela- accommodate more jobs. The tionships with Beaverton and districts have capacity for new adjacent neighborhoods. four-story office buildings as well as some residential devel- Fanno Creek and its delicate opment. riparian areas lie at the out- 9 skirts of Districts D & E. In The corridor along 217 addition to enhancing pedes- through these districts will con- trian and bicycle access to tinue to attract retail develop- A rnix ofcommereia4 retail and residential Fanno Creek, design concepts merit. uses linked to a commuter rail station and for these districts call for care- a muhimodal center ful buffering and sensitive land A key to making the best use oFthis district will be use planning to create an environmentally sensi- enhanced public transit. The task force strongly rec- tive transition between some of the highest den- ommends creation of a commuter sity development. 0 ^t,Iiw ik~ RRiW WRORRM PRIVATE SECTOR INVOLVEMENT IN ACHIEVING THE VISION To achieve the densities envisioned here, local govern- result in discouraging development. Local govern- ments will be responsible for making major infrastruo- ments and community members must be prepared tare improvements that will support access in and out to work with the development community to en- of the regional center, provide for greenspace, offer sure that property development remains an attrac- environmental protection, particularly flood control, tive investment within the regional center. and ensure other essential services. Successful build-out will rely on coordination between The actual block-by-block build-out of the area, private developers and public service providers. If however, will be the responsibility of private devel- new development occurs before adequate infrastruc- opers. Market forces, financing and other issues will ture improvements are made, the district risks in- determine the extent developers redevelop existing creased traffic and stormwater problems. Local gov- land uses or fill in vacant land and parking lots. cmments should create timelines for infrastructure investment that can guide private investment. To attract private investment, local governments and community members must be sensitive to the reali- The appendix to this document contains specific data ties of the market place. Market conditions may about available acreage and infill and redevelopment affect the type and extent of development that is potential. It also contains charts indicating recom- feasible at a given time. Furthermore, aggressive mended building heights and floor area ratios neces- regulations intended to promote the vision, protect sary to achieve specific job and housing targets. the environment, encourage transit use, etc., may I ■ 4. PARKS AND OPEN SPACE Open space in any city significantly contributes to citi- choices for residents, employees and visitors to bike zens' and visitors' quality of life. Open space includes or walk comfortably from place to place within the parks, plazas, natural areas, wetlands, cemeteries, golf regional center, reducing the number of short trips courses or landscape spaces next to highways. These in automobiles. Open spaces would also provide areas are not necessarily available for public access. How convenient access to transit, further reducing reli- ever, all open space is intended to create a visual and ante on automobiles. This all adds up to less con- physical respite from urban development. Parks and gestion and cleaner air. plazas create a framework for livability that knits places together into neighborhoods and communities. The Today is the time to establish these places. At no other Fen Way in Bos- point in the fu- ton, a series of Bicycle/ Lure will there small and large pedestrian be a better op- parks linked by a path portunity to stream with ponds School create such a and pools, enliv- complete and fJp ~f f r y ens the comma- Course lasting contri- ni and attracts bution to the visitors from all n a livability and over the world. Cesnesery future of the Golden Gate Park p Washington in San Francisco, Square Re- Central Park and ri Metzger gional Center. P rk r, Battery Park in q Establishing an Manhattan, and interconnected the mall in Wash- open space sys- ington DC are ex- p o l tem and agreen amples of open c° t., belt around the spaces that pro- center would foundly influ- $Lj potentially add enced the develop- n property value ment and livabil- 41 - ` u and attract ity of their sur- Fanno quality devel- rounding cities. Creek r 3a Bicycle/ opments that - pedestrian ultimately will ,a trail The Washington f ; create a great Malta-modal Square open bridges with Ash place to live space system pedestrian links ' Pedestrian Creek and work. would provide bridge Open space map e roow am avw e THE WASHINGTON SQUARE GREENBELT Today, Fanno and Ash Creeks converge in the south- The task force targeted six to eight acres of wetland west portion of the study area near North Dakota and floodplain areas in the south just north of High- Street and the Southern way 217 for preservation Pacific Rail Line. These as open space. These sen- two creeks flow through a yd. sitive lands lie within an variety of floodplain and area that is envisioned to wetland areas that wrap absorb nearly half of the around the west, south, regional center's projected and eastern edges of the " e d residential growth. The regional center study area. d task force also allocated Progress Downs Golf - • another two acres of pro- Course, certain forested tected open space along areas around Taylor's r f Fanno Creek. Ferry Road and Whitford Middle School create a ~ ~ ~ The green belt exists to- "green link" around the day as an incomplete northern edge. These green space around the re- form a natural greenbelt. gional center. A continu- a' = = ous trail system would Much of the wetland and provide access and links to flood lain areas are on s% s:; - P s~ . residential, employment public lands. The City of ° • z and commercial districts Tigard manages park Apath system would link and provide pedestrian lands in the southern Por- recreation areas andparkfacilities. and bicycle connectivity tion of the study area near between destinations in where Fanno and.Ash t the area. The path system Creek join. Other wet- would also link recreation lands are privately owned. L. areas and park facilities such as Metzger Park, Within the western green 1 Progress Downs Golf belt lies an incomplete pe- Course, Fanno and Ash destrian and bike trail and Creek and Whitford park system that connects a o • • Middle School play fields. the neighborhoods be- Special treatments along tween Scholls Ferry Road Hall Boulevard and across and Hall Boulevard with Oleson Road connecting i the Fanno Creek natural Agateway marks the transition to the golf course are nec- areas. into a neigbborliooeL essary for continuity. 0 ■ A trail system around visitors to circulate the edges of the golf throughout the center. course would provide Washington Square will pedestrian connections become, upon comple- to the club house, tion of the open space Fanno Creek trail sys- network and path sys- tem, Whitford Middle tem, a walkable place School and to destina- with less reliance on au- tions across Highway tomobiles. 217. Pedestrian bridges across Highway Public plazas are part of she open space network. The trail system re- 217 north of the Hall Boulevard overpass and south quires special design to avoid sensitive environmen- of Greenburg Road would complete the connec- tal and habitat areas while providing places for tions. people to sit and walk. Crossings over Fanno and Ash Creeks must be sited to prevent adverse im- An internal network of open paces, plazas, pedes- pacts on wildlife habitat and wetlands. A native trian oriented streets and access ways connect to the plant program should complement federal, state and green belt creating ways for residents, employees and regional requirements to create a model urban natu- ral area that will benefit future generations. .Y o +r .8 as AAL Plazas become part of the transportation Public plazas provide for a variety of system, linkingpedestrians to transitservice. activities such as a farmers market. nuorw oa.rtn•uw OPEN SPACE such as playgrounds, soccer, little NET-WORK league baseball, softball, tennis - and model boating. They would An internal open space network connect to other parts of the identifies parks, plazas, streets and community through the open access ways that provide choices space network. This version of for residents, employees and visi- park development is consistent tors to walk or bike throughout with the Tigard Regional Parks the regional center. Public plazas Master Plan. provide a variety of places for Pedestrianpromenades between major community events, farmers mar- anchor storesprovide connectivity kets, festivals and other exhibits through Washington Square Mall. that help create a sense of neigh- RECOMMENDATIONS borhood. Each of the plazas is linked to a system of pedestrian-oriented access ways and streets and is The City of Tigard should: connected to the internal pathway system in the mall. • seek to purchase lands to complete the Green Public plazas would be located at the commuter rail Belt around the Washington Square Regional station, in the center of and at the east end of the Center. Washington Square Mall, and in the south end near • purchase or request dedications of park lands Ash creek. adjacent to significant new developments that would benefit from parks and open space. The illustration above shows begin discussions and ac- connectivity through the mall by quire the rights to construct enhancing pedestrian prom- L pedestrian bridges over High- enades between anchors. The way 217. pedestrian system also provides "t"' investigate the feasibility convenient connections and fre- I'erfestn of forming a public private lrnk~iX quent service to the people / partnership with the mall to mover and transit routes. develop the central plaza. F cooperate with private land PARK USES owners and commuter rail representatives to encourage Active community use parks the operation of commuter would be located at Metzger rail and the development of a i Grade School, Whitford _ rail station and plaza. Middle School and in two other study the feasibility, align- locations: in the Fanno Creek ments and phasing of a people -1- 7 and Ash Creek corridors. These Wa~hn " mover that would provide ac- parks would offer active uses SM~i cess to the open space system, parks and plazas. Greenbelt and Pedestrian Linkages s~ari~.wuw • v. LAND USE INNOVATIONS MIXED-USE DEVELOPMENT A key element in the region's ability to achieve its Mixed-use developments offer excellent opportuni- goals for the Washington Square Regional Center ties for sharing parking. Generally, residents need will be mixed-use development. The task force be- parking spaces in the evenings and at night, while lieves that development that combines more than employees need the spaces during the day. There- one land use on one site will help :he region meet its fore, office or retail uses complement housing for density expectations while minimizing problems of- the purpose of sharing parking. Restaurants and ten associated with growth. movie theaters can easily share parking with offices because Two of the most severe prob- of the difference in parking lems associated with higher demand times. densities are traffic conges- tion and parking. Mixed- Development of housing, en- use projects can address tertainment and retail adds these in several ways. First, vitality and interest to a com- by building housing in prox- _ munity. The sense of "eyes on imity to work places, people the street" created by people may not need to use cars to living in an area and using the reach their work. The more public right-of--way at all mixed-use development in times of day enhances safety an area, the more options and encourages others to use employees have to live near the area. Ground floor uses their work site. such as stores, coffee shops and restaurants give pedestri- When an office develop- - ans interesting views as they ment shares a site with din- An "eyes on sbe strew"sense is creased by people walk past buildings - and ing and retail businesses, em- s`s`ngsJ'epublic righrs-of-way atalllimes ofday. also contribute to sidewalk ployees are less likely to need safety. their cars once they get to their jobs, making it pos- sible for them to carpool or use transit, bicycles or to The bulk of this section addresses proposed regula- walk to work. tory changes that will make it easier for local gov- ernments and developers to site and build mixed- use projects in Tigard, Beaverton and unincorporated Washington County. i ■ COMPREHENSIVE PLAN AND ZONING CODE AMENDMENTS To implement ( The principal the principles amendments are and concepts to create new described in mixed-use dis- this framework tricts to be in- plan, task force cluded both in the Com re- members pre- ! P pared amend- pensive Plan ments to the ~r and the Zoning City of Tigard Code. These Comprehen- new districts r~ •r' will support a sive Plan and Development variety of land Code. For the use types suit- portions of the i able for com- planning area mercial, em- within the City S ployment and of Beaverton, residential areas R-0.5 and Washing- at densities ap- ton County, ro riate for the .?,~the task force ~ regional center. recommends These mixed use plan and code districts are amendments in summarized be- these jurisdic- low. The pro- tions, to be posed plan and implemented zoning map for separately by P the Washington plan amend- R-'2 Square Regional ment processes.' Center is also shown. Beaverton Zoning Wash. Co. Zoning Tsgard Comp Plan = CI Q CBD e9r.j Central Business District DV Med;zm Density Res. [1 CS Q 1NST qW Community Commercial Medium-High Density Res. Q GC r__1 MED ® General Commercial ® Multi-Use Employment Q OC NC = Neighborhood Comm. Open Space R2 Q OC Professional Comm. IM Public Institution R7 P ----l R15 via Nigh Density Res. Proposed Comp Plan ® R24 Heavy Industrial ® Mixed Use Residential ® R5 Light Industrial I ® Mixed Use Commercial Q R9 Low Density Res. ® Afixed Use Employment Comprehensive Plan and Zoning Designations s MIRED-USE COMMERCIAL MIXED-USE EMPLOYMENT The purpose of the Mixed Use Commercial (MUC) The purpose of the Mixed-Use Employment (MUE) land use designation is to: land use designation is to: • create a dense mixed-use commercial • create a mixed use employment district that district that forms the commercial core of is complementary to the rest of the commu- the Washington Square Regional Center; nity and the region; • provide opportunities for employment and Y provide opportunities for major retail for new business and professional services in goods and services, office employment, and close proximity to retail centers and major housing to locate in proximity, and with transportation facilities; good access to, transportation services; 0 provide for major retail goods and services accessible to the general public, and minor • implement the Metro 2040 Growth Con- retail goods and services accessible to the cept and Urban Growth Management public which works and lives within the Functional Plan for areas within the City of MUE district; Tigard designated Regional Center. • provide for groups and businesses in centers; • provide for residential uses that are compat- The regional center plan recommends that land ible with and supportive of retail and em- around the Washington Square Mall and land im- ployment uses. mediately west of Highway 217 be designated a • implement the Metro 2040 Growth Con- mixed-use commercial district. Principal develop- cept and Urban Growth Management ment in these areas would be office buildings, retail Functional Plan for areas within the City of and service uses. A zoning designation of MUC Tigard designated Regional Center and would also allow mixed-use development and hous- Employment. ing at densities of 50 units an acre. MUC districts would encourage larger buildings with parking un- Mixed-use employment districts refer to areas with der, behind or alongside the structures. concentrations of office, research and development, and light manufacturing industrial uses. Commer- cial and retail support uses are allowed, but are lim- ited. The zoning would permit residential develop- ment compatible with the district's employment char- acter. Lincoln Center is an example of an area desig- nated MUE-1, the high density mixed-use employ- ment district. The Nimbus area is designated MUE- 2, requiring more moderate densities. MP~.I.tOMAPW MIXED-USE RESIDENTIAL The purpose of the Mixed-Use Residential (MUR) The Tigard Community Development Code is rec- land use designation is to: ommended to include: • create moderate and high density mixed use • a Mixed-Use Commercial District; residential districts in proximity to other • both high density and moderate density mixed use districts; Mixed-Use Employment Districts; and • provide opportunities for a variety of hous- • both high density and moderate density ing types and densities, and to produce that Mixed-Use Residential Districts. housing in ways that residents have a high degree of pedestrian amenities, recreation Development standards are proposed that require: opportunities and access to transit; • minimum residential densities and floor area • incorporate limited commercial and service ratios (FAR) be achieved; uses within mixed-use projects that provide • limiting certain commercial uses so that a benefits and amenities to residents, but are pedestrian-oriented development pattern is compatible with residential uses. achieved; • implement the Metro 2040 Growth Con- • design standards for pubic improvements, cept and Urban Growth Management site design building design, signs and land- Functional Plan for areas within the City of scaping are achieved in order to create high Tigard designated Regional Center. quality, pedestrian-oriented developments; • all areas be subject to site development The MUR designation is appropriate for predomi- review; nantly residential areas where mixed uses are per- • limited adjustments, and phasing so that mitted when compatible with the residential use. development standards can be achieved over Areas will be designated high density (MUR-1) or time; moderate density (MUR-2). • improvements to pre-existing uses and developments so that existing residents and businesses may continue to thrive; • incentives to preseve and enhance significant wetlands, streams and floodplains. The primary development standards proposed for each of these new zones is summarized in the fol- lowing table. 8 roew,wwaauw 0 SELECTED DEVELOPMENT STANDARDS IN !MIXED-USE ZONES MUC MUE 1 MUE 2 MUR 1 MUR 2 Dimensional Requirements Minimum Building Height 2 stories 2 stories None 2 stories None Maximum Building Height 200' 200' 60' 75' 45' Density Requirements Minimum Floor Area Ratio (FAR) 1.25 1.25 0.6 0.6 0.3 Minimum Residential Density 50 units/acre 50 units/acre 25 units/acre 50 units/acre 25 units/acre Maximum Residential Density None None 50 units/acre None 50 units/acre Recognizing that protection of natural resources is areas, consistent with the requirements of the City an important objective for the regional center, the of Tigard, Metro Title 3 and rules and standards task force incorporated the most current identifica- utilized by the Unified Sewerage Agency under agree- tions of floodplains, wetlands and water courses ment with the City of Tigard, and the City's water within the planning area. Regulations for develop- resources overlay district, including a 50' riparian ment within and adjacent to these natural resource buffer, apply within the regional center. A figure showing these resource areas is included on page 13. DEVELOPMENT CAPACITY WITHIN THE REGIONAL CENTER The consultants and the task force studied land avail- The task force concludes that the proposed zoning able for development and redevelopment within the map and the minimum density requirements in the study area. Available land estimates helped the task's draft development code will allow adequate levels of force determine the potential for creation of new employment and housing growth to meet Metro's jobs and housing in the area. target growth allocations for the City of Tigard as well as Washington County's housing targets for this Estimates indicate that building to minimum den- area. This conclusion is based on the assumption sities, the regional center can accommodate 10,100 that the downtown Tigard Town Center can accom- new jobs and 2,067 new housing units. This breaks modate approximately 600 new jobs. down to 7,443 jobs in Tigard and Washington County, excluding the Nimbus-Fanno Creek Dis- trict located inside the City of Beaverton. Housing capacity excluding that district is 1,871 units. «a~~ jO° 1 6e TRANSPORTATION SYSTEM PLAN Transportation is one of the major areas of empha- The challenge to regional center plan participants sis in regional planning. Perhaps there is no part of was to ensure access to this emerging regional cen- the region in which transportation plays a more criti- ter by all transportation modes. The task force cal role than in this section of Washington County. wanted to balance air quality issues, congestion con- WORTH (NOT TO $CAL ! : 17 q? i✓ sip ~Lf .j.. I _l..... t ti 210 ¢p t\ % :.,1 T--t w m Cg i i `may , WASHINGTON m :T'. SQUARE & Qfft o „5W.,HO.. JER..ST f MALL; ' v+ N y t ` - 1 :rs _ 5T ~ i e0 . _ _ sw• coeRr~ I 4l 5T SW LOAM ST ~e c~ ' siaumre;rla a~p+'~IYs4~ C SQUAl:F."•Ra ~ ~nlTlal~•e:a;~RCta lalaiaim:t1111f1i1II19~ i , o 4 4 : >..:....i , i , ; % ; 1 <y/(•,~y WI OAK SF 411.10"-fN ~ Nm 1/11 ~l 1 we p't, 1 O~ ASH i Stlv PINE $T 1y7b ` a, a W PSKM4~... - _t Sw S RUCE 5•. ` - '~F,T, ~ ` ~ 217 L..'..i.... ~ ..".'i~. / °x- SRC q sw PFA,FiLE ST ARTERIAL alalC:ilown MAJOR COLLECTOR o MINOR COLLECTOR Recommended Roadway Functional Classifscation ruouu prnwnuor terns, desires to reduce space allocated to parking, The task force recommends that local governments bicycle, pedestrian and auto safety, and increased fo- and businesses work closely with Tri-Met and coor- cus on transit. In addition, the task force found it dinate with the Regional Transportation Plan to bring important to address barriers to pedestrian access (busy about necessary changes in the Washington Square streets, lack of sidewalks, etc.) as a way to make shared Regional Center. parking between complementary uses more attractive. The following sections offer a current analysis of Task force members identified establishment of a transportation issues within the study area, discuss commuter rail line as a high priority project for im- future issues and provide a variety of strategy rec- proving access to the regional center. In addition, ommendations. they strongly support development of a people mover system that will help commuters, shoppers and resi- dents circulate between destinations throughout the regional center. SYSTEM NEEDS AND PROBLEMS A thorough analysis of existing transportation con- Sidewalks and bike lanes. The majority of ditions in the study area was undertaken by the con- the arterial and collector streets in the study sulting team. In summary, they found: area have sidewalks. Scholls Ferry Road and Hall Boulevard have bike lanes within the • Traffic congestion. Major roadways in the study area. Highway 217 presents a major study area experience significant traffic con- barrier for pedestrians and bicyclists. The gestion during weekday peak periods. High- only connections between the east and west way 217, Greenburg Road, Hall Boulevard sides of the highway in the study area are and Scholls Ferry Road experience traffic de- over-crossings on Hall Boulevard, Scholls lays. The major capacity constraints occur at Ferry Road and Greenburg Road. Ap- the Hall Boulevard/ proaching these three crossings, Scholls Ferry Road inter- only Hall Boulevard and section, the Scholls Ferry ! Greenburg Road have sidewalks, Road/Nimbus Drive in- with bicycle lanes only on tersection, and the Scholls Ferry Road. The only Greenburg Road/High- bike lanes on the east side of the way 217 ramp intersec- Washington Square Mall are on tions. In addition, High- Hall Boulevard. way 217 itself is highly' congested. Greenburg Road today. o a YOCMIYYY/IUw' • Transit. The Washington Square Transit Cen- tinue to be clogged. In addition, other sec- ter is located in the northeast parking area of tions of Hall Boulevard, Greenburg Road, and the Washington Square Mall. This transit cen- Cascade Avenue and Oleson Road will also ter serves as a bus stop for routes 43, 45, 56, experience congestion. Traffic estimates do 62, 76 and 78. These routes connect Wash- not predict congestion. on local Metzger area ington Square to transit centers in downtown streets directly east of Washington Square Portland, Beaverton, Tigard and Lake Os- Mall. wego, as well as providing service to the Tualatin area. Riders found that buses on ex- RECOMMENDED IMPROVEMENTS isting routes don't run frequently enough and don't offer enough direct connections. A The task force recommends a series of projects to im- wider selection of transit tools could create a prove access by transit, bicycle, pedestrians and mo- less congested, less torized vehicles into and auto-dependent Z throughout the district. transportation sys- The following paragraphs tem within and describe those projects that connecting to the the task force feels should study area. T be pursued. In some cases, the task force expressed an • Future traffic con- interest in specific major gestion. In the fu- projects, but members rec- .ture, those areas al- ognized them as outside the ready identified as charge of the Task Force. experiencing traffic Those are listed on the fol- OEM Cz= congestion will con- lowing pages, as well. Streets have a balance ofpedestrian, bicycle and vehicularfeatures. rowuprrr num OVERALL DISTRICT 1MPRO • Development of a "Transit Access and Ac- traffic problems. The task force members iden- tion Ilan" in concert with Tri-Met. Im- tified a menu of needs, including more frequent proved transit service and a wider set of tran- service on existing bus lines, more direct con- sit options will be very important in helping nections to other locations, creation of a com- the regional center grow without increasing muter rail line, transit center improvements, and WORTH ti (NOT 7O SCAtf i 1) ' w RE ~?J i 1.. t ;7.. _ i. .T: 2.0 WASHINGTON +o , 19 2 a . SQUARE Q Sk ElOt2DR S1'••' a' ` a ~ MALL zY S. W.. LE S7....... cy a ............__~........._.i'SW COR., SW DAM ST Si . rZS ~t~ 4 . A, m" reZ' ;3?R~rt'SDS'§,...T'I~Ayrr<. ..M. + SW 'LOCI.+.ST ST _ SW OAK S ® :rI a+et~, ST IL . ASH CR~Efk, ' SW SPRUCE ST Y' 1 + ~5. 7C Rj ~ ~e ~cl si •y• 21 7 .~"~.I.. Ri: pp I SW PFAfFLt 5? a s ro NEW ROADWAY a`= UPGRADE EXISTING ROADWAY j....... r: \ I F P!JASING Of KCY MOTOR VE11-11CII TREATMEN'S Recommended Motor Vehicle System Improvements roo.w own nu■r design of a people mover to help circulation improvements to the regional roadway system. within the regional center. Local govern- A number of task force recommendations are ments, businesses and Tri-Met should work aimed at increasing road capacity A reduc: ag together to develop incentives and strategies congestion throughout the district. Increased to increase transit use. density will bring more traffic, as well as more F'3 (Nor TO ALE) H S ...W~ I J ?T7 r. , „L yam' + V J1 c '~v 210 a . % Ir Lei l / 3, g TVt Z £cv~ I ' - t WASHNGkTON SQUARE al Sr BoWl[a Si ♦'P x n.................. ' MALL N N 4 Je o+ x' COR SW LWDAY ST SW IOC= T ST L _ • e • t ° SW LOCUST ST K _ '1-• ~ ~ s--- ti I t C y:. SW OAKiST /yz` v '._a' SW'OAK ST +/II' r st ASt( SW~f~tff 5i Sw:SPRUCC. ST i e~p I 21 Commuter PailSution • n.. 't' _ t I a Commuter RA r onav- Existing Bus Routes SW PF .F-_4E ST IfR Future Pcdeatrian/Biryc1cF, nnerions A- i •as,:•+•+l• New Bus Service ■•--r••, Sidewalk Improvements j 4--+ Pedestrian Access Improvet_9 C6 `h~.'iOl Improved Alignment e Transit Center Improvettea?iiLs 1 Potential Pedestrian Crossing`Re(uge t Enhanccd Pedestrian/Bicyde Treatments tlQYIYIRMP RIIM short-term visits for shopping and professional vard and at the Scholls Ferry Road/Hall Boule- services. The vitality of the area will depend vard intersection and offer a new, direct route upon ensuring relatively free-flowing traffic from the north to the south ends of the district. at major intersections, on arterials and into With pedestrian and bicycle improvements, this and out of key commercial areas. Some key route will open significant transportation op- road improvements that will affect the entire tions for people working in the Nimbus devel- district include: opment. • A bridge over Highway 217 connecting Nim- • A bridge over Highway 217 connecting Lo- bus Drive to the Mall area. Highway 217 is cust to Nimbus. The task force recommends a major physical and psychological dividing building a second overpass over the railroad line in the Washington Square area. The task right-of-way and Highway 217 once the Nim- force recommends development of a two-lane bus extension is -completed. The Regional road over the highway and the rail corridor Transportation Plan already has identified a providing motor vehicle, bicycle and pedes- form of this recommendation. Construction trian access between the Nimbus employment of the overpass will offer vital connectivity in center and the commercial core. The recom- the regional center, as well as relieving conges- mendation also calls for a ramp to Cascade tion on Hall Boulevard and Scholls Ferry Road Avenue. In addition to linking two previously east of Nimbus Drive. Additionally, pedestrian disconnected parts of the regional center, the and bicycle facilities should link to the Fanno over-crossing would relieve traffic at the Hall Creek Bikeway and residential neighborhoods. Boulevard/Scholls Ferry Road intersection and the Hall Boulevard/Highway 217 interchange by allowing westbound mall traffic to bypass these congested areas. Bicy cle an d pedestrian e. connections would link to the F anno Creek Bikeway. . • Extending Nimbus Drive to Greenburg ls', s' 12' 1 12' s ts' Road. The task force recommends construc- 64' tion of a road linking Hall Boulevard at the northwest corner of the study area to A bridge shouLdaeeommodatepedestrians, Greenburg Road at the south end. This bicye fists and motorized vehieles. project will relieve congestion or. Hall Boule- LW .il ~I®Y60M1i~wU~1' A collector system at Oak-Lincoln-Locust. Widening Hall Boulevard to three lanes be- To help traffic move more freely once cross- tween Oleson Road and the southern bound- freeway connections are built, the task force ary of the study area. Hall Boulevard is a state recommends improvements to this street sys- arterial roadway and a major travel corridor tem. The intent is to distribute east/west traf- through the regional center. Upgrading this road- fic between Locust and Oak Streets and im- way will reduce cut-through traffic in surround- prove accessibility to the Lincoln Center com- ing residential neighborhoods and will provide mercial district. It also would improve access overall improvements in traffic flow throughout to residential areas for bicyclists and pedestri- the area. In the short-term, pedestrian and bike ans, as well as autos. The task force recom- improvements are needed. mends that local governments apply traffic management techniques here to protect The task force recognizes that the Regional Trans- neighborhood streets (see discussion on dis- portation Plan calls for expansion of Hall Bou- trict improvements). levard to five lanes. However, the task force en- dorses an expansion to three lanes while acquir- ing right of way for a five lane roadway. ,.,:««~'<E~'Y..Y..~~~?? •9.sa 6'rlRi.+~'S'.;:xs>. ~:°:fif~'~i .cs„>:: S :rs r. .a. P"m P°~"~8 ord:.n 1~' 8' S' 11' 1I' 11' S' 8' N' W S' It' 11' 71' tt' Il' S' 13' 87 93 Parking and shade trees create a bufferforpedestrians Sidewalks, median strips andplantings make typical on typical streets designated minor collectors. streets designated major collectors more comfortable and convenientforpedestrians. e • Interchange capacity im- interest in bicycling, both for provements at Highway commuter and recreational pur- 217. The Scholls Ferry poses. The task force wants to Road/Highway 217 inter- • ensure that bicyclists have easy, change and the Hall Bou- " safe access to employment, levard/Highway 217 in- housing and retail development, terchange are both gate- as well as to greenspace around ways into the regional the district. Many of the study center. Both are extremely areas busiest streets and bridges congested during peak Commuter rail would strict. access to arerAt wide enough for installa- periods throughout the this busy dssrics tion of bike lanes in the road- day. The task force views improvements to way. In this case, an acceptable alternative is these interchanges as critical to alleviating con- creation of off-street bike paths parallel to the gestion along High- street. The task force way 217, increasing recommends identifying access to the area Multi-modal commuter rail potential bicycle routes station/bus d -people mover and helping the dis- Commuter l~ connecting to existing trict serve its role as rail trans center bikeways, neighbor- a regional center. St hoods and activity cen- I m p r o v e m e n t s ` j t, f ters. Specifically, it rec- should include up- ommends extending the IVY grades of all af- Fanno Creek Bikeway to feted access ramps. 1' a g d People the east along Ash Creek. The task force rec- i' mover ommends that v:ra'' • Commuter rail. The these improve- = r Portland region's ex- ments be identified t perience demon- as significant needs ' strates that rail service in Metro's Highway d attracts new riders to ":3k 217 Major Invest- p Q. transit. Creation of a ment Study, and lo- di ° • commuter rail system cal governments has strong appeal if should coordinate F Washington Square with regional trans- d becomes a more portation planning densely developed efforts. employment center. 'D Existing railroad People mover • Bike paths. In- r right-of-way offers creased densities the potential to de- will bring greater rl ~L~ velop commuter rail Transit system 0 roraarrmsr service between Wilsonville .r' j People mover. The task force mem- and Beaverton, with the pos- bers recommend a people mover cir- sibility of links to the existing culator that will travel throughout the MAX system. Currently, a t district, linking jobs, housing, retail consultant team is analyzing and services. Members believe such a the potential for such rail ser- service would be very valuable, not only vice in an unrelated study. If to people living 'and working in the the study's outcome recom- People mover area, but for people coming in who mends pursuit of this option, maywant to combine avisit to the doc- the task force would like to see this rail sys- tor, the bank and the accountant with a shopping tem serve the Washington Square Regional trip. Determining what this servi,7n would look Center, with a station and associated park like, who would operate it, where it would run and and ride near Scholls Ferry Road in the Nim- other fundamentals was outside the charge of the bus area. Task force members believe that task force. However, members strongly encourage commuter rail should be a high priority for local governments and transit providers to pursue the regional center. the feasibility of such a system. afll o e t_ - Q o 0 i 11' t]' IS' 37 The people mover can travel in an exclusive right-of- way designed with pedestrian and bicycle facilities. V I'M G o ° J_ n' t 1' S' n' 1 t' n' I S' A multi-modal commuter rail station, bus &People mover transfer center. The people mover can travel in the traffic lane as it circulates through the regional center. -WE 1111111min 0 DISTRICT IMPROVEMENTS The task force has identified a number of site spe- cific improvements that will enhance the safety and atmosphere of the various districts. Each of these reflect the expectations for increased development and the distinct characteristics and functions of the five districts within the overall re0onal center. !•4:xr.yo%''>rr,.,;t,,"`;4y.:.,£,`,rsS`,.'.Y,F?>.,'3n.,~~n'..zs»e;: m 0? !'/:,t• < ?1.::;. s; sr t • ;3;. v%.<OR. r. ~kc .:.3•~G~' ✓z'~.?}%. ~>;F;>z::; ~c::: ;E~>#~ir:•.8<x 28~:: n i%i t28 rr~~~:> ::yyg:> k 3i't^b:i~'<} 9'rF n :~3's>}i~!.S}#:.}o ) !g:h:?2: ;Q.t ;:%i:?i~' . ~?Ri:;#rro,}1:'i•;.4}:E 2.?8;#? a., w?:} ...X %'r „F.xi: fs W WQ'y:v .:.'i {yY`r4 . v. oSA1t. Y y2„' k~ f:cM p c4;n~ nn n:: wm ~.:vi a~. Y } 41Ryv::4?: Districts within the regional center. i i 3 MEN v DISTRICT A: THE COMMERCIAL CORE AND GOLF COURSE The recommendations in this district address pri- Transportation Planning Rule requirements of side- marily circulation, transit and pedestrian access to. walks on arterials and collectors and would improve and from the mall and affecting other retail in the pedestrian access in this area that transitions be- area. They also reflect a desire to include Progress tween the financial and the retail areas. Downs Golf Course into the district-wide green belt. Mall area street develop- °x ment. Improve SW Eliander : Lane <s Washington a s t center amenities. , SW The Washington Square Mall £'''ry`,v ~~Yr ` Square Road, SW Palm Bou- Transit Center is an impor- levard and the roadway tant link to the rest of the re- bounding the cemetery to full gion. The task force hopes street standards, with side- that improved pedestrian walks and bicycle lanes. amenities will make this fa- Typical section showing sidewalks along These improvements are key cility safer and more attrac- Greenburg that would improve access between to pedestrian, auto and bi- tive to encourage transit use. ,financial and retail areas. cycle access and circulation Proposed improvements in- into and throughout the re- clude a covered pedestrian path to the mall and bet- tail core. Currently, people have difficulty getting ter pedestrian links to other retail and commercial from one retail facility to another on foot. For ex- establishments. Tri-Met's ample, Hall Boulevard Transit Choices for Liv- Target customers have no ability Study has already direct pedestrian connec- identified these improve- tion to the mall. Local ments as high on the is governments must estab- community's priority list. fish policies and incen- s r~ tives to encourage private Sidewalks on Greenburg. r~$M, ti developers to include As development begins to °~X= =,Pti, - t Mx ' these infrastructure im- ~L fill out the area, local gov- t r : provements with redevel- vw_ ernments should build i opment. Creative public/ sidewalks along Greenburg private partnerships sari Road. This recommenda- assist with financing and tion is consistent with state Suggested improvements will make it safer and coordination. easier to walk from one place to another. f~ . i~ roow wwwww Pedestrian amenities within the Evaluate pedestrian crossings on Commercial Core. Provide pedes- Greenburg Rd. and Hall Boulevard XV, trian treatments such as raised pc- These two very busy streets are destrian refuges and designated physical and psychological barriers walkways within the mall's park- to pedestrians. The task force rec- ing areas. Provide pedestrian/bi- ognizes that mid-block crossings can cycle connections between Wash- help pedestrians significantly. How ington Square Mall and adjacent ever, the also have associated disad- retail establishments. Suggested vantages. Task force members rec- improvements will make it safer ommend evaluating right-of-way and easier for people to walk from impacts, construction costs, impacts one place to another within the on traffic flow and pedestrian de- commercial core and limit the mand for mid-block, raised pedes- need for vehicle traffic within the trian refuges on Greenburg and etween core. Local governments should Wetter connections h all and Hall. adopt policies that encourage cre- Washington square Ma an adjacent stores will make it safer ation of these improvements as re- for people to walk. Evaluate a golf course pedestrian development occurs. trail. A pedestrian trail within the Progress Downs Public Golf Course Relocate Park & Ride to a permanent site. The task would provide a safe walking and exercise area for force believes that the location of the Tri-Met Park neighborhood residents and allow more people to & Ride at Scholls Ferry Road and Highway 217 use this existing open space. The task force recom- adds to traffic congestion by bringing cars into the mends studying the feasibility of providing pedes- district during peak hours. This was originally in- trian paths from neighborhoods to and through - tended to be a temporary site. The task force rec- or around - Progress Downs Golf Course. The trail ommends finding a new, permanent location for this would be similar to the popular pedestrian path facility outside the regional center. around Glendoveer Golf Course. . a7 a ~ f: ■ DISTRICT B: THE METZGER NEIGHBORHOOD The task force identified transportation improve- pedestrian crossings, controlling speed through ments that would protect and preserve this signage and patrols, and building pedestrian paths neighborhood's residen- to adjacent neighbor- tial character while of- ales- hoods. fering residents more commute and recreation ,~-r- Sidewalks on Hall. options. Sidewalks have not been built at several spots on Neighborhood traffic Hall Boulevard. The task force recommends management. To control traffic speeds, ensure completing the sidewalk safety for pedestrians and - system as called for by bicyclists and, in general, _ the state's Transporta- reduce the impact of tion Planning Rule. higher traffic volumes on Specifically, complete neighborhood streets, the sidewalk on the the task force recom- A traffic median can helm maintain the north side of SW Hall mends pursuing an ag- MetzgerDistricesrrsidentialcharacter. Boulevard Near Cas- gressive traffic manage- cade Avenue and the - ment strategy on Locust Highway 217 bridge, Street between Lincoln allowing pedestrians on Street and Hall Boule- the north side of Hall vard, on Lincoln Street r~ Boulevard to access between Locust and Oak safely the south side of Streets, and on Oak; T - Hall Boulevard and the Street between Lincoln Highway 217 over- Street and Hall Boule- t crossing, using the pe- vard. Elements of this l destrian crossing signal strategy might include _ at Cascade Avenue. providing for bicycle ac- cess, establishing safer A neighborhoodgateway helps establish the district identity. in 4 {'dry»:...Y~' R+~. n~ Y01041pMiPYI DISTRICT C: LINCOLN CENTER - ASH CREEK This area, a center for financial those made by transit, pedes- and commercial development, trian and bike travel. Pedes- is slated for high density office trian and bike facilities devel- . and residential development. oped in concert with new Adjacent to a residential neigh- housing and offices will be a borhood, it will be important step toward achieving these re- for this area to provide easy pe- gional goals. destrian and bicycle access be- Qf? tween homes and jobs. A par- Highway 217 parallel road- ticular goal is to protect the High density office and way. The task force considered Metzger neighborhood from residential developments this as an alternative to wid- the impacts of increased traffic, ening Hall Boulevard to five while assuring free-flowing ve- lanes. There is the possibility hicular movement throughout n of building a road parallel to the district. ~m + Highway 217 to provide new 00~. access to Lincoln Center and Pedestrian and bicycle connec- , t z t,e ~o the Washington Square Mall. tions in new developments. The task force encourages Metro has established goals for •t, a$ pg a a w Metro to review this option in the region to reduce the num- °p,# °`d ' its Highway 217 Major Invest- ber of trips by auto relative to \ ment Study. Financial and commercial development is centered in District C. fi„• na: .,lya ,ri# #iti Tv 1 1 S' S' t t' 11' 11' S' IS' n• A typical new road parallel to Highway 217 would provide access to Lincoln Center and Washington Square. DISTRICT D: DISTRICT D& E: NIMBUS - FANNO CREEK SOUTH OF NIMBUS - FANNO CREEK NORTH SCHOLLS FERRY ROAD AND SOUTH OF SCHOLLS FERRY ROAD Cascade Avenue pedestrian and bicycle improve- ments. The task force considered, but did not rec- Nimbus bus service. Tri-Mees Transit Choices for ommend, capacity improvements to Cascade Av- Livability identified bus service to Nimbus work enue. However, members recognized the need to places as a regional priority. The task force supports provide pedestrian and bicycle facilities on this im- Tri-Met's intention to develop this service in one to portant north/south road. five years. DISTRICT E: NIMBUS NORTH OF SCHOLLS FERRY ROAD Sidewalk completion on Hall. Boulevard at Cascade Avenue. A short gap exists in the sidewalk on the north side of Hall Boulevard between Nimbus Drive and the Highway 217 bridge. Completing the side- walk will help improve pedestrian access to the other n side of the street by making it easier to reach the crossing signal at Cascade Avenue. Bus service to Nfinbus workplaces is a regional priority for Tri Met 10 <M~. KIM YdOWl4YY RIIR TABLE 1 SUMMARY OF RECOMMENDED MULTI-MODAL TRANSPORTATION SYSTEM TREATMENTS Impacted Travel Modc Nimbus Bus Service N/A2 Sidewalks on Greenburg Road and Hall Boulevard X N/A3 Transit Center Amenities X N/A2 Sidewalk Construction on Hall at Cascade X $40-50 /sq yd Evaluate Golf Course Pedestrian Trail X $15-20,0004 Mall Area Street Development X X X N/A3 Pedestrian Treatments in Commercial Core X N/A3 Evaluate Pedestrian Crossings on Greenburg / Hall X X $10-15,0004 Neighborhood Traffic Management X X X $30-50,000 Develop Oak-Lincoln-Locust Street Collector System X Construction of Lincoln Street connection $8-12/ sq. ft Reconstruction of Existing Roadways $5-7/ sq. ft Widen Hall Boulevard to Three Lanes X $4.7 million 5 Pedestrian/bicycle Connections in New Developments X X N/A3 Mall-to-Nimbus Highway 217 Over-crossing X X X $15-25 million Nimbus Extension / Realignment X X X $10-15 million Locust-to-Nimbus Highway 217 Over-crossing X X X $15 million 5 Highway 217 Interchange Capacity Improvements X $70-100 million 5 Cascade Avenue Pedestrian/Bicycle Improvements X X N/A3 Cascade/Scholls Ferry Intersection Improvements X $5-7 million Evaluate Off-road, Parallel Bicycle Paths X $10-25,000 4 ' To be used for general planning guidance. i Z Identified in Tri-Met's Transit Choices for Livability Study. 3 To be incorporated with development and roadway improvement projects. 4 Cost to conduct an engineering/planning study. ' Cost estimated obtained from the Regional Transportatibn Plan improvement list for expansion to five lanes. i raow unr •wv 7. PARKING STRATEGY Parking management is important to the success of KEY FINDINGS a regional center. On the one hand, easily accessible EXISTING CONDITIONS parking - and the perception that parldng will al- ways be available - is critical to many services and The consulting team analyzed current conditions retail facilities. Office-based businesses have come in the study area to determine these findings: to expect adequate parking for their employees, as well as for their customers. On the other hand, land • The overall parking supply in the Washing- set aside for parking adds to developer overhead with- ton Square Regional Center is adequate to out bringing in direct revenues. meet existing demand. • Office developments currently experience Finally, the region is committed to increasing the per- considerable parking pressure during week- centage of transit, bicycle and pedestrian trips for day peak demand. In particular, office de- daily commutes. This implies creating a strategy that velopments on Nimbus Drive and in the Lin- will provide enough parking to Coln Center development are ef- keep an area competitive, but fectively full during weekday peak with enough restrictions to en- hours. courage employees and others to Complementary land uses look toward alternatives to "one present opportunities for shared person-one car" commutes. parking. For example, restau- rants and offices tend to expe- The Washington Square Re- rience peak use at different gional Center Task Force has _ times, making it possible for evaluated existing and projected ~ these different uses to share the parking conditions. From this same parking spaces without information, they have agreed on conflict. However, barriers to a recommended parking strategy intended to help pedestrian access such as railroad tracks and the district balance the critical need to attract busi- lack of sidewalks limit the feasibility of shared nesses, residents and shoppers with the long-term goal parking in many cases. of managing demand on the transportation system. .:S Y{tDY1LYMY Ytt,Y a FORECAST CONDITIONS PARKING STRATEGIES The consultants used anticipated changes in land uses Key Objectives to determine future parking needs. They did not fac- tor in significant new parking (except for that planned The Washington Square Regional Task Force iden- with specific new developments), changes in transit; tified four objectives to drive decision-making about bicycle or pedestrian travel or shared parking arrange- parking strategies. They are: ments. • Ensure sufficient parking to support eco- • Changes in land uses anticipated by the Wash- nomic activities in the area. In retail areas, ington Square Regional Center Plan will in- customer parking in prime spaces will crease overall peak parking demand in the area receive priority consideration. by approximately 90 Employee parking percent. In some ar- demand can and eas, parking demand . ' should be reduced by will increase by more encouraging fewer than 200 percent. Qa single-occupant com- e Redevelopment on „ra►► mute trips. Parking surface lots would ,r . strategies should be eliminate about consistent with other 8,000 existing park- t transportation im- ing spaces. D a ¢e' o provement elements • Available parking that support alternative spaces effectively mode travels. will be full during - Secure bicycle racks the weekday peak SurfaceparkingLots surround development- and lockers should be periods, even if the provided at various maximum allowable parking ratio is applied. locations, primarily by employers. Parking supply will be adequate for weekend New municipal parking facilities should be conditions in the overall study area. However, provided to serve multiple uses, with an high-density commercial areas will experience emphasis on supporting economic activi- weekend parking pressures. ties. • A high priority is maintaining residential parking in existing neighborhoods. ■ EMPLOYMENT-BASED STRATEGIES COMMERCIAL/RETAIL PARKING Employment-based parking management strategies Parking management strategies should ensure that can help reduce parking demand and encourage a the most convenient parking spaces are available to variety of travel modes. These strategies can be imple- customers and visitors. Some principles to accom- merited by public agencies and private employers. plish this are described below. • Transit service should be provided to serve • Local governments and key constituent groups employees in clustered office developments. should agree on a parking management plan Bus service on Nimbus Drive is a priority and (PMP) that will cover a variety of issues. Items is included in Tri-Met's Transit Choices for to be addressed include: Livability plan. • ways to reduce single occupancy trips; • Nominal parking fees will encourage consid- • a parking strategy to support commuter eration of commuter alternatives, and rev- rail (should the Scholls Ferry Station have enues may be used to support improved fa- parking? If so, what should it look like cilities for transit, carpools, bicycles and pe- and who should be encouraged/allowed destrians. This is an option that local govern- to park there?); and menrs, property owners and building man- strategies to increase shared parking op- agement companies may want to consider. portunities. • Employer-run programs to reduce parking • On-street parking in commercial areas should demand include: be restricted to short-term parking to ensure ' on-site bicycle lockers and showers adequate turn-over in prime locations. Park- ' a carpool-matching service, to help em- ing meters may be needed to assure compli- pioyees find people in their neighborhoods ante and to provide a funding source for f i- with whom to drive or ride ture parking supply. ' free or preferential parking for carpools • A uniform "way-finding" system should be ' free or subsidized transit passes. created to direct-customers to any public park- ing facilities built in the study area. Direc- tion signs posted at the main entry points into the regional center can use arrows and text to help drivers find parking as quickly as pos- sible. This can reduce the need for drivers to drive slowly through an area looking for park- ing, interfering with traffic flow and adding air pollution. wawawwn•www INCREASED PARKING SUPPLY'/ RESIDENTIAL PRIORITY PARKING SHARED PARKING As parking demand increases, the community may Any new parking structures or surface lots should be need to implement a residential parking priority located to serve uses with complementary demand strategy, particularly in the Metzger and Lincoln patterns. For example, movie theaters have the high- Center areas. Such a strategy would reduce con- est parking demand on evenings and weekends and flicts between residents' parking needs and spill-over could share parking facilities with offices that need parking from the commercial areas. the parking primarily during weekdays. Regulations should require retail space to be built into the first floor of any new parking structure. Originally, planners intended the Park & Ride lot to be at its present location only temporarily. If a new lot is sited within the regional center, planners should consider the following: opportunities to serve local demand during evenings and weekends for such land uses as movie theaters and churches; the destinations of primary users (are they coming into the district or leaving their cars to catch transit out of the district). Transportation improvements should focus on reduc- ing barriers to pedestrian access (lack of safe crossing areas at streets and railroad tracks, lack of sidewalks, no direct route, etc.) to encourage walking between different business and, ultimately to and from shared parking. D a 5 • s B. PLAN IMPLEMENTATION Implementation of the Washington Square Re- gional Center Plan will require the cooperation, effort and funding of a variety of public and pri- vate entities. Among the parties involved and the actions required are: Multi-modal bridge Multi-modal Pedestrian Center - bridge commuter Go Course rail, people mover, transit , center Washington V Square Mall ,t. ~ ~ In, fiU development Infxll Li ; K. Plaza der Metzger Park Z;J NJ s r. Redevelops" opportunia~ C ~J Metzger Infsll School deuPlopnnaat ~j~` j~ o a N Greenbelt Greenbelt Fanno Creek Pedestria r - Greenbelt bridge r] Ash Creek Locust extension - multi-modal bridge New elopment New development Development Concept rmwu r.nw wuw' • Cities of Tigard and Beaverton and Wash- • Employers: promotion of transit, carpool, pe- ington County: destrian and bicycle commuting to preserve • adoption of zoning code amendments, valuable parking spaces for customers of re- parking policies, ratios and regulations, tail businesses and service providers. comprehensive plan amendments and • Residents: participation in developing traffic other regulations affecting private devel- management and parking strategies. opment in the five districts. Proposed regulatory language, including design guidelines, comprehensive plan and COORDINATION zoning changes, are included in the ap- pendix to this document; The timing and coordination of development will • approval of key transportation improve- play an important role in the success of the regional ments for regional funding; center build-out. All parties agree that key infra- • Cities of Tigard and Beaverton, Washington structure improvements must be in place before County, Metro and ODOT. development of building densities increase significantly. a financing strategy - and pursuit of funds - to pay for significant infrastructure im- The task force has identified a number of important provements, including transit, road and high- transportation improvements that must be com- way improvements, rail, pedestrian and bi- pleted before the regional center can absorb signifi- cycle facility development, parking facilities, cant increases in jobs and housing. Similarly, the environmental protection, parks and open area requires substantial investment in stormwater space development, etc.; drainage. Too much development in anticipation of • Tri-Met: action to expand service, upgrade these improvements may overwhelm existing systems facilities and relocate the Park & Ride; - creating a disincentive for future projects. • Private property owners and developers: in- terest in and commitment to infill and rede- The task force has recommended language in the velopment in the Washington Square Re- comprehensive plan that requires necessary infra- gional Center study area, as well as a consen- structure be in place, or planned for completion in sus on creating pedestrian and bicycle amcni- the proper time frame, before new developments are ties, to pursue share parking and follow other approved. development policies that will contribute to the vision of a regional center. k i i i i t 3 'a E tlgpMLpMY CIIF NEXT STEPS • Complete review and adoption of new regu- lations. Staff and consultants will work on The Washington Square Regional Center Task Force revisions of relevant comprehensive plans, has prepared a work plan to move the Regional Cen- zoning ordinances and creation of the Public ter Plan from concept to reality. The work plan Improvement Plan with the goal of quick calls for completion of essential activities within eight adoption by the City of Tigard. to ten months of approval of the Regional Center . Prepare financing plan for public improve- Plan. Local government officials, consultants, stake- ments. City staff and consultants will review holders and the public will be asked to: financing options, including studying the fea- sibility of establishing an urban renewal dis- • Review regional center plan proposals. Steps trict. The final product will include an over- will include: all funding and phasing strategy. • Reaching agreement on specific options • Develop a Transportation Demand Man- and proposals for analysis agement Plan. Transportation demand man- 0 Conducting detailed environmental agement (TDM) involves looking compre- evaluation hensively at transportation needs in an area • Identifying physical and policy constraints and developing ways to reduce stress on road • Refining final recommendations. systems, parking availability and air quality. • Refine recommendations for transportation City of Tigard staff will work with stakehold- improvements. City staff and consultants will ers (major employers, retailers, property man- assess needs, review task force recommenda- agers, etc.) to develop strategies to encourage tions and create final recommendations for people to walk, bike, carpool or use transit. transportation improvements throughout the study area. Each activity will be conducted with extensive pub- • Develop recommendations for stormwater lic outreach, through surveys, public hearings and drainage. City staff and consultants will as- other tools. The goal is to ensure that implementa- sess needs, review alternatives and create fi- tion reflects the spirit, intentions and interests of nal recommendations for stormwater drain- people living, working, operating businesses and age throughout the study area. owning property within and adjacent to the proposed • Refine recommendations for open space de- regional center. velopment. City staff and consultants will as- sess needs, review task force recommendations and create final recommendations for open space preservation and new park identification. • Prepare implementation strategies for all public improvements. City staff and consult- ants will refine inventories, recommend new code and policy revisions for local govern- ments and develop a timeline with action steps. PROTECTION OF SENSITIVE AREAS TRANSPORTATION IMPLEMENTATION, PRIORITIES Recognizing that protection of natural resources is AND PHASING an important objective for the regional center, the task force incorporated the most current identifica- The recommended Transportation Master Plan for tions of floodplains, wetlands and water courses the Washington Square Regional Center describes within the planning area Regulations for develop- an integrated system designed to serve the needs of ment within and adjacent to these natural resource regional as well as local travel, and to encourage a areas, consistent with the requirements of Metro Title balance of travel modes. In some cases, the effer.- 3 and rules and standards utilized by the Unified tiveness of specific recommendations would be Sewerage Agency under agreement with the City of weakened by the absence of other plan elements. Tigard, apply within the regional center. A figure showing these resource areas is included on page 13. The task force, therefore, analyzed the full set of recommendations to determine the highest priority The Task Force strongly supports the protection stan- projects and the most effective phasing for their con- dards included in the Water Resources Overlay Dis- struction. The priorities and phasing are indicated trict of the Community Development Code. Par- below: ticularly the 50 foot riparian buffer requirements along the Ash and Fanno Creek wetland areas. Ad- ditional incentives for enhancing natural resources Key Motor Vehicle Projects along these corridors are proposed in zoning code amendments. 1. Highway 217 over-crossing connecting Wash- ington Square Mall to the Nimbus office de- velopments. This project will represent the first step toward eliminating Highway 217's function as a barrier within the district. It will connect office and retail development on both sides of the freeway. 2. Nimbus Drive extension to Greenburg Road. The second major project to pursue after agreement on the Nimbus-Mall connec- tion is this extension of Nimbus Drive. It 1 will relieve congestion on Hall Boulevard and i at the Scholls. Ferry Road/Hall Boulevard in- tersection. h 1 ■ 3. Highway 217 over-crossing on Locust Street. 2. Neighborhood traffic management mea- This second crossing will provide additional sures. The City of Tigard, along with local east-west access over the highway and improve residents and businesses, should work to- connections within the district. Building this gether to plan and implement traffic man- connection before completing the Nimbus agement measures along Locust, Lincoln, and Drive extension would limit the over- other applicable streets. These measures will crossing's effectiveness. be critical to preserving a safe neighborhood street system. The community should pre- 4. Development of the collector system along pare strategies and specific tactics as soon as Oak, Lincoln and Locust Streets. These im- possible to ensure that measures are in place provements, along with neighborhood traffic no later than the opening of the Locust Street management, will be important in helping ex- over-crossing. isting neighborhoods absorb increased traf- fic. 3. Pedestrian crossings on Greenburg Road and Hall Boulevard Traffic engineers, in concert 5. Hall Boulevard widening. The task force rec- with residents and businesses, should evaluate ommends this as the last of its five priorities potential crossing improvements as traffic vol- to give the community time to evaluate the umes increase. ODOT and the City of Tigard impacts of new development and other traf- should begin cooperating on evaluation, de- fic improvements on the area. With devel- sign and implementation as soon as possible. opment of the Nimbus Drive extension and the new Highway 217 over-crossing, Hall 4. Sidewalk construction on Hall Boulevard at Boulevard may not need widening within the Cascade Avenue. The existing gap in the side- study area. However, this statement is not walk and over-grown vegetation create barri- meant to negate other regional needs identi- ers to pedestrian circulation and hinder ac- fied for Hall Boulevard cess to the sidewalks on the Hall Boulevard bride over Highway 217. ODOT could be- gin building this sidewalk soon. Key Transit, Bicycle and Pedestrian Projects 5. Mall area street development. Improvements 1. Nimbus bus service. Tri-Met has identified of Eliander Lane, Washington Square Road bus service to Nimbus office developments and Palm Boulevard that include pedestrian, as a priority, with service to start in one to bicycle and transit amenities can contribute five years. The Cities ofTigard and Beaverton, significantly to better access in the commer- + as well as businesses along proposed routes, cial core. These streets should be brought into + should work with Tri-Met to encourage compliance with full street standards. The speedy implementation. City ofTigard should ensure that the preferred pedestrian and bicycle amenities are included s in the appropriate City codes and ordinances. OHM G. First phase of a people mover system. The The Washington Square Regional Center has great task force recommends that local govern- potential for shared parking. However, as the park- ments and businesses pursue an analysis of a ing strategy noted, lack of pedestrian amenities, high people mover system that will help circula- traffic volumes, railroad tracks and other barriers tion within the regional center. make shared parking less attractive. Public and pri- vate investment in sidewalks, street and rail cross- 7. Commuter Rail. The task force strongly sup- ings and other pedestrian enhancements would in- ports the creation of commuter rail service crease the potential that different uses (e.g. an office within the Regional Center and location of building and a movie complex) could share the same a station to serve the district. Existing and parking spaces. future freight service should be considered in the planning process. Shared parking agreements between property own- ers are fairly straightforward. Although many prop- erty owners worry about liability issues, owners who PARKING participate in shared parking agreements have found that liability is riot a greater concern with shared Shared parking can be a significant asset to mixed- parking than with more traditional parking arrange- use areas and is actively encouraged by the task ments. force. Shared parking can occur in several ways: Metro has published a handbook on shared parking O Investment by a single developer that creates that contains sample shared parking agreements for " parking for a shopping center or other collec- property owners. tion of uses; • Investment of public funds for parking struc- tures, as has been done in downtown Portland and Tualatin; 0 Agreements between private property owners. rmracwr aua, APPENDIX Task Force Recommendations for Comprehensive Plan Amendments, August 1999. Task Force Recommendations for Mixed Use Zoning Districts and Design Standards, August 1999. Meeting Minutes and Agendas, Washington Square Regional Center Task Force June 3, 1998 July 15, 1998 August 19, 1998 (Bus Tour) September 16, 1998 November 18, 1998 December 16, 1998 January 20, 1999 February 17, 1999 April 21, 1999 May 19, 1999 June 1, 1999 June 9, 1999 June 16, 1999 Washington Square Regional Center Study: Open House Report Summary of open houses at Washington Square Mall and Metzger Elementary School Washington Square Regional Center Study: Verbatim Comments Written comments from participants at open houses held at Washington Square Mall and Metzger Elementary School Notice of March 8 Public Meeting Press Release: March 8 Public Meeting 1 a Washington Square Regional Center Study Open House Report. Report on Tigard Water Building open house Minority Report to the Washington Square Regional Center Task Force Concerning Proposed Upzoning of the Ash Creek Wetland & Floodplain Area, August 24, 1999 3 Washington Square Regional Center Study Final Public Event, Metzger Park Hall, September 15, 1999 rm.wa arnM~.w ■ CORRESPONDENCE Petition submitted by Elisabeth R. Braam, September 29, 1998 Letter from Michael Neunzert, November 30, 1998 Memo from James Coleman, City Attorney's Office, December 9, 1998 Memo from Pat Whiting, February 17, 1999 Letter from Jim Grimes, Oregon Dept. of Fish & Wildlife, March 8, 1999 Letter from Mike Donovan, Metzger Park LID Advisory Board, March 13, 1999 Letter from Nancy Lou Tracy, March 22, 1999 Letter from Michael Neunzert, April 13, 1999 Letter from Dr. Gene Davis, April 14, 1999 Letter from Trudy Knowles, April 16, 1999 Letter from Robin Smith, May 5, 1999 Letter from Jill Tellez, May 6, 1999 Letter from David A. Abrams, May 13, 1999 Letter from Mike Houck, Audubon Society of Portland, May 19, 1999 Memo from Barbara Fryer, City of Beaverton, May 21, 1999 Letter from Ward Rader, Chair, CPO 4-M, May 28, 1999 Letter from Ann Beier, Oregon Department of Land Conservation and Development, June 2, 1999 Letter from Michael Neunzert, June 4, 1999 Petition from Pieter and Elisabeth Braam, Janna and Brandon Herbst andCharles Harper, June 13, 1999 Letter from Sue Marshall, Tualatin Riverkeepers, June 16, 1999 "The Danger of Building in Flood Plains," written by David Warren, Risk Management Consultant Petition from Pat Whiting re Ash Creek Wetland and Floodplain re-zoning, May 19, 1999 Letter from Sheila Greenlaw-Fink, Community Partners for Affordable Housing, June 9, 1999 Letter from Trudy Knowles, June 21, 1999 Statement of Pat Whiting, June 23, 1999 Letter from Brian Wm. Lightcap, June 25, 1999 Letter from Gene Davis, July 5, 1999 Letter and petition from Stephen W. Perry, July 6, 1999 Letter from Trudy Knowles, July 13, 1999 Letter from Brian Wegener, Tualatin Riverkeepers, July 19, 1999 Letter from Jere Retzer, Crestwood Headwater Group, July 19, 1999 Letter from Trudy Knowles, July 27, 1999 Letter from Gene Davis, July 28, 1999 ' Letter from U.S. Department of the Interior Fish and Wildlife Service, July 28, 1999 Position Statement, Ash Creek Coalition, July 28, 1999 Letter from Pat Whiting, July 28, 1999 Letter from Trudy Knowles, August 14, 1999 Letter from Pat Whiting, August 22, 1999 Letter from U.S. Department of the Interior Fish & Wildlife service, August 23, 1999 Letter from Trudy Knowles, August 24, 1999, with Metro resolution on protection of environmentally sensitive lands NOCNl Q4[tNYn OTHER DOCUMENTS: Ash Creek Wetland/Floodplain Map Reference Booklec of FEMA, Washington County, USA, Tigard Re- source Maps, February 12, 1999 Unbuildable Lands Resolution, Metro, September 25, 1997 Washington County Ordinance 0.535 of the Raleigh Hills Town Center downzoning of a wetland area proposal EXHIBIT B - ORDINANCE NO. 00-18 WASHINGTON SQUARE REGIONAL CENTER STUDY Final Draft Bask Force Recommendations for Comprehensive Plan Amendments to Implement the Washington Square Regional Center Plan August 25, 1999 Add the following to implementation strategies, under policies 1.1.1 and 1.1.2: Implementation strategies 1. The Comprehensive Plan Future Land Use Map and the Official Zoning District map will reflect the plan policies and apply land use categories in the following manner: n. Mixed Use Commercial District - Principle development in these areas will be high density office buildings, retail and service uses. A zoning designation of MUC will also allow mixed-use development and housing at densities of 50 units an acre. MUC districts will encourage larger buildings with parking under, behind or alongside the structures. The Regional Center Plan recommends that land around the Washington Square Mall and land immediately west of Highway 217 be designated a mixed-use commercial district. o. Mixed Use Residential District - The MUR designation is appropriate for predominantly residential areas where mixed uses are permitted when compatible with the residential use. Areas will be designated high density (MUR-1) or moderate density (MUR-2). Locations within the Washington Square Regional Center are appropriate for this mixed-use designation. Add a new section 11.8 with the following: 11.8 WASHINGTON SQUARE REGIONAL CENTER In 1995, Metro Council adopted a visionary plan for regional development. The 2040 Growth Concept described strategies to make the most efficient use of urban land in the face of dramatic population growth, to create and preserve livable neighborhoods, and to promote a useful, accessible transportation system. One of the key elements of the 2040 Growth Concept, was the designation of regional centers. These are areas of concentrated commerce, local government services and housing served by high-quality transit. Washington Square is one of three regional centers in Washington. County and one of nine in the region. The 2040 Growth Concept resulted from extensive regional discussion about the future of the 1 Washington Square Regional Center Comprehensive Plan Amendments 8/: Portland metropolitan area. Metro, working with local jurisdictions, then developed the Urban Growth Management Functional Plan in 1996 to implement the Growth Concept. Local citizens and governments were then to determine the best way to create regional centers given the values, interests and needs of residents and businesses of that community. The following findings and policies summarize the results of a thorough public discussion about the future of the Washington Square Regional Center area. It demonstrates the way the people of Tigard and Washington County incorporated their expectations for the future into the Regional Center Plan. Findings 0 With the adoption of the Urban Growth Management Functional Plan, local governments, businesses, residents and property owners in Washington County began a study of land use, transportation and other functions around Washington Square. O In 1998, the Tigard City Council appointed 23 people to serve on the Washington Square Regional Center Task Force. Task Force members represent neighborhoods, schools, business and property owners, state and local governments and public interest groups. The task force=s charge was to identify issues and set general policy for recommendations about land use, transportation, open space, aesthetics and other issues relevant to development around Washington Square. The Task Force also oversaw a public involvement process. C The Task Force agreed on a study area that includes 1250 acres, with Washington Square Mall approximately in the center. The area is bounded by Fanno Creek on the west, SW Greenburg Road and Hall Blvd. on the east, Progress Downs Golf Course to the north, and Highway 217 and Ash Creek on the south. 0 The Task Force members agreed on a set of principles that would guide development of all recommendations. These principles are as follows: CreationlPreservation of Area Identity 0 Reinforce a distinctive Regional Center while recognizing and respecting the character of the nearby residential community. • Retain and develop quality housing, including affordable housing, for all income levels. o Facilitate transitions from one use to another; for example, single to multifamily residential uses. • Preserve and enhance Metzger Park and consider additional parks. • Encourage environmentally friendly development. • Try to keep historic trees. 0 Build for our children: 1-lave a sense of stewardship. • Think creatively and be innovative in improving/maintaining quality of life. e Consider market forces and development patterns. 2 Washington Square Regional Center Comprehensive Plan Amendments 8/: J • Maintain and preserve floodplains and wetlands. Government/Institutional Issues • Consider all political boundaries and facilitate cooperation among jurisdictions. • Maintain neighborhood schools. a Identify and reinforce what makes the learning (educational) environment viable. Transportation i Strive for a self-sufficient, connected transportation system. • Consider transportation needs for the whole study area. • Plan for a multi-modal transportation system that accommodates increased auto and non- auto travel needs. • Respect and enhance local street networks and neighborhood livability. • Maintain an acceptable level of service and safety on regional roads, minimizing the effect on regional roads outside the study area. • Provide good transportation access to the rest of the region. • Make the community accessible for all people and modes with connections for cars, bikes, pedestrians and transit. • Maintain a high level of accessibility within and to the regional center. • Use appropriate street and streetscape design. • Encourage attractive, high quality development. • Promote long-term viability for the area. Assure infrastructure is available prior to or with development. The Regional Center Plan Should • Be understandable to lay people • Be implementable within a reasonable, staged period of time • Help develop a sense of community with a common vision, hope and optimism • Be based on statistics and facts for population, employment and other factors • Use existing resources as much as possible • Encourage compatible and complementary uses • Contain solutions to common problems • Avoid conflict with other regional centers. • The Washington Square Regional Center study area includes land within the City of Tigard, the City of Beaverton and in unincorporated Washington County. The study covers approximately 1,074 acres exclusive of public rights-of-way and 1,250 total acres. About 4.2 percent of the net land area within the study area is vacant. • The Task Force evaluated all lands within the study area for future development or redevelopment capacity through 2020. Land identified as having development or redevelopment potential if it is currently vacant, has infill capacity, holds an opportunity for redevelopment or currently is used as a large (greater than one acre) surface parking 3 Washington Square Regional Center Comprehensive Plan Amendments B/~ lot. The vast majority of growth potential will come from redevelopment of existing structures and infill on sites currently used for surface parking. Over the next 20 years, approximately 192 acres of land will become available to accommodate employment and residential growth within the study area. • MetroI s Regional Urban Growth Management Functional Plan established "target growth capacity- for each jurisdiction in the region. The goal of setting these target numbers is for each part of the region to be prepared to accommodate housing and job growth. The target growth capacity for the Washington Square Regional Center is based on accommodating the following new jobs and housing units between 1998 and 2020: Employment: 9,804 jobs Retail: 1,188 jobs Office: 8,436 jobs Lodging: 180 jobs Housing: 1,500 units Residents: 2530 people • A development program for the Washington Square Regional Center provides for the target employment and housing growth capacity. Areas including the districts around the Washington Square Mall, the Lincoln Center office complex, and an emerging mixed- use district south of Locust will develop at relatively high densities. Areas north of Locust and west of Highway 217 will develop at more moderate intensities, but generally greater than existing intensity in these areas. Density assumptions are summarized below: Land Use: High Density: Moderate Density: Office @ FAR 1.25 @ FAR 0.6 Retail @ FAR 0.6 @ FAR 0.3 Lodging @ FAR 1.0 @ FAR 1.0 Housing @ 50 DU/Acre @ 25 DU/Acre • This development program will require approximately 170-200 acres over the next 20 years. Adequate development and redevelopment capacity exists within the study area as a whole to accommodate development as long as densities assumed above are achieved. • The Regional Center Task Force reached agreements on basic elements of urban development, environmental protection, and transportation facilities. The Washington Square Regional Center Plan describes the vision for the regional center. • The Task Force demonstrated an impressive amount of interest in mixed-use neighborhoods and developments. Increasing land value and transportation costs will 4 Washington Square Regional Center Comprehensive Plan Amendments 8/; contribute to the desirg of workers and employers for proximity of housing and work sites. The regional center, s urban design concept incorporates the need for improved transportation links, higher density, variety of land uses and services and a quality of environment necessary to create a desirable, livable community in the face of dramatic population growth. • Major roadways in the study area experience significant traffic congestion during weekday peak periods. Highway 217, Greenburg Road, Hall Boulevard and Scholls Ferry Road are subject to traffic delays. The major capacity constraints occur at the Hall Boulevard/Scholls Ferry Road intersection, the Scholls Ferry Road/Nimbus Avenue intersection, and the Greenburg Road/Highway 217 ramp intersections. In addition, Highway 217 itself is highly congested. • The majority of the arterial and collector streets in the study area have sidewalks. Scholls Ferry Road and Hall Boulevard have bike lanes within the study area. Highway 217 presents a major barrier for pedestrians and bicyclists. The only connections between the east and west sides of the highway in the study area are overcrossings on Hall Boulevard, Scholls Ferry Road and Greenburg Road. Of these three crossings, sidewalks are found only on Hall Boulevard and Greenburg Road, with bicycle lanes only on Scholls Ferry Road. The only bike lanes on the east side of the Washington Square Mall are on Hall Boulevard. • The Washington Square Transit Center is located in the northeast parking area of the Washington Square Mall. This transit center serves as a bus stop for routes 43, 45, 56, 62, 76 and 78. These routes connect Washington Square to transit centers in downtown Portland, Beaverton, Tigard and Lake Oswego, as well as providing service to the Tualatin area. A wider selection of transit tools could create a less congested, auto- dependent transportation system within and connecting to the study area. • In the future, those areas already identified as experiencing traffic congestion will continue to be clogged. In addition, other sections of Hall Boulevard, Greenburg Road, and Cascade Avenue and Oleson Road will also experience congestion. Traffic estimates do not predict congestion on local Metzger area streets directly east of Washington Square Mall. POLICIES 11.8.1 THE CONCEPTS AND PRINCIPLES CONTAINED IN THE WASHINGTON SQUARE REGIONAL CENTER PLAN SHALL PROVIDE THE OVERALL GUIDING FRAMEWORK FOR MORE DETAILED IMPLEMENTING ACTIONS FOR THE AREA. THE IMPLEMENTING ACTIONS INCLUDE AT A MINIMUM: a. Comprehensive plan map and zoning map amendments including transportation plan. 5 Washington Square Regional Center Comprehensive Plan Amendments 8/~ L INNER b. A public facil4ies plan for the area including a financing plan. C. A transportation improvement plan for the area including a financing plan. d. A parks and open space plan for the area including a financing plan. e. A recognition of the Regional Center Boundary for the purpose of establishing local, regional and state funding priority in order to accomplish the concepts and principles of the plan. 11.8.2 THREE DISTINCT TYPES OF MIXED USE DISTRICTS SHALL BE ESTABLISHED FOR THE WASHINGTON SQUARE REGIONAL CENTER. THESE DISTRICTS ARE: a. MIXED USE COMMERCIAL DISTRICTS (MUC). THE REGIONAL CENTER PLAN RECOMMENDS THAT LAND AROUND THE WASHINGTON SQUARE MALL AND LAND IMMEDIATELY WEST OF HIGHWAY 217 BE DESIGNATED A MIXED USE COMMERCIAL DISTRICT. PRINCIPAL DEVELOPMENT IN THESE AREAS WILL BE OFFICE BUILDINGS, RETAIL AND SERVICE USES. A ZONING DESIGNATION OF MUC WILL ALSO ALLOW MIXED-USE DEVELOPMENT AND HOUSING AT DENSITIES OF 50 UNITS AN ACRE. MUC DISTRICTS WILL ENCOURAGE LARGER BUILDINGS WITH PARKING UNDER, BEHIND OR ALONGSIDE THE STRUCTURES. b. MIXED USE EMPLOYMENT DISTRICT (MUE). MIXED USE EMPLOYMENT DISTRICTS REFER TO AREAS WITH CONCENTRATIONS OF OFFICE, RESEARCH AND DEVELOPMENT, AND LIGHT MANUFACTURING INDUSTRIAL USES. COMMERCIAL AND RETAIL SUPPORT USES ARE ALLOWED, BUT ARE LIMITED. THE ZONING WILL PERMIT RESIDENTIAL DEVELOPMENT COMPATIBLE WITH THE DISTRICT=S EMPLOYMENT CHARACTER. LINCOLN CENTER IS AN EXAMPLE OF AN AREA DESIGNATED MUE-1, THE HIGH DENSITY MIXED-USE EMPLOYMENT DISTRICT. THE NIMBUS AREA IS DESIGNATED MUE-2, REQUIRING MORE MODERATE DENSITIES. C. MIXED USE RESIDENTIAL DISTRICTS (MUR). THE MUR DESIGNATION IS APPROPRIATE FOR PREDOMINANTLY RESIDENTIAL AREAS WHERE MIXED USES ARE PERMITTED WHEN COMPATIBLE WITH THE RESIDENTIAL USE. AREAS WILL BE DESIGNATED HIGH. DENSITY (MUR-1) OR MODERATE DENSITY (MUR-2). Proposed Amendment to Chapter 8. Transportation. Add a new Policy: 6 Washington Square Regional Center Comprehensive Plan Amendments 84 8.1.9 THE CITY SHALL ADOPT THE FOLLOWING TRANSPORTATION IMPROVEMENT STRATEGY IN ORDER TO ACCOMMODATE PLANNED LAND USES IN THE WASHINGTON SQUARE REGIONAL CENTER: a. Addition of bus service for employees in the Nimbus office development. This service has been identified as a priority in Tri-Met=s Transit Choices for Livability study. Tri-Met expects to begin service within one to five years. b. Improvements to the Transit Center Amenities in Sub-Area A, including a covered pedestrian path of the mall and improved connections to other retail and commercial establishments would create a significant difference in this area=s pedestrian environment. C. In cooperation with the City of Beaverton and Tri-Met, identification of a new Park & Ride site to replace the existing site that was intended to be temporary. d. Sidewalks on Greenburg Road and completion of sidewalk system on Hall Boulevard will improve connectivity and access, plus construction of pedestrian crossings on Greenburg and Hall. e. A pedestrian trail within and/or around the Progress Downs Public Golf Course presents an opportunity to provide a safe neighborhood walking/exercise area and to serve more of the population using existing resources. f. Recommended mall area street improvements include bringing SW Eliander Lane, SW Washington Square Road, SW Palm Boulevard and the roadway around the cemetery to full street standards. This includes building sidewalks and bicycle lanes. g. Within the mall area parking area, recommend raised pedestrian refuges and designated walkways to connect bicyclists and pedestrians to the mall and adjacent retail establishments. h. Improve multi-modal accessibility, safety and neighborhood traffic management on Locust Street between Lincoln Street and Hall Boulevard, Lincoln Street Between Locust and Oak Streets, Oak Street between Lincoln Street and Hall Boulevard, and on other streets as the need arises. The goal is to improve safety, bicycle accessibility, pedestrian crossing, control traffic speed and improve pedestrian connections. i. Develop Oak, Lincoln and Locust as collectors. Acquire right-of-way to allow a five-lane roadway, and develop Hall Boulevard to a three-lane facility as an initial phase. 7 Washington Square Regional Center Comprehensive Plan Amendments 8/c j. Provide pedestrian/bicycle connections between SW Borders Street and Greenburg Road. k. Provide pedestrian/bicycle connections on local streets to, from and within new developments and redevelopments. 1. Create a two-lane, local level over-crossing of Highway 217, from Washington Square to Nimbus Avenue, including pedestrian and bike facilities and people mover extending to Fanno Creek Bikeway. M. Extend Nimbus Avenue to Greenburg Road, including bike and pedestrian facilities. This includes realignment of Greenburg Road and related improvements. n. Construct a regional level over-crossing of Highway 217 connecting Locust Street to Nimbus Avenue and providing for a people mover. o. Reinforce need for interchange capacity improvements at Hall Boulevard and Scholls Ferry Road in the upcoming Highway 217 Major Investment Study. P. Design a frontage road to improve access to Washington Square Mall. q. Add bike and pedestrian facilities on Cascade Avenue. r. Identify potential bicycle network alignments with connections to existing bikeways, neighborhoods and activity centers, with particularly emphasis on extending the Fanno Creek Bikeway along Ash Creek. S. Strongly support commuter rail service and a commuter rail station within the Regional Center. Connect the station with other activity centers by an efficient people mover system t. Adopt the functional classification plan for streets internal to the Washington. Square Regional Center as shown on Figure 1. The following policies apply to local streets within the regional center: 1. Local street spacing shall be a maximum of 530 feet. 2. Access way spacing shall be a maximum of 330 feet. 3. Spacing of signalized intersections on Major Arterials shall be a minimum of 600 feet. 4. Existing rights of way will, to the greatest extent possible, be utilized for a local street system. Right of way vacations will be considered only when all other policies in this subsection are met. 8 Washington Square Regional Center Comprehensive Plan Amendments 8/~ U. The transportation protects described in this sectionshould be added to the ity o Tigard, s Transportation System Plan. The City, ODOT and Metro should work to include these improvements in regional and state implementation programs. 11.8.3 NECESSARY PUBLIC FACILITIES INCLUDING SEWER, WATER AND DRAINAGE FACILITIES, SHOULD BE IN PLACE OR PLANNED TO BE CONSTRUCTED IN TIME TO SUPPORT NEW DEVELOPMENTS. 11.8.4 NECESSARY TRANSPORTATION FACILITIES, AS DETERMINED BY A TRAFFIC IMPACT ASSESSMENT, SHOULD BE IN PLACE OR PLANNED TO BE CONSTRUCTED IN TIME TO SUPPORT NEW DEVELOPMENTS. Proposed Amendment to Chapter 12. Locational Criteria. Add a new Section 12.5: 12.5 MIXED USE DISTRICTS POLICY 12.5.1 THE CITY SHALL PROVIDED FOR MIXED USE DEVELOPMENTS IN ACCORDANCE WITH: a. APPLICABLE PLAN POLICIES; b. APPLICABLE PURPOSE STATEMENTS; AND C. APPLICABLE COMMUNITY DEVELOPMENT CODE PROVISIONS. 1. Mixed Use Commercial A. The purpose of the Mixed Use Commercial (MUC) land use designation is: 1. To create a dense mixed-use commercial district that forms the commercial core of the Washington Square Regional Center; 2. To provide opportunities for major retail goods and services, office employment, and housing in close proximity, and with good access to transportation services; 3. To implement the Metro 2040 Growth Concept and Urban Growth Management Functional Plan for areas designated Regional Center within 9 Washington Square Regional Center Comprehensive Plan Amendments 8/i the City of Tigard. 2. Mixed Use Employment A. The purpose of the Mixed Use Employment (MUE) land use designation is: 1. To create a mixed-use employment district that is complementary to the rest of the community and the region; 2. To provide opportunities for employment and for new business and professional services in close proximity to retail centers and major transportation facilities; 3. To provide for major retail goods and services accessible to the general public, and minor retail goods and services accessible to the public which works and lives within the MUE district; 4. To provide for groups and businesses in centers; 5. To provide for residential uses which are compatible with and supportive of retail and employment uses. 6. To implement the Metro 2040 Growth Concept and Urban Growth Management Functional Plan for areas designated Regional Center and Employment within the City of Tigard. 3. Mixed Use Residential A. The purpose of the Mixed Use Residential (MUR) land use designation is: 1: To create moderate and high density mixed use residential districts in close proximity to other mixed-use districts; 2. To provide opportunities for a variety of housing types and densities, and to produce that housing in ways that residents have a high degree of pedestrian amenities, recreation opportunities and access to transit; 3. To incorporate limited commercial and service uses within mixed-use projects that provide benefits and amenities to residents, but are compatible with residential uses. 4. To implement the Metro 2040 Growth Concept and Urban Growth Management Functional Plan for areas designated Regional Center within 10 Washington Square Regional Center Comprehensive Plan Amendments B/~ the City of Tigard. Policies 12.5.2 THE CITY SHALL APPLY A MIXED USE COMMERCIAL LAND USE DESIGNATION FOR AREAS SHOWN AS REGIONAL CENTER IN THE METRO 2040 GROWTH CONCEPT. 12.5.3 THE CITY SHALL APPLY A MIXED USE EMPLOYMENT LAND USE DESIGNATION FOR AREAS SHOWN AS REGIONAL CENTER AND EMPLOYMENT IN THE METRO 2040 GROWTH CONCEPT. 12.5.4 THE CITY SHALL APPLY A MIXED USE RESIDENTIAL LAND USE DESIGNATION FOR AREAS SHOWN AS REGIONAL CENTER IN THE METRO 2040 GROWTH CONCEPT. IMPLEMENTATION STRATEGIES 1. The Community Development Code shall: a. Include a Mixed Use Commercial District; b. Include high density and moderate density Mixed Use Employment Districts; C. Include high density and moderate density Mixed Use Residential Districts. d. Require that: 1. Minimum residential densities and floor area ratios (FAR) be achieved; 2. Certain commercial uses be limited so that a pedestrian-oriented development pattern is achieved; 3. Design standards for pubic improvements, site design, building design, signs and landscaping are achieved in order to create high quality, pedestrian-oriented developments; 4. All areas be subject to Site Development Review. e. Provide for: I . Limited adjustments, and phasing so that development standards can be achieved over time; 2. Improvements to pre-existing uses and developments so that existing residents and businesses may continue to thrive; 3. Incentives to preserve and enhance significant wetlands, streams and 21 Washington Square Regional Center Comprehensive Plan Amendments 8/i floodplains. f 12 Washington Square Regional Center Comprehensive Plan Amendments 8/: I Jim ' 00-18 EXHIBIT C - ORDINANCE NO .v.1 I 1' ' 'r ,.fit a. - ,•Tr MA,,y~ ` ~ rrw ~ ~ Yq ma y ` fi r ;ar ~H~ t .tic r,~~"„*~~" ad~~s~~a't`tk~•; ~1 ,yam ~ ~II t ~ - Y 3 t q I i\• : ,~A,~3 E l RA - `a~2 t ^J~\~ •`K F l .Q - \ ~ 1 L LlL1J ~j,'•"` t ~4 I • ,t0.;. ` c - - S 1 _LLj L4_ `R-4.5 1--~•J~^~l-i a~ ~ ! ~ Y / _ ylt~ yC. P Ili I ~r X 1> R-1 2 _ Plan 1- 1 ~ s ~(I i -1 ` \ Beaty rton Zoning T~~CeMrol Business DsMet rmmdy Commercial O Cl General Comm a' ~l tJei porhood ARE REGIONAL. CENTER STUDY °0 ~ p,o~ssional Con'me""al WASHINGTON SQU R High Denny ~aes'de^tial City of Tigard, Oregon r~ Or Co. Zoning t~ n~a, f REA C8D Low Derni. Residential STUDY A to diumDenstyResidential INST 1. ity of Tmard J ME Medium-High Density Residential CITY BOUNDARIES NGD Murt-Use £mdoYn a^t so Open Space . Dom.. Rt5 -.rv± Publie lnsti[ubon R24 ProP~etl C°mp Ptan LA p plan: OC ZONING SOURCES: g n: o 25 25p Feet R5 Tigard Zonis Com a ` 1 O Ry i4 M M aed Use use CResidential al City of Tigard Mored - ly tKe Use ErnTA Y rnpl-Y 14 JI r Parcel Boundaries: Wash nr 4 - 30o feet County A&T Dept. tflCl i Waco Zoning. Co my erton Zoning: Washing! DRAFT ~grstprol~tSwash-sa\'eetingt aPr '!9196 tt ~ y c \ ,C~ r / ~N•~. ~L1JZ ~1LLLllfI_ZLl_ ~ ~ logo -,1 7-1 1 L;r-= !R-4.51 L - i _ , - R-1 2 J~-~ % r T yy ~rH ~1 ~ I I •ti t` . 7 .GNCV \A x M Beaverton Zoning Tigard Comp Plan WASHINGTON SQUARE REGIONAL CENTER STUDY Central Business District ;M Community Commercial = CS C ® General Commercial C City of Tigard, Oregon o 0C ®P ii9 ~°a m glal Cin of Tigard R2 0 R7 ® High Density Residential 4IF STUDY AREA Wash Co. Zoning 74 Hdria! l CBD Light Indndustria! INST Low Density Residential A Medium Density Resident I SOURCES: Tigard Zoning. Comp Plan: ZONING / PLAN ~y CITY BOUNDARIES ® NCD Medium+lE loymeyReaidental g. P ~ Muhillse Employment City of T;gard O OC open space Parcel Boundaries = R15 pudic Institution Q 125 250 Feet E3 R24 Washington County A&T Dept. DESIGNATIONS so R5 Proposed Comp Plan WaCo Zoning, Beaverton Zoning: I~ R9 IM Moved Use Residential Washington County D" FT 1 inch = 300 feet = Mixed Use Commercial ngistprcrectstwash-sgtmeetmg1 apr 719/98 D■ = Moved Use Employment 1 - - - - rr ®seaal EXHIBIT E - ORDINANCE NO. 00-18 WASKINGTON SQUARE REGIONAL CENTER STUDY Final Draft 'B'ask Force Recommendations for Mixed-Use Zoning Districts and Design Standards August 25, 1999 Chapter 18.630 WASHINGTON SQUARE REGIONAL CENTER 18.630.010 Purpose A. This Chapter will implement the vision, concepts and principles contained in the Washington Square Regional Center Plan, prepared by a Task Force appointed by the City of Tigard. B. Metro's Regional Urban Growth Management Functional Plan target growth capacity for the Washington Square Regional Center will be met by permitting mixed use development within the Regional Center at densities appropriate for an urban center. C. A mixed use Regional Center will contain a variety of districts that vary in scale, predominant use, and character. Distinct districts, connected to each other and to the rest of the region by a multi-modal transportation system, will provide a range of working, living and shopping opportunities. D. Improved multi-modal transportation links, higher densities, variety of land uses, and enhanced environmental qualities will all contribute to create a desirable, livable community in the face of dramatic population and employment growth. E. New mixed-use zoning districts, along with existing residential zoning districts in established areas, are appropriate for the Regional Center. 18.630.020 List of Washington Square Regional Center Mixed Use Zoning Districts A. (MI IC)_ Mixrrd I Ic(- C ommarcial District This designation includes land around the Washington Square Mall and land immediately west of Highway 217. Primary uses permitted include office buildings, retail, and service uses. Also permitted are mixed-use developments and housing at densities of 50 units per acre. Larger buildings are encouraged in this area with parking under, behind or to the sides of buildings. B. (MI IE - MixaI jse f o orient Districts. This designation applies to areas where employ nient uses such as office, research and development and light manufacturing are concentrated. Commercial and retail support uses are allowed but are limited, and residential uses are permitted which are compatible with employment character of the area. Lincoln Center is an example of an area designated MUE-1, the high density mixed use employment district. The Nimbus area is an example of an area designated MUE-2 requiring more moderate densities. C. (A4lJ i`)wlixrdllsc-Rrsidenda Districts. The MUR designation is appropriate for predominantly residential areas where ❑tixed-uses are permitted when compatible with the residential use. A high density (MUR-1) and moderate density (MUR-2) designation is available. "Zoning Districts cSr 1)esil n S'Inndards-{::SRC' 18.630-1 Morewher 22, 1999 18.630.030 Uses (insert Sections A, B and .C from commercial use section (18.520.030). Table 18.630.1 USE TABLE: MIXED-USE ZONES Use Categories MUC MUE 1 and 2 MUR 1 and 2 Residential Household Living P P P Group Living R(IYC R(IyC R(I)/C Transitional Housing C C C Home Occupation R(2) R(2) R(2) Housing Types Single Units, Attached R(3) R(3) P Single Units, Detached R(3) R(3) R(3) Accessory Units R(4) R(4) R(4) Duplexes R(3) R(3) P Multi-Family Units P P P Manufactured Units N N N Mobile liorne Parks/Subdivisions N N N Civic (Institutional) Basic Utilities C(5) C(5) C(5) Colleges C C C Conununity Recreation P C C Cultural Institutions P P N Day Care P P P/C(6) 1 Lutergency Services P 1' N { Medical Centers C C C 1 + Postal Service 1' I' N i Public Support Facilities 13 l' P Religious Institutions 1' C Schools C C C Social/Fraternal/Clubs/l.c~dges l' I'. C 7oninR Dis(r•icis (f Design .4/rntdard -18.630-2 Novernher 22. 1999 rl RIII -~a~~rtM171@ a 't~lAll~rlRlli®SA~rFi I Usc Catceorics MUC MUE I and 2 MUR t and 2 Commercial Commercial Lodging P P N Eating and drinking establislunents P P R(7X8) Entertainment-Oriented - Major Event Entertainment C N N - Outdoor Entertainment C N N - Indoor Entertainment P P N - Adult Entertainment C N N General Retail - Sales-Orictited P R(9) R(7X8) - Personal services P R(9) R(7X8) - Repair-Oriented R(9) R(9) N - Bulk Sales R(9) R(9) N - Outdoor Sales N N N - Animal-Related N N N Motor Vehicle Related - Motor VehicleSalcsiRenlal R(10) R(10) N - Motor vehicle Servicing/Repair N N N - Motor Vehicle Fucl Sales C C N Office P P R(7X8) Self-Service Storage N N N Non-Accessory Parking P P N Industrial Industrial Services N N N Manufacturing and Production - Light hidustrial N R(11) N - General Industrial N N N - Heavy Industrial N N N Railroad Yards N N N Research and Development N R(11) N WarehouseiFrcigltt Movement N R(I OX 11) N Waste-Related - N N N Wholesale Sates N R(IOX 11) N P=Permitted R=Restricted C=Conditional N=Not Permitted 1. Group living with five or fewer residents permitted by right, group living with six or more residents permitted as conditional use. 2. Permitted subject to requirements Chapter 18.742. 3. Pre-existing housing units permitted. Conversion of pre-existing housing units to other uses is subject to the requirements of this Chapter. 4. Permitted subject to requirements Chapter 18.710. 5. Except water, storm and sanitary sewers, which arc allowed by right. 6. In-home day care which meets all slate requirements permitted by right; freestanding day care centers which Zoning Districts ct Design .S'landardc-11:SRC _ 18.630-3 November 22, 1999 meet all state requirements permitted conditionally. 7. This use is allowed only in mixed-use developments. Commercial uses shall occupy no more than 50% of the total floor area within the mixed-use development, and shall be permitted only when minimum residential densities are met. 8. The maximum building footprint size permitted for any building occupied entirely by a commercial use or uses shall be 7,500 square feet. 9. New retail and sales uses larger than 60,000 square feet of gross leasable area per building or business constructed after this section is effective shall be prohibited. 10. Permitted as an accessory to a permitted use as long as this use is contained within the same building as the permitted use, and does not exceed the floor area of the permitted use. ' 11. All activities associated with this use, except employee and customer parking, shall be contained within building(s). 18.630.040 Development Standards A. Cnai liannn Required. All development must comply with: 1. All applicable development standards contained in the underlying zoning district, except where the applicant has obtained variances or adjustments in accordance with Chapters 18.310 and 18.320, and Sub-Sections C and D of this Section, 2. All other applicable standards and requirements contained in this title. B. Development Standard . Development standards which apply within mixed-use zones in the Washington Square Regional Center are contained in Table 18.630.2 below. Existing developments which do not meet the standards specified for a particular district may continue in existence and be altered subject to the provisions of Section 18.630.050. %oning Districts A Uc'si~ ~i fi(nndnrde-H;tiRt' 18.630-4 November 22, 1999 .r , Table 18.630.2 DEVELOPMENT STANDARDS IN MIXED-USE ZONES MUc MUE 1 MUE 2 MUR I MUR 2 DIMENSIONAL REQUIREMENTS Minimum Lot Area None None None None None Minimum Building Setbacks 0' 0' 0' 0' front; 10' IV front and rear, 0' rear, 0' interior side; interior side; 5' streetside 10' streetside Maximum Building Setbacks Commercial:10' 20' front; 0' 20' front; 0' 20' front; 0' 20' front; 0' front & rear and rear and rear and rear and streetside; 0' interior side; interior side; interior side; interior side; interior side & 20' streetside 20' streetside 20' 20' streetside rear. (I X2) (I X2) streetside (1x2) Residential: (IX2) 20' front 0' rear and interior side; 20' streetside (IX2) Minimum Building Height 2 stories 2 stories None 2 stories None Maximum Building Height 200' 200' 60' 75' 45' DENSITY REQUIREMENTS(3)(6) Minimum Floor Area Ratio (FARX4) 1.25 1.25 0.6 0.6 0.3 Minimum Residential Density(5) 50 units/acre 50 units/acre 25 units/acre 50 25 unitsiacre units/acre Maximum Residential Density(5) None None 50 units/acre None 50 units/acre 1. Side and rear yard setbacks shall be 20 feet when the zone abuts a residential district. 2. The requirements contained in the Buffer Matrices in Tables 18.745.1 and 18.745.2 shall be used in calculating widths of buffering/screening and required improvement s to be installed between proposed uses in the Washington Square Regional Center (WSRC) and abutting zoning districts not included within the WSRC, or zoning districts which are not mixed-use. For MUC and MUE zones, the requirements for Commercial Zones apply. For MUR zones, the requirements for the Neighborhood Commercial Zone apply. 3. For purposes of detcnnining floor area ratio and residential densities, the net development area shall be used to establish the lot area, determined per Section 18.715.020 A. 4. The minimum and maximum floor area ratios shown in Table 18.630.2 apply to all non-residential building development and mixed-use development which includes a residential component. In mixed-use developments, 7oning Districts & Design Standards-WWt"' 18.630-5 November 22, 1999 residential floor area is included in the calculations of floor area ratio to determine conformance with minimum and maximum FAR. 5. Notwithstanding the requirements of 18.715.020, minimum and maximum density shall be determined for residential only projects using the number of residential units per net acre as shown in Table 18.630.2. The provisions for density transfer described in 18.715.030 apply, using the minimum and maximum density shown in Table 18.630.2. 6. The maximum density requirements for developments that include or abut designated Water Resources Overlay District Riparian Setbacks per Chapter 18.797 are described in Section 18.630.040 (E). C. AdismtmPnts to DnmitVRenuiremPntc The density requirements shown in table 18.630-2 are designed to implement the goals and policies of the Comprehensive Plan. These requirements apply throughout the Regional Center zoning districts, but the City recognizes that some sites are difficult to develop or redevelop in compliance with these requirements. The adjustment process provides a mechanism by which density requirements may be adjusted up to twenty five percent (25%) of the original requirement if the proposed development continues to meet the intended purpose of the requirement and findings are made that all approval criteria are met. Adjustment reviews provide flexibility for unusual situations and allow for alternative ways to meet the purpose of the code. 1. Approval Criteria. Adjustment requests will be approved if the review body finds that the applicant has shown that approval criteria 1 through 4 below, are met. a. Granting the adjustment will equally or better meet the purpose of the regulation to be modified; and b. The proposal will be consistent with the desired character of the area; and c. If more than one adjustment is being requested, the cumulative effect of the adjustments results in a project which is still consistent with the overall purpose of the zone; d. Any impacts resulting from the adjustment are mitigated to the maximum extent possible. 2. Procedure. Requests for an adjustment are processed along with the development proposal for which the application has been filed. 3. Ineligible regulations. Adjustments are prohibited for the following items: a. To allow a primary or accessory use that is not allowed by the regulations; { b. As an exception to any restrictions on uses or development which contain the words "prohibited" or "not allowed", 3 c. As an exception to a qualifying situation for a regulation, such as zones allowed or Zoning Uistricis ct• Design Sean lnrdr-IVSRC 18.630-6 November 21, 1999 items being limited to new development. d. As an exception to a definition or classification e. As an exception to the procedural steps of a procedure or to change assigned procedures. D. Phasing of Develnpment Standards. Projects may use the Site Development Review process (Chapter 18.366) to develop a site by phasing compliance with the development standards established in this Chapter. Such projects must demunstrate how future development of the site, to the minimum development standards established in this Chapter or greater, can be achieved at ultimate build out of the site. The Planning Director may waive or modify the approval period (Section 18.360.030 C) and phased development time schedule (Section 18.360.030 E.1) for projects approved under this section. E. Density Ren,niroments fnr De=lnnm~nta including nr Ahntting Riparian Cethaek Notwithstanding the density requirements in Table 18.630.2, the maximum residential density and mixed-use and non- residential floor area ratio for developments that include or abut Riparian Setbacks shall be no greater than 110 percent of the minimum residential density and floor area ratios in all Mixed Use Zones, except when the following are met: 1. Wetlands within the development are expanded or enhanced in conformance with the Oregon Division of State Lands Wetlands Restoration and Enhancement Program, and if applicable 2. Fish Habitat within the development is enhanced in conformance with the Oregon Division of State Lands Fish Habitat Enhancement Program, and if applicable 3. The overall flood storage capacity of the 100-year floodplain within the development is increased by 10 percent. If the enhancements described above are approved, or if enhancements are already in existence, the maximum residential density standards shown in Table 18.630.2 and no maximum floor area ratio standards for mixed use and non-residential developments shall apply. 18.630.050 Pre-Existing Uses and Developments within the Washington Square Regional Center Mixed Use Districts A. ApplimhilitT. Pre-existing housing units in mixed use districts are permitted. Conversion of pre- existing housing units to other uses is subject to the requirements of this Chapter. Notwithstanding the provisions of Section 18.760.040, uses prohibited and structures that would be nonconforming in any of the Regional Center Mixed Use zoning districts that were lawfully in existence at the time of adoption of the Regional Center Mixed Use districts are considered to be approved uses and structures. However, future additions, expansions, or enlargements to such uses or structures, shall be limited to the property area and use lawfully in existence at the time of adoption of this ordinance (date). i 1. An addition, expansion, or enlargement of such lawfully preexisting uses and structures up to twenty (20%) of the gross floor area lawfully in existence at the time of adoption of this ordinance will be allowed provided the applicant of such proposed addition, expansion or enlargement demonstrates substantial c6mpliance with all appropriate development standards in this Code, or that the applicant demonstrates that the purposes of applicable development suidards are addressed to the extent that the proposed addition, expansion or enlargement Zoning Districts & Design Standards-U:SRC 18.630-7 Novcniber 22, 1999 allows. 2. All additions, expansions, or enlargements of existing uses or structures that take place after using the 20 percent addition, expansion, or enlargement exception shalt be in conformance with the development standards of this Code. Projects may use the Site Development Review process (Chapter 18.360) to develop a site by phasing compliance with the development standards established in this Chapter per Section 18.360.040.D: 3. If a pre-existing use is destroyed by, fire, earthquake or other Act of God, then the use will retain its pre-existirig status under this provision so long as it is substantially reestablished within three (3) years of the date of the loss. The reestablished use shall be in conformance with the development standards of this Code. Projects may use the Site Development Review process (Chapter 18.360) to develop a site by phasing compliance with the development standards established in this Chapter per Section 18.360.040.D. CHAPTER 18.630.100 WASHINGTON SQUARE REGIONAL CENTER DESIGN STANDARDS 18.630.110 Purpose and Applicability A. Deyig nrinnililec, Design standards for public street improvements and for new development and renovation projects have been prepared for the Washington Square Regional Center. These design standards address several important guiding principals adopted for the Washington Square Regional Center, including creating a high-quality mixed use area, providing a convenient pedestrian and bikeway system, and utilizing streetscape to create a high quality image for the area. B. Development conf mmnce. All new developments, including remodeling and renovation projects resulting in non single family residential uses, are expected to contribute to the character and quality of the area. In addition to meeting the design standards described below and other development standards required by the Development and Buiiding Codes, developments will be required to dedicate and improve public streets, connect to public facilities such as sanitary sewer, water and storm drainage, and participate in funding future transportation and public improvement projects necessary within the Washington Square Regional Center. C. C'nnflicting etandirfis. The following design standards apply to all development located within the Washington Square Regional Center within the MUC, MUE and MUR zones. If a standard found in this section conflicts with another standard in the Development Code, standards in this section shall govern. r i 18.630.120 Street Connectivity A. Demnnsrratinn of standards. All development must demonstrate how one of the following standard options will be nict. Variance of these standards may be approved per the requirements of Chapter 18.370.010 where topography, barriers such as railroads or freeways, or environmental constraints such as major streams and rivers prevent street extensions and connections. . Design Option a. Local street spacing shall provide public street connections at intervals of no more Zoning Districts ct Design Standards-UNRC 18.630-8 November 22. 1999 than 530 feet. b. Bike and pedestrian connections on public easements or right-of-way shall be provided at intervals of no more that 330 feet. 2. Performance Option a. Local street spacing shall occur at intervals of no less than eight street intersections per mile. b. The shortest vehicle trip over public streets from a local origin to a collector or greater facility is no more than twice the straight-line distance. C. The shortest pedestrian trip on public right-of-way from a local origin to a collector or greater facility is no more than one and one-half the straight-line distance. 18,630.130 Site Design Standards A. Compliance. All development must meet the following site design standards. If a parcel is one acre or larger a phased development plan must be approved demonstrating how these standards for the overall parcel can be met. Variance to these standards may be granted if the criteria found in Section 18.370.010 C2, governing criteria for granting a variance, is satisfied. 1. Building placement on Major and Minor Arterials - Buildings shall occupy a minimum of 50% of all street frontages along Major and Minor Arterial Streets. Buildings shall be located at public street intersections on Major and Minor Arterial Streets. 2. Building setback - The minimum building setback from public street rights-of-way shall be 0 feet; the maximum building setback shall be 10 feet. 3. Front yard setback design - For setbacks greater than 0', landscaping, an arcade, or a hard- surfaced expansion of the pedestrian path must be provided between a structure and a public street or accessway. If a building abuts more than one street, the required improvements shall be provided on all streets. Landscaping shall be developed to an L-1 standard on public streets and an L-2 standard on ac cessways. Hard-surfaced areas shall be constructed with scored concrete or modular paving materials. Benches and other street furnishings are encouraged. These areas shall contribute to the minimum landscaping requirement per Section 18.520.04013 and Table 18.520.2. 4. Walkway connection to building entrances - A walkway connection is required between a building's entrance and a public street or accessway. This walkway must be at least six feet wide and be paved with scored concrete or modular paving materials. Building entrances at a corner near a public street intersection are required. These areas shall contribute to the minimum landscaping requirement per Section I8.520.040B and Table 18.520.2. 5. Parking location and landscape design - Parking for buildings or phases adjacent to public street rights-of-way must be located to the side or rear of newly constructed buildings. When buildings or phases are adjacent to more than one public street, primary street(s) shall be identified where this requirement applies. If located on the side, parking is limited to 50% of the street frontage and must be behind a landscaped area constructed to an L- I Landscape Zoning Districts & Design Standards-bi.SRC 18.630-9 November 22, 1999 Standard. The minimum depth of the L- I landscaped area is five feet or is equal to the building setback whichever is greater. Interior side and rear yards shall be landscaped to a L- 2 Landscape Standard, except where a side yard abuts a public street, where it shall be landscaped to an L- I Landscape Standard. 18.630.140 Building Design Standards A. - Non-residential buildings. All non-residential buildings shall comply with the following design standards. Va: iance to these standards may be granted if the criteria found in Section 18.370.010 C2, criteria for granting a variance, is satisfied. I . Ground floor windows - All street-facing elevations within the Building Setback (0 to 10 feet) along public streets shall include a minimum of 50% of the ground floor wall area with windows, display areas or doorway openings. The ground floor wall area shall be measured from three feet above grade to nine feet above grade the entire width of thd street-facing elevation. The ground floor window requirement shall be met within the ground floor wall area and for glass doorway openings to ground level. Up to 50% of the ground floor window requirement may be met on an adjoining elevation as long as all of the requirement is located at a building comer. 2. Building facades - Facades that face a public street shall extend no more than 50 feet without providing at least one of the following features: (a) a variation in building materials; (b) a building off set of at least t foot; (c) a wall area that is entirely separated from other wall areas by a projection, such as an arcade; or (d) by another design features that reflect the building's structural system. No building facade shall extend for more than 300 feet without a pedestrian connection between or through the building. 3. Weather protection - Weather protection for pedestrians, such as awnings, canopies, and arcades, shall be provided at building entrances. Weather protection is encouraged along building frontages abutting a public sidewalk or a hard-surfaced expansion of a sidewalk, and along building frontages between a building entrance and a public street or accessway. Awnings and canopies shall not be back lit. 4. Building Materials - Plain concrete block, plain concrete, corrugated metal, plywood, sheet press board or vinyl siding may not be used as exterior finish materials. Foundation material may be plain concrete or plain concrete block where the foundation material is not revealed for more than 2 feet. 5. Roofs and roof lines - Except in the case of a building entrance feature, roofs shall be designed as an extension of the primary materials used for the building and should respect the building's structural system and architectural style. False fronts and false roofs are not permitted. r1 • H 6. Roof-mounted equipment - All roof-mounted equipment must be screened from view from adjacent public streets. Satellite dishes and other communication equipment must be set back or positioned on a roof so that exposure from adjacent public streets is minimized. Solar heating panels are exempt from this standard. B. Rnsidnnrial-nnlN, anti Mixe sc Buildings. For residential-only buildings and mixed-use buildings where the predominant use is resideniial, the requirements of Chapter 18.720-Design Compatibility Standards shall apply. Zoning Districts h Design Standards-NMC 18.630-10 November 22, 1999 NMI 18.630.150 Signs A. Sign standarclc, In addition to the requirements of Chapter 18.780 of the.Development Code the following standards shall be met: 1. Zoning district regulations - Residential only developments within the MUC, MUE and MUR zones shall meet the sign requirements for the R-40 zone 18.780.13013; non-residential developments within the MUC zone shall meet the sign requirements for the commercial zones, 18.780.13OC; non-residential development within the MUE zone shall meet the sign requirements of the C-P zone, 18.780.130D and non-residential development within the MUR zones shall meet the sign requirements of the C -N zone, 18.780.130E. 2. Sign area limits - The maximum sign area limits found in 18.780.130 shall not be exceeded. No area limit increases will be permitted. 3. Height limits - The maximum height limit for all signs except wall signs shall be 10 feet. Wall signs shall not extend above the roofline of the wall on which the sign is located. No height increases will be permitted. 4. Sign location - Freestanding signs within the Washington Square Regional Center shall not be permitted within required L- I landscape areas. 18.630.160 Entry Portals A. Required laratinne• (Reserved) 18.630.170 Landscaping and Screening A. Applicable levels. Two levels of landscaping and screening standards are applicable. The locations were the landscaping or screening is required and the depth of the landscaping or screening are defined in other sub-sections of this section. These standards are minimum requirements. Higher standards may be substituted as long as all height limitations are met. L-1 Low Screen = For general landscaping of landscaped and screened areas within parking lots and along local collectors and local streets, planting standards of Chapter 18.745 Landscaping and Screening, shall apply. In addition the L-I standard applies to setbacks on major and minor arterials. Where the setback is a minimum of 5 feet between the parking lot and a major or minor arterial, trees shall be planted at 3-2 inch caliper, at a maximum of 28 feet on center. Shrubs shall be of a variety that will provide a 3-foot high screen and a 90% opacity within one year. Groundcover plants must fully cover the remainder of landscape area within two years. Any tree planted in excess of a 2 inch caliper shall be eligible for full mitigation credit. H 1 ' 2. L-2 General Landscaping - For general landscaping of landscaped and screened areas within parking lots, and along local collectors and local streets, planting standards of Chapter 18.745,A~ Landscaping and Screening, shall apply. In addition, trees shall be provided at a minimum 2-2 inch caliper, at a maximum spacing of 28 feet. Shrubs shall be of a size and quality to achieve, the required landscaping or screening effect within two years. Any tree planted in excess of a 2-inch caliper shall be eligible for full mitigation credit, Zoning Districts <& Design Standards-W.S'RC 18.630-11 November 22, 1999 III! g 18.630.180 Street and Acr_essway Standards A. Functional Classifications and Street Sections. The Recommended Roadway Functional Classification Map and Street Cross Sections attached shalt govern the improvement and construction of major streets within the Washington Square Regional Center. 18.630.190 Design Evaluation The provisions of Section 18.620.090-Design Evaluation apply within the Washington Square Regional Center. Zoning Districts cS Design Standards-14:SR7 18.630-12 November 22, 1999 EXHIBIT F - ORDINANCE.NO. 00-18 Hearing Date: March 94.2000 7:30 PM K, ~ rr yu~~~~.- a "f j ~~~Y V•~ i 0 '~i :tom a •",u. 1,1;•i ~..i x~c~~ ~w l.:.[~'~. 7'r. t:..a:L .ta ~r ...+i'~.n.-.`1~.i.r dir~`- _ .t i'. r',. P,T. SECTION 1: APPLICATION SUMMARY CASES: FILE NAME: WASHINGTON SQUARE REGIONAL CENTER Comprehensive Plan Amendment CPA 1999-0000220N 1999- 00001/ZOA 1999-00004 PROPOSAL: A request for approval of legislative Comprehensive Plan Map, Rezone and Text Amendments within the area known as the Washington Square Regional Center. 7Specifically, the request includes redesignation from Low Density Residential, Medium-Density Residential, Medium-High Density Residential, Commercial Professional and General Commercial to new zoning designations of Mixed Use Employment 1&2, Mixed Use Residential 1&2, and Mixed Use Commercial. Specific implementing amendments to the Comprehensive Plan, Development Code, and amendments to the Comprehensive Plan Transportation Map are proposed; however, implementation of the plan shall be delayed until certain conditions are met as outlined in the findings and conclusions outlined below. The request further includes a request for approval of a zone change from C-P (Commercial Professional), C-G (General Commercial), CN (Neighborhood Commercial), R-40 (40 units per acre), R-25 (Residential, 25 units per acre), R-12 (12 units per acre), and R-4.5 (Residential, 4.5 units per acre) to new zoning designations of MUE. 1&2 (Mixed Use Employ::;ent), MUR 1&2 (Mixed Use Residential), and MUC (Mixed Use Commercial). The request also includes amendments to the Community Development Code to add a new section entitled "Washington Square Regional Center" to provide new zoning districts. APPLICANT: City of Tigard 13121 5W *Hall Boulevard Tigard, OR 97223 OWNER: Various STAFF REPORT CFA 1999-0002 Page 1 COMPREHENSIVE PLAN DESIGNATION: Low Density Residential, Medium Density Residential, High Density Residential, Commercial Professional, Neighborhood Commercial, and General Commercial ZONING DESIGNATION: R-4.5 (Residential, 4.5 units per acre), R-12 (Residential, 12 units per acre), R-25 (Residential, 25 units per acre), R-40 (Residential, 40 units per acre), CN (Neighborhood Commercial), CP (Commercial Professional), and CG (General Commercial) LOCATION: The area is bounded generally by Fanno Creek on the west, SW Greenburg Road and Hall Boulevard on the east, Progress Downs Golf Course to the north, and Highway 217, including the Ash Creek area, on the southern border. APPLICABLE REVIEW CRITERIA: Statewide Goals 1-19; Oregon Administrative Rule 660-12-060; Comprehensive Plan Policies 1.1.1, 2.1.1, 6.1.1, 8.1.1, 8.2.2, 9.1.1, 12.1.1, and12.2.1; Community Development Code Chapter 18.390.060, and 18.390.060(G). SECTION II: BACKGROUND INFORMATION Site History: In 1996, Metro adopted a visionary plan that would limit the expansion of the Portland Metro Area Urban Growth Boundary yet accommodate growth. This regional plan is known as the Metro 2040 Plan. Focusing development and growth in regional centers represented a key aspect of supporting growth of the area and preserving livability. Regional centers are areas containing concentrated business, local government, retail services, and housing served by high-quality transit. The Washington Square area represents one of three regional centers in Washington County and one of seven in the metropolitan region. To ensure that enough housing and employment is located within the urban growth boundary, Metro's Functional Plan requires that local jurisdictions plan for their respective assigned growth targets for jobs and housing. Tigard's assigned target capacity in the Washington Square Regional Center is 9,804 jobs and 1,500 housing units. Washington County's housing density target of approximately 500 housing units is included in Tigard's target, so that the single-family Metzger neighborhood can be preserved. STAFF REPORT CPA 1999-0002 Page 2 Washington Square Regional Center Mixed Use Districts: Mixed Use Employment 1&2, Mixed Use Residential 1&2, and Mixed Use Commercial! With funding from a Transportation & Growth Management (TGM) Grant, a master planning effort was undertaken to define the boundaries of the Regional Center and propose transportation and land use designations intended to reflect a twenty year planning horizon. To assist the planning effort, Tigard City Council appointed a 23 member task force. Task force members represented neighborhoods, schools, businesses, property owners, state, regional, local governments, and public interest groups. The Washington Square Regional Center Task Force directed staff and consultants in the preparation of the land use and transportation development concept of the Washington Square Regional Center. The Task Force met for over a year and was made up of area residents, business owners and developers, and representatives of the Planning Commission, Metro, and the Oregon Department of Transportation (ODOT). The recommendations for the Washington Square Regional Center were intended to not only meet the Metro Design Concept for the Regional Center, but also to meet the neighborhood goals for the area. The vision for the Washington Square Regional Center, as developed with the assistance of the Task Force, is guided by the following: Overall Vision: • The Washington Square Regional Center will be a vital regional center serving the needs of the Washington County residents. • Preserve existing residential neighborhoods. • Offer an innovative transportation service that makes it easy for people to reach their destinations. • Focus on Washington Square Mall as a community resource. • Feature a linked belt green belt of parks and open space easily reached by residents and employees. Guiding Principles-Creation/Preservation of Area Identity: • Reinforce a distinctive regional center while recognizing and respecting the character of the nearby residential community. • Retain and develop quality housing, including affordable housing, for all income levels. • Facilitate transitions from one use to another; for example, to multifamily residential uses. • Preserve and enhance Metzger Park and consider additional parks. • Encourage environmentally friendly development. STAFF REPORT CPA 1999-0002 Page 3 e Try to keep historic trees. • Build for our children; have a sense of stewardship. • Think creatively and be innovative in improving/maintaining quality of life. • Consider market forces and development patterns. Y Maintain and preserve floodplains and wetlands. Government/Institutional Issues: • Consider all political boundaries and facilitate cooperation among jurisdictions. e Maintain neighborhood schools. • identify and reinforce what makes the learning (educational) environment viable. Transportation: Strive for a self-sufficient, connected transportation system. Consider transportation needs for whole study area. 0 Plan for a multi-modal transportation system that accommodates increased auto and non-auto travel needs. i Respect and enhance local street networks and neighborhood livability. O Maintain an acceptable level of service and safety on regional roads, outside the study area. ® Provide good transportation access to the rest of the region. ® Make the community accessible for all people and modes with connections for cars, bikes, pedestrians, and transit. y C Maintain a high level of accessibility within and to the regional center. i i Y Use appropriate street and streetscape design. • Encourage attractive, high quality development. ® Promote long-term viability for the area. Assure infrastructure is available prior to or with development. STAFF REPORT CPA 1999-0002 Page 4 Jill 111111EI 111111milmi r The Regional Center Plan should. • Be understandable to lay people. • Be impiementable within a reasonable, staged period of time. • Help develop a sense of community with a common vision, hope and optimism. • Be based on statistics and facts for population, employment, and other factors. • Use existing resources as much as possible. • Encourage compatible and complementary uses. • Contain solutions to common problems. • Avoid conflict with other regional centers. The resulting plan reflects these guiding principles. The plan was completed and the Washington Square Regional Center Task Force accepted this plan in September of 1999. Vicinity Information: The affected parcels and street system are within the area known as the Washington Square Regional Center. The area is generally bordered by Fanno Creek on the west, SW Greenburg Road and Hall Boulevard on the east, Progress Downs Golf Course to the north, and Highway 217, including the Ash Creek area, on the southern border. It was the consensus of the Washington Square Regional Center Task Force that the Washington Square Regional Study area would include 1,250 acres with Washington Square Mall located in approximately the center of the study area. The total study area includes land within unicorporated Washington County and the City of Beaverton. Site Information and Proposal Description: The site is approximately 1,250 acres in size. The proposed land use actions include amendments to the Comprehensive Plan to update references to the Washington Square Regional Center and include a description of the regional center zones (Mixed Use Employment 1&2, Mixed Use Residential 1&2, and Mixed Use Commercial), update the adopted transportation element of the Comprehensive Plan and amend the Development Code to include a new chapter that addresses development standards in the Washington Square Regional Center. Some of n the zoning shown is outside of Tigard's jurisdiction and adoption of these zoning districts, N transportation linkages, and design standards are recommended to the jurisdictions of Washington County and the City of Beaverton. SECTION III: FINDINGS AND CONCLUSIONS Both the requested Comprehensive Plan amendments and Development Code amendments are subject to the same criteria within the Tigard Municipal Code (see Section 18.30.120). The following staff evaluation and findings are therefore intended to address both the requested amendments to the Comprehensive Plan and amendments to STAFF REPORT CPA 199M002 Page 5 the Development Code. The relevant criteria in this case are Statewide Goals 1-19: Oregon Administrative Rule 660-12-060; Comprehensive Plan Policies 1.1.1, 2.1.1, 6.1.1, 8.1.1, 8.2.2, 9.1.1, 12.1.1,-12.2.1; and Community Development Code Chapter 18.390:060 and 18.390.060(G). STATEWIDE GOALS Citizen Involvement: Goal 1 requires a ci¢.izen involvement program that ensures the opportunity for citizens to be involved in the planning process. Tigard Comprehensive Plan Policy 2.1.1 and Tigard Community Development Code Chapter 18 provide for citizen participation and notice. Notice of the Planning Commission and City Council hearings and opportunity for response were advertised in the local newspaper and request for comments were sent to the Department of Land Conservation and Development. A public hearing notice was mailed out to all property owners within the Washington Square Regional Center, as well as property owners located within 500 feet of the proposed land use action. In 1998, Tigard City Council appointed 23 people to serve on the Washington. Square Regional Center Task Force. Task Force members represented neighborhoods, schools, business, property owners, state, and local governments, and public interest groups. The task force met 17 times between June 3, 1998, and August 18, 1999. All meetings were open to the public and time was set aside on every meeting agenda to solicit public comment. Three public workshops were held. One was held on September 28, 1998; one workshop was held at Washington Square during the day and another at Metzger School in the evening. A second public workshop was held on March 8, 1999, at the Tigard Water Building and a final public open house was held on September 15, 1999, at Metzger Park Hall to present the findings of the Task Force. Metro provided a $10,000 grant to the City of Tigard to supplement the City's public outreach program. This goal is satisfied. Land Use Planning: Goal 2 requires, in part, that adopted comprehensive plans be revised to take into account changing public policies and circumstances. This goal is met because the City has applied all relevant Statewide Planning Goals, City Comprehensive Plan policies and Community Development Code requirements in the review of this proposal. In addition, the proposal is intended to implement the vision for a Regional Center that is expressed in Metro's 2040 Growth Concept and comply with Metro's i Functional Plan. ~ Agricultural Lands: Goal 3 requires, in part, that adopted comprehensive plans be 3 revised to preserve and maintain agricultural lands. This goal is not applicable because a no agricultural lands are involved in this legislative plan and code amendment. Forest Lands: Goal 4 requires, in part, that adopted comprehensive plans be revised to preserve and maintain forest lands. This goal is not applicable because no forest lands are involved in this legislative plan and code amendment. STAFF REPORT CPA 1999-0002 Page 6 Open Spaces, Scenic, and Historic Areas, and Natural Resources: Goal 6 requires, in part, that adopted comprehensive plans be revised to conserve and protect natural resources and scenic resources. This goal is met because the plan protects all resources as follows: 1. Open spaces: Some of the goals of the Washington Square Regional Center Plan are as follows: "[f]eature a linked green belt of parks and open space easily reached by residents and employees and [p]reserve and enhance Metzger Park and consider additional parks." The Washington Square Regional Center supports existing open space protections and identifies the need for 12 additional acres of open space. 2. Scenic resources: This part of the goal is not applicable because no identified scenic views exist in this area. 3. Historic areas: This part of the goal is not applicable because no historic areas are inventoried for the portion of the Regional Center located in the City of Tigard. 4. Natural resources: The City of Tigard has existing regulations protecting natural resources. The Washington Square Regional Center plan is providing an optional development standard to provide incentives to developers to enhance natural resource areas. The following incentive is proposed under 18.630.040(E) of the Washington Square Regional Center comprehensive plan amendments: "Density Requirements for Developments including or abutting riparian setback. Notwithstanding the density requirements in Table 18.630.2, the maximum density and floor area ratio for developments that include or abut riparian setbacks shall be no greater than 110 percent of the minimum residential density and floor area ratios in all Mixed Use Zones, except when the following are met: 1. Wetlands within the development are expanded or enhanced in conformance with the Oregon Division of State Lands Wetlands Restoration and Enhancement Program, and if applicable 2. Fish Habitat within the development is enhanced in conformance with the Oregon Division of State Lands Fish Habitat Enhancement Program, and if applicable 3. The overall flood storage capacity of the 100-year floodplain within the development is increased by 10 percent." Air, Water, and Land Resources Quality: Goal 6 requires the maintenance and improvement of the quality of air, water, and land resources of the state. The City of Tigard complies with this goal through its adopted comprehensive plans and policies regarding water resources (Tigard Comprehensive Plan Volume II, Chapter 4 and Tigard Development Code standard: 18.7 97). Natural Disasters and Hazards: Goal 7 requires the maintenance and improvement of the quality of the air, water, and land resources of the state. This City of Tigard has existing regulations that address natural disasters and hazards. Washington Square Regional Center Plan does not affect these provisions. Recreational Needs: Goal 8 requires that the recreational needs of the citizens of the state and visitors and, where appropriate, to provide for the siting of necessary STAFF REPORT CPA 1999-0002 Page 7 Balm LM M, recreational facilities including destination resorts. This goal is not applicable because no recreational issues or destination resort issues are involved. Economic Development: Goal 9 requires. the provision of adequate opportunities for a variety of economic activities. This goal has been met because the plan continues to promote opportunities for a variety of economic activities vital to the health, welfare and prosperity of Tigard citizens. The mix of uses will encourage a diversity of development with emphasis on employment based uses. During the planning process for the Washington Square Regional Center, consultants performed an analysis of development and redevelopment opportunities in the study area. The study shows that approximately 170 acres of land will be needed over the next 20 years to accommodate the development densities outlined in the Washington Square Regional Center Plan. The report summarizing these opportunities is attached to this staff report. Please refer to exhibit A. Housing: Goal 10 requires that plans shall encourage the availability of adequate numbers of needed housing units at various price ranges and rent levels and allow for flexibility of housing location, type and density. The new Mixed Use Residential 1&2 zones will encourage higher density housing than currently exists. Mixed Use Residential 1 will require a minimum residential density of 50 units per acre and Mixed Use Residential 2 will require a minimum residential density of 25 units per acre. The existing commercial and commercial professional zones do not allow opportunities for residential development with the commercial and office development. The new zoning will provide provisions that allow retention of existing residences thereby preserving affordable housing, while still providing the opportunity for high-density housing. Goal 10, Housing, is, therefore, met because the proposal provides for additional housing opportunities as called for both in the City's Comprehensive Plan and the Metropolitan Housing Rule, in addition to the Metro 2040 Plan. One of Washington County's strategies to meet their required housing densities recommended that the area in unincorporated Washington County be rezoned from R-5 to R-40 to comply with Metro residential growth targets. The Task Force is recommending that the single-family zoning remain and that Washington County's share of the Washington Square Regional Center residential growth targets be located elsewhere within the Washington Square Regional Center, threreby preserving an existing single-family neighborhood. The analysis of available land done by the consultants confirm that additional dwelling units can be accommodated elsewhere within the Regional Center. Public Facilities and Services: Goal 11 requires planning and development of timely, orderly, and efficient arrangement of public facilities and services to serve as a framework for urban and rural development. Because the Washington Square Regional Center plan includes the adoption of a transportation system plan and parks and open space plan to support the proposed land uses, this goal is satisfied. Street and utility improvements are addressed in Chapter 18.810 of the Tigard Development Code. Transportation: Goal 12 requires a safe, convenient and economic transportation system. The Washington Square Regional Center Transportation Plan has been STAFF REPORT CPA 1999-0002 Page 8 extensively analyzed to evaluate the impacts that the proposed new zoning categories would have on transportation systems. The project team has worked closely with the Washington Square Regional Center Task Force, has reviewed the draft Regional Center Plan and past traffic studies for proposed development projects in the study area, and has conducted a planning analysis of the 2020 traffic volume forecasts for the area-wide roadway system. Although traffic will be increased with the development of the proposed Washington Square Regional Center, the traffic studies show that traffic congestion will exist in the future with or without the proposed land use changes. The proposed mixed-use zones will create the potential to capture some of the auto trips going in and leaving the Regional Center. The Washington Square Regional Center Plan proposes to improve the transportation through the following improvements: work with regional partners to develop a commuter rail system; improve transit both to and within the regional center; improve local street connections; improve sidewalks and bike lanes; and widen key regional streets. In addition, the proposed transportation improvements as part of the Regional Center plan include a series of pedestrian/bicycle improvements that will increase the . ability to use alternate modes of transportation. Attached is a summary of proposed transportation improvements for the Washington Square Regional Center area (please refer to exhibit B). This memorandum describes the final evaluation of alternatives for motor vehicle, bicycle, pedestrian, and transit travel modes, and describes a recommended Transportation Master Plan for the Washington Square Regional Center. One of the recommendations of the transportation element of the Washington Square Regional Center is to eventually widen Hall Boulevard to five lanes. The Metro Regional Transportation Plan shows that Hall Boulevard will need to be widened to five lanes to accommodate traffic in the area over the twenty year planning horizon. The Washington Square Regional Center recognizes that the Regional Transportation Plan calls for expansion of Hall Boulevard to five lanes; however, the task force endorses an expansion to three lanes while acquiring right of way for a five lane roadway. This goal is satisfied because the total projects outlined above will create a transportation system that can support the proposed land use changes. Energy Conservation: Goal 93 requires that land and uses developed on land shall be managed and controlled so as to maximize the conservation of all forms of energy, based upon sound economic principles. The proposed Washington Square Regional Center design concept would allow the opportunity to build residential development in commercial and industrial areas and, therefore, create the opportunity for people to live in close proximity to work and/or shopping. In addition, the transportation improvements proposed outline a series of bicycle/pedestrian improvements that will increase the alternate modes of travel. This goal is satisfied. STAFF REPORT _ CPA 1999-0002 Page 8 r Urbanization: Goal 14 requires orderly and efficient transition from rural to urban land use. This goal is not applicable because urban growth boundary issues are not involved. Willamette River Greenway: Goal 15 requires protection, conservation, and enhancement of lands along the Willamette River as the Willamette River Greenway. This goal is not applicable because Willamette River Greenway issues are not involved. Estuarine Resources: Goal 16 requires recognition and protection of the unique environmental, economic, and social values of each estuary and associated wetlands and, where appropriate, protect, maintain and restore the long-term environmental, economic, and social values diversity and benefits of Oregon's estuaries. This goal is not applicable. Coastal Shorelands: Goal 17 requires conservation, protection, and, where appropriate, restoration of coastal shorelands. This goal is not applicable. Beaches and Dunes: Goal 18 requires conservation, protection, and, where appropriate, restoration of coastal beaches and dunes. This goal is not applicable. Ocean Resources: Goal 19 requires conservation of the long-term values, benefies, and natural resources of the nearshore ocean and the continental shelf. This goal is not applicable. COMPLIANCE WITH FEDERAL AND STATE STATUTES OR GUIDELINES Oregon Administrative Rule: Section 660-12-060 states that plan amendments which significantly affect a transportation facility shall assure that allowed land uses are consistent with the identified function, capacity, and level of service of the facility. Section 660=12-060 of the Transportation Planning Rule requires that amendments to rim acknowledged comprehensive plans and land use regulations which may significantly affect a transportation facility shall assure that allowed land uses are consistent with the identified function, capacity and level of service of the facility. Plan or regulation amendments significantly affect a transportation facility if it changes the functional classification of a i transportation facility; changes facility standards, creates levels of service which are inconsistent with the functional classification of the facility, or would reduce the level of service below the minimum acceptable. i i The list of projects outlined in the Transportation Element of the Washington Square Regional Center Plan will create a functional transportation system that can support the proposed land use changes, and this plan is compatible with Metro's Functional Plan Goals and Policies, and Metro's Regional Transportation Plan. COMPLIANCE WITH COMPREHENSIVE PLAN POLICIES STAFF REPORT CPA 1999-0002 Page 10 General Policies: Policy 1.1.1(a) requires that legislative changes are consistent with statewide planning goals and the regional development plan. The proposal is consistent with statewide planning goals as addressed above under 'Statewide Goals'. The proposal conforms with the applicable portions of the Metro "Urban Growth Management Functional Plan" that was approved for adoption on October 24, 1996, by the Metro Council. The "Growth Concept" map associated with the Functional Plan indicates this area as a "Regional Center". Since most of the concept area for the proposed Washington Square Regional Center is located within the City of Tigard, we took the lead in developing the plan for this area. The Metro Framework Plan has the following description: "These regional centers would become the focus of compact development, redevelopment and high-quality transit service, multi-modal street networks and act as major nodes along regional through routes. The Growth Concept estimates about 3 percent of new household growth and 11 percent of new employment growth would be accommodated in these regional centers. From the current 24 people per acre, the Growth Concept wouid allow for about 60 people per. acre (Regional Framework Plan, pp. 17-18, December 11, 1997)." Citizen Involvement: Policy 2.1.1 states that the City shall maintain an ongoing citizen involvement program and shall assure that citizens will be provided an opportunity to be involved in all phases of the planning process. The Planning Commission and City Council hearings were legally advertised. The meetings of the Washington Square Regional Center Task Force were open to the public and time was provided during each meeting for the public to make comments. Public workshops and open houses were held during the planning process for the Washington Square Regional Center. Notice was sent of the workshops to property owners within 500' of the study area to ensure that they had the opportunity to learn about our planning process and to participate in it. Metro provided the City with a $10,000 grant to help facilitate an extensive public involvement program. Housing: Policy 6.1.1 requires the City shall provide an opportunity for a diversity of housing densities and residential types at various prices and rent levels. This policy is primarily implemented through OAR 660-07, the Metropolitan Housing Rule. The rule requires that the City maintain sufficient residential buildable land to provide the opportunity for at least 50% of new units to be attached single family or multi-family housing and to provide for an overall density of ten units per acre. The City is currently in compliance with this rule. The proposed Washington Square Regional Center design concept will encourage a variety of housing types including single-family detached, duplexes, fourplexes, rowhouses, and new multi-family developments. Transportation: Policy 8.1.1 requires the City to plan for a safe and efficient street and roadway system that meets current needs and anticipated future growth and development. The list of projects outlined in the Transportation Element of the Washington Square Regional Center Plan will create a functional transportation system that can support a safe and efficient roadway system that meets current needs and anticipated future growth. Transit: Policy 8.2.2: THE CITY SHALL ENCOURAGE THE EXPANSION AND USE OF PUBLIC TRANSIT BY: STAFF REPORT CPA i999-6602 Page i 1~ a. LOCATING LAND INTENSIVE USES IN CLOSE PROXIMITY TO TRANSITWAYS; The Washington Square Regional Center Plan encourages the development of intense land uses in close proximity to existing bus lines in Washington Square, on Greenburg Road, on Hall Boulevard, and in proximity to the proposed commuter rail station. b. INCORPORATING PROVISIONS INTO THE COMMUNITY DEVELOPMENT CODE WHICH REQUIRE DEVELOPMENT PROPOSALS TO PROVIDE TRANSIT FACII-(TIES; AND The existing development _ Ae addresses the provision of transit facilities c. SUPPORTING EFFORTS BY TRI-MET AND OTHER GROUPS TO PROVIDE FOR THE REEDS OF THE TRANSIT DISADVANTAGED. Tri-Met has been involv,.;d in the development of the Washington Square Regional Center Plan and the City continues to work with Tri-Met on issues of the transit disadvantaged. Energy: Policy 9.1.1: THE CITY SHALL ENCOURAGE A REDUCTION IN ENERGY CONSUMPTION BY INCREASED OPPORTUNITIES FOR ENERGY CONSERVATION AND THE PRODUCTION OF ENERGY FROM ALTERNATIVE SOURCES. The Washington Square Regional Center Plan will encourage reduction in energy consumption by allowing the opportunity for housing to be located in close proximity to jobs and transit. Locational Criteria: Policy 12.1.1: THE CITY SHALL PROVIDE FOR HOUSING DENSITIES IN ACCORDANCE WITH: a. Applicable Plan Policies; The Washington Square Regional Center Plan is creating mixed-use zones that will allow high-density esidential zones and plan policies regarding these zones to address the goals of Metro 2040. b. Applicable Locational Critieria; 4. Medium-High Density and High Density Residential A. The following factors will be the determinants of the areas designated for high density on the plan map: (1) Areas which are not committed to low density development; One of the goals of the Washington Square Regional Center Plan is to preserve existing residential neighborhoods which is why the City is recommending to Washington County to leave the Metzger neighborhood with its existing single-family zoning. Areas proposed for higher density zoning are located next to or within existing commercially zoned area. (2) Areas which can be buffered from low density residential areas in order to maximize the privacy of established low density residential areas; f The existing development code has buffering standards. One of the goals of the Washington Square Regional Center Plan is to facilitate transitions from one use to another, for example, multifamily residential uses, which is why the higher density zones will be located closer to existing commercially zoned areas. (3) Areas which have direct access from a major collector or arterial street; s The Washington Square Regional Center Area is surrounded by collector and arterial streets such as, Hall Boulevard, Scholls Ferry Road, and Highway 217. In addition, the transportation element of the plan includes new collector streets to support existing and new development. (4) Areas which are not subject to development limitations; The existing Tigard Development Code addresses issues of site development limitations. (5) Areas where the existing facilities have the capacity for additional development; STAFF REPORT CPA 1999-0002 Page 12 1111MI 1211111111 M11 I The transportation element of the Washington Square Regional Center plan adds transportation improvements to the existing comprehensive plan to support existing and new development and land use-densities. (6) Areas within one-quarter mile of public transit; Bus lines exist to serve Washington Square Mall, on Scholls Ferry Road, and on Greenburg Road. In addition, commuter rail is being studied that will run through the Regional Center. (7) Areas within one-quarter mile from neighborhood and general commercial shopping centers or business and office centers; and Washington Square Mall, Burlington Plaza on Cascade Avenue, and Lincoln Center are located within the Regional Center. (8) Areas adjacent to either private or public permanent open space. The Greenway Park area is located next to the Regional Center and the plan identifies the need for additional open space in the regional center, as part of one of the implementation strategies. B. The following factors will be determinants of the density ranges allowed in the medium-high and high density planned areas should the City adopt more than one high density zone: (1) The topography and natural features of the area and the degree of possible buffering from established low density residential areas; One of the goals of the Washington Square Regional Center Plan is to preserve the existing single-family character of the Metzger neighborhood. In addition, Tigard's existing development code standards address issues of land use compatibility and buffering. (2) The capacity of the services; The transportation element of the Washington Square Regional Center plan adds transportation improvements to the existing comprehensive plan to support existing and new development and land use densities. In addition, the Tigard Development Code has a section that addresses public service and utility improvements. (3) The distance from public transit; and Bus lines exist to serve Washington Square Mall, on Scholls Ferry Road, and on Greenburg Road. In addition, commuter rail is being studied that will run through the Regional Center. (4) The relationship of the site to existing neighborhood and general commercial centers and office and business centers. One of the goals of the Washington Square Regional Center Plan is to preserve existing single-family neighborhoods, to facilitate transition of land uses, and to reinforce a distinctive Regional Center while recognizing and respecting the character of the nearby residential community. Policy 12.2.1 NEW COMMERCIAL ZONES a. PROVIDE FOR COMMERCIAL DEVLEOPMENT BASED ON THE TYPE OF USE, ITS SIZE AND REQUIRED TRADE AREA The new commercial zones will not differ significantly from existing commercial uses in the City plan and code, except for that they will allow a mix of commercial and residential development. b. APPLY ALL APPLICABLE PLAN POLICIES Exhibit C is the attached plan policies that will be added to the City's plan regarding the new Hill Mixed-Use Commercial areas. C. APPLY THE APPROPRIATE LOCATIONAL CRITERIA APPLICABLE TO THE SCALE OF THE PROJECT. STAFF REPORT CPA 1999-0002 Page 13 Exhibit C is the attached plan policies that will be added to the City's plan regarding the new Mixed-Use Commercial areas. PROVISION OF ADDITIONAL OR REVISED COMPREHENSIVE PLAN LANGUAGE Certain Comprehensive Plan language will require amendment or additional language to address the proposed Washington Square Regional Center Plan. Exhibit C includes the specific language from the Comprehensive Plan that requires amendment. COMPLIANCE WITH COMMUNITY DEVELOPMENT CODE SECTIONS: Procedures for Decision Making: Legislative: Chapter 18.390.060 establishes procedures for consideration of legislative and quasi-judicial changes to the provisions of the Comprehensive Plan, implementing ordinances and maps. Section 18.30.390`G) lists the factors upon which the Planning Commission and City Council shall base their decisions. The factors and responses are as follows: 18.390.060 TYPE IV PROCEDURE This land use action involves legislative and quasi-judicial amendments therefore, as per Type IV procedures a two hearings one before the Planning Commission and one before the City Council were held. Notice of the hearings was given to property owners within 500 feet, as well as to affected government agencies. G. Decision-Making Considerations: The recommendation by the Commission and the decision by the Council shall be based on the following factors: 1. The Statewide Planning Goals and Guidelines adopted under the Oregon Revised Statutes Chapter 197; These standards are addressed in Section II under'Statewide Goals' in this staff report. 2. Any federal or state statutes or regulations found applicable; The State's Transportation Planning Rule is addressed in Section IV under 'Compliance with Federal and State Statutes or Guidelines'. 3. Any applicable METRO regulations; In 1996, the Functional Plan designated the Washington Square Mail and the area around it as a regional center; an area of intense commercial, office, retail, and residential development. Under the 2040 plan, Tigard is required to demonstrate how it can comply with the concepts demonstrated under the 2040 plan. This proposed plan will define how we can accommodate the expected growth, and prevent the Metzger area from the necessity of upzoning. Please refer to exhibit C for the Washington Square Regional Center Plan Amendments and Zoning Ordinance. 4. Any applicable comprehensive plan policies; and These standards are addressed under 'Compliance with Plan Policies" in this staff report. 5. Any applicable provisions of the City's implementing ordinances. The implementing ordinances are contained in the Tigard Community Development Code, which are addressed in this section of the staff report. STAFF REPORT CPA 1999-0002 Page 14 EXHIBITS: EXHIBIT A: Washington Square Development & Redevelopment Opportunities Memorandum EXHIBIT B: Washington Square Regional Center Transportation Plan EXHIBITC: Washington Square Regional Center Comprehensive Plan Amendments and Zoning Ordinance STAFF REPORT CPA 1999-0002 Page 15 r t n r et uu U4:14p John G. Spencer j (503) 292-2723 p.2 EXHIBIT A - FINAL ORDER WASHINGTON SQUARE REGIONAL CENTER) - AS ATTACHED .e. a TO ORDINANCE NO. 00-18 A REGIONAL CENTER STUDY ® • CITY Of TICARD 13125 SW HAM Blvd. Tigard Oregon 87223 Plane 503.639.4171 Fax 503.684.7297 T A S K F O R C E lw~ft hii°pdMagerSd od TomAnfiec WASHINGTON SQUARE REGIONAL CENTER We#:gaa, ~ Adm'ri>r-afor C-Stc"ecawt-7 DEVELOPMENT and yo REDEVELOPMENT OPPORTUNITIES Ov,;d o~aaa~t ran~dr~c.~ Final Task Force Development Allocations Task Force Mceting of February 17, 1999 coon ~,&S, p, n March 24, 1999 JonK%ij, 4 M1P~a« oon Waft A~aiation dOregn Raj and TiicitAdaoxc (!"don M14Pd( tynfvkaoY&Aroriacs Adele hk.vmrt VV~~Ca~ try~nc . Fm N.3A %-d M,,,- ntMzadodrMvn Pms; a dOTAx skwPape Mcag-fts--N Ndc Rordort waa,~gsu^St.~n4,e R'adcSatq r~fOt4/!\ldccrme Font.-a Sods G.-ft,.0,yC .n:i Tod Spare Ted C6- a-sa-rt Caiavc fcxSncilc ' Tiare;rxtYion P.KtNe:K, (AR,.vatixt 4 M Ka. WJ..ti fltnl l Lrrii 6Cu~rii sin NEI ,Mar 24 99 04:14p John C. Spencer 1' (5031 282-272i' P.3 • , IINTRODUMON This summary report contains the results of data collection and analysis of land uses and vacant lands within the Washington Square Regional Center study area, an assessment of development potential within the area, and a development allocation scenario which describes the year 2020 condition. Mapping of a variety of features within the study area was undertaken by the City of Tigard. Data from Metro, Washington County, City of Beaverton and the City of Tigard was utilized, and field surveys and aerial photo checking was undertaken to verify information. Specific information on vacant land and redevelopment potential was verified with property owners, residents and business interests in the study arcs. EXISTING CONDMONS The Washington Square Regional Center study area includes lands within the City of Tigard, City of Beaverton and in unincorporated Washington County. Approximately 1,074 acres exclusive of public rights-of-way are included within the study area. The area is shown on the attached figure. Table 1 summarizes land area including vacant lands within each of five sub-areas established for study purposes. Table 1 WASHINGTON SQUARE REGIONAL CENTER STUDY Existing Conditions Sub-Area A Sub-Area B Sub-Area C Sub-Area D Sub-Area E Total (Acres) E217- Green. N. Locust S. Locust W217-S.Scliolls W217-N.Scholls (Acres) (Acres) (Acres) (Acres) (Acres) Gross Area 895.4 153.0 216.0 168.7 351.0 1784.1 Net Area 537.2 91.8 129.6 101.2 210.6 1070.5 Public 186.2 0.0 6.5 0.0 0.0 642.3 Vacant 4.3 8.9 20.2 7.3 4.3 44.9 Sauce: City of Tigard and Spencer & Kupper Sub-Area A is bound by Hwy. 217 on the west, SW Greenburg Road to the east and includes the Progress Downs Golf Course to the north. Area B lies east of SW Greenburg Road to SW Hall Boulevard and SW Locust Street. Area C is south of SW Locust Street between SW Greenburg Road and SW Hall Boulevard to Hwy. 217. Areas D and E lie west of H%vy. 217 to Fanno Creek. Area D is south of SW Scholls Ferry Road, area E north, Approximately 4.2 % of the net land area within the study area is vacant. Development and Redevelopment Opportunities Page 2 March 24, 1999 man 3 star G4 bu U4:14p John C. Spencer 1•(5031 282-2723 p.4 • f: awns NORTH (HOT TO SC/U.Ja Samoa" ftn. a 17 H 210 W • ~ ~ W C c~ z ab - °z ~y WASHINGTON Z > T oP SQUARE sw eo ER ST °O MALL V a SW LEHWN ~s ST `~s y~ 4 l m SW C OR t SW LANOAM ST v SQUARE RD t LOCUST ST SW OAK ST' SW OAK ST SW PINE ST 9~ ASH _ CR~K i ~ SW SPRUCE ST 'QLy w ~ 0 0+ m ~ ~"n~ 217 vii a a' r ' ~~~6UR SW PFAFFLE ST • II % t 1{6OIKt C01"M CW04 CITT Or TICARO SITE VICINITY MAP WASHINGTON SQUARE REGIONAL CENTER FtGUR£ TIGARO OREGON ' OCTOBER 1998 02.1.F. .Mar 24 SS 04:15p John C. Spencer 1.(5031 262-2723 p.5 ' DEV7EL,OpM EN T AND R EDEVELOPbffNT OPPOR'TUNTT1lES All lands within the study area were evaluated as to their future developuMat or redevelopment capacity over a twenty year time frame (2020). Table 2 summarizes the analysis for each sub- district. Lands identified as having future development or redevelopment capacity are currently vacant, have infill opportunity, have redevelopment opportunity, or are currently used as large (greater than one acre) surface parking lot. Each of these categories is defined in the table. The vast majority of had available to accommodate future growth within the study area will be in the form of redevelopment of existing structures, and infill on sites currently utilized for surface parking lots. The'assumptions used to determine had available is these two categories were developed with property owners and development interests knowledgeable of the study area. Over the next twenty years, approximately 192 acres of land area will be available to accommodate employment and residential growth within the study area. , 1 , , i Development and Redevelopment Opportunities Page 3 March 24. 1999 1111=1 Emil Mar 24 93.04:15p John C. Spencer 1 (5031 2182-2723 p-G Table 2 WASHINGTON SQUARE REGIONAL CENTER STUDY Developmene and Redevelopment Opportunity Sub-Area A Sub-Area B Sub-Area C Sub-Area D Sub-Area B Total (Acres) E217- Green. N. Locust S. Locust W217-S.Scholls W217-N.Scholls (Acres) (Acres) Acres Aces) (Atxes Vacant 4.3 8.9 20.2 7.3 4.3 44.9 Ltfill 1.0 9.9 5.7 16.6 opportuniv Redevelopment 11.4 2.2 20.6 14.9 20.1 69.2 Opportunity' Parking Lot 22.2 4.4 5.8 - 6.4 38.7 Redevelopment' Potential 14.7 29.3 44.0 Commercial Redevclopmeat' Gross Totals 38.9 20.9 $0.9 42.7 60.2 213.5 -7 ~7 "1VA- Source: City of Tigard and Spencer & Kupper Parcel is completely vacant or contains a small shed or similar small structure. Parcel appears large enough to accommodate additional dwelling units or businesses- 3 Value of improvements is.generally less than value of parcel, and/or a large portion of the parcel is used for outdoor storage or parking. 4Assumcs for surface parking lots in the vicinity of Washington Square Mall (A): 500/a of existing area to remain surface parking; half of the remaining area (25% ortotal) available for redevelopment, the remaining area used for structured parking Total existing surface parking lots = 88.75 acres. For surface parking lots west of 1- 217 (D and E) assume that 501/a are available for redevelopment. For surface parking lots in the vicinity of Lincoln Center (C), assure 75% arc available for redevelopment. 'Far existing light industrial/contmereial areas west of 1-217 (D and E), 25% of the total developed area available for redevelopment Total existing area is 175.99 acres. aNct total = 90% of Gross Total Development and Redevelopment Opportunities Page 4 March 24, 1999 .Mar 24 SS 04:16p John C. Spencer i-(503) 262-2723 p.7TARGET GROWTH FOR THE REGIONAL CENTER The Metro Urbrnr Growth Mawyement Functional Plan', 1996 establishes target growth capacity for each jurisdiction in the region- City of Tigard W/in Mixed-Use Areas Dwelling Unit Capacity 6,073 Units 981 Units Job Increase 14,901 Jobs 8,026 Jobs These growth targets for mixed-use areas were used for planning purposes to develop future growth scenarios for the Washington Square Regional Center study area. The Regional Center Task Force has had several work sessions evaluating options and refining a desired development scenario. Both the target employment and dwelling unit assumptions for the most recent scenarios are higher than the figures noted above for mixed-use areas to reflect that the study area includes areas within the City of Beaverton and unincorporated Washington Counry as well as the City of Tigard. Table 3 summarizes a development scenario for the Washington Square Regional Center, The scenario is based on accommodating the following job and housing targets: Growth Scenario Summary: 1998-2020 Employment: 9,804 jobs Retail: 1,188 jobs Office: 8,436 jobs Lodging: 180 jobs Housing: 1,500 units Residents: 2530 people Estimates were made of needed building area to accommodate both employment types and housing, and land needed for parking at target parking ratios. Two scenarios were then identified, which represent "bookends" as to the amount of land needed within the study area to accommodate the growth targets. j The Mgh Density Scenario assumed high floor area ratios (FAR ratio of building area to site i area) and residential densities, mixed-use buildings, and also assumed that new parking would be predominantly constructed in parking structures. Approximately 120 acres would be needed. The Moderate Density Scenario assumed floor area ratios and housing densities within the range j that exists in the study area today, and also assumed that most new parking would be constructed on surface parking lots. Approximately 220 acres would be needed. 1 Table I-Target Capacity for Housing and Employment Units-Year 1994"-2017, Urban Growh APyin emenl Function ai 1 Plan, Metro, 1996. Development and Rodevelopment Opportunities Page 5 March 24. 1999 i II IS II III ~7 ~•L n~ N 1'Y `1 L-EG~IL .a m Not to Y o R ,f able 3cenarto r p`L CB g°tce tJ A~ .R'~G1'pI`t .Pask a+ 1999 S NGTGN SQ, ~ebtut ry 17: Mewl pment gcena~°. 15,os4 i~ ~ 1 ent: 5014 ~xistinB nts 1178 0 Residc x gxistin~ S~amUnts 1114 + a i 504 jd°s gyasGnB MF~TJnits c n ' Assu~Ptwns fatget o h 9 ~ ~eDe ; ena~ ~ ~mpl°yment: 7asg"t 9436 jobs stin6 M Lattd 'm o Retyi retail Barg et 180 job' nsity Scennci° A~ n 'gin3 T et 2530 ~°Ple ugh fle Goss g1d& f & a Residents Tget 1500 units NS d~ Met (SF) pet>si ft Etousiag' et Spy°s tdS. Av8 0.6 88 8 ~atg patkin8 t;coss15,1 F pctes paxlcsng ~umbec ,o A~ (SF) pensi 2,319,400 Landtise ~~e~(t8F) Ryti°s4 (SF) 2 0 54.6 0.3 54.5 t 4,155195 ?12800 2 A35,895 21.1 6.5 6,960 2.0 1.0 3.0 1,835.460 285,000 r 2,119, 900 3,10S 1122,660 2'0 3.3 60.0 ~u+empi0y 4.5 ~275Srtemp 712,5p0 255,000 25~V1 N Reuel n t 0 300 1,650,000 A 30.0 600SFtemp 285,011 2,431,500 50~~ 33'7 781,500 221.5 CD 2 250 N MOMS 450 SF 1,650000 4,461.100 a 120.6 W 1~usin8• 1500 muu @ 1 911 13155 1104' 12,711 4,346,05 'OalFacking~`b°S' 4at~ 4,961,100 1990, ~aaeMettoRe~ Totals tDen~t`1 Stud9+ xen~ use pet M.etto Empl,od 1, analwousm%PeC unit. ~~ploy~ie~i1 dens and retail pet 1000 SF yetage persons pet 1~°e~0ld• ,ice, employzn ace 7 a +0350 svpatlanB d patkin$ es 1. ~ atktn~ ark acres needed. psstlm ' ltln c1 des ~~~uted p 2.06j1000 = P un k 0.32 lobs X sta. people 1 Mar 24 SS 04:17p John C. Spencer 1[5031 282-2723 S P- Table 4 shows a refimed development program for the study area by sub-area. This program provides for the same target employment and housing as do the scenarios describod in Table 3. Sub-Areas A and C are assumed to dcvelop at higher densities than the rest of the study area. These sub-areas include the areas around the Washington Square Mall and the Lincoln Center office complex. Sub-Areas B, D and E are assumed to develop at intensities more moderate, but generally greater than existing intensity in these areas. Density assumptions are summarized below: Land Use: High 1kna:ty: Moderate Density: Office @ FAR 1.25 @ FAR 0.6 Retail @ FAR 0.6 C FAR 0.3 Lodging @ FAR 1.0 @ FAR 1.0 Housing @ 50 DU/Acre @ 25 DU/Acre This refined development program will require approximately 170 acres over the next 20 years. Table 4 shows the amount of net land available for development within each sub-area. Adequate development and redevelopment capacity exists within the study area as a whole to accommodate development at densities assumed in Table 4. Sub-Area B is shown to need approximately two additional acres to accommodate the growth allocated to this area. It is anticipated that that growth will likely occur in adjacent sub-areas. The analysis shown in Table 4 is for general planning purposes only. More detailed analysis of zoning capacity will be required to refine ultimate development allocations. i Development and Redevelopment Opportunities PW 7 Niarch 24, 19' 9 _Uri Lill LUI 1 1 0 1 rur •r a Table 4 WASHINGTON SQUARE REGIONAL CEN'T'ER Proposed Development Program C Final Task Force Development Allocations " e -c Growth Summary Employment: 9,804 jobs Retail: 1,188 jobs r_ Office: 8,43 6 jobs j Lodging: 180 jobs Housing: 1,500 uluts r Sub-Area A Sub-Area B Sub-Area C Sub-Area D Sub-Area E. Totals -Vo (High Density) (Moderate Tensity) (High Density) (Moderate Density) (Moderate Density) A n Avg Job✓ Aces Avg Job✓ Aces Avg lobe/ Acres Avg Job✓ Aces Avg. Jobs/ Acres Avg Jobs/ Aaw Lhiu t3nae tleite uvu Lbb Units Units LW" Unite LIMA tbul:s 7 Moo 460 1673 8.4 200 727 7.7 460 1673 8.4 400 1453 15.3 goo 2909 30.6 2320 8436 70.5 RCUU 400 667 13.3 30 83 3.8 75 125 2.9 73 125 5.7 113 leg 8.6 713 list 363 Lodging 0 0 150 90 3.3 75 45 1.6 73 43 1.6 0 0 300 180 6.3 Housing 300 300 6.0 130 130 6.0 450 430 9.0 400 400 16.0 200 200 8.0 1300 1300 45.0 Parke 2 2.0 0 0.0 8 8.0 0 0.0 2 2.0 12 12.0 'foul 31.8 20.8 30.0 32.7 59.2 170.4 ~ Na tad 35.0 18.9 45.8 38.4 34.1 192.2 N Avsilsble O Source: Spea_'+et & Kuper Co Avere`e Unlu: Reh DaWty Moderate Dauity. i N Office (X 1000 Ntwe feet): 275 SFletup. e FAR 1.25 Q FAR 0.6 t tV Retail (X 1000 sq o feet); 600 SFleap. Q FAR 0.6 Q FAR 0.3 Lodgag (Nmmber of rooms): 0.6 ear/room @ FAR 1.0 Q FAR 1.0 Housing (Number of uniu): Q 30 DU/Acre Q 25 DU/Ace N Paka (Acres) W I r O I . EXHIBIT B - FINAL ORDER (WASHINGTON SQUARE REGIONAL CENTER) - AS ATTACHED TO ORDINANCE NO. 00-18•. KITTBLSON & ASSOCIATES, INC. TRANSPORTATION PLANNING/TRAFFIC ENGINEERING 610 SW ALDER, SWTE 700 • PORTLAND, OR 97205 (503) 228-5230 FAX (503) 273-8169 MEMORANDUM To: Laurie Nicholson, City of Tigard cc: Lidwien Rahman, ODOT John Spencer, Spencer & Krupper From: Beth Wemple, Justin Jahnke, & Judith Gray, Kittelson & Associates, Inc. Date: June 25, 1999 Project: Washington Square Regional Center, KAI Project.#2879 Subject: Transportation Master Plan - Deliverable 2B This memorandum describes the final evaluation of alternatives for motor vehicle, bicycle, pedestrian, and transit travel modes, and describes a recommended Transportation Master Plan for the Washington Square Regional Center. BACKGROUND Transit, Pedestrian, Bicycle Transportation Opportunities to improve multi-modal access to/from and within the Washington Square Regional - Center were evaluated in a separate memorandum (Alternative Transportation Modes) regarding bicycle, pedestrian, and transit facilities. Existing deficiencies in transit, pedestrian, and bicycle access were identified. Several potential treatments were described aimed at providing a safe and efficient transportation system for all travel modes in the Washington Square Regional Center. Motor Vehicle Transportation Three alternative transportation system concepts were developed to meet future motor vehicle demand in the Washington Square Regional Center. These concepts were described and evaluated in detail in a previous Technical Memorandum (Transportation System Improvement Alternatives). The following briefly repeats the three initial concepts: Alternative A was designed to test the effect of a series of regionally significant transportation system treatments, which either provided alternate routes through the area for regional traffic, or improved the capacity of existing congested corridors. The specific treatments tested under Alternativf3 A include: • Alternate northbound Highway 217 ramp arrangement at Hall Boulevard. • New over-crossing of Highway 217 from Locust Street. • New corridor connecting Greenburg Road south of Highway 217, to Hall Boulevard west of the existing Nimbus Avenue intersection. • Neighborhood circulation roadway Alternative 13 was developed to test the effect of a series of locally significant transportation system treatments, which primarily provided alternate connections for Washington Square Mall \\K17' rvX\WKK\ProjldcV8mfUrl'UKIUm-2b.doc Ell ai Washington Square Regional Center TeGrnlcat Memorbvadum Jane 25, 1999 Recommended TranspoeW tI'on Master Ptan traffic to access the regional transportation network It was expected that this could assist in reducing predicted congestion on critical. regionally significant locatiotts in' the study area, /particularly Hall Boulevard. Specific elements of Alternative B include: Highway 217 Over-crossing from Washington Square Highway 217 Over-crossing from Locust Street alignment 45 Neighborhood Circulation Roadway Under Alternative C, a new roadway connection to the Washington Square Mall from SW Hall Boulevard ('immediately north of Highway 217) would be provided to relieve congestion on SW Locust Street and SW Hall Boulevard east of the Washington Square Mall. ALTERNATIVE TRANSPORTATION SYSTEM ELEMENTS Following the evaluation of the three alternative motor vehicle system concepts, components of the system concepts were identified as potential elements of an improved transportation system. The project team isolated individual components of the Alternatives A, B, and C as elements of a single master plan integrating regional and local transportation improvements. The individual elements are listed below along with the findings of the evaluation by the task force and project team. Pedestrian, bicycle, and transit system treatments are listed as well. Nimbus Bus Service Incorporate bus service to serve employees in the Nimbus office developments. This new service was identified in Tri-Met's Transit Choices fur Livability study and is expected to be implemented withine-one-to-five year time frame. ➢ RECOMMENDED Sidewalks on Greenburg (Sub-Area A) Provide sidewalks on the west side of Greenburg Road adjacent to the Mall as development occurs. Treatment Evaluation Provision of sidewalks on Greenburg Road is consistent with State Transportation Planning Rule (TPR) requirement of sidewalks on arterials and collectors, and would improve pedestrian connectivity and access in this transition area to the commercial core. ➢ RECOMMENDED Transit Center Amenities (Sub-Area A) Improve amenities at the Washington Square Mall Transit Center, including a covered pedestrian path to the Mall, and improved connections to other retail and commercial establishments in the .vicinity. This is consistent with Tri-Met's Transit Choices for Livability plan. Treatment Evaluation Transit is a key component of the Regional Center transportation system. The Transit Center in Washington Square Mall is the hub for all routes serving the Regional Center. Tri-Met's Transit Choices for Livability Study identifies improved amenities as a high community priority. ➢ RECOMMENDED Kittalson & Associales, Inc. Pago 2 Washington Square Regional Center TechMcai Men70randum Jvtre 25, 1999 Reaonvrww d Transportation Masternan Sidewalks on Hall (Sub-Areas B&C) . Complete sidewalks on Hall Boulevard as development occurs. Treatment Evaluation Several gaps in the sidewalk network exist along Hall Boulevard. Provision of sidewalks on arterials is a requirement of the -TPR. Completing the existing network will improve pedestrian circulation and access. D RECONOAENIDED Sidewalk Construction ou HallBoulevard at Cascade (Sub-Area E) Complete the sidewalk on the north side of SW Hall Boulevard near Cascade Avenue and Highway 217 bridge, allowing pedestrians on the north side of SW Hall Boulevard to safely access the.south side of Hall Boulevard and the Highway 217 over-crossing via the pedestrian crossing signal at Cascade Avenue. Treatment Evaluation A short gap exists in the sidewalk on the north side of Hall Boulevard between Nimbus Avenue and the Highway 217 over-crossing. Sidewalks on the over-crossing are only provided on the north side. Therefore, filling this gap will help ensure pedestrian safety. RECOMMENDED Evaluate a Golf Course Pedestrian Trail (Sub-Area A) Evaluate the feasibility to provide pedestrian pathway or trail connections from neighborhoods to and through (or around) Progress Downs Golf Course (similar to the popular pedestrian trail around . Glendoveer Golf Course). Treatment Evaluation A pedestrian trail within the Progress Downs Public Golf Course presents an opportunity to provide a safe neighborhood wAking/exercise area and to serve a greater portion of the population with existing resources. RECOMMENDED Mall Area Street Development (Sub-Area A) Improve SW Eliander Lane, SW Washington Square Road, SW Palm Boulevard and the roadway bounding the Cemetery to full street standards, including sidewalks and bicycle lanes. These improvements would require policies to ensure that treatments would occur with redevelopment Treatment Evaluation This treatment is a key component in providing pedestrians and bicycle access and circulation from the area surrounding the Mall to and within the retail core of the Regional Center. Barriers within the commercial core area hinder direct pedestrian access between retail establishments, potentially encouraging added vehicle trips onto the surrounding roadway. For example, customers shopping at the Target store on Hall Boulevard leave no direct pedestrian connection to Washington Square Mall. This encourages vehicle trips onto Hall Boulevard in order to visit these two retail businesses. ➢ RECOMMENDED 1<-,rttelson & Associates, If 7c. Page 3 Washington S4~m ReglorW Center TechnA=l Memorandum Jtme 25, y999 Reoomrrrended Tran-'% tbn Mas&v-Ran Pedestrian Amenities within the Commercial Core (Sub-Area A) Provide pedestrian treatments such as raised pedestrian refuges and designated walkways within the mall parking areas. Provide pedestrian/bicycle connections between Washington Square mall and retail establishments adjacent to the Mall (e.g., connections to the mall from Target, and between the Fuddruckers and Sears). Treatment Evaluation There is a high volume of-motor vehicle traffic within the parking lots of the Washington Square Mall. Pedestrian treatments, such as raised pedestrian refuges and designated walkways within the Mall parking areas, will provide safe walking access to retail and other activities'and minimize potential pedestrian and vehicle conflicts. Additionally, pedestrian and bicycle connections between retail establishments will reduce the existing barriers within the commercial core and discourage vehicle trips onto the surrounding roadway. Policies should be implemented to support pedestrial and bicycle connections as redevelopment within the core occurs. These are public improvements recommended on private right-of-way; and would therefore require implementing policies to ensure that treatments would occur with redevelopment. ➢ RECOMMENDED Park & Ride Improvements (Sub-Area A) Improve amenities at the existing Park & Ride lot to promote this as a viable transportation option. Treatment Evaluation The Park & Ride lot at Scholls Ferry Road and Highway 217 serves commuters leaving the Washington Square Regional Center. However, vehicle trips associated with the parking lot impact the already congested roadways within the Regional Center system. Since, its current location was originally intended to be a temporary site, a new location (or locations) should be identified to better serve. Regional Center travel demands ➢ NOT RECOMMENDED (Improvements at existing Park & Ride) RECOMMENDED (Identify location(s) for new Park & Ride) Evaluate Pedestrian Crossings on Greenburg and Hall (Sub-Area A) Evaluate feasibility of mid-block raised pedestrian crossings on Greenburg Road and Hall Boulevard Treatment Evaluation Hall Boulevard and Greenburg Road are barriers to east/west non-motorized travel. Providing mid- block raised pedestrian crossings would provide additional opportunities for pedestrians to cross H these streets. There are advantages and disadvantages associated with constructing mid-block ca crossings. An evaluation of right-of-way impacts, construction costs, impacts to traffic flow, and ~H pedestrian demand for mid-block raised pedestrian refuges on these two roadways would be H beneficial.` a ➢ RECOMMENDED r~ U' Neighborhood Traffic Management (Sub-Area 13) Implement neighborhood traffic management on Locust Street between Lincoln Street and (-Tall Boulevard, Lincoln Street between Locust Street and Oak Street, and Oak Strect h,;(Xveen Lincoln Street and Hall Boulcvard(e.g. bicycle accessibility, pedestrian crossing treatments, speed control treatments, and pedestrian connections into adjacent neighborhoods). Kitte/son & Associates, tnc• Page 4 Washington square negionat center Technical Mermntndum June 25, 1999 Recommended Transpodatlon i~vPasterpPan Treatment Evaluation ➢ Oak Street, and Locust Street currently serve as major east/west connections into the Regional Center Area. Implementing a traffic management prograrn'on these streets could control travel speeds, create a safer pedestrian and bicyclist environment and thus minimize the negative impacts associated with higher volume streets. RECOMMENDED Oak-Lincoln-Locust Collectors System. (Sub-Area C) Develop Oak Street as east/west collector (connecting Hall Boulevard and areas cast to Lincoln Street). Develop Lincoln Street as a north/south collector connecting Oak Street to Locust Street Under this treatment, Hall Boulevard would require widening to five lanes (see next element). Treatment Evaluation Distributes cast-west traffic between Locust Street and Oak Street, and improves accessibility to the Lincoln Center commercial district, and neighboring residential areas for vehicular, pedestrian and bicycle modes.. This treatment is mutually exclusive to the Highway 217 parallel roadway treatment described later. RECOMMENDED Widen Ball Boulevard to Five Lanes Widen Hall Boulevard to a five-lane arterial section between Oleson Road and the southern boundary of the study area, consistent with the RTP recommendations. Treatment Evaluation Hall Boulevard is a state arterial roadway and is a major travel corridor through the Regional Center. Upgrading the facility reduces cut through traffic in surrounding residential areas, and improves the level of service for regional trips through the area. A RECOMMENDED Borders Street Pedestrian /Bike Connection (Sub-Area B) Provide pedestrian/bicycle connection between SW Borders Street and Greenburg Road Treatment Evaluation A vacant parcel east of Greenburg Road would serve as the alignment for a pedestrian/bicycle connection between Borders Street and Greenburg Road. However, the parcel is planned for the development of a hotel, and an alternative alignment has not been identified. ➢ NOT RECOMMENDED n N Pedestriaq & Bicycle Connections in New Developments (Sub-Area C) -4 Provide pedestrian/bicycle connections on local streets in new developments. Treatment Evaluation Provision of pedestrian and bicycle connections in new developments is consistent with Metro's regional goal to increase the modal share of pedestrian and bicycle trips. ➢ RECOMMENDED Kitteison & Assoc/ates, Inc. Page 5 11111111 Mani Washington Square Regional Center Tec,hnktW Memomndurn June•25, 7999 Recommended Tramwottabon Master Ran Nimbus-to-Cascade Pedestrian Connections (Sub-Area E) Consider pedestrian connections from Nimbus Ave to Cascade Ave. Treatment Evaluation Currently, pedestr an access between these two key north-south roadways can require significant out-of-direction travel due to the existing land use development, the railroad tracks, and the distance between pedestrian connections. Increasing pedestrian connections between office developments and retail activities (across or over the railroad tracks) will reduce the reliance on motor vehicle travel between neighboring properties. However, this connection should be incorporated as part of the Mall-to-Nimbus over-crossing, and is not recommended as a separate treatment. D NOT RECOMMENDED Mall-to-Nimbus Avenue Over-Crossing (Sub-Area A) Provide a Highway 217 over-crossing connecting Washington Square to Nimbus Avenue, including pedestrian and bicycle facilities extending to Fanno Creek Bikeway. Treatment Evaluation Provide a two-lane, local level over-crossing of Highway 217, from Washington Square to Nimbus Avenue. The over-crossing must clear both Highway 217 and the rail corridor before meeting Nimbus Avenue at grade. Ramped connections to Cascade Avenue will promote accessibility between two previously disconnected sub-areas of the Regional Center. Provides relief to the Hall Boulevard/Scholls Ferry Road intersection, and the Hall Boulevard/Highway 217 interchange by . allowing westbound Mall traffic to bypass these congested areas. RECOMMENDED Nimbus Avenue Extension to Greenburg Road (Sub-Areas D&E) Extend Nimbus Avenue to Greenburg Road, including facilities for pedestrian and bicycle modes. Re-align Greenburg Road to be continuous along Nimbus Avenue with the existing Greenburg Road forming a T-intersection with the new Nimbus Arterial. The new connection would provide arterial level access from Greenburg Read to Hall Boulevard along the existing Nimbus Boulevard. The arterial would be a three-to-four lane, 35mph facility. Treatment Evaluation Passes through the existing Nimbus Avenue/Scholls Ferry Road intersection, and where possible uses the existing Nimbus Avenue alignment. Serves regional demand between northwest and southeast of the regional center. Provides opportunity for motorists to divert off of Hall Boulevard to gain access to Hall Boulevard north and west of the study area. The arterial forms a connected Z system with the recommended Locust Street, and Nimbus Avenue/Mall over-crossings of Highway 217. Assists in relieving congestion on Hall Boulevard, Scholls Ferry Road (east of Nimbus Avenue), and the Highway 217 interchange intersections. Is likely to require grade separation at the y' intersection of Nimbus Avenue/Scholls Ferry Road by the 2020 horizon. ~~pp ➢ RECOMMENDED Locust-to-Nimbus Over-Crossing of Highway 217(Sub-Area A) W Construct a regional level over-crossing of Highway 217 connecting Locust Street to Nimbus a Avenue. Includes ramp connections to Cascade Avenue and either an at-grade or grade separated crossing of the railroad tracks. Also, includes pedestrian and bicycle amenities extending, to Fanno Creek Bikeway. KlUckson & Associates, Inc. Pago 6 Was/tington Square Regkh-W Center Technical Memorandum June g5, 1999 Recommended Tiartsportatlorr Master plan Treatment Evaluation A form of this over-crossing has been identified in the Regional Transportation Plan. This over- crossing will form a vital element for east-west connectivity in the Regional Center, as well as providing regional connectivity and congestion relief on Hall Boulevard and Scholls Ferry Road (east of Nimbus Avenue). This plan recommends a two lane "major collector" over-crossing connecting to Greenburg Road at the existing Locust Street intersection at its eastern end, and a T intersection at its western end at Nimbus Avenue. Intermediate connections to the Mall and ramped connections to Cascade Avenue are also recommended. ' D RECON54ENDED Interchange Capacity Improvements on Highway 217 (Sub-Area A) Recommend that Highway 217 interchange capacity improvements at Hall Boulevard and Scholls Ferry Road be identified as significant needs in the upcoming Highway 217 Major Investment Study. Treatment Evaluation The Scholls Ferry Road/Highway 217 interchange and the Hall Boulevard/Highway 217 interchange both serve as gateways into the Washington Square Regional Center. Under existing conditions, both are extremely congested during the p.m. peak period and during other peak periods of retail and commercial activity. In order to facilitate access (existing and future) to and from the Regional Center, it is imperative that these interchanges be considered as critical points for relieving congestion along the Highway 217 corridor, and thus increasing access to the Washington Square Regional Center. D' RECOMMENDED (Component of forthcoming Highway 217 Major Investment Study) Highway 217 Parallel Roadway (Sub-Area C) Provide new access to Washington Square Mall via a roadway parallel to Highway 217 with a Hall Boulevard under/over-crossing. Hall Boulevard could remain a three-lane road from Highway 217 through Oleson Road. This treatment is mutually exclusive to -the Collector System on Oak, Lincoln, and Locust Streets. This treatment would likely be integrated into capacity improvements identified on Highway 217. Note that Hall Boulevard is currently planned to be a five-lane *facility from Scholls Ferry Road through Durham Road south of the Regional Center Study area. Maintaining Hall Boulevard as a three-lane facility would severely constrain the flow of traffic through the area. Treatment Evaluation A road parallel to Highway 217 in this area could be constructed as a frontage road or collector- distributor depending on the desired connectivity to adjacent land uses and the degree of congestion relief planned for Highway 217. This project would likely be integrated into the larger regional transportation system and should be identified as a possible congestion relief option to be tested in a the upcoming Highway 217 Major Investment Study.. RECOMMENDED (Component of forthcoming Highway 2l7 Major Investment Study) U' W a Lincoln Street Over-Crossing (Sub-Area C) Construct a Highway 217 over-crossing connecting Lincoln Street to Greenburg Road, including pedestrian and bicycle facilities. K/tte/son.& Assoc/ates, Inc. Page 7 Washungton squares Re~iorssACen~er TeaklAcat Memotancfwn June 25, 7999 Recommended Ttansporradon Master Man Treatment Evaluation The analysis showed that this treatment would serve a relatively low travel demand and would not likely warrant the cost of construction. The over-crossing could provide connectivity benefits for pedestrians and cyclists depending on the connections to the surrounding pedestrian/bicycle system. Y NOT RECOMMENDED Cascade Avenue Upgrade (Sub-Area D) Upgrade traffic carrying capacity of Cascade Avenue and develop with pedestrian and bicycle design amenities. Treatment Evaluation . Additional motor vehicle capacity is not needed on Cascade Avenue. Due to the close proximity, improvements to the Cascade AvenuelSehoils Ferry Road intersection should be considered integral to improvements at the Highway 217/Scholls Ferry Road interchange. A possible grade separation at the Cascade Avenue/Scholls Ferry Road intersection assists in relieving congestion on Scholls Ferry Road by reducing the effects of closely spaced signalized intersections: Connectivity within the Regional Center area is provided with ramp connections to both recommended over-crossings of Highway 217. This provides improved connectivity to the Mall, Greenburg Road and Locust Street, and aids in reducing congestion on both Hall Boulevard and Scholls Ferry Road. Pedestrian and bicycle amenities should be implemented on Cascade Avenue as surrounding land develops or redevelops. These improvement requirements should be incorporated into City of Beaverton planning documents. ➢ NOT RECOMMENDED -Capacity Improvements - RECOMMENDED - Intersection improvements at Scholls Ferry Road and ramp connections to proposed Highway 217 over-crossings (Component of forthcoming Highway 217 Major Investment Study) ➢ RECOMMENDED - Pedestrian and Bicycle amenities on Cascade Avenue. Cascade Avenue Realignment (Sub-Area D) Realign Cascade Avenue south to connect with the new Nimbus Avenue arterial. Eliminate the intersection of Cascade Avenue/Greenburg Road. Treatment Evaluation Most of the potential benefits of this realignment would be achieved by the Nimbus Avenue extension to Greenburg Road (the new arterial). Also, this treatment would impose a second major intersection on the new arterial without significant benefits in system capacity. Corridor benefits would be achieved on Greenburg Road by increasing the spacing of signalized intersections in proximity to the Highway 217 ramp intersections. ➢ NOT RECOMMENDED Ideulify Separate Parallel Bicycle Paths (i.e., Ash Creek) Identify potential bicycle network alignments with connections to existing bikeways, neighborhoods, and activity center. Specifically, extend the Fanno Creek Bikeway along Ash Creek. Kittelson & Associates, /rec. Pages a Washington Square ReglofW Center Technical Memorandum June 25, 1999 Reoo vnended Transportation M"terpan 2Watrnent Evaluation Provision of off-street parallel bike paths is included in Metro's Street Design Guidelines as an alternative bicycle treatment when roadway widths on high-volume streets preclude bicycle lanes. This is the case of most of the major .roadways and bridges in the study area. Therefore, such parallel facilities should be considered. Specifically, Metro's Regional Bicycle System Map shows the Fanno Creek Bikeway (as an ofd street multi-use path) extending from its current alignment to the south along Tiedeman Avenue. D RECONUdENDED ' Commuter Rail System Commuter rail service between Wilsonville and Beaverton on existing railroad right-of-way. Consider a station in the vicinity of Scholl Ferry Road. If implemented connect to regional center transportation system. This improvement is included in the Regional Transportation Plan process. Evaluation Considerable interest has been expressed regarding a potential commuter rail system serving Beaverton and Wilsonville. That project is being evaluated in a separate study and a specific recommendation is outside the scope of this study. However, if the-commuter service is implemented, it should be incorporated into the transportation system in the Washington Square Regional Center. People Mover Interest was expressed in a people mover system connecting the retail, recreational, residential and commercial areas of the Regional Center. Such a system could be above grade or at grade on a separate alignment or in shuttle buses on the recommended transportation system. If implemented, it should be incorporated into the transportation system in the Washington Square Regional Center. RECOMMENDED TRANSPORTATION MASTER PLAN Table 1 summarizes the elements of the recommended Transportation Master Plan. The table identifies the travel modes impacted by each element, and also provides "order of magnitude" cost information for planning guidance. Table 2 shows the lanes, functional classifications, and design classifications on the major study area facilities. Figures 1 and 2 graphically depict the recommended transportation system improvements. Kitte/son & Assoclates, inc. Page 9 01-11111 _1 wash/ngeon 6gt142re Reglona!G~rrter Todu lea/ Merrrctsndum JUrW 25, 9999 Recommended rransportatfon Master PYan Table 1 Summary of Recommended Multi-Modal Transportation System Treaitments Irrt cted Travel Mode Financial ProProject Name/ > t a Factors I'lling Nimbus Bus Service N/A Sidewalks on Greenburg Road and Hall Boulevard X N/A Transit Center Amenities X l.(/q Sidewalk Construction on Hall at Cascade . X $40-50 isq yd Evaluate Golf Course Pedestrian Trail X $15-20;000 Malt Area Street Development X X . X N/A Pedestrian Treatments in Commercial Core X N/A Evaluate Pedestrian Crossings on Greenburg / Hall X X $10-15,000 Neighborhood Traffic Management X X X $30-50,000 Develop Oak-Lincoln-Locust Street Collector System X Construction of Lincoln Street connection $8-12/ sq. ft Reconstruction of existing roadways $5-7/ sq. ft Widen Hall Boulevard to Five Lanes X $4.7 million Pedestrian/bicycle Connections in New Developments X X N/A $15-25 Mail-to-Nimbus Highway 217 Over-crossing X X X million $10-15 Nimbus Extension / Realignment X X X million Locust-to-Nimbus Highway 217 Over-crossing X X X '$15 million $70-100 Highway 217 Interchange Capacity Improvements X million s Cascade Avenue Pedestrian/Bicycle Improvements X X N/A Cascade/Scholls Ferry Intersection Improvements X $5-7 million p i Evaluate Off-road, Parallel Bicycle Paths X $10-25,000 E To be used for general planning guidance. CID 2 Identified in Tri-Mot's Transit Choices for Livability Study To be incorporated with development and roadway improvement projects. 4 Cost to conduct an engineering/planning study. C7 S Cost estimated obtained from the Regional Transportation Plan improvement list Kitte/son & Associates, inc. page 10 Was rVton Square ReglbrW Center TeCftaA=t MernorarxJum June 2,5, 1999 Ro ded Transportsidon MasterPlan Table 2 -Recommended Street Characteristics Cross Proposed Tigard Metro Street Design Impacted Roadway Section Street Classification Compatibility Nimbus over-crossing: 2-lane Major Collector Community Street Washington Square to Nimbus bridge Locust Street over-crossing 2-lane bridge Major Collector Community Street Nimbus Extension:, 3 to 4 Greenburg to Nimbus Avenue lanes Arterial Community Street Lincoln-Greenburg Over-crossing 2-lane bridge Minor collector Community Street Eliander Lane, Palm Boulevard, 2 lanes Local Street N/A Washington Square Road tto 3 Minor Collector Community Boulevard Oak Street/Lincoln Street lanes Road Parallel to Highway 217* 2 lanes Major Collector Regional Street Cascade Avenue 2 to 3 Minor Collector- Community Boulevard lanes Greenburg Road 3 to 5 Major Collector Community Street lanes Hall Boulevard 5 s Arterial Regional Street Scholls Ferry Road s Arterial Regional Street Local Streets Local Street N/A * 'This element is a mutually exclusive with to the Oak - Lincoln - Locust collector system, and the associated widening of Hall Boulevard to five lanes east of Oleson Road. Wttelson & Assoclates, Inc. page f 1 i NORTH (NOT TO SCALE) SW 17 Q ~o h 210 4p Spt, a z m `Z WASHINGTON o > ' °z SQUARE 4 0¢ SW 80 DER S co MALL N N v J > SW LEHMAN Bt :c 2 } ~u (n ST ! l rn SW COR i SW LANDAM ST S Q it _ Zn ST SG~OZ ` _ $ v* 40 SW LOCUST ST 1 co , 0 F51 SW To En o = SW OAK ST ASH m SW PINE ST _.CRf % 1 3 SW SHADY SW SPRUCE ST o~ 40 m Q' & z_ co 2171: eVA'G R~ SW PFAFFLE ST P f CH!] F . Q? s ® p~~ RIGbRLL C(MFR CTUOT M G I T f a f T I C A R O ~rC'3 1•"'I LEGEND ® NEW RonownY RECOMMENDED MOTOR VEHICLE UPGRADE EXISTING RonownY SYSTEM IMPROVEMENTS WASHINGTON SQUARE REGIONAL. CE=NTER FIGURE Ki PHASING OF KEY MOTOR TIGARD, OREGON VEHICLE TREATMENTS JUNE 1999 2079 DWGS 1"INAL 2879PLAN all (NOT T SCALE) 17 h 210 Sp~ EtO w a sly k~' 00 iym I G 1 Z N as C¢ SW 00 ER ST ; 00 z ` rn ¢ SW LEHMAN l: r v N ST i ~ o W CORRAL i SW LANDAM ST SW LOCUST ST ~-Q~,' - ♦ ~ / SW LOCUST ST -o rn Q I SW OAK QST SW OAK ST j ~ a -wa~sr-0E ~ i ASH SW PINE ST Slim - CRffK N SW SPRUCE ST .T ~Yyo LN co o ~F~•f _ = 217 N ¢ m T I f c~ N o o 4 i 1 FF~~RC RO SW PFAFFLE ST RlClarctl CENTER CT40~ - CITY or V I C A K O In addition to the improvements shown above. sidewalks and bicycle lanes should be provided on SW Scholls Ferry Rd.. SW Hall Blvd.. SW Greenburg Rd.• and SW Oleson Rd. as development and/or other roadway improvements occur. LEG NO FUTURE PCOESTRIaN/BICYCLE CONNECTIONS .N.Il.ll.ll. NEW BUS SERVICE RECOMMENDED PEDESTRIAN, BICYCLE, ■~~~wt.o■ StIDEWALK IM ACCESS IMPROVEMENTS pCOCSTRVJJ ACCESS AND TRANSIT SYSTEM IMPROVEMENTS P£ WIPRO`E° ALIGNI.ICNT WASHINGTON SQUARE REGIONAL CENTER FIGURE ®a UT TRANSIT CENTER IMPROVEMENTS TIGARD OREGON ~C MTE141AL PCOCSTRIAN CROSSING REFUGE - JUNE 1999 2 i 71 ENI%NCEO P£OCSTRWJ/lI YCLE TREATUCNTS 2879 OWES FINAC 2879F202 ITT Wa__Vrtgtori Square Regglo.-ta/ Guenter Te0hf1W/ "emonUndum June25, 1999 Recommended Trsrtsportaabn Master Plan TRANSPORTATION SYSTEM IMPLEMENTATION Recommended improvements identified in this memorandum are intended to supplement improvements identified in Metro's Regional Transportation Plan (RTP). Furthermore, the implementation of capacity improvements at the Highway 217 interchanges is critical to many elements of the motor -vehicle system improvements. The elements of the recommended Transportation Master Plan comprise an integrated system designed to serve the needs of regional as well as local travel, and to provide a balanced system for all travel modes. In several cases, the effectiveness of individual treatments would be reduced by the absence of other elements of the system. Therefore, the most complex elements of the recommended motor vehicle system were reviewed to determine the most effective phasing for the implementation of these elements. The recommended phasing is described below. This is followed by a similar discussion of the alternative travel mode treatments. Phasing of Key Motor Vehicle Treatments. 1. Early implementation of the Highway 217 over-crossing connecting Washington Square Mall to the Nimbus office developments will serve local traffic accessing-the Mall from the west, providing needed relief to the congested regional system. This will be a first step toward providing local connectivity within the Regional Center area and crossing the Highway 217 barrier. .2. The extension of Nimbus Avenue to Greenburg Road (Nimbus Avenue Extension) should be implemented after the Nimbus-Mall over-crossing. This treatment will relieve congestion on Hall Boulevard, and at the Scholls Ferry Road/Hall Boulevard intersection. Construction of this extension can be followed by construction of the Highway 217 over-crossing on the Locust Street alignment. 3. The Highway 217 over-crossing on the Locust Street alignment should be constructed after the Nimbus Avenue extension to Greenburg Road, to provide an additional east-west connection over Highway 217 and improve connectivity within the study area. Constructing the connection prior to the Nimbus Drive extension would sharply limit the effectiveness of this connection. 4. Development of the Collector System along Oak Street, Lincoln Street, and Locust Street should begin concurrent to the construction of the Locust-to-Nimbus Highway 217 over- crossing in order to accommodate associated traffic volumes. This stage should also include neighborhood traffic management in area. 5. The widening of Hall Boulevard to five lanes should follow construction of the Locust-to- Nimbus Highway 217 over-crossing and development of the Oak, Lincoln, Locust collector system. This will provide the opportunity to monitor changes in traffic associated with these and other system treatments. It is feasible that with development of the Nimbus Avenue extension and the new Highway 217 over-crossing, Hall Boulevard may not need to be widened within the study area. This however, is independent of other regional needs identified for Hall Boulevard. Kittelson A Associa res, lric. Pago 14 IN ill WastWngton Square Regional Center Technical Memorandum June 25, 1999 Recommended Transportadon Masterptan Implementation Pedestrian/Bicycle and Transift Treatments Several of the alternative mode treatments should be implemented as development occurs in. site specific areas. This requires ensuring that the preferred pedestrian and bicyclist amenities are included in the appropriate City codes and ordinances. In other cases, a proactive approach will be. required to see the alternative mode treatments to completion. Specifically, Nimbus Bus Service. This treatment has been identified by Tri-Met with a one-to;five year time frame. Tigard, Beaverton, and businesses likely to receive benefits from this service should work with Tri-Met to achieve implementation. Neighborhood Traffic Management measures should be implemented along Locust, Oak and Lincoln Streets to ensure a safe environment conducive to all neighborhood activities. Measures should be in place no later than opening day of the recommended Locust Street over-crossing. Traffic management measures could be developed and implemented as soon as possible. Pedestrian Crossing Treatments on Greenburg Road and Hall Boulevard should be evaluated to ensure safety as traffic volumes increase. Coordination (between ODOT and the City of Tigard), evaluation, design and implementation could begin as soon as possible. Sidewalk Construction on Hall Boulevard at Cascade Avenue. The existing gap in the sidewalk and over-grown vegetation are barriers to pedestrian circulation and hinder access to the sidewalks on the Hall Boulevard bridge over Highway 217. ODOT- could construct this sidewalk in the immediate term. Mall Area Street Development. In order to create a more pedestrian/bicycle-friendly environment within the commercial core of the Regional Center, the existing and future internal roadways (Eliander Lane, Washington Square Road, Palm Boulevard) should be improved to full street standards including pedestrian/bicycle and transit amenities. This requires ensuring that the preferred pedestrian and bicyclist amenities are included in the appropriate City codes and ordinances CONCLUSION The purpose of this transportation plan is to address the growing transportation needs in the Washington Square Regional Center in a manner consistent with Metro's Region 2040 concept for this area. The system improvements were designed to serve local and regional transportation demand for all travel modes. The recommended transportation system was developed with input from residents of surrounding neighborhoods, property owners, and developers, as well as representatives of public agencies. Following'this framework plan, more refinement and implementation will be necessary to apply more specifics to the recommendations (e.g. roadway alignments, location of sidewalks, connections to Fanno Creek Pathway). Tigard, Beaverton, Washington County and ODOT should begin coordinating objectives and policies. Further, strong recommendations and participation in the Highway 217 Major Investment Study and (lie Wilsonville-Beaverton Commuter Rail planning efforts (and other future transportation related projects in this corridor) will yield attention to the transportation issues related to the Washington Square Regional Center. Katte/son & Associates, Inc. Page 15 w swngton Squares Regional C aOntw rVO/V3Jcsl Memorandum .lure 25, 1999 Recommended Ttansportatlort Masterfvan The long-term vision for this Regional Center will not be achieved without a great deal of planning and collaboration between the public and private sectors. The magnitude of improvements identified in this plan, cannot be shouldered completely by either the private or public sector. In the near term, implementing small-scale pedestrian and bicyclist projects as well as championing the Nimbus-Washington Square Mall.overcrossing and the Nimbus Arterial extension will, from a transportation perspective- begin the process of developing the Regional Center. Ultimately, the future transportation system must be a multi-modal system addressing regional and local travel demands within and to/from the Washington Square Regional Center. a i i a~ i 7 Kittelson& Associates, Inc. page 16 KITTELSON & ASSOCIATES, INC. TRANSPORTATION PLANN(NGITRAFFIC ENGINEERING 610 SW ALDER. SU(TE 700 • PORTLANO. OR 97205 • (503) 226-5230 FAX(503)273-6169 TECHNICAL MEMORANDUM To: Laurie Nicholson, City of Tigard cc: Lidwien Rahman, ODOT . John Spencer, Spencer & Krupper From: Justin Jahnke, Judith Gray & Beth Wemple, Kittelson & Associates, Inc. Date: June 25, 1999 Project: Washington Square Regional Center Project 2879 Subject: Transportation System Treatment Alternatives - Deliverable 2A _ INTRODUCTION This technical memorandum documents the findings of the future transportation system analyses for -the Washington Square Regional Center. Based on an evaluation of the future (year 2020) baseline transportation system, system deficiencies were identified and poteatiaLimprovements to the motor vehicle transportation system were developed and analyzed. An evaluation was also conducted of the transit, pedestrian, and bicycle systems in the Regional Center. Deficiencies were identified and improvements were developed to support alternative mode travel demand. MOTOR VEHICLE TRANSPORTATION SYSTEM The analysis of the motor vehicle transportation system includes analysis of a future (2020) baseline transportation network to estimate the future travel demands and associated congestion points within the study area. Improvement elements were then identified to treat specific problem areas and then integrated into three alternative system improvement concepts. Analysis Period and Evaluation Criteria Metro has recently moved from a one-hour peak assignment to a two-hour peak assignment. This two-hour assignment is representative of the average operating condition during the two highest hours during the p.m. period. This change in methodology was introduced in an attempt to simulate peak demand spreading over.a two-hour period, due to the future transportation demands of the region. Metro has identified evaluation criteria that recommend deficiency thresholds that describe operating standards for use with this two-liour peak assignment. These criteria use link based volume to capacity ratios to categorize operation into categories of "Ideal Conditions", "Preferred Operating Standard", "Acceptable Operating Standard", "Unacceptable Operating Standard", and "Grossly Unacceptable". . 4 Washington Square Regknat Center . PAYOct: 287.9 Transportation System TreatrnentAtterna6ves Page. 2 June 25 1999 Different deficiency thresholds have been established dependent oa the location of the roadway . facility by surrounding land use type. This study focuses on the Washington Square area being designated as a "Regional Center" under Metro's Urban Growth Management Functional Plan. The relevant deficiency thresholds and operating standards are described in Table 1. These standards have been adopted for use in this study. Table I Motor Vehicle Level of Service Deficiency Thresholds and Operating Standards (Two-hour p.m. peak average) Location by Land Ideal Preferred Acceptable Operating Unacceptable Grossly Use Design Type Conditions Operating Standards Operating Unacceptable Standards (Approaching Standard (Exceeds Deficiency Deficiency Threshold) Threshold) In Central City, 2 hour V hour at LOS 1` hour at LOS F; 2 V hour at LOS F; 2 hour average Regional Centers, average is E; 2nd hour at hour at LOS E; (2 2"d hour at LOS F; is worse than Town Centers, LOS D or LOS E; (2 hour hour average is 0.96 (2 hour average is LOS F (greater Main Streets, and better (0.90 average is 0.90 (0 1.00) 1.01 to 1.T0)' than 1.10)• Station or less) to 0.95) Communities * Dcmand/capacity of greater than 1.0 (during two-hour p.m. peak) will start to spread the peak into a third hour, however, some drivers will choose slow out of direction alternative routes to avoid the high level of congestion. Future Baseline Transportation Network An initial network assignment was performed to provide-on estimate of the future travel demands and associated congestion points within the study, prior to specific improvements due to the regional center concept. Network Description The baseline 2020 transportation network was developed by reviewing and revising Metro's regional travel demand model transportation network that is under development for the current Regional Transportation Plan Update. Planned transportation network improvements in the Washington Square Regional Center area and on the surrounding transportation system were identified and incorporated into the baseline future transportation network. The baseline transportation network system improvements included pedestrian and bicycle projects, transit projects and roadway improvement projects. Figures I and 2 summarize the roadway system improvements by comparing the existing transportation network to the Baseline future transportation network. in summary the major improvements in the baseline future transportation network included: Transit rinproventents • Peak Hour Commuter Rail Service from Wilsonville to Beaverton • Bus Service from Washington Square Regional Center to Lewis & Clark College • Bus Service from Cedar Mill Town Center to Washington Square Regional Center • Bus Service from Washington Square Regional Center to Jantzen Beach • Bus Service from Sunset Transit Center to Washington Square Regional Center highway Systetn Improvenients • Highway 217 - additional capacity between 1-5 and US 26 (six lanes assumed) • I lighway 217 ramp metering, and Advanced Traffic Management Systems Kiltolson & /Associates, Ana. Portland, Or'a9orr Washington Square Reglonat Center P Ycct: 2879. TnUkVWWtbn System Trea&n&7lAitemaUves Page. s June 25, .'t 999 • Highway 217 and I-5 interchange reconstruction • . 99W upgrade to seven lanes Arteriat/Locat Street System Improvements • Nimbus Avenue extension from Hall Boulevard to Denney Road • Highway 217 / Greenburg Road ramp improvements • Highway 217 over-crossing from Washington Square Regional Center to Cascade Plaza • Hall Boulevard widening to five lanes between Scholls Ferry Road and Durham Road • Extension of Taylors Ferry Road to Oleson Road (three lanes) • Greenburg Road widening to five lanes between Washington Drive and Tiedeman Avenue Appendix A provides a more detailed summaryof the improvements, as well as other significant improverntnts in the area, that are included in the project baseline forecast model, and Metro's estimated project costs. In addition to the future improvements described above, a number of pedestrian and bicycle improvements' have been identified by Metro for the study area. These-improvements are not included in the adopted transportation network, however this will not significantly effect results of the transportation model assignments, as information from Metro indicates that the overall mode splits with these improvements do not significantly vary from those reported for the adopted network. The proposed future pedestrian and bicycle improvements include: • Oleson Road bike lanes, sidewalks, lighting, crossings, bus shelters and benches between Fanno Creek and Hall Boulevard • Sidewalk, lighting, crossing, bus shelter and bench improvements for Scholls Ferry Road, Hall Boulevard, Greenburg Road, Oleson Road, Cascade Avenue and neighborhood streets • Sidewalk, lighting, crossings, bus shelter and bench improvements for Scholls Ferry Road between Beaverton-Hillsdale Road and Hall Boulevard • Hall Boulevard bikeway, sidewalk, and pedestrian crossing improvements between Oak Street and Highway 99W. Existing and Future Traffic Volumes A Baseline 2020 two-hour p.m. peak period vehicular travel demand forecast was obtained from Metro. This forecast assigned the trips generated by the Regional Center land uses (adopted by 4 Tigard and Metro as part of the 2040 Functional Plan process)` to the adopted Baseline 2020 H H r The land use forecasts form the basis for the trip end estimation process in the transportation model. The 2020 land use H forecast and trip generation estimates are based on Metro targets for the Regional Center. Therefore it would be -4 theoretically correct to modify the land use characteristics to reflect the specific Regional Center concept being developed by this project. However, the regional transportation model is limited in its ability to focus on a relatively small area such as this study arc.. Metro advised that unless trip generation levels varied by more than 10% under the specific Regional Center concept, then a full land use estimation calculation would not produce significant differences in the trip generating behavior of the model. The land use changes proposed under the specific Regional Center concept produced a decrease in total trip generation estimates of 9.8% for TAZ's within the study area. The existing 2020 trip table' was therefore conservatively adopted for use in this assessment. This allows a consistent comparison of the puibrmancc of the alternative transportation systems with the future baseline assignment. Kltte/son A Assoclates, Inc. Port/and, Oregon Washington Square Reglonal Center PRYeot: 2879 Transportadon System TreatmentAtte:madves Page: 4 June 25, 1999 Transportation Network. Metro also provided a 1994 two-hour p.m. peak vehicular travel demand forecast. Figure 3 shows the 1994 forecast and Figure 4 shows the 2020 forecast, respectively. The 2020 forecast included an applied mode split of- 0 5% pedestrian/bicycle • 4% transit • 65% single occupant vehicle • 26% high occupancy vehicle (which yields an average auto occupancy of 1.17 passengers per vehicle) Comparing Figures 3 and 4 shows that there is significant traffic growth forecast on regional and local streets in the study area, in particular on the following corridors: • Hall Boulevard • L-crust Street • Greenburg Road • Oleson Road • Taylors Ferry Road (due to the future connection to Oleson Road) Existing and Future Traffic Congestion Based the assigned volume to capacity ratio calculations, and Metro's two-hour peak deficiency thresholds, Figures 5 and 6 show the 1994 and 2020 forecast two-hour p.m. peak period areas of unacceptable and grossly unacceptable operation. Comparing the two figures shows 'that, as compared to Metro's 1994 analysis, there will be a significant growth in congestion in the study area. Figure 6 shows that during the future two-hour p.m. peak period, there will be unacceptable or grossly unacceptable vehicular operating conditions on: • Hall Boulevard west of Scholls Ferry Road, • Oleson Road north of Hall Boulevard, • SchollsTerry Road south-west of Highway 217, and • Cascade Boulevard north and south of Scholls Ferry Road. Travel Demand Analysis Travel demand patterns were evaluated using select link analyses from Metro's travel demand model. For pre-selected roadway segments (links), the select link analyses show how many vehicles are traveling on the roadway segment during the two-hour p.m. peak period, where the vehicles originate from, to cross the road segment, and where the vehicles travel to, after crossing the road segment. Results of these select link analyses are reported in Appendix B. Results from these travel pattern analyses show: • There is significant demand for travel along Hall Boulevard from south of Highway 217 to west of Highway 217 toward Beaverton; • Thcre is also significant demand for travel between Oleson Road north of Ilall Boulevard and Ilall Boulevard west of Highway 217 toward Beaverton; Kittelson & Assoclates, Inc. Portland, Orcryon Washington Square Regional 0 rtter Pr+?Iect: 2679 Transpottadon System TmatrnentA/tematlves Page. 5 June 25,-1W9 • The Washington Square Mall generates a significant number of trips into and out of the regional center area in all directions. Travel through Hall Boulevard/Scholls Ferry Road to the west is high; and • The majority of vehicles on Highway 217 are traveling through the study area; however on Highway 217 between Scholls Ferry Road and Greenburg Road there is a high exchange of vehicle trips indicating that motorists might be using Highway 217 for local instead of regional trips. . These results indicate that congestion within the Washington Square Regional Center study area is produced by competing demands between two different transportation needs. Regional transportation demands direct traffic through the study area on Highway 217, Hall Boulevard, Scholls Ferry Road, Greenburg Road and Oleson Road. Competing with this through traffic demand are local access and connectivity needs of the Washington Square Mall, the Nimbus Avenue commercial precinct, the Lincoln Center, and the Metzger residential area. The regional transportation demands are generally summarized on Figure 7. Limited alternatives exist to serve these regional demands, which focuses trips onto a limited number of corridors. These same corridors are the primary access points for the Washington Square Mall and other non-retail employment centers. Future Transportation System Alternatives Alternatives Development In attempting to find solutions to the predicted future congestion within the study area, it is important to address the significance of the regional and local transportation demands. By addressing these general demands individually, and testing specific improvements designed to cater for, and separate these demands, it is possible to develop a set of improvements to relieve particular aspects of future congestion within the study area. Using this methodology of alternative concept development, a series of three alternative future transportation systems were developed and tested using the Metro emmel2 model. As a general summary of the performance of these alternatives, Tables 2a - 2d summarize the key features of each of the alternatives, as well as the benefits that each provides to critical corridors and intersections within the study area. Potential environmental impacts that each alternative may cause are broadly identified. Each of the three alternatives is described and discussed in detail in the following sections. Alternative "A" General Description This alternative was designed to test the effect of a series of regionally significant transportation system improvements, which either provided alternate routes through the area for regional traffic, or improved the capacity of existing congested corridors. Ittolson a Assoclatcs, Inc. Portland Oregon WasWngton Square Reglona/Center PnYect: 2879 Tranaportabron System Trea&nentAttemadves page. is June 25, 1999 The specific improvements tested include: a Alternate northbound Highway 217 ramp arrangement at Hall Boulevard. New over-crossing of Highway 217 from Locust Street New corridor connecting Greenburg Road south of Highway 217, to Hall Boulevard west of the existing Nimbus Avenue intersection. These improvements are shown conceptually on Figure 8. Details of Proposed Improvements Highway 217 Ramp Arrangement This concept rearranged the existing northbound ramp configuration to Highway 217 at Fall Boulevard. The existing ramp connects Scholls Ferry Road, south of Hall Boulevard, to the northbound travel lanes of Highway 217. This forces all traffic accessing Highway 217 northbound to use Scholls Ferry Road. An alternative form was developed to replace the existing northbound ramp from Scholls Ferry Road. This included a loop ramp connecting Hall Boulevard eastbound to Highway 217 northbound. In conjunction with this loop ramp, an additional ramp connecting Hall Boulevard westbound to Highway 217 northbound was proposed. Both ramps meet on a frontage road that connects to Highway 217 at a single metered ramp terminal north of the-Hall Boulevard over-crossing. The Hall Boulevard termini of both ramps would be located west of the Hall Boulevard intersection with Scholls Ferry Road. Greenburg Road - Hall Boulevard Connection This connection is proposed to allow an alternate route for travel demand presently on Hall Boulevard, between areas to the northwest and areas to the southeast. By providing this alternate route the aim is to relieve congestion on Hall Boulevard, in particular at the Scholls Ferry Road/Hall Boulevard intersection. A general two-lane connection is proposed, with a design speed of 35rnph. Widening at intersections would be required to accommodate turn lanes. Figure 8 shows the general alignment. At its northern end, the facility would intersect with Hall Boulevard west of the existing Nimbus Avenue intersection. The facility's intersection with Scholls Ferry Road would be combined with the existing Scholls Ferry Road/Nimbus Avenue. At its southern end, this new corridor would make a four-way intersection with the existing Greenburg Road/ Tiedeman Avenue intersection. Locust Street Over-crossing of ighway 217 A form of this over-crossing has been identified in the RTP, and based on the future baseline analysis, the demand for a connection of this type exists. This link will provide an additional cast- west connection over Highway 217, providing increased connectivity and cast west capacity within the study area. As a regional level connection, the alignment of the link is proposed to meet the existing Lecusl Strect/Grecrtburg Road intersection and then proceed on a direct path over Highway 217 and Cascade Avenue, and then meet the new proposed Greenburg - liall Boulevard connection. The facility Kltln_/mrJ R A^cnc!a!e !iJC. !'orY/<~nd, O~cc7on WasNngton SgLm ReglorW Center PAYect 2879 Tansportatlon System Trea&nentAltenwbvies Page. 7 June 26; '>999 would in general be a two laneTacility with a design speed of 35mph. A ramp is proposed between this over-crossing and Cascade Avenue. Neighborhood Circulation Roadway To serve potential future development east of Greenburg Road, the concept for a new circulating roadway was developed. This roadway would connect to Greenburg Road, south of Highway 217, making a four-way intersection with Cascade Avenue at Greenburg Road. The proposed roadway then crosses over Highway 217, between Greenburg Road and Hall Boulevard, before continuing north to meet Locust Street, between Greenburg Road and Hall Boulevard. Volume to Capacity Analysis The volume to capacity ratios. for the study area are shown in Figure 9. Compared to the baseline future transportation analysis, corridor congestion on Cascade Avenue, south of'Scholls Ferry Road is reduced. This is due to the Hall Boulevard - Greenburg Road connection, which shifts traffic further west to access areas to the west using Scholls Ferry Road. The volume to capacity ratios show that congestion is increased in the vicinity of the Hall Boulevard/Scholls Ferry Road intersection. Link Volumes and Intersection Performance The assigned traffic volumes for this alternative are shown in Figure 10. Appendix C contains the select link analysis plots. The impact due to these improvements at the main points of interest within the study area are summarized in Tables 2a - 2d. The most significant of the improvements in these tables is the 30% reduction in volume of Scholls Ferry Road, west of Cascade Avenue. This was reflected in the volume to capacity ratio discussed above. The section of Hall Boulevard between Oleson Road and Locust Street shows a 12% reduction from the base forecast. This is a direct result of the new Hall Boulevard - Greenburg Road connection, and the high-standard Locust Street over-crossing. This connection can therefore be seen to provide congestion relief, in particular on Hall Boulevard. In combination with the Locust Street over- crossing, it provides an alternate connection between both Hall Boulevard and Scholl Ferry Road to i the west, and areas to the south and east of Highway 217. The benefits 'of this new connection are not obvious in all areas of the network. The select link analyses revealed a general decrease in volumes in Hall Boulevard on all sections cast of the new corridor. However, latent demands in the congested system caused a redistribution of trips to fill this newly available capacity. This was particularly evident on Hall Boulevard between Scholls Ferry Road and Oleson Road. As can be seen from the volumes in figure 10, the Hall Boulevard -Greenburg Road connection will carry two way volumes ranging between 1,200 and 4,500 vehicles during the two liour peak period. /Clttelson & Assoclales, Inc. Portland, Oregon Wasttingtaa Square R7eg/beW t entef Protect 2,67.9 Transportabon System rrea&nentA/lemae'ves page. a June 25, 1999 The section between the Locust Street over-crossing and Scholls Ferry Road has the highest two hour volumes. The level of demand at this location introduces significant northbound left taming volumes to the intersection at Scholls Ferry Road. These left turning volumes are likely to be difficult to accommodate using an at grade intersection when opposed by the projected volumes on Scholls Ferry Road. The increased standard of the Locust Street over-crossing from the future base, transportation network does not impact significantly on volumes on Locust Street between Greenburg Road and Hall Boulevard in the peak period. Due to the regionally significant trip generation of the Washington Square Mali, and the demand between the Mall and northbound Highway 217, the proposed rearrangement of the Highway 217/Hall Boulevard ramps did not provide benefits to the system. In particular, the new arrangement resulted in the addition of a further 1,000 northbound right turning vehicles to the already over- saturated intersection, which cannot reasonably be accommodated using an at grade intersection. Other than the discussed improvements at the Scholls Ferry Road/Cascade Avenue intersection, only the Hall Boulevard/Nimbus Avenue intersection is benefited by the proposed improvements. Again, this is due to the proposed Hail Boulevard - Greenburg Road connection. Alternative "B" General Description This alternative was developed to test the effect of a series of locally significant transportation system improvements, which primarily provided alternate connections for Washington Square Mall traffic to access the regional transportation network. It was expected that this may assist in reducing F +icted congestion on critical regionally significant locations in the study area, particularly Hall Boulevard. Key components of Alternative "B" include: • Highway 217 over-crossing from Washington Square Mall to Nimbus Avenue • Highway 217 over-crossing from Locust Street to Nimbus Avenue • Neighborhood circulation roadway The tested improvements are shown in concept form on Figure 11. Details of.Proposed Improvements Highway 217 Over-crossing jroin Washington Square A local connection from the nortlieastern area of the Washington Square Mall was proposed to connect the Mall to Cascade Avenue. This connection would provide twofold benefits to the existing transportation system. I( would provide a local connection between the Mall and the commercial districts on Nimbus and Cascade Avenues. In addition it provides an alternate route for trips both in and out of the Mall to access both hall Boulevard west of Highway 217, and ScItiuIIS Derry Itoad, K/tte/sons Associates, ttic. h;)lYL'JIJf~ OYC^QfJ WasNngton Square Reglonal Center PnVeot 2879 TrensnorWtbn System TreatmentAltematrves Page: 9 June 25 ' 1999 west of Highway 217. This alt6ws the bypass of bath the congested Hall Boulevard/Scholls Ferry Road intersection, and the Scholls Ferry Road/Highway 217 interchange ramp intersections. These are the primary congestion points in both the existing and future transportation system in the area, and any relief obtained from diverting Mall traffic from these intersections will be beneficial to their operation. Highway 217 Over-crossing from Locust Street alignment Another local level over-crossing of Highway 217 was proposed to connect the Mall to Cascade Avenue south of Scholls Ferry Road. This would allow diversion of traffic from existing congested intersections on Scholls Ferry Road. As shown on Figure 11, by design this connection would be made in a manner that reduces the level of through traffic that uses it. While it would still be physically possible to. travel from Locust Street or Greenburg Road to Cascade Avenue via this connection, the intent for the link is to primarily serve Mall generated traffic demands. Neighborhood Circulation Roadway As a modification to the form of this roadway tested in Alternative "A", this circulating roadway would connect directly to Grecnburg Road, north of Highway 217. A connection was then proposed from this intersection with Greenburg Road directly to the Mall. Volume to Capacity Analysis With the proposed improvements in place, several locations of congestion still remain in the network. These can be seen from the reported volume to capacity ratios in Figure 12. Notable locations include: • Hall Boulevard westbound, west of Scholls Ferry Road. • Oleson Road, north of Hall Boulevard. • Scholls Ferry Road westbound, east and west of Nimbus Avenue. • Greenburg Road, south of Cascade Avenue. • New Loop Connection - between the Locust Street over-crossing and Greenburg Road. Compared to the Base Network, locations where congestion is reduced by these improvements include: • Cascade Avenue, north of Scholls Ferry Road. • Minor Improvements on Hall Boulevard. Link Volumes and Intersection Performance The assigned traffic volumes for this alternative are shown in Figure 13. Appendix D contains the select link analysis plots. The impact due to these improvements at the main points of interest within the study area are summarized 'in Tables 2a - 2d. The most significant of these impacts is shown on Hall Boulevard between Locust Street and Oleson Road, where a reduction of 20% of total trips on this link was observed. This is associated with a major redistribution of traffic within the system caused by the new link between Grecnburg [toad and (tic Washington Square Mall (western end of the Neighborhood Circulation Roadway). The Alternative B volume plot shows 4,000 vehicles in the two-hour peak period on this link, all of which are diverted from either [Jail Boulevard, or Greenburg [toad north of the new connection. Immediately south of this new connection, volumes on Greenburg Road increase around 500 vehicles. As can be seen by the volume to capacity ratios, this Kittelson & Associates, If 1c. Portland, Orcgon V t%ashIngtOn Square RegANW Center Pm l0 cr 2879 Trans Portauon System Trea&nent Afterrratl'ves Page: to June 25 1999 redistribution will not significantly impact either Greenburg Road or Tiedeman Avenue South of Highway 217. The select link analysis for the proposed over-crossing between the Mall and Nimbus Avenue, shows a diversion of regional trips of around 1,000 vehicles in the two hour period, from Hall Boulevard and Oleson Road, onto the new over-crossing. These trips are headed either.to Nimbus Avenue, or to . westbound Scholls Ferry Road. This diversion was the major component of volumes on the new over-crossing (57%), which highlights the degree of congestion that exists at the Scholls Ferry Road/Hall Boulevard intersection. The Mall over-crossing did not therefore capture Mall generated trips to and from areas to the west of Highway 217 as had been anticipated. Out of 5,000 to 6,000 vehicle trips from the Mall that could potentially use this connection, only around 10% did so. The vast majority of westbound Mall generated trips therefore continued to travel through the Scholls Ferry Road/Hall Boulevard intersection in spite of the predicted congestion levels. In this system, the Locust Street over-crossing carries 1,900 vehicles, an_ increase of some 350 vehicles from the Base condition. The Mail generates 50% of the trips on this link. None of the intersections within the study area were significantly effected by the system changes introduced in this alternative. A/temative "C" General Description Alternative C was developed to relieve congestion on SW Locust Street and SW Hall Boulevard east of the Washington Square Mall by providing a new roadway connection to the Washington Square Mall from SW Hall Boulevard. Figure 14 graphically depicts the proposed new link under Alternative C. Details of Proposed Improvements The new roadway would be a three-lane, 35-mph facility parallel to Highway 217 between Hall Boulevard and Washington Square Mall. The roadway would connect to Hall Boulevard at a signalized T-intersection north of Highway 217. The roadway would terminate at the Washington Square Mall without any intermediate automobile access. A grade separation would be constructed at SW Greenburg Road. Bike lanes and sidewalks . would be provided on both sides. i i Volume-to-Capacity Analysis Figure IS shows the volume-to-capacity ratios under Alternative C. The most significant impact with respect to volume-to-capacity ratios is evident on Hall Boulevard near the intersection with the -4 proposed connecting link. The volume-to-capacity ratios on Hall Boulevard deteriorate on either side of ilighway 217. However, directly north of (lie new connection, conditions improve considerably. Plots of the select link analysis are provided in Appendix G. On Locust Street, volume-to-capacity ratios improve in both directions, but were already within "ideal" operating range. Ilowever, given the residential area and polenlial pedestrian/bike route on this street, reduced volumes are of more significance than indicated by impact on traffic conditions. Kiite/son 6 Associ. or, btc. /'oitland oregor? Washington Square Regions/ Center PAYect•2879 Tnvuportnbbn System Tiea&nentol/temaUWS Page: 11 June 25,• 1999 The volume-to-capacity ratio on SW Greenburg Road westbound from Highway 99W shows improvement from 1.04 (unacceptable) to 0.97 (acceptable). A slight increase in the volume-to-capacity ratio is shown on Pfaffle Street. However, conditions remain within the "ideal conditions" range. Link Volumes and Intersection Performance The assigned traffic -volumes under this alternative are shown in Figure 16. The proposed new link between Hall Boulevard and Washington Square Mall provides access from the south and east. Figure 15 shows a reduction in traffic volumes on Greenburg Road near Highway 217,'and on SW Hall Boulevard north of the new connection. Traffic volumes are shown to increase south and east of the Mall, including on SW Hall south of the new roadway, as well as on Pfaffle Street. Select link analysis shows that approximately 70% of the traffic served by the new facility is from the south on Hall Boulevard and from Highway 99W. Approximately 20 to 30% is from Pfaffle Street, and a small portion (9% from, 2% to) is from Locust Street. In the base case, approximately 55% of traffic on Locust Street was through traffic traveling between Hall Boulevard and west of Highway 217. The addition of the new facility reduced overall volumes on Locust Street, with an associated increase in the share of through traffic to approximately 72°/a. The proposed connection diverts significant traffic volumes from Hall Boulevard and reduces the need for widening Hall Boulevard to five lanes between the new connection and Oleson Road. Table 2a Key Transportation System Considerations Feature Alternative A Alternative B Alternative C Improves East/West Connectivity over Highway 217 yes yes yes Develops Secondary Travel option to Hall Blvd. yes yes no Maintains Hall Blvd. at 3 lanes (Locust St. to Oleson no no yes Rd.) Maintains Hall Blvd. at 3 lanes (south of Locust St.) no no no Provides Alternate Connections to the Mall no yes yes Modifies the Hall Blvd./Highway 217 interchange yes no no Upgrades the role of Locust St. yes no no i 7 K/lto/son dAssoc/rates, /nc. Portland, Oregon WasNingeon Square Reglonal Center PnYOct 2879 Tiensporfatton System Ties&nent Altemaffi es page: 12 June 25, 1999 Table 2b Relieves Corridor Congestion Corridor Alternative A Alternative B Alternative C highway 217 (between Greenburg Rd. and Hall Yes (2%) Yes (20/-) No Blvd.) Hall Blvd. (west of Cascade Ave.) Yes (8%) No No Hall Blvd. (between Scholls Ferry Rd. and Oleson No Yes (5%) Yes (20K) Rd.) Hall Blvd. (between Oleson Rd. and Locust St.) Yes (12%) Yes (20%) Yes (83%) Hall Blvd. (south of Locust St.) Yes (6%) Yes (3%) Yes (66•%) Scholls Ferry Rd. (west of Cascade) Yes (30%) Yes (2%) No Scholls Ferry Rd. (between Cascade and Hall) No Yes (2%) No Table 2c Relieves Intersection Congestion Intersection Alternative A Alternative B Alternative C Hall BlvdJCascade Ave./Hwy 217 Southbound No No No Ramp intersection Hall BlvdJScholls Ferry Rd. No No No Scholls Ferry RdJCascade Avenue Yes No No Greenburg Rd./Highway 217 No No Yes Scholls Ferry Rd./Nimbus Avenue No No No Hall Blvd./Nimbus Avenue Yes No No Oleson RdJHall Boulevard No No Yes Table 2d Potential Environmental Impacts Area Alternative A Alternative B Alternative C Ash Creek Wetlands Yes Yes Yes Fanno Creek Wetlands Yes No No a n lrtto/son & Assoclate s, lnc. Pail/and, Oie90n Wash/ngton Square Regional Center Pnalect: 2679 Tnaaspoeftbon System Trea&nentAltemadVes Page: 73 June 25, 1999 ALTERNATIVE MODE TRAVEL As a designated Regional Center, the Washington Square area is intended to be highly accessible by both auto and public transportation, and to have a fully improved network of multi-modal streets. An evaluation of existing transit service, bicyclelpedestrian. facilities, and area connectivity, and, improvements to support alternative mode accessibility to, from, and within the study area. Existing Facilities A review of existing alternative transportation facilities was conducted. Specifically, transit service and pedestrian/bicycle facilities' were inventoried with respect to the extent of facilities provided relative to design and policy guidelines, general system deficiencies, and specific gaps in connectivity. Also, a general review of neighborhood connections within the study area is provided. A summary of the findings is provided below. A more detailed inventory of alternative mode connections in the study area is provided in Appendix F. Existing Transit Service - Figure 17 depicts the existing transit service provided within the study area. Transit access to Washington Square Transit Center is available from the downtown Portland Transit Center, Tigard Transit Center (via Route 43), Beaverton Transit Center (located near the Hall Boulevardfrualatin- Valley Highway intersection), Lake Oswego Transit Center (located in downtown Lake Oswego), and the Tualatin area (Meridian Park Hospital). Routes 43, 45, 56, and 62 operate at intervals of 20- 30 minutes during weekday peak periods. On routes 76 and 78, peak period headways are 20 minutes. Transit routes and service frequency are listed in Appendix F. Two key transit system deficiencies identified in the study area are the lack of transit service on SW Nimbus Avenue between SW Hall Boulevard and SW Scholls Ferry Road, and the lack of a covered walkway between Washington Square Mall and the Transit Center. As previously noted, Tri-Met's Transit Choices for Livability project identified transit service on SW Nimbus Avenue as well as improved amenities at transit stops as needed improvements. Existing Bicycle Facilities Striped bicycle lanes along study area roadways were identified and are shown in Figure 18. As the figure shows, bicycle lanes are provided on both sides of SW Scholls Ferry Road throughout the study area, including the Highway 217 bridge. SW Hall Boulevard and SW Greenburg Road are partially striped for bicycles. The bicycle lanes on Scholls Ferry -Road and Hall Boulevard provide access to the six bus routes in the study area and to the Washington Square Transit Center. Bicycle locking amenities are provided at Washington Square Mall, including at the Transit Center. Specific deficiencies related to bicycle connectivity in the study area include the following: Inadequate crossing opportunities are provided over Highway 217. The only designated bicycle crossing over Highway 217 is on SW Scholls Ferry Road, where high speed and high volume motor vehicle traffic limit safety and comfort to bicyclists. O No striped bicycle lanes are provided on SW 1-lall Boulevard west of Scholls Ferry Road or south of SW Pfaffle Street. 6 Most of SW Greenburg and SW Oleson Roads are without striped bike lanes. Like lanes are provided only along the cast side of SW Grcenburg [toad south of Highway 217. K/tte/son 6 Assoc/gyres, Inc. Portland, Oregon Washington Square Reglona/ Center PAYect: 2879 Tnu&VwWtk;n System Treatment A/tema&,es Page. 14 June 25, 1999 • Within the Washington Square circulating roadways, there are no striped bicycle lanes leading to the transit center. Existing Pedestrian Facilities Figure 19 shows the existing sidewalks in the study area. Most of the major roadways provide at least partial sidewalks and sidewalks are provided along the Highway 217 bridges 'on SW Hall Boulevard near Cascade Avenue (south side only), SW Greenburg Road, and on SW Hall Boulevard near SW Pfaflle Street. However, frequent gaps in the sidewalks hinder pedestrian t;irculation. As Figure 19 phows, gaps exist in the sidewalks on each of the major study roadways. Also, safe pedestrian crossing opportunities are limited in. some parts of the study area. Pedestrian treatments within Washington Square Mall are minimal. Key deficiencies in the pedestrian system include: • Sidewalks are not provided on SW Scholls Ferry Road between SW Cascade Avenue and SW Washington Square Road. - • Sidewalks are not provided along the west side of SW Greenburg Road adjacent to the Washington Square Mall. • Sidewalks along SW Hall Boulevard east of SW Greenburg Road-SW Oleson Road have frequent interruptions. • On SW Hall Boulevard near the P&W railroad tracks, a gap in the sidewalk and overgrown vegetation hinder pedestrian access to the Highway 217 bridge. • There is no sidewalk on SW Hall Boulevard leading to the_Highway 217 bridge near Pfaffle Street, although sidewalks are provided on the bridge. • No walkways are provided on SW Scholls Ferry Road over-crossing of Highway 217. • No pedestrian crossing treatments are provided along SW Greenburg Road between SW Locust Street and SW Hall Boulevard, a distance of nearly one-half mile. • No pedestrian crossing treatments are provided on SW Hall Boulevard south of Oak Street, hindering pedestrian access to the Highway 217 crossing at SW Pfaffle Street. • Minimal sidewalk connections are provided into Washington Square Mall. Sidewalks provided from SW Hall Boulevard (along SW Eliander Lane) have gaps on both sides of the street. A sidewalk is continued along the east-west street south of the Target store *(one side only) but stops adjacent to the Transit Center. A sidewalk is provided on SW Washington Square Road from S W Greenburg Road but stops prior to the main shopping area. • Inadequate formal pedestrian facilities are provided between retail services within the study area. Several locations within the Washington Square Mall show pedestrian paths worn in the landscaped areas. Existing Neighborhood Connections Neighborhood connections within the study area were reviewed with respect to Metro's intersection spacing guidelines, as well as system connections between neighborhoods and Washington Square Mall. A significant connectivity gap exists between the Nimbus Avenue business developments and Washington Square Mall due to limited opportunities for crossing Highway 217. Sidewalks are provided on SW Hall Boulevard only, while bicycle lanes are provided oidy on SW Scholls Ferry road. "Transit connections can be made on either SW Hall Boulevard or SW Scholls Ferry K/lle/son & Associates, /ne. /'orY/and, OiecJon WasNrgtoa Square Reglonal Center FVWect 2879 Transporwtbn System TreatmentA/temabves Page. 15 June 25, `1999 Road. (Note: SW Hall Boulevard and-SW Scholls Ferry Road are separated by an approximate distance of 600 feet along Nimbus Avenue). Sidewalks and bicycle lanes are not provided on most of the streets within the Metzger residential neighborhood. Additionally, the intersection spacing tends to be higher than the design guidelines for new residential developments. However, vehicle traffic is not high enough too hinder the safety and comfort of pedestrians and bicycles. The approximate grid layout of the streets in the neighborhood provides relatively direct access for most locations within the neighborhood. However, protected crossing opportunities are limited on SW Hall Boulevard and on SW Greenburg Road east of Washington Square Mall. The limited crossing opportunities, coupled with frequent gaps in the sidewalks and bicycle lanes constrain bicycle and pedestrian connectivity from the neighborhood to other areas within the . regional center area. a Residential streets off of SW Pfaffle Street have no direct connections to the north, requiring out- of-direction travel to access Washington Square Mall. Also, the street system layout within the Progress neighborhood (north of the mall, off of SW Scholls Ferry Road) includes an internal closed loop (SW Crestwood Court) requires out-of-direction travel for trips to the south. Alternative Travel Mode System Improvements The specific improvements identified for the study area were grouped into two categories: 1) improving system links in the existing multi-modal transportatica-Rtetwork; and 2) providing new neighborhood connections within the study area. These improvements are described below and are depicted in Figure 20. Improvements to Existing System Links Several major roadways in the study area are intended to provide 'a balanced multi-modal travel function, and as such should provide designated pedestrian and bicycle accessways consistent with Metro's guidelines for street design. Several deficiencies were identified in the alternative mode travel network within the study area. In general, as development and roadway improvements occur on SW Hall Boulevard, SW Scholls Ferry Road, SW Oleson Road, and SW Greenburg Road, sidewalks and bicycle lanes should be provided along roadways and over bridges. Any new arterials and collectors that may be constructed within the study area should also provide sidewalks and bicycle lanes. Where roadway width is insufficient to provide bike lanes, Metro policy allows that a wide outside lane is acceptable if average daily traffic (ADT) is 10,000 to 20,000. If ADT exceeds 20,000 and roadway width is insufficient to provide bike lanes, a parallel bikeway should be developed (Reference 6). Also, transit service should be provided along Nimbus Avenue connecting employees in the area to SW Hall Boulevard and SW Scholls Ferry Road, consistent with Tri-Met's Transit Choices for Livability plan. Kittelson 6 Assoolates, Inc. Port/and, Oregon WasWnglon Square Regional Center Pml--ct• 2879 Trnnsp0rWb0n System TrvatmentAitematives page.- 16 June 25 1999 Other potential improvements to the systems for alternative travel modes are as follows: • Complete the sidewalk on the north side of SW Hall Boulevard near Cascade Avenue and Highway 217 bridge. Since sidewalks over Highway 217 are provided only on the south side of SW Hall Boulevard, filling this sidewalk gap will permit pedestrians on the Korth side of SW Hall Boulevard to safely access the south side of Hall Boulevard via the pedestrian crossing signal at Cascade Avenue. Complete sidewalks on SW Hall Boulevard east of SW Oleson Road-SW Greenburg Road through SW Pfaflle Street. Significant gaps exist on the east approach to SW Oleson Road-SW Greenburg Road, and again along the north/south portion of the roadway. Another significant gap exists north of SW Pfaffle Street and the Highway 217 bridge, although pedestrian facilities are provided on the bridge itself. • Provide sidewalks on the west side of SW Greenburg Road adjacent to Washington Square Mall. • Provide pedestrian and bicycle facilities on SW Cascade Avenue as development in the area occurs. Improved Neighborhood Connections Eastside Designated Pedestrian/Bicycle Route Opportunities to provide a designated pedestrian/bicycle connection to Washington Square Mall from residential neighborhoods east of SW Greenburg Road were evaluated. Potential routes were considered along SW Locust Street and SW Oak Street. The SW Oak Street intersection with SW Greenburg Road is-located approximately ISO feet from the Highway 217 northbound ramps. Therefore, designation of SW Oak Street as a pedestrian! bicycle route would introduce a high potential for conflicts between motor vehicle and pedestrian/bicycle traffic. Oak Street could be realigned to provide adequate distance from the freeway ramps, but would result in considerable expense and disruption to adjacent properties. SW Locust Street is more centrally located than SW Oak Street relative to the residential neighborhoods, and offers a natural transition area between the residential neighborhood' to the north and business developments to the south. For these reasons, SW Locust Street is proposed for a designated pedestriar/bicycle route. SW Locust Street should be designated as a -Community StreEt. The following site-specific improvements were developed as supplemental pedestriantbicycle improvements to the SW Locust Street pedestrian/bicycle route. However, they would also provide effective improvements as individual treatments: • Provide a raised pedestrian refuge on SW Greenburg Road at the north edge of the cemetery, providing a safe mid-block crossing opportunity and access from the Metzger neighborhood. • . Provide.a raised pedestrian refuge on SW Hall Boulevard at SW Spruce Street, reducing the distance between pedestrian crossing treatments. • Realign SW 90"' Avenue for a more continuous north/south route and easier crossing of Locust Street. Traffic calming treatments on SW Locust Street should be considered to improve this location for neighbors, including children accessing the elementary school. Washington Square Internal Access Improvements Several gaps were identified between Washington Square Mall and other commercial estahlishnicnts bounded by the major study roadways. For instance, there is no direct connection between (he 'T'arget Kltte/son Assoc/ates, Inc. Port/:rnd, Orv,ryon ==INN IN IN :Iliili Washington Square Regional Center P~c~Ject 2879 Tiansportadon System Trea&nent AJtema&ves Page: 17 June 25, 1999 and the mall, so that any access between the two properties requires significant out-of-direction travel. Also, several locations within the Washington Square Mall show pedestrian paths worn in the landscaped areas. Specific connectivity improvements were identified within the commercial core: e Improve SW Eliander Lane, SW Washington Square Road, SW Palm Boulevard and the roadway bounding the Cemetery to full street standards, including sidewalks and bicycle lanes. This will enhance pedestrian/bicycle circulation among the key activities in the area. Pedestrian treatments, such as raised pedestrian refuges and designated walkways, should also be provided to create safe crossing opportunities from the roadways to the mall. o Improve amenities at the Washington Square Mali Transit Center, including a covered pedestrian path to the Mall, consistent with Tri-Met's Transit Choices for Livability plan. a Currently, all motor vehicle access to the Target/Good-Guys development north of Washington Square Mall must be made via Hall Boulevard. New driveways with sidewalks should be provided on Eliander Street and Palm Boulevard, providing multi-modal connections between the two retail locations. a If redevelopment of the Target store takes place in future, a secondary store-front orientation should be encouraged facing the south and a pedestrian stairwell or pedestrian/bicycle path should be provided to access Washington Square Mall. Wesiside Boulevard Classification SW Cascade Avenue between SW Hall. Boulevard and SW Greenburg Road should receive the Boulevard classification, providing continuity of design and accessibility throughout the regional center. Significant portions of SW Hall Boulevard and SW Greenburg Road are dlassified as Regional Boulevards, which are designated to provide special amenities that promote pedestrian, bicycle, and public transportation travel. However, without this classification change on SW Cascade Avenue, there is not a comparable connecting facility designation west of Highway 217. Bicycle/Pedestrian Crossings over Highway 217 As previously noted, bicycle and pedestrian opportunities to cross over Highway 217 are limited in the study area. Considerable distance separates the pedestrian/bicycle facilities, and high-speed, high-volume motor vehicle traffic hinders safety and comfort. New crossing locations for bicycle and pedestrian access over Highway 217 were identified. a Provide a new bicycle/pedestrian connection over Highway 217 between SW Hall Boulevard and SW Scholls.Feny Road, which will provide an alternative connection between the Nimbus Avenue developments and Washington Square Mall for both pedestrians and bicycles. Also, providing the parallel bicycle path would be consistent with Metro's street design guidelines for high volume roads when roadway widths are insufficient to provide striped bicycle lanes. This improvement would be incorporated as part of the roadway improvements identified in the Future Transportation Alternatives Evaluations memorandum. • Provide a bicycle/pedestrian connection over Highway 217 from SW Cascade Boulevard southeast of Washington Square, which will provide an alternative to existing Highway 217 crossing opportunities, and would be consistent with Metro's street design guidelines for high volume roads when roadway widths are insufficient to provide striped bicycle lanes. This Klfto/son & Assocla tes, It 7c. hortland, Orogon mom Wash/ngton Square Reglona/ Center Fftvfect: 2879 Transportadon System Trea&nentA/temadves page. 18 June 25, Y999 improvement would be incorporated as part" of the roadway improvements identified in the Future Transportation Alternatives Evaluations memorandum Provide a bicycle/pedestrian connection over Highway 217 along the SW 951 Avenue alignment south of Washington Square, providing access from the residential neighborhood south of the study area to Washington Square. This connection would provide a bicycle route parallel to SW Greenburg Road and SW Hall Boulevard at SW Pfaffle Street where insufficient bridge width precludes striping of bicycle lanes on the roadway. SUMMARY OF FINDINGS Motor Vehicle System . A number of conclusions can be drawn from the evaluation of the alternative system treatments reported in this memorandum. The key findings derived from this analysis are as follows: • The modified Highway 217/Hall Boulevard interchange. form tested in Alternative A does not improve the operation of the Scholls Ferry Road/Hall Boulevard intersection. • An alternative connection between areas to the west and areas to the southeast such as the tested Greenburg Road - Hall Boulevard connection assists in reducing congestion on Hall Boulevard. Latent demand in the system quickly absorbs the resulting release in capacity at the Hall Boulevard/Scholls Ferry Road intersection. • Variations in the connectivity of the Locust Street over-crossing (i.e. local vs. regional level connection) do not significantly impact on the traffic volumes in Locust Street. C The proposed southern connection between the Washington Square Mall and Hall Boulevard tested in Alternative C diverts significant traffic volumes from Hall Boulevard and reduces the need for widening Hall Boulevard to five lanes between the connection and Oleson Road. • A local level over-crossing connection between Washington Square and Cascade Avenue/Nimbus Avenue has the ability to divert traffic from the Hall Boulevard/Scholls Ferry Road intersection. Alternative Mode Transportation System Many opportunities exist to improve multi-modal access to/from and within the Washington Square Regional Center. The improvements identified in this memorandum fill gaps in the existing networks systems and provide new connections within the study area. The implementation of a series of improvements to the area's transit, pedestrian, and bicycle connections is critical to the continued development of the study area consistent with it's designation as a Regional Center. Existing transit service provides connections to the Washington Square Regional Center study area from downtown and from Beaverton. However, no service is provided along Nimbus. Transit connections to/from Nimbus Avenue must be made at SW Hall Boulevard or SW Scholls Ferry Road, which are spaced at approximately 6,000 feet (1.14 miles). • The pedestrian path provided from the Washington Square Transit Center to the mail is poorly s delineated and has no rain shelter. 1 I The only designated bicycle crossing over 1{ighway 217 within the study area is via SW Scholls Ferry Road, where high-volume and high-speed motor vehicle traffic hinders bicyclist safety anal com fort. Kit tolson & Assocla tcs, Inc. l 4 or tl: u u f, (h opt n ) Milan IMIN WasNrigtoa Squats Reglonal Canter PAVect: 2879 Tfansportsdon System Tree&nenl Alterrmatrves Page. Y9 . June 25, 1999 - ' • No bicycle lanes ar,- provided on SW Oleson Road, SW Greenburg Road north of Highway 217, and SW Hall Boulevard east of Scholls Ferry Road. Bicycle lanes are provided along SW Scholls Ferry Road and part of SW Hall Boulevard, and provide connections to most study area transit routes. No bike lanes are within the Washington Square Mall. • The existing sidewalk network has frequent gaps, including along Hall Boulevard between SW Oleson Road-Greenburg Road and SW Pfaffle Street; on SW Greenburg Road; and accessing Washington Square Mall. • Sidewalks are provided on Highway 217 over-crossings on SW Hall Boulevard near Cascade and near SW Pfaffle Street. However, sidewalks leading to these crossings have significant gaps. • Protected pedestrian crossing opportunities are limited on SW Greenburg Road adjacent to the Mall, and on Hall Boulevard south of Oak Street- • Pedestrian and bicycle facilities within Washington Square Mall are minimal and require pedestrians and bicyclists to navigate through parking lots and landscaped areas to gain access between shopping areas. • Lack of a direct link from Nimbus business developments to the Mall requires all modes to use SW Hall Boulevard or SW Scholls Ferry Road. Also, gaps in connectivity lead to out-of- direction travel for residents of Progress neighborhood, residential streets-off of SW Pfaffle Street. Conclusion The analysis of the motor vehicle and alternative mode transportation systems revealed many of the trade-offs inherent in developing a transportation system to serve competing demand. As the analysis showed, each concept plan would have varying degrees of impact on local and/or regional traffic conditions. In order to develop a system integrating regional and local travel needs, the elements of each system concept were evaluated individually, along with the potential improvements for pedestrian, bicycle, and transit modes. The evaluation results and the recommended transportation plan will be provided in a subsequent technical memorandum. I Kittelson & Associates, Inc. I'oilinnd, OreGon Appendix A Regional Transportation ]Plan Project List Appendix B Baseline Select Link Analyses N Appendix C Alternative A Select Link Analyses Appendix D Alternative B Select. Link Analyses All Appendix E Alternative C Select Link Analyses Appendix F ore Systems of 6 Inventory .lternaflve gavel M allow ORTH (HOT TO SCALE) - 17 N 210 a _ W 0 s ~ I I 0 4 s Q a 3 ~ ~ m Sly >/y m S S 8(~ _ is GF, i ° ! o WASHINGTON 3 > co SQUARE N o SW 80 OER ST r p~ z MALL rn ¢ SW LEHMAN j m r ST p~ y to 3 m SW COR ! SW LANOAM ST `rte 2cf~'v ST SQUARE RD SW LOCUST ST SW LOCUST ST S r 94 S rn Q SW OAK ST SW OAK ST ~t ~ ~ ~ Sw PINE ST 1 ~ ASH gco( , f SW SPRUCE ST sw Swwr = 3 0 pF~~~ - = 2171 ¢ cn a x s~ Fc`,1,euR SW PFAFFLE ST C RO 7 LEGEND - STOP SIGN EXISTING ROADWAY LANES TRAFFIC SIGNAL WASHINGTON SQUARE REGIONAL CENTER FIGURE ®®e ® NUMBER OF MI_ ~aLQCI< ONES TIGARD OREGON JUNE 1999 owcs nw~+ zsTSrzo~ Connecting to _ ~r NORTH (NOT TO SCALE) 17 O 210 p~ O a . o oW S ~ 6 c~ z 3 i Q W J o i. en 3 m sw . ~Fy z aJe~I'D is WASHINGTON o a S N SQUARE o SW 80 DER ST w MALL N > SW L EHMAN N rn J'y S N c ST i ~O d+~ ycoy t~~ SW STORRAL s i SW IANDAM ST SQUARE RD SW LOCUST ST > F SW LOCUST ST \ Proposed Z = c,t1 yG ercrossing r 00 .0 5 rn < ~ SW OAK ST SW OAK ST ` • SW PINE ST yy sw srum NST y0~• `N~'~ rz- CC) ~~F~~•. ¢ 217 N a cn 53 Z 4m C3 m O m O i ~FF,1, `n in i eURp R~ SW PFAFFLE ST P~ S NOTE: HWY 99W UPGRADED TO 7 LANES BETWEEN HWY 217 AND 1-5 LEGEND - STOP SIGN TRAFFIC SIGNAL 2020 FUTURE ROADWAY LANES NUMBER OF MIDBLOCK LANES WASHINGTON SQUARE REGIONAL CENTER FIGURE NUMBER OF WIDENED MIDBLOCK LANES TIGARD, OREGON KV JUNE 1999 2 DWGS Fiwa 2e79c202 0 0 i ~ m 217- y NORTH (NOT TO SCALE) 390D 0 0 °!s ~p~ eel co 7700 ° ~oooo P~- co co co Z6400 Sjy 0 ° 0° 0 0 U n9,Gb °z v v J h) l~ m /4~ c~ 1° o0 5~-2pop J'iy oo ' opp 3y SW 'LOCUST ST 400 och G~`~~~~R~F 00 100 SW LOCUST ST 100 S 9L 6g 0 0 0 00 v~ o 0 0 6j0 O 500 SW PINE ST 136-0 mooo 500 10 9~0 to 2 1500 ti ry 9,~0 O Q 217 cn o Co f o 0 F FNeVRC Rp SW PFAFFLE ST e Q2 4~ 4-- 99W W G~ 1.994 2-HOUR PM PEAK TRAFFIC VOLUMES WASHINGTON SQUARE REGIONAL CENTER STUDY FIGURE TIGARD, OREGON JUNE 1999 1 OWCS fiNN. 2879f203 o 217 _ (NOT T SCALE) s 10400 54 a o p°°o 1100 ~~0~ F y0 8000 5 do °o °o g `y o° t4~ n J n ?00 3 p 60~ s~ o ~~pp g000 0 800 SW LOCUST ST 1100 300 Sw LOCUST ST 00 S i0soo o° o SAI 900 SW PINE ST 900 ~6.!°°° m mho^oo 11 x,200 ~ O i `v 217 in o ~ o ~F N~RG Rp SW PFAFFLE ST Q2 4~ . ZG 99W f 2020 2-HOUR PM PEAK TRAFFIC VOLUMES WASHINGTON SQUARE REGIONAL CENTER STUDY FIGURE TIGARa OREGON 4 K JUNE 1999 OWLS FINAL 2079F204 NORTH (NOT TO SCALE) - Qp 17 . 4~ 210 S~ o a ~ 3 ' a /yam z aJ e~~ *~y WASHINGTON eg a Q ; N o~ SQUARE o Sw BO ER-ST ; co MALL v j 1z" (n a SW LEHMAN m ST 1 4, o SW ST CORRAL i ` O~~S E, y SQUARE RDi SW LOCUST ST SAY LOCUST ST I-- co -0 Cn Sr SW OAK ST" SW OAK ST co SW PINE ST SW SFNDY k•.- N SW SPRUCE ST yo ~N F O1 F¢~. r = 217 vi F;-,cn G m a 9! 2 ~/RG RD SW PFAFFLE ST E~ a m NOTE: METRO DEFINES CROSSLY UNACCEPTA©lE OPERATING CONDITIONS AS THOSE CONDITIONS q Wt{ERE THE 2-HOUR LINK VOLUME TO CAPACITY RATIOS EXCEED 1.10. C3 LEGEND 1994 2-HOUR PM PEAK ®Imlelfi OGROSSLY PERATING CONDITIONSE OPERATING CONDITIONS WASIIINGTON SQUARE REGIONAL CENTER FIGURE TIGARD, OREGON KC, JUNE 1999 • OWGS IINAL 28791"205 NORTH (NOT TO SCALE) p 17 S 210 W • ' co ~'c~` Z r a J 6~ lv may, WASHINGTON o a i N SQUARE o SIN 80 ER ST. j co MALL rn a SW LEHMAN t t syi N ST EL a!+ Z C> SW COR i o v ST SW LANDAM ST y SQUARE RD L' SW LOCUST ST ' a SW LOCUST ST CD > a a SW OAK ST SW OAK ST ` 3 SW PINE ST Sw stem ...=4Sii _ CRe fK..- N SW SPRUCE ST do FF~~ - ¢ 217 N z J < i ` rn ¢ o o r- • FF`,T, BVRG Rp SW WAFFLE ST NOTE: METRO DEFINES UNACCEPTABLE OPERATING CONDITIONS AS THOSE CONDITIONS WHERE THE 2-HOUR LINK VOLUME TO CAPACITY RATIOS ARE BETWEEN 1.01 do 1.10. METRO DEFINES GROSSLY UNACCEPTABLE OPERATING CONDITIONS AS THOSE CONDITIONS WHERE THE 2-HOUR LINK VOLUME TO CAPACITY RATIOS EXCEED 1.10. LEGEND 2020 2-HOUR PM PEAK an UNACCEPTABLE OPERATING CONDITIONS OPERATING CONDITIONS mlat®Im GROSSLY UNACCEPTABLE OPERATING CONDITIONS WASHINGTON SQUARE REGIONAL CENTER FIGURE TIGARO OREGON G Wa JUNE 1999 V OWGS FINAL 2879F20e NORTH 1 (NOT TO SCALE) SFy 17 Z i R~ o~ 210 o~ W v~vo o i 3 Z y SHI ON N cn QUA a SW BO ER-ST j co MALL v ~ N LE j s~ 2 C i SW CDR i FAR oy ST j SW LANDAM ST S RO j SW LOCO ST j S~ iG = a SW LOCUST ST co SW OAK ST SW OAK ST -O ~ 1 a ASH `~~i SW PINE ST sw SW SPRUCE ST do \ LN _ 7 ~ ~ I 217 ¢ m N F N r, In ANALYSIS OF TRAVEL DESIRES NeURC RO SW PFAFFLE ST SHOWS CONGESTION AT: a OLESON/HALL • HALL/SCROLLS • SCHOLLS/CASCADE THIS IS CAUSED BY HIGH TRAFFIC VOLUME TO AND THROUGH THE AREA, WHICH HAVE FEW ROADWAY CHOICES OTHER THAN GREENGURG, HALL, SCROLLS, AND HWY 217. a a LEGEND LOCAL TRAVLI. DESIRE LANE GENERALIZED TRAVEL DEMANDS REGIONAL TRAVEL DESIRE LANE WASHINGTON SQUARE REGIONAL CENTER FIGURE ®a TIGARD, OREGON JUNE 1999 OWCS fINnL 2f379f207 NORTH (NOT TO SCALE) o 17 y ~ ~o ~ o 210 Q~ • W W N Z s Z J ~ s ~ m a6 3 ~ e<l~ _i' z -MASHINGTON SQUARE o SW e0 ER- -ST o x MALL N j < SW LEHMAN x ST H ! ` E~F~I `row v ST R SW LANOAM ST ` c~S?j`°~~ ~F RQ OLSwCUST ST > ` SW LOCUST ST i ` SW OAK SW OAK ST m SW PINE ST e < ASH `CREEK lp SW SwAm SW SPRUCE ST yp ~ W ' C'~••-i ¢ co m 217Q < < IMPROVEMENTS INCLUDE: ' t ' FF~BURC RD SW PAFFI E SST • IMPROVED ACCESS TO WY 217 • NIMBUS AVE. EXTENSION TO GREENBURG RO. • LOCAL LEVEL CONNECTIONS FROM MALL TO CASCADE AVE. AND NIMBUS AVE. • GEMIN RD. EXTENSION TO HALL BLVD. LEGEND PROPOSED NEW ROADS ALTERNATIVE SOLUTION CONCEPT A WASHINGTON SQUARE REGIONAL CENTER FIGURE TIGARO OREGON ®a JUNE 1999 8 0WG5 FIW1. 2879F208 LBG~YI,ITY gT~ a `yr HANG BCl!p' . o~ r.oaai r tt 'Oyl ;Al vt„~ xtC FERRY RD. TAfLORS .w 1 pt~ : 4 Ott pttt w K ~j \ yt tit SQUARE \ = z Esc ' " ?►At l LOCUS? S%. ,at t y (1 '(tom- ~1 r • { I y' h l 'd J ~ ~ d p y) \ t1 , g ,tX ~ 1 r .a of . f " :HOUR ' ATIV'E A: 2020 .2 CAPACITY RATIOS ALTER sQUAVOLUME TO P M PEAK RE REGIONAL. CENTER Fl. 9 E ,NIA,SBjN GT0N OREGON JUNE 1999 z via .dap ~ ~~a ~,a' '~2.. ~i TAYLORS FERRY RD. lit 1 roor ior U44 °x ~N N ~~i r ` \ o.i u oet tie to w z WASH. ; °j n 3 x to ~SQUARV' % x y °z ti MPLt ; 4i co r n ~'Cj• 5p f i° 1 w f 6 N LOCUST, ST, 1 ti ~0j1 1~ * MR g )It ' s~ kti Ra ,rt r p~ 21 RD r r . ur! t ! ' SC`s , ~ . • + J q1M iPi s ~ ,9 1, S a it ?ti x~ ,3 t f~ ti 7s ~ 4 f ttl \ - I ALTERNATIVE A: 2020' 2-HOUR PM PEAK TRAFFIC VOLUMES WASHINGTON SQUARE REGIONAL CENTER F1cuRE . TIGARDOREGON - 10 JUNE 1999 HORTH (NOT 70 SCALE) - ~ 17 shy ~o 210 O~ W n C3 n , sc m ¢ 6Cylj ~.Q Fly Z- ASHINGTON:t: a i p~ SQUARE ¢ o Sw e0 DER ST j co MALL N y a SW LEHMAN 7 ST i C) EL o ST R SW LANOAM ST SQUARE RD Sw i O S~ St~ LOCUST ST a SW LOCUST ST SW OAK ST SW OAK ST < ASH CREEK SW PINE ST SW SPRUCE ST ao cJn FF~~ r 217 xn ~.;`1 rn 3E & ~z >c € IMPROVEMENTS INCLUDE: r . FN in iN ti • IMPROVED ACCESS 6URC Rp SW PFAFFLE ST TO HWY 217 P a • NIMBUS AVE. EXTENSION T TO GREENBURG R0. i • LOCAL. LEVEL CONNECTIONS cry''' . FROM MALL TO CASCADE AVE. AND NIMBUS AVE. • GEMIN R0. E? TENSION TO 3 HALL BLVD. LEGEND PROPOSED NEW ROADS ALTERNATIVE SOLUTION CONCEPT B WASHINGTON SQUARE REGIONAL CENTER FIGURE TIGARO OREGON JUNE 1999 OWCS FIN/1~ 2(379F211 s a ,,<< IyAq tAYLORS FERRY iRD. A^ m ~yJi r • t r .te .i t 2 : • a4 ~ ~ 2~i ~ a 'S S • t: }3a1 WASH ` k i R !+l5x QUARE aor » x 5,cr LOG ST ST, rn 40 ~ - ~~5 l L t 9 + :Q'`A 'rte ~ ^ 11 9~ ( t gyp. ` ATIVE •6: 2020 2-HOUR RATIOS ALTERN VOLUME TO CAPACI F1 PM PEAK. cu WASH INGT N SQUARE REGIONAL CENTER 2 TIGARD OREGON JUNE 1999 LEMBILITY STRIP ti is TAYLORS FERRY R0. t f 1' DUI o+t~e g fill seo lu +I 0*4 fn t w m St Z SQUARE,., rj~e x = zv ,rtL'a ~ µA~t,.~s rI'~t co le Iyx t , LOCUST ST. tt n v. 1211 4t 1 : t It - ift. R7 U11 G' G "'1 ~zt' LLS EE 8 X IS ' \ ~q 57 1,5 S~H~ ~ ''ti• z NN f! u 1 p 1 It Ih ~ G ? R `y ti~ 1 e~ yy M on tt 1 ~ I , M n t i G~ GN G 1 ~i N 1 I ~ ~ ` ao 1 I `~I f • ' r K ~r . VE E: 2020 2-HOUR ALTERNATI PM PEAK TRAFFIC VOLUMRES FIGURE WASHINGTON SQUARE REGIONAL CEN 13 . TIGARD OREGON JUNE 1999 NORTH (NOT TO SCALE) p 17 sly Gov 210 r a W ~ W 2 Vi~ O ' Z J ~ ado, ~'F a J 6~1D i < may, ti WASHINGTON o > i r SQUARE o SW BO ER ST j co MALL < SW LEHMAN o Z ST .A' CD SQUARE O " SW ST OR SW LANDAM ST SW LOCUST ST > SW LOCUST ST > i -o co SW OAK ST" SW OAK ST 1 r^ j < ASH i` GGo SW PINE ST ` sw SVAOY _ CREEK =XRUCE ST 40 m F~+ ~,..N = 217 a o, • K 2 ~ 0 C, ~ 'eVRC R~ SW PFAFFLE ST IMPROVEMENTS INCLUDE: , P a NIMBUS AVE. EXTENSION TO TIEDEMAN AVE. ! p~v i • REGIONAL CONNECTION FROM LOCUST ST. TO NIMBUS AVE. a MALL CONNECTION TO ` NIMBUS AVE. do CASCADE AVE. • LOCAL CIRCULATION f IMPROVEMENTS LEGEND PROPOSED NEW ROADS ALTERNATIVE SOLUTION CONCEPT C WASHINGTON SQUARE REGIONAL CENTER FIGURE TIGARD,_OREGON q ®a JUN[ 1999 1 OWGS F4AL 2679F214 ii No d Noll 111 No No Noll ti ° o HAQ BCVp t srt y ~N ' 7Ari0RS fERR'! RD. ~ x 90 9 ~N ~`1'~ •lyjF \ ZB tiY~• t p. tj`vy, Z S t1t , . 01 ¢ SOU RE `~a' Tss 2t fi ~AAtI..~°` sor a .SAO) LO CU tlt ° v + Z°1, 011 9p S! Pitt N` tt Zi1 `~sa' 1yyy1S~~1 w t jig d ~ It X~ 1 91t 'J~! ~ i5 8 .960 .iii 1 t 1 06 \ b t Ct 6 is ,te5 t ~~lp ry ~t t o y~~Q ~,J~ 761 a N 115~ 2020 2-HouY RAT►~'~• , pTIVE C ; CAPAC►T ALTERNVOLUME TO nGURE PM PEAK ONAL CENTER ,OUARE .15 REGI TIGARQ OREGON ,~~~fE 1999 R 8, 1 R ~C I Q~ ,b1Rv HAQ $~VD h ro ' i TAYLQRS FERRY RD. a ► tt 1029 4 w ~ ~ ' ~ tp~S bbd , 1211 c 999 1261 ~ v, h Vf '1 ~q2 r. ~ ~ r J f , , at r WASIA. ^ 2cos y sn to?s r~s re SQUARE •Y ?P~ E o !S '4 MALL Gj y N ~o ti ~ 4 ti ~ qc ~a, LO UST Sr: . o~ x:~ It ~ m ~ SSS 6~ t i 2i ~ 6~p2a ~ d c ~pr'A S ? A661 t2gti2 ` coG 7 t?a5 6 tg , o N ~ 1g'1~1 2S 1 ~It a Egt ~ 22ci 22 6,~ Qry ty ~,b A gg1 221, ~ RD' ~ ` ~.A bR k k o ~22SB FAR S . ' ~ Sc~Q~~S & z ►1 ' a2 ~6 ~ ~ r a it J~ sb ~ f s ' r let N n 1 W • y t59 !t< h 1 ~`taD ~ ZG ~ 11 tin 1191 619/J~. ~g~ b tJ6{ tt sit 67° ~y g5°b s` y~`c ~ zpl.+ J66, sit ye,1 R ~ aA ~a 2020 2-HOUR ALTERNATIVE C:IC VOLUMES (7 IIII, PM PEAK TRAFF HINGTON SQUARE REGIONAL CENTER FIDURE ®Q WAS pREGON 16 TIGARU JUNE 1999 t (NOT NR O SCALE) 17 ye'- i <v i 210 ~ TEMPORARY ~ p PARK AND RIDE LOT > 0 l i Z. cn _ zs ( l i Vl- m S(tr > ~L co c'~~ z • _L..TRR ANNSSIT eCI'4 0 CENTER WASHINGTON e > N o~ cn SQUARE o SW 80 OER co MALL dT z N rn ¢ SY/ LEHMAN S cn ST 0 RO~♦ J~ o rn SW TOR SW LANDAM ST SQUARE Q. SW LOCUST ST _ SW LOCUST ST S•t1 O~ 7 = ~ e' 9L l as SW OAK ST h~ SW OAK ST SW PINE ST 3 Stun `n SW 'SPRUCE ST a' a 217 N ¢ m t t S C Z N W a7 47 n • \ n N SW PFAFFLE ST ~ •ea Q i acSti o ~Q? nccC fkL C[MFR[tVOf C ,T t •OF TICA RO LEGENI -BUS 43 BUS 67 BUS 45 BUS 76 EXISTING TRANSIT SERVICE - BUS 56 - - - - BUS 78 TRANSIT CENTER/PARK k RIDE LOT WASHINGTON SQUARE REGIONAL CENTER FIGURE ® BUS STOP TIGARD, OREGON 17 ~a JUNE 1999 28 )9 TPAN =I 11111m (NOT T SCALE) 17 210 Spy W W . <75 y4 ~ W V ~ J Z _ V1 m ~ 3 co a Q WASHINGTON e o > N y SQUARE a SW 80 DER co o MALL z J a Swr LEHMAN s 3~ ST sw COR SW LANOAM ST y SQUARE RD 1% 51 f LOCUST STST. 9p a SPL LOCUST ST SG~p S ~ ~ 9G o ~ > ' tr SW OAK ST- A SW OAK ST. SW PINE ST ASH CREfK SW SPRUCE ST LN Q' > m 217 N ¢ < < < 3: ~ 'z 1n rn ~ ~ 4 0 { 1:I J SW PFAFFLE ST Q { i RlC gpLL CF.TiR CTUOT - ~ ' CITY Of VICAR* 3 a • LEGEND - BIKE LANES 'EXISTING BIKE -LANES WASHINGTON SQUARE REGIONAL CENTER FIGURE TIGARO OREGON q 8 r JUNE 1999 I 28 7901KE (NOT TO SCALE) sw ~ 17 cl) rev 210 SpC~ O E Q ~ o as o1Q m S(Y J~ z e<yb a WASHINGTON a > N ~y SQUARE o SW e0 R v z p~ MALL j rn a SW LEHMAN s ST rn SW CORR~~ S SW LANDAM ST ' , oy SQUARE 0 . 4%* LOCUST ST ~p SW LOCUST ST SW OAK ST c~ SW OAK ST 70~ Q co SW PINE ST ASH C K vii ~ ~ s REf SW SPRUCE ST w x - c- rn 217 N ¢ m < < J 1-n 2 n x O O s e W £ SW PFAFFLE ST E+ • ~~P~ R 'QD CQ • ~~o II4Cp/1aL cew"A [TUOT E CITT OF TICAKO ' a LEGEND - SIDEWALK EXISTING SIDEWALKS man •4 am - DISCONTINUOUS SIDEWALK WASHINGTON SQUARE REGIONAL CENTER FIGURE TIGARO OREGON 19 ®a JUNE 1999 2879wou ggm s star e-t zoto u-t: 1-tp jann tr. 5peneer 1 (5031 202-2723 P, 2 Exmi na us a REGIONAL CENTER STUDY CITY Of TICARO 19125 SIN HaN Blvd. rigid, Omgai 07223 Plwne 501839.4171 Fax 503.684.7297 T A S K F O R C E ki-ft PrirsdpdMett~erSfod TcmAidcc ac~ WASHINGTON SQUARE REGIONAL CENTER v1-Hr%ax C--),Adrt"atr+mr . DEVELOPMENT and ~0. REDEVELOPMENT OPPORTUNITIES O®U Dmxhm farts elf "m Oedc Pfcllasges. Final Task Force Development Allocations hGs+6ra aru~stCo tm"U C Task Force Meeting of February 17, 1999 COOT Nm;s,& `sapcn March 24, 1999 jonxwgadf', is DwMdar4p_ AsswiaCvs d0 Rai endTmctAdwonc lj+don hGenl( LynM6olf&Assooalc , Adele Nit im tSaofs r~ln~ayQ NwmdOdrrvt Pee0emofUrAK 9oete 11°*Y• . M<:ger,viiaA {a~Re~ort ~h6SF~v16'n' &t..,e Mel RikSoax Croup hklCnsrie . FomxtS06 Beoe~tsnCnyCan+ol red Spam rrj.d Gmu~ Citiare fix$etvtlc TO. apo~ C:tuar~P+n~iPa~n~ (]gcrraUcm 4111 rfa; Wl,.xt rd per"- .'('~rir~issiv~ ,Mar 24 99 04:14p John C. Spencer 1 (5031 292-2723 p'.3 RfMODUMON This summary report contains the results of data collection and. analysis of land uses and vacant lands within the Washington Square Regional Center study area, an assessment of development poteatial within the area, and a development allocation scenario which describes the year 2020 condition. Mapping of a variety of features within the study area was undertaken by the City of Tigard. Data from Metro, Washington County, City of Beaverton and the City of Tigard was utflized, and field surveys and aerial photo checking was undertaken to verify information- Specific information on vacant land and redevelopment potential was verified with property owners, residents and business interests is the study area. EXISTING CONDMONS The Washington Square Regional Center study area includes lands within the City of Tigard, City of Beaverton and in unincorporated Washington County. Approximately 1,074 acres exclusive of public rights-of-way are included within the study area. The area 'is shown on the attached figure. Table 1 summarizes land area including vacant lands within each of five sub-areas established for study purposes. Table I WASHINGTON SQUARE REGIONAL CENTER STUDY Existing Conditions Sub-Area A Sub-Area B Sub-Area C Sub-Area D Sub-Area E Total (Acres) E217- Green. N. Locust S. Locust W217-S.Scholts W217-N.Scholls (Acres) (Acres) (Acres) (Acres) (Acres) Gross Area 895.4 153.0 216.0 168.7 351.0 1784.1 Net Area 537.2 91.8 129.6 101.2 210.6 1070.5 Public 186.2 0.0 6.5 0.0 0.0 642.3 Vacant 4.3 8.9 20.2 7.3 4.3 44.9 Source: City of Tigard and Spencer & Kupper Sub-Area A is bound by Hwy. 217 on the west, SW Greenburg Road to the east and includes the Progress Downs Golf Course to the north. Area B lies east of SW Greenburg Road to SW Hall Boulevard and SW Locust Street. Area C is south of SW Locust Street between SW Greenburg Road and SW Hall Boulevard to Hwy. 217. Areas D and E lie west of Hwy. 217 to Fanno Creek. Area D is south of SW Scholls Ferry Road, area E north. Approximately 4.2 % of the net land area within the study area is vacant. Development and Redevelopment Opportunities Page 2 March 24, 1999 p.4 (NOT TO sc" 47 d S)p y ~VP 290 co ~J !y< CF` 2 a i o ~y WASHINGTON ® H e~ SQUARE z sW 8 R ST MAtI. a SW LEHMAN y k.. SW COR ; SW LANDAM ST sr ; °y sQUARE RO SW LOCUST ST SW OAK ST SW OAK 5T 4'- IF SW PINE 5T ~'p ASH _ CRf£K i ~ri SW SPRUCE ST 1 < 217 /~i, E co ~ a a jR SW PFAFFLE ST R~.p/y.1, Cf,RTY lfYOf ` I ` C/Yf OF rIG ARO 1 SITE VICINITY MAP rT ASHINGTON SQUARE REGIONAL CENTER FIGURE GAR O OREGON T08F_R 1998 2679FO01 nar e4 UU u4:15p John C. Spencer 1 (5031 262-2723 P.'s DEVELOPWNT AND REDEVELOPMENT OPPORTUNnm All lands within the study area were evaluated as to their future development or redevelopment capacity over a twenty year time frame (2020). Table 2 munmadzes the analysis for each sub- district. Lands identified as having future development or redevelopment capacity are currently vacant, have imfill opportunity, have redevelopment opportunity, or are currently used as large (greater than one acre) surface parking lot. Each of these categories is defined in the table. The vast majority of land available to accommodate future growth within the study area will be in the form of redevelopment of existing structures, and hrfill on sites currently utilized for surface parlamg lots. The'assuniptions used to determine had available in these two categories were developed with property owners and development interests knowledgeable of the study area. Over the next twenty years, approximately 192 acres of land area will be available to accommodate employment and residential growth within the study area. Development and Redevelopment Oppomutities Page 3 March 24, 1999 rear c-t --iZI u-t: !ap .ronn c. Spencer 1 tbU31 282-2723 p-6 Table 2 WASIENGfON SQUARE REGIONAL. CENTER STUDY Development and Redevelopment Opportunity Sub-Area A Sub-Area B Sub-Area C Sub-Area D Sub-Area B Total (Acres) E217- Green. N. Locust S. Locust W217-S.Scholb W217-N.Scholls Acres (Acres Acres (Acres) (Acres Vaeane 4.3 8.9 20.2 7.3 4.3 44.9 Will 1.0 9.9 5.7 16.6 Oppactn 't, Redevelopment 11.4 2.2 20.6 14.9 20.1 69.2 Oppommit? Parking Lot 22.2 4.4 5.8 6.4 38.7 Redevelopment' Potential 14.7 29.3 44.0 Commercial Ralevelopmene Gross Totals 38.9 20.9 $0.9 417 60.2 213.5 Source: City of Tigard and Spencer & Kupper tParcel is completely vacant or contains a small shed or similar small structure. 2Parcel appears large enough to accommodate additional dwelling units or businesses. Value of improvements is generally less than value of parcel, and/or a large portion of the parcel is used for outdoor storage or parking. 4Assumes for surface parking lots in the vicinity of Washington Square Mall (A): 501/c of existing area to remain su face parking; half of the remaining area (25% of total) available for redevelopment, the remaining area used for structured parking. Total existing surface parking lots = 88.75 acres. For surface parking lots west of I- 217 (D and E) assume that 500% are available for redevelopment. For surface parking lots in the vicinity of Lincoln 'enter (C), assume 75% are available for redevelopment. . 5For existing tight industrial/commercial areas west of 1-217 (D and E), 25% of the total developed area available for redevelopment. Total existing area is 175.99 acres. 6Net total = 900% of Gross Total Development and Redevelopment Opportunities Page 4 March 24, 1999 Mar 24 99 04:16p John C. Spencer 1 (503) 282-2723 p'7 TARGET GROWTH FOR THE REGIONAL. CENTER The Metro Urb4wi Growth Management Functional LOW 1996 establishes target growth capacity for each jtgisdiction in the region. City of Tigard W/in Mixed-Use Areas Dwelling Unit Capacity 6,073 Units 981 Units Job Increase 14,901 Jobs 8,026 Jobs These growth targets for mixed-use areas were used for planning purposes to develop future growth scenarios for the Washington Square Regional Center study area. The Regional Center Task Force has had several work sessions evaluating options and refining a desired development scenario. Both the target employment and dwelling unit assumptions for the most recent scenarios are higher than the figures noted above for mixed-use areas to reflect that the study area includes areas within the City of Beaverton and unincorporated Washington County as well as the City of Tigard. Table 3 summarizes a development scenario for the Washington Square Regional Center. The scenario is based on accommodating the following job and housing targets: Growth Scenario Summary: 1998-2020 Employment: 9,804 jobs Retail: 1,188 jobs Office: 8,436 jobs Lodging: 180 jobs Housing: 1,500 units Residents: 2530 people Estimates were made of needed building area to accommodate both employment types and housing, and land needed for parking at target parldng ratios. Two scenarios were then identified, which represent `bookends" as to the amount of land needed within the study area to accommodate the growth targets. The High Density Scenario assumed high floor area ratios (FAR ratio of building area to site area) and residential densities, mixed-use buildings, and also assumed that new parking would be predominantly constructed in parking structures. Approximately 120 acres would be needed. The Moderate Density Scenario assumed floor area ratios and housing densities within the range that exists in the study area today, and also assumed that most new parking would be constructed on surface parking lots. Approximately 220 acres would be needed. 3 a 7Table 1-Target Capacity for Housing and Employment Units-Year 1994-2017, Urban Grosith "w7ggement Functio a! Plan. Metro, 1996. Development and Redevelopment Opportunities Page 5 March 24, 1999 • .n a Table 3 WASHINGTON SQUARE REGIONAL CENTER STUDY R Development Scenario: February 17, 1999 Task Force Scenario Assumptions Employment: Target Growth 9,804 jobs Existing Employment: 18,054 jobs C Retail Target 1188 jobs Existing Residents 5074 Non-retail Target 8436 jobs Existing S tram Units 1179- Lodging Target 180 jobs Existing; M Pam Units 1114 Residents: Target 2530 people Housing: Target 1500 units i f Target High Density Scenario Moderate Density Scenario 1 T Land Use' Net Build Parking Parking Spaces Area (SP) Ratios' Number Gross Bldg. Avg. Land Gross Bldg. Avg Land fl ~o (SP) Area (SF)" FAR/ Needed Area (SF) FAR/ Needed ' Density Acrea Densit Acres N T Office/employ 2,319,900 3.0 6,960 2,435,895 4,755,795 2.0 54.6 2,319,900 0.6 88.8 11 @ 275SF/enip A n Retail @ 712,800 4.5 3,208 1,122,660 1,835,460 2.0 21.1 712,800 0.3 $4.5 600SF/emp F Lodging 285,000" 1.0 300 285,000 2.0 3.3 283,000 1.0 6.5 300 rooms @ 950 SF Housing 1;650,000 1.5 2,250 787,500 2,437,500 50 DU/ 30.0 1,650,000 25 DU/ 60.0 1500 units @ Acre Acre 1100 SIP Parks" 11.7 11.7 N 0 Totals 4,967,700 12,711• 4,346,055 9,313,755 120.'6 4,967,700 221.5 •N N 'Employment density by use per Metro Employment Density Study, 1990, v 'Office, employment and retail per 1000' SF; lodging and housing per unit. Mid-range Metro Regional Parking Ratios, Zone A. 10350 SF/parking space "Includes structured parking "Includes structured parking V "No. people + 0.32 jobs X 2.06/1000 =park acres needed. Assumes 1.7 average persons per household. m Mar 24 99 04:17p John C. Spencer 1 (503) 282-2723 p:9 Table 4 shows a relined development program for the study area by sub-area. This program provides for the same target employment and housing as do the smarios descnbed in Table 3. Sub-Areas A and C are assunwd to develop at higher densities than the rest of the study area. These sub-areas include the areas around the Washington Square Mall and the Lincoln Center office complex. Sub-Areas III, D and E are assumed to develop at intensities more moderate, but generally greater than existing intensity in there areas. Density assumptions are summarized below. Land Use: 1Tigh Density: Moderate Density: Office @ FAR 1.25 @ FAR 0.6 Retail @ FAR 0.6 @ FAR 0.3 Lodging @ FAR 1.0 @ FAR 1.0 Holt @ 50 DU/Acre @ 25 DU/Acre This refined development program will require approximately 170 acres over the next 20 years. Table 4 shows the amount of net land available for development within each sub-area. Adequate development and redevelopment capacity exists within the study area as a whole to accommodate development at densities assumed in Table 4. Sub-Area B is shown to aced approximately two additional acres to aeeornmodate the growth allocated to this area- It is anticipated that that growth will likely occur in adjacent sub-areas. The analysis shown in Table 4 is for general planning purposes only. More detailed analysis of zoning capacity will be required to refine ultimate development allocations. i a i i i 3 Development and Redevelopment Opportunities Page 7 Match 24, 1999 SEE LLtT11711)11 1 V 11. . 3 d 1 Table 4 WASHINGTON SQUARE REGIONAL CENTER Proposed Development Program C Final Task Force Development Allocations M Growth Summary Employment: 9,804 jobs Retail: 1,188 jobs Office: 8,436 jobs o Lodging: 180 jobs Housing: 1,500 units n T Sub-Area A Sub-Area B Sub-Area C Sub-Area D Sub-Area E Totals N (High Density) (Moderate Density) (High Density) (Moderate Density) (Moderate Density) -a 11 Avg Jobe/ Acw Avg Job el Agee Avg Jobe/ Acres Avg Jobs/ Acre Avg Jobd Aeae A%S rTabd ARw 11 LVU Naito 1i» b Lfilita Uclto Ua3a Units L% to Uolte pfliae 460 1673 8.4 200 727 7.7 460 1673 8.4 400 1455 13.3 800 2909 30.6 2320 84136 Xs Retail 400 667 15.3 50 83 3.8 75 125 2.9 75 125 5.7 113 lee 8.6 713 1181 36.3 Lod&& 0 0 150 90 3.3 75 45 1.6 75 45 1.6 0 O 300 180 63 Houli 300 300 6.0 150 150 6.0 450 450 9.0 400 400 16.0 200 200 8.0 1500 1300 4:.0 P&U 2 2.0 0 0.0 8 8.0 0 0.0 2 2.0 12 12.0 r pct 31.8 20.8 30.0 38.7 491 170.4 Na Ind 35.0 18.9 45.8 38.4 341 1922 ~ o W AVriLble Source: Spec= Kupper N 0, Averole UrAu: meh Detour. ModentA Density. N Once Qt 1000 square fen); 275 SFlerrp. @ FAR 1.25 @ FAR 0.6 t N Retail (X 1000 snare fact); 600 SF/e¢p. @ FAR 0.6 @ FAR 0.3 Ladgbg (Number of raome): 0.6 etrphoom @ FAR 1.0 @ FAR 1.0 N N.ou+ing (Number of uaits). @ 50 DU/Acre @ 25 DU/Acre W Ptrk! (Acreal . a A I I NORTH (NOT TO SCALE) S~ 17 . eC 1'b v h •I~ 210 SpC~ Rp Q ~ O a W Im ~ ~ ~ SKr z< eCVp O~ a C~ ' 'R o SW 80 DER ST C14 an ¢ SW LEHMAN ST ~ 901 o WSCORRAL ;i SW LANDAM ST FE,~' (7 SW LOCUST ST SG~pt 'ja'i°° aaa ¢ ar r SW LOCUST ST 01 S 9L ~ -O OOi < I I SW OAKaS7 ! ¢ SW OAK ST I a amass' S % F- ao SW PINE ST ASH_ _ CR£f i 3 w K =SIVSPRUCE ST ~y0 LN F- Goo 0 217 vii ¢ m < < < U7 J r = it z IN c~ 4 co o r'~ ~FN I. ' eVRG ~,0 SW PFAFFLE ST 1 J J ~ i .1 RECq/lLL C[RTYR [TOOT ~ a C IT T OF T IC A R O In addition to the improvements shown above, sidewalks and bicycle lanes should be provided on SW Scholls Ferry Rd.. SW Ball Blvd., SW Greenburg Rd., and SW Oleson Rd. as development and/or other roadway improvements occur. LEGEND ■o* X 11 Op.- FUTURE 11 NEW 8115 SEES ICC ~/BICYCLE CONNECTIONS PEDESTRIAN, BICYCLE, AND TRANSIT .__..1 - SPEDESR~uACCE SEMTPROVEMENTS TREATMENT ALTERNATIVES IMPROVED ALIGNMENT WASHINGTON SQUARE REGIONAL CENTER FIGURE O TWr51T CENTER IMPROVEMENTS TIGARO OREGON POTENTIAL PEDESTRIAN CROSSING REFUGE JUNE 1999 2o K EMWCL0 PCOCSTRWd/81CYCLE TREATMENTS 2679 OWCS f1NAL 2879f220 • E Mrr Washington Square Regional Center Study CITY OF TIGARO, OREGON THIRD DRAFT COMPREHENSIVE PLAN AMENDMENTS August 19, 1999 n Add the following to implementation strategies, under policies 1.1.1 and 1.1.2: implementation sirat~ 1. The Comprehensive Plan Future Land Use Map and the Official Zoning District map will reflect the plan policies and apply land use categories in the following manner. n. Mixed Use Commercial District - Principal development in these areas will be high density office buildings, retail and service uses. A zoning designation of MUC will also allow mixed-use development and housing at densities of SO units an acre. MTJC districts will encourage larger buildings with parking under, behind or alongside the structures. The Regional Center Framework Plan recommends that land around the Washington Square Mall and land immediately west of Highway 217 be designated a mixed use commercial district. o. Mixed Use Residential ]District - The-MUR designation is appropriate for predominantly residential areas where mixed uses are permitted when compatible with the residential use. Areas will be designated high density (MDR 1) or moderate density (MUR-2). Locations within the Washington Square Regional Center are appropriate for this mixed use designation. Add a new section 11.8 with the following: 11.8 WASHINGTON SQUARE REGIONAL CENTER In 1996, Metro adopted a visionary plan for regional development. The Metro Urban Growth Management Functional Plan described strategies to make the most efficient use of urban land in the face of dramatic population growth, to create and preserve livable neighborhoods, and to promote a useful, accessible transportation system. One of the key elements of the functional plan, often called the 2040 plan, was the designation of regional centers. These are areas of concentrated commerce, local government services and housing served by high-quality transit. Washington Square is one of three regional centers in Washington County and one of nine in the region. The 2040 plan resulted from extensive regional discussion about the future of the Portland metropolitan area. Once the plan was adopted, Metro instructed local citizens and governments to determine the best way to create regional centers given the values, interests and needs of residents and businesses. 1'lie following findings and policies sunuiiarim the results of a thorough public discussion about the future of the Washington Square Regional Center area. It demonstrates tlic way the people of Tigard and Washington County incorporated their expectations for (lie future into (lie regional 2 6i'ashington Square Regional Center Contpreheasiae Playa Antendntcnts: Draft 8119199 MIN Im framework plan. ® As a result of work completed on the 2040 Growth Concept, local govectaments, husinesses, residents and yropffW owned in Washington County began a study of land use,'bmnsportation and other fimctnoas around Washington Square. ® In 1998, the T'agard City Council appointed 23 people to serve oa the Washington Square Regional Center Task Force. Task Force members represent neighborhoods, schools, business and property owners, sate and local governments and public iatereg groups. The task force's charge was to identify issues and set general policy for recommendations about had use, transportation, open space, aesthetics and other is ,:es relevant to development around Washington Square. The Task Force also oversaw a public involvement process. e The Task Force agreed on a study area that includes 1250 acres, with Washington Square Mall approximately in the center. The area is bounded by Fanno Creek on the west, SW Greenburg Road and Hall Blvd. on the east, Progress Downs Golf Course to the north, and Highway 217 and Ash Creek on the south. • The Task Force members agreed on a set ofprinciples that would guide development of all recommendations. These principles are as follows: - CreatiotvPreservation of Area Identity • Reinforce a distinctive Regional Center while recognizing and respecting the character of the nearby residential community. • Retain and develop quality housing, including affordable housing, for all income levels. • Facilitate transitions from one use to another; for example, single to multifamily residential uses. • Preserve and enhance Metzger Park and consider additional parks. • Encourage environmentally-friendly development. • Try to keep historic trees. • Build for our children: Have a sense of stewardship. • Think creatively and be innovative in improvi Wmaintainicag quality of life. • Consider market forces and development patterns. • Maintain and preserve floodplains and wetlands. Government/Institutional Issues 'I Consider all political boundaries and facilitate cooperation among jurisdictions. ` Maintain neigliborhood scliools. Identify and reinforce what makes fade learning (educational) environment viable. I I 3 lVashington Square Regional Center Conypreltensive Plait Amendments: Draft 8119199 Transporpa~ion - • Strive for a self-.at is icat, connected transportation system- Consider transportation needs for the whole study area. • flan for a multi-modal transportation system that accommodates increased auto and non- auto travel needs. • Respect and eahnnce local street itctworks and neighbodrood livabRity, • Maintain an acceptable level of service and safety on regional roads, minimizing tho effect on regional roads outside the study area. • Provide good transportation access to the rest of the region. • Make the community accessible for all people and modes with connections for cars, bikes, pedestrians and transit. • Maintain a high level of accessibility within and to the regional center. • Use appropriate street and streetscape de4u. • Encourage attractive, high quality development. • Promote long-term viability for the area. Assure infrastructure is available prior to or with development. The Regional Center Plan Should • Be understandable to lay people • Be implementable within a reasonable, staged period of time • Help develop a sense of community with a common vision, hope and optimism • Be based on statistics and facts for population, employment and other factors • Use eking resources as much as possible • Encourage compatible and complementary uses • Contain solutions to common problems • Avoid conflict with other regional centers. o The Washington Square Regional Center study area includes land within the City of Tigard, the City of Beaverton and in unincorporated Washington County. The study covers approximately 1,074 acres exclusive of public rights-of=way and 1,250 total acres. About 4.2 percent of the net land area within the study area is vacant. • The Task Force evaluated all lands within the study area for future development or redevelopment capacity through 2020. Land identified as having development or redevelopment potential if it is currently vacant, has infill capacity, bolds an opportunity for redevelopment or currently is used as a large (greater than one acre) surface parlang lot. The vast majority of growth potential will come from redevelopment of existing structures and infill on sites currently used for surface parking. Over the next 20 years, approximately 192 acres oCland will become available to accommodate employment and residential growth within the study area. • Metro's Regional Urban Growth Management Functional Plan established "target growth capacity" for eacli jurisdiction in the region. "laic goal of setting these target numbers is for 4 lVashinglon Square Regional Center Comprehensive Plan Anreadntenls: Draft 8119199 each part of the region to be prepared to acoominodate housing and job growth. 'The target growth capacity for the Washington Square Regional Center is based on accommodating the following new jobs and housing units between 1998 and 2020: Employment: 9,804 jobs Retail: 1,188 jobs Office: 8,436 jobs Lodging. 180 jobs Housing: 1,500 units Residents: 2530 people 0 A development program for the Washington Square Regional Center provides for the target employment and housing growth capacity. Areas including the districts around the Washington Square Mall, the Lincoln Center office complex, and an.emer&g milted-use district south of Locust will develop at relatively high densities. Areas north of Locust and west of Highway 217 will develop at more moderate intensities, but generally greater than existing intensity in these areas. Lenity assumptions are summarized below. Land Use: Lligh Density: Moderate Density: Office @ FAR 1.25 @ FAR 0.6 Retail @ FAR 0.6 @ FAR 0.3 Lodging @ FAR 1.0 @ FAR 1.0 Housing @ 50 DU/Acre @ 25 DU/Acre 0 This development program will require approximately 170-200 acres over the next 20 years. Adequate development and redevelopment capacity exists within the study area as a whole to accommodate development as long as densities assumed above are achieved. • The Regional Center Task Force reached agreements on basic elements of urban development, environmental protection, and transportation facilities. An overall framework plan descries the vision for the regional center- 0 The Task Force demonstrated an impressive amount of interest in mixed-use neighborhoods and developments. Increasing land value and transportation costs will contribute to the desire of workers and employers for proximity of housing and work sites. The regional center's urban design concept incorporates the need for improved transportation links, higher density, variety of land uses and services and a quality of caviroamcut necessary to create a desirable, livable comm unity in the fact of dramatic population growtli. ® Major roadways in the study area experience significant traffic congestion during weekday peak periods. I lighway 217, Greenberg Road, l{all Boulevard and Scrolls Derry Road 5 Washing(cm Square Rcglotral Center Comprehensive Plan Anteadments: Draft 81191Y9 i A The majority of the arterial and collector streets in the study area have sidewalks. Schous Ferry Road and Hall Boulevard have bike lanes within the study area. HiAway 217 preseats a major barrier for pedestrians and bicylists. The only connections between the east and west sides of the highway in the study area are overcrossings on Half Boulevard, Scholls Ferry Road and Greenburg Road. 'Of these three crossings; sidewalks are found only on Hall Boulevard and Greenburg Road, with bicycle lanes only on Scholls Ferry Road. The only bikce lanes on the east side of the Washington Square Mall are on Hall Boulevard. ® The Washington Square Transit tenter is located in the northeast parting area of the Washington Square Mall. This transit center serves as a bus stop for routes 43, 45, 56; 62, 76 and 78. These routes connect Washington Square to transit centers in downtown Portland, Beaverton, Tigard and Lake Oswego, as well as providing service to the Tualatin area. A wider selection of transit tools could create a less congested, auto- dependent transportation system within and connecting to the study area. In the future, those areas already identified as experiencing traffic congestion will continue to be clogged. In addition, other sections of Hall Boulevard, Greenburg Road, and Cascade Avenue and Oleson Road will also experience congestion. Traffic estimates do not predict congestion on local Metzger area streets directly cast of Washington Square Mall- l'OLICUF,S 11.8.1 THE CONCEPTS AND PRINCIPLES CONTAINED IN THE WASHINGTON SQUARE REGIONAL CENTE R. FRAMEWORK PLAN SHALL PROVIDE THE OVERALL GUIDING FRAME WORK FOR MORE DETAILED IMPLEMENTING ACTIONS FOR THE AREA. THE IIVIPLEMENTI N G ACTIONS INCLUDE AT A MINIMUM: a. Comprehensive plan map and zoning map amendments including transportation plan. b. A public facilities plan for the area including a financing plan. 'c. A transportation improvement plan for the area including a financing plan. i a d. A parts and-open space plan for the area including a financing plan.. a c. rc nition oft(re Regional Center I3otrndary r h urpose orestablishiar (oral. rcgsr~l~n state fir in Pri n in r r (-i actor lien the conccn s an 3 I~n'ncir~~~►f llie Jan. a a 6 lVashington Square Regional Center Conrlyrehensive .'c'lan Atuendwrenis: Draft 8119199 11.8.2 THREE DMINCT TYPES OF A]X3D USE DISTRICTS SifALL BE ESTABLISHED FOR THE WASHINGTON SQUARE REGIONAL CENTEEL THESE DISTRICTS ARE: s. bffXED USE COMMERCIAL IDISMCTS (74UC). THE FRAMEWORK PLAN RECOMVIENDS THAT LAND AROUND THE WASHINGTON SQUARE MALL AND LAND Il4iNMIATELY WEST OF HIGHWAY 217 BE DESIGNATED A MIXED USE COMMERCIAL DISTRICT. PRINCIPAL DEVELOPMENT IN THESE AREAS WOULD BE OFFICE BUILDINGS, RETAIL AND SERVICE USES. A ZONING DESIGNATION OF MUC WOULD ALSO ALLOW MIXED-USE DEVELOPMENT AND HOUSING AT DENSITIES OF SO UNITS AN ACRE. MUC DISTRICTS WOULD ENCOURAGE LARGER BUILDINGS WITH PARKING UNDER, BEHIND OR ALONGSIDE THE STRUCTURES. b. M13MD USE EMPLOYMENT DIWIRICT (MM). N3CED USE EMPLOYMENT DISTRICTS REIrrEK TO AREAS WITH CONCENTRATIONS OF OFFICE, RESEARCH AND DEVELOPMENT, AND LIGRT MANUFACTURING INDUSTRIAL USES. COMMERCIAL AND RETAIL SUPPORT USES ARE ALLOWED, BUT ARE LM TIED. TIC ZONING WOULD PERMIT RESIDENTIAL DEVELOPMENT COMPATIBLE WITH THE DISTRICT'S EMPLOYMENT CHARACTER. LINCOLN CEN1F-R IS AN EXAMPLE OF AN AREA DESIGNATED MUE-1, THE HIGH DENSITY MIXED-USE EMPLOYMENT DISTRICT. THE NIMBUS AREA IS DESIGNATED MUE-2, REQUIRING MORE MODERATE DENSITIES. c. MIXED USE RESIDENTIAL DISTRICTS 01UR). THE MUR DESIGNATION IS APPROPRIATE FOR PREDOMINANTLY RESIDENTIAL AREAS WHERE MIXED USES ARE PERMITTED WHEN COMPATIBLE WITH THE RESIDENTIAL USE. AREAS WILL BE DESIGNATED HIGH DENSITY (MUR 1) OR MODERATE DENSITY (MUR-2).. Proposed Amendment to Chapter 8 Transportation. Add a new Policy: 8.1.9 THE CITY SHALL ADOPT THE FOLLOWING TRANSPORTATION IMPROVEMENT STRATEGY IN ORDER TO ACCOMMODATE PLANNED LAND USES IN THE WASI-IINGTON SQUARE REGIONAL CENTER-- a. Addition of bus service for employees in the Nimbus office development. This service has been identified as a priority in Tri-Mot's Transit Choices for Livability study. Tri-Met expects to begin service widiin one to five years. b. Improvetnews to flit Transit Center Amenities in Sub-Area A, including a covered 7 ff'ashingtou Square Regional Center Conrprehensir-e Plan Araeadnrents: Draft 8119199 pedestrian path of the mall and improved connections to other retail aad commercial establishmmts would create a significant difference in this area's pedestrian environment. C. ~n cooperation with the CGty of Beaverton and Tri-pviet_ identification era new Park & tilde site to replace the existiag site that was itheaded to be temporary. d. (Sidewalks oa Grewburg Road and completion of sidewalk system on Hall Boulevard wull improve connectivity and access, plus constmc doh of pedestrian ,4ip!ossiags on Greenburg and Hall. e. A pedestrian trail within godlor around the Progress Downs Public Golf course presents an opportunity to provide a safe neighborhood walkinglexercise area and to serve more of the population using existing resources. E Recommended mall area street improvements include bringing SW Elia.nder Lane, SW Washington Square Road, SW Palm Boulevard and the roadway around the cemetery to full street standards. This includes building sidewalks and bicycle lanes. g. Within the mall area parking area, the task force recommends raised pedestrian refuges and designated walkways to conned bicyclists and pedestrians to .the mall and adjacent retail establishments. h. Improve multi-modal accessibility, safety and neighborhood traffic management on Locust Street between Lincoln Street and Hall Boulevard, Lincoln Street Between Locust and Oak Streets, and Oak Street between Lincoln Street and Hall Boulevard. The goal is to improve , aa&M bicycle accessibility, pedestrian crossing, control traffic speed and improve pedestrian connections. i Develop Oak, Lincoln and Locust as collectors. and-widca m r Hall Boulevard as a three lane arterial without precluding the potential widening, to five lanes. (Task Force Option) evelop Oak,. Lincoln and Locust as collect ors and widen Hall Boulevard to ~ Manes. (Technical Advisory Committee IR ~ rmmendatio - j. Provide pedestrianibicycle connections between SW Borders Street and i Greenburg Road. hin new s k. Provide pedestrian/bicycle connections on local streets 14. from and miL developments at id jclonmcnts. fi i3'ashington Square Regional Center Comprelneasive Plain Annendnnents: Draft $119199 i L Create a two4ane, local level over-crossing of Highway 217, from Washington Square to Nimbus Avenue, including pedestrian and bike facilities oxtending to Fanno Creek Bikeway. UL F.-dead Nrmbus Avenue to Greeaburg Road, including bike and pedestrian facili ies. This includes realignment of Greenburg Road and related improvements. U. Construct a regional level over-crossing of highway 217 connecting Locust Stream to Nimbus Avenue. o. Reinforce need for interchange capacity improvements at Hall Boulevard and Scholls Ferry Road in the upcoming Iliiighway 217 Major Investment Study. P_ Design a frontage road to improve access to Washington Square Mall. q. Add bike and pedestrian facilities on Cascade Avenue. r. Identify potential bicycle network alignments with connections to existing bikeways, neighborhoods and activity centers, with particularly emphasis on extending the Fanno Creek Bikeway along Ash Creek s. ,S1 WdySrpport commuter rail service and a commuter rail tion within the Regional Center. Connecct_the station with other acth ty centers by an efficient people mover system t. Adopt the functional classification plan for streets internal to the Washington Square Regional Center as shown on Figure 1. The following policies apply to local streets within the regional center. 1. Local street spacing shall be a maximum of 530 feet. 2.. Access way spacing shall be a maximum of 330 feel. . 3. Spacing of signalized intersections on Major Arterials shall be a minimum. of 600 feet. 4. Existing rights of way will, to the greatest extent possible, be utilized for a local street system. Right of way vacations will considered only when all other policies in this subsection are met. U. The transportation projects described in this section should be added to the City of Tigard's Transportation System Plan. The City, ODOT and Metro should work to include these improvements in regional and state implementation programs. 9 Washington Square Regional Center Conrlyrehensive Plan Anrendnrents: Draft 8119199 11.8.3 NECESSARY PUBULC FACILITIES INCLUDING SEWER, WATER AND DRAINAGE FACILrDES, SHOULD BE IN PLACE ORPLANNED TO BE CONSTRUCTED IN TIME TO SUPPORT NEW DEVELOPMENTS, 11.8.4 NECESSARY TRANSPORTATION FACILI TWS, AS DETERMINED BY A TRAMT C IMPACT ASSESSMENT, SHOULD BE IN PLACE OR PLANNED TO BE CONSTRUCTED IN T RAE TO.SUPPORT .NEW DEVELOPMENTS. Proposed Amendment to Chapter 12 Locadonal CrUerla. Add a new Section 12.5: 12.5 MIXED USE DISTRICTS POLICY 12.5.1 THE CITY SHALL PROVIDED FOR MIXED USE DEVELOPMENTS IN ACCORDANCE VnM- a. APPLICABLE PLAN POLICIES; b. APPLICABLE PURPOSE STATEMENTS; AND C. APPLICABLE COMMUNITY DEVELOPMENT CODE PROVISIONS. L. Mixed Use Commercial A. The purpose of the Mixed Use Commercial (MUC) land use designation is: 1. To create a dense mixed use commercial district that forms the commercial core of the Washington Square Regional Center; 2. To provide opportunities for major retail goods and services, office employment, and housing in close proximity, and with good access to i transportation services; 3. To implement the Metro 2040 Growth Concept and Urban Growth Management Functional Plan for areas designated Regional Center within the City of Tigard. 7 10 li'ashingtotr Square Regional Center Conq)rehertshve Plan Arttettd»tertts: Draft 8119199 blixed Use EmEd2ni eat A The purpose of the Mixed Use Employment (MM) la-ad use designation is: 1. To create a mbced use employment district that is complementary to the rest ofthe community and the region; 2. To provide opportunities for employment and for new business and professional services in close proximity to retail centers and major transportation facilities; 3. To provide for major retail goods and services accessible to the general public, and minor retail goods and. serviceiaccessible to the public which works and lives within the MUE district; 4. To provide for groups and businesses in centers; 5. To provide for residential uses which are compatible with and supportive of retail and employment uses. 6. To implement the Metro 2040 Growth Concept and Urban Growth Management Functional Plan for areas designated Regional Center and Employment within the City of Tigard_ Mixed Use Residential A The purpose of the Mixed Use Residential (MUR) land use designation is: 1. To create moderate and high density mixed use residential districts in close proximity to other mixed use districts; 2. To provide opportunities for a variety of housing types and densities, and to produce that housing in ways that residents have-a high degree of pedestrian amenities, recreation opportunities and access to transit; 3. To incorporate limited commercial and service uses within mixed use projects that provide benefits and amenities to residents, but are compatible with residential uses. 4. To implement the Metro 2040 Growth Concept and Urban Growth Management Functional Plan for areas designated Regional Center within the City of Tigard. 11 f 'ashing(on Square Regional Cenfcr Comprehensive Plat. Asti,rrdmcnfs: Draff 8/19 9 19 ]?~licies 12.5.2 THE MY SHALL APPLY A MIXED USE COMMERCIAL LAND USE DESIGNATION FOR ARE.='.S SHOWN AS REGIONAL CENTER IN TEjE METRO 2040 GROWTH CONCEPT. 12.5.3 THE CITY SHALL APPLY A MIXED USE EMPLOYMENT LAND USE DESIGNATION FOR AREAS SHOWN AS REGIONAL CENTER AND EMPLOYMENT IN THE METRO 2040 GROWTH CONCEPT. i2.5.4 "~V r aant•loc~ou-fora ty park =d , d inrrovc-di nixcd use ~ x cuiploymcutdistricri~rhic~2 serves-thc cixti.'cncgtau; ' oyn=t-area, he . TTtangle; Q tsin"ord - ~-~~catc~-,comp3,cuicatatp-laud-us~at~cru-Ekat-aHvws~f~ra~lc;r-oft~-pu~lroscs C yTS[t1n)ICTtdiY~~tCAtIC~~LStiY~tIf GS"~IOSC to be ' h~f5~01rC1`7r'~rtOdd"PCnod~~~da3'i -Md,-i~'~Oadways-IId SfTtichuv--to ccommodatc ftitum ~ T'iga-rd-~Tiaugle tf~at-lu~-s-iutcrnai-uses,~n~d-connacts-tn-thc-ci~o-sysfem: n N ~,---~ntceratc~vit~iin-new-dcv~ciopmcnt-t~csi~aificantt-natural-~catures-found-dvit~m~hc ~'Yiangic; .--{---{jy~-~rccts~pc-asa-~-cy-clcmcntto-crcatca-fu~ii-quality-icna~c-for-tiic~Tiangic and-to-cstablisli--pcopic-ftiendfy-spacc,s; 12 if'ashingeon Squarc Regional Center Comprehensive Plait Amendments: Draft 8119199 areas: 12.5.5 THE C11Y SHALL APPLY A MIXED USE RESIDENTIAL. LAND USE DESIGNATION FOR A FAS SHOWN AS REGIONAL CENTER IN THE ME7MO • 2040 GP OV rM CONCEPT. 'I FM NTATION STRATEGIES 1. The Community Development Code shall: a. Include a Mixed Use Commercial District; b. Include high density and moderate density Mixed Use Employment Districts; C. Include high density and moderate density NGxed Use Residential Districts. d. Require that: 1. Nfinimum. residential densities and floor area ratios (FAR) be achieved; 2. Certain commercial uses be limited so that a pedestrian-oriented development pattern is achieved; 3. Design standards for pubic improvements, site design building design, signs and landscaping are achieved in order to create high quality, pedestriart- oriented developments; 4. All areas be subject to Site Development Review. C. Provide for: 1. Limited adjustments, and phasing so that development standards can be achieved over time; 2. Improvements to pre-existing uses and developments so that existing residents and businesses may continue to thrive. 13 6Vashington Square Regional Center Cotnpreheash a Plan Anrendments: Draft 8119199 oil WASMGI'ON SQUARE REGIONAL CENTER STUDY Draft Mixed -Use Zoning Districts August 19, 1999 Chapter 18.630 WASMNG ON SQUARE REGIONAL CENTER ' 18.630.010 Purpose '11,ic !Myicx win implmg~j the visioa- oonoents and pdadplka contained in the Washington Sgncrre Reedonal Center Study Plash, V=at y-a To Force MVgirrted by the City of Tigard P.. Metro's Regonal Urban Gromdh Man gemgd Etm fowl Plan target growth capadix for the Wa_chirww SQmre R 'oral Center will be met by ponutting mixed use devdonment witbig the Regional ceaw at densities appropriate fie- urban center. -C A mixed use R%6onal Center will contain a variety of districts that vary in scale preclorr inapt use and diaraaer. ~stirKI dsWctc txxmected to eachotmer and to the rest ofthe region bya mu1 '-modal n ation system, will provide a mwe ofwo living and shoppim gWgctxmities p_ Jmproved multi modal IMVDjadon links higber dwsities varigjy land uses, apes enhanced emyiurtrzrmt rtal rnialities will all contribute to create a able- livable community in time face of dramatic p t lation and cmnlo i grown . E- New mixed-use zoning districts Blom with existing residential toning districts in gstablished areas are appp=riate for the Regional er 18.630.020 List of Washington Square Regional Center Mixed lisc Zoning Districts A. tMiJCI: jYCxcYI Ilse Commercial I?isUici This designation includes land around the Washington Square Mall and land immediately west, of H&way 217. Primary uses permitted induce office buildings, retail, and service uses. Also permitted arc mixed-use devdopaxxts and housing at densities of 50 units per acre. Larger buildings are encouraged in this area with. parking under, behind or to the sides of buildings. 4 F. CMiJEI Mixed Use Fn lovnncrn Districts. Miis designation applies to areas Where employment uses such as office-, researdi and devclopanenl and tight manufacturing are coRncentrated. Commercial and retail support uses are allowed but are limited, and residential uses are permitted winch are compatible with employment character of the area. Lincoln Center is an example of an area designated MUG-1, the lugb daisity rhnixed use cxhhploynnent district. 'the Nimbus area is an example of an area designated MUG-2 requiring more moderate densities. a G. (_M 7[ R1: M~tm4WWI Rtsiciexl il1 j)igri~;j . lbe MUR designation is appropriate for predomiwandy residential areas 4vhcre nnixexl-uses are permitted when compatible with the residential use. A high density (MUR-1) and moderate density (MUR-2) designation is available. nrnll 7nairro ni.dri~tc R llocrorr Vnndardv-1(WRr tR 6.11l-7 Auouct to t900 i 18.630.030 Tises (Inset Sections A, B and C from eomn> mrW use section (18.520.030). Table 18.630.1 USE TABLE: MML E D-USE ZONES Use Catecortes WC MUE 1 and 2 MUR I and 2 Resdeadal Housohdd laving p P P Group Living FV C R(gfC R¢)l'C Transitional Housing C C C Homo Occupation R(2) R(2) R(2) H Single Units, Att-hod Rf3) R(3) p Singo Units, Detached R(3) R(3) R(3) Accessory Units R(4) R(4) R(4) Duplexes R(3) R(3) P Multi-Family Units p F P Manufacturod Units N N N Mobile Homo Park: /Subdivisioas N N N Civic anti (utional) Basic U i'Iitios C(5) C(5) C(5) Colleges C C - C Commuddy Recreation P C C Cultural Institutions p P N Day Caro p P P/0(6) Emergency Services P P N J~ >r Medical Centers C C C Postal service P P N Public Support Fsclitics p P P Religious Institutions p p C Schools C C C Soaal/I ratenuVQu(is/l edges p p C "rat? 74rrinv Mwri`rvA 1)acivn.ClnrrAnr~lc-I::G7(' 1R64(1-2 Anond 10 1000 N >Qae cata~ortcs MiTC PIM 1 aid 2 Imm Y Mid a Cocitraactlal - coa=wKd l Lodging p P N lEataug and dmaling cdsbUA moats p p R(7)(8) Eutedriiamb&d-O•doatud - Msjoc Ev & d 6aomuiaaraat c N N OutdoocEmWd aerated c N N - Indoor rstdortaQaai P P N - A,d,dt Ekdatainmmt C N N Goaeal FAW Salos-0dontod P R(g) R(7X8) - PoDMA cecviow P R(7)(8) - Repair-Onmted M)) N - Built Sales R(g) R(g) N - Outdooc Solos N N N Mimat-RdAed N N N Motor Vdride Rdstod - Matoc Vdndo Salos/Rea(al R(10) R(10) - N - Motor vdude Secvidag/Rapair N N N - Moor Voludo Fud Sales C C N Office P P R(7XS) Sdf-Sccvioo Storago N N N Nom-A-essory Partang p P N Industrial Industrial Socvicos N N N Mmufadudng and Production - LightIadusbu N R(11) N - General Iadustdal N N N - heavy Industrial N N N Rs7road Yards N N _ N Remand, and Dovdopment N R(11) N WarehousdFroight Movement N R(10X11) N Wa_sts-Relstod N N N WholosaloSales N R(IOXII) N P=Pertuided R=Restricted Conditional N =Not Permitted 1. Grog living will, five or fewer residents pemutted by right; group living will, six or more residents pennitted as conditional use. 2. Pcrn»ttod subject to requiremalts Cliap(cr 18.742. 3. Preexisting housing touts pcnl,ittcd. riytr~,on of qrc cxistinn 1~ i i s ni S~~ OI1~~rs!SSS ~S_&i1~~JS s4 I~uircn,ents oftliis~~p(cr. -subjcd~totl,evonditiocis-of~oction-l$-634{)50: !N•nfi Znnlno nLdrirlc X fV ion ,Gnndnrdc-tl!CR!' IN &M7 - - r ;fcrtc! !V t 94a 4. Pcxazitted subject to requireneats Cbapter 18.710. 5. Except water, storm and Sa &UY spew=, which are ai ow led by 49bt 6. k4. day care which meets 911 state reTiremeds Permitted by right; f wzWn&G8 day cane oeaters which mart all state requires permitted ooitionally. 7. This use is allowed only in mixed-use developments. Commercial uses shall occupy no snore than 50% of the total floor area within the named Am development, and shall be permitted only whoa ni w== residential dew ities are met. 8. The mwdmu m bruil&ng footprint size permitted for any building occupied entirely by a commeva1 use or uses shall be 7,500 square feet. 9. New retail and sales uses larger than 60,000 square feet ofgross leasable area per building or business constructed after this section is effective shall be prohribited 10. Permitted as an accessory to a permitted use as long as this use is contained within the sauna building as the permitted use, and does not exceed the floor area of the permitted use. 11. All activities associated with this use, except employee and customer parking, shall be oontained within building(s). 18.630.040 Mvelopment Standards A. Cg=kiance Required. All development must comply with: 1. All applicable development standards contained in the underlying zoning district, except where the applicant has obtained variances or adjustments in accordance with Chapters 18.310 and 18.320, and Sub-Sections C and D of this Section; 2. All other applicable standards and requirements contained in this title. B. DcYdgpnx,*t Standards. Development standards which apply within mixed-use zones in the Washington Square Regional Center are contained in Table 18.630.2 below. E7dsdng developments which do not next the standards specified for a particular district may continue in e)dsteace and be altered subject to the provisions of Section 18.630.050. /)v-n (I Rnnino !)i.d.i~l.cR nacrorr CMn~nrdc-ir!Cll(' IR 6il1.4 ,(vortd /O 1000 T*bic 18.630.2 DEVELOPhfENT STANDARDS IN AUXED-USE ZONES KUC AM I . ME .7 DIiULt a BMWR 2 D1M1215aONAY. IIdgiF.2~2Td5 . Mcrimam Lot Area Mae Norio Nano Name None Maaiarrem Ben'lding ~atbacLs 0' 0' 0' 0' Snoa ; 10' i0' Seoat and rare; 0' iateew a4N idadoc ride; S atcmotsida to. dzaotsi& M-Cemam Bumarg Setbacks CoataardYLl0' 20' hunt; a 20' fi oat; 0' 20' hoat; 0' 20' Eroc t; 0' five & straotside; tact and roar Mad war aad Kea and 0' interior side & intedoc silo; MI.- ado; iatedor side; -twoc sido• Carr 20' dme(d& 20' da»dside 20' ctrodsido . 20' draotgd© ResidantiaL (1)(2) (1)C2) (I)C2) (1)C2) 20' hoot; 0' rear Sad interior lido; • 20'shrwtsdo (1)C2) - Mmimum Budding Haisht 2 stories 2 dodos None 2 stories None Mwdmum Building Height 200' 200' 60' 75' 45' DENSITY REQgMM NTS(3 6 M'nimum Floor Area Ratio (FARX4) 1.25 125 0.6 0.6 03 Mminrum Reddontial DansitA5) 50 units/am 50 etarts/acre 25 uaits/acm 50 uaits/acre 25 units/acro Modmum Rxwidontial DmdV:S) None None 50 units/&= None 50 units/acm 1. Side and rear yard setbacks shall be 20 fed whey the zone abuts a residential district. 2. 'The requirements contained in the Buffer Matrioes in Tables 18.745.1 and 18.745.2 shall be used in calculating widths of buH'eringfscreening and required improvement s to be installed between proposed uses in the Washington Square Regional Center (WSRQ and abutting wing districts not included within the WSRC, or zoning districts which are not mixed-use.. For MUC and MUB zones, the requirements for Commercial Zones apply. For NM zones, the requireaw is for the Neighborhood Commercial Zone apply. 3. For purposes ofdetArrrrinino floor area ratio and residential densities, the net developmetvt area shall be used to establish the lot area, ddenmrined per Section 18.715.020 A. i 4. The minimum arid maximum. floor area ratios shown in Table 18.630.2 apply to all non-residential building development and mixed-use development, which includes a residential component. In nixed-use developments, i residential floor area is induded in the calculations of floor area ratio to determine conformance with minimum i and rnaxinnurm FAR. 5. Notwithstanding the requirennents of 18.715.020, minimum acid maximum d nsity shall be deternlined for a residential only projects using the number of residential units per net acre as shown in Table 18.630.2. Tine provisions for density transfer descril>od in 18.715.030 apply, using the mininiurm and ma)dnrurn density shown in Table 18.630.2. /kill Rnrrlno ni.dricLc rG /)ncio~r Crnn~~r`/c-R:CKC' /R 6.iA-S A,iodd /0 OOCO ==lima Ell 6 The roaL m, dm t; recrgseant ats for devTlona ats that iatdtOe or abort desit nat~ W tPr Res^ tom; Oneee lay,_Distsiet Riparian ; d-cs M- Ompjcg: 18.797 are descn'bod irg ~YOd 1 g ~3n nan C. "Usbuents.to tyR=mnem&. The density ae*aremOdsshown intable 18.630-2 are designed to irolemmt the goals and policies of the Coapreheasive klao. These reqpiremeoft apply dam]Shout the Regional Centex zoning &striets, but the City raoogdzes that some sites are difficult to c1erelap or redevelop in compliance with these regrrit emeats. The adjustnw t process provides a Eby which density requirements may be adjusted up to twenty five percent (25%) of the original requirement if the proposed development continues to meet the intended purpose of the requiremeat and finc&ngs are made that all approval criteria are met. Adjustmcd reviews provide flexibility for unusual situations and allow for alteanadw ways to meet the purpose of the code. 1. Approval Criteria. Ac}jusumeat requests will be approved if the review body finds that the applicant has shown that approval criteria 1 through 4 below, are met. a. Cianiing the acijustmeat will equally or better meet the purpose of the regulation to be modified; and b. The proposal will be consistent with the desired character of the area; and c. If more than one adjustment is being requested the cumulative effect of the adjusbaicats results in a projod which is still consistent with the overall purpose ofthe zone; CL Any impacts resulting from the adjustment are mitigated to the maximum extent possible. 2. Procedure. Requests for an adjustment are processed along with the development proposal for which the application has been filed 3. Ineligible regulations. Adjustments are prohibited for the following items: a. To allow a primary or accessory use that is not allowed by the regulations; b. As an. exception to any restrictions on uses or developni6A which contain the words "prohibited" or `bot allowed"; C. As an exeeptioa to a qualifying situation for a regulation, such as zones allowed or items being limited to new development. i d. As an exxption to a definition or classification i C. As an exocptiou to the procedural steps of a procedure or to drange assigned prooodures. D. ill -hjin 4f t)c'.vclot?n h n r 1 . Projects nhay use the Site Developnhait Review process (Chapter 18.360) to develop a site by phasing oonhpliancc with the development standards established in this Chapter. Sud) projects must danoustrate how future development oftiie site, to (lie miniinunh development standards established in phis Chapter or greater, can be adhicvod at ulti flaw build out of die site. 'itic Planning Director may waive or modify the approval period (Soction 18.360.030 C) and plmsod developincit time schedule (Soction 18.360.030 G.1) for projocis approved under this section. /)rnR 7nniao ni.d.iNc .C /hereon .GmrAivr/c-IRCR(' /R /S QA-R A vovcl IO 1040 E. 1?cYicity RM4fMreftLYite firer !vdroxmmts rode lino nr Abtdtirto Hi mm Setback- d(WIt1lcPamr ~T Y *'rr+e<hhmts is Table 181630.2: the f48„*+ s i*;new deuft --"t floor ave. r -sti~ fire devdg= that iadu6 or a~ Riparian SAadcs ~j no greater tan I I O parc~st ark min residential density and floor area ratios is AV Mixed Use j. Wetlands wiHTia the dev igpmernt a_ro expanded or cubawedin cotiil aPlOe Vith ~re~nr, Division of State wds `Vf dlwds Itckmdon and Fnhano halt Propsam athtl lPAiV1LMt ~ ]Fish Habitat within the devdaonletxt is enhanced is conformance with the Uregau I)ivisirsn .;t' State Ledds Fish Habitat Ertmomc t Program, and if applicaule Tfhe overall flood storage of the 104-= A294-A n within the devp]onrnc~,r ;t inor+eased by 10 percent. Tfthe enhanoe<nents dzg bed above are approved- or if enab +tts are already tx~axtmrun residential density standards shown in Table 18,630.2 and no maxi-murn f Wr Are., Qu fY standards shall aoaly. 18.630.050 Pre-Existing Uses and Developments within the Washington Squam Regional Center Mixed Use Districts A- Applicability. Notwithstanding the provisions of Section 18.760.040, uses prohibited and Structures that would be nonconforming in any of the Regional Cuter c . zoning districts that were L - lawfully in existence at the time of adoption of the Regional Center Mixed U districts are covsida-ed to be approved uses and structures. However, future additions, expansions, or enlargements to such uses or structures, shall be limited to the property area and use lawfully in existence at t3he time of adoption oftlhis ordinance (date). 1. An addition, expansion, or enlargement of such lawfully preexisting uses and structures up to twenty (20%) of the gross floor area lawfully in existence at the time of adoption of this ordinance will be allowed provided the applicant of such proposed addition, expansion or enlargemeat demonstrates substantial compliance with all appropriate development standards in this Code, or that the applicant demonstrates that the purposes of applicable development standards are addressed to the extent that the proposed addition, expansion, or enlargement allows. 2. All additions, expansions, or enlargements of existing uses or structures that take place after using the 20 percent addition, expansion, or enlargement exception shall be in conformance with the development standards of this Code. Projects may use the Site Development Review process (Chapter 18.360) to develop a site by phasing compliance with the development standards established in this Chapter per Section 18.360.040.D. 3. If a pre-existi% use is destroyed by fire, earthquake or other Act of God, then the use will retain its prc-cxisting status under this provision so long as it is substantially reestablished within three (3) years of the date of die loss. The reestablished use shall be iii cmiforn><rnce with the development standards of this Code. Projects may use (lie Site Developniait Review process (Chapter 18.360) to develop a site by phasing compliatice with the developnxYht standards established in this Chapter per Section 18.360.040.D. nrnA 7.anlno ni.drielr A nnrian Clandardr-KNRC IN 4.30-7 Avoud 19 1004 r CATER 18.60.1 WASMNG rON SQUARE REGIONAL CENTER DESIGN STANDARDS 18.630.110 Purpose And ApplrcalAty A. Design ydad;pies. Riga standards for public street improvements and for new &W,,opm ea and renovation projects lfiave bcnea pmpared for the Washington Square Regional Center. these design standards ad&-= we wal important gvidiag prin«pals adopted for the WashmStoa Square Regional Center, including creating a high-quality mixed use anpioy at area, providing a omvenia t pedestrian and bikeway sysb~~ &c and uffiiag dreatscape tm create a bah quality image for the area. B. oanformanoe. All new devdopme ots, including madding and reaovadaaprajects resulting in non. single family residential rases, are expected to eoata'bute to the charade and quality of the area. la addidoa to aoerhg the design standards described below and other development standards required by the Devdopme d and Budding Codes, developments vM be required to dedicate and improve public streets, conned to public facilities such as sanitary sewer,-water and sto= drainage, and participate in funding future transportation. and public improvement projects necessary within the Washington Square Regional Center. C. n'n_g standards. The following design standards apply to all developmct located within the Washington Square Regional Center within the MUC, MUE and MUR zones. if a standard found in this section conflicts with another standard in the Development Code, standards in this section shall govern. 18.630.120 Street Connectivity A. Dwionstmtion of standards. All'dcvelopmcn.t must demonstrate how one of the following standard options will be met. Variance of these standards may be approved per the requirements of Chapter 15.370.010 where topography, barriers such as railroads or freeways, or environmental constraints such as major streams and rivers prevent street extensions and connections. 1. Design Option a. Local street spacing shall provide public street connections at intervals ofno more than 530 feet. b. Bike and podc';triaa connections on public easameats or right-of-way shall be provided at intervals of no more that 330 fed. 2. Ped brinancc Option a. Local street spacing shall occur at intervals of no less than eight street intersections per mile. b. Ilte shortest vdticle trip over public streets from a local origin to a collector or greater facility is no more than twice the straight-line distance. C. 'Ilse shortest pedestrian trip on public right-of-way from a local origin to a collector or greater facility is no more than one and ono-half the straight-line distance. neerR 7anirra Mmtri.-tv A naciorr Clarrdardr-WVRC IN A?n_R .(rrorte! 10 1000 r 18.630.M Site IDesigu Standards A. Lance, Ail devetopmeat must meet the Mowing site design daadards. If a parcel is one acre or urger, a pbased deydop ed plan must be approved demonstrating how these standards for the overall pm d caabe met. Variance to these standards may be granted if the criteria found in Section 18.370.010 C2, governing criteria for granting a variance, is satisfied.. 1. Bumi% placement on Major and RT nor Arterials - Buiicfings shall occupy a minimum of 50% of all street froatages along Major and lvfiwr Arterial Streets. Buildings sball be located at public street intersections on Major and Minor Arterial Streets. 2. Building setback - The minimum buril(ling setback from public street rights-of-waybr-dodicatod shall be 0 feet; the mra3dmum.building setback shall be 10 feet. 3. Frost yard setback design - Eor setback Qreater than 01, landscaping, an. arcade, or a hard- surfaced expansion of the pedestrian path must be provided betwom a structure and a public street or accessway. If a building abuts more than one stroll, the required improvements shall be provided oa all streets. Landscaping shall. be developed to an i.r-1 standard on public streets and an 1-2 standard on aeoessways. Hard-sufficed .areas shall be coostnicted with scored concrete or modular paving materials. Beaches and other street fitmishings are encouraged. These areas shall contribute to the minimum landscaping regwremeat per Section 18.520.040B and Table 18.520.2. 4. Walkway connection to building dances - A walkway connection is required between a buildings entrance and a-public street or aecessway. This walkway must be at least six feet wide and be paved with soared concrete or modular paving materials. 'Building eaumnoes at a comer near a public street intersection are Ea& eacourageck These areas-shall contribute to the minimum landscaping requirement per Section 18.520.040B and Table 18.520.2. 5. Parking location and landscape design - Parking for buildings or phases adjacent to public street rights-of--way must be located to the side or rear of newly constructed buildings. When buildings or Phases are adjacent to MEQ than one blic gnpd, grimarv street(sl shall be identified where this Muir mgA aoDlies If located on the side. Parldng is limited to 5011/o of the street frontage and must be behind a landscaped area constructed to an L- I Landscape Standard The minimum depth of the U I landscaped area is five feet or is equal to the building setback, whichever is greater. Interior side and rear yards shall be landscaped to a L-2 Landscape Standard, cxcept where a side yard abuts a public street, where it shall be i landscaped to an Lr i Landscape Standard. a i 18.630.140 R69diug Resign Standards i a A. Non-resideatial buildings. All non-residential buildings shall comply with the followrrng design standards. Variance to these standards may be granted if the Criteria found in Section 18.370.010 C2, criteria for granting a variance, is satisfied. 3 a 1 . Ground floor windows - All street-facing elevations within the Building Setback (0 to 10 feet) along public strocis shall include a nunirnwn of 50% of the ground floor wall area %vith windows, display areas or doorway openings. 'n is ground floor an--- shalt be ineasured from three feet. above grade to nine fax above grade the satire width of the street.-facie f),rnQ 7arrirra f)i.driclc.C n~cioa .Clnndnrv/c-fi CR!' /R rf.4n-0 Avovd /4 jO00 NNE INN elevation. The groin floor window requirement edaR be aid w4 m the ground floor wA area and for glass doorway openings to ground level. Up to 50'/ of the ground floor window regtniremed may be and on as adorcigg elevation as long as all of the requirement is located at a butTdwg coui r. 2. Building facades -Facades that face a public street shall extend no mace than 50 fed wi&otd providing of least one of the following features: (a) a variation in building materials; (b) a building off-set of at yeast 1 foot; (c) a wall area that is eatirdy separated from other wall areas by a projection, suci as an arcade; or (d) by another design fieatuues that refie a the building's stnuxural system. No building facade shall edend for more lino 300 foot without a podestciaa ooanection between or through the building. 3. Weather protection - Weather protection for pedestrians, such as awnings, canopies, and arcades, shall be provided at building entrances. Weather protection is encouraged along building frontage abutting a public sidewalk or a hard-sudaeed expansion of a sidewalk, and along building frontages between a budding entrance and a public street or accessway. Awnings and canopies shall not be back lit. 4. Building Materials - Plain concrete block, plain oaacrete, corrugated metal, plywood, shed press board or vinyl siding may not be used as exterior finish materials. Foundation material may be plain concrete or plain: concrete block where the foundation material is not revealed for more dm 2 feet. 5. Roofs and roof lines - Except in the case of a building entrance feature, roofs shall be designed as an extension of the primary materials used fvrrhe. building and should respect the building's structural system and architectural style. False fronts and false roofs are not pernutted. 6. Roof-mount d equipment - A11 roof-mounted eTApmeat must be screened from view from ae jaoeat public streets. Satellite dishes and other communicatioa equipment must be set back or positioned on a roof so that exposure from adjacent public streets is minimized Solar heating panels are exempt from this standard. B. Residaotial ocilxarnd Mmd-Use buildings. For ress-~~ cbuil i and mixed-use buildings her c predoninant use is residential, the requirements of Qn,apier 18 720-De Pn_ Qgm_. patibility Standards shall anoly, 18.630.154 Signs `I A. Sigp ,standards. In addition to die requirements oCCI aptc r 18.780 of the Development Code; the i following standards shall be nnet: i 1. Zoning district regulations - Residential only developnncnts within the MUC, MUE and MUR zones shall i ncet the sign roquirenients for tine R40 zone 18.780.13OB; non-residential developments within the MUC zone shall nnoct the sign requirements for the commercial zones, 18.780.13OC; cion-residential development wiUun the MUG zone shall nice( tic sign requiranents ortine C-P zone, 18.780.130D and non-residential devdopmait within tine MM zones shall nnocx the sign roquiremernts ofdne C-N zone, 18.780.1300. 2. Sign area limits -'ilne m)dnnurn sign area limits found in 18.780.130 shall not be exocodod. "wfl 7nnina (Hs/ric•tc.C /)e.ciorrSfmrAnr.~c-Ii:CR(' ~~'K74-rn drrartd f0 1~4~ MIM~ No area limit increases will be permitt(d. 3. Idei& limits - The ma)danrm heir limit for an o8as cavt wall signs shall be 10 feet. Wall signs shalt not eadead above the roof line of throe wall oa mK& time saga is located.. No height increases vM be permitted. 4. Siam location - Frig signs within the Washington. Square Regional 'C~stes shall not be permitted widen required 1,1 landscape areas. 18.630.160 FAVU7 Portals A. Rexncired locations. (Reserved) M630.170 Landscaping and Scmeni ag A. Applicable levels. i%wo levels of landscaping and screening standards are applieabl TTkwgle. The locations where the landscaping or screening is required and the depth of the, Landscaping or screening are defined in other sub-sections of this suction. These standards are minimum. requirements. Nigher standards may be substituted as long as-all height limitations are met. 1 . L-1 Low.Screen - For general landscaping of landscaped and s6c a areas within parking lots and along local collectors and local streets, planting standards of Chapter 18.745 Landscaping and Screening, shall apply. 1'n addition the L-1 standard applies to setbacks on major and minor arterials. Where the setback is a minimum of 5 fed betwom the parking lot and a major or minor arterial, trees shall be planted at 3-%z inch caliper, at a maximum of 28 .fed on center. Shrubs shall be of a variety that will provided a 3 foot high sc re m and a 90% opacity within one year. Groundcover plants rust fully cover the remainder of Landscape area within two years. Any tree planted in exams of a 2 inch caliper shall be eligible for full mitigation credit. 2. L-2 General Landscaping - For general landscaping of landscaped and screened areas within parking lots, and along local colloctors and local streets, planting standards of Chapter 18.745, Landscaping and Screening, shall apply. In addition trees shall be provided at a minimum 2-`h inch caliper, at a maximum spacing of 28 feet. Shrubs shall be of a. size and quality to achieve the required landscaping or screening effect within two years. Any tree planted in excess of a 2-mch caliper shall be eligible for full mitigation credit. 18.630.180 Strect and Accessway Standards Functional Classifications and Street Soc Lions The Reeonunendod Roadway Functional Qassificabion Map and Street Cross Sociions attached shall govern the improvement and EOnstnrction of major streets i Mdthin the Washi Mon S%tarc Regional C61ter i i 18.630.190 Design Evaluation s "flee provisions 4f Sccticx~ 18 G2O.094-Desifi~~['. tt~llratirni ap~~~5~+tlrin the Washirint ro r SnL~rC l2cx!i al ~t~r. A---~~~--itis~+ooogrrinodthatthcabovcdrsign~tartdards arc-tQassist-in-upgrading-~tr<d-l•rroviciing consi staicyto~dcvdo{~nxntzvidun-flit-~Vastungton~quarciZc~ionai-Galbcr:-lt•isrooogrri nod-that n/1 9.nnJno 1)i.driclc R 1)~cion C~m+Aarrlc-fi CR(' 1R Kla-11 (iiavc/ 10 1000 dfffec~ast wir-j 5-6stalcats P___ WC 00 fire ot od= causes ~c Standards: valaatiocY~c Consist of deign proficssiocals with %e DEF shaff accep 'ds ism proposals that Vary from anyoffficj_~~~ cc~ r _k, A.LLV Oalo-ffie e 1~ . _ S3~Cd2II 4UV anacc~ta{i} ocvf af -area7and-tIO try; afid 3. re Lu=. the s~arIl asvi Purpose, foals and stands , d. djust i d alifr~abod toerpracical E-1 aayim acts 'Les 6-fivnz D. ~~cfollrnviriq~s~nu~t bcfbliowvdlicazs topain~3csigt Evaluation H a lz- -1 Applicnuts-dioosit~g die I~csi~n~~aluatienproccss~tust~ubruit a-Design Gvaluation~nd W Adjustnmrt-rust-icoordingtoa-list-ofTcgcurenicntsprovidod-byt ic-Dinoctor. ~l .'.~crnbcrs of thc~)csign-i :valuations zwmancavailablcto~ioct~vitir-a~licants as Pa rt-vt-the prc-a~iication-pcoocss; f~rnv~cver,~~lieantsahxlSpayfortl~ecntir~c-cvst~ft3re-review oftiie Design d:valuation3cam-~A~clq~osit~of-~3C-3C3C-shall~cpaid•v~or1-a~lication :~1~ca~plicarn nrnR 7nninv nJ.c/.rrccR /)rcivn.C/irnrlnrilc_(f:CK(' /R /SiA-!9 ~,~o,~c{ /O 1000 oil . aoQ OMNA ZvoluatiCAUL Ibis is not ea3: .y crame od by ~Wll flt~ sbaRindude-the Low itio= offfic DER id1conditionsor 6. lhc Mmaing Go i i i a~ i D. r.A 7e:n6na nr.drtinlc r4 !?rcivrr Clnnrlnrrfc-1tSCRC fR rf.3n-l.i Aur ucl 10 1000 (NOT Ta BHC,Itc~ SK, 17 210 ti gO ~ a It _ K to rK Illufft- $ . - WASHINGTON a.r > g ;E SQUARE Sw no sr MALL d Sw t£IiMMi r SWST -0 A COR R Sr t SW LANOAM Si SQUARE -K (160K IIKIW( A~11 SW PINS; ST ~Fyy't `..l W. SW SPRUCE Si 04' i 1=t & 217 Sig;; . RC R 1 SW Pt'Af rLE ST IKaC)hµ C«'rlt (iUOf ` j ~ C4. < G.. TIC n, 0 ART CRIAI RECOMMENDED ROADWAY NIUMIX(VUitt MAJOR COLLCCIOR rUNCT10NAL CLASSIFICATION WAS14INGT014 SQUARE REGIONAL CENTER r1GURC MINOR COLLCCTOR TIGARD, OREGON _ JUt4C 1999 3 Ir ~ s ss a (r s r Is Iss S Sloda<lakvA&,wdapoaptc-w L..aIR.Nmb.a00--/cas•W.ll:.g<oeSq.L..p K If if K K if K r K of • u w,;.fl...I.ti..u . +c.a.4c .a..~r..i.wsl-tsa+.r~ ~r s Ir Ir s• Ir cc iti Mq.tcaa..cx. al:a~c ld. paak;ag ~11c Nuabm aad t.eaex . • T ` at ' if 'fir ~i T K 1Y ' M /..r Gh..r.l.f"l"'l K.y.a Fld M.l. rrid.. ll7 If 9 ~s ' I:• u~ s• I• Is' . w' IS' Y ll' II' s' IS' IB Major.A=.tv<id1 p.Wng 'NI. Ftmbua uad L-o 75.... Loaf ..id, packing F1.ndu l,~ H.tl 13Gd_ Wadlillgao. Sy. Rn.d If T 1 If 11' If T 1 f l 1< -r T I T f.<-.. • M-.r 151' - j~-i 1- --i --1 i ' ti s, .:.1r..1 a l ~I•L 1~: t ta•..a,,..<..,~, tc•.a,: c..Sq t-r .a H.... Ciw r.. d d<. G..4 EXHIBIT C - FINAL ORDER (WASHINGTON SQUARE REGIONAL CENTER) - AS ATTACHED TO ORDINANCE NO. 00-18 WASIIINGTON SQUARE REGIONAL CENTER STUDY Final Draft Task Force Recommendations for Mixed-Else Zoning Districts and Design Standards August 25, 1999 Chapter 18.630 WASHINGTON SQUARE REGIONAL CENTER 18.630.010 Purpose I A. This Chapter will implement the vision, concepts and principles contained in the Washington Square Regional Center Plan, prepared by a Task Force appointed by the City of Tigard. B. Metros Regional Urban Growth Management Functional Plan target growth capacity for the Washington Square Regional Center will be met by permitting mixed use development within the Regional Center at densities appropriate for an urban center. C. A mixed use Regional Center will contain a variety of districts that vary in scale, predominant use, and character. Distinct districts, connected to each other and to die rest of the region by a multi-modal transportation system, will provide a range of working, living and shopping opportunities. D. Improved multi-modal transportation links, higher densities, variety of land uses, and enhanced environmental qualities will all contribute to create a desirable, livable community in the face of dramatic population and employment growth. E. New mixed-use zoning districts, along with existing residential zoning districts in established areas, are appropriate for the Regional Center. 18.630.020 List of Washington Square Regional Center Mixed Use Zoning Districts A. (Ml IC)- Mixr I Ise C'nmmercinl District This designation includes land around the Washington Square Mall and land immediately west of Highway 217. Primary uses permitted include office buildings, retail, and service uses. Also permitted are mixed-use developments and housing at densities of 50 units per acre. Larger buildings are encouraged in this area with parking under, behind or to the sides of buildings. B. (MI JE L-M xrri I Ise Employment Districts. This designation applies to areas where employment uses such as office, research and development and light manufacturing are concentrated. Commercial and retail support uses are allowed but arc limited, and residential uses are permitted which are compatible with employment character of the area. Lincoln Center is an example of an area designated MUC-1, the high density mixed use employment district. The Nimbus area is an example of an area designated MUG-2 requiring more moderate densities. C. (N4-Ult):_Mixcd-Used{tsidcntiall)istricts. Tlie MUR designation is appropriate for predominantly residential areas where mixed-uses are permitted when compatible with (lie residential use. A high density (MUR-1) and moderate density (MUR-2) designation is available. %aingDistricisS Desr~~n.SYonclnrclr-1f:S%l(' 111.630-1 November 22. 1999 Mill JIM •r °r 18.630.030 Uses (insert Sections A, B and .6 from commercial use section (18.520.030). Table 18.630.1. USE TABLE: MIXED-USE ZONES Use Categories MUC MUE t and 2 NUR 1 and 2 Residential Household Living P P P Group Living R(l)VC R(1)/C R(l YC Transitional Housing C C C Home Occupation R(2) R(2) R(2) Housing Types Single Units, Attached R(3) R(3) P Single Units, Detached R(3) R(3) R(3) Accessory Units R(4) R(4) R(4) Duplexes R(3) R(3) P Multi-Family Units P P P Manufactured Units N N N Mobile Nome Parks/Subdivisions N N N Civic (institutional) Basic Utilities C(5) C(5) C(5) Colleges C C C Community Recreation P C C Cultural Institutions P P N Day Care P P P/C(6) Emergency Services P P N Medical Centers C C C Postal Service 1' P N Public Support Facilities Religious loslituttous Schools C C C Socu+111 r:ucrnat/('lulrs/LoJgcs 1' 1'. C zoning Ihstricls,C• 1) wiKlf stallclarrls-If :S/W 111.630-2 A/m,embcr 22. 1999 Use'Catcgorics MUC WE 1 and 2 MUR I and 2 Commercial Commercial Lodging P P N Eating and drinking establislunents P P R(7X8) Entertainment-Oriented - Major Event Entertainment C N N - Outdoor Entertainment C N N - indoor Entertainment P P N - Adult Entertainment C N N General Retail - Sales-Oriented P R(9) R(7x8) - Personal services P R(9) R(7X8) - Repair-Oriented R(9) R(9) N - Bulk Sales R(9) R(9) N - Outdoor Sales N N N - Animal-Related N N N Motor Vehicle Related - Motor VehicleSales/Rental R(10) R(10) N - Motor vehicle Servicing/Repair N N N - Motor Vehicle Fuel Sales C C N Office' 13 1' R(7X8) Self-Service Storage N N N Non-Accessory Parking P P N Industrial Industrial Services N N N Manufacturing and Production - Light Industrial N R(11) N - General hidustrial N N N - Heavy Industrial N N N Railroad Yards N N N Research and Development N R(I 1) N Warchouse/FreightMovcmcnl N R(IOXI1) N Waste-Related N N N Wltolesale Sales N R(1 0X 11) N P=Pennitted R=Restricted C=Conditional N=Not Permitted L Group living with five or fewer residents permitted by right, group living with six or more residents permitted as conditional use. 2. Permitted subject to requirements Chapter 18.742. 3. Pre-existing housing units permitted. Conversion of pre-existing housing units to other uses is subject to the requirements of this Chapter. 4. Permitted subject to requirements Chapter 18.710. 5. Gxccpt water, storm and sanit tt), sewers, wl►ich are allowed by righ(. 6. In-home day care which meets all state requirements permitted by right; freestanding day- care centers which oning Dislrict.v & Destg n Vandarels-If 18.630-3 Novemher 2. 1999 •t meet all state requirements permitted conditionally. 7. This use is allowed only in mixed-use developments. Commercial uses shall occupy no more than 50% of the total floor area within the mixed-use development, and shall be permitted only when minimum residential densities are met. 8. The maximum building footprint size permitted for any building occupied entirely by a commercial use or uses shall be 7,500 square feet. 9. New retail and sales uses larger than 60,000 square feet of gross leasable area per building or business constructed after this section is effective shall be prohibited. 10. Permitted as an accessory to a permitted use as long as this use is contained within the same building as the permitted use, and does not exceed the floor area of the permitted use. ' 11. All activities associated with this use, except employee and customer parking, shall be contained within building(s). 18.630.040 Development Standards A. Compliance Required. All development must comply with: 1. All applicable development standards contained in the underlying zoning district, except where the applicant has obtained variances or adjustments in accordance with Chapters 18.310 and 18.320, and Sub-Scctions C and D of this Section; 2. All other applicable standards and requirements contained in this title. B. DrveEnpment Stnndirds. Development standards which apply within mixed-use zones in the Washington Square Regional Center are contained in Table 18.630.2 below. Existing developments which do not meet the standards specified for a particular district may continue in existence and be altered subject to the provisions of Section 18.630.050. H 1 ZoI111s 1)~.Gricl.c ~f /)e.ci~u .l7~nukuv/.r II:S/lC 18.630-4 November 22, 1999 Table 18.630.2 DEVELOPMENT STANDARDS IN MIXED-USE ZONES MUC MUEI MUE2 MUR1 MUR2 DIMENSIONAL REQUIREMENTS Minimum Lot Area None None None None None Minimum Building Setbacks 0' 0' 0' 0' front; 10' 10' front and rear; 0' rear, V interior side; interior side; 5' strectside 10' streetsidc Maximum Building Setbacks Comrnercial:10 20' front; 0' 20' front; 0' 20' front; 0' 20' front; Y front & rear and rear and rear and rear and streetside; 0' interior side; interior side; interior side; interior side; interior side & 20' strcetside 20' streetside 20' 20' streetside rear. (1X2) (I X2) strcetside (I X2) Residential: (1X2) 20' front; 0' rear and interior side; - 20' strectside (IX2) Minimum Building Height 2 stories 2 stories None 2 stories None Maximum Building Height 200' 200' 60' 75' 45' DENSITY REQUIREMENTS(3X-6) Minimum Floor Area Ratio (FARX4) 1.25 1.25 0.6 0.6 0.3 Minimum Residential Density(5) 50 unitslacre 50 units/acre 25 units/acre 50 25 unils/acre units/acrc Maximum Residential Density(5) None None 50 units/acre None 50 units/acre 1. Side and rear yard setbacks sliall be 20 feet Alien the zone abuts a residential district. 2. The requirements contained in the Buffer Matrices in Tables 18.745.1 and 18.745.2 shall be used in calculating widths of buffering/screening and required improvement s to be installed between proposed uses in the Washington Square Regional Center (WSRQ and abutting zoning district--, not included within the WSRC, or zoning districts which are not mixed-use. For MUC and MUE zones, the requirements for Commercial Zones apply. For MUR zones, the requirements for the Neighborhood Commercial Zone apply. • 3. For purposes of determining floor area ratio and residential densities, the net development area shall be used to establish the lot area, determined per Section 18.715.020 A. 4. The minimum and ntaxinium floor area ratios shown in'rable 18.630.2 apply to all non-residential building development and mixed-use development which includes a residential component. In mixed-use developments, Loning Uislriclc <f l)e.n~n .tiYandarr/.e-II'.4K(' 111.630-5 November 22. 1999 residential floor area is included in the calculations of floor area ratio to determine conformance with minimum and maximum FAR. 5. Notwithstanding 'the requirements of 18.715.020, minimum and maximum density shall be determined for residential only projects using the number of residential units per net acre as shown in Table 18.630.2. The provisions for density transfer described in 18.715.030 apply, using the minimum and maximum density shown in Table 18.630.2. 6. The maximum density requirements for developments that include or abut designated 'later Resources Overlay District Riparian Setbacks per Chapter 18.797 are described in Section 18.630.040 (E). C. Adjustments to nensitV Reanirements The density requirements shown in table 18.630-2 are designed to implement the goals and policies of the Comprehensive Plan. These requirements apply throughout the Regional Center zoning districts, but the City recognizes that some sites are difficult to develop or redevelop in compliance with these requirements. The adjustment process provides a mechanism by which density requirements may be adjusted up to twenty five percent (25%) of the original requirement if the proposed development continues to meet the intended purpose of the requirement and findings are made that all approval criteria are met. Adjustment reviews provide flexibility for unusual situations and allow for alternative ways to meet the purpose of the code. 1. Approval Criteria. Adjustment requests will be approved if the review body finds that the applicant has shown that approval criteria l through 4 below, are met. a. Granting the adjustment will equally or better meet the purpose of the regulation to be modified; and b. The proposal Nvill be consistent witli the desired character of the area; and c. If more than one adjustment is being requested, the cumulative effect of the adjustments results in a project which is still consistent with the overall purpose of the zone; d. Any impacts resulting from the adjustment are mitigated to the maximum extent possible. 2. Procedure. Requests for an adjustment are processed along with the development proposal for wlmiclm the application has been filed. 3. Ineligible regulations. Adjustments are prohibited for the following items: 6 a. To allow a primary or accessory use that is not allowed by the regulations: N b. As an exception to any restrictions on uses or development which contain the words "prohibited" or "not allowed"; C. As an exception to a qualifying situation for a regulation, such as zones allowed or 01stric-I.N X 1)"Sigii StallelurdV-11 SYC 18.630-6 Alowwlher 22. 1999 items being limited to new development. d. As an exception to a defutition or clasgification C. As an exception to the procedural steps of a procedure or to change assigned procedures. D. Phasing nf4 i eel pmant gtanriards, Projects may use the Site Development Review process (Chapter 18.360) to develop a site by phasing compliance with the development standards established in this Chapter. Such projects must demonstrate how future development of the site, to the minimum development standards established in this Chapter or greater, can be achieved at ultimate build out of the site. The Planning Director may waive or modify the approval period (Section 18.360.030 C) and phased development time schedule (Section 18.360.030 E.1) for projects approved under this section. E. Dpncity! Rrn4iirPmr-ntc fnr nevPlnTmr-ntt in Jitdino nr Ahiitting Riparian q -thack Notwithstanding the density requirements in Table 18.630.2, the maximum residential density and mixed-use and non- residential floor area ratio for developments that include or abut Riparian Setbacks shall be no greater than 110 percent of the minimum residential density and floor area ratios in all Mixed Use Zones, except when the following are met: I. Wetlands within the development are expanded or enhanced in conformance with the Oregon Division of State Lands Wetlands Restoration and Enhancement Program, and if applicable 2. Fish Habitat within the development is enhanced in conformance with die Oregon Division of State Lands Fish Habitat Enhancement Program, and if applicable 3. The overall flood storage capacity of the 100-year floodplain within the development is increased by 10 percent. If the enluancements described above are approved, or if enhancements are already in existence, the maximum residential density standards shown in Table 18.630.2 and no maximum floor area ratio standards for mixed use and non-residential developments shall apply. 18.630.050 Pre-Existing Uses and Developments within the Washington Square Regional Center Mixed Use Districts A. App1; ahility. Pre-existing housing units in mixed use districts are permitted. Conversion of pre- existing housing units to other uses is subject to die requirements of this Chapter. Notwithstanding the provisions of Section 18.760.040, uses prohibited and structures that would be nonconforming in any of the Regional Center Mixed Use zoning districts that were lawfully in existence at the time of adoption of the Regional Center Mixed Use districts are considered to be approved uses and structures. However, future additions, expansions, or enlargements to such uses or structures. shall be limited to the property area and use lawfully in existence at the time of adoption of this ordinance (date). 1. An addition, expansion, or culargeuucat of such lawfully preexisting uses and structures up to twenty (20%) of the gross floor area lawfully in existence at the time of adoption of this ordinance; will be allowed provided the applicant of such proposed addition, expansion or enlargement demonstrates substantial compliance with all appropriate development standards in this Code, or that the applicant demonstrates that the purposes of applicable development standards are addressed to the extent that the proposal addition, expansion or enlargement Zoning Districts d: Design Standards-f1 VW 111.630-7 November 22, 1999 allows. 2. All additions, expansions, or enlargements of existing uses or structures that take place after using the 20 percent addition, expansion, or enlargement exception shall be in conformance with the development standards of this Code. Projects may use the Site Development Review process (Chapter 18.360) to develop a site by phasing compliance with the development standards established in this Chapter per Section 18.360.040.D, 3. If a pre-existing use is destroyed by. fire, earthquake or other Act of God, then the use will retain its pre-existing status under this provision so long as it is substantially reestablished within three (3) years of the date of the loss. The reestablished use shall be in conformance with the development standards of this Code. Projects may use the Site Development Revicw process (Chapter 18.360) to develop a site by phasing compliance with the development standards established in this Chapter per Section 18.360.040.D. CHAPTER 18.630.100 WASHINGTON SQUARE REGIONAL CENTER DESIGN STANDARDS 18.630.110 Purpose and Applicability A. Design princ s. Design standards for public street improvements and for new development and renovation projects have been prepared for the Washington Square Regional Center. These design standards address several important guiding principals adopted for the Washington Square Regional Center, including creating a high-quality mixed use area, providing a convenient pedestrian and bikeway system, and utilizing strectscape to create a high quality image for the area. B. D .vrlnrun=1 confnmianre_ All new developments, including remodeling and renovation projects resulting in non single family residential uses, are expected to contribute to the character and quality of the area. In addition to meeting the design standards described below and other development standards required by the Development and Building Codes, developments will be required to dedicate and improve public streets, connect to public facilities such as sanitary sewer, water and storm drainage, and participate in funding future transportation and public improvement projects necessary within the Washington Square Regional Center. C. Confli_ crinTsrandarris. The following design standards apply to all development located within the Washington Square Regional Center within the MUC, MUE and MUR zones. If a standard found in this section conflicts with another standard in the Development Code, standards in this section shall govern. 18.630.120 Street Connectivity A. DLmonslration-oLstandards. All development must demonstrate how one of (lie following standard options will be mct. Variance of these standards may be approved per the requirements of Chapter II 18.370.010 where topography, barriers such as railroads or freeways, or environmental constraints such as major streams and rivers prevent street extensions and connections. ~I 1. Design Option a. Local street spacing shall provide public street connections at intervals of no more 7_orring Districts X. l)r.cif,o.4londnrde-Il:ti%t(' 18.630-8 Movearber 22. 1999 than 530 fort. b. Bike and-pedestrian connections on public easements or right-of-way shall be provided at intervals of no more that 330 feet. 2. Performance Option a. Local street spacing shall occur at intervals of no less than eight street intersections per mile. b. The shortest vehicle trip over public streets from a local origin to a collector or greater facility is no more than twice the straight-line distance. C. The shortest pedestrian trip on public right-of--way from a local origin to a collector or greater facility is no more than one and one-half the straight-line distance. 18.630.130 Site Design Staudards A. C nm hnnrr.. All development must meet the following site design standards. If a parcel is one acre or larger a phased development plan must be approved demonstrating how these standards for the overall parcel can be met. Variance to these standards may be granted if the criteria found in Section 18.370.010 C2, governing criteria for granting a variance, is satisfied. 1. Building placement on Major and Minor Arterials - Buildings shall occupy a minimum of 50% of all street frontages along Major and Minor Arterial Streets. Buildings shall be located at public street intersections on Major and Minor Arterial Streets. 2. Building setback - The minimum building setback from public street rights-of-way shall be 0 feet; the maximum building setback shall be 10 feet. 3. Front yard setback design - For setbacks greater than 0', landscaping, an arcade, or a hard- surfaced expansion of the pedestrian path must be provided between a structure and a public street or accessway. If a building abuts more thampne street, the required improvements shall be provided on all streets. Landscaping shall be developed to an L- I standard on public streets and an L-2 standard on accessways. Hard-surfaced areas shall be constructed with scored concrete or modular paving materials. Benches and other street furnishings are encouraged. These areas shall contribute to the minimum landscaping requirement per Section 18.520.040B and Table 18.520.2. 4. Walkway connection to building entrances - A walkway connection is required between a building's entrance and a public street or accessway. This walkway nwst be at least six feet wide and be paved with scored concrete or modular paving materials. Building entrances at a corner near a public street intersection are required. These areas shall contribute to the minimum landscaping requirement per Section 18.520.0408 and Table 18.520.2. 5. Parking location and landscape design - Parking for buildings or phases adjacent to public street rights-of-way must be located to the side or rear of newly constructed buildings. When buildings or phases are adjacent to more than one public street, primary street(s) shall be identified where this requirement applies. If located on the side, parking is limited to 50% of the street frontage and must be behind a landscaped area conslrucled to an L- I Landscape 7oninb Disiricis ci 11esiJ;n .SlantlarcLc-tf:tiR(' 11.630-9 November 22, 1999 Standard. The minimum depth o: th:, L- I landscaped area is five feet or is equal to the building setback, whichever is greater. Interior side and rear yards shall be landscaped to a L- 2 Landscape Standard, except where a side yard abuts a public street, where it shall be landscaped to an L- I Landscape Standard. 18.630.140 Building Design Standards A. • Non-residential buildings. All non-residential buildings shall comply with the following design standards. Variance to these standards may be granted if the criteria found in Section 18.370.010 C2, criteria for granting a variance, is satisfied. I . Ground floor windows - All street-facing elevations within the Building Setback (0 to 10 feet) along public streets shall include a minimum of 50% of the ground floor wall area with windows, display areas or doorway openings. The ground floor wall area shall be measured from three feet above grade to nine feet above grade the entire width of the street-facing elevation. T1-,c ground floor window requirement shall be met within the ground floor wall area and for glass doorway openings to ground level. Up to 50% of the ground floor window requirement may be met on an adjoining elevation as long as all of the requirement is located at a building comer. 2. Building facades - facades that face a public street shall extend no more than 50 feet without providing at least one of the following features: (a) a variation in building materials; (b) a building off-set of at least 1 foot; (c) a wall area that is entirely separated from other wall areas by a projection, such as an arcade; or (d) by another design features that reflect the building's structural system. No building facade shall extend for more than 300 feet without a pedestrian connection between or through the building. 3. Weather protection - Weather protection for pedestrians, such as awnings, canopies, and arcades, slhall be provided at building entrances. Weather protection is encouraged along building frontages abutting a public sidewalk or a hard-surfaced expansion of a sidewalk, and along building frontages behveen a building entrance and a public street or accessway. Awnings and canopies shall not be back lit. 4. Building Materials - Plain concrete block, plain concrete, corrugated metal, plywood, sheet press board or vinyl siding may not be used as exterior finish materials. Foundation material may be plain concrete or plain concrete block where the foundation material is not revealed for more than 2 feet. 5. Roofs and roof lines - Except in the case of a building entrance feature, roofs shall be designed as an extension of the primary materials used for the building and should respect the building's structural system and architectural style. False fronts and false roofs are not permitted. 6. Roof-mounted equipment - All roof-mounted equipment must be screened from view from adjacent public streets. Satellite dishes and other communication equipment must be set back or positioned on a roof so that exposure from adjacent public streets is minimized. Solar heating panels are exempt from this standard. 7 ' 13. Residential-only-uid114ixed-AJse13uildiiigs. For residential-only buildings and mixed-use buildings where the predominant use is residential, the requirements of Chapter 18.720-Design Compatibility Standards shall apply. Zoning Disfricis & Oesign S1oluki ds-II'h'l1(' 18.630-10 November 33. 1999 18.630.150 Signs A. Linn ctanrtards. In addition to the requirements of Chapter 18.780 of the -Development Code the following standards shall be met: 1.. Zoning district regulations - Residential only developments within the MUC, MUE and MUR zones shall meet the sign requirements for the R40 zone 18.780. BOB; non-residential developments within the MUC zone shall meet the sign requirements for the commercial zones, 18.780.13OC; non-residential development within the MUE zone shall meet the sign requirements of the C-P zone, 18.780. HOD and non-residential development within the MUR zones shall meet the sign requirements of the C-N zone, 18.780.130E. 2. Sign area limits - The maximum sign area limits found in 18.780.130 shall not be exceeded. No area limit increases will be permitted. 3. Height limits - The maximum height limit for all signs except wall signs shall be 10 feet. Walt signs shall not extend above the roofline of the wall on which the sign is located. No height increases will be permitted. 4. Sign location - Freestanding signs within the Washington Square Regional Center shall not be pennitted within required L- I landscape areas. 18.630.160 Entry Portals A. Required locatinas, (Reserved) .18.630.170 Landscaping and Screening A. Applicable levels. Two levels of landscaping and screening standards are applicable. The locations were the landscaping or screening is required and the depth of the landscaping or screening are defined in other sub-sections of this section. These standards are minimum requirements. Higher standards may be substituted as long as all height limitations are met. L-I Low Screen - For general landscaping of landscaped and screened areas within parking lots and along local collectors and local streets, planting standards of Chapter 18.745 Landscaping and Screening, shall apply. In addition the L-l standard applies to setbacks on major and minor arterials. Where the setback is a minimum of 5 feet between the parking lot and a major or minor arterial, trees shall be planted at 3-2 inch caliper, at a maximum of 28 feet on center. Shrubs shall be of a variety that tall provide a 3-foot high screen and a 90% opacity within one year. Groundcover plants must fully cover the remainder of landscape area within two years. Any tree planted in excess of a 2 inch caliper shall j be eligible for full mitigation credit. i i 2. L-2 General Landscaping - For general landscaping of landscaped and screened areas xvithin parking lots, and along local collectors and local streets, planting standards of Chapter 18.745.77 Landscaping and Screening, shall apply. In addition, trees shall be provided at a minimum 2-2 inch caliper, at a maximum spacing of 28 feet. Shrubs shall be of a size and quality to achieve the required landscaping or screening effect within two years. Any tree planted in excess of a 2-inch caliper shall be eligible for frill mitigation credit. ffm Zoning Districts c& Oesign Slandnrils-U RC 18.630-11 November 22, 1999 18.630.180 Street and Acsessway Standards A. Functional Classifications and Street Sections. The Recommended Roadway Functional Classification Map and Street Cross Sections attached shall govern the improvement and construction of major streets within the Washington Square Regional Center. 18.630.190 Design Evaluation The provisions of Section 18.620.090-Design Evaluation apply within the Washington Square Regional Center. %oning Districts ,f Ucrsil~n .Shnrlordr-Ii:S%{f' 18.630-12 Aloveaiher 22. 1999 WASHINGTON SQUARE. REGIONAL CENTER STUDY Final Draft Task Force Recommendations for Comprehensive Plan Amendments to Implement the Washington Square Regional Center Plan August 25, 1999 Add the following to implementation strategies, under policies 1.1.1 and 1.1.2: Implementation strate ies 1. The Comprehensive Plan Future Land Use Map and the Official Zoning District map will reflect the plan policies and apply land use categories in the following manner: n. Mixed Use Commercial District - Principle development in these areas will be high density office buildings, retail and service uses. A zoning designation of MUC will also allow mixed-use development and housing at densities of 50 units an acre. MUC districts will encourage larger buildings with parking under, behind or alongside the structures. The Regional Center Plan recommends that land around the Washington Square Mall and land immediately west of Highway 217 be designated a mixed-use commercial district. o. Mixed Use Residential District - The MUR designation is appropriate for predominantly residential areas where mixed uses are permitted when compatible with the residential use. Areas will br~ designated high density (MUR-1) or moderate density (MUR-2). Locations within the Washington Square Regional Center are appropriate for this mixed-use designation. Add a new section 11.8 with the following: 11.8 WASHINGTON SQUARE REGIONAL CENTER In 1995, Metro Council adopted a visionary plan for regional development. The 2040 Growth Concept described strategies to make the most efficient use of urban land in the face of dramatic population growth, to create and preserve livable neighborhoods, and to promote a useful, accessible transportation system. One of the key elements of the 2040 Growth Concept, was the designation of regional centers. These are areas of concentrated commerce, local government services and housing served by high-quality transit. Washington Square is one of three regional centers in Washington County and one of nine in the region. The 2040 Growth Concept resulted from extensive regional discussion about the future of the 1 Washington Square Regional Center Comprehensive Plan Amendments 84 Portland metropolitan area. Metro, working with local jurisdictions, then developed the Urban Growth Management Functional Plan in 1996 to implement the Growth Concept. Local citizens and governments were then to determine the best way to create regional centers given the values, interests and needs of residents and businesses of that community. The following findings and policies summarize the results of a thorough public discussion about the future of the Washington Square Regional Center area. It demonstrates the way the people of Tigard and Washington County incorporated their expectations for the future into the Regional Center Plan. Findings • With the adoption of the Urban Growth Management Functional Plan., local governments, businesses, residents and property owners in Washington County began a study of land use, transportation and other functions around Washington Square. • In 1998, the Tigard City Council appointed 23 people to serve on the Washington Square Regional Center Task Force. Task Force members represent neighborhoods, schools, business and property owners, state and local governments and public interest groups. The task force=s charge was to identify issues and set general policy for recommendations about land use, transportation, open space, aesthetics and other issues relevant to development around Washington Square. The Task Force also oversaw a public involvement process. • The Task Force agreed on a study area that includes 1250 acres, with Washington Square Mall approximately in the center. The area is bounded by Fanno Creek on the west, SW Greenburg Road and Hall Blvd. on the east, Progress Downs Golf Course to the north, and Highway 217 and Ash Creek on the south. • The Task Force members agreed on a set of principles that would guide development of all recommendations. These principles are as follows: Creation/Preservation of Area Identity • Reinforce a distinctive Regional Center while recognizing and respecting the character of the nearby residential community. • Retain and develop quality housing, including affordable housing, for all income levels. • Facilitate transitions from one use to another; for example, single to multifamily residential uses. • Preserve and enhance Metzger Park and consider additional parks. • Encourage environmentally friendly development. • Try to keep historic trees. • Build for our children: Have a sense of stewardship. • Think creatively and be innovative in improving/maintaining quality of life. • Consider market forces and development patterns. 2 Washington Square Regional Center Comprehensive Plan Amendments 81: • Maintain and preserve floodplains and wetlands. Government/Institutional Issues a Consider all political boundaries and facilitate cooperation among jurisdictions. a Maintain neighborhood schools. a Identify and reinforce what makes the leaming (educational) environment viable. Transportation a Strive for a self-sufficient, connected transportation system. a Consider transportation needs for the whole study area. a Plan for a multi-modal transportation system that accommodates increased auto and non- auto travel needs. a Respect and enhance local street networks and neighborhood livability. a Maintain an acceptable level of service and safety on regional roads, minimizing the effect on regional roads outside the study area. a Provide good transportation access to the rest of the region. a Make the community accessible for all people and modes with connections for cars, bikes, pedestrians and transit. a Maintain a high level of accessibility within and to the regional center. a Use appropriate street and streetscape design. a Encourage attractive, high quality development. a Promote long-term viability for the area. Assure infrastructure is available prior to or with development. The Regional Center Plan Should a Be understandable to lay people a Be implementable within a reasonable, staged period of time a Help develop a sense of community with a common vision, hope and optimism Be based on statistics and facts for population, employment and other factors a Use existing resources as much as possible a Encourage compatible and complementary uses a Contain solutions to common problems a Avoid conflict with other regional centers. a The Washington Square Regional Center study area includes land within the City of a Tigard, the City of Beaverton and in unincorporated Washington County. The study 1 covers approximately 1,074 acres exclusive of public rights-of-way and 1,250 total acres. About 4.2 percent of the net land area within the study area is vacant. a a The Task Force evaluated all lands within the study area for future development or j redevelopment capacity through 2020. Land identified as having development or redevelopment potential if it is currently vacant, has infill capacity, holds an opportunity for redevelopment or currently is used as a large (greater than one acre) surface parking 3 Washington Square Regional Center Comprehensive Plan Amendments w ` lot. The vast majority of growth potential will come from redevelopment of existing structures and infill on sites currently used for surface parking. Over the next 20 years, approximately 192 acres of land will become available to accommodate employment and residential growth within the study area. • Metro, s Regional Urban Growth Management Functional Plan established target growth capacity" for each jurisdiction in the region. The goal of setting these target numbers is for each part of the region to be prepared to accommodate housing and job growth. The target growth capacity for the Washington Square Regional Center is based on accommodating the following new jobs and housing units between 1998 and 2020: Employment: 9,804 jobs Retail: 1,188 jobs Office: 8,436 jobs Lodging: 180 jobs Housing: 1,500 units Residents: 2530 people • A development program for the Washington Square Regional Center provides for the target employment and housing growth capacity. Areas including the districts around the Washington Square Mall, the Lincoln Center office complex, and an emerging mixed- use district south of Locust will develop at relatively high densities. Areas north of Locust and west of Highway 217 will develop at more moderate intensities, but generally greater than existing intensity in these areas. Density assumptions are summarized below: Land Use: High Density: Moderate Density: Office @ FAR 1.25 @ FAR 0.6 Retail @ FAR 0.6 @ FAR 0.3 Lodging @ FAR 1.0 @ FAR 1.0 Housing @ 50 DU/Acre @ 25 DU/Acre • This development program will require approximately 170-200 acres over the next 20 years. Adequate development and redevelopment capacity exists within the study area as a whole to accommodate development as long as densities assumed above are achieved. • The Regional Center Task Force reached agreements on basic elements of urban development, environmental protection, and transportation facilities. The Washington Square Regional Center Plan describes the vision for the regional center. • The "task Force demonstrated an impressive amount of interest in mixed-use neighborhoods and developments. Increasing land value and transportation costs will 4 Washington Square Regional Center Comprehensive Plan Amendments s/; 7 contribute to the desire of workers and employers for proximity of housing and work sites. The regional center, s urban design concept incorporates the need for improved transportation links, higher density, variety of land uses and services and a quality of environment necessary to create a desirable, livable community in the face of dramatic population growth. • Major roadways in the study area experience significant traffic congestion during weekday peak periods. Highway 217, Greenburg Road, Hall Boulevard and Scholls Ferry Road are subject to traffic delays. The major capacity constraints occur at the Hall Boulevard/Scholls Ferry Road intersection, the Scholls Ferry Road/Nimbus Avenue intersection, and the Greenburg Road/Highway 217 ramp intersections. In addition, Highway 217 itself is highly congested. • The majority of the arterial and collector streets in the study area have sidewalks. Scholls Ferry Road and Hall Boulevard have bike lanes within the study area. Highway 217 presents a major barrier for pedestrians and bicyclists. The only connections between the east and west sides of the highway in the study area are overcrossings on Hall Boulevard, Scholls Ferry Road and Greenburg Road. Of these three crossings, sidewalks are found only on Hall Boulevard and Greenburg Road, with bicycle lanes only on Scholls Ferry Road. The only bike lanes on the east side of the Washington Square Mall are on Hall Boulevard. • The Washington Square Transit Center is located in the northeast parking area of the Washington Square Mall. This transit center serves as a bus stop for routes 43, 45, 56, 62, 76 and 78. These routes connect Washington Square to transit centers in downtown Portland, Beaverton, Tigard and Lake Oswego, as well as providing service to the Tualatin area. A wider selection of transit tools could create a less congested, auto- dependent transportation system within and connecting to the study area. • In the future, those areas already identified as experiencing traffic congestion will continue to be clogged. In addition, other sections of Hall Boulevard, Greenburg Road, and Cascade Avenue and Oleson Road will also experience congestion. Traffic estimates do not predict congestion on local Metzger area streets directly east of Washington Square Mall. POLICIES _ 11.8.1 THE CONCEPTS AND PRINCIPLES CONTAINED IN THE WASHINGTON + SQUARE REGIONAL CENTER PLAN SHALL PROVIDE THE OVERALL GUIDING FRAMEWORK FOR MORE DETAILED IMPLEMENTING ACTIONS FOR THE AREA. THE IMPLEMENTING ACTIONS INCLUDE AT A MINIMUM: 3 a a. Comprehensive plan map and zoning map amendments including transportation plan. 5 Washington Square Regional Center Comprehensive Plan Amendments 8/~ b. A public facilities plan for the area including a financing plan. C. A transportation improvement plan for the area including a financing plan. d. A parks and open space plan for the area including a financing plan. e. A recognition of the Regional Center Boundary for the purpose of establishing local, regional and state funding priority in order to accomplish the concepts and principles of the plan. 11.8.2 THREE DISTINCT TYPES OF MIXED USE DISTRICTS SHALL BE ESTABLISHED FOR THE WASHINGTON SQUARE REGIONAL CENTER. THESE DISTRICTS ARE: a. MIXED USE COMMERCIAL DISTRICTS (MUC). THE REGIONAL CENTER PLAN RECOMMENDS THAT LAND AROUND THE WASHINGTON SQUARE MALL AND LAND IMMEDIATELY WEST OF HIGHWAY 217 BE DESIGNATED A MIXED USE COMMERCIAL DISTRICT. PRINCIPAL DEVELOPMENT IN THESE AREAS WILL BE OFFICE BUILDINGS, RETAIL AND SERVICE USES. A ZONING DESIGNATION OF MUC WILL ALSO ALLOW MIXED-USE DEVELOPMENT AND HOUSING AT DENSITIES OF 50 UNITS AN ACRE. MUC DISTRICTS WILL ENCOURAGE LARGER BUILDINGS WITH PARKING UNDER, BEHIND OR ALONGSIDE THE STRUCTURES. b. MIXED USE EMPLOYMENT DISTRICT (MUE). MIXED USE EMPLOYMENT DISTRICTS REFER TO AREAS WITH CONCENTRATIONS OF OFFICE, RESEARCH AND DEVELOPMENT, AND LIGHT MANUFACTURING INDUSTRIAL USES. COMMERCIAL AND RETAIL SUPPORT USES ARE ALLOWED, BUT ARE LIMITED. THE ZONING WILL PERMIT RESIDENTIAL DEVELOPMENT COMPATIBLE WITH THE DISTRICT=S EMPLOYMENT CHARACTER. LINCOLN CENTER IS AN EXAMPLE OF AN AREA DESIGNATED MUE-1, THE HIGH DENSITY MIXED-USE EMPLOYMENT DISTRICT. THE NIMBUS AREA IS DESIGNATED MUE-2, REQUIRING MORE MODERATE DENSITIES. c. MIXED USE RESIDENTIAL DISTRICTS (MUR). THE MUR DESIGNATION IS APPROPRIATE FOR PREDOMINANTLY RESIDENTIAL AREAS WHERE P.'IIXED USES ARE PERMITTED WHEN COMPATIBLE WITH THE RESIDENTIAL USE. AREAS WILL BE DESIGNATED HIGH DENSITY (MUR-1) OR MODERATE DENSITY (MUR-2). 3 Proposed Amendment to Chapter 8. Transportation. Add a new Policy: 6 Washington Square Regional Center Comprehensive Plan Amendments 8/~ MEN 8.1.9 THE CITY SHALL ADOPT THE FOLLOWING TRANSPORTATION IMPROVEMENT STRATEGY IN ORDER TO ACCOMMODATE PLANNED LAND USES IN THE WASHINGTON SQUARE REGIONAL CENTER: a. Addition of bus service for employees in the Nimbus office development. This service has been identified as a priority in Tri-Met=s Transit Choices for Livability study. Tri-Met expects to begin service within one to five years. b. Improvements to the Transit Center Amenities in Sub-Area A, including a covered pedestrian path of the mall and improved connections to other retail and commercial establishments would create a significant difference in this area=s pedestrian environment. C. In cooperation with the City of Beaverton and Tri-Met, identification of a new Park & Ride site to replace the existing site that was intended to be temporary. d. Sidewalks on Greenburg Road and completion of sidewalk system on Hall Boulevard will improve connectivity and access, plus coiistruction of pedestrian crossings on Greenburg and Hall. e. A pedestrian trail within and/or around the Progress Downs Public Golf Course presents an opportunity to provide a safe neighborhood walking/exercise area and to serve more of the population using existing resources. f. Recommended mall area street improvements include bringing SW Eliander Lane, SW Washington Square Road, SW Palm Boulevard and the roadway around the cemetery to full street standards. This includes building sidewalks and bicycle lanes. g. Within the mall area parking area, recommend raised pedestrian refuges and designated walkways to connect bicyclists and pedestrians to the mall and adjacent retail establishments. h. Improve multi-modal accessibility, safety and neighborhood traffic management on Locust Street between Lincoln Street and Hall Boulevard, Lincoln Street Between Locust and Oak Streets, Oak Street between Lincoln Street and Hall Boulevard, and on other streets as the need arises. The goal is to improve safety, bicycle accessibility, pedestrian crossing, control traffic speed and improve pedestrian connections. i i i. Develop Oak, Lincoln and Locust as collectors. Acquire right-of-way to allow a Gve-iane roadway, and develop Hall Boulevard to a three-lane facility as an initial phase. i 7 Washington Square Regional Center Comprehensive Plan Amendments 8/. j. Provide pedestrian/bicycle connections between SW Borders Street and Greenburg Road. k. Provide pedestrian/bicycle connections on local streets to, from and within new developments and redevelopments. 1. Create a two-lane, local level over-crossing of Highway 217, from Washington Square to Nimbus Avenue, including pedestrian and bike facilities and people mover extending to Fanno Creek Bikeway. M. Extend Nimbus Avenue to Greenburg Road, including bike and pedestrian facilities. This includes realignment of Greenburg Road and related improvements. n. Construct a regional level over-crossing of Highway 217 connecting Locust Street to Nimbus Avenue and providing for a people mover. o. Reinforce need for interchange capacity improvements of Hall Boulevard and Scholls Ferry Road in the upcoming Highway 217 Major Investment Study. p. Design a frontage road to improve access to Washington Square Mall. q. Add bike and pedestrian facilities on Cascade Avenue. r. Identify potential bicycle network alignments with connections to existing bikeways, neighborhoods and activity centers, with particularly emphasis on extending the Fanno Creek Bikeway along Ash Creek. S. Strongly support commuter rail service and a commuter rail station within the Regional Center. Connect the station with other activity centers by an efficient people mover system t. Adopt the functional classification plan for streets internal to the Washington Square Regional Center as shown on Figure 1. The following policies apply to local streets within the regional center: 1. Local street spacing shall be a maximum of 530 feet. 2. Access way spacing shall be a maximum of 330 feet. 3. Spacing of signalized intersections on Major Arterials shall be a minimum of 600 feet. 4. Existing rights of way will, to the greatest extent possible, be utilized for a 7 local street system. Right of way vacations will be considered only when all other policies in this subsection are met. B Washington Square Regional Center Comprehensive Plan Amendments 8/ U. The transportation projects described in is section -should be -added to the tty o Tigard, s Transportation System Plan. The City, ODOT and Metro should work to include these improvements in regional and state implementation programs. 11.8.3 NECESSARY PUBLIC FACILITIES INCLUDING SEWER, WATER AND DRAINAGE FACILITIES, SHOULD BE IN PLACE OR PLANNED TO BE CONSTRUCTED IN TIME TO SUPPORT NEW DEVELOPMENTS. 11.8.4 NECESSARY TRANSPGRTATION FACILITIES, AS DETERMINED BY A TRAFFIC IMPACT ASSESSMENT, SHOULD BE IN PLACE OR PLANNED TO BE CONSTRUCTED IN TIME TO SUPPORT NEW DEVELOPMENTS. Proposed Amendment to Chapter 12. Locationaf Criteria. Add a new Section 12.5: 12.5 MIXED USE DISTRICTS POLICY 12.5.1 THE CITY SHALL PROVIDED FOR MIXED USE DEVELOPMENTS IN ACCORDANCE WITH: a. APPLICABLE PLAN POLICIES; b. APPLICABLE PURPOSE STATEMENTS; AND C. APPLICABLE COMMUNITY DEVELOPMENT CODE PROVISIONS. I . Mixed Use Commercial A. The purpose of the Mixed Use Commercial (MUC) land use designation is: L To create a dense mixed-use commercial district that forms the i commercial core of the Washington Square Regional Center; i 2. To provide opportunities for major retail goods and services, office i ' empicyment, and housing in close proximity, and with good access to transportation services; 3 3. To implement the Metro 2040 Growth Concept and Urban Growth Management Functional Plan for areas designated Regional Center within 9 Washington Square Regional Center Comprehensive Plan Amendments 8/ the City of Tigard. 2. Mixed Use Employment A. The purpose of the Mixed Use Employment (MUE) land use designation is: 1. To create a mixed-use employment district that is complementary to the rest of the community and the region; 2. To provide opportunities for employment and for new business and professional services in close proximity to retail centers and major transportation facilities; 3. To provide for major retail goods and services accessible to the general public, and minor retail goods and services accessible to the public which works and lives within the MUE district; 4. To provide for groups and businesses in centers; 5. To provide for residential uses which are compatible with and supportive of retail and employment uses. 6. To implement the Metro 2040 Growth Concept and Urban Growth Management Functional Plan for areas designated Regional Center and Employment within the City of Tigard. 3. Mixed Use Residential A. The purpose of the Mixed Use Residential (MUR) land use designation is: 1. To create moderate and high density mixed use residential districts in close proximity to other mixed-use districts; 2. To provide opportunities for a variety of housing types and densities, and to produce that housing in ways that residents have a high degree of pedestrian amenities, recreation opportunities and access to transit; 3. To incorporate limited commercial and service uses within mixed-use projects that provide benefits and amenities to residents, but are compatible with residential uses. 4. To implement the Metro 2040 Growth Concept and Urban Growth Management Functional Plan for areas designated Regional Center within 10 Washington Square Regional Center Comprehensive Plan Amendments B/: the City of Tigard. Policies 12.5.2 THE CITY SHALL APPLY A MIXED USE COMMERCIAL LAND USE DESIGNATION FOR AREAS SHOWN AS REGIONAL CENTER IN THE METRO 2040 GROWTH CONCEPT. 12.5.3 THE CITY SHALL APPLY A MIXED USE EMPLOYMENT LAND USE DESIGNATION FOR AREAS SHOWN AS REGIONAL CENTER AND EMPLOYMENT IN THE METRO 2040 GROWTH CONCEPT. 12.5.4 THE CITY SHALL APPLY A MIXED USE RESIDENTIAL LAND USE DESIGNATION FOR AREAS SHOWN AS REGIONAL CENTER IN THE METRO 2040 GROWTH CONCEPT. IMPLEMENTATION STRATEGIES 1. The Community Development Code shall: a. Include a Mixed Use Commercial District; b. Include high density and moderate density Mixed Use Employment Districts; C. Include high density and moderate density Mixed Use Residential Districts. d. Require that: 1. Minimum residential densities and floor area ratios (FAR) be achieved; 2. Certain commercial uses be limited so that a pedestrian-oriented development pattern is achieved; 3. Design standards for pubic improvements, site design, building design, signs and landscaping are achieved in order to create high quality, pedestrian-oriented developments; 4. All areas be subject to Site Development Review. C. Provide for: 1. Limited adjustments, and phasing so that development standards can be achieved over time; 2. Improvements to pre-existing uses and developments so that existing residents and businesses may continue to thrive; 3. Incentives to preserve and enhance significant wetlands, streams and 11 Washington Square Regional Center Comprehensive Plan Amendments B/ ~ M-Mm floodplains. 12 Washington Square Regional Center Comprehensive Plan Amendments 8/ CITY OF TIGARD, OREGON ORDINANCE NO. 2000- 1q AN ORDINANCE AM ENDING ORDINANCES 2000-03 THROUGH 2000-17 TO CORRECT CLERICAL ERRORS IN THE LEGAL DESCRIPTIONS ATTACHED AS EXHIBITS TO THE ORDINANCES AND DECLARING AN EMERGENCY. WHEREAS, the City of Tigard adopted Ordinances 2000-03 through 2000-17 annexing property into the City of Tigard on February 8,2000; and WHEREAS, each of the Ordinances includes an Exhibit A which is a map of the area to be annexed and an Exhibit B which is a legal description of the area to be annexed; and WHEREAS, it has come to the City's attention that the legal descriptions adopted were not the corrected version of the legal descriptions pre-approved from the Department of Revenue; and WHEREAS, the maps included in Exhibit A of the Ordinances previously approved accurately reflected the correct areas to be annexed; and WHEREAS, the legal descriptions approved by the Department of Revenue fixed clerical errors only and the area to be annexed was not changed by the corrected legal description; and WHEREAS, information on an annexation must be forwarded to the State by March 31, 2000, for the annexed territory to be added to Tigard's tax rolls for the next fiscal year during which Tigard will supply public services to the annexed area; and WHEREAS, the annexations previously approved were noticed correctly and a public hearing held in accordance with the City, Metro, and State requirements, therefore a new public hearing on the annexations is not required, NOW, THEREFORE, THE CITY OF TIGARD ORDAINS AS FOLLOWS: SECTION 1: The City Council amends Ordinance No. 2000-03 by replacing Exhibit B of Ordinance 2000-03 with the clerically correct legal description in the form of Exhibit A to this Ordinance. SECTION 2: The City Council amends Ordinance No. 2000-04 by replacing Exhibit B of Ordinance 2000-04 with the clerically correct legal description in the form of Exhibit B to this Ordinance. SECTION 3: The City Council amends Ordinance No. 2000-05 by replacing Exhibit B of Ordinance 2000-05 with the clerically correct legal description in the form of Exhibit C to this Ordinance. SECTION 4: The City Council amends Ordinance No. 2000-06 by replacing Exhibit B of Ordinance 2000-06 with the clerically correct legal description in the form of Exhibit D to this Ordinance. P-4 ~i SECTION 5: The City Council amends Ordinance No. 2000-07 by replacing Exhibit B of Ordinance 2000-07 with rEH, the clerically correct legal description in the form of Exhibit E to this Ordinance. yi SECTION 6: The City Council amends Ordinance No. 2000-08 by replacing Exhibit B of Ordinance 2000-08 with H the clerically correct legal description in the form of Exhibit F to this Ordinance. a SECTION 7: The City Council amends Ordinance No. 2000-09 by replacing Exhibit B of Ordinance 2000-09 with the clerically correct legal description in the form of Exhibit G to this Ordinance. SECTION S: The City Council amends Ordinance No. 2000-10 by replacing Exhibit B of Ordinance 2000-10 with the clerically correct legal description in the form of Exhibit H to this Ordinance. SECTION 9: The City Council amends Ordinance No. 2000-11 by replacing Exhibit B of Ordinance 2000-11 with the clerically correct legal description in the forts of Exhibit I to this Ordinance. ORDINANCE NO. 2000- 1 L4 is\citywide\ord\legal description correctionORD.doc Page I oft Julia P H 01-March 2000 2:30 PM SECTION 10: The City Council amends Ordinance No. 2000-12 by replacing Exhibit B of Ordinance 2000-12 with the clerically correct legal description in the form of Exhibit J to this Ordinance. SECTION 11: The City Council amends Ordinance No. 2000-13 by replacing Exhibit B of Ordinance 2000-13 with the clerically correct legal description in the form of Exhibit K to this Ordinance. SECTION 12: The City Council amends Ordinance No. 2000-14 by replacing Exhibit B of Ordinance 2000-14 with the clerically correct legal description in the form of Exhibit L to this Ordinance. SECTION 13: The City Council amends Ordinance No. 2000-15 by replacing Exhibit B of Ordinance 2000-15 with the clerically correct legal description in the form of Exhibit M to this Ordinance. SECTION 14: The City Council amends Ordinance No. 2000-16 by replacing Exhibit B of Ordinance 2000-16 with the cierically correct legal description in the form of Exhibit N to this Ordinance. SECTION 15: The City Council amends Ordinance No. 2000-17 by replacing Exhibit B of Ordinance 2000-17 with the clerically correct legal description in the form of Exhibit O to this Ordinance. SECTION 16: Because of the need for an orderly transition to City jurisdiction of the annexed territory and the need to assure that tax revenues from the annexed territories are paid to the local government providing service to the annexed territory, an emergency is declared to exist and this Ordinance shall take effect immediately upon its passage by the City Council. SECTION 17: A copy of this Ordinance, along with the correct legal descriptions, will be forwarded immediately to the Department of Revenue to insure review prior to March 31, 2000. PASSED: By LA r)Od' 'I lONA5 vote of all Council members present after being read by number and title only, this 1'4 - day of -f-r)0.v 22000. Catherine Wheatley, City Recorder APPROVED: By Tigard City Council this 1aay of 2000. 7Aroved as to f rm. ` Brian J. Moore, Council President 14 le4y ~~e~ Date { I ORDINANCE NO.2000- is\citywide\ord\iegal description correctionORD.doc Page 2 of 2 Julia P 14 01-March 2000 2:30 PM Y milli EXHIBIT A (Replaces Exhibit B of ORD. No. 2000-03) DESCRIPTION OF THE TIGARD ISLAND ANNEXATION This description was prepared by using various maps with various bearing bases therefore this description may not be the same as if it were surveyed and should not be used for Land Surveys or Legal Descriptions. A bearing base was used to try and put all maps of the same basis therefore the bearings shown. may not agree with record bearings. Description 1 A tract of land situated in Section 3 and the east one-half of Section 4, and the north 1/2 of Section 10, Township 2 South, Range 1 West, Willamette Meridian, Washington County, Oregon being more particularly described as follows: Commencing at the comer of Sections 3,4,9,. and 10 Township 2 South Range 1 West, Willamette Meridian; thence N 00° 05'32" E a distance of 527.99 feet to the True Point of Beginning; thence N 89° 35' 00" E a distance of 850 feet to the easterly right-of-way of SW 121st Avenue; thence S 01" 04'42" W, along said easterly right-of-way, a distance of 548.12 feet to a point 20.00 feet south of the center line of SW Gaarde Street; thence N 89° 35' 00" E, along said line 20.00 feet from the center line of SW Gaarde Street a distance of 130 feet to the easterly line of Arlington Ridge as recorded in Book 91 Pages 33 & 34 of the Washington County Subdivision Records; thence S 00° 01' 06" W, along said easterly line, a distance of 180.00 feet to the northwest corner of Tract "E" Redwood Vista as recorded in Book 122 Page 1-3 of the Washington County Subdivision Records; thence N 89° 11' 54" E, along the north line of said Redwood Vista, a distance of 135.00 feet; thence N 00" 01' 06" E a distance of 224.09 feet to the north right of way of SW Gaarde Street; thence N 89° 35' 00" E, along said north right of way, a distance of 211.05 feet; thence S 00° 01' 15" E a distance of 355.28 feet; thence N 89° 10' 44" E a distance of 317.50 feet; thence N 00° 01' 15" W a distance of 308.04 feet to the south right of way of SW Gaarde Street; thence S 89° 35' W, along the said south line, a distance of 159.57 feet to the extension of the east line of Colonial View as recorded in Book 18 Page 14 of the Washington County Subdivision Records; thence N 01 ° I F 00" E, along said east line and the extension thereof, a distance of 487.88 feet to the southeast comer of lot 5 of said Colonial View; thence S 76° 54' 00 W along the southerly line of said lot 5, a distance of 132.57 feet to a point on curve; thence along said curve to the left with a radius of 135.00 feet a delta of 29° 42' 32" (a chord which bears N 29° 42'36" W, 68.82 feet) a distance of 70.00 feet to the northwest corner of said lot 5; thence N 45° 40'00" E, along the northerly line of said lot 5, a distance of 228.36 feet to the northeast corner of said lot 5; thence N 30° 07' 48" E leaving said plat of Colonial View along the westerly line of the plat of Creekside Park Recorded in Book 50 Pages I and 2 Washington County Subdivision Records and the westerly line of the Plat of Terrace Trails Recorded in Book 34 Page 37 Washington County Subdivision Records a distance of 399.10 feet; thence N 82° 03' 00" W a distance of 548.94 feet; thence N 71 ° 24' 26" W a distance of 70 feet to the easterly line of SW 121st Avenue; thence S 29° 26' 00" W, along said easterly line; a distance of 230 feet; thence N 83° 00' 00" W a distance of 150 feet; thence N 00° 25'00" E a distance of 244 feet; thence N 61 ° 22' 30" E a distance of 18.30 ISLAND ANNEXATION 1 Bill 111100 1 =I . ====~A feet; thence N 57° 40' W a distance of 15.1 feet; thence N 30° 26' 20" E a distance of 100.23 feet; thence S 76° 42' 00" E a distance of 260.80 feet to the center line of SW 121st Avenue; thence N 29° 26'00" E, along the center line of 121st Avenue, a distance of 177.57 feet to the southerly line of Woodcrest, recorded in Book 22 Page 18 of the Washington County Subdivision Records, extended; thence S 67° 19' 20" E, along the south line of Woodcrest, a distance of 276.92 feet to the southwest corner of lot 4 Woodcrest; thence N 29° 26' 00" E , along the westerly line of said lot 4, a distance of 172.97 feet to the southerly . right-of-way of SW Howard Drive; thence S 61° 16'45" E, along said southerly right-of- way, a distance of 36.05 feet to the point of curve; thence along said curve with a radius of 167.42 feet, a delta of 39° 01' 14" (a chord which bears S 80° 47'20" E, 111.83 feet), and a length of 114.02 feet to the northeast comer of lot 5 Woodcrest; thence S 10° 18' 00" E, along the easterly line of lot 5, a distance of 233.56 feet to the southwest corner of lot 6 Woodcrest; thence S 67° 19' 20" E, along the south line of Woodcrest, a distance of 23.38 feet to the southeast corner of Woodcrest; thence N 30° 25' 39" E, along the east line of Woodcrest and the east line of Woodcrest no 2, recorded in Book 23 Page 11 of the Washington County Subdivision Records, a distance of 1224.34 feet to the northwest corner Terrace Trails, recorded in Book 34 Page 37 of the Washington County Subdivision Records; thence S 75° 06' 02" E, along the North line of Terrace Trails, a distance of 296.21 feet to the east right-of-way of SW 115th Avenue and the west line of Genesis No. 3, recorded in Book 52 Pages 32 and 33; thence N 00° 33' 01" E , along said east right-of- way, a distance of 389.29 feet to the northwest corner of Genesis No.3; thence N 89° 47' 52" E, along the north line of Genesis No. 3, a distance of 291.04 feet; thence N 00° 49' 02" E, along the most easterly west line of Genesis No. 3, a distance of 140.12 feet to the northwest comer of lot 80 Genesis No.3; thence N 89° 53' 00" W a distance of 291.60 feet to the east line of SW 115th Avenue; thence S 00° 33' 01" E, along said east line, a distance of 25.00 feet; thence N 89° 32' 49" W, along the south line of SW Fonner Street, a distance of 441.02 feet; thence N 00° 31' 46" E a distance of 503.25 feet to the southeast corner of lot 8 Carmen Park, recorded in Book 23 page 23 of the Washington County Subdivision Records; thence S 89° 44' 52" W, along the south line of said lot 8, a distance of 88.71 feet to the southwest corner of said lot 8; thence N 00° 15' 18" W, along the west line of lot 8 and its extension, a distance of 217.01 feet to the north line of SW Carmen Street; thence N 89° 44' 52" E, along said north line, a distance of 92.44 feet to the southwest corner of lot 12 Hunters Glen recorded in Book 105 pages 47-50 of the Washington County Subdivision Records; thence N 00° 23' 16" E, along the west boundary line of said Hunters Glen, a distance of 798.39 feet to the south line of SW Walnut Street; thence S 78° 21'40" W, along said right of way, a distance of 167.60 feet; thence S 00° 23' 16" W a distance of 521.30 feet to the northerly boundary line of Carmen Park; thence S 77° 42' 42" W, along said northerly boundary line, a distance of 144.00 feet; thence N 04° 12' 18" W a distance of 364.92 feet; thence N 87° 18' 42" W a distance of 116.00 feet; thence N 01° 13' 38" W a distance of 211.16 feet to the northerly line of SW Walnut Street; thence N 78° 21' 40" E, along said northerly line, a distance of 669.27 feet; thence N 00° 34' 16"E a distance of 260.71 feet to the southeast corner of Leron Heights, recorded in Book 19 Page 27 of the Washington County Subdivision Records; thence N 89° 25'44" W, along the south line of Leron I-leights, a distance of 146.62 feet to the southwest comer of lot 19 Leron Heights; thence N 00° 51' 16" E, along the cast line of lot 19, a distance of 25.06 ISLAND ANNEXATION 2 feet to the north center line of SW Ann Street; thence N 85" 10'44" W, along said center line a distance of 677.48 feet to the extension of the west line of lot 4 Leron Heights; thence S 04° 56' 16" W, along said west line, a distance of 169.28 feet to the southwest comer of lot 4; thence N 82° 46' 44" W, along the south line of lot 3 Leron Heights, a distance of 40.08 feet to a point; thence S 07° 30'00" W a distance of 120.00 feet; thence N 821 30' 00" W a distance of 130.00 feet; thence S 07° 30'00" W a distance of 218.05 feet; thence S 86° 22' 10" W a distance of 203.83 feet to the center line of SW 121st Avenue; thence S 07° . 30' 00" W, along said center line, a distance of 39.32 feet; thence N 87° 28' 57" W a distance of 290.91 feet to the east line of Lake Terrace, recorded in Book 34 Page 20 of the Washington County Subdivision Records; thence S 07° 31' 20" W, along said east line, a distance of 187.18 feet to the center line of SW Walnut Street; thence S 621 16' 38" W, along said centerline, a distance of 555.25 feet to the extension of the west line of Tippitt Place, recorded in Book 35 Page 15 of the Washington County Subdivision Records; thence S 01° 27 42" E, along said west line, a distance of 254.00 feet to the southwest comer thereof; thence N 89° 54120" E, along the south line of Tippitt Place, a distance of 830.90 feet to the southeast corner of Tippitt Place and the center line of SW 121" Ave; thence S 04° 10' 50" E, along said center line, a distance of 51.00 feet; thence S 89° 54' 20" W a distance of 145.05 feet to the east line of Fyestone, recorded in Book 73 Page 12 of the Washington County Subdivision Records; thence S 04° 51'57" E, along the west line of Fryestone, a distance of 366.88 feet to the southeast comer of Fryestone; thence S 89° 54' 20" W, along the south line of Fryestone and its extension, a distance of 1317.4 feet to the Section line between sections 3 & 4; thence N 00° 29'08" E, along the said Section line, a distance of 209.8 feet to the southwest corner of Curl Acres, recorded in Book 29 Page 9 of the Washington County Subdivision Records; thence N 62° 20' 20" E, along the south line of Curl Acres, a distance of 158.2 feet to the southeast coiner of lot 2 block 1 Curl Acres; thence N 00° , 29' 08" E, along the west line of lot 2 block 1, a distance of 149.73 feet to the center line of SW Walnut Street; thence S 63° 14'58" W, along said center line, a distance of 169.52 feet to a point of curve; thence along said curve to the right with a radius of 384.54 feet, a delta of 29° 09' 15" (a chord which bears N 77° 49'36" E, 193.56 feet) and a length of 195.67 feet to the point of tangency; thence N 87° 35'47" W, along said center line, a distance of 469.24 feet; thence S 01° 46' 13" W a distance of 677.08 feet to the center line of Section 4; thence N 89° 19' 54" W, along said center line of Section, a distance of 388.33 feet; thence N 01° 46' 13" E a distance of 356.7 feet; thence N 89°19' 54" W a distance of 132.68 feet; thence S 010 46'.13" W a distance of 357.26 feet to the center line of Section 4; thence N 890 19' 54" W, along said center line of Section, a distance of 436.82 feet to the easterly right-of-way of SW 132nd Avenue; thence S 00° 03' 30" W, along said right-of-way, a distance of 1309.80 feet to the northwest corner of the plat of Morningstar; thence N 89° 48'45" E, along the north line of the plats of Morningstar, Mountain Highlands and Eagle Pointe, a distance of 1630 feet to the Section line between Sections 3&4; thence S 00° 05' 32" W, along said section line, a distance of 776.1 feet to the True Point of Beginning. ISLAND ANNEXATION 3 EXHIBIT B (Replaces Exhibit B of ORD. No. 2000-04) Description 2 A tract of land situated in Section 3, Township 2 South, Range 1 West, Willamette Meridian, Washington County, Oregon being more particularly described as follows: Beginning at the southwest corner of the plat of Wilderness; thence N 24° 38'00" W, along said the westerly line of the Plat of Wilderness recorded in Book 40 Page 48 of the Washington County Subdivision Records, a distance of 357.14 feet to the angle corner in the Plat of Wilderness; thence N 00° 48'27" E, along said westerly line, a distance of 140.25 feet to the northwest corner of said Plat; thence N 89° 03'00" E, along the north line of said Plat, a distance of 451.55 feet to the northeast corner of said Plat; thence S 00° 47' 00" W, along the easterly line of said Plat and the extension thereof, a distance of 483.04 feet to the center line of SW Fonner Street; thence N 87° 59' 00" E, along said Street, a distance of 137.97 feet; thence N 63° 38' 00" E, along said center line, a distance of 582.04 feet; thence N 53° 38'00" E, along said center line, a distance of 211.60 feet; thence S 00° 57' 00" W a distance of 14.47 feet to the point on the extension of the westerly line of Yolo Estates recorded in Book 47 Page 35 of the Washington County Subdivision Records; thence N 46° 11' 43" E, along said westerly line, distance of 413.78 feet; thence N 74° 18' 16" W a distance of 189.56 feet; thence N 89° 03' 16" W a distance of 90.55 feet to the easterly right of way of SW Fonner Street; thence S 00° 57' W, along said easterly right of way, a distance of 80.00 feet; thence N 89 13' 00" W a distance of 40.00 feet to the westerly right of SW Fonner Street; thence N 00° 57' E, along said westerly right of way, a distance of 79.2 feet to the northerly right of way of SW Errol Street; thence S 89° 13' W, along said northerly right of way, a distance of 140.00 feet; thence N 00° 57' E a distance of 202.49 feet; thence S 89° 13' 00" W a distance of 171.25 feet; thence N 00° 57' E a distance of 41.78; thence S 89° 13' 00" W a distance of 165 feet; thence S 00° 57' W a distan:°e of 84.19 feet; thence S 89° 13' 00" W a distance of 165 feet; thence N 00° 57' E a distance of 12.46 feet; thence N 83° 30' 33" W a distance of 82.85 feet; thence N 00' 57' E a distance of 305.50 feet to the southerly right of way of SW Walnut Street; thence S 89° 13" W a distance of 412.5 feet to the extension of the easterly boundary of McMichael Heights as recorded in Book 5 Page 32 of the Washington County Subdivision Records; thence N 00° 57' E a distance of 20.00 feet to the center line of SW Walnut Street; thence S 89" 13' 00" W, along said center line, a distance of 282.02 feet; thence N 00° 36' 46" E a distance of 665.27 feet; to the southeast corner of Mcadowglade, recorded in Book 83 Page ISLAND ANNEXATION 4 16 of the Washington County Subdivision Records; thence N 89° 44' 04" W, along the south line of Meadowgiade, a distance of 553.82 feet to the southwest corner of Meadowglade and the west line of J.L. Hicklin D.L.C. No 37; thence S 25° 01' 00" E, along said D.L.C. line, a distance of 422.89 feet; thence S 08° 28' 59" E a distance of 311.25 feet to the centerline of SW Walnut Street; thence S 78° 25' 40" W, along said centcr line, a distance of 161.84 feet to the northeast corner of Walnut Grove, recorded in Book 80 Page 14 of the Washington County Subdivision Records; thence along the boundary of Walnut Grove the following 4 courses, S 07° 50' 43" E a distance of 625.31 feet; thence N 86° 16'59" E a distance of 37.20 feet; thence S 12° 35'00" W a distance of 23.76 feet; thence S 55° 33' 18" W a distance of 121.28 feet to the northeast corner of Partition Plat 1997-080; thence S 010 43' 24" W, along the east line of said Partition Plat, a distance of 463.52 feet to the northerly right of way of SW Fonner Street; thence N 870 33' 57" E, alone the said northerly right of way, a distance of 494.84; thence N 00° 59' E a distance of 199.36 feet; thence S 89° 58' E a distance of 83.45 feet; thence S 00° 59' W a distance of 195.76 feet to the northerly right of way of SW Fonner Street; thence S 87° 33' 57" W, along said northerly right of way, a distance of 212.04 to the point of beginning. ~I ISLAND ANNEXATION 5 EXHIBIT C (Replaces Exhibit B of ORD. No. 2000-05) Description 3 A tract of land situated in Section 3, Township 2 South, Range 1 West, Willamette Meridian, Washington County, Oregon being more particularly described as follows: Beginning at the northeast comer of Genesis No. 3 as recorded in Book 52 pages 32 & 33 of the Washington County Subdivision Records and the westerly line of Pathfinder II, recorded in Book 37 Page 32 of the Washington County Subdivision Records; thence N 2411 38'00 W, along said westerly line, a distance of 354.44 feet to the northwest comer of Pathfinder II; thence N 87° 25' 10" E, along the north line of Pathfinder II, a distance of 90.63 feet to the northeast comer of lot 43 Pathfinder II; thence N 24° 55' 30" W a distance of 180.35 feet to the southerly right of way line of SW Fonner Street; thence S 87° 46'00" W, along said right of way line, a distance of 464.61 feet; thence S 00° 53' W a distance of 317.00 feet; thence N 87° 46' E a distance of 70.00 feet; thence N 02° 00' 30" W a distance of 98.00 feet; thence N 87° 46' E a distance of 98.00 feet; thence S 02° 00' 30" E a distance of 98.00 feet; thence N 87° 46' E a distance of 173.18; thence S 14° 32' 10" E a distance of 175.59 feet to the north line of Genesis No. 3 as recorded in book 52 page 32 & 33 of the Washington County Subdivision Records; thence S 89° 53' E, along said north line, a distance of 218.00 feet to the point of beginning. ISLAND ANNEXATION 6 EXHIBIT D (Replaces Exhibit B of ORD. No. 2000-06) Description 4 A tract of land situated in Section 3, Township 2 South, Range 1 West, Willamette Meridian, Washington County, Oregon being more particularly described as follows: Beginning at the southwest corner of Walnut Grove as recorded in Book 80 Pages 14 & 15 of the Washington County Subdivision Records also being the northwest corner of Partition Plat 1997-080; thence N 87° 46' E, along the south line of said partition plat, a distance of 115.00 feet; thence S 001 53' W, along the west line and it's extension of said Partition Plat, a distance of 352.91 feet to the southerly right of way of SW Fonner Street; thence N 87° 46' E, along said southerly right of way, a distance of 202.04 feet; thence S 00° 53' W a distance of 226.87 feet; thence N 89° 53' W a distance of 125.6 feet; thence S 00° 53' W a distance of 53.00 feet; thence N 89° 53' W a distance of 171.00 feet to the easterly right of way of SW 115d' Avenue; thence N 00° 53'E, along said right of way, a distance of 307.75 feet to the northerly right of way of SW Fonner Street; thence S 87° 46' W, along said northerly right of way a distance of 20.03 feet; thence N 00° 53' E a distance of 312.85 feet to the point of beginning. ISLAND ANNEXATION 7 EXHIBIT E (Replaces Exhibit B of ORD. No. 2000-07) Description 5 A tract of land situated in Section 3, Township 2 South, Range 1 West, Willamette Meridian, Washington County, Oregon being more particularly described as follows: Commencing at the center of Section 3, Township 2 South, Range 1 West thence N 00° 46' 32" E, along the center line of said Section 3 and the center line of SW 115'' Avenue, a distance of 120.34 feet; thence S 89° 47' 46" W a distance of 20.00 feet to the west right of way of SW 115'` Avenue and The True Point of Beginning; thence S 89° 57' 46" W a distance of 205.00 feet; thence N 00° 46' 32" E a distance of 194.00 feet; thence N 89° 57' 46" E a distance of 205.00 feet; thence S 00° 46' 32" W a distance of 194.00 feet to the true point of beginning. ISLAND ANNEXATION 8 loan,= I lows EXHIBIT F (Replaces Exhibit B of ORD. No. 2000-08) Description 6 A tract of land situated in Section 10, Township 2 South, Range 1 West, Willamette Meridian, Washington County, Oregon, being a portion of lot 2 Cole's Acres, being more particularly described as follows: Beginning at the Southeast corner of lot 2 Cole's Acres as recorded in Book 11 Page 38 of the Washington County Subdivision Records; thence S 891 30' 33" W, along the south line of said lot 2 a distance of 152.50 feet to the east right of way of SW 114'x' Avenue; thence N 00° 04' 05" W, along said east right of way, a distance of 110.00 feet; thence N 89° 30' 33" E, along the south line of Partition Plat 1994-042, a distance of 152.50 feet to the east line of said lot 2; thence S 00° 04' 05" E, along the said east line, a distance of 110.00 feet to the point of beginning. ISLAND ANNEXATION 9 EXHIBIT G (Replaces Exhibit B of ORD. No. 2000-09) Descriptiou 7 A tract of land situated in Section 10, Township 2 South, Range 1 West, Willamette Meridian, Washington County, Oregon, being a portion of lot 20 Cole's Acres, being more particularly described as follows: Beginning at a point which is S 000 05' E a distance of 25.00 feet from the north one-quarter comer of Section 10 Township 2 South Range 1 West, also being the northwest corner of Lot 20 Cole's Acres as recorded in Book 11 Page 38 of the Washington County Subdivision Records; thence S 001 05' E, along the west line of lot 20, a distance of 150.00 feet to the north right of way line of SW Cole Lane; thence N 89° 30'30" E, along said north right of way line, a distance of 152.5 feet to the east line of said lot 20; thence N 00° 05' W, along the east line of lot 20, a distance of 150.00 feet to the south right of way of SW Walnut Street; thence S 89° 30' 30" W, along said right of way, a distance of 152.5 feet to the point of beginning. ISLAND ANNEXATION 10 EXHIBIT H (Replaces Exhibit B of ORD. No. 2000-10) Description 8 A tract of land situated in Section 10, Township 2 South, Range 1 West, Willamette Meridian, Washington County, Oregon, being more particularly described as follows: Commencing at the north one-quarter Corner of Section 10 Township 2 South, Range one West; thence S 89° 10' W, along section line, a distance of 346.5 feet' thence S 00° 05' E, along the westerly line of the Evergreen Springs as recorded in Book 121 Pages 29& 30 of the Washington County Subdivision Records, a distance of 207.50 feet to the True Point of Beginning; thence S 00° 05' E, along said westerly line, a distance of 135.00 feet; thence S 89° 10' W a distance of 131.75 feet; thence N 00° 05' W a distance of 27.04 feet to a point of curve of a curve to the right; thence along said curve with•a radius of 120.00 feet, a delta of 34° 45' 54" (a chord which bears N 17° 17' 57" E 71.70 feet) and a length of 72.81 feet to a point of tangency; thence N 43° 40' 54" E a distance of 32.92 feet to a point of curve of a curve to the left; thence along said curve to the left with a radius of 65.00 feet, a delta of 10° 06' 05" (a chord which bears N 29° 37' 51" E 11.44 feet) and a length of 11.46 feet; thence N 891 10' E a distance of 84.44 feet to the true point of beginning. i i i ti ]a~ Y ISLAND ANNEXATION 11 EXHIBIT I (Replaces Exhibit B of ORD. No. 2000-11) Description 9 A tract of land situated in Section 10, Township 2 South, Range 1 . West, Willamette Meridian, Washington County, Oregon, being more particularly described as follows: Commencing at the north one-quarter Comer of Section 10 Township 2 South, Range one West; thence S 89° 10' W, along section line, a distance of 346.5 feet; thence S 00° 05' E, along the westerly line of the Evergreen Springs as recorded in Book121 Pages 29& 30 of the Washington County Subdivision Records, a distance of 430.0 feet to the True Point of Beginning; thence S 001 05' E, along said westerly line, a distance of 115.00 feet; thence S 89° 10' W a distance of 131.75 feet; thence N 00° 05' W a distance of 115.00 feet; thence N 89° 10' E a distance of 131.75 feet to the true point of beginning. ISLAND ANNEXATION 12 EXHIBIT J (Replaces Exhibit B of ORD. No. 2000-12) Description 10 A tract of land situated in Section 10, Township 2 South, Range 1 West, Willamette Meridian, Washington County, Oregon, being more particularly described as follows: Commencing at the north one-quarter Corner of Section 10 Township 2 South, Range one West; thence S 89° 10' W, along section line, a distance of 660.0 feet; thence S 00° 05'E a distance of 20.00 feet to the southerly right of way of SW Gaarde Street and the True Point of Beginning; thence S 00° 05' E a distance of 640.0 feet to the northerly line of Shadow Hills as recorded in Book 42 Pages 41 41A of the Washington County Subdivision Records; thence N 89° 10' E,, along said northerly line, a distance of 131.75 feet; thence N 00° 05' W a distance of 345.19 feet to the point of curve of a curve to the right; thence along said curve with a radius of 170 feet, a delta of 34° 45' 54" (a chord which bears N 17° 17' 57" E, 101.57 feet) and a length of 103.15 feet; thence N 34° 40' 54" E a distance of 32.92 feet to a point of curve of a curve to the left; thence along said curve to the left with a radius of 15 feet a delta of 34° 45' 54" (a chord which bears N 17° 17' 54" E, 8.96 feet) and a length of 9.10 feet; thence N 001 05' W a distance of 163.17 feet to the southerly right of way of SW Gaarde Street; thence S 89° 10' W, along said southerly right of way, a distance of 183.54 feet to the true point of beginning. n 1 ISLAND ANNEXATION 13 EXHIBIT K (Replaces Exhibit B of ORD. No. 2000=13) Description 11 A tract of land situated in Section 10, Township 2 South, Range 1 West, Willamette Meridian, Washington County, Oregon, being more particularly described as follows: Commencing at the north one-quarter Corner of Section 10 Township 2 South, Range 1 West; the S 90° 00' W, along Section line, a distance of 792.0 feet; thence S 00° 44' W a distance of 20 feet to the southerly right of way of SW Gaarde Street and the True Point of Beginning; thence S 000 44' W a distance of 127.00 feet; thence N 90° W a distance of 118.00 feet; thence N 00° 44' E a distance of 127.00 feet to the southerly right of way of SW Gaarde Street; thence N 90° E, along said southerly right of way, a distance of 118.00 feet to the true point of beginning. , t , , , s ISLAND ANNEXATION 14 MEN EXHIBIT L (Replaces Exhibit B of ORD. No. 2000-14) Description 12 A tract of land situated in Section 10, Township 2 South, Range 1 West, Willamette Meridian, Washington County, Oregon, being more particularly described as follows: Beginning at the southwest corner of lot 50 Shadow Hills No. 2 as recorded in Book 59 Pages 28 & 29 of the Washington County Subdivision Records; thence S 86' 39' 46" W a distance of 175.10 feet; thence S 00' 40' 32" W a distance of 292.31 feet to the northerly right of way of SW Bull Mountain Road; thence N 86' 42' 40" E, along said right of way, a distance of 304.14 feet; thence N 00' 37' 30" E a distance of 292.81 feet to the southerly boundary line of Shadow Hills No. 2; thence S 86' 35' 42" W, along the southerly line of Shadow Hills No. 2, a distance of 127.81 feet to the point of beginning. i r~ a ISLAND ANNEXATION 1-5 EXHIBIT M (Replaces Exhibit B of ORD. No. 2000-015) Description 13 A tract of land situated in Section 9, Township 2 South, Range 1 West, Willamette 'Meridian, Washington County, Oregon, being more particularly described as follows: Commencing at the Northeast comer of said Section 9; thence South, along the east line of said Section 9, a distance of 750.95 feet to The True Point of Beginning; thence S 890 50' 30" W a distance of 660 feet; thence South a distance of 182.7 feet; thence N 890 50' 30" E a distance of 660 feet to the east line of Section 9; thence North, along said Section line, a distance of 182.7 feet to the true point of beginning. a N ISLAND ANNEXATION 16 EXHIBIT N (Replaces Exhibit B of ORD. No. 2000-16) Description 14 A tract of land situated in Section 9, Township 2 South, Range 1 West, Willamette Meridian, Washington County, Oregon, being more particularly described as follows: Beginning at the Southeast corner of lot 1 Blue Ridge as recorded in Book 24 Page 16 of the Washington County Subdivision Records; thence N 00° 00' 00" E, along the east line of Blue Ridge , a distance of 568.7 feet to the northeast comer of Blue Ridge; thence S 89° 50' 30" W, along the north line of Blue ridge, a distance of 597.0 feet to the northwest comer of lot 6 blue ridge; thence S 00° 00' 00" W, along the west of Blue Ridge and its extension, a distance of 616.53 feet to the northerly right of way of SW Bull Mountain Road; thence N 86° 13' E, along said northerly right of way, a distance of 190 feet; thence N 00° 00' 00" E a distance of 329.9 feet to the south line of lot 7 Blue Ridge; thence N 89° 50' 30" E, along the south line of said lot 7, a distance of 125.9 feet to the southeast corner of lot 7 also being on the west right of way of SW 126 th Ave.; thence S 00° 00' 00" E, along said westerly right of way, a distance of 311.93 feet to the northerly right of way of SW Bull Mountain Road; thence N 86° 13' E, along said right of way, a distance of 282.1 feet to point of beginning. ISLAND ANNEXATION 17 EXHIBIT O (Replaces Exhibit B of ORD. No. 2000-17) Description 15 A tract of land situated in Section 4, Township 2 South, Range 1 West, Willamette Meridian, Washington County, Oregon, being more particularly described as follows: Beginning at the northeast corner of lot 6 Obrs Heights as recorded in Book 22 Page 43 of the Washington County Subdivision Records; thence S 89° 30' W, along the north line of said lot 6 a distance of 169.06 feet to the northwest Corner of said lot 6; thence S 000 30' E, along the west line of lot 6 and its extension and the east line of lot 8 , a distance of 289.83 feet to the southeast corner of lot 8 Obrs Heights; thence S 89° 37' W, along the south line of lot 8, a distance of 46.56 feet to the northeast comer of lot 9 Obrs Heights; thence S 00° 43' W, along the east line of said lot 9, a distance of 175.00 feet to the southeast corner of lot 9; thence S 89° 37' W, along the South line of said lot 9, a distance of 155.98 feet to the southwest corner of said lot 9; thence S 00° 43' W, along the east line of lot 2 Obrs Heights, a distance of 19.80 feet to the southeast corner of said lot 2; thence S 89° 37' W, along the south line of said lot 2, a distance of 144.02 feet to the southwest comer of said lot 2 and the northwest comer of lot 1 Obrs Heights; thence S 00° 43' W, along the west line of said lot 1, a distance of 155.21 feet to the southwest corner of said lot 1; thence N 89° 37' E, along the south line of lots 1,10,& 11 a distance of 340.00 feet to the extension of the east line of lot 29 Handy Acres as recorded in Book 10 Page 31 of the Washington County Subdivision Records; thence S 00° 42' 55" W, along the extension of and east line of said lot 29 and the west line of Vista Lake as recorded in Boole 26 Page 44 of the Washington County Subdivision. Records, a distance of 369.73; thence S 89° 32' 41" W a distance of 139.78 feet; thence N 00° 42' 55" E a distance of 319.98 feet to the southerly right of way of SW Fern Street; thence S 89° 37' W, along said southerly right of way, a distance of 50.02 feet; thence S 00° 42' 55" W a distance of 319.81; thence S 89° 32' 41" W a distance of 100.09 feet; thence S 00° 42' 55" W a distance of 319.60 to the north line of Hillshire as recorded in Book 85 Pages 45 -50 of the Washington County Subdivision Records; thence N 89° 43' 30" E, along said north line, a distance of 509.84 feet to the east right of way of SW 135`h Street; thence N 00° 43' E, along said east right of way, a distance of 120.00 feet; thence N 88° 01' E a distance of 150.00 feet; thence S 00° 43' W a distance of 120.00 feet to the south line of Handy Acres; thence N 88° 01' E, along said south line a distance of 50.21 feet; thence S 00° 43' W, to the center line of Section 4, a distance of 6.29 feet; thence N 89° 36' 09" E, along the center line of Section 4, a distance of 163.91 feet to the extension ISLAND ANNEXATION 1u r of the east line of lot 31 Handy Acres; thence N 00° 51' E, along the east line of lots 31 and 33 Handy Acres, a distance of 847.35 feet to the center line of SW Walnut Street being a point on a curve to the right; thence along said curve with a radius of 573M feet a delta of 24° 42' 59" (a chord which bears N 51° 22'29" W, 245.27 feet) and a length of 247.18 feet to a point of tangency; thence N 39° 01' W, along said center line, a distance of 151.29 feet to a point of curve to the right; thence along said curve with a radius of 477.50 feet a delta of 26° 31' 30" (a chord which bears N 25° 31'30" W, 222.81 feet) and a length of 224.88 feet to a point which is on the extension of the north line of lot 6 Obrs Heights; thence S 89° 30' W, along the extension of said north line, a distance of 25.00 feet to the point of beginning. EXCLUDING THE FOLLOWING: Commencing at the southeast corner of lot 32 Handy Acres; thence N 00° 54' W, along the east line of said lot 32, a distance of 114.77 feet to the initial point of Partition Plat 1997-031 as recorded in Washington County Subdivision records and the True Point Beginning; thence N 00° 54' W, along the east line of said Partition Plat, a distance of 115.41 feet to the northeast corner of said Partition Plat; thence S 88° 00' 14" W, along the north line of said Partition Plat, a distance of 182.59 feet to the east right of way of SW 135`h Avenue; thence S 00° 48' 25" W, along the west line of said Partition Plat and the east right of way of SW 135`h Avenue, a distance of 115.41 feet to the southwest comer of said Partition Plat; thence N 88° 00' 04" E, along the south line of said Partition Plat, a distance of 182.40 feet to the True Point of Beginning. ALSO EXCLUDING THE FOLLOWING: Commencing at the southeast comer of lot 32 Handy Acres; thence N 00° 54' W, along the east line of said lot 32, a distance of 345.58 feet to the True Point Beginning; thence N 00° 54' W, along the east line of said lot 32, a distance of 115.41 feet; thence S 88° 00' 14" W a distance of 182.59 feet to the east right of way of SW 135`h Avenue; thence S 00° 48' 25" W, said east right ofway, a distance of 115.41 feet; thence N 88° 00' 14" E, along a distance of 182.40 feet to the True Point of Beginning. ISLAND ANNEXATION 19 MEN moll In AGENDA ITEM # Study Session FOR AGENDA OF March 14.2000 CITY OF TIGARD, OREGON COUNCIL AGENDA ITEM SUMMARY ISSUE/AGENDA TITLE Briefing on Initiative #47 the Taxpayer Protection Initiative. PREPARED BY: Craig Prosser DEPT HEAD OK CITY MGR OK ISSUE, BEFORE THE COUNCIL Receive information concerning a measure currently being circulated for signatures for inclusion on the November 2000 ballot. If approved by voters, this measure will retroactively affect several issues currently under discussion in the City of Tigard. STAFF RECOMMENDATION No action necessary. Informational briefing only. INFORMATION SUMMARY The Taxpayer Protection Initiative (Initiative #47) is currently being circulated for signatures, if it receives sufficient signatures, it will appear on the November 2000 ballot. The measure includes a two year retroactive provision, so if approved by voters in November 2000, it will affect actions taken by local governments since December 6, 1998. Tigard is also currently considering several issues that will be affected by this measure should it qualify for the ballot and be approved by voters. This informational briefing will explain several provisions of the measure and identify uncertainties it creates for actions to be considered by the Council between now and November 2000. Briefing materials are attached. OTHER ALTERNATIVES CONSIDERED N/A VISION TASK FORCE GOAL AND ACTION COMMITTEE STRATEGY N/A FISCAL NOTES N/A PI i 5,r: c N Pwesent'at'on.to,,....,,_..: r • t F r°~L 1 ty F 'nar~ce 0 fficer°s r~ ~.~K'T` 'w''.`~'~~T r..'.i,`i'`~S3}S7'r • ~iL Y, r . J~~ ' k tee' Taxpayer Protection Initiative x and Local Option Taxes -?'Za+. ~i•f SEATTLE- NORTHWEST OEM SECURITIES CORPORATION Ll+,U.Lb1L1'1' Y 5'fml-, M t" . t a J sr W MAIL ® Filed by Bill Sizemore March 10, 1999 as Initiative #47 ® Certified Ballot 'T'itle reads "Amends Constitution: Requires voter approval of most new and increased taxes, fees." Similar to Measures 5 and 20 from 1994 and 1996, as well as I-695 recently approved in Washington. Main differences with earlier versions are provisions making measure retroactive to December 6, 1998, making inappropriate tax or fee increases subject to refund, and raising percentage required for voter approval of measures. LEGI~~'IT`I STg~ Y yf of oxego®l, , o Shy xea . to MatejC~ SeC1 endment is to are ° tt~o of ~~1e se of his 200p e and FxOpe.)• an CQ~Stl1ae§•The, urpo cins of ~ncom e or increase ~n e~V? SeC6.011 ht to aggrove all h further deFravew taX, fee, or charg a yeople!s TWO n ows: es and tax ~ncrea e4' le.'lherefore• the people, as fob o'Cc ~ as$eSsed Of Secu°n 32 . new tax the F p rOVa1 by be iMP ensure that a roved by ire app charge shad or charge' or f nee, ear, or hereafter directly FF e Shall req fee, or ew tax, d y tax, °r charg '40 new tax, mess the fees n anbere • ~)~a) eased. N ove an even Wait existing with°ut vote. be incr bet of ated as an » Sh m fee increases taX? fee °r choge lection held Lina 've assembly hab desiH ative petiti°n. sung an e sl of y mvs d n© ex~ is roved in state legs e t levied, first app th Ced on the state"`r'de e thereof L he ch pp0 held on a date w a be Fla or incre Yes„ on s 2 Tel increase tr election charge, who Vote any oth on which meas'~es m Y " the new tax, f ee' voters date O e aciFav g elecfi°n vat exeent e of F wed as nu~ifying the ro the Fercentag ores, ed v°Cex a ~nexeas b not less e tax meas d y shallbe coast not le an a prove Ss th S section s foo r ° hieve be~•• F I`3o~ing in ~ that election ~nendment" bes• « •~5) is Cons ntutio the genera eleCn ° of date other oxi st~]l a of ~icle double xna held On a 1 » eat in SeCfionelection be Valid' requitem voted on in an anticipation to F whicrlare 50%) Voter fifty Percent ~ go a _ e^•-J S i f ter' ~ti `~.J 04 requirement, ercentage ents royal with new p IssuesComm . taxes, fees and charges t°charge sand permit and planning fees • Subjects all obvious utili rates and easure. tion taxes, including local op due to increases in value are subject to m roPerty tax revenues due to unclear whether increase p aid by property owners for levy based taxes o b Unclear whether increases in n taxes covered by measure uld need to establish an valuation differential growm rates 1 Legislature wo e went election oppoh't'~ to exist tes only at general elections. measure allows vo currently, in statewide initiatives for more r q would still apply to new Measure 50 double majority p a~,ual date for aPPrOvg rovisions If new elections granted, 0 property taxes 3 I mom low ~t q wh y this section, an the effective date of or charge o ears previous to 0 or a new tax, fee, 4 'a If in the t`'~' Y ercent (30 the voters for ore than three p er repealed or submitted toroved by at least the ReCroactive Provisio Ch ar e was increased m be eihnot app fee, or g ed ,the increase...Shall fee or charge was existing tax, ted or first impos or increased tax, 3) was adop if the new easure] • . fee, or charge tax, approval at the next election, Section la of his m existing in aired in t osed, or an entage of voters req fee or charge was imp and [it,...was not approved amount of the new perc if a new tax is section, Provision "(`l) (a) • to the effective date of th fund voters at the next election, the ® Re the two years previous roved by refunded to the payer... increased in this section, and not a shall pp be conformance with ive increase collected charge or excess 3% must tax, fee, or by more than mn~.ents 799 and that increased tax roved. quently reapproved. Issues Co roved af erc.P .ter 12J J ntage or subsequently levies option levies app eneral electio . all. approved by new p be refunded unless originY election, not just g l revious rovisions increase m aY abepply at to any reaPproya. year validate p o per ear. Blection to or. P, equal to 1.5 /0 P clear whether double mal ate, rather than annual is to meet Lion appe~s to be in aggr increases aired by bond I'nan over what 301o exen'p creases in rates req funds If revenue bonds collected are outstandm protectegd 1 by reclause.funHowever, contracts d provisions a e bject to coverage ratlos ~ e b coverage maY be su is necessary to 4 ~ i i l i 111 NAM= .,x ~ I4}~ „r t mw- - a Y...) f' .Vr a '5.®®®~: at-`y - ro s^• , . Increases e Inflationary Increases (4) (b) Provided that the amount of a fee or charge does not exceed the actual cost of providing the product or service, the following fees and charges may be increased at a rate not greater than the rate of inflation since the effective date of this section, without a public vote: (i) charges and fees in effect on or before December 6, 1998; (ii) charges and fees first adopted or first effective after December 6, 1998) if adopted in accordance with this section." - Issues/Comments: With 3% provision, essentially allows for increase of approximately 1.5% per year during period between December 7, 1998 and December 7, 2000 and inflationary increase thereafter. Applies to fees imposed prior to December 6, 1998 and those approved thereafter in accordance with this measure. "Rate of Inflation" is not defined. Depending on index used, this may be more or less useful. MEMO= M Aga ~.r M1 d for the V levee N a Y tC F {'T rt% iyµlf. l.'^" es x , or ffect ta 200 I-Iov. 7, V this Section shad prior to . wire voter • .1(c) Ij°thing in an election held on do 'S no,, req This SeCU r issued in ess Bxem tion voters o ess a roved by is seal©n Bonded Indebtedn d indebtedness. bonded indebtedn pP the effective date of this regayrnent of nding bonds to Pay such bonde bonds issued prior to refu the issuance of issued to repay es been royal for...bon with 55 have at tlm vent app this section, overnments t• «...(10} Because g in order to circmn new Or renamed conformance Exem funding mechanisms to any ci an°n d ot ise creating new voter shy be t Certificadetesfiof 1'ning arti s or otl'lerw hall apply the strides bl rstank, mechanisms e Bu term and the coin... s reasona creative at re ire in every such funding the legislature... and shall r and eq limitations... mechanism, ci atlon ent funding Certificates of Pam as -a bond measure " governor this section, Bremen ndCr apgroval..... AJ and req same limitauons iestions subject to the but raises eats roved prior to 117 f 00, Issues Conn ano C n bong aPp Lion by less than reported Percentage not eneTal oblig elec Nay apply to learly exempts of g bonds apProved at 11/7/00 tedneSS ° about validity levied for... bonded ended by the VOters• lies to ut~es reviously apPrO „ have no Lion only aPp have been p "finding mechanisms' ° Ex-Mp even if they or other revenue bonds ub' ect to voter approval even if certificates of participation, stll 1 Suggests that taxes, fees or charges impact on increasing ~i ff ~~I 1I IN I IM IN ptev e 1 ~ A i r of those o ~~,,r~~~; ~;~i,~.- z~ majority or ~ or ' n shall require only apPr ~ o e a ly finds poliCe fire, the followr g levy, which levy s ount Safe gxem bons "(1) (a) ex firing tax greater than the rate or am ® public ~ a measure to renew an P is not g lectron: amount of which levy i vehicle fuel tax." d taxes, voting in the eservices, the rate or am the state motor fees, or 911 emergency or increase and ir) a measure to increase th not be co " nsidered new expiring levy a t following revenues shall gxem t Revenues • (3) The Port districts; Districts or p charges... les Utility user fees charged by peoP • b Article XI Section Jib of this mass transit fares; and fees, defined by versity twt1On an rovenments as college or uni and assessments for local imp l to pas through increased costs o y r otherwise under the charging incurred charges an d services sole ~nstitutron; ducts an for overnment Pro 10 ee labor costs, o increases in charges at a e not government emp y wholesale rn:Ru of law, ation;~ governments control; forfeitures for violation e en aged in that business or occup fines or thus g lottery revenue; business and trade associaaoor by available fees paid to off icial donations, or asset sales; and a ree for the pr interest, investorents, which may be legally obtained from earnings oduct or from r services e new or increased sew or product or service in the es for roducts O rovrdedfat th fees or charg overnment, P rrvate sector charge for th source other than g the average P $ervice, is not greater than same market. sow rt = mix ~ ~tr\ l~ t r~ Y s Umstat, Irc ,na e wry'-1~~_p1~ JG(igjf `~~v~`5 ~l„ S.t' ■cs~s~f;'~ P~ F t , . of the K. wire a vote a 'fhis section hall not reqreal tax law, increases (b)() Circt stances due to a Change in fed. this section shall Chan e in r solely a ers. Nothing allowed ® Increase- in ~ncom eox taxp y overnunent revenue occu in an amount greater than le when increases in g s in the circumstances of individual property verty tax u PeoP or other changes crease in the tax on in income prizing an be construed as auth isle XI of this constitution." under Art local option Con'mrnts classify expenclitures for existing issues A can it be used to I,oliCe/Fire exemption unicial utilities levies? be helpf~ for m P es exemption may charges incur into fines . may give incentive to modify e red charg should apply to orfeituxes exemption overnmene Fines(F a source other than g obtained from swimming pools) Exemption for legaservices (e-g•, should allow state to collect some park and recreation ' revenue due to increases in ~.nCOmr Exemption for increases m stem. in value is income tax based on curre in local sY taxes due to growth government property individual Not clear whether increases «cliarsge in the circumstances of an may ties attributable to annexations are unclear. exempt under this section as manbe ta'Payer Also, revers ~ R ,!I Calls eal" -KNOW 11 HIMMUMMM- I. - wlwiF rye„' 1 S ~r Y 3 y~,c '7• y~J l' H 2'e t 4 ' ; . f&- i?4'' •"'va Isa'c.i~~U~~Y,1. e rte'' x, . rr ° ~ w'i~ `.tr'` . . ® State Authority to Override. "...(7) (a) Subject to Section la of Article IX, the Legislative Assembly and Governor may override this section and call for a special election date other than the date(s) set forth in subsection (1) of this section, or may enact by law particular taxes, or authorize particular local taxes, fees, or charges without a vote of the People if such taxes are approved by a three-fourths vote in each house and signed into law by the Governor. Any tax authorized or enacted by such action shall be designated for a specific purpose and shall be in effect no longer than twelve months. Any tax, fee, or charge imposed under this subsection shall be subject to referendum. Issues/Comments : Ability to achieve 3/4 majority plus Gubernatorial approval seems remote. Best case is one year tax • Impractical timing: No provision for dealing with years when Legislature not in session. Section la of Article IX refers to needing to wait 90 days after sine die for a tax measure to be effective. Therefore, delays in collection of additional revenue may be substantial. Local tax may be approved, but not clear on collection mechanism and how it is coordinated with other constitutional provisions. Measure 50 limitations still in effect for property taxes. 9 IRS a WIcr a-S . . •inR' Yr , aroma Y W - y a vvewrf r .4 rr,(n 'sri ,-t n%. n,l 3c:rJ_-,+- s . y.~ _..X .{c.yC~. H. LsY"'arn ~,5 iv..~~ ~.N~ I~.H.a... eM~. t~i.. . tiY - . Local Authority to Override "...7(b) Subject to Section la of Article IX of this Constitution, if a local emergency is declared by the Governor, the affected city county, or local taxing district may override this section for a period not exceeding twelve months, if: (i) the override is approved by not less than a three-fourths vote of the members of the local governing body, and (ii) the continuation of the tax for any remainder of the twelve months is approved by voters voting in an election held within ninety (90) days of the date the emergency is declared, and otherwise adopted in conformance with this section. Issues/Comments Timing issues - State override seems to suggest 12 month period starts from when tax is collected; local override may start 12 month period from when it is collected; Required declaration of emergency by Governor is at best impractical, and at worst may prevent local government from managing local crisis; Election problems - may not be able to hold an election within 90 days under current law; Voter approval subject to adoption "in conformance with this section," which probably means both the higher percentage and possibly requiring voting at a general election, which would render the local override provision mostly meaningless. /D 4 y 77 Ire in violation of this fees, or charges ~t • 9) A government that levies taxes, . 11 plus interest, tot , payers in erest ~aid hall be computed as the ® Penalties - 6% Interest plus. n1ount...collected in violation of this Section 32a shall re find the amount Int th d for the period llection of the tax, owin the determination of violation. from co the twelve monks full g ercent per year, compoun cost of living change plus of the refunds..." or charge* *,has standing fee, or charge to paym fee, affected by a new or increased tax, in material violation of this section within Any ninety Oregon taxpayer • . II Standen ) If the... tax, fee, or charge is imposed... an action shall be comet ccharge or bond to challenge it. fee charge or bond Void- roving the tax, fee for arlier of (1) the date on which the election ap court shall declare the tax, found to be after the e or charge is first imposed or the b° ad tion approved (90) days afte date on which the tax, fee, taxpayer, or if th is held; or (ii) th fees... to the prevailing issue. The court shall awaar... nment attorney party' frivolous, to a prevailing g provisions in current law, although "cost Issues ents nerous than other Penalty p less o provisions • penalty of living Change» undefined- as issuers may want to let cause delay in he issuance of bonds, sued. The 90 day provision may obtaining voter approval before the bon period run after citizen litigation- Citizen receives attorney's U lous. if the citizen suit is "frivo n treatment of attorney's fees encofees only neve fees if they prevail; governments receive r t . i eta , r >{ru✓ e., - -nVkM~ " charge to or new tax, f the wor A o i.17' a rojection for a measfuee, re to ad Pe Shad begin with .1(~ e ballot title' or charg ' easuxe, p b Th e mea sure is a bond m tents existing tax' Ballot Title Con or to increase an eas taxeS....if ~ measure; ncr e 'approve a bond vote to i this measure is a interest thereon „Yes' vote on bond including esses fees he total cost of the where measures addr o t 5? even in cases ents trtltes, Issues comn1 ies increasing aired specif are not to be sold for Language req ecially if bonds and charges. &y inaccurate, esp bond «cost' play be wdsold in series projection of period of time or are to be an extended MINE MMMM S ~ S ! MAI 5 8k -1. t 9 4 .h. r f retroactive period during of an illegal tax r g o versions and I- which is conse certainly distinguishes at from p «refund" provision, m the art of the measure, and e fro The retroacnthe worst p er fee or charge ~ icient dollars is obviously even if the improP if de the re if there was insilff 695 too. source - e.g.) imbursement maybe payablef~a might have to prove ore than eneral that increased taxes more roved sewer fiend, the g een 72198 and 12/()o the s measure was app in the sewer hand to do it. election betty the percent that roved atannot approved by at least th roved ® Local option taxe aPP are not approved % will be in trouble if they we be in think trouble if they you sell the 3 that you are ok Y bond elections may also el bonds in one by. genera' obligation h 2000 the measure itself. Most bond coons ave to sell all ® November 7, best case is that municip ahnes by the same percentage However, erty tax was riot to December 8• Under Measure 5, a Pro al cost bonds P to the actu eriod of time. s„mayhelp utility systems. e avoidable, equal was monthp sifted as an incurred charr$ -as an incurred charge Exemption for "incurredcharge etlu awa the propel' hen and om the Umits if it could bT be ause classifOlgs taking Y the reverse to deal with of Proov ding the service) • , diction si nplY g°t around y be reason to do of diffacult, many lm tax at making such all. Now' there maY extremely charges not a property this measure. t3 isly. p 1 p evio'L ve not been levi ed the extent the extent they ha to ossibly Only. laps, safe for exlstinQ 0 P abl in trouble to t rotectionI but PO rob y Plans to be devised in ewal special levees are p have contra P revenue ar Ten Trent debt may tints wide the tax eriod and/°r P a new Urban ~ D ® levies necess r faloox e the actual Paym ear retroactive P h divide t t eS' Special t the tw° y increase thr°ug they are necessary laps formed during tactually creases or lacement of ,be not for because alth°ugh taxes don but may .s is kin meter inaal. and/or the future. This revenue. to voter approv ci ality nught cafeteria incr s e pu sect n1tu i p jurisdiction is receiving library fines, fitting fee . more than 30/0, tton• ousness'lanning fees; perm if increase red charge exemP ® TYPrcal r~dnc meters, p General - at ink new parka g feeS and charges. want to consider lp° oval and hOPe it's enough' Advice on raising taxes, Utlities might et high voter app A Cess • d as possible tog ndard rate covenant ® to reserve eX than a sta Want t tax -'Fork as liar no other reason now don't necessarily buy Property if for creases bond issues. uld probably be done now, Ma. r rate In ose the - bonds p,dviCe on sho easure passes - . oW, with a covenant to imP revenue bonds . ossible if this `refund provision. now, WM probably 1 P • because of be Completed any additional protection ons shod probably an November. sacti ban renewal tran for debt Serince. ter aPproval in MaY, railer Ur if necessary seek vo Special lei' ataon bonds if possible, General obhg I~ • oo tin l~j ri i ; l PHIL Y F ! S ! _ ! I' t4•AXPAYER PROTECTION INrrIAT1VE lie It eaaded by lPo>iple ott~the stairs 0f,01tgon: The Constitution of the State of Oregon is amended by creating a new, Section 32a in Article I, which section shall read: Section 32a. People's right to approve all taxes. The purpose of this 2000 Amendment is to ensure that new taxes and tax increases, which further deprive citizens of income and property, are hereafter directly approved by the people. Therefore, except as provided in Section 6 of Article IX, any new tax, fee, or charge, or increase in an existing tax, fee, or charge, shall require approval by the people, as follows: (1)(a) No new tax, fee, or charge shall be imposed, assessed or levied, and no existing tax, fee or charge shall be increased by the state or any local government or taxing district, unless the new tax, fee, or charge, or increase thereof is first approved in an election held on the first Tuesday after the first Monday of November of an even numbered year, or any other election held on a date which the state legislative assembly has designated as an annual election date on which measures may be placed on the statewide ballot by initiative petition, and the new tax, fee, or charge, or increase thereof, is approved by not less than the percentage of participating voters who voted "Yes" on this 2000 Amendment For purposes of this section and subject to subsection (5) of this section, the following shall require only approval by a majority of those voting in the election: (i) a measure to renew an expiring tax levy, which levy solely funds police, fire, or 911 emergency services, the rate or amount of which levy is not greater than the rate or amount of the expiring levy; and (ii) a measure to increase the state motor vehicle fuel tax (b) The ballot title and official voters pamphlet explanatory statement for a measure to adopt a new tax, fee, or charge; to approve a bond measure; or to increase an existing tax, fee, or charge, shall begin with the words: A "Yes" vote on this measure is a vote to increase taxes. The question submitted to voters also shall clearly describe the proposed new tax, fee, or charge, or increase thereof; if the measure is a bond measure, a projection of the total cost of the bond, including interest thercon; and revenue the measure would produce annually. (c) Nothing in this section shall affect taxes levied for the repayment of bonded indebtedness approved by voters in an election held prior to Nov. 7, 2000, or the issuance of refunding bonds to pay such bonded indebtedness. This section does not require voter approval for the issuance of, or the levy of taxes to pay, bonds issued to repay bonds issued prior to the effective date of this section or issued in conformance with this section. (2) For purposes of this section, any elimination, limitation, or reduction of a tax exemption, credit, deduction, exclusion, or cost- of-living indexing shall be considered a tax increase. (3) The following revenues shall not be considered new or increased taxes, fees, or charges for the purposes of this section: user fees charged by Peoples' Utility Districts or port districts; mass transit fares; college or university tuition and fees; incurred charges and assessments for local improvements as defined by Article M Section l lb of this Constitution; increases in charges for government products and services solely to pass through increased costs of wholesale inputs that are not government employee labor costs, or otherwise under the charging government's control; fines or forfeitures for violation of haw; lottery revenue; fees paid to official business and trade associations by those engaged in that business or occupation; earnings from interest, investments, donations, or asset sales; and fees or charges for products or services which may be legally obtained from a reasonably available source other than government, provided that the new or increased fee or charge for the product or service is not greater than the average private sector charge for the same product or service in the same market (4xa) If in the two years previous to the effective date of this section, an existing tax, fee, or charge was increased more than three percent (30/o), or a new tax„ fee, or charge was adopted or first imposed, the increase in the existing tax, fee, or charge, to the extent it exceeded a three percent increase, and any new tax, fee, or charge, shall be either repealed or submitted to the voters for approval at the next election, if the new or increased tax, fee or charge was not approved by at least the percentage of voters required in paragraph (a) of subsection (1) of this section. If a new tax fee or charge was imposed, or an existing tax, fee, or charge increased in the two years previous to the effective date of this section, and the new tax, fee, or charge or increase in an existing tax, fcc, or charge, was not approved in conformance with this section, and not approved by voters at the next election, the amount of the new tax, fee, or charge or excessive increase collected shall be refunded to the payer. Taxes to pay voter approved bonded indebtedness, and taxes, fees, and charges listed in subsection (3) of this section are exempt from the requirements of this paragraph (a) of this subsection (4). (b) Provided that the amount of a fee or charge does not exceed the actual cost of providing the product or service, the following fees and charges may be increased at a rate not greater than the rate of inflation since the effective date of this section, without a public vote: (i) charges and fees in effect on or before December 6, 1998; (ii) charges and fees first adopted or first effective after December 6, 1998, if adopted in accordance with this section. 0 (5) Nothing in this section shall be construed as nullifying the requirement-in Section 11 of Article JQ of this Constitution that elections for property tax measures, which are voted on in an election held on a date other than the general election, achieve not less than fifty percent (50%) voter participation to be valid Ma) This section shall not require a vote of the people when increase; in government revenue occur solely due to a change in federal tax law, increases in income, or other changes in the circumstances of individual taxpayers. Nothing in this section shall be construed as authorizing an increase in the tax on a property tax in an amount greater than allowed under Article M of this Constitution. (b) If, after the effective date of this section, a government temporarily suspends or voluntarily lowers a tax, fee, or charge; the tax, fee or charge may be increased later, without a public vote, to the rate or amount it would have been under this section had the suspension or reduction not occurred (7)(a) Subject to Section la of Article IX, the Legislative Assembly and Governor may override this section and call for a special election date other than the date(s) set forth in subsection (1) of this section, or may enact by law particular taxes, or authorize particular local taxes, fees, or charges without a vote of the People if such taxes are approved by a three-fourths vote in each house and signed into law by the Governor. Any tax authorized or enacted by such action shall be designated for a specific purpose and shall be in effect no longer than twelve months. Any tax, fee, or charge imposed under this subsection shall be subject to referendum (b) Subject to Section la of Article IX of this Constitution, if a local Emergency is declared by the Governor, the affected city, county, or local taxing district may override this section for a period not exceeding twelve months, if: (i) the overri& is ;._-xnvcd by not less than a three-fourths vote of the members of the local governing body, and (ii) the continuation of the tae for any remainder of the twelve months is approved by voters voting in an election held within ninety (90) days of the date the emergency is declared, and otherwise adopted in conformance with this section. (8) The public shall be given reasonable opportunity to comment on the proposed ballot title for any measure to create a new tax, fee, or charge or increase an existing tax, fee, or charge. The ballot title may be challenged in court; and shall be rejected if it is biased, inaccurate, not easily understood, or does not comply with paragraph (b) of subsection (1) of this section. (9) A government that levies taxes, foes, or charges in violation of this Section 32a shall refund the amount of any tax, fee, or charge collected in violation of this section, plus interest, to taxpayers in the twelve months following the determination of violation. Interest paid shall be computed as the cost of living change plus six percent per year, compounded for the period from collection of the tax, fee, or charge to payment of the refunds. If the cost of issuing the refund is more than twenty percent (209/6) of the amount of the refund, a credit may be issued to the appropriate taxpayers. (10) Because governments have at times been creative at redefining terms, or otherwise creating new funding mechanisms in order to circumvent limitations placed upon them by the people, the legislature, in implementing this section, and the courts in interpreting it, shall apply the strictest scrutiny to any new or renamed government funding mechanism; and shall require in every reasonable circumstance voter approval as required in this section for new or increased taxes, fees, or charges, regardless of the creativity used by the government in designing or naming the finding mechanism Under this section, certificates of participation and all such funding mechanisms shall be subject to the same limitations and requirements as a bond measure. (11) Any Oregon taxpayer affected by a new or increased tax, fee, or charge or bond issue subject to this Section 32a has standing to challenge it, and/or the election authorizing its imposition, by court action commenced in any cmnW in which the taxing entity is located If the elation is held, a tax, fee, or charge is imposed, or a bond is approved, in material violation of this section or any implementing legislation, the court shall declare the tax, fee, charge or bond void Such an action shall be commenced within ninety (90) days after the earlier of (i) the date on which the election approving the tax, fee, charge or bond is held; or (ii) the date on which the tax, fee, or charge is first imposed or the bond is approved for issue. The court shall award reasonable attorney fees and costs to the prevailing taxpayer, or if the action is found to be frivolous, to a prevailing government party. (12) If any phrase, clause, or part of this Amendment is invalidated by a court of competent jurisdiction, the remaining phrases, clauses, and parts shall remain in full force and effect. If any provision of this Amendment is found to violate or infringe upon a right of any person or group under the U.S. Constitution, the provision shall remain in full force and effect for all other persons or groups for which no infringement has been found 31Y IS' -0 AU1713L103S .-MSi3a -HHd LS Wd 01 M 66, r7 A 17n']W AGENDA ITEM # ) , 3 FOR AGENDA OF March 14.2000 CITY OF TIGARD, OREGON COUNCIL AGENDA ITEM SUNLMARY ISSUE/AGENDA TITLE Pledge of/rAll~le fiance and Patriotic Songs PREPARED BY: Susan Koepping~~~l{f DEPT HEAD OK „~46L~CITY MGR OK ISSUE BEFORE THE COUNCIL Brownie troop 692 will lead the Council and audience in the Pledge of Allegiance and present a short program of patriotic songs. STAFF RECOMMENDATION None INFORMATION SUMMARY The 10 Members of Brownie Troop 692 are all 2"d graders at Mary Woodward School. The troop leader is Jill Johnson. The Week of March 12 - 18 is National Girl Scout Birthday Week. OTHER ALTERNATIVES CONSIDERED None VISION TASK FORCE GOAL AND ACTION COMMITTEE STRATEGY Community Character and Quality of Life - Volunteerism Goal #1: City will maximize the effectiveness of the volunteer spirit to accomplish the greatest good for our community. FISCAL NOTES None iAcityvdde\sum.dot AGENDA ITEM N0: 2 -VISITOR'S AGENDA DATE : March 28, 2000 (Limited to 2 minutes or less, please) Please sign on the appropriate sheet for listed agenda items. The Council wishes to hear from you on other issues not on the agenda, but asks that you first try to resolve your concerns through staff. Please contact the City Manager prior to the start of the meeting. Thank you. STAFF CONTACTED NAME, ADDRESS & PHONE TOPIC MEMORANDUM Agenda Item No--3.3 CITY OF TIGARD, OREGON Meeting of 3/1'-IIDD TO: Honorable Mayor and City Council FROM: Bill Monahan DATE: March 7, 2000 SUBJECT: COUNCIL CALENDAR, March 2000 - May 2000 Regularly scheduled Council meetings are marked with an asterisk If generally OK, we can proceed and make specific adjustments in the Monthly Council Calendars. March *14 Tues Council Meeting - (6:30 p.m.) Study Session - Business Meeting * 21 Tues Council Workshop Meeting (6:30 p.m.) * 28 Tues Council Meeting (6:30 p.m.) Study Session - Business Meeting A ril *11 Tues Council Meeting - (6:30 p.m.) Study Session - Business Meeting *18 Tues Council Workshop Meeting - (6:30 p.m.) * 25 Tues Council Meeting - (6:30 p.m.) Study Session - Business Meeting May 1 Mon Budget Committee Meeting - 6 p.m. Meeting Room TBA 8 Mon Budget Committee Meeting - 6 p.m. Meeting Room TBA * 9 Tues Council Meeting (6:30 p.m.) Study Session - Business Meeting 15 Mon Budget Committee Meeting - 6 p.m. Meeting Room TBA *16 Tues Council Workshop Meeting (6:30 p.m.) 22 Mon Budget Committee Meeting - 6 p.m. Meeting Room TBA * 23 Tues Council Meeting - (6:30 p.m.) Study Session - Business Meeting 29 Mon Memorial Day Holiday - City Offices Closed i Aadm\cathy\cou nc11\ccca1.doc Tigard City Council Tentative Agenda O 3121100 - Workshop Jeff Munro 3128100 - Business 4111100 -Business TV Due: 3116/00 Due: 3130/00 Due: 319100 Workshop Topics Study Session Study Session Z E Presentation "Making Climate Change a Local Management Class/Comp Study -BLUE BMURipley Presentation and Q & A -15 mm (D O Issue" - Cathy/Curt Nichols - 10 min SHEET NEEDED - BLUE SHEET NEEDED $ 0 Presentation on Atfalati Recreation District - S -Jeff Munro & Steering Committee -1 hr c ) ®Tri-Met Demo Project - Survey --Laurie -10 min Q Durham Quarry - Jim/Laurie - 30 min Consent Agenda Consent Agenda R & F - Solid Waste Haulers 1999 Annual Financial Review Results - Loreen/Craig Bid Award - Backhoe -Sam Morrison Appointments Appoint Library Board Member - Susan -2 min J~ Bu ness Meeting Business Meeting 1. f Support for Atfalati Recreation District/ Vision Update - Dept Reports - How Issues Public Comment - Ed - 45 min addressed - BLUE SHEET NEEDED PH? - CPAH Property Tax Exemption Request- Update Council Goals Craig - 30 min Nextlink Telecommunications Franchise - Craig - 5 min I:/adm/greer/tentatv ag/year99-0.xis 3/7/00 Page 1 Tigard City C°uncil Tentative Agenda 519100 -Business N I)ue. 4127100 4125100 - Business Study session Due' 4113100 Workshop $ession eenit iz - 411g100 • study Wide SuNeY Review - Commun` min 2 Due 416100 res 30 min Input _ Loreenll-IZ- Wo~cshoP~Op ~mrnunity Su~eY consent Agenda Consent enda Business Meeting task Force odafion Bond 45 min U -transp Gus - Fees _ Gary Recommendations - 'ss Meeting gusin uildin9 prposed Increase in pN _ B Jim H - 30 min Volunteer Month page 2 reerltentaty a9lyear9~.0.xls Iaadml9 317140 r AGENDA ITEM # FOR AGENDA OF March 14 2000 CITY OF TIGARD, OREGON COUNCIL AGENDA ITEM SUMMARY ISSUE/AGENDA TITLE A RESOLUTION AUTHORIZING THE FINANCE DIRECTOR TO SIGN A DISCLOSURE AND WAIVER OF POTENTIAL CONFLICT OF INTEREST FORM WITH THE CITY'S BOND COUNSEL PRESTON GATES AND ELLIS LLP. PREPARED BY: Craig Prosser DEPT HEAD OK C~ CITY MGR OK~ ISSUE BEFORE THE COUNCIL Should the City waive any potential conflict of interest on the part of its bond counsel in the representation of a private firm on franchise issues? STAFF RECOMMENDATION Staff recommends approval of this resolution. INFORMATION SUMMARY The City uses the firm of Preston, Gates, and Ellis for municipal finance and bond related work. This is a well- qualified firm which is knowledgeable about the City and its municipal finance requirements. The lead attorney for the City's work is Harvey Rogers. The Preston firm was recently retained by RCN, a telecommunications and cable firm to represent is in negotiations with the Metropolitan Area Communications Commission and, potentially, the City of Tigard, regarding the granting of a franchise. The lead attorney for this engagement is another of the firm's attorneys, not Harvey Rogers. The Oregon Code of Professional Responsibility Disciplinary Rules require a legal firm to disclose and request a waiver of a potential conflict of interest when it is hired by a client who may have opposing business interests with another client. Preston, Gates, and Ellis has sent a letter making this disclosure and requesting the City's waiver of this potential conflict of interest. OTHER ALTERNATIVES CONSIDERED Do not waive the potential conflict of interest. Due to the size of the City's business, it is likely that Preston, Gates, and Ellis would withdraw from further representation of the City. VISION TASK FORCE GOAL AND ACTION CONEWITTEE STRATEGY N/A FISCAL NOTES No fiscal impact PrestonIGateslEllis LLP Harvey W Rogers February 23, 2000 Craig Prosser City of Tigard 13125 S.W. Hall Blvd. Tigard, Oregon 9722" Re: Disclosure and Waiver of Potential Conflict Dear Craig: The purpose of this letter is to seek a waiver of any potential conflict of interest in connection with the work we have been asked to do for RCN, a corporation that provides telecommunications and cable services to residential customers. Your consent is needed to waive this potential conflict of interest. Under the Oregon Code of Professional Responsibility Disciplinary Rules ("DR"), an attorney may not represent clients whose "objective personal, business or property interests... are adverse." DR 5-105(A)(2). Also, under the Disciplinary Rules, an attorney may not oppose a current client, even on an unrelated matter, without full disclosure and consent. DR 10-101(B) provides: "'Full disclosure' means an explanation sufficient to apprise the recipient of the potential adverse impact on the recipient, of the matter to which the recipient is asked to consent. '[F]ull disclosure' shall also include a recommendation that the recipient seek independent legal advice to determine if consent should be given. Full disclosure shall be contemporaneously confirmed in writing." Preston Gates & Ellis LLP presently represents the City of Tigard on municipal finance issues. The work we have been asked to do for RCN concerns assisting and advising RCN in its cable franchise negotiations with the Metropolitan Area Communications Commission ("MACC") and its telecommunications franchise negotiations with Tigard. A LAW rIRM I A LIMITED LIABILITY PARTNERSHIP INCLUDING OTHER LIMITED LIABILITY ENTITIES 222 SW COLUMBIA STREET, SUITE 1400 PORTLAND, OR 97201.6632 TEL: 15031 228.3200 FAX: 15031 248-9085 www.prestongates.com Anchorage Coeur d'Alene Hong Kong Los Angeles Orange County Palo Alto Portland San Francisco Seattle Spokane Washington. DC Craig Prosser February 23, 2000 Page 2 If the City of Tigard wishes to waive this conflict, I would appreciate it if you would sign this letter in the space below and return it to me. Please let me know if you need further information on this. Thank you for your cooperation. Sincerely, Harvey W. Rogers On behalf of the City of Tigard, I waive any conflict of interest in the representation of RCN by Preston Gates & Ellis LLP before MACC during cable franchise negotiations and with the City of Tigard during telecommunications franchise negotiations in connection with Preston's representation of the City of Tigard. Craig Prosser City of Tigard TJS:jIj K141715100002URBURB 120BQ AGENDA ITEM FOR AGENDA OF March 14.2000 CITY OF TIGARD, OREGON COUNCIL AGENDA ITEM SUMMARY ISSUE/AGENDA TITLE Adoption of updated City wide Personnel Policies PREPARED BY: Sandy Zodrow. HR Dir. DEPT HEAD OK CITY MGR OK ISSUE BEFORE THE COUNCIL Should the City Council adopt the updated Citywide Personnel Policies STAFF RECOMMENDATION Council adopt the proposed updated Personnel Policies for City employees INFORMATION SUMMARY The Personnel Policies for City employees have not been comprehensively reviewed and updated since 1987.These policies have been contained in two documents titled: a) City Council Policies, and b) Administrative Rules and Regulations. The Executive Staff, comprised of the City Manager and department directors, reviewed all of these personnel policies and administrative rules in detail to make certain that they reflected the City's current practices and philosophies for personnel management as well as appropriate federal, state and local law. The attached Exhibit A combines all of those updated policies into one document and represents the proposed new City Personnel Policies. The City Personnel Polices, which we are asking your Council to approve at this time, primarily represent broad personnel policies and rules that apply to all City employees such as Code of Ethics, Conduct, Equal Employment, Non-Harassment, Safety, etc. In those few instances where an existing collective bargaining agreement with the City differ from these rules, the language in the bargaining agreement prevails. As previously mentioned, most of these policies are existing policies, some of which have been modified to reflect the City's administrative direction, workplace philosophy, and/or employment law. Other articles are newly created, such as: a) Drug Free Workplace - City policies on drugs effecting work and the workplace b) Electronic Communications - telephone, internet, cell phone, and e-mail policies c) Classification Plan - polices and procedures for administration of the job classification system d) Compensation Administration - policies and procedures for salary administration e) Family Medical Leave Act - City procedures and polices related to the FMLA f) Reporting Improper Government Action - procedures for employees reporting improper government activities g) Workplace Violence - inappropriate behavior in the workplace In reviewing the proposed rules, there was some objection by some employees to the new proposed rule regarding prohibiting smokeless tobacco in any City vehicle. Executive staff rereviewed this matter but felt it was needed to establish this policy. We respectfully request your Council's approval of these updated personnel policies. OTHER ALTERNATIVES CONSIDERED Not applicable VISION TASK FORCE GOAL AND ACTION COMMITTEE STRATEGY While not directly related to the ongoing Visioning Project, the updated City Personnel Policies reflect the City of Tigard's current and future human resources philosophy and practices for its workforce. FISCAL NOTES Not applicable i:kitywide\s=.dot PERSONNEL POLICIES Personnel Policies 57.0 and 58.0 removed from No. 57.0 consideration by Council on 3/14/00, when Resolution No. 00-08 was adopted. Policies 57.0 and 58.0 will be discussed/considered at a later USE OF CITY OWNED VEHICLES: date. Cathy Wheatley, 3/15/00 In the event a work assignment requires the use of a City owned vehicle, the employee is required to be qualified and possess the appropriate class of license for the type of vehicle used. The employee shall immediately report any limitation on his/her ability to safely operate the vehicle or any change in his/her licensing status to the employee's supervisor or department director. Failure to report may result in disciplinary action up to and including termination. City vehicles are to be used only in the performance of official City business; however, personnel whose work assignment is primarily in the field may utilize their assigned City vehicle during meal and rest periods for personal business as approved by the employee's supervisor. Employees doing so must conduct themselves in a manner which does not bring discredit upon the City or incur additional costs for fuel or vehicle maintenance. The following additional guidelines for the use of a City owned vehicle shall apply: • Any out-of-pocket expenses such as fuel, emergency repairs, parking or tolls shall be reimbursed upon presentation of receipts; O No reimbursement will be made for parking fines or any other charge levied for violation of a motor vehicle law; ® Family members or other non-City employees shall not be transported in City vehicles except as specifically authorized by the Department Head or consistent with department policy or in cases in which the City vehicle is permanently assigned to the employee as a provision of an employment contract; Temporary employees, contractors or volunteers are prohibited from driving a City vehicle without the specific authorization of the department director, verification of appropriate motor vehicle license and approval by the Risk Manager; o There shall be no smoking or use of smokeless tobacco products in any City a vehicle. 60 PERSONNEL POLICIES No. 58.0 SMOKE FREE WORK ENVIRONMENT The City seeks to promote a safe, healthy and pleasant work environment for all employees and the public. In response to increasing evidence showing that tobacco smoke creates a health hazard for persons exposed to the smoke, all city facilities, including city-owned buildings, vehicles, individual employee offices, and offices or other facilitates rented or leased by the City will be smoke free. Smokeless tobacco is also prohibited. Signs will be posted in designated locations outside of the buildings where employees may step outside to smoke. Visitor's to any of the City's facilities will be requested to comply with the City's efforts to maintain a smoke free environment. 61 MEMORANDUM CITY OF TIGARD, OREGON TO: Honorable Mayor & City Council FROM: Cathy Wheatley, City Recorde C; t ` j DATE: March 6, 2000 SUBJECT: City Personnel Policies The attached Personnel Policies document is the same information sent in the March 3 Council Newsletter, which was forwarded at that time to give you adequate time to review this material. This item will be discussed during the March 14, 2000, City Council Study Session and is scheduled for adoption on the Consent Agenda for that same meeting. If for any reason there is a cause to delay action on these policies, that can be accommodated. I:WDM\CATHMOUNCILTERSONNEL RULES.DOC J 7 { { a{ ai i EXHIBIT A City Personnel Policies March 14, 2000 PERSONNEL POLICIES ARTICLE TITLE PAGE 30.0 Purpose 1 31.0 Code of Ethics for City Employees 2-3 32.0 Conduct and Appearance of City Employees, 4-6 33.0 Equal Employment Opportunity/Non-Discrimination/ 7-9 Harassment 34.0 Job Attendance 10-12 35.0 Drug Free Workplace 13-14 36.0 Pre Employment Drug Testing 15 ' 37.0 Personnel Records 16-17 38.0 Employment of Relatives 18 39.0 Political Activities 19 40.0 Outside Employment 20 41.0 Education/Training 21-24 42.0 Travel Authorization and Reimbursement 25 43.0 Solicitation on City Property 26 44.0 Written Departmental Rules and Standard 27 Operating Procedures 45.0 Electronic Communications 28-30 46.0 New Employee Orientation 31 47.0. Voluntary Resignations 32 48.0 Performance Reviews 33-34 49.0 Pay Dates and Payroll Advances 35 50.0 Temporary Employees/Intern Employment/ 36-38 Contracted Services 51.0 Classification Plan 39-41 52.0 Compensation Administration 42-45 53.0 Recruitment and Selection 46-49 54.0 Job Sharing 50-51 55.0 Family and Medical Leaves of Absence 52-58 56.0 Inclement Weather 59 57.0 Use of City Owned Vehicles 60 58.0 Smoke Free Work Environment 61 59.0 Defense and Indemnification of City Employees 62-64 60.0 Personal Property 65 61.0 Reporting of Vehicular and/or Occupational Accidents 66 62.0 Hazard Communication 67 63.0 Complaint Process 68-65 64.0 Reporting Improper Government Action 70-71 65.0 Safety Policy 72 66.0 Workplace Violence 73-74 67.0 Use of City Property and Information 75 PERSONNEL POLICIES No. 30.0 PURPOSE: These personnel policies and procedures are designed to inform all employees of the day-today administrative working of the City. They are also meant to provide employees with an understanding of what is expected of them and to provide consistent, fair and uniform treatment to all. The rules and procedures contained herein shall apply to all City employees. Where the provisions of a collective bargaining agreement with the City differ from these rules, the language in the bargaining agreement shall prevail. The City reserves the right to change any of these policies and procedures at any time. Although it is the City's policy not to terminate the employment relationship with the City unless it has just cause to do so, these policies *and procedures do not and are not intended to constitute a contract of employment or a promise or guarantee of specific treatment in specific situations. AUTHORITY AND RESPONSIBILITY: The Mayor and the City Council shall have authority over all matters -of personnel administration through adoption and implementation of the City budget, pay plans, collective bargaining agreements, and ordinances and resolutions adopting and/or amending the personnel rules and regulations. The City Manager may interpret the language of the rules and regulations in any case where interpretation is in question, and may specifically delegate the authority for the enforcement of these rules and regulations. The City Manager shall be responsible for ensuring the effective implementation of these rules and regulations and may further establish, amend or otherwise modify these rules and regulations pursuant to City Council policies. The City Manager shall advise the City Council on any changes concerning these rules and regulations. I 1 Mill PERSONNEL POLICIES No. 31.0 CODE OF ETHICS FOR CITY EMPLOYEES: City employees have a special responsibility to act on behalf of the public good and to ensure that the public's trust in government is respected. Public service requires a continual effort on behalf of employees to guard against conduct that is not only illegal but also conduct that could appear inappropriate to a reasonable observer even if the conduct is not against the law. Just because an action is legal doesn't necessarily mean it is right or good. Conduct which could appear dishonest to an observer will undermine the public trust even if the conduct is not illegal. The code of ethics is intended to convey the general expectations of what is considered to be appropriate conduct for a City employee. City employees shall not serve on City policy boards or committees except as specifically provided by ordinance or as required to perform as part of their official City duties. City employees may not use City time to participate in matters of personal interest. When giving testimony unrelated to their assigned City responsibilities, City employees should recognize themselves as private citizens and not use information or facts that have come to them by virtue of their employment and are not subject to disclosure to the public. In matters of personal interest, employees should conduct themselves so as not to impair their working relationship with other employees or with public officials. In general, City employees are encouraged to not accept personal gifts. However, State law does provide certain guidelines for the receipt of gifts as a public employee and the City of Tigard will comply with those standards. Pursuant to ORS (Oregon Revised Statutes) Chapter 244, Government Standards and Practices, the following restrictions apply to the acceptance of gifts or gratuities: • City employees may receive food, lodging and travel when participating in an event which is related to the employee's official position and when the employee is appearing in his/her official capacity. Food and/or beverages consumed by the employee in the presence of the purchaser or provided is acceptable. Receiving entertainment gifts is acceptable only a) when the entertainment is experienced in the presence of the provider, and b) when the value of the entertainment does not exceed $100 per person on a single occasion and is not greater than $250 in any o6e calendar year. Gifts exchanged between cc-workers for occasions such as birthdays and holidays are not prohibited. Gifts for employee's awards, volunteers and community cooperation are also allowed. 2 } • Employees shall not accept any special favor, gifts, or gratuities resulting from or related to employment with the City unless otherwise specified in this policy. In this regard, the appearance of impropriety can be as damaging as actual impropriety and is equally to be avoided. • Department Heads may allow acceptance of nonmonetary gifts of nominal value (e,g., under $100) at holidays or special occasions which are available to be shared by all employees in a nonbiased or nondiscriminatory manner or on behalf of an area nonprofit public service agency. Any person who observes unlawful or improper action(s) by a City employee is expected to report them. The matter should be reported to the employee's immediate supervisor. If the supervisor appears to be involved in the improper action, the report can be made to the department director, City Manager, or Human Resources. 3 PERSONNEL POLICIES No. 32.0 CONDUCT AND APPEARANCE OF CITY EMPLOYEES The City of Tigard is committed to providing efficient, courteous, friendly service to its citizens consistent with its mission statement, and embodying the highest standards of public service. Each employee in his or her position represents the City to the public; therefore, it is the obligation of every employee to be safe, courteous, friendly and efficient in the performance of their duties, to treat all those encountered in the course of work professionally and with dignity, and to present a well groomed personal appearance and dress consistent with their job assignment. The City of Tigard is also committed to promoting a work environment based on mutual trust, acceptance, productivity and respect for the dignity of every member of the City staff. We are committed to opposing behavior that detracts from-the ability of each employee to perform at his/her highest level to fulfill the mission of the City. Employees have the responsibility of working cooperatively with co-workers to create and maintain a positive work environment. This includes respecting the individual rights of others, supporting and ability by reasonable standards of conduct. Employees of the City of Tigard shall maintain the ethical standards required of a public employee, and shall insure that off the job conduct does not impair their effectiveness on the job. The expected standard of conduct for all employees in the City service shall be in the public interest as opposed to individual interest. In addition, each employee shall exhibit care and responsibility with public property and shall strive to reduce costs of materials and services in the performance of their duties. The continued employment of every employee shall be conditioned on good behavior and satisfactory performance of duties. Examples of appropriate behavior in the workplace include, but are not limited to: 1) presenting a cooperative and professional image 2) treating others with respect 3) working effectively with others and functioning as part of a team 4) being flexible to accept changes in a positive manner, and 5) communicating effectively in a constructive, respectful manner including the proper use of tone and volume. Failure to' meet the expected standards of conduct and appearance shall be grounds for disciplinary action, up to and including termination. Causes for disciplinary action include, but are not limited to, the following: Improper use of an employee's position for personal gain; • Inefficiency or incompetence; 4 • Neglect of duty or negligence of duty causing risk of personal injury to the employee or any other employee or a member of the public or causing risk of damage to property; • Insubordination and/or discourteous treatment of a Supervisor, Department Director, City Manager, City Councilor, the public or a fellow employee; • Gambling for items of value during working hours or on City premises, including participating in internal pools or wagers; • Solicitation of a contribution, response or action in the name of the City designed to further a political or charitable cause while on duty; • Acceptance of gratuities or gifts in violation of State ethics laws or City policy; • Theft of, damage to, negligence or improper or unauthorized_ use of City vehicles, equipment or property; • The use of intoxicants or illegal use, possession, distribution or sale of controlled substances on the job or on City premises, or reporting for work under the influence of intoxicants or controlled substances; • Habitual or excessive absence or tardiness or abuse of sick leave privileges; • Absence from duty without authorization or failure to follow department notification procedures regarding absence or tardiness; • Violation of safety rules or policies; damage to or negligence in the care and handling of City property; • Conviction of a felony or conviction of any crime where the conviction would impair effectiveness as a City employee or bring discredit or reproach on the City or department involved; • Dishonesty; i i • Fraud in securing employment; i i • Claim of sick leave under false pretenses or misuse of sick leave; j s • Fighting or violence in the workplace or worksite; • Possession of firearms or lethal weapons except for police officers and others authorized to carry firearms; 5 • Willful violation of any provision of City ordinances, rules or policies, or any provision of departmentts rules and regulations • Other conduct unbecoming public service or reflecting discredit on the City or any department. 6 PERSONNEL POLICIES No. 33.© EQUAL EMPLOYMENT OPPORTUNITY/NON-DISCRIMINATION/HARASSMENT POLICY: The City of Tigard is committed to providing a workplace that is respectful and productive for all of its employees, and one that affords equal opportunities to all employees and applicants for City jobs. Discrimination on the basis of race, color, religion, sex, age, national origin, disability or marital status is prohibited. Harassment of any employee based on these distinctions is also inappropriate, offensive and illegal, and will not be tolerated. Any employee found to have engaged in harassment will be subject to disciplinary procedures up to and including dismissal. These policies extend to all areas of employment, benefits, conditions, terms and privileges of service. It is the responsibility of all employees, managers and supervisors to understand and comply with these polices. Supervisors have the additional responsibility to support these policies, and to take prompt, corrective action if harassment is found to have occurred. Management is expected to encourage and support constructive and open communications in order to prevent the development of hostile or discriminatory work environments. Sexual Harassment: Sexual harassment is a form of sex discrimination and an unlawful employment practice under. Title VII, defined as deliberate or repeated behavior of a sexual nature which is unwelcome. Harassing behaviors are judged not by the perceptions of intent of the alleged harasser, but by how the recipient and reasonable people similar to the recipient perceive the behavior. There are two major forms: 1) "Quid Pro Quo", which refers to requiring an employee or co-worker to submit to unwelcome behavior as a condition of employment 2) "Hostile Work Environment", which refers to behavior that creates or fosters an unwelcome or abusive work environment. Harassment can include verbal behaviors such as unwanted sexual comments, suggestions, jokes, or pressure for sexual favors; and non-verbal behaviors such as suggestive looks or leering, and physical behavior such as pats, squeezes, or repeatedly brushing against someone's body. Some specific examples of inappropriate or illegal behaviors include: • Negative or offensive comments, jokes or suggestions about another employee's gender or sexuality; 7 ss Slang, names or labels such as "honey", "sweetie", "boy", "girl", that others find offensive;; e Obscene or lewd sexual comments, jokes, suggestions, or innuendoes; • Talking about or calling attention to another employee's body or sexual characteristics in a negative or embarrassing way; e Laughing at, ignoring or not taking seriously an employee who experiences sexual harassment; • Blaming the victims or sexual harassment for causing the problems; O Continuing certain behavior after a co-worker has objected to that behavior; • Displaying sexual pictures, cartoons, or calendar's on any City property. Sexual harassment in the workplace is strictly prohibited and any employee found to have engaged in sexual harassment will be subject to disciplinary procedures up to and including dismissal. An employee who uses sexual behavior to create a hostile work environment for another employee or to implicitly or explicitly threaten, coerce, influence or affect the employment, job status, salary or performance of another employee is engaging in sexual harassment. Any intimidation, coercion, discrimination or retaliation against an individual who files a complaint or who testifies, assists, or participates in any manner in an investigation will not be tolerated. All such acts against complainants or other participants should be immediately reported to the supervisor, manager, department director or Human Resources. Complaint Procedure: It is critical that employees who believe that they have been subjected to discrimination or harassment discuss the matter with their supervisor immediately. Employees are encouraged but not required, as a first step, to confront the person who harassed them and state their objection to the offensive behavior when it occurs. When the employee believes that he/she is being harassed or discriminated against by their supervisor, they should notify their department director, or any other supervisor, manager or director, or they may contact Human Resources. Employees who believe that they have witnessed another employee being harassed or discriminated against should also follow this procedure. Reports or harassment or discrimination shall be investigated promptly. All employees involved in an alleged case of harassment and/or discrimination will be treated with respect and courtesy. Confidentiality will be maintained as far as practical given the complaint, law and the investigation procedure. If the incident is isolated and of a less 8 n serious nature, the supervisor may attempt to resolve it informally. In any case, the supervisor (or person responding to the -complaint) is required to document the incident and action taken, and forward a copy to the department director and the Human Resources Director. 9 PERSONNEL POLICIES No. 34.0 JOB ATTENDANCE In accordance with the City's commitment to provide the highest level of public service to its citizens, each employee is required to meet certain standards of attendance and punctuality. Continued employment carries with it the personal responsibility of each employee to be on the job on time every scheduled work day. Recurring and excessive absences and/or tardiness is disruptive to work schedules, costly to the City and its residents, and detrimental to the morale and efforts of employees who maintain a good work record. Employees who do not maintain a satisfactory record of attendance and punctuality will be subject to disciplinary procedures up to and including termination. Hours of Work/Work Schedules: A work day and work week shall be established by the department director which is consistent with the law, collective bargaining agreements and operating needs of the department, and kept on file with the Payroll Division of the Finance Department. The standard schedule shall be either eight hours per day for a five-day week or ten hours a day for a four-day week; however, department directors may establish alternate or flexible work hours, work days or work weeks to accommodate the department's operating requirements. Alternate or flexible work schedules shall be established in writing and may be changed by the department directors for any reason. Employees working alternate schedules shall be held to the same standard of attendance and punctuality as those working a standard schedule. Meal Periods/Rest Periods: Pursuant to State of Oregon Wage and Hour Law (OAR 839-20-030) all employees who work shifts of six or more hours are entitled to a meal period of not less than thirty (30) minutes and a rest period of not less than ten (10) minutes for every segment of four hours worked. City of Tigard employees are provided either thirty (30) minutes or one (1) hour per eight (8) hour shift as a meal period depending on department operating needs. This time is unpaid as long as an employee is relieved of all duties. Any work to be 10 performed during a lunch period must be approved in advance by the supervisor. If an employee performs any job duties during the meal period, the time shall be paid. In addition, City employees are provided a 15 minute rest period during each one-half shift. It is the responsibility of the immediate supervisor to ensure that all employees have meal/rest periods available to them that is appropriate to their department operations. Departments should consult any applicable collective bargaining agreements for variations to these policies. Attendance/Punctuality: All employees are expected to report for work on every scheduled work day at their scheduled starting time, unless authorized for a different work schedule by their immediate supervisor. Employees shall comply with departmental notification procedures if unable to report for work on time or if an extraordinary circumstance occurs which will cause them to be absent. Excessive absence, or habitual tardiness may be cause for disciplinary action. It shall be the responsibility of the department director in coordination with subordinate supervisors and managers to ensure that standards of attendance and punctuality are maintained within his/her department. Any employee who is absent from work for three or more days without authorization shall be considered to have abandoned his/her position and shall be assumed to have resigned. When mitigating circumstances are found to have existed at the time of the absence, the individual may be reinstated to their position at the sole discretion of the City Manager. Work Location: All employees shall report to their assigned work location every scheduled working day unless prior authorization is received from the immediate supervisor for an employee to work in or report to a different location. At the sole discretion of the City, a telecommuting option may be implemented as follows: • Telecommuting is using technology to enable an employee to work at a location other than the usual work setting. Its goal is to enhance productivity, increase customer service and accommodate employee's special needs. It is not a universal employee benefit, nor a condition of employment, but rather a voluntary 11 arrangement between the employee and the City which may be discontinued at the discretion of the City. Telecommuting may be instituted on a full or part time basis with the prior approval of the department director if, based on a full analysis of the employee's position, it is determined that the nature of the duties and - responsibilities of the position qualify for telecommuting, the. cost to the City of required supplies and equipment is justified, and there is significant benefit to the public service in instituting a telecommuting option. 12 PERSONNEL POLICIES No. 35.0 DRUG FREE WORKPLACE: The City of Tigard recognizes that the use of drugs and alcohol which adversely affect job performance may constitute a serious threat to the health and safety of the public and employees and to the-efficient delivery of City services. The use of illegal substances and abusive use of controlled substances by employees not only affect job performance, but . decrease productivity, lower morale, and create a hazardous environment. City employees are expected and required to report to work on time and in appropriate mental and physical condition for work. Pursuant to the Drug Free Workplace Act of 1988 and in response to the growing awareness of substance abuse, the manufacture, distribution, dispensation, possession, or use of unlawful drugs while on City premises or while conducting City business is strictly prohibited and will not be tolerated. Violations of this policy will result but is not limited to disciplinary action, up to and including termination. The following conduct is prohibited while on duty or on paid standby: 1. Unlawful buying, selling, transportation, possession, providing or use of drugs 2. Use of alcohol 3. Being under the influence of alcohol 4. Being under the influence of drugs 5. Having a detectable odor of alcohol on the breath 6. Failure to report limitations or impairment caused by prescribed drugs or over the counter drugs This policy is not intended to prohibit the safe and legal use of prescription and non- prescription medications. However, employees taking medication that may impede or otherwise affect their ability to safely and efficiently perform job assignments shall report the medication to their supervisor or Department Director immediately. i Employees needing help in dealing with substance abuse problems are encouraged to use the Employee Assistance Program and health insurance plans, as appropriate. It is the desire of the City to help these employees, while at the same time ensuring that they will not endanger themselves or other persons. However, violations of this policy will 3 result in disciplinary action. Continued poor performance, or failure to successfully complete a rehabilitation program, are grounds for dismissal. 13 Employment with the City is conditional upon the employee's acceptance of the terms of this policy. As mandated by the Drug Free Workplace Act, any conviction fora violation of a criminal drug statute occurring in the workplace shall be reported to the City in writing no later than, fire calendar days after the conviction. Once a verifiable conviction is reported,. the City will be required to notify the Federal Justice Department within ten days after receipt Incumbents in positions covered by the Department of Transportation's Mandatory Drug and Alcohol Testing Regulations will also abide by those requirements. As part of the City's efforts to educate all employees about the potential personal and professional hazards of substance abuse, the City. will provide an annual mandatory educational program. The City will provide a copy of the drug policy to all employees and include this policy in its orientation to new employees. Supervisors will also be required to attend a training program to help them recognize, document and handle performance related issues. Additional information is available through the City's Employee Assistance Program or by contacting Human Resources. 14 PERSONNEL POLICIES No. 36.0 PRE-EMPLOYMENT DRUG TESTING The City of Tigard, in a positive effort to provide a healthy and safe working environment for all its employees and the citizens of the community, requires a pre employment drug screen. Finalists for City jobs must successfully pass the drug screen test as a final condition of the job offer. The confirmed presence of any illegal drug in a urine sample will be cause for disqualifying an applicant. If an applicant is taking prescription medication, this must be substantiated by a physician's report or-statement. The report should indicate whether or not the taking of these legal drugs will prevent or alter the person's ability to perform essential job duties. If the report indicates the person cannot perform essential job duties while under the influence of these prescribed legal drugs, this shall be grounds for disqualification. H ca H H a MOM 15 PERSONNEL POLICIES No. 37.0 PERSONNELRECORDS The Human Resources Director of the City shall initiate and maintain a personnel file for each employee of the City. This collection of files shall be kept in Human Resources. The personnel file will contain the employee's name; positions and departments to which the employee has been assigned while employed by the City; employment application materials; notification of employment; salary history; changes in employment status; performance, progress, and merit evaluations; training records; written disciplinary actions; written commendations; and any other pertinent information required to allow the City to comply with Federal, State, and other agency laws, rules, and regulations. Department Heads may maintain a separate training record for employees in their department. These training records shall be considered a part of the employee's personnel record. Employee personnel records are confidential and shall be accessible only to the following persons/agencies: • The employee • The City Manager • The Human Resources Director • Employees in Human Resources designated by the Human Resources Director • The employee's Department Head • The employee's Supervisor • Federal, State, and other agency representatives that have lawful access to the records • Legal counsel employed by the City No portion of the employee's personnel file shall be made available to any other person than those listed above without the written consent of the employee or by order of a court of competent jurisdiction. An employee may place pertinent and appropriate information in their personnel file with the approval of the Human Resources Director. 16 Any general inquiries regarding either current or former employees shall be limited to the following information, unless authorization has been made by use of the City's Reference Consent Form: • Verification of the individual's employment status with the City • Verification of the employee's starting and ending dates of employment • Verification of the positions the employee has held while employed by the city • Verification of the employee's salary range An employee may obtain copies of any portion of their personnel file by making a written request to the Human Resources Division. 17 PERSONNEL POLICIES No. 38.0 EMPLOYMENT OF RELATIVES: It is the policy of the City of Tigard that two relatives may not be employed, or considered for employment whenever one person might have supervisory or management responsibilities affecting the other in such matters-as wage and salary _ administration, employee evaluation, transfer, promotion, assignment of work, .discipline, adjustment of grievances, or any other recommendations of personnel action, or whenever such employment is deemed by the City Manager to be a conflict of interest. For the purposes of this policy, relatives are defined as being an individual's spouse, mother, fattier, son, daughter, mother-in-law, father-in-law, grandfather, grandmother, step-son, step-daughter, step-parent, sister, brother, sister-in-law, brother-in-law, uncle, aunt, niece, nephew, grandchild, or any other relative. If any of these conditions exist the City will ask that one of the employees transfer to another position provided openings exist for which he/she is qualified, or resign, within 120 calendar days of the change in status. If the individuals involved do not agree as to who will resign, the City Manager shall decide based on merit and the needs of the City. The provisions of the section shall not be retroactive. 18 PERSONNEL POLICIES No. 39.0 POLITICAL ACTIVITIES OF CITY EMPLOYEES: City employees are free to express political views on their own time. Oregon law forbids any City employee, while on the job, from soliciting money, influence, or anything of value or otherwise aiding and/or promoting any political cause or the nomination or election of a person for public office. It is also inappropriate to use a City office or City equipment for political work even if an employee is doing so on hislher own time (i.e. at lunch). Nothing in this section is intended to restrict the political actions or activities of employees outside of their regular working hours. 19 PERSONNEL POLICIES No. 40.0 OUTSIDE EMPLOYMEN'T': No employee shall accept or retain paid outside employment, whether part-time, temporary or permanent, without prior written approval of the department director. Each change in.outside employment shall require separate approval. A leave of absence will not be granted to accept outside employment. The department director shall approve outside employment when the employment is compatible with their City employment, does not detract from the efficiency of the employee's City work, and does not conflict with the interest of the City or is not a discredit to Lhe City. An employee cannot be a contractor or a sub-contractor on City 'projects, where the work performed is similar to the employee's-City job. Extra duty required by City employment will have preference over outside employment. Under no circumstances may City equipment or resources be used in outside employment. The department director may at any time revoke permission to hold outside employment. 20 PERSONNEL POLICIES No. 41.0 EDUCATION/TRAINING The City recognizes the value of allowing employees to participate in conferences, seminars, training, college courses, and meetings that will enhance the employee's ability to provide a high level of public service. City officials and employees should exercise good judgment, regard for economy, and recognition of proper use of public monies when selecting training, meetings, courses, conferences, etc. in connection with City business. Expenditures incurred by the employee while participating in these activities will be paid by the City according to the receipt of properly detailed expense forms and actual receipts, using the procedures and forms prescribed by the City. Attendance at training, meetings, courses, etc. must be approved in advance by the department director. General Guidelines • The term "training" as used in these policies is intended to include conferences, seminars, workshops or other professional development programs of a similar nature. The term "college courses" is used to describe coursework taken through an accredited college, university and/or business or technical school. • The Education and Training policies are intended to apply only to programs that: a) enhance the employee's job performance, and b) serve as a beneficial retention tool in keeping high quality employees • Training programs, not college courses, are intended for career development purposes. Supervisors need to be very clear regarding the expectations they may create regarding such things as future job opportunities with employees when reimbursing for training that is related to career development. • Applicable collective bargaining agreements must be consulted for language specific to training and/or educational reimbursement policies. • '[he City retains the right to determine the mode of transportation most appropriate to the type of travel involved. • Expenses for meals, including tips, will be reimbursed upon presentation of actual receipts for the expenses incurred. 21 • Expenses for telephone or other communication methods are reimbursable with department director approval only if they are directly related to City business and are supported by actual receipts. • Any expenses for family members or other non-City employees who accompany the employee on a trip are not reimbursable. • Expenses for tips should be included with the reported associated expenses. Tips and/or gratuities paid on an individual basis are not reimbursable. Expenses for public transportation (taxi, bus, rental car, etc.) are reimbursable if supported by actual receipts and approval by the department director: If the employee is using a City vehicle or rental car, necessary parking expenses, toll fees, etc. are reimbursable as approved by the director and supported by actual receipts, or documented by the employee in cases where no receipt is available. The Traininq Plan • All department directors requesting funding for any college course and/or training for their staff shall prepare a written departmental Training Plan as part of their annual budget submittal, which must include an explanation of the following: a) The requested funding for college courses and training for their department b) A clear justification for each requested amount c) An explanation of how these expenditures relate to the employee's career development plans and/or performance goals d) A prioritization of these requested expenditures in the event not all requests are approved • The Training Plan will be submitted to the City Manager for review and final approval. Until the Training Plan has been approved by the City Manager, requests for training and/or college courses will not be authorized. Once the department Training Plan has been approved, all training and/or college courses approved for staff participation will follow the plan description. • Supervisors should discuss training and/or college course work goals with the employee in their regular performance evaluation session and they should be specifically detailed in their written evaluation form. College Courses • The City does not intend to pay for employees to obtain college degrees. Rather, it will reimburse for individual college courses only. 22 • The course must be related to the current job that they employee holds, as described in their current job classification description. • Mandatory coursework that is related to the employee's current job shall have tuition, travel, per diem, hotel, books, mileage and hours worked paid for by the City. Coursework that is not mandatory but is job related will have only tuition, books and related materials (to be retained by the City) paid for by the City. Non-mandatory coursework that is not job related shall have none of the above paid for by the City. • In those instances where the City reimburses for some or all of the expenses, employees must document satisfactory completion of the course. • The City will provide tuition reimbursement for college coursework not to exceed the tuition level established by the State of Oregon Higher Education Department for State colleges/universities. Department directors need to explore less costly college courses available at other institutions before finalizing their Training Plans. • To be eligible for reimbursement of non-mandatory courses that are job related as described above, employees must also receive a grade of "C" or better, or "Passing" for the course and provide written evidence of that to their supervisor. If the employee does not receive a passing grade for this course, they will not be reimbursed. • Prior to an employee participating in a college course which may include reimbursement by the City, the employee will be required to sign a written authorization to have any costs paid for by the City removed from their final paycheck, should they fail to comply with the reimbursement guidelines. • The following reimbursement guidelines shall be enforced when an employee separates from the City service for any reason except involuntary dismissal: a) within one year of the completion date of the class, 100% of the amount of reimbursement will be deducted from the employee's final paycheck b) between one and two years after the completion date of the class, 50% of the amount of reimbursement will be deducted from the employee's final paycheck. c) Department directors are responsible for monitoring these reimbursement requirements. i Training 3 The following guidelines apply to Training reimbursement: • Department directors need to evaluate the value of the proposed training and whether that is the best way to acquire the information for the City. 23 • All training must be tied to the department's Training Plan. • The City will pay for all expenses related to mandatory training programs as follows: Mileage - per IRS Travel expenses - all expenses. Airport shuttles, taxi's and parking fees will be paid as determined by the Director. Food - reasonable expenses paid based Motel - reasonable expenses • Employees may not accrue frequent flyer miles for personal use • Employees are encouraged to use a City vehicle when attending training programs. If an employee uses his/her own car, they must possess automobile insurance, and provide proof to the department director. • Travel time will be handled according to applicable collective bargaining agreements and/or City policy, state, federal law, as appropriate. • When appropriate, employees may be asked to share/present information they have received from their training to others in the department. Participants must complete an evaluation summary form regarding the training program available from Human Resources after attendance at training. This form will be placed in the employee's personnel file. • The department director may authorize the payment of expenses for voluntary training as the deem appropriate providing the training is beneficial to the department and/or City operations. • All arrangements for training will be made in the most cost and time efficient manner as possible. • Only expenses for the employee will be paid for • No reimbursement will be provided for alcoholic beverages • All books and materials paid for by the City of Tigard will become the property of the City Dues and Memberships • Payment for all or a portion of dues and memberships in professional organizations will be dependant on the employee's position, assignments, and the benefit to the department and the City, as determined by the department director. 24 PERSONNEL POLICIES - No. 42.0 TRAVEL AUTHORIZATION AND REIMBURSEMENT: Reimbursement for expenses involved with employee travel on City related business activities shall follow the following general guidelines. Additional information on EDUCATION and TRAINING reimbursement is detailed in that article of the personnel policies. • The City retains the right to determine the mode of transportation most appropriate to he type of travel involved. • Travel requests must be pre-approved by the department director o Expenses for public transportation (taxi, bus, rental car, etc.) are reimbursable if supported by actual receipts and approval by the department director. If the employee is using a City vehicle or rental car, necessary parking expenses, toll fees, etc. are reimbursable as approved by the director and supported by actual receipts, or documented by the employee in cases where no receipt is available. o Hotel and motel accommodations should be appropriate to the purpose of the trip. Expenses for lodging must be supported by actual receipts in order to be reimbursed. • Expenses for meals, including tips, will be reimbursed upon presentation of actual receipts for the expenses incurred. Tips and/or gratuities paid on an individual basis are not reimbursable. • Expenses for telephone or other communication methods are reimbursable with department director approval only if they are directly related to City business and are supported by actual receipts. • Any expenses for family members or other non-City employees who accompany the employee on a trip are not reimbursable. • Any expenditures for alcoholic beverages are not reimbursable. 25 PERSONNEL POLICIES No. 43.0 SOLICITATION ON CITY PROPERTY: V1/ith the exception of vendors conducting normal business with the City,. the City does not allow peddling, solicitation or sale of goods or services for charitable or any other purposes on City property during working hours without the approval or the City Manager. In addition, the City Manager may designate specified locations on City property to be used by employees for the purpose of posting notices of items for sale or otherwise of interest to other employees. It is the obligation of employees wishing to utilize this privilege to do so during off duty hours and in a manner which does not interfere with their work. The City Manager may waive the provisions of this rule in cases where the sale of goods on City property will not interfere with the operations of the City nor be in conflict with any other rule, regulation or law. 26 PERSONNEL POLICIES No. 44.0 WRITTEN DEPARTMENTAL RULES AND STANDARD OPERATING PROCEDURES Each department director may establish such written rules and standard operating procedures as may be deemed necessary for the efficient and orderly administration of their department. Such rules and procedures may be in the format and detail as determined by the department, however, they must be consistent with the policies, procedures, rules and regulations established in this manual. Copies of the applicable departmental rules and operating procedures shall be available to all employees. It shall be the responsibility of the department to ensure that appropriate copies of the rules and procedures are provided to Human Resources and the office of the City Manager. 27 PERSONNEL POLICIES No. 45.0 ELECTRONIC COMMUNICATION: It is the City's goal to enhance both external and internal communication through the use of various electronic communication tools. All electronic communication tools are the property of the City of Tigard. Employees should have no expectation of privacy in connection with the transmission, receipt, or storage of information in these electronic communication devices. The City follows the standards and practices set by the Oregon Government Standards and Practices Commission. TelenhonesNoice Mail The ability to make outgoing and receive incoming telephone calls is an essential element of the City of Tigard's ability to provide service to the public. The City's telephones and voice mail system are intended to be used only for official business. The City believes, however, there are occasions when employees may use telephones for personal purposes without such usage being at odds with the law. It is normal practice by both public and private employers to permit employees to use business telephones to talk to family members, make medical appointments, schedule service technicians, confer with children's schools, and take care of any of a variety of other matters which can only be accomplished during "regular" work hours. The City believes it is less disruptive to permit employees to make such personal calls at their workstation than to require'an employee to take a break or leave from work to take care of personal matters. Personal telephone calls made during working hours from City telephones should, of course, be brief and infrequent. Personal long distance calls, even if the employee reimburses the City for the cost, may not be made on City telephones. If it is necessary for an employee to make personal long distance calls while at work, such calls must be made with the employee's personal calling card, by placing a collect call, or by calling from a pay phone. 28 Cellular Telephones The City provides cellular phones to their employees specifically to facilitate the carrying out of official business. The City's cellular phones afe not for the convenience or personal use of employees. The instances when an employee may use a City cellular phone for personal purposes are limited. An example of an occasion when an employee's personal use of a City cellular phone would not violate Oregon Government Standards and Practices Commission guidelines would be to contact a spouse or childcare provider to advise that the employee is going to be late getting home or picking up children for a reason . direct) related to official duties such as a meeting which ran later than expected or a last minute change of schedule. Another permitted personal use of a City cellular phone by an employee would be receiving an incoming call regarding a family emergency. Employee will not be required to reimburse the City when the cellular telephone call follows these guidelines., that is, the personal call is directly related to official duties. A City employee cannot make a personal cellular call even if he or she intends to reimburse the City at a higher rate than that generally available to the public. Computers/[nternet/E-mail Employees may not generally use computers owned by the City for personal purposes. However, there are some instances in which the City believes the use of computers for personal purposes would not violate the Oregon Government Standards and Practices Commission guidelines. For example, an allowable use would be the preparation of application materials for a different position with the City, or term papers for a City- sponsored class. Employees cannot use computers and the Internet for personal purposes that could potentially result in a personal financial gain. Law specifically prohibits use of City- owned equipment to avoid financial expense or for personal financial gain. i 29 The personal use of City computers and the Internet is permitted during lunch period, 1 hour before the normal work hours, 1 hour after the nonnal work hours, and the time between the end of an employee's "wor'lcshift" and the beginning of an evening meeting that the City requires the employee to attend. No personal use of computers or the Internet shall be allowed on an employee's day off unless the use is related to an educational purpose that is consistent with the City's policies and has been approved by the employee's supervisor. The City has equipped their computers with access to the Internet in order to have access to information and to provide information to the public. Personal use of the Internet is subject to the same considerations as the use of the computer itself. If an employee uses Internet access through the City's equipment in order to avoid the financial expenses of subscribing to an Internet service as a personal expense, it is a violation of the law. City equipment may not be used at any time to access inappropriate sites or to transmit or receive inappropriate information. Pornography, hate groups, and off shore gambling are examples of inappropriate sites and access _to_ them is a misuse of City property. Electronic mail (e-mail) is a communication tool provided to City employees to assist them in the performance of their job duties. E-mail is transported and processed via the Internet, so sending and receiving e-mail is considered a type of Internet usage. An employee who uses the e-mail system for personal or improper reasons bears any responsibility that might arise from that usage. The City's e-mail system should not be used to produce a document that, using good judgment, would not be produced using any other form of office communication. Use of the City's e-mail system for commercial purposes or illegal activities is prohibited including the sending of "classified ad" types of information. 30 PERSONNEL POLICIES No. 46.0 NEW EMPLOYEE ORIENTATION The Human Resources Director or other designated staff: member in Human Resources shall conduct a "new hire" orientation meeting with all newly hired employees. It shall be the responsibility of the department in which the employee has been hired to ensure that the new employee reports to Human Resources on their first day of employment to complete their Verification of Employment (1-9) and W4 forms. Individual departments are also responsible for supplementing the "new hire" orientation by providing the new employee with more detailed information relating to operations of the department. d 5 31 PERSONNEL POLICIES No. 47.0 VOLUNTARY RESIGNATIONS: To voluntarily resign or retire in good standing, an employee must submit a written letter of resignation or letter stating intent to retire to their supervisor a minimum of ten (10) working days prior to the effective date of resignation or retirement; unless covered by an employment agreement in which case the provisions of such agreement shall prevail. Failure to submit a timely written resignation or notice of intent to retire may be cause to exclude the individual from future employment opportunities with the City. A resignation may be accepted immediately upon receipt when the notice requirement is waived by the department director. Upon receipt of the written letter of resignation or notice, the supervisor shall prepare and obtain the employee's signature on a Personnel Action form and forward that form to Human Resources with the original letter of resignation/retirement attached. A copy of the letter may be retained in the department. The supervisor shall ensure that all City property is returned by the employee on or before the effective date of resignation/retirement, and that arrangements are made for - previous tuition reimbursement to be refunded to the City by the employee if appropriate. The supervisor shall advise the employee to contact Human Resources regarding scheduling an exit interview. At the discretion of the Department Director, with the approval of the City Manager, an employee may be permitted to withdraw his/her resignation/retirement request at any time up to and including his/her last day of employment, provided the position has not already been filed. However, the employee may not be reinstated after leaving City employment without participating in an authorized selection process. Employees who are absent from work without approved leaves for a period of three consecutive work days may be considered by the City to have abandoned their position and resigned from the City service. 32 PERSONNEL POLICIES No. 48.0 _ PERFORMANCE REVIEWS: Employee performance reviews are an essential tool in the communication process between the employee and their immediate supervisor. The goal of the employee performance review process is to establish a pattern of expected work habits, give employees and supervisors an opportunity to review and reset goals, reward or acknowledge good performance, create incentives, and identify and correct improper behavior or activity and/or substandard work performance. Performance reviews are to be completed on the form prescribed by Human Resources. It shall be the responsibility of the supervisor to ensure that performance reviews are completed appropriately and by the scheduled due date. The original performance review will be placed in the employee's personnel file, and the employee will be provided with a copy of the review. The employee may respond in writing to the performance review or any aspect of that review, and the response will also be placed in the employee's personnel file. Probationary employees will participate in an initial goal setting interview/review and will receive a performance review at the end of six (6) months of employment. This date establishes the employee's merit review date, which can only be changed upon promotion, layoff or leave without pay. Upon completion of the probationary period, as documented by a satisfactory performance review, the employee shall receive a merit increase. Thereafter, regular performance reviews will occur annually on the employee's merit review date. Contingent on continued satisfactory performance, an employee shall receive a merit increase in conjunction with the performance review until the employee reaches the maximum salary in his/her salary range. Nothing in this section shall prohibit the supervisor from conducting more frequent performance or progress reviews. A supervisor may initiate a special performance/progress review whenever a special review is deemed necessary. a i All performance reviews, accompanied by a personnel action form, shall be submitted to Human Resources. The personnel action form is required whether or not a merit increase is granted. 3 33 An employee on leave without pay will have his/her merit review date adjusted to reflect the unpaid time. This adjustment will not apply to those on unpaid military leave whose _ merit review date will not be changed to reflect time off without pay. The department director may elect to extend an employee°s probationary period for a maximum of three (3) months or to deny a merit increase from a non-probationary employee. Performance reviews are not subject to appeal or the complaint process. 34 PERSONNEL POLICIES No. 49.0 PAY DATES AND PAYROLL ADVANCES The established pay cycle for the City is biweekly (every other Thursday). When the regular payday is a holiday, paychecks shall be issued on the previous business day. Employees may elect to have their paychecks directly deposited to one or more financial institutions. This option is administered through the Payroll Division of the Finance Department. Emergency Advance Paychecks: In extraordinary circumstances an employee may receive an emergency advance on wages earned. An employee needing an emergency advance on wages shall request such advance in writing to his/her supervisor stating the reason for the emergency request. The emergency advance is limited to twenty-five percent (25%) of the net pay for hours worked during the pay period, and is limited to one in a six month period. Approval is at the sole discretion of the department director. Early Paychecks: If an employee who is not participating in the direct deposit option will be on vacation or other approved leave on payday, a request for an advance paycheck may be made during the pay period preceding the pay period for which the advance is requested, and if the request is granted, the advance check will be issued with the payroll check for the pay period prior to the payday on which the employee will be on leave. Advance paychecks are limited to one in a six month period. Approval is at the sole discretion of the department director. The six month period limitation for each type is defined as July 1st to December 31st and January 1st through June 30th. 35 PERSONNEL POLICIES No. 50.0 TEMPORARY EMPLOYEES/INTERN EMPLOYMENT/CONTRACTED SERVICES: Temporary Employees: Temporary employees may be hired to perform temporary or seasonal work whose anticipated duration is less than 1,040 hours in a year. Employment may be terminated at the sole discretion of the department director and/or City Manager. Temporary employees are not eligible to participate in the fringe benefit package offered. to regular employees and do not receive sick leave, vacation, or holiday pay. A temporary employee may apply for regular City positions as an internal candidate. Temporary employees are covered by the City's liability and worker's compensation insurance, and may be eligible for unemployment compensation upon termination pursuant to law. An offer of temporary appointment shall be made in writing and shall clearly state the temporary nature of the work, expected duration of employment, a statement that the employment may be terminated at any time at the sole discretion of the City, and the absence of any fringe benefits. When a department utilizes the services of a temporary service agency neither a written offer of employment nor a Personnel Action form is required. Temporary employees, including agency personnel, are required to pass a pre-employment drug screen and may be subject to verification of applicable motor vehicle license and acceptable driving record prior to employment with the City. It is the obligation of the hiring department to maintain records of the hours worked by temporary employees and to ensure that employment does not exceed the limit established in applicable labor agreements. Intern Employment: The City may place, or contract with other agencies to place, student interns on projects of limited duration with the City. An intern is usually a full or part time student at an accredited college or university whose work with the City is within their course of study. Guidelines for the employment of student interns are as follows: • Interns shall be required to pass a pre-employment drug screen prior to appointment; 36 Ell If applicable to the duties of the position, a student intem may be required to possess a valid driver's license and to show proof of an acceptable driving record prior to appointment; o Student interns receive no benefits, and are not eligible for vacation, sick leave or holiday pay; • Interns may be paid at the rate specified by the educational institution through which they were hired, or, if there is no rate specified, the department may determine an appropriate wage; • Student interns shall be covered by the City's general liability and worker's compensation insurance coverage, but shall not receive no_ r accrue any other benefits generally received by regular employees. Contracted Services: The City may utilize the services of an independent contractor to meet short term non- recurrent or special project needs. It shall be the department director's responsibility to ensure that the contractor meets all of the criteria under ORS 670.600 which defines the standards for an independent contractor (versus an employee) and possesses all applicable certificates of insurance. ORS 670.600 provides the following standards in order for a business entity providing labor or services to be considered an independent contractor. They must be: • free from direction and control over the way the work is done except insofar as the employer accepts or rejects the results of the work; • responsible for obtaining all applicable business registrations or licenses; • furnish the necessary tools or equipment; • determine his or her own work hours; • have the authority to hire and fire other employees to perform the labor or services; 37 • receive payment upon completion of the performance or an annual or periodic retainer, • represent to the public that they are an established business and typically work for two or more different persons during the course of a year, • pays federal or state income taxes in the name of the business, or a Schedule C on a personal tax return. Departments may not enter into contracts to provide labor or services with individuals who do not qualify as independent contractors under the law. 38 PERSONNEL POLICIES No. 51.0 CLASSIFICATION PLAN: Preparation The purpose of the classification plan is to provide a complete systematic and continuous inventory of all job classifications in the City and to provide accurate descriptions and specifications for each class. The Classification Plan shall standardize titles, each of which shall be indicative of a definite range of duties, authority and responsibilities. Each classification shall be described in a written specification to include an appropriate titles, a statement of the duties and responsibilities involved, supervision exercised and received, and the minimum qualifications required for applicants to the position. Any "working title" desired may be used when authorized by the department director, however the unofficial job titles will have no bearing on the official designated classification title of any position or employee. Maintenance of the Plan The Human Resources Director shall be responsible for the administration and maintenance of the classification plan. Human Resources shall also periodically review the classification of positions and audit their duties and responsibilities, making changes as necessary to keep the plan up to date. The Human Resources Director, with recommendations from department directors, will allocate positions to the appropriate classification and may make revisions in the classification plan including the addition of new classes, combination and/or revision of existing classes, and deletion of obsolete classes. Class Descriptions Class descriptions are written statements of each class included in the classification plan. Descriptions include a class title, a statement describing the purpose and distinguishing characteristics of positions in the class, representative examples of work performed, supervision exercised, supervision received, and general recruiting indicators (knowledge, skills, abilities, experience and training) that a person should possess to successfully perform the work. Necessary requirements such as licenses or certifications are also included. 39 ~'Em Kill Specifications are descriptive and not restrictive and do not prescribe each and every specific duty of any position, nor do they limit the authority of management in assigning work. A class specification shall be liberally construed as a general description of the work characteristics of similar positions properly allocated to that class. Specifications are intended to indicate the kinds of positions allocated to the various classes as determined by their duties, responsibilities and minimum qualifications and should be interpreted as a whole and in relation to others in the classification plan. Particular phrases or examples shall not be isolated and treated as a full definition'of the class. Nothing in the class specification is to be -interpreted as restricting a supervisor from assigning an employee of one class to perform some of the duties of a higher class or lower class for a limited period of time. Allocation of Positions Each position shall be allocated to one of the classes of the approved classification plan. In determining the class to which any position is allocated, the specification describing each class shall be considered as a whole, comparing general duties, responsibilities, minimum qualifications and relationships to other positions in order to obtain an inclusive picture of the position and placement into an appropriate class. The Human Resources Department shall analyze the position and assign it to the appropriate class within the Classification Plan. A new class specification shall be prepared to cover each additional position which is created and for which the classification plan does not provide a satisfactory class description. Employees shall be notified of the allocation of their position, and the class title as it appears on the class specification shall be used to designate the position on official records and payroll. Reclassification A reclassification may occur when job content changes substantially, requiring the position to be assigned to a different classification and/or pay range. Managers and supervisors are responsible for ensuring that the duties assigned to employee are consistent with their classification and reasonably fit within the overall concept of that class. Managers and supervisors are also responsible for making timely requests for classification reviews when there is a question regarding the classification allocation of a position or positions. If the duties of an existing position change sufficiently so that the current classification may no longer be appropriate, a request for a classification review shall be submitted to Human Resources, preferably prior to the change in assigned duties and responsibilities. An employee may also initiate a request to their supervisor for a reclassification review. Reclassification will not be used to: a) avoid restrictions 40 concerning demotions and promotions, or b) make a change in salary in the absence of a significant change in assigned duties and responsibilities. The request must be in writing and must include all requested supporting documentation required for a decision to be made. The Human Resources Director may initiate a classification review at any time. The effective date of the reclassification action shall be the date the written request for reclassification and all required supporting documentation is filed with Human Resources. Managers may assign duties that reasonably fit within the overall, broad concept of the classification. A manager may also assign duties outside the broad parameters of a classification in cases of a bona fide emergency affecting the health, safety and welfare of the community for a specific duration to deal with that emergency, or in temporary "working out of class" -situations. An employee occupying a position that has been reclassified may be retained in the position provided that a) Human Recourses certifies that the incumbent possesses the minimum qualifications of the new class, and b) the incumbent has been performing the duties of the higher or lower classification prior to the position audit and c) the department director determines that the performance of the incumbent has been satisfactory. Reclassified employees meeting the above criteria will not serve a new probationary period and their merit date will not change. If all of the above conditions - cannot be met, the position will be open for recruitment. An employee who is not appointed to the reclassified position will be transferred or demoted to a suitable, vacant position, provided that they are qualified to perform the work, or will be separated from employment if no other suitable, vacant position exists. 41 Y PERSONNEL POLICIES No. 52.0 COMPENSATION: The City is interested in providing a fair and equitable compensation plan that retains and attracts qualified employees to the organization. The salary plans for City employees are developed through the collective bargaining process for those employees represented by bargaining units, and by the City Manager and City Council for those supervisory, management and non-represented employees. In consultation with the City Manager, the Human Resources Director shall recommend to the City Council for adoption, the City's salary plans, compensation policies and any changes necessary. The salary plans list the salary ranges in the plan for each classification, and a minimum and maximum rate of pay and such intermediate rates as are considered necessary and equitable. Flat rates may be used instead of salary ranges where appropriate. Each classification shall be assigned a salary range, and pay for any position in that classification must be within that salary range except as approved by the City Manager. Development and Adoption Compensation rates for City classifications shall be set in accordance with the City compensation policies, subject to collective bargaining where applicable. Compensation policies shall be administered in .a fair and consistent manner. Adjustments to assigned ranges for individual classifications, and presentation to Council of new classifications and ranges, shall generally be done in conjunction with the annual budgetary process, except where the Human Resources Director determines that: • a substantial change in the duties and responsibilities of the classification necessitates a salary adjustment, or; • an inordinate amount of turnover within the classification is attributed to an inadequate salary level, thereby necessitating an immediate salary review; or • difficulty in recruitment of qualified candidates for a classification is attributed to an inadequate salary level, thereby necessitating an immediate salary adjustment. 42 Annual Review Annually, prior to the adoption of the budget, the Human Resources Director shall submit a recommended compensation plan for all non-bargaining unit City employees to the City Manager for consideration by the City Council. The Council may provide a general salary adjustment to the salary plan and this is distinguished from a merit salary increase. Administration Individual wages are determined by progression through the steps of the classification range as provided below, or within the collective bargaining agreement. Eligibility for advancement through the salary range will be delayed by layoffs or certain unpaid leaves of absence. Beginning Salary Normally an employee will be appointed at the first step of the range established for the classification. Appointments at higher steps will be presented in writing to the City Manager for final approval. The factors to be reviewed in approving appointment beyond the first step may include the availability of applicants with the qualifications for the vacant position, qualifications of all available applicants, the resulting relationship to other similar classifications, a substantially higher level than the recruiting indicators of training, experience, or other qualifications of the candidate, and the time available to continue the recruitment process. Budget considerations will be an important factor in the recommendation. Merit Increases Merit increases shall be granted based on satisfactory performance at the completion of twelve months of employment from the date of satisfactory completion of the probationary period, and every twelve months thereafter, except as provided in union contracts'. When an employee reaches the final step or maximum rate of the salary range no more merit increase salary adjustments will occur. Promotions b A promotion is an appointment to a position in a classification which has a higher maximum salary rate than the employee's present classification. Normally, the employee shall receive the nearest higher salary, equal to or greater than five percent (5%) above the employee's current salary in the new range on the date of promotion. In no event shall a promoted employee's salary be less than the starting pay of the salary range for the new classification. The department director who believes that the promotion should be made at a higher rate within the new range must present his/her request in writing to the Human Resources Director, who will review the matter and 43 make a recommendation to the City Manager. Factors such as the qualifications and prior experience of the candidate as well as the City budget will be considered. Employees who are promoted will be required to serve a new probationary period, and their merit date will change to the date of their promotion. Demotions A demotion is an appointment to a position in a classification which has a lower maximum salary rate than the employee's present classification or a reduction in rate to a lower step on the range. When a demotion occurs, the department director shall recommend one of two salary options: (1) a salary for the demoted employee on one of the steps within the salary range of the lower classification, or (2) that the employee's salary be set at not higher than ten percent (10%) over the top step in the salary range of the lower classification and designated by "red circle" rating. The application of any of these options shall not result in an employee receiving a higher salary. These options shall also apply to demotions in lieu of layoff. The City Manager has the authority to grant approval of "red circle" ratings where the salary is to exceed the lower range. An employee's merit date shall remain the same when a demotion occurs. Temporary Employees Temporary employees usually will be paid at a rate within the salary range for the class which most nearly describes the nature of the duties assigned to the employee. Salary Range Changes When the salary range for a classification is changed, the employee's pay will be based on the same step or same relative position in the new range as the old range. This change will not alter the employee's merit date. Salary range adjustments normally are made as part of the budgetary process and are to be distinguished from merit salary increases. Salary range changes do not recognize length or quality of service. Classification Transfer When an employee is appointed to a position in a different classification which has the same pay range, the empioyee's pay remains the same. The employee will be required to serve a probationary period in the classification if he/she has not previously served a probationary period in the classification. The employee will retain the same merit date. Reclassification A reclassification may occur when the job content changes substantially, requiring the position to be assigned to a different classification and/or pay range. An employee whose position is reclassified to a higher classification with a higher maximum salary rate will receive a pay increase equal to at least 5% or the nearest step, whichever is 44 greater. An employee may not be placed lower than the first step of the range or above the top step of the range. When an employee is reclassified to a lower classification the salary may be decreased if the salary is higher than the highest step of the new salary range or the salary may be frozen until the new range reaches the employee's present pay level. Employees will not be required to serve a new probationary period if they are retained in the reclassified position provided they meet the conditions specified under the article "Classification Plan", and their merit date will not change. Working Out Of Classification Except for on the job training purposes, whenever an employee is required to perform any substantial portion of duties relative to tasks assigned in a higher level of classification above that in which the employee is normally classified for more than a. total of fifteen (15) consecutive or nonconsecutive days (eight (8) hours or any portion thereof) the employee shall be paid for such work at the rate of ten percent 10% above their current salary or the first step of the assigned higher classification work, whichever is greater, not to exceed the maximum step of the higher salary range. Working out of classification must be approved in advance by the department director. Supervisory Pay Whenever an employee is temporarily assigned the added responsibility for supervision of a work unit beyond their regular duties but they are not performing a substantial portion of the duties of a higher supervisory class, the department director shall pay that employee an additional rate of five percent (5%) added to the employee's regular wage for the period the employee is given the added supervisory responsibilities. Jury/Witness Pav Employees will be paid at their standard rate of pay when they are required to report for jury duty or as a witness in cases in which the employee has no interest. Compensation received by the employee for serving on a jury will be paid to the City. Compensation received by the employee to cover travel and related expenses will be retained by the employee, unless otherwise paid by the City. It is the responsibility of the employee to report to work for the remainder of their normal shift if jury duty does not exceed the work day, or to make arrangements with their supervisor for approval of the use of accrued leave. 45 PERSONNEL POLICIES No. 53.0 RECRUITMENT AND SELECTION The City of Tigard seeks to ensure that each position is filled by an employee whose experience, training and skills make him/her the best match for work of. the position. Further, the City seeks to. assure fair treatment of all applicants and all employees in recruitment, selection and placement without regard to age, sex, marital status, race, creed, color, national origin or mental or physical disability. It is the policy of the City of Tigard to not accept, retain, or respond to unsolicited resumes or applications. Job Announcements Recruitment announcements shall be posted by position in Human Resources and in each City facility for the length of the application period. Position vacancies may also be advertised in the appropriate labor market. In keeping with the City's commitment to equal employment opportunities, an effort will be made to announce position vacancies with resources likely to provide qualified, protected-class applicants. Positions may be opened intemally (for City of Tigard regular and temporary (non-agency) employees only), or externally (for City employees, volunteers and non-employees), at the discretion of the department director and as prescribed in applicable labor agreements. Internal postings shall be announced at least five (5) working days, unless otherwise specified in collective bargaining agreements. External announcements shall be announced as determined by the Human Resources Director and hiring department director. Previously certified lists of qualified candidates may be used to fill a vacancy as specified by these rules and in accordance with posting requirements of bargaining agreements: Deadlines for job openings may be extended by reopening the position, with or without additional advertisement, if, In the view of the Human Resources Director, insufficient applications from qualified persons are received. At the discretion of the Human Resources Director, job announcements may be posted for individual positions or to establish a pool of qualified candidates for anticipated vacancies. Applications Human Resources will prescribe the application form(s) to be used for each recruitment that fairly test and determine the qualifications, fitness and ability of a candidate to perform the duties of the class for which they seek appointment. In order a a 46 to be considered for a position, an application must be completed and signed, or a resume submitted and filed by the stated deadline date. Applicants must generally be at least 18 years of age. Applicants under 18 years of age must obtain a work permit from the Oregon State Bureau of Labor. Applicants who are not citizens of the United States must be of a status that allows them to work in the United States. All'applicants will be asked to voluntarily complete a -'form providing information regarding ethnic background, date of birth, sex, etc. The form shall state that the information is voluntary and will be used only for applicant profile purposes, and that the form will be detached from the application materials prior to any evaluation of the application. Late applications will not be accepted except in the case of extraordinary circumstances as determined by the Human Resources Director. When it is determined appropriate by the Human Resources Director, application materials received for one vacancy may be considered for a subsequent vacancy in the same job classification. Selection The Human Resources Director, with the advice and participation of the hiring director, will determine the selection procedures to be used to obtain the candidates who best match the requirements of the position. Tests or selection mechanisms may include but are not limited to performance tests, experience and education ratings, oral examinations, demonstrations of skill and tests of physical fitness and written examinations. If the duties of the position require it, final candidates may be scheduled for a pre- employment medical or psychological evaluation with a licensed physician or psychologist selected by the City. Current employees being considered for transfer or promotion may be required to update health or other background information or to submit to a physical or psychological examination. If the physician or psychologist, based on standards established by the City, deems any candidate to be unable or unfit to perform the duties required of the position, they shall file a report stating the reasons for making such a determinations and the reasons for their rejection of the candidate. The City Manager shall make all final decisions regarding the reports filed by the 47 7 physician and/or psychologist. These reports may be held in confidence by the City. Any physical or psychological pre-employment examinations required of the candidates shall be paid for by the City. Any candidate who refuses to submit to a required examination"shall be rejected from consideration for employment, transfer, or promotion, as applicable. A personal background investigation may be completed prior to consideration for employment in, or transfer or promotion to some positions. Additionally, some positions may require that the candidate be fingerprinted and/or photographed prior to appointment to the position. Any candidate who refuses such an investigation and/or fingerprint/photograph process shall be rejected from consideration for employment, transfer, or promotion, as applicable. Disqualification of Applicants The Human Resources Director may disqualify an applicant from the selection process, refuse an applicant the opportunity to take an examination, and remove his/her name from a hiring list for reasons including, but not limited to: • Failure to meet the standard published requirements for the class for which application is made • Failure to furnish true statements of material facts • Practice or attempted practice of fraud or deception in connection with filing of an application • Failure of an applicant, after notification, to be promptly present at the time and place designated for any portion of an examination • The applicant has used, or attempted to use, political pressure or bribery to secure an advantage in testing or appointment • The applicant has been convicted of a crime directly related to the requirements and performance of the position The applicant is a previous City employee who was terminated from City service or who resigned or retired in a manner in violation of City policy • The applicant has refused to submit to required screening or examination requirements for the position 48 The applicant is unfit or unable to perform the duties of the position based upon standards established by the City The applicant has otherwise violated policy, procedures, rules or regulations relating to the application process The applicant has failed to respond to an employment offer made by the City Offers of Employment When a final selection has been made for the vacancy. to be filled, the hiring department director or supervisor shall issue a written conditional offer of employment to the chosen candidate. Such offer shall state the position being offered, salary, starting date and any other conditions of employment. In addition, the offer shall notify the candidate that employment is contingent upon passing a pre-employment drug screen and, where appropriate, a pre-employment physical and/or psychological examination. The candidate shall also be advised that a written acceptance of the conditional job offer is required within ten (10) calendar days of the receipt of the offer. 49 PERSONNEL POLICIES No. 54.0 JOB SHARING: A budgeted position may be shared by more than one individual if, in the.City's judgment, the position lends itself to a job share arrangement without decreasing the efficiency of City services or increasing the net cost of the position to the City. The criteria for determining if a position lends itself to a job share arrangement include, but are not limited to those outlined below: • whether the arrangement hampers or assists departmental or City operations; • whether the job functions can easily be broken into parts or have a variety of unique duties or specific parts; • whether the normal work schedule allows the job to be shared on an equal basis during the pay period; • whether qualified individuals can be found to fill both parts of the position; • whether the amount of training required before a person can fully perform the job functions is cost effective. • whether arrangements can be made to accomplish the work assigned to the position in the absence of one or both employees filling the position. Job sharing arrangements are typically on a half day or half week basis. Filling of a job share position shall be in accordance with established recruiting and selection procedures. The following guidelines shall apply: • Job sharing will only be granted when it is consistent with City needs and where the department has demonstrated that the functions of the shared position can effectively be performed by two (2) persons; c The position to be shared must be an adopted and budgeted full time position; • All job sharing requests must be submitted under the signature of the department director and approved by the City Manager; 50 Each job sharer is required to work a total of twenty (20) hours per week in order to qualify for City benefits. Benefits, including sick leave, vacation, holiday pay, and health insurance will be pro-rated in the same manner as for other regular part time employees; • The two (2) employees filling a job share position must be of the same classification as the position being shared. The employees may be hired at different steps within the pay range as long as the adopted budget for the'position is not exceeded. • The days and hours worked and the duties assigned to each employee shall be the responsibility of the immediate supervisor with the approval of the department director, • The City reserves the right to discontinue a job share position for any reason at any time; - • No job share arrangement will be allowed for positions represented by a collective bargaining agreement unless specifically provided for in such agreement. Job share arrangements may be initiated by the supervisor or department director when the position to be shared is vacant, or by a regular full time employee filling a full time position who wishes to enter into a job sharing arrangement. This option is not available to temporary or probationary employees. If initiated by the employee, the request must be made in writing to the supervisor who must then obtain the approval of the department director, Human Resources Director and the City Manager. If an employee in a job share position requests to work full time and the position is not filled by two employees when the request is made, the position may be reallocated as full time and the employee may be granted the right to fill the full time position. If the job share position is filled by two employees, the employee requesting to work full time may apply for other City positions for which he/she is qualified. In no case will the second employee filling a job share position be laid off or terminated solely in order to accommodate the other employee's request to convert the position to full time. a 51 PERSONNEL POLICIES No. 55.0 FAMILY AND MEDICAL LEAVES OF ABSENCE POLICY This policy is established to comply with both the Oregon and Federal Family and Medical Leave Act which entitle eligible employees to 12 weeks of job-protected leave every 12 months for family and medical reasons. The intent of this policy and the law is to allow City employees to balance their work and family life by making reasonable, unpaid leave of absences for the reasons specified in these rules and regulations. The City's family medical leave policy combines benefits required by the federal Family and Medical Leave Act (FMLA) and state law. EMPLOYEE ELIGIBILITY - An employee must have been employed by the City for at least 180 days for an average of 25 hours of work per week during the previous 180 days. Exception: The hourly prerequisite does not apply to parental leave. PERMISSIBLE REASONS FOR TAKING LEAVE • Birth of a child (also referred to as "Parental Leave'. • Placement of a child under the age of 18 (or older if the child is mentally or physically disabled) with the employee for adoption or foster care (also referred to as "Parental Leave"). Care of a family member (spouse, child, parent, or parent-in-law) with a serious health condition or for a child requiring home care due to illness extending longer than three days. Leave to care for a parent-in-law is only required by state law. (This type of leave may be referred to as "Serious Health Condition Leave. • To recover from or seek treatment for a serious health condition of the employee when the employee is unable to perform at least one essential function of his/her i regular position. Serious health conditions include on-the-job injuries, pregnancy- related disabilities, and prenatal care (may also be referred to as "Serious Health Condition Leave"). 3 ® To care for a child who suffers from an illness or injury that does not qualify as a a serious health condition but that requires home care (may also be referred to as "Sick Child Leave" and is only required by state law). If "Sick Child Leave" is requested to care for a child who does not have a serious health condition, the City has the right to 52 not approve the employee's request for leave when another family member is available to care for the child. DURATION OF. LEAVE • Twelve work weeks during a rolling 12 month period computed forward from the date the employee first uses FMLA leave. • Taking leave on an intermittent basis or on a reduced work schedule may be permitted by the City if necessary to take care of an ill family member or because of the employee's own health condition. In either case, documentation by a medical professional is necessary. Leave of this nature must be approved in advance by the City and employees must make a reasonable effort to minimize disruption in the work unit. Intermittent leave will be calculated on an hourly basis which computes to 480 hours per year. Parental leave must be taken within 12 months after the birth/placement of a child. Leave may be taken non-consecutively, but if more than 2 nonconsecutive leaves are taken within the 12 month period, the employee must receive prior authorization from the City Manager or Human Resources Director. • Employees who take parental leave are also entitled to an additional 12 weeks of family leave to care for a sick child. • Female employees who must take leave because of a pregnancy-related disability which prevents the employee from performing any available job duties as documented by the employee's treating physician or health care provider, may take an additional 12 weeks for other purposes approved under the law. Sometimes more than one type of leave may apply to a situation. Where allowed by federal or state law, leaves will run concurrently. This means that worker's compensation leave, leave for a non-industrial injury or illness (including paid leave such as sick leave), leave as a reasonable accommodation for a qualified individual with a disability, paid j vacation used for a family leave qualifying reason, and federal family medical leave and state family medical leave may all run concurrently and be counted against the employee's annual family medical leave entitlement. i i CITY'S RESPONSIBILITIES o If the City (specifically the employee's supervisor, Human Resources, or any other management employee) acquires knowledge that an employee may need to take FMLA leave for any of the reasons specified in these policies, the City will inform the employee of their entitlement to request leave within 2 working days. 53 Human Resources will furnish the employee with a copy of this policy, a leave request form, and the required medical certification form. This information must be completed and returned to the employee's supervisor within the timelines stipulated under "Employee's Responsibilities." After the supervisor has acquired all the necessary signatures on the leave request form, it should be forwarded to Human Resources who will determine the employee's eligibility and make a entitlement designation within 2 working days of receipt of the completed request forms. Notification will be in writing. • It is the City's right and responsibility to determine and designate leave as FMLA if the eligibility standards are evident. Such a designation will be based on information obtained either from the employee or his/her spokesperson (e.g., spouse, parent, physician, etc.) in the event the employee is incapacitated. • If the City is unable to confirm that the requested leave qualifies as-FMLA leave, it may declare a preliminary designation regarding eligibility. However, upon receipt of the medical information, the City must either withdraw or finalize the preliminary designation in writing to the employee. SUPERVISOR'S RESPONSIBILITIES • When a supervisor becomes aware of a pending leave of absence which might qualify for FMLA leave, the supervisor will provide the employee with a brief summary of their FMLA rights and advise the employee to contact Human Resources for more details. The supervisor should advise Human Resources of this referral. e After the supervisor reviews the leave request, they must immediately forward the request form to the appropriate signing authority (i.e., Department Head, City Manager, Human Resource Director). It is the supervisor's responsibility to assure that all necessary signatures are acquired and that the signed leave request form is submitted to Human Resources within 1 working day after receipt from the employee. • All medical documentation must be forwarded to Human Resources. No medical files shall be retained at the supervisor's desk. It is also important to remember that the supervisor must protect the confidentiality of the employee. Information should be shared only on "as need to know" basis and no specifics should be shared with the employee's co-workers. The supervisor is required to process a Personnel Action form with all the appropriate signatures for the employee's leave of absence. 54 MEN '111111111M Is IM • The supervisor should make arrangements with the employee for the completion and submittal of timesheets. Timesheets need to be processed by standard Payroll procedures. • The supervisor should make every effort to maintain ongoing communication with the employee during his/her absence for the purpose of acquiring status reports especially in regards to the employee's return to work date. Contacts should take-place at least every 30 days. • The supervisor should notify Human Resources of the employee's pending return to work and acquire any necessary medical release information prior to the employee's return to the job. EMPLOYEE'S RESPONSIBILITIES • The employee should notify their supervisor of any pending leave ofabsence and contact Human Resources for additional details of their FMLA rights. The employee is required to submit a completed City of Tigard "Family and Medical Leave of Absence Request" form to their supervisor within the following timeframes: - When leave is anticipated, written notice must be provided at least 30 calendar days prior to the start of leave. "Anticipated" refers to an employee having knowledge at least 30 calendar days in advance. - When leave is unexpected, verbal notice must be provided to the supervisor or Human Resources within 24 hours of the leave commencement plus written notice must be forwarded to Human Resources within 3 days after returning to work. - Failure to comply with providing proper notice will result in delaying the leave until proper notice is received. • The employee should submit any required written verification from their treating physician or health care provider based on the timeframes and guidelines identified under the "Medical Certification" section below. • The employee should make arrangements with their supervisor for the completion and submittal of timesheets during their leave of absence. • The employee should keep their supervisor and Human Resources apprised of their situation on a regular basis. 55 A The employee should inform their supervisor and Human Resources of their intent to return to work as soon as their treating physician has informed them of the release date. The employee should forward any required medical release documentation from their treating physician or health care provider to Human Resources at least one day prior to returning to work. MEDICAL CERTIFICATION • The City requires written verification from the treating physician or health care provider at least 30 days prior to the start of the leave for an anticipated serious health condition relating to either the employee or the employee's family member on a form fumished by the City. • In cases where the serious health condition is unanticipated, the employee has 15 days from the date of the City's request to provide the required medical certification. s The City has the right to solicit a second and, if necessary, a third opinion to verify the health care provider's certification of a serious health condition. This verification will be at the City's expense. If the required medical certification does not validate the necessity for FMLA leave, the leave will be retracted. In this situation, employee's may be placed on unapproved leave of absence and the time originally counted toward their FMLA entitlement will be revoked. Y For employees on approved intermittent family medical leave, additional medical certification may be required upon expiration of the current medical certification or every 30 clays as deemed necessary by the City. ® The City also requires the employee to contact their supervisor with a status report at least every 30 days. In addition, the employee must inform their supervisor of their intent to return to work at least one day before returning to the job. In the case of the employee's own serious illness, a medical release form will be required before returning to work. • If an employee has used leave to care for a sick child on three occurrences in the past 12 months, upon request the employee must provide medical documentation that their child was ill and required home care to support any additional use of sick child leave. 56 USE OF PAID LEAVE TIME • The City requires the substitution of accumulated sick leave prior to or during the duration of FMLA leave unless the leave is running concurrent with Worker's Compensation leave and the employee is receiving time loss benefits. • After sick leave has been exhausted, employees are required to use any other accumulated paid time (i.e., vacation, compensatory time, management leave, floating holiday, etc.) during their leave of absence before being placed on unpaid leave status. • Employees are required to notify their supervisor of the order in which accumulated paid time (after sick leave has been exhausted) is to be used during the period of time they are on FMLA leave. BENEFIT CONTINUATION _ • The City will continue to maintain group health insurance coverage for the employee for the duration of their leave on the same terms as if the employee is working. This includes medical, vision, and dental. If applicable, the employee is responsible for paying their share of health insurance premiums while on leave - arrangements will be made prior to the start of the leave. • Non-medical related benefits (i.e., LTD, Life, etc.) are the responsibility of the employee when on leave without pay status. • Once an employee is placed on leave without pay status as a result of using all their accumulated paid leave, the employee will not continue to accrue time and benefits associated with the employee's length of service. • If the employee chooses not to return to the City after their FMLA leave (other than as a result of their serious health condition), the City has the right to recoup any health insurance costs spent in their behalf. • If the employee does not return to work after the allotted 12 weeks (either by choice or inability), they will be eligible for continuation of health benefits through COBRA provided the employee does not have other health coverage. i REINSTATEMENT s • The City will make every effort to reinstate the employee in their former position. • If reinstatement to the employee's former position is not possible due to the unanticipated elimination of the position during the time of the employee's absence, 57 the employee will be reinstated to an equivalent position if one exists. If the employee is covered by a collective bargaining agreement, reinstatement will comply with the terms of the agreement. N 1 =-1 58 PERSONNEL POLICIES No. 56.0 INCLEMENT WEATHER The City Manager may use his discretion in deciding whether City offices will remain open during periods of severe inclement weather, and may vary these policies on Inclement Weather on a case by case basis. Employees must advise their supervisor of their late arrival to work or absence from work due to inclement weather as soon as possible. Overall, the City's policy is that employees will only be paid for hours worked. Employees who are authorized to report to work late or are authorized to leave early because of extremely hazardous weather conditions shall use accrued leave. Sick leave may not be used for lost time due to inclement weather conditions. Employees may, as an alternative, request authorization to make up missed time from their supervisor. If an employee determines that it is unsafe to report for work, they will be authorized to use accrued leave, other than sick leave, or may request authorization from their supervisor to make up the missed time if such time can be arranged to accommodate work needs of the department. If the City finds it necessary to close City Hall and/or other City facilities while employees are at work, employees will not automatically be released from work. On a case by case basis, employees may be reassigned to other duties such as assistance in the City's emergency operations center. Department directors will determine whether an employee is to be temporarily reassigned duties, or whether they may be released from work early. If they are released from work early, the employee may use accrued leave other than sick leave, or make arrangements with their supervisor to make up the missed time if such time can be arranged to accommodate work needs of the department. If City Hall and/or other City facilities are closed effective the beginning of the work day, employees will be allowed to take accrued leave other than sick leave, or make up the missed time with their supervisor's authorization. Exceptions to this situation will be those City employees required to report for work due to the nature of their job and/or its relationship to the emergency situation (i.e. police, public works, etc.) 59 SIEMENS 11 gillielloslill -05IMPIE111 PERSONNEL POLICIES No. 57.0 USE OF CITY OWNED VEHICLES: In the event a work assignment requires the use of a City owned vehicle, the employee is required to be qualified and possess the appropriate class of license for the type of vehicle used. The employee shall immediately report any limitation on his/her ability to safely operate the vehicle or any change in his/her licensing status to the employee's supervisor or department director. Failure to report may result in disciplinary action up to and including termination. City vehicles are to be used only in the performance of official City business; however, personnel whose work assignment is primarily in the field may utilize their assigned City vehicle during meal and rest periods for personal business as approved by the employee's supervisor. Employees doing so must conduct themselves in a manner which does not bring discredit upon the City or incur additional costs for fuel or vehicle maintenance. The following additional guidelines for the use of a City owned vehicle shall apply: • Any out-of-pocket expenses such as fuel, emergency repairs, parking or tolls shall be reimbursed upon presentation of receipts; • No reimbursement will be made for parking fines or any other charge levied for violation of a motor vehicle law; • Family members or other non-City employees shall not be transported in City vehicles except as specifically authorized by the Department Head or consistent with department policy or in cases in which the City vehicle is permanently assigned to the employee as a provision of an employment contract; • Temporary employees, contractors or volunteers are prohibited from driving a City vehicle without the specific authorization of the department director, verification of appropriate motor vehicle license and approval by the Risk Manager; • There shall be no smoking or use of smokeless tobacco products in any City vehicle. 60 WON OWN 'Mile PERSONNEL POLICIES No. 58.0 SMOKE FREE WORK ENVIRONMENT The City seeks to promote a safe, healthy and pleasant work environment for all employees and the public. In response to increasing evidence showing that tobacco smoke creates a health hazard for, persons exposed to the smoke, all city facilities, including city-owned buildings, vehicles, individual employee offices, and offices or other facilitates rented or leased by the City will be smoke free. Smokeless tobacco is also prohibited. Signs will be posted in designated locations outside of the buildings where employees may step outside to smoke. Visitor's to any of the City's facilities will be requested to comply with the City's efforts to maintain a smoke free environment. 61 11MMINIEW, loll PERSONNEL POLICIES No. 59.0 DEFENSE AND INDEMNIFICATION OF CITY OFFICIALS This policy refers to the defense and indemnification of City officials in proceedings not subject to the Oregon Tort Claims Act (OTCA), and defense of claims brought pursuant to ORS Chapter 244 (Government Standards and Practices). Public Purpose for Policy It Is in the public interest of the City of Tigard that Tiigard's officers and employees be free of the personal financial hardship resulting from having to defend claims and charges (other than "true" crimes punishable by imprisonment) which are beyond the scope of the OTCA (Oregon Claims Tort Act) and which arise out of their good faith performance of their duties. For the purpose of this policy, the City's "officers and employee's" include: City elected officers, members of the City's offi - ial advisory boards; committees and commissions, charter officers and all employees. General Rule The City will defend and indemnify any City officer or employee and pay the cost of defense and the amount of any judgments entered against the officer or employee. The City reserves the right to not defend or indemnify if the action or omission of the officer or employee was in bad faith and with malice. Good faith is absent if the officer or employee knew or reasonably should have known that the action or omission would violate the law, rule or regulation which he or she is charged with violating, or if the officer or employee acted contrary to the advice of legal counsel. Limitations on Defense and Indemnification of Crime Punishable by imprisonment In no event should the resources of the City be committed to the defense and indemnification of a City officer or employee charged with a crime punishable by i imprisonment unless the Council is satisfied that: a. The offense charged is based solely on the alleged negligence of the officer 3 or employee, and the officer or employee was not malfeasant in office nor willfully or wantonly neglectful of official duty; and/or, b. It appears that the allegedly criminal act or omission was done or omitted as a 62 conscious and good faith choice between evils in response to an emergency, or as a conscious and good faith attempt to protect persons from injury, disease, or to protect property from damage or destruction, either of which would have been likely and substantial had the officer or employee not acted in the manner charged; and/or, c. The only basis for charging the official is vicarious liability fbr the misconduct of a subordinate, and where the official clearly did not participate in or condone the subordinate's conduct knowing or having good reason to know it to be unlawful. Defense and Indemnification Conditional Any commitment of City resources, pursuant to this policy must be contingent on the Council's continued satisfaction that the conditions found to justify defense and indemnification continue to be met. Should it appear that the officer or employee has misstated or failed to disclose facts which, if known, would have changed the initial decision to defend and indemnify, the City's commitment to that person's defense and indemnification shall be withdrawn and the City shall be entitled to recover from that person any public funds expended on that person's defense and/or indemnification. Payment of Costs- Reimbursement of City Ordinarily the commitment to defense and indemnification of an officer or employee will involve direct payment of defense and indemnification costs as they are incurred. In any case, however, the Council may choose to commit only to reimbursement of validated expenses in the even the officer or employee is ultimately exonerated. If the particular law, rule or regulation under which the officer or employee has been charged provides for payment of costs and/or attorney fees if the officer or employee prevails, the City shall be entitled to reimbursement of any such costs and/or attorney fees paid by the city. No Entitlement to Defense and Indemnification Nothing in this policy should be construed to entitle any officer or employee to defense and indemnification. The intent of this policy is to vest discretion with the Council with certain restrictions as to when defense and indemnification funds may not be provided. In each case the Council should be guided by considerations of what is in the best interest of the City of Tigard subject to the above conditions and restrictions. Defense of ORS Chapter 244 Claims In the event a claim is made against any officer or employee pursuant to ORS Chapter 63 244 (also known as Oregon Government Standards and Practices), the officer or employee is responsible for providing their own defense. The officer or employee will be reimbursed for the costs of providing their own defense, if the officer or employee is exonerated. 64 SIM PERSONNEL POLICIES No. 60.0 PERSONALPROPERTY The City will not reimburse an employee for the loss or damage of personal property brought to the work site by the employee. Employees will be provided appropriate tools and equipment, as determined by their supervisor, to perform the duties of their job. Employees who choose to bring personal property and equipment into the workplace do so at their own risk. Precautions should be taken with all tools and equipment to place them in a secure location. Employees should report the loss of personal items to the. Police Department. 65 PERSONNEL POLICIES No. 61.6 REPORTING OF VEHICULAR AND/OR OCCUPATIONAL ACCIDENTS Whenever a vehicular accident occurs involving a City' owned vehicle or a 'personal vehicle, if the employee is using the vehicle while on City business, the accident must be reported immediately to the employee's supervisor, and, if within the City limits, to the Tigard Police Department. Further information and procedures related to this policy are contained in the City of Tigard's Risk Management manual. 66 PERSONNEL POLICIES No. 52.0 HAZARD COMMUNICATION : In order to comply with federal and state occupational health and safety. codes, and to ensure a safe environment for employees and members of the general public, the City of Tigard maintainsa written Hazard Communication Program which complies with all applicable codes and standards. It shall be the responsibi!ity of the Risk Management Division to maintain and update this Program, and of managers, supervisors and employees to comply with its provisions. Further information and procedures related to this policy are contained in the City of Tiigard's Risk Management Manual. i i i ^y~ Fig 67 PERSONNEL POLICIES No. 63.0 COMPLAINT PROCESS: It is the policy of the City that employees be provided a process whereby their problems and complaints will be considered as fairly and rapidly as possible without fear of reprisal. These policies are available to all employees, however, bargaining unit employees must use the grievance procedure in their collective bargaining agreement if the action pertains to an interpretation or application of an agreement provision or any matter within the scope of representation. This procedure may not be utilized for: 1) disciplinary action 2) complaints for which the City provides an alternate dispute resolution procedure 3) any matter which is to be or has been grieved undar an applicable collective bargaining agreement, or 4) termination or a probationary appointment. Every effort will be made to find an acceptable resolution by informal means at the lowest possible level of supervision. An employee or group of employees may file a complaint if they believe an injustice has been done because of. e A lack of City policy or department policy • A policy that is unfair ® A deviation from the City's adopted policies o A disagreement with another emp(oyee or supervisor e A discretionary action of a department in the application of the City personnel rules and policies All complaints must be in writing and must, at a minimum, refer to the policy, rule or regulation in question, the condition or situation causing the complaint to be filed, and the remedy sought by the complainant. An employee who has a problem or complaint shall first attempt to resolve the 'problem through consultation with his/her immediate supervisor. This shall be accomplished within five working days after the occurrence, or within seven working days after the employee knew or reasonably should have known the facts upon which the complaint is based. The supervisor shall respond to the employee within seven days of the initial discussion with the employee. 68 If the complaint is not resoived to the employee's satisfaction, the employee may, within five working days of a response by the supervisor, forward the written complaint to the supervisor. The supervisor shall, within five working days of receipt. of the complaint, render a derision in writing regarding the resolution of the complaint. If a complaint is not settled with the employee's supervisor, the complaint may be appealed in writing to the employee's department director within ten working days from the receipt of the immediate supervisor. The complaint must specifically set forth the reason the supervisor's response was not satisfactory. The employee may request a meeting with the department director. The department director may also conduct a meeting without a request from the employee. The department director shall render a decision in writing within ten working days of the date of the meeting, if a meeting was held, or within fourteen days of the receipt of the complaint. If a complaint is not with the department director, the employee may submit the complaint within ten working days of receipt of the department director's response in writing to the City Manager or his/her designee. The complaint must specifically state the reason the responses previously provided by management were not satisfactory. A meeting may be held by mutual agreement of the parties. Twenty one calendar days from receipt of the complaint, the City Manager shall deliver a written decision to the employee. This decision shall be final and binding. The time limits set forth are essential to the timely review and resolution of complaints. The time limits, however, may be extended by mutual agreement in writing of the employee and the City Manager or department director, depending at which step the complaint is at. It will be the employee's responsibility to submit the complaint to the next designated level within the specified time limits if they are not satisfied with the decision. The employee's failure to submit the complaint to the next designated level within the time limits imposed shall terminate the process, and the complaint shall be considered settled on the basis of the last decision, and not be subject to further appeal or recommendation. There shall be no restraint, interference, coercion, discrimination or reprisal against any employee for using the complaint procedure. 69 PERSONNEL POLICIES No. 64.0 REPORTING IMPROPER GOVERNMENT ACTION The City of Tigard is committed to maintaining an ethical workplace. City employees are encouraged' to report any incidence of improper governmental action. "Improper government action" is defined as action taken by a city employee or officer that occurs during the performsc ice of their official duties and that is illegal, an abuse of authority, or substantial and specific danger to public health or safety, or a gross waste of public funds. "Improper government action" does not include personnel actions, including employee grievances, complaints, appointments, promotions, transfers, assignments, reassignments, reinstatements, restoration, re-employment, performance evaluations, reductions in pay, dismissals, suspensions, demotions, violations of collective bargaining or personnel policies, alleged violations of labor agreements, or reprimands. Procedure Employees who become aware of improper governmental actions should report the matter to their own supervisor and should specifically state the basis for the employee's belief that improper action has occurred. If the matter is not resolved by the supervisor, or it is believed that the supervisor is involved in the issue, the employee should send a detailed, confidential memo to their division manager, department director, Human Resources or the City Manager. Investigation The employee's supervisor, manager, department director, Human Resources, or the City Manager is obligated to promptly investigate the reported improper governmental action. The name of the employee reporting the action will remain confidential to the extent possible under the law. A summary of the findings may be requested by the employee placing the complaint. Any personnel- actions taken are confidential and will not be included in the surri;-nary. Retaliation If an employee makes a good faith effort to follow the procedures outlined above, he/she is protected from retaliatory action by this policy and under the law. "Retaliatory action" means any adverse change in the terms and conditions of the employee's employment due to reporting an improper governmental action. 70 If an employee believes that retaliatory action has been taken, they should report the change to their supervisor, division manager, department director or Human Resources. If the complaint is not resolved within 30 days, the employee may forward their complaint to the City Manager. The written complaint must state the retaliatory action taken, and the requested relief. The complaint will be investigated and responded to within 30 days. 71 PERSONNEL POLICIES No. 65.0 SAFETY POLICY The City of Tigard is concerned about the welfare and safety of employees and the public. The City acknowledges the obligation, as the employer, to provide the safest possible working conditions for employees, and, as a government service organization, to provide a safe environment for the public. In order to ensure the effective implementation of the City of Tigard's Safety'Policy, responsibilities shall be as follows: The City Manager and department directors accept the responsibility for the development and maintenance of the safety program, for its effectiveness and improvement, and for providing the safeguards required to ensure safe working conditions. The division managers and supervisory personner are responsible for developing the proper attitudes toward safety in themselves and those they supervise, for ensuring that all operations are preformed in a safe manner, providing adequate training procedures for operations, and reporting and investigating all incidents immediately. The employees are responsible for cooperation of all aspects of the safety program, observing safe working practices, complying with safety directions and procedures, and reporting all incidents immediately to the supervisor. The Safety Officer (Risk Management Division) is responsible to coordinate and guide the overall City Safety Program, serving as a resource to departments as individual safety training programs are developed, reviewing incident reports, and providing adequate information sharing between departments and the various insurance carriers. Penalties for Violation of the Safety Policy: In order to maintain a safe and productive work environment, a violation of this policy will be considered a very serious case of misconduct and subject to disciplinary action. Further information and procedures related to this policy are contained in the City of Tigard's Risk Management Manual. 72 1.1111 NINON 1IN11 INNER 111 I~J PERSONNEL POLICIES No. 66.0 WORKPLACE VIOLENCE: The City of Tigard is committed to the safety and security of its employees, citizens, and visitors. All employees are expected to maintain high standards of employee behavior including respect for the dignity of all individuals. As a result, threats, threatening behavior, or acts of violence against or by employees, visitors, or guests on the City of Tigard property' will not be tolerated. Furthermore, threats, threatening behavior, or acts of violence off City property by city employees will also not be tolerated. Any person who exhibits threatening behavior or engages in violent acts on City of Tigard property should be removed from the premises as quickly as reasonably possible, and shall be required to stay off City premises pending the outcome of an investigation into any incident. In cases where the reporting individual is not a City employee, the report should be made to the City of Tigard Police Department. In the event the investigation discloses prohibited behavior the City has the right to take any steps the City Manager deems necessary. This response may include, but is not limited to, suspension and/or termination of any business relationship, reassignment of job duties, suspension of at least one week or termination of employment, and/or criminal or civil prosecution of the person or persons involved. The need to prevent a threat from being carried out, a violent act from occurring, or a life threatening situation from developing shall supersede any policy, practice or procedure which may appear to prohibit taking action to avoid the violence. All City of Tigard personnel shall notify their supervisor, department head, or the Human Resources Director of any threats which they have witnessed, received, or have been told that another person has witnessed or received. Even without an actual threat, personnel should also report any behavior that might be carried i out on a City of Tigard controlled site, or is connected to City employment. If the supervisor, department head, or Human Resources Director is not available, personnel shall report the threat to the City Manager's office. All supervisors and managers are responsible for taking workplace violence issues seriously and following prevention, policies and procedures as appropriate. 7 All individuals who obtain a protective or restraining order which lists City of Tigard sites as being protected areas, must provide their supervisor and the 73 Human Resources Director a copy of the order(s). The City of Tigard understands the sensitivity of the information requested and has developed procedures which recognize and respect the privacy of the reporting employee(s). Specific examples of conduct prohibited under this policy include, but. are not limited to, the following: • Hitting or shoving an individual; • Threatening to harm an individual or his/her family, friends, associates, or their property; • Intentional destruction or threat of destruction of property owned, operated, or controlled by the City of Tigard; _ • Harassing or threatening telephone calls, letters or other forms of written or electronic communications; • Intimidating or attempting to coerce an employee to do wrongful acts that would affect the business interests of the City; • Harassing surveillance, also known as "stalking," the willful, malicious and repeated following of another person and making a credible threat with intent to place the other person in reasonable fear of his/her safety; • Making a suggestion or otherwise intimating that an act to injure persons or property is "appropriate," without regard to the location where such suggestion or intimation occurs. 74 BONN, !I PERSONNEL POLICIES No. 67.0 USE OF CITY PROPERTY AND INFORMATION All City property and information is to be used solely for job related purposes. Use of such property or information for personal purposes is strictly prohibited unless specifically authorized by City policy or the department director. Employees should not have any expectation of privacy in the use of City property or any information contained therein at any time. For purposes of this policy, City.property includes all equipment, information, materials and facilities owned by the City of Tigard. Examples include software, electronic equipment, information systems (including but not limited to computers, cellular telephones, fax machines, copiers, voice mail, e-mail), all communications and information stored in the City's information systems and electronic equipment, passwords, codes and keys to gain access to such. equipment, buildings, motor vehicles, lockers, desks, etc. The City reserves the right to access all City property and may periodically monitor use of such property. The City reserves the right to review and/or disclose all information contained in such property at any time and for any purpose. Employees are strictly prohibited from using any City property to solicit other individuals for any purposes or to send messages which may be interpreted as harassing, discriminatory, obscene, or defamatory. The City's anti-harassment policy fully applies to employees in this use of City property. Employees shall not use a code, access a file, or retrieve any stored information, other than where authorized, unless there has been prior clearance by an authorized supervisor. City property or information that is confidential and/or proprietary information cannot be shared with individuals outside of the City without prior clearance from an authorized City representative. Any employee who leaves employment with the City is prohibited from taking or copying any City property or information unless specifically authorized by their department director. Employees who violate this policy are subject to disciplinary action, up to and including termination of employment. i 75 AGENDA ITEM # 5 FOR AGENDA OF March 14. 2000 CITY OF TIGARD, OREGON COUNCIL AGENDA ITEM SUMMARY ISSUE/AGENDA TITLE Dedication of Reserve Strip on 84th Avenue as Public Right-of-Way PREPARED BY: John R. Hadley DEPT HEAD OK CITY ADMIN OK ISSUE BEFORE THE COUNCIL Dedication of existing reserve strip as public right of way to allow the extension of street. STAFF RECOMMENDATION Staff recommends, by motion, approval of the attached resolution authorizing the dedication. INFORMATION SUMMARY The Community Development Code required the dedication of reserve strips at the temporary dead end street at the boundaries of new subdivisions. When the streets are extended it is necessary to dedicate the reserve strips as public right-of-way. Currently, a plat is being processed that involves the extension of a SW 84th Avenue and requires the dedication of a reserve strip in the adjoining subdivision. Previous approval by the Planning Commission has authorized the street extension. The attached ordinance will authorize the City Manager to dedicate the reserve strip as public right-of-way so that the street extension can be completed. OTHER ALTERNATIVES CONSIDERED . NA FISCAL NOTES No Impact kkdtywldelsumlashlord oaks.ss.doc • KL I URN KLLUKULU DUCUAILN7"1'U: CITY HALL RECORDS DEPARTMENT, CITY OF T(GARD 13125 SW Hall Blvd. `~JI Tigard, OR 97223 CORPORATION C?Ir~ - am_e ralo File No. 0 CV) DEDICATION DEED FOR ROAD OR STREET PURPOSES City of Tigard does hereby dedicate to the public a perpetual right-of-way for street, road, and utility purposes on, over, across, under, along, and within the following described real properties in Washington County, Oregon: Being that parcel described as tract "G" in the subdivision plat of Ashford Oaks No. 3 as recorded in Book 80 Pages 10 & 11of the Washington County Subdivision Records. To have and to hold the above-described and dedicated rights unto the public forever for uses and purposes hereinabove stated. The grantors hereby covenant that they are the owner in fee simple and the property is free of all liens and encumbrances, they have good and legal right to grant their right above-described, and they will pay all taxes and assessments due and owing on the property. The true consideration for this conveyance is $ 0.00 . However, the actual consideration consists of or includes other property or value given or promised which is the whole consideration. . IN WITNESS WHEREOF, I hereunto set my hand on this z. day ofL '201'V) City of Tigard Name of Corporation William A. Monahan 13125 SW Hall Blvd. City Manager Address Title Tigard Or.. 97223 Signature Tax Statement Mailing Address (ifdderenr from above) Title STATE OF OREGON ) ) ss. County of Washington ) l Q (date) by William A. Monahan, as This ' nowled ed before me on 7/ fthe CATHERINE D WHEATLEY 40TARY PUBUGOREOON COMMISSION NO. 322M L[J MY COMMISSION EXPIRES MAY 1o, 2003 Notary's Signature ~ My Commission Expires: Accepted on behalf of the City of Tigard this day of 20 City Engineer %Wg373V,"ep44npyowhW ui ew it WuO.doo ROSS ST > F- F- i TRACT "G" 1' RESERVE STRIP ON R ! i t i i r I 00 I r 1 t AGENDA ITEM # J. (0 FOR AGENDA OF March 14.2000 CITY OF TIGARD, OREGON COUNCIL AGENDA ITEM SUMMARY ISSUE/AGENDA TITLE Purchase of portable mobile restroom for Cook Park i PREPARED BY: Jeff Munro DEPT HEAD OK Y CITY MGR OK ISSUE BEFORE THE COUNCIL. Shall the Local Contract Review Board declare Blazer Industries Inc. a sole source vendor for the construction of the portable mobile restrooms for Cook Park and award the bid not to exceed $ 60,000.00. STAFF RECOMMENDATION 1) Staff recommends that the Local Contract Review Board approve and award Blazer Industries Inc. sole source status for the construction of the portable mobile restrooms for Cook Park. 2) Staff recommends bid award to Blazer Industries Inc. for an amount not to exceed $ 60,000.00. INFORMATION SUMMARY The City of Tigard Public Works Department has been working on the purchase of the portable mobile restrooms that will provide service to the new riverfront shelter at Cook Park. Staff searched locally and nationally for the past 7 months for a company that could construct this portable facility to fit the needs at Cook Park. There are very few companies that manufacture this type of facility and even fewer that will custom build them to our specifications as well as the specifications of the State Building Codes. Our most promising vendor was Ameri-can, a large manufacturing company from Argos, Indiana who builds these types of facilities. However, they are hesitant to build a single facility to our specifications plus they do not meet the Oregon codes as they pertain to plumbing, structural, electrical and mechanical. Ameri-can believes that they do not need to meet the codes because their facilities are mobile. The State of Oregon Building Department disagrees and cautions not to jeopardize our ability to use our facility in the park by purchasing one that does not meet the required codes. Further research led us to a local company in Aumsville, Oregon that builds a variety of facilities and is willing to work with us on the custom design and construction. They also come highly recommended by the State of i Oregon Building Department as a company that meets the required state codes. We have met with the president of the company and he has drawn up plans that meet both the State requirements and our specifications. Blazer Industries Inc. has temporarily left a spot open in their production line should the decision be made to proceed with the construction of this facility. If Local Contract Review Board approval is granted at the March 14, 2000 Council meeting, then the delivery date would be the end of May 2000. OTHER ALTERNATIVES CONSIDERED 1) Continue to search for a vendor that will custom build a facility to our specifications and that will meet the required Oregon Building Codes. (If this is recommended by the Local Contract Review Board, then we will need to roll over the budgeted amount into the 2000-2001 fiscal year budget since delivery will most likely not be before the end of the fiscal year). 2) Continue to use existing porto-potties at the riverfront area. (If the Local Contract Review Board recommends this, they need to be aware that current porto-potties are not adequate to keep up with the rising usag-- due to the newly installed picnic shelter). 3) Local Contract Review Board may instruct staff to go through the formal bid process. (If this is the direction that they want staff to proceed, then we may need to roll over the budgeted amount into the 2000- 2001 fiscal budget year since the formal bid process may push the delivery date past the end of the current fiscal year). VISION TASK FORCE GOAL qM? ACTION COMINUTTEE STRATEGY Accommodate growth while protecting the character and livability of new and established areas. FISCAL NOTES $ 60,000.00 was budgeted for out of the 1999-2000 fiscal year for the purchase of this facility. ~:kry~;a~~nn.aoi IMF MEMORANDUM TO: Ed Wegner FROM: Jeff Munro RE: Purchase of portable mobile restrooms for Cook Park DATE: March 1, 2000 1 have been working on the purchase of the portable mobile restrooms, which will service the riverfront area at Cook Park. I started the search for a manufacturer in September of 1999 when I contacted national and local companies as well as local park agencies. Most manufactures could not offer what we desired, but we eventually narrowed our search down to a few companies. The first was Bucks Sanitation from Sweet Home, Oregon. Bucks is the company that provided the portable restroom for the City of Tigard for the "Festival of Balloons" in 1999. 1 worked with them for two months on putting together a plan, but had difficulties when it came to addressing ADA accommodations and getting any specialized features. They informed me that they would have the unit manufactured in Indiana. They put me in contact with the company who manufactured their unit, which is Ameri-Can Engineering. Ameri-Can has a line of portable restrooms, but does not customize their units to fit specialty needs. The customizing however was minor in comparison to the fact that their units did not meet the State of Oregon building codes. There seems to be a difference of opinion between Ameri-Can, Bucks and the State of Oregon regarding the fact of whether or not they need to meet code since their units are not a permanent structure. However, according to Ernie Hopkins of the State of Oregon Building Department, the unit must meet state code as it pertains to plumbing, structural, electrical, and mechanical. Ameri-Can, being a large company is not in favor of altering their production plans for one specialty unit especially when they don't believe their unit is a permanent structure and needs to meet the code requirements. Mr. Hopkins made the point very clearly that if the city were to purchase a product that did not meet proper codes, that the city may jeopardize the ability to use it in our application in the park. asked Mr. Hopkins to put that in writing for me and his response was, ° Don't need to, it's the law, you have to meet the codes". The second company I dealt with was Cascade Phillips of Oregon City, Oregon. We began working with Cascade Phillips in December 1999, when we met with their Sales Manager at their site in Oregon City. After our meeting and a tour of their facility, it was obvious that they could not construct the desired unit and would themselves have to have an outside vendor construct it. They also informed us that whatever was built would need to meet Oregon codes. They did their best to talk us out of this type of unit and into top scale porto-potties on a trailer, sighting the expense involved in the construction of a unit like we were requesting. They did not know of anyone who manufactured what we were looking for, but gave us the name of a company, Blazer Industries Inc. that does specialized work. Had we agreed on a project with Cascade Phillips, they would have contracted out the work to Blazer Industries Inc. anyway. This brings us to the third and final company, Blazer Industries, Inc. in Aumsville, Oregon. We met with Marv Shetler the president of the company in late December of 1999 to discuss our needs and his willingness to meet them. It had become evident at this point that what we needed was going to be a custom built unit with many original designs that would allow us to both meet our needs and meet the State code requirements. Mr. Shetler is willing to build us a customized unit that addresses the above needs. He has worked with the State of Oregon on plan review and will submit a copy of his plans to the State for their review and approval. I have confirmed his statements with Ernie Hopkins of the State Building Department and was even given a recommendation for Mr. Shetler and his company. According to Mr. Hopkins, his department visits Blazer Industries 2-3 times a week for inspections on various projects and has work with them for years on meeting code requirements. Mr. Shetler has produced some preliminary drawings and is willing to work with the City of Tigard to make this project successful. Time of delivery is dependent on when the order is placed. Current delivery date if ordered within the next month is the end of May 2000. It is my recommendation after many months of research and many dead ends, to make Blazer Industries Inc. a sole source vendor for the purchase of the portable mobile restrooms for Cook Park. » Q o a 0 ~ K M 8 M r Y i f-f TC711. gU1t)MG m G~~' pJB yffi pP.P`v41NN 81~• g.t7..0(? ►Npt15 INC. 9A'fp 2040 6tA'~ yHET CoFyglGtq p t 15 ~tC , AND 97325-Q489 vt5 j,~l0.t ~►e, .,1P1C dR D15G1.03t0 4899 t+uNS of MAZIpt IN rtgMI55ION 01 EL r 3~16~-1. fa. TotLET t3U1DtNG StTt.E- Cp,DD: ® DRAWL -AJ5 2000, B1AZ~R INDU57EtIE5, INC. A.~: 2- t 7-~ a C:C)r 1GhT CW5Nt a SHED NO. 115 WER A1. t5 TYtE ZINC. OAND R D%N.L OR 97325 115 DL64 ItlpLygYRiES, eax 489 AUM5111L -0484 P.o. KODUCeD, USea BID NOT DE ~ VLEFf A51A; k;OFUFT by VE 10 Ovf ~KN1F5 ;tON Of 81p,Zepuwu5TK o- mso wriTTCN FEB-16-2000 10:59 BLAZER INDUSTRIES F'•02i05 `'-Oj..Aw(Lq~[LLLVLTe~ INC. BLAZER a v~ P.Q. BOAC 489 - AUMSVILLE, OR 97325-0489 - (503) 749-1900 CCB 40050106 Dante To MY of MARD, OREGON 02/16/2000 ~ D5085 - -TtA1lD1Qtm1Y [M7a - • ATM- JEFF MUNRO 7ltdr+0lPJt{Dla1a M11E 7a 1ffi llDMirgl4 13125 SW HALL BLVD _ •f1GAR , OR 97223 Maly Shcdtr Factory 1 each 11'6"x,32' Mobile Restroom Frith stainless steel bolding tanks for $59,149.40 waste. Per attached specs. QtEDrrMOM As stated io modarrl tecma attached This quote ii sul iwt to selleOs approval of buyer's credit. Special term additional fmanr, iid infomr Eao, payment bond or pasaond guaanwar may be regdaed far credit aplawat. ® To be arranged This quote is valid for 30 days. Gaxpi as modified above, the attacBad Suadasd Tana r s' alt apply to arty sale. BWU mast sib below and return ctisind befure we ran proceed. MAUR INDUSTRIES. INC. Acoapta- Buyer „eo+ - 13y: • WX t9VgRM %1 FOR TERM AND CV"DMOM DR= To CoNFiRM ORDM SIGN AND REniRN 1wkWE ACCE.PTAN= COPY FEB-16-2000 10:59 BLAZER INDUSTRIES P.03105 Slazer Industries, Inc SPEC SHEF-r RESIGN Lp-mg: Date: 0211611000 size: 11'6"x32' Floor: 40 Cusume Ciity of T'>ardt 17escriptian: Restroom WIM& 808 Location: Mobde Roof: 23 Project: Park - insignias: Prtgon Foundation: Biock & Level _ OEM Size: I 1'6"x32' I ea Type: Non-Conventional - See drawings _ - _ Main rail: !2" Jr I-beam Double 1-beam: No Axles: 13-Brake 8:00 14.5 10 Ply tires - Hitch: Detachable Joists: _ 4" stet! 2_21F-welded to top of frame Rims: 4" steel Bottom board: n/a Insulation: none Pecking (I st : 314" Plywood T&G PT DecWn (2nd): 1 /4° Fiberboard s Framing (En. 2x4 & 2x6 16" oc Ht = 90" NO : Double studs Q siding joints, Use double top plate on 32' wags only Framing IN : 3,x6- !6" oc Plenum wall: No Insul-Exterior. n/a Sheathing: 112" CDX Plywood Siding--- Snxxxh Hardipanei - over R-wrap building paper Fascia: 2x8 DF Skirting. not included Corners: Galvanized stmi, painted sane color as siding _ Trims Ix2 Prins Trim at trop of sic%ng, I x4 Prime Trim at doors b 85095-123 02116/2000 FEB--16-2000 10:59 BLAZER INDILBSTRIES P.04105 ® ® o Frarrei 4x6 DF beams C W oc Rf p1mb = 4/12 lnsulatlon: >nla Sheathing: _ 112' CDX plywood over 2x6 T&G wood decking _ Corer: _ 24 u e Standino Seam Metal ewer 15# felt -match existing roofs for color _ Ventin . l=ave - evr1~~ rTy HMM s~S12~ fm LEM Iry146H CLOSER P- M w L S RA I EXT 2 TWS" HM BB NO PAINT BEST YES YES GALV rwar 2 EXT 1 3%c6%0 HM BB NO PAINT BEST No YES GALV 64esiiroiorn doors to be equipped with an autcMatk magnetic night lock and an emergency b n on_t_he,. inside to let a petrsoln out if'.lockedl In actideng HM - Hallow Mewl $Wei w/Swel pmb GAILY = C.Ovw9n d (2)ea 4x4 Texan -one per resbvorn o- Floors; Entire bldg. Forever Wails: RR's onl : Smooth FRP panels All but RR's: ltfiase) bare stud Base: RR's only. 6° rubber Tviam Walls: Alun-dnum Ceifi . Entire bldg: Open beam with 2x6 T&G decking stained) Toilet tissue: Vandal resistant 3 roll dlspe.-:;c.s (4)ea Mirror: 24x36 (2)ea S_S..- - - Grab bar: 36" (2)ea 42" (2)ea wlconcealed fasteners Towel dispenser: None Soap dispemer: S.S, li aid type (2)ea 'roHet seat cove- eGgnnse (4)ca Hand Dryers: (4)ea Fasttalre Air Towels/Elemic hand dryers Toilet p~rtitlons: Solid plastic floor mounted overhead braced Urinal screen: (Ilea -Solid plastic - IB" b d5085.123 02/16/2000 FEB-16-2000 11:00 EL 42 ER I i` US T4 I ES P. 05/05 Shelves: Som d u4m in center Chase area None Toilets: regular handicap Flush Valve UrInals: (l) handicap Lays ...-(4) Wall huM Drink fountain: stone i WK- twrfe sink I free standing Iaunddr r tub _ DWV: PVC Water. Wirsbo PI EX Waste holding tank) P)ea nominal 7S0 gallon stainless steel compEate with k wd %n=mImw. panel nxmer, strobe alert flash alarm, ekectric water shut-off vafves. Tank worm holding tank cleaner, Quick d€sconnom coupler with ban wdit for drain tits tanks Servke f%% Phase Undo- Meter base: n/a Panei: i 100 anip Material: Rornesc Receptad Duplex (2.).20 amp - in Chase SwW-= SP i - In Chase Wire for: _ Autornabc electric locks on PR doors Li&ht Strip 4%2 tube (1)ea - in Chase Light: Vandal resistant Incandescems in RR's - (2) per side Inter,or [oils be on a diner Porch light: . Handal Ressistant inn } on Photo cel b D5095.123 07JIW20M TOTAL P.05 2 Rectangular waste storage tanks. Built as per customer provided drawings. Will include a 16" manhole with a 10" hinged clean out port (K.napoco KA 4320 or equal). All materials shall be 304 series stainless steel with the main body of the tank to be manufactured from 11-gauge thick material. """IMPORTANT: It is imperative that the bottom of the tank be adequately externally supported. We recommend 3" 4.1 lb structural channel (or equal) at no more than 24" on center. MEN do- De,x 4-4 r 311166 bet expert advice Your local Chamber of Commerce and neighborhood business association offer opportunities to promote your business and network Doing Business with other business owners. Retired business owners can During Highway provide advice through the Service Corps of Retired Executives Construction (SCORE). Call (503) 326-3441 for more information. Associations tailored to your specific industry are also a tremendous resource. Take advantage of any advice or support you can find that will help your business adjust to change. e o a I .1.1 o, Advice and Ideas for Getting Your Business Over the Bumpy Road of Construction Plan ahead No construction project happens overnight. You will have months, maybe even years to get ready for the construction crew to knock on 7LI70.6 rovided by the your door. gon Department Don't wait-start planning now to Tran sportation carry your business over the lumps Region 1 Community Affairs and bumps of construction. (503) 731-8200 It isn't going to be We'll provide construction updates easy... Construction can cause Having a highway construction temporary lane restrictions and project on your doorstep will road closures. As projects impact your business. progress, traffic patterns and In the public's mind, construction schedules change. construction means traffic snarls, Access to businesses may be lack of on-street parking and slow temporarily or permanently going-even if roads are clear and altered. traffic is flowing smoothly. Your Community Affairs We understand the challenges representative can provide you you face. The Oregon Department with up-to-date construction of Transportation (ODOT) will schedules and may have maps of work with you to minimize the road changes and new access impact of construction on your routes. business. Here are some examples You can use this information to of how ODOT can help: keep your customers and suppliers informed of changes that may affect how they get to your business. OMS We'll help you inform your customers ODOT Community Affairs produces flyers and brochures to Well fork with you and keep the public informed of the yo progress of construction and your neighbors changes along the route. You may Now is the time to get to know want to have a supply available on your neighbors. By working the counter for your customers. together, you can develop We can also provide you with a strategic plans to maintain levels master copy to reproduce and mail of business during construction. to your regular customers and Discussions with other business suppliers. owners give you an opportunity to plan joint advertising, construction Co high tech sales or special promotions. You Put your fax machine and e-mail can also share your frustrations to work. Use them for taking and successes. orders so your customers don't Construction can r(sult in have to fight traffic to get to your temporary loss of on-street business. Fax updates of route or parking. You may want to make access changes to your customers arrangements ahead of time to and suppliers. You can also fax or rent or borrow parking space from e-mail traffic updates-let your another business or be prepared to customers know it's clear sailing to share your off-street parking your business. during construction. This may be a good time toa Advance planning explore the IS the key... possibility of N'=< \ setting up a \ Every business is unique, so you Web site for need to develop a marketing your business strategy that is right for you. with the ability Other businesses are affected by to take orders on-line. Consider construction projects and survive. providing a link to ODOTs Here are a few flips that have construction update Web site and worked for others: traffic cameras at www.odot.state.or,us/regionl/ Use your customer construc.htm. You may find that if7Q~/ir! list the Internet becomes an important 9 means of communication for your Make plans to keep in touch with business that long outlasts the your customers during construction project. + construction. If you don't already have a list of your regular customers, start one. It can be your most successful tool for letting customers know you're open for business during construction. Collect addresses from personal Consider delivery service checks or company invoices. Ask If your customers cant or won't customers if they would like to be come to you, take your business to included on a mailing list for them. Offer pick-up and delivery notification of special discounts or during construction. It works for sales. pizza-it may work for you, too. Analyze your business Now is the time to know your ® ® business inside and out. Find out or who your customers are and why they choose to do business with you. Make plans to improve on your weak points and devise strategies to capitalize on your strong points. Estimate before construction starts whether or riot your business can absorb any decrease in revenue or increase in expense. Consider whether this might be a good time for that remodeling Plan for more advertising project. To keep your business in the public eye, consider boosting your advertising during construction. Get creative More advertising takes more Try "Eat money, so set some aside now to My Dust" cover your costs later. sales, or Q hold "How I Survived Highway Construction" Increase your visibility promotions, with discount coupons Do a quick audit of your business for customers with the best signs. Are they visible and well lit? construction navigation stories. Will they be seen from the new Humor can be a terrific marketing roadway, or do you need to move tool and helps turn a negative them or make them taller? Will you situation into a positive one. need new signs to direct customers to any new accesses? Location, location, location Maybe now would be a good time If access to your business is to try a new design or color to permanently changed, consider all draw attention to your sign. You your options. These can range from will need to check with city, modifying your site layout to a county and state offices for any change of location. conditions or restrictions on Moving your business may be the business signs before you make best choice for you. By planning in significant changes. Call ODOTs advance you can determine the Outdoor Advertising Sign Permits best course of action for your Unit at (503) 986-3656, business. Ore. Hwy. 99W Roadway Conditions i~@i6Hty^'~~ _ NIM i ,r Rol "At ` _ cnpacity 'conditions bumper to bumper "Wheel rutting" conditions a~*sC:•'~ i wr'."'°: ...iii+,'.~.~~"1f~8~%4'~~. ` . L'~; f,:.i' ~_-i "'-.i~'~`n~•s~. -5 f , •F~ • 7 + v ` ,y t .1'~ 'y i x.Gy-ir -mot. . ~L',; "Pothole" conditions "Cracking" conditions .r 7.31 ~r.•.ramavww*•n l+r•<'ww..gMarnti:~t.. ~ ~ - , . rs+l ~,rn~'t : . ,.,r. • v~ "Worn" bridge points 3~~' "K'-+ `:'~Y',~ • I III ~'i~ ~ ~:ti`,,•'=~'_ ' I TYPICAL A WEIGHTED SOUND PRESSURE LEVELS 140 (THRESHOLD OF PAIN) I 50 HP SIREN (30 m) i I 130 I JET TAKEOFF (60 m) { I 120 (UNCOMFORTABLY LOUD) I ROCK-N-ROLL BAND { I RIVETING MACHINE 110 - I I I 100 (VERY LOUD) FARM TRACTOR I I MOTOR CYCLE IS m) 90 I DIESEL TRUCK 65 krrVh (15 m) I GARBAGE DISPOSAL 80 (MODERATELY LOUD) I I I VACUUM CLEANER (3 m) 70 I PASSENGER CAR 110 km/h (8 m) { I AIR CONDITIONING UNIT (6 m) 60 NORMAL CONVERSATION I l PRIVATE BUSINESS OFFICE 50 (QUIET) _ I ' I I 40 { SOFT WHISPER (1.5 m) i RUSTLING OF LEAVES 30 (VERY QUIET) I 1 I STUDIO FOR SOUND PICTURES 20 - I I f 10 (JUST AUDIBLE) I I I 0• (THRESHOLD OF HEARING) 1000-4000 HZ SOUND LEVEL. dBA _ Oregon t 'e, 4Z, DER. RT1[ENTOFTRk.\SPORT.aMN OREGON HWY. 99W PAVING OPEN HOUSE You are invited to attend an open house to learn about the Ore. Hwy. 99W paving project. The open house will be held at Tigard City Hall, 13125 SW Hall Blvd. from 7 to 8:30 p.m., Wednesday, March 15. The Proiect in March 2000, the Oregon Department of Transportation this movement are called bridge joints. Though bridge joints begins a $2.2 million paving project on a five-mile section of withstand a tremendous amount of use and wear, they need Oregon Highway 99W (Pacific Hwy. West) between S.W. to be replaced before they wear out. 60th and the Tualatin River. The project also includes guardrail; signing; striping; bridge joint and rail repair or Two bridges and two overcrossings require joint repair or replacement; and traffic island removal and replacement. replacement - the Tualatin River and Fanno Creek bridges; and the Pacific & Western Railroad/Commercial Street and Currently the highway functions at capacity between 6 a.m. Oregon Highway 217 overcrossings. This work could begin and 9 p.m. This means there is little room for more traffic. as early as March. The use of nighttime construction is critical in order to maintain daytime traffic flow on this major regional and coastal connector, minimize impacts to adjacent Freewa]6 Apigroach Change neighborhoods and meet the aggressive schedule for the The lane configuration at the Oregon Highway 99W/1-5 split project. The nighttime work could result in some traffic will be modified to address last minute motorist lane changes. delays. Currently, Oregon Highway 99W is striped so motorists can Some construction activities such as bridge rail, sidewalks, exit onto 1-5 northbound byway of a two-lane on-ramp, or curb and off-road sign installation may occur during daylight continue north on Oregon Highway 99W. hours and could begin as early as March. Because some motorists weave and cross in front of one The state's contractor is Morse Brothers, Inc. of Sherwood. another just before the split, ODOT will re-stripe the roadway The project is scheduled for completion August 31, 2000. to provide a single dedicated lane to 1-5 and a single lane for Oregon Highway 99W traffic. Both single lanes will become double lanes just past the split. Paving & Road Surface Activities Years of heavy use have caused the existing roadway to fail at some locations. Deep road base damage and cracks Traffic Islands & Bicycle Lanes allowing moisture to seep in have compromised the road's Traffic islands will be replaced at S.W. Hall Boulevard, ability to support traffic much longer. Repairs at those Greenburg Road, Garrett and McDonald streets, Cantebury locations will be made first. Lane and Royalty Parkway. To provide a level and bondable surface, the roadway will be The new S.W. McDonald Street to Canterbury Lane island will ground down prior to paving. Construction crews will grind be lengthened to extend to the S.W. Gaarde/McDonald Street + (remove) asphalt and apply a 1.5-inch asphalt overlay intersection. beginning in the spring of 2000. a The existing Oregon Highway 99W bicycle lane system will Approximately 50 manholes require adjustment. Those be enhanced. Standard bicycle lanes will be striped in - a adjustments will occur prior to or in conjunction with the through most of the project; however, there are areas not paving operation and could result in traffic delays. widen enough for bicycle lanes. At those locations, vehicular and bicycle traffic will share a Bridge Joint Repair/F~e1nlacement widened travel lane. Shared lanes will be located between Bridges and overcrossings are built to expand and contract as S.W. 60th and 64th avenues; from approximately S.W. 69th temperature changes take place. They also flex from the to 72nd avenues; and between S.W. Hall Boulevard and movement and weight of traffic. The mechanisms that allow Greenburg Road. I M311110 Construction Aioise Why is night work necessary? Though some work will be conducted during the day on this In most situations, if you are inside with your television or project, the use of nighttime construction is critical in order to radio on, you probably won't be able to hear the construction maintain daytime traffic flow on this major regional and noise. Neighboring homes, fences and shrubs also help to coastal connector, and minimize impacts to adjacent block the sound of construction. neighborhoods. What hours will the contractor work? Currently, the highway functions at capacity between 6 a. m. Bridge and overcrossing joint repair or replacement activity and 9 p.m. This means there is little room for more traffic. begins at approximately 9 p.m. and wraps up by 6 a.m. the Taking away a lane for construction during the day could following morning. result in severe traffic congestion. Grinding and paving begins at approximately 9 p.m. and What construction equipment will be used? wraps up by 6 a.m. the following morning. Noise generated Concrete removal and replacement requires the use of from this "moving operation" will be perceptible for a shorter concrete saws, jackhammers, cement trucks/mixers, and air period of time. compressors. Paving and grinding equipment will be used when the roadway is resurfaced. Where ®o You Find Out More? Who will be affected by the noise? Recorded construction information on this and other Construction noise will be audible to businesses and projects is available by dialing (503) 223-0066. residents along the project corridor. Other construction inquiries may be directed to ODOT's Noise levels dissipate quickly as distance from the source project manager office at (503) 731-3142. increases. The grinding and paving operation is continually moving. Though the construction work may still be audible You may also visit ODOT's Internet web site at: at 400 feet, its decibel level will be the same as or very similar to existing traffic noise levels. www.odot.state.or.us./regionl/99w. htm Oregon Highway 99W Paving Project Open !-louse Invitation Construction Notification Uregon ; DEP.ARD E:N? OF TRkMPORT,AT]01 46- - 123 N.W. Flanders ' Po'rllind, OR 97209 AGENDA ITEM! No. 5 Date: Parch 14, 2000 SIGN-UP SHEETS 5 minute Time Restriction PUBLIC HEARING LOCAL LAW ENFORCEMENT BLOCK GRANT AS REQUIRED Y THE BUREAU OF JUSTICE AND TO APPROVE THE GRAFT EXPENDITURES I:WDM\GREER\CCSIGNUP\PH TESTIMONY LEG.DOC AGENDA ITEM No. 5 PLEASE PRINT Proponent - (Speaking In Favor Opponent - (Speaking A ainst Neutral Name, Address & Phone No. Name, Address & Phone No. Name, Address & Phone No. i Name, Address & Phone No. Name, Address & Phone No. Name, Address & Phone No. Name, Address & Phone No. Name, Address & Phone No. Name, Address & Phone No. Name, Address & Phone No. Name, Address & Phone No. Name, Address & Phone No. Name, Address & Phone No. Name, Address & Phone No. Name, Address & Phone No. n N Name, Address & Phone No. Name, Address & Phone No. Name, Address & Phone No. 3 ~ i AGENDA ITEM # I' FOR AGENDA OF March 14, 2000 CITY OF TIGARD, OREGON COUNCIL AGENDA ITEM SUNIMARY ISSUE/AGENDA TITLE Local Law Enforcement Block Grant PREPARED BY: Ron Goodpaster DEPT HEAD OK CITY MGR OK ISSUE BEFORE THE COUNCIL The issue before Council is to hold this public hearing that is required by the Bureau of Justice and to approve the Grant expenditures. STAFF RECOMMENDATION Staff recommends Council approve Grant expenditures. INFORMATION SUMMARY ' We have been awarded a $26,054 Local Law Enforcement Block Grant by the Bureau of Justice. This Grant I requires a $2,605 local match. The Bureau of Justice requires that a citizens committee be convened to make non-binding recommendations about how the money is spent. These funds can only be spent in certain areas, and the two areas in which the funds will be spent are: supporting law enforcement and community crime prevention programs. I held the citizens meeting on February 22, 2000, and the following expenditures were approved by them: #1. Police Pursuit Intervention Training $1,104 Equip 5 patrol cars with front bars 2,500 #2 School Violence training 1,854 93 Community Partners for Affordable Housing 2195 (summer camp programs) #4 Tigard-Tualatin School District 300 (to track kids and programs database) #5 TPD Youth Summer Camps and Training 16,996 #6 Homicide School 1,105 I The purpose of this meeting is to hold a public hearing and to approve the expenditures of the Grant. This will also require a supplemental budget motion so $6,555 can be transferred into and spent this fiscal year. The remaining funds ($19,496) have been included in next year's budget. OTHER ALTERNATIVES CONSIDERED Not to approve this request. i VISION TASK FORCE GOAL AND ACTION CONMTTEE STRATEGY This request addresses issues raised in the Public Safety and Schools and Education sections. FISCAL NOTES The $2,605 match money is available in the existing budget. iAcitywtdalsum.dot i I I i i 1 I v TO: Bill Monahan, City Manager FROM: Ron Goodpaster, Police Chief F 71GARD OREGON DATE: February 25, 2000 SUBJECT: Pursuit Intervention Technique Questions Below are listed the responses to questions from the Council regarding this technique. The first question regarded how many times we would have used this technique in the past year. Last year we had situations that we would have used this technique 1 to 3 times per month. In one scenario last summer we used the technique to stop a car being driven in an extremely dangerous manner. The driver has tried to run over one of our inotor officers and was driving out of control on lawns. By using the technique we were able to stop the vehicle and eliminate the threat. Because we did not have the front bars, it caused about $5,000 damage to our vehicle and took it out of service for several weeks. If the vehicle had the bars the damage, if any, would have been minimal. I believe we would use the technique at least I to 3 times per month. Another question was the cost to equip the vehicles and how many of our vehicles we would outfitted with the front bars. The cost to equip each of the 15 patrol vehicles we would equip is $500 per vehicle. We anticipate taking that cost out of the 2000 LLEBG Grant that we were just awarded. The funding for this training and the front bars comes from an Omnibus Fiscal Year 1999 Appropriations Act, which provides funds for the implementation of the Local Law Enforcement Block Grant Program, which is administered by the Bureau of Justice. The purpose of the LLEBG Program is to provide local government with funds for local projects to reduce and improve public safety. This Grant was for $26,050, which included a local hard money match of $2,605. These funds can be spent in the following areas: supporting law enforcement, enhancing security measures, establishing or supporting drug courts, enhancing the adjudication of cases involving violent offenders, establishing multijurisdictional task forces, establishing community crime prevention programs, and indemnification insurance. We have just been advised that we have been awarded a LLEBG Grant for 2000. This Grant is for $25,360, which includes a local hard money match of $2,536. 13125 SW Hall Blvd., 71gard, OR 97223 (503) 639-4171 TDD (503) 684-2772 M13 11111 11111=0 AGENDA ITEM # FOR AGENDA OF March 14.2000 CITY OF TIGARD, OREGON COUNCIL AGENDA ITEM SUMMARY ISSUE/AGENDA TITLE A resolution approving budget adjustment #7 to the FY 1999-00 budget to accent a Local Law Enforcement block grant and to increase appropriations to allow expenditure of grant funds PREPARED BY: Craig Prosser DEPT HEAD OK _CITY MGR OK ISSUE BEFORE THE COUNCIL Should the Council amend the FY 1999-00 Budget to accept and appropriate a law Enforcement Block Grant? STAFF RECOMMENDATION Staff recommends approval of this budget amendment. INFORMATION SUMMARY The City has been awarded a $26,054 Local Law Enforcement Block Grant by the Bureau of Justice. The Council will hold a public hearing this evening on use of these funds. Following the public hearing, if the Council chooses to accept the grant, it is necessary to amend the FY 1999-00 Budget to accept the grant and to adjust appropriations to allow the funds to be spent. The grant will be spent over a two-year period. This resolution, there fore amends the budget to reflect only that portion that will be spent in FY 1999-00 ($6,558). The balance of the grant will be included in the FY 2000-01 Budget. The grant requires a 10% local match. The Police department has sufficient appropriation to provide this match with no other adjustments. OTHER ALTERNATIVES CONSIDERED Do not approve this budget amendment; maintain the City's FY 1999-00 budget. This would prevent the City from accepting the grant. VISION TASK FORCE GOAL AND ACTION COMMITTEE STRATEGY This budget amendment addresses issues raised in the Public Safety and Schools and Education sections of the Vision statement. FISCAL NOTES The amendment will increase the budget by $6,558 using grant funds. AGENDA ITEM # FOR AGENDA OF March 14.2000 CITY OF TIGARD, OREGON COUNCIL AGENDA ITEM SUMMARY ISSUE/AGENDA TITLE Transportation Bond Update PREPARED BY: A.P. Duenas DEPT HEAD OK C~Z CITY MGR OK ISSUE BEFORE THE COUNCIL Briefing on the progress of the Transportation Bond Task Force. No Council action required. 5TTAFF RECOMMENDATION No Council action required. Council discussion and input is welcomed on progress to date. INFORMATION SUMMARY The Transportation Bond Task Force appointed by City Council to select projects for a proposed transportation bond issue during the year 2000 has been meeting since April 1999. The Task Force developed criteria for project selection, then compiled an extensive list of projects for consideration. The projects include street reconstruction and expansion, safety-related improvements, sidewalks, bike paths, and streetlights. A citizen involvement meeting was conducted on October 20, 1999 to receive citizen input on the proposed projects, and to gauge public feeling on the size of bond issue that would be acceptable to voters. The Task Force met on November 3, 1999 to review and discuss the comments received at the citizen involvement meeting. At that meeting, the Task Force determined that even more citizen input is needed to help the Task Force develop a package of projects to recommend to Planning Commission and City Council. To solicit continents from a broad cross-section of the community, the Task Force conducted a series of meetings at various locations throughout the City during the month of February 2000. The first meeting was a presentation to the Citizen Involvement Teams on February 3, 2000 at the Tigard Senior Center. The other meetings were open house format scheduled as follows: February 9, 2000 at Fowler Middle School, February 16, 2000 at Conklin Hall, Metzger United Methodist Church, and February 24, 2000 at Tigard High School. All of the meetings, with the exception of the meeting at the Metzger United Methodist Church, were well attended. Citizen input was obtained at all meetings. The Task Force is scheduled to meet on March 8 and again on March 15 to discuss the projects, the size of the proposed bond issue, and to formulate recommendations that will be submitted to Planning Commission and City Council. The presentation to the Planning Commission is scheduled for April 17, 2000 followed by the presentation to City Council on May 9, 2000. Assuming Council approval of the bond package, the bond measure will be submitted for voter approval in the November 2000 general election. The Task Force will actively participate in promoting the bond issue for passage. 'Mom" loll 11101111 NORMSEEW Attached are the bond projects that are currently under consideration. Also attached are charts indicating the rates to the taxpayers for various sizes and terms of the bond issue, and the expected annual payment for homes in the $100,000 to $300,000 range.The final project listing and other recommendations will be determined during the Task Force meetings in the month of March. OTHER ALTERNATIVES CONSIDERED N/A VISION TASK FORCE GOAL AND ACTION COMMITTEE STRATEGY The improvements proposed for funding through a Road Bond issue would meet the Tigard Beyond Tomorrow goals of Improve Traffic Safety and Improve Traffic Flow. FISCAL NOTES Costs for Transportation Bond Support have been absorbed in the Engineering Department's budget so far. Funding for bond issue support, and for the preparation and review of bond projects for design and construction implementation are proposed for inclusion in the FY 2000-01 annual operating budget. IACirywiW Swn\AgcRda Item for Transportation Bond Update - Much 14, 2000 N ~-1 1 NEM City of Tigard Tigard, Oregon Proposed Transportation Bond Projects to Enhance Traffic Safety, Traffic Flow, Pedes- trian, and Bike Transportation Throughout the City of Tigard t .'N4~ .r l City of Tigard I Vibat's NextT eetings on February 9, lb overall goals, the City's a Open House M To accomplish these a list and 24, 2000 to Planning dation Committee is c onsidering osed TransPo roje~ that would: o April l7, 2000 Presentation -Free prop of transportation P Commission Council '3eranso®rtat9®In '~®nd 95SeAe Reconstruct and widen the streets within g, 2000 Presentation to City • the City's transportation network to meet May c demands Thee Projects r®eeenents future traf f ide through safety re- The projects are divided into the following ~V are Transportation In.P a Enhance safety cityw rovements categories: Necessafe- lated imp . and bike paths as part a Major Collectors and TOnlorrow surveys revealed . The Tigard Bey ' Construct Pedestrian s transp°rtation network • Minor Collectors 0 ondents listed traffic and of the City a Local Streets ssues that over 50 /o of the resp ti o ears since • and Bike Paths ro ress" transportation issues as the ben 0 yea The process Sidewalks I work-in-p g facing the community . bond. ointed a TransP°~ The project listings are a roved the last transportation The City Council has app pro ens for a the voters app or improvements and will nc~t be finalized unti e~zand city That bond completed a host of maj tion Bond Task Force to consider submitt J planning Commission comments, current the City's ~sportation network. transportation bond issue to be . The Tead k°r to fi ast few year 2000. 'I11e Council direction are obtained. Duruig the p agproval'r'tl'e y ject listings will be available at the Citizen s , the population voter the process of evaluating PTO" on October 20th, and years, Force is now in evolvement Meeting Hall upon request' the projects under consideration inclu e pro and increase Jects• a ansion of certain major can be obtained from City m°traffic have reconstruction and xP bike lanes, Farce = Pointed out won of sidewalksinand stallation of Yransportation aond Tasic Y streets, tale need for further Safety-r elated improvements, and Steve Clark (Chair) areas' Atthe ice Chair) improvements to en- erect lighting in certain Mark Padgett (`'r hence transportation of the evaluation process, the Ta,g Co leis- Joyce Patton (Council Liaison) - circulation and make recommendations to the P royal. Brian Moore (Council Liaison) throughout the council for review and app safety Sion and city Joe Schweitz City. Some streets Beverly Froude have deteriorated criteria for Project Selecttoa Paul Owen t;- significantly and are ent w Goals Elaine Beaurega need of re- General and Tomorro xiI construction, while Supports Tigard Bey Ted Spence promotes Citywide Equity Phillip Pasteris proceeds from a transportation other Streets require Olsen Solves Safety Problems John expansion to meet Availability bond would lmPfOve deter' .0- rated streets such as that shown the forecasted traffic Supplemental Fun Alternate Modes Sidewalks, above. demands over the Provides Links bike lanes, Supports Future Growth -R and Yertical next twenty years. These transportation improve- Public SuppOrtt tefts realignment move merits need to address hand other~modes of trans- vehicles, Links to Other Pro greatly en- destrians, bicyclists, Development Foreseeable would pe Nance safety portation. $pecrfic"` on this Traffic Congestion Relief street. Yransportatlon Goals 4 vement Condition 's tran sportati°n goals are. Pa 'Ihe City Connectivity • Improve Traffic FSaf low Multi-Jurisdictional Support • Improve Traffic and Bike Transportation 92UNNIEW e Enhance Pedestrian an Bond proceeds would fund projects (such as that shown below) that address the cuff range of transportation-related problems. We Need Your Iilptltl r q Your participation is important. Your comments over the next two months will be considered in our analysis as we deliberate on the final list of projects to be presented to City Council for approval. Please let us know what you think. Did we identify a// the The completed projects would enhance transpor- tation .safety by separating vehicular, bicycle and trade problems! Did we pro- pedestrian movements as shown below. vide a good mix ofprojects to enhance vehicle travel, bike - ~u- travel, and pedestrian move- ments throughout the City! Please call to give your com- ments: Diane Jelderks @ 639- 4171 x 369 For further information, please call or kite! t .z~ Agustin P. Duenas, P.E. City Engineer City of Tigard 13125 SW Hall Boulevard Tigard, Oregon 97223 777777777777777777 Phone: (503) 639-4171 Fax: (503) 624-0752 gus@ci.tigard.or.us Proposed Transportation Bond $25 Million Bond Issue $350 l --$287- $344 , $300 $229 $224. $250 ( $187 } -$172 $200- $150 o_ $150 I $115 $112 . N 10 Year Bond o ' $75 ®20 Year Bond V $100 $50 $0 $100,000 $150,000 $200,000 $250,000 $300,000 Assessed Value of Home Proposed Transportation Bond $20 Million Bond Issue $300 $275 j $229 $250- $200---- $183 $180 } $138 $150 a $150 I $ $9U $120 ® 10 Year Bond ° $100 j $60 E20 YearBond 0 f $50 $0 $100,000 $150,000 $=00,000 $250,000 $300,000 Assessed Value of Home Proposed Transportation Bond T $15 Million Bond Issue $250-.' $206 $200- $172 $138 $135 M - } $150 $102 $113 n' $69 $90 ®10 Year Bond c $100 $68 M20 Year Bond v $45 $50 $0 $100,000 $150,000 $200,000 $250,000 $300,000 Assessed Value of Home Proposed Transportation Bond $1.60- $1.42 c ~ $1.40- $1.15 y $1.20- $0.92 $0.93 CL H $1.00 $0.75 U) $0.69 N $0.80 $0.60 ®10 Year 8ortd c $0.60 $0.45 ®20 Year Bond x $0.40- $0 , 20 $0.00 $15,000,000 $20,000,000 $25,000,000 $31,000,000 Bond Issue Amount Proposed Transportation Bond $33 Million Bond Issue $450 - $378 $427 ! $400 i $350 $303 $2781 M $300- , $227 $232 1 $250 1. $186 a $200 ^ $151 a $139 ®10 Year Bond LO $150 X93 ® 20 Year Bond $100- $50 - L F $0- $100,000 $150,000 $200,000 $250,000 $300,000 Assessed Value of Home 111111,111,IM milli 1111:118 10111 =IN M11111111111111111 Proposed Transportation Bond Project Ranking By Priorities Cate o ' Project Priori Project Cost CUMUlative Total Proposed Projects Major Collectors Gaarde Street-99W to 121st Avenue 1 53,140,000 53,140,000 121st Avenue- Walnut to North Dakota 2 S2,030,000 SS,170,000 Walnut Street -Tiedeman to 121st 3 $4,990,000 $10,160,000 121st Avenue -Gaarde to Walnut 4 $3,760,000 $13.920,000 Burnham'Street-Main to Hall S S1,570,000 S1S149 000 98th Ave. SI allzatlon - at Durham Road 6 5280,000 $15,770,000 $15,770,000 Greenburg Road - WS to Hall 7 54,380,000 520,150,000 72nd Avenue - 99W to Hunziker Street 8 53,640,000 523,790,000 Wall Street Extension 9 $4,880,000 528,670,000 Hunziker Street - Hall to 72nd Avenue 10 S1.810,000 $30,480,000 Grccnburg Road - WS to Tiedeman 11 $3,710,000 $34,190,000 Tiodeman Ave. - Greenburg to Tigard St. 12 $860,000 $35,050,000 $35,050,000 Minor Collectors Battler Street -100th to 98th 1 W01009 55601000 Sattler Stmt - 98th to 92nd 2 S540 000 $1,100,000 TI and Stmt - MsW to Tledeu= 3 $9904000 $2,090,000 79th Avenue - Bonita Rd. to Durham Rd. 4 $2,78 000 $4,870,000 Watkins Avenue - 99W to Walnut Stmt S $l 740 000 61 000 $6,610,000 Former StreKt - Walmtt to S. of 115th Avenue 6 $1,840,000 S8,450,000 Tigard St. Bride Replacement 7 51,310,000 $9.760,000 Tigard Street -Tiedemanto115thAvenue 8 51,660,000 $11420000 New Connect - North Dakota to Tigard 9 51,540,000 Sl 960 000 115th _Ave- Tiprd SL to North Dakota 10 $590,000 S13,550,000 North Dakota - Tiedeman to 121 st 11 $3.850,000 S17,400,000 S 17,400,000 Local Streets Murdock Street -103rd Ave. to 97th Ave. 1 S75000 57 000 ScoMns Street Resli went 2 SI 2 000 =70,000 Murdock Street -106th Ave, to 103rd Ave. 3 $190,000 $2,460,000 $2,460,000 $2,460,000 Sidewalks and Bike sths 92nd Ave nee to Heidi Court 5250,000 Piaebrook SL all Blvd to 92nd Avenue S310,000 103rd Ave (McDonald SL to View Terrace $350,000 103rd Ave (Canterbury Ln to Lad Marlon 5280,000 100th Ave (McDonald SL to Murdock St $990,000 Inez St. 103rd Ave. to 109th Ave.5300,000 Grant Ave Johnson St to Tigard SL) I 5250,000 Ash Ave Garrett SL to north of HIII SL $630,000 Park Street Watkins St. to 99 $280,000 Ann Street 121st Ave. to 300 ft east 5901000 Lynn Street 121st Ave. to 300 fL east $100,000 Commercial Street (Main SL to Lincoln St. $460,000 116th Avenue (Tigard SL to Katherine St.$130,000 Locust Street (West of 92nd Ave to Hall Blvd $610,000 72nd Avenue (Locust SL to Spruce St $410,000 Spruce Street (72nd Ave to 78th Ave S140,000 Oak Street (Lincoln St. to Hall Blvd 5750,000 Garrett Street 99W to Cramer Dr•. 4_. 78th Avenue (Spruce SL to Pfafile St 71st Avenue 99W to Oak SL 69th Avenue 99W to Oak SL) 1 57,450,00TotaB All Projects) 592,290,000 Bond issue and Otber Costs 1.5% 5480,000 Grand Total for Bond Issue $32,770,000 WE! Milli' E10111111 1 d ~ t d 14 t --A l 1 ,~Ay 4 Vi; 19 ;v 10 N 1 A : I Proposed Sidewalk and Bikepath Projects Lltt L 92nd Ave Inez St. to Heidi Ct. (Sidewalk West Side) . ✓ 2. Pinebrook St. - Hall Blvd. to 92nd Ave. (Sidewalk South Side / 3. 103rd Ave - INIMouald St. to View Terrace (Bikepath Both Sides) - 4. 103rd Ave - Canterbury Lu. to Lady Marion (Sidewalk Nest Side) 5. 100th Ave. - 6lcDonald St. to Murdock St. (Bikepath Both Sides) /6. Inez St. -103rd Ave. to 10001 Ave. (Bikepath South Side) 1 r 7. Grant Ave. - JbIRd54id St. to Tigard 5t. (Sidewalk East Side) 8. Ash Ave. - Garrett St. to N. of Hill St. (Sidewalk, Bikepath, Nest Side) _ 9. Park 5r. - Watkins to 9911(Sidewalk Both Sides) 10. Ann St. - 121st Ave. t01 16th Ave. (Sidewalk North Side) I - 11. Lynn St. - 121st Ave. M 't16th Ave. (,Sidewalk North Side) t 1 1- f 12. Commercial St. -,Hain St. to Lincoln St. (SidewaikNorth Side) 13. 116th Ave. - Bikepath and Bridge between Tigard and Katherine St. 4 1 1.4. Locust St. - West of 92nd Ave. to Hall Blvd. (Sidewalk North Side) 2 15. 7211d Ave. - Locust St. to Spruce St. ( Sidewalk Fast Side) 16. Spruce St. - 72nd Ave. to 18th Ave. (Street Widening Norttd Side) 17. Oak St. - Lineolu St. to Nall Blvd. (Sidewalk North Side) 18. Garrett St. - 99w to Cresmer Dr. (Sidewalk Soutld Side) r - 19. 78th Ave. - Spruce St. to Ptafl1e St. (Sidewalk Fast Sid,,) 20. 71st Ave. - 99W to Oak St. (Sidewalk Fast Side) / 21, 69th Ave. - 99W to Oak St. (Sidewalk East Side) m 1 i~ 1 Y G' 1 i : 1 1 1 7 r r 1 N a t L I m m . S A t ~ 11 .t ~ 11 I Y 1 1 n 10 ! 9 Proposed Road Projects 12 , 2 t9 Major Collector Streets = Y, r 7 rt "'°g 1 1 1. Gaarde Street- 99W to 121st Avenue t _ 2. 121st Avenue - Walnut to North Dakota ` t # ° 3 3 2 3. Walnut Street - Tiedeman to 121st Avenue 1 f 1 r Am- 4. 121st Avenue - Gaarde to Walnut 5. Burnham Street - Main to hall Blvd. 10 6. 98th Ave. Sigaalization - at Durham Rd, - u t +1 1 8 r 7. Greenburg Road - Washington Square to Hall Blvd. 1 19 1 - = 1 r r` 8, 72nd Avenue - 99W to flunziker St. 9. Wall Street Eatention 10. Hunziker Street - Hall to 72nd Ave. S 11. Greenburg Road - Washington Square to Tiedeman 12. Tiedeman Ave. - Greenburg to Tigard St. 'i ° 1 r d ' r r a A i f[C ! 9 A Minor Collector Streets- 4RIAMMEM 1 fr s" `T 1. SaBier Street -100th to 98th t p 1 2. Sattler Street - 98th to 92nd 1 r = 1. 1 ` - ~4 ' a • " i 3. Tigard Street - Main to Tiedeman 4. 79th Avenue - Bonita Rd. to Durham Rd. r _ t r My 5. Watkins Avenue - 99W to Walnut St. 3 6. Former Street - Walnut to South of 115th Ave.j 1 _ J 11 Ir 1 e s 7. Tigard Street Bridge Replacement 1 r i 1, rV 8, Tigard Street - Tledeman to 115th Avenue 2 " 9, New Connection - North Dakota to Tigard St. r ! _ 10. 115th Avenue - Tigard St. to North Dakota ac 11. North Dakota - Tiedeman to 121st Ave. t Local Streets = Bill, 11 a 1 r aM try e 1. Murdock Street -103rd Ave. to 97th Ave. 2. SCef M Street Realignment m 3. Murdock Street -106th Ave. to 103rd Ave. 6 n4 0 p „ _ 6 t~ t r- 16 J { " ray An, L o no Proposed Transportation Bond No on Status Update ®E March 14, 2000 M® on on WE no Progress to Date INN o 00 1119 o Citizen Involvement Meetings min - October 20, 1999 - Open House on - February 3, 2000 - CIT Presentation No - February 9, 2000 - Open House @Fowler - February 10, 20010- r pda'<n House @ on United Methodist Church in Metzger area on - February 24, 2000 - Open House @ Tigard No High f Task Force Issues u2 I MOO MO O Project selection Big on - Project categories • Major Collectors No • Minor collectors ME a Local Streets - Sidewalks and Bikepaths NO " Size of bond issue • Term of bond issue IBM wo: n_h a,Fx M0 ER Size and Term of Bond Issue ®M MOM Proposed Transportation Bond MOO ®12 $160 1r~4 ` %9L~tX 1$1.42 F ®~1~ A $140 1 `i he. $115 o - $120 a. $092 j $0931. ~ $100 rat r w*:S j ft $075w N M $080 $0.60 rz+F ®lOYearBond 1$0.45 10 20 Year Bond 5 `o $060 r ; r.tp" 40 ~f EO ®M $0.20 t a i af,y $0.00 ME $15,000,000 $20,00,000 $25,000,000 $31,000,000 M® Bond Issue Amount 2 uY TT1~~ rir_yu w E..:1 T `j $33 Million Bond Issue Proposed Transportation Bond M® $33 Million Bcnd Issue sea No $450 af7® n 3378 $427' $400 v $350 ;$303E 3278 $300 .5227 -t $2321 kr. a $250 151 y^-a - $186; $200 j139 - •e .;J ,Y• 010YearBond c l $150 $93E r c;;^ 11t`" ■20YearBond $100 $50 4 z?. S0 $100,000 $150,000 $200,000 $250,000 $300.000 Assessed Value of Home Iw. i+,~I st:~ itl! $25 Million Bond Issue ®W Proposed Transportation Bond $25 Million Bond Issue $350 i 1 iJ 5287 $300 -Z ®O $229 E224 $250 $172 $187 ®E ' $200 $150 a E115 $150 - ^'5112 ~A ■10YearBond ~1 375 i. _ af, i ®20 Year Bond ME $100 ,H $50 no e ' Ss. $0 ' an $100,000 $150,000 $200,000 $250,000 $300,000 no Assessed Value of Home M® 3 All Ili;,,:' I !1 1111111 IN1111 loll ,-J_J Ej 110 -1t C.L .f O $20 Million Bond Issue 4. SE2 ®m Proposed Transportation Bond $20 Million Bond Issue $3006 sz7s 1 $250 r ,1$729$ r $183 $180 $200 ,E138r 1^ i,{m' $150{ v:., 0 o. $150 I$92 t rl$90' $120. ~ir 010 Year Bond $100$60;' K;•::Ys p20YearBond y 5: v $1 K v" $100,000 $150,000 s2o0,000 $250,000 $300,000 Assessed Value of Horne "S $15 Million Bond Issue ~112LA E} M[~qMp~ y t.'e^9 M ®lm Proposed Transportation Bond Ea ER $15 Million Bond Issue $zso M1 u 206 °t $ a®a$'~® $200 93$1721 lam j$138~i i. $135. )i a $150 ME ' a $102 A 10 Year Bond c $300 X569} i ijS68i ;u a ■20YearBond a $45. tY $0 $300,000 $150,000 $200,000 $250,000 $300,000 ' Assessed Value of Hame ON ME Elm 4 INNER Jill min UN ® hat's Next? Task Force Meetings - Task Force meeting on March 8, 2000 -Task Force meeting on March 15, 2000 o Presentation to Planning Commission: April 17, 2000 • Presentation to City Council: May 9, ME 2000 5 AGENDA ITEM # FOR AGENDA OF March 14, 2000 CITY OF TIGARD, OREGON COUNCIL AGENDA ITEM SUMMARY ISSUE/AGENDA TITLE Summer Creek Wetlands Enhancement Project erestone Pond) PREPARED BY: A Duenas DEPT HEAD OK -T --"_'CITY MGR OK ISSUE BEFORE THE COUNCIL Progress report on Summer Creek Wetlands Enhancement Project (Merestone Pond). STAFF RECOMMENDATION No Council action is requested. INFORMATION SUMMARY On February 8, 2000, City and USA staff and the City's consultant met with regulatory agencies to discuss water quality improvement options. Agencies attending included the US Environmental Agency, US Corps of Engineers, Oregon Division of Fish and Wildlife and Division of State Lands. The general plan agreed upon includes regrading of the area so that several channels extending from the main channel will flood during periods of high flow. During periods of low flow, water will retreat to the main stream from the channels and leave a wetland that will provide improved habitat. Following the meeting, the consultant was requested to prepare a proposal to provide a conceptual plan meeting the requirements the agencies expressed during the meeting and the objectives of Council. Staff will be working with the consultant to complete the conceptual plan for regulatory agency review. Milestones for this project include: Council consideration of conceptual plan April 11, 2000 Submittal of Permit Applications April 14, 2000 Final Design Complete June 5, 2000 Advertise for Bids June 12, 2000 Bid Opening June.27, 2000 Award by LCRB July 11, 2000 Begin Construction July 24, 2000 Complete Construction Sept. 18, 2000 These dates are tentative and are subject to adjustment based on actual dates of agency approval of the permits. The intent is to construct the project this summer. OTHER ALTERNATIVES CONSIDERED Not applicable. VISION TASK FORCE GOAL AND ACTION COMMITTEE STRATEGY Not applicable. FISCAL NOTES Funding through Surface Water Management system development charges is available. The cost will be estimated following Council approval of the conceptual plan. I:tdWMdeW:m\summer creek progress report.doc a m er Creek Wetlands ancement Project Status Update March 14, 2000 s of Project ❖ Meeting on February 8, 2000 ❖ Attendees included representatives from: - City and USA Staff - City's consultant - US Environmental Protection Agency -US Corps of Engineers - Oregon Division of Fish & Wildlife -Division of State Lands 1 ; eral Points of Agree rent ❖ Meandering stream will be restored ❖ Creation of several off-line channels Water will drain to the creek during low flow ❖ Improvements to habitat in the area ❖ Consultant will create concept plans for review by regulatory agencies gstones S~SYLM° i -r V ❖ Council Discussion ❖ April 18th Workshop ❖ Submittal of Permit April 20, 2000 Applications ❖ Final Design ❖ June 5, 2000 ❖ Advertise for Bids ❖ June 19, 2000 ❖ Bid Opening ❖ July 11, 2000 ❖ LCRB Award ❖ July 25, 2000 ❖ Begin Construction ❖ July 31, 2000 ❖ Complete Construction ❖ September 29, 2000 2 AGENDA ITEM # FOR AGENDA OF March 14.2000 CITY OF TIGARD, OREGON COUNCIL AGENDA ITEM SUMMARY ISSUE/AGENDA TITLE Washington Square Regional Center Decisio PREPARED BY: Laurie N. DEPT HEAD OK CITY MGR OK I~ ISSUE BEFORE THE COUNCIL The issue before City Council is whether to adopt the Washington Square Regional Center Plan findings and ordinance. STAFF RECOMMENDATION Staff recommends that the City Council adopt the Washington Square Regional Center Plan findings and ordinance. INFORMATION SUMMARY At the February 8"' City Council meeting, the Council adopted the Washington Square Regional Center Plan, and to delay its implementation. Staff has drafted findings and an ordinance adopting the plan, and outlining when the plan will be finally implemented. OTHER ALTERNATIVES CONSIDERED 1.) The Council could deny the proposed findings and ordinance. VISION TASK FORCE GOAL AND ACTION COMMITTEE STRATEGY Growth Management Goal #1 - Accommodate growth while protecting the character and livability of new and established areas; Strategy 3) Address planning and growth issues associated with the Regional Center. Growth Management Goal #3 - The City encourages and supports private sector programs to maintain diverse and affordable housing; Strategy 4) Incorporate affordable housing policies into study of Downtcwn, Washington Square Regional Center, and other mixed use areas. FISCAL NOTES Not applicable iAcitywidel3-14-00 Washington Square.sum.dot i. Agenda Item: Hearing Date: March 14.2000 7:30 PM FINDINGS AND CONCLUSIONS IN SUPPORT OF WASHINGTON SQUARE REGIONAL CENTER CITY COUNCIL FOR THE CITY OF TIGARD, OREGON SECTION I: APPLICATION SUMMARY CASES: FILE NAME: WASHINGTON SQUARE REGIONAL CENTER Comprehensive Plan Amendment CPA 1999-000021ZON 1999- 0000120A 1999-00004 PROPOSAL: A request for approval of legislative Comprehensive Plan Map, Rezone and Text Amendments within the area known as the Washington Square Regional Center. Specifically, the request includes redesignation from Low Density Residential, Medium-Density Residential, Medium-High Density Residential, Commercial Professional and General Commercial to new zoning designations of Mixed Use Employment 1&2, Mixed Use Residential 1&2, and Mixed Use Commercial. Specific implementing amendments to the Comprehensive Plan, Development Code, and amendments to the Comprehensive Plan Transportation Map are proposed; however, implementation of the plan shall be delayed until certain conditions are met as outlined in the findings and conclusions outlined below. The request further includes a request for approval of a zone change from C-P (Commercial Professional), C-G (General Commercial), CN (Neighborhood Commercial), R-40 (40 units per acre), R-25 (Residential, 25 units per acre), R-12 (12 units per acre), and R-4.5 (Residential, 4.5 units per acre) to new zoning designations of MUE. 1&2 (Mixed Use Employment), MUR 1&2 (Mixed Use Residential), and MUC (Mixed Use Commercial). The request also includes amendments to the Community Development Cade to add a new section entitled "Washington Square Regional Center" to provide new zoning districts. APPLICANT: City of Tigard 13121 SW Hall Boulevard Tigard, OR 97223 OWNER: Various STAFF REPORT CPA 1999-0002 Pago 1 COMPREHENSIVE PLAN DESIGNATION: Low Density Residential, Medium Density Residential, High Density Residential, Commercial Professional, Neighborhood Commercial, and General Commercial ZONING DESIGNATION: R-4.5 (Residential, 4.5 units per acre), R-12 (Residential, 12 units per acre), R-25 (Residential, 25 units per acre), R-40 (Residential, 40 units per acre), CN (Neighborhood Commercial), CP (Commercial Professional), and CG (General Commercial) LOCATION: The area is bounded generally by Fanno Creek on the west, SW Greenburg Road and Hall Boulevard on the east, Progress Downs Golf Course to the north, and Highway 217, including the Ash Creek area, on the southern border. APPLICABLE REVIEW CRITERIA: Statewide Goals 1-19; Oregon Administrative Rule 660-12-060; Comprehensive Plan Policies 1.1.1, 2.1.1, 6.1.1, 8.1.1, 8.2.2, 9.1.1, 12.1.1, and12.2.1; Community Development Code Chapter 18.390.060, and 18.390.060(G). SECTION II: BACKGROUND INFORMATION Site History: In 1996, Metro adopted a visionary plan that would limit the expansion of the Portland Metro Area Urban Growth Boundary yet accommodate growth. This regional plan is known as the Metro 2040 Plan. Focusing development and growth in regional centers represented a key aspect of supporting growth of the area and preserving livability. Regional centers are areas containing concentrated business, local government, retail services, and housing served by high-quality transit. The Washington Square area represents one of three regional centers in Washington County and one of seven in the metropolitan region. To ensure that enough housing and employment is located within the urban growth boundary, Metro's Functional Plan requires that local jurisdictions plan for their respective assigned growth targets for jobs and housing. Tigard's assigned target capacity in the Washington Square Regional Center is 9,804 jobs and 1,500 housing units. Washington County's housing density target of approximately 500 housing units is included in Tigard's target, so that the single-family Metzger of ighbor ;cod can be preserved. STAFF REPORT CPA 1999-0002 Page 2 lffi~~ 111111111E1111111111 Washington Square Regional Center Mixed Use Districts: Mixed Use Employment 182, Mixed Use Residential 182, and Mixed Use Commercial With funding from a Transportation 8 Growth Management (TGM) Grant, a master planning effort was undertaken to define the boundaries of the Regional Center and propose transportation and land use designations intended to reflect a twenty year planning horizon. To assist the planning effort, Tigard City Council appointed a 23 member task force. Task force members represented neighborhoods, schools, businesses, property owners, state, regional, local governments, and public interest groups. The Washington Square Regional Center Task Force directed staff and consultants in the preparation of the land use and transportation development concept of the Washington Square Regional Center. The Task Force met for over a year and was made up of area residents, business owners and developers, and representatives of the Planning Commission, Metro, and the Oregon Department of Transportation (ODOT). The recommendations for the Washington Square Regional Center were intended to not only meet the Metro Design Concept for the Regional Center, but also to meet the neighborhood goals for the area. The vision for the Washington Square Regional Center, as developed with the assistance of the Task Force, is guided by the following: Overall Vision: • The Washington Square Regional Center will be a vital regional center serving the needs of the Washington County residents. • Preserve existing residential neighborhoods. • Offer an innovative transportation service that makes it easy for people to reach their destinations. • Focus on Washington Square Mail as a community resource. • Feature a linked belt green belt of parks and open space easily reached by residents and employees. Guiding Principles-Creation/Preservation of Area Identity; • Reinforce a distinctive regional center while recognizing and respecting the character of the nearby residential community. • Retain and develop quality housing, including affordable housing, for all income levels. • Facilitate transitions from one use to another; for example, to multifamily residential uses. • Preserve and enhance Metzger Park and consider additional parks. • Encourage environmentally friendly development. STAFF REPORT CPA 1999-0002 Page 3 • Try to keep historic trees. • Build for our children; have a sense of stewardship. • Think creatively and be innovative in improving/maintaining quality of life. • Consider market forces and development patterns. • Maintain and preserve floodplains and wetlands. Governmentllnstitutional Issues: • Consider all political boundaries and facilitate cooperation among jurisdictions. • Maintain neighborhood schools. • Identify and reinforce what makes the learning (educational) environment viable. Transportation: • Strive for a self-sufficient, connected transportation system. • Consider transportation needs for whole study area. • Plan for a multi-modal transportation system that accommodates increased auto and non-auto travel needs. • Respect and enhance local street networks and neighborhood livability. • Maintain an acceptable level of service and safety on regional roads, outside the study area. • Provide good transportation access to the rest of the region. • Make the community accessible for all people and modes with connections for cars, bikes, pedestrians, and transit. • Maintain a high level of accessibility within and to the regional center. • Use appropriate street and streetscape design. • Encourage attractive, high quality development. • Promote long-term viability for the area. Assure infrastructure is available prior to or with development. STAFF REPORT CPA 19994002 Page 4 11111 111111 111'1111 IN ill~imilligillillmol i The Regional Center Plan should. • Be understandable to lay people. • Be implementable within a reasonable, staged period of time. • Help develop a sense of community with a common vision, hope and optimism. • Be based on statistics and facts for population, employment, and other factors. • Use existing resources as much as possible. • Encourage compatible and complementary uses. • Contain solutions to common problems. • Avoid conflict with other regional centers. The resulting plan reflects these guiding principles. The plan was completed and the Washington Square Regional Center Task Force accepted this plan in September of 1999. Vicinity Information: The affected parcels and street system are within the area known as the Washington Square Regional Center. The area is generally bordered by Fanno Creek on the west, SW Greenburg Road and Hall Boulevard on the east, Progress Downs Golf Course to the north, and Highway 217, including the Ash Creek area, on the southern border. It was the consensus of the Washington Square Regional Center Task Force that the Washington Square Regional Study area would include 1,250 acres with Washington Square Mall located in approximately the center of the study area. The total study area includes land within unicorporated Washington County and the City of Beaverton. Site Information and Proposal Description: The site is approximately 1,250 acres in size. The proposed land use actions include amendments to the Comprehensive Plan to update references to the Washington Square Regional Center and include a description of the regional center zones (Mixed Use Employment 1&2, Mixed Use Residential 1&2, and Mixed Use Commercial), update the adopted transportation element of the Comprehensive Plan and amend the Development Code to include a new chapter that addresses development standards in the Washington Square Regional Center. Some of the zoning shown is outside of Tigard's jurisdiction and adoption of these zoning districts, transportation linkages, and design standards are recommended to the jurisdictions of Washington County and the City of Beaverton. SECTION Ili: FINDINGS AND CONCLUSIONS Both the requested Comprehensive Plan amendments and Development Code amendments are subject to the same criteria within the Tigard Municipal Code (see Section 18.30.120). The following staff evaluation and findings are therefore intended to address both the requested amendments to the Comprehensive Plan and amendments to STAFF REPORT CPA 1999-0002 Page 5 NEW III= ~~=IIIIIIINE the Development Code. The relevant criteria in this case are Statewide Goals 1-19: Oregon Administrative Rule 660-12-060; Comprehensive Plan Policies 1.1.1, 2.1.1, 6.1.1, 8.1.1, 8.2.2, 9.1.1, 12.1.1, 12.2.1; and Community Development Code Chapter 18.390.060 and 18.390.060(G). STATEWIDE GOALS Citizen Involvement: Goal 1 requires a citizen involvement program that ensures the opportunity for citizens to be involved in the planning process. Tigard Comprehensive Plan Policy 2.1.1 and Tigard Community Development Code Chapter 18 provide for citizen participation and notice. Notice of the Planning Commission and City Council hearings and opportunity for response were advertised in the local newspaper and request for comments were sent to the Department of Land Conservation and Development. A public hearing notice was mailed out to all property owners within the Washington Square Regional Center, as well as property owners located within 500 feet of the proposed land use action. In 1998, Tigard City Council appointed 23 people to serve on the Washington Square Regional Center Task Force. Task Force members represented neighborhoods, schools, business, property owners, state, and local governments, and public interest groups. The task force met 17 times between June 3, 1998, and August 18, 1999. All meetings were open to the public and time was set aside on every meeting agenda to solicit public comment. Three public workshops were held. One was held on September 28, 1998; one workshop was held at Washington Square during the day and another at Metzger School in the evening. A second public workshop was held on March 8, 1999, at the Tigard Water Building and a final public open house was held on September 15, 1999, at Metzger Park Hall to present the findings of the Task Force. Metro provided a $10,000 grant to the City of Tigard to supplement the City's public outreach program. This goal is satisfied. Land Use Planning: Goal 2 requires, in part, that adopted comprehensive plans be revised to take into account changing public policies and circumstances. This goal is met because the City has applied all relevant Statewide Planning Goals, City { Comprehensive Plan policies and Community Development Code requirements in the { review of this proposal. In addition, the proposal is intended to implement the vision for a Regional Center that is expressed in Metro's 2040 Growth Concept and comply with Metro's i Functional Plan. i Agricultural Lands: Goal 3 requires, in part, that adopted comprehensive plans be revised to preserve and maintain agricultural lands. This goal is not applicable because 3 no agricultural lands are involved in this legislative plan and code amendment. a a Forest Lands: Goal 4 requires, in part, that adopted comprehensive plans be revised to preserve and maintain forest lands. This goal is not applicable because no forest lands are involved in this legislative plan and code amendment. STAFF REPORT CPA 1999-0002 Page 6 Open Spaces, Scenic, and Historic Areas, and Natural Resources: Goal 5 requires, in part, that adopted comprehensive plans be revised to conserve and protect natural resources and scenic resources. This goal is met because the plan protects all resources as follows: 1. Open spaces: Some of the goals of the Washington Square Regional Center Plan are as follows: "[f]eature a linked green belt of parks and open space easily reached by residents and employees and [p]reserve and enhance Metzger Park and consider additional parks." The Washington Square Regional Center supports existing open space protections and identifies the need for 12 additional acres of open space. 2. Scenic resources: This part of the goal is not applicable because no identified scenic views exist in this area. 3. Historic areas: This part of the goal is not applicable because no historic areas are inventoried for the portion of the Regional Center located in the City of Tigard. 4. Natural resources: The City of Tigard has existing regulations protecting natural resources. The Washington Square Regional Center plan is providing an optional development standard to provide incentives to developers to enhance natural resource areas. The following incentive is proposed under 18.630.040(E) of the Washington Square Regional Center comprehensive plan amendments: "Density Requirements for Developments including or abutting riparian setback. Notwithstanding the density requirements in Table 18.630.2, the maximum density and floor area ratio for developments that include or abut riparian setbacks shall be no greater than 110 percent of the minimum residential density and floor area ratios in all Mixed Use Zones, except when the following are met: 1. Wetlands within the development are expanded or enhanced in conformance with the Oregon Division of State Lands Wetlands Restoration and Enhancement Program, and if applicable 2. Fish Habitat within the development is enhanced in conformance with the Oregon Division of State Lands Fish Habitat Enhancement Program, and if applicable 3. The overall flood storage capacity of the 100-year floodplain within the development is increased by 10 percent." Air, Water, and Land Resources Quality: Goal 6 requires the maintenance and l improvement of the quality of air, water, and land resources of the state. The City of Tigard complies with this goal through its adopted comprehensive plans and policies regarding water resources (Tigard Comprehensive Plan Volume Il, Chapter 4 and Tigard Development Code standard: 18.797). , Natural Disasters and Hazards: Goal 7 requires the maintenance and improvement of f the quality of the air, water, and land resources of the state. This City of Tigard has existing regulations that address natural disasters and hazards. Washington Square Regional Center Plan does not affect these provisions. Recreational Needs: Goal 8 requires that the recreational needs of the citizens of the state and visitors and, where appropriate, to provide for the siting of necessary STAFF REPORT CPA 1999-0002 Page 7 IN= 1111011 MIMI Ell recreational facilities including destination resorts. This goal is not applicable because no recreational issues or destination resort issues are involved. Economic Development: Goal S requires the provision of adequate opportunities for a variety of economic activities. This goal has been met because the plan continues to promote opportunities for a variety of economic activities vital to the health, welfare and prosperity of Tigard citizens. The mix of uses will encourage a diversity of development with emphasis on employment based uses. During the planning process for the Washington Square Regional Center, consultants performed an analysis of development and redevelopment opportunities in the study area. The study shows that approximately 170 acres of land will be needed over the next 20 years to accommodate the development densities outlined in the Washington Square Regional Center Plan. The report summarizing these opportunities is attached to this staff report. Please refer to exhibit A. Housing: Goal 10 requires that plans shall encourage the availability of adequate numbers of needed housing units at various price ranges and rent levels and allow for flexibility of housing location, type and density. The new Mixed Use Residential 1 &2 zones will encourage higher density housing than currently exists. Mixed Use Residential 1 will require a minimum residential density of 50 units per acre and Mixed Use Residential 2 will require a minimum residential density of 25 units per acre. The existing commercial and commercial professional zones do not allow opportunities for residential development with the commercial and office development. The new zoning will provide provisions that allow retention of existing residences thereby preserving affordable housing, while still providing the opportunity for high-density housing. Goal 10, Housing, is, therefore, met because the proposal provides for additional housing opportunities as called for both in the City's Comprehensive Plan and the Metropolitan Housing Rule, in addition to the Metro 2040 Plan. One of Washington County's strategies to meet their required housing densities recommended that the area in unincorporated Washington County be rezoned from R-5 to R-40 to comply with Metro residential growth targets. The Task Force is recommending that the single-family zoning remain and that Washington County's share of the Washington Square Regional Center residential growth targets be located elsewhere within the Washington Square Regional Center, threreby preserving an existing single-family neighborhood. The analysis of available land done by the consultants confirm that additional dwelling units can be accommodated elsewhere within the Regional Center. Public Facilities and Services: Goal 11 requires planning and development of timely, orderly, and efficient arrangement of public facilities and services to serve as a framework for urban and rural development. Because the Washington Square Regional Center plan includes the adoption of a transportation system plan and parks and open space plan to support the proposed land uses, this goal is satisfied. Street and utility improvements are addressed in Chapter 18.810 of the Tigard Development Code. Transportation: Goal 12 requires a safe, convenient and economic transportation system. The Washington Square Regional Center Transportation Plan has been STAFF REPORT CPA 1999-0002 Page 8 extensively analyzed to evaluate the impacts that the proposed new zoning categories would have on transportation systems. The project team has worked closely with the Washington Square Regional Center Task Force, has reviewed the draft Regional Center Plan and past traffic studies for proposed development projects in the study area, and has conducted a planning analysis of the 2020 traffic volume forecasts for the area-wide roadway system. Although traffic will be increased with the development of the proposed Washington Square Regional Center, the traffic studies show that traffic congestion will exist in the future with or without the proposed land use changes. The proposed mixed-use zones will create the potential to capture some of the auto trips going in and leaving the Regional Center. The Washington Square Regional Center Plan proposes to improve the transportation through the following improvements: work with regional partners to develop a commuter rail system; improve transit both to and within the regional center; improve local street connections; improve sidewalks and bike lanes; and widen key regional streets. In addition, the proposed transportation improvements as part of the Regional Center plan include a series of pedestrian/bicycle improvements that will increase the ability to use alternate modes of transportation. Attached is a summary of proposed transportation improvements for the Washington Square Regional Center area (please refer to exhibit B). This memorandum describes the final evaluation of alternatives for motor vehicle, bicycle, pedestrian, and transit travel modes, and describes a recommended Transportation Master Plan for the Washington Square Regional Center. One of the recommendations of the transportation element of the Washington Square Regional Center is to eventually widen Hall Boulevard to five lanes. The Metro Regional Transportation Plan shows that Hall Boulevard will need to be widened to five lanes to accommodate traffic in the area over the twenty year planning horizon. The Washington Square Regional Center recognizes that the Regional Transportation Plan calls for expansion of Hall Boulevard to five lanes; however, the task force endorses an expansion to three lanes while acquiring right of way for a five lane roadway. This goal is satisfied because the total projects outlined above will create a transportation { system that can support the proposed land use changes. Energy Conservation: Goal 13 requires that land and uses developed on land shall + be managed and controlled se as to maximize the conservation of all forms of energy, based upon sound economic principles. The proposed Washington Square Regional Center design concept would allow the opportunity to build residential development in commercial and industrial areas and, therefore, create the opportunity for people to live in close proximity to work and/or shopping. In addition, the transportation improvements proposed outline a series of bicycle/pedestrian improvements that will increase the alternate modes of travel. This goal is satisfied. STAFF REPORT CPA 1999-0002 Page 9 slag 31,11 11,11, 111101MMI 11111111N 011,111101 J Urbanization: Goal 14 requires orderly and efficient transition from rural to urban land use. This goal is not applicable because urban growth boundary issues are not involved. Willamette River Greenway: Goal 15 requires protection, conservation, and enhancement of lands along the Willamette River as the Willamette River Greenway. This goal is not applicable because Willamette River Greenway issues are not involved. Estuarine Resources: Goal 16 requires recognition and protection of the unique environmental, economic, and social values of each estuary and associated wetlands and, where appropriate, protect, maintain and restore the long-term environmental, economic, and social values diversity and benefits of Oregon's estuaries. This goal is not applicable. Coastal Shorelands: Goal 17 requires conservation, protection, and, where appropriate, restoration of coastal shorelands. This goal is not applicable. Beaches and Dunes: Goal 18 requires conservation, protection, and, where appropriate, restoration of coastal beaches and dunes. This goal is not applicable. Ocean Resources: Goal 19 requires conservation of the long-term values, benefies, and natural resources of the nearshore ocean and the continental shelf. This goal is not applicable. COMPLIANCE WITH FEDERAL AND STATE STATUTES OR GUIDELINES Oregon Administrative Rule: Section 660-12-060 states that plan amendments which significantly affect a transportation facility shall assure that allowed land uses are consistent with the identified function, capacity, and level of service of the facility. Section 660-12-060 of the Transportation Planning Rule requires that amendments to acknowledged comprehensive plans and land use regulations which may significantly affect a transportation facility shall assure that allowed land uses are consistent with the identified function, capacity and level of service of the facility. Plan or regulation amendments significantly affect a transportation facility if it changes the functional classification of a transportation facility; changes facility standards, creates levels of service which are inconsistent with the functional classification of the facility, or would reduce the level of service below the minimum acceptable. The list of projects outlined in the Transportation Element of the Washington Square Regional Center Plan will create a functional transportation system that can support the proposed land use changes, and this plan is compatible with Metro's Functional Plan Goals and Policies, and Metro's Regional Transportation Plan. COMPLIANCE WITH COMPREHENSIVE PLAN POLICIES STAFF REPORT CPA 1999-0002 Page 10 General Policies: Policy 1.1.1(a) requires that legislative changes are consistent with statewide planning goals and the regional development plan. The proposal is consistent with statewide planning goals as addressed above under 'Statewide Goals'. The proposal conforms with the applicable portions of the Metro "Urban Growth Management Functional Plan" that was approved for adoption on October 24, 1996, by the Metro Council. The "Growth Concept" map associated with the Functional Plan indicates this area as a "Regional Center". Since most of the concept area for the proposed Washington Square Regional Center is located within the City of Tigard, we took the lead in developing the plan for this area. The Metro Framework Plan has the following description: "These regional centers would become the focus of compact development, redevelopment and high-quality transit service, multi-modal street networks and act as major nodes along regional through routes. The Growth Concept estimates about 3 percent of new household growth and 11 percent of new employment growth would be accommodated in these regional centers. From the current 24 people per acre, the Growth Concept would allow for about 60 people per acre (Regional Framework Plan, pp. 17-18, December 11, 1997)." Citizen Involvement: Policy 2.1.1 states that the City shall maintain an ongoing citizen involvement program and shall assure that citizens will be provided an opportunity to be involved in all phases of the planning process. The Planning Commission and City Council hearings were legally advertised. The meetings of the Washington Square Regional Center Task Force were open to the public and time was provided during each meeting for the public to make comments. Public workshops and open houses were held during the planning process for the Washington Square Regional Center. Notice was sent of the workshops to property owners within 500' of the study area to ensure that they had the opportunity to learn about our planning process and to participate in it. Metro provided the City with a $10,000 grant to help facilitate an extensive public involvement program. Housing: Policy 6.1.1 requires the City shall provide an opportunity for a diversity of housing densities and residential types at various prices and rent levels. This policy is primarily implemented through OAR 660-07, the Metropolitan Housing Rule. The rule requires that the City maintain sufficient residential buildable land to provide the opportunity for at least 50% of new units to be attached single family or multi-family housing and to provide for an overall density of ten units per acre. The City is currently in compliance with this rule. The proposed Washington Square Regional Center design concept will encourage a variety of housing types including single-family detached, duplexes, fourplexes, rowhouses, and new multi-family developments. Transportation: Policy 8.1.1 requires the City to plan for a safe and efficient street and roadway system that meets current needs and anticipated future growth and development. The list of projects outlined in the Transportation Element of the Washington Square Regional Center Plan will create a functional transportation system that can support a safe and efficient roadway system that meets current needs and anticipated future growth. Transit: Policy 8.2.2: THE CITY SHALL ENCOURAGE THE EXPANSION AND USE OF PUBLIC TRANSIT BY: STAFF REPORT CPA 1999-0002 Page 11 a. LOCATING LAND INTENSIVE USES IN CLOSE PROXIMITY TO TRANSITWAYS; The Washington Square Regional Center Plan encourages the development of intense land uses in close proximity to existing bus lines in Washington Square, on Greenburg Road, on Hall Boulevard, and in proximity to the proposed commuter rail station. b. INCORPORATING PROVISIONS INTO THE COMMUNITY DEVELOPMENT CODE WHICH REQUIRE DEVELOPMENT PROPOSALS TO PROVIDE TRANSIT FACILITIES; AND The existing development code addresses the provision of transit facilities c. SUPPORTING EFFORTS BY TRI-MET AND OTHER GROUPS TO PROVIDE FOR THE NEEDS OF THE TRANSIT DISADVANTAGED. Tri-Met has been involved in the development of the Washington Square Regional Center Plan and the City continues to work with Tri-Met on issues of the transit disadvantaged. Energy: Policy 9.1.1: THE CITY SHALL ENCOURAGE A REDUCTION IN ENERGY CONSUMPTION BY INCREASED OPPORTUNITIES FOR ENERGY CONSERVATION AND THE PRODUCTION OF ENERGY FROM ALTERNATIVE SOURCES. The Washington Square Regional Center Plan will encourage reduction in energy consumption by allowing the opportunity for housing to be located in close proximity to jobs and transit. Locational Criteria: Policy 12.1.1: THE CITY SHALL PROVIDE FOR HOUSING DENSITIES IN ACCORDANCE WITH: a. Applicable Plan Policies; The Washington Square Regional Center Plan is creating mixed-use zones that will allow high-density esidential zones and plan policies regarding these zones to address the goals of Metro 2040. b. Applicable Locational Critieria; 4. Medium-High Density and High Density Residential A. The following factors will be the determinants of the areas designated for high density on the plan map: (1) Areas which are not committed to low density development; One of the goals of the Washington Square Regional Center Plan is to preserve existing residential neighborhoods which is why the City is recommending to Washington County to leave the Metzger neighborhood with its existing single-family zoning. Areas proposed for higher density zoning are located next to or within existing commercially zoned area. (2) Areas which can be buffered from low density residential areas in order to maximize the privacy of established low density residential areas; The existing development code has buffering standards. One of the goals of the Washington Square Regional Center Plan is to facilitate transitions from one use to another, for example, multifamily residential uses, which is why the higher density zones will be located closer to existing commercially zoned areas. (3) Areas which have direct access from a major collector or arterial street; The Washington Square Regional Center Area is surrounded by collector and arterial streets such as, Hall Boulevard, Scholls Ferry Road, and Highway 217. In addition, the transportation element of the plan includes new collector streets to support existing and new development. (4) Areas which are not subject to development limitations; The existing Tigard Development Code addresses issues of site development limitations. (5) Areas where the existing facilities have the capacity for additional development; STAFF REPORT CPA 1999-0002 Page 12 The transportation element of the Washington Square Regional Center plan adds transportation improvements to the existing comprehensive plan to support existing and new do c!opment and land use densities. (6) Areas within one-quarter mile of public transit; Bus lines exist to serve Washington Square Mall, on Scholls Ferry Road, and on Greenburg Road. In addition, commuter rail is being studied that will run through the Regional Center. (7) Areas within one-quarter mile from neighborhood and general commercial shopping centers or business and office centers; and Washington Square Mall, Burlington Plaza on Cascade Avenue, and Lincoln Center are located within the Regional Center. (3) Areas adjacent to either private or public permanent open space. The Greenway Park area is located next to the Regional Center and the plan identifies the need for additional open space in the regional center, as part of one of the implementation strategies. B. The following factors will be determinants of the density ranges allowed in the medium-high and high density planned areas should the City adopt more than one high density zone: (1) The topography and natural features of the area and the degree of possible buffering from established low density residential areas; One of the goals of the Washington Square Regional Center Plan is to preserve the existing single-family character of the Metzger neighborhood. In addition, Tigard's existing development code standards address issues of land use compatibility and buffering. (2) The capacity of the services; The transportation element of the Washington Square Regional Center plan adds transportation improvements to the existing comprehensive plan to support existing and new development and land use densities. In addition, the Tigard Development Code has a section that addresses public service and utility improvements. (3) The distance from public transit; and Bus lines exist to serve Washington Square Mall, on Scholls Ferry Road, and on Greenburg Road. In addition, commuter rail is being studied that will run through the Regional Center. (4) The relationship of the site to existing neighborhood and general commercial centers and office and business centers. One of the goals of the Washington Square Regional Center Plan is to preserve existing single-family neighborhoods, to facilitate transition of land uses, and to reinforce a distinctive Regional Center while recognizing and respecting the character of the nearby residential community. Policy 12.2.1 NEW COMMERCIAL ZONES a. PROVIDE FOR COMMERCIAL DEVLEOPMENT BASED ON THE TYPE OF USE, ITS SIZE AND REQUIRED TRADE AREA The new commercial zones will not differ significantly from existing commercial uses in the City plan and code, except for that they will allow a mix of commercial and residential development. b. APPLY ALL APPLICABLE PLAN POLICIES Exhibit C is the attached plan policies that will be added to the City's plan regarding the new Mixed-Use Commercial areas. C. APPLY THE APPROPRIATE LOCATIONAL CRITERIA APPLICABLE TO THE SCALE OF THE PROJECT. STAFF REPORT CPA 19994=2 Page 13 Exhibit C is the attached plan policies that will be added to the City's plan regarding the new Mixed-Use Commercial areas. PROVISION OF ADDITIONAL OR REVISED COMPREHENSIVE PLAN LANGUAGE Certain Comprehensive Plan language will require amendment or additional language to address the proposed Washington Square Regional Center Plan. Exhibit C includes the specific language from the Comprehensive Plan that requires amendment. COMPLIANCE WITH COMMUNITY DEVELOPMENT CODE SECTIONS: Procedures for Decision Making: Legislative: Chapter 18.390.060 establishes procedures for consideration of legislative and quasi-judicial changes to the provisions of the Comprehensive Plan, implementing ordinances and maps. Section 18.30.390(G) lists the factors upon which the Planning Commission and City Council shall base their decisions. The factors and responses are as follows: 18.390.060 TYPE IV PROCEDURE This land use action involves legislative and quasi-judicial amendments therefore, as per Type IV procedures a two hearings one before the Planning Commission and one before the City Council were held. Notice of the hearings was given to property owners within 500 feet, as well as to affected government agencies. G. Decision-Making Considerations: The recommendation by the Commission and the decision by the Council shall be based on the following factors: 1. The Statewide Planning Goals and Guidelines adopted under the Oregon Revised Statutes Chapter 197; These standards are addressed in Section 11 under'Statewide Goals' in this staff report. 2. Any federal or state statutes or regulations found applicable; The State's Transportation Planning Rule is addressed in Section IV under 'Compliance with Federal and State Statutes or Guidelines'. 3. Any applicable METRO regulations; In 1996, the Functional Plan designated the Washington Square Mall and the area around it as a regional center; an area of intense commercial, office, retail, and residential development. Under the 2040 plan, Tigard is required to demonstrate how it can comply with the concepts demonstrated under the 2040 plan. This proposed plan will define how a we can accommodate the expected growth, and prevent the Metzger area from the { necessity of upzoning. Please refer to exhibit C for the Washington Square Regional Center Plan Amendments and Zoning Ordinance. 4. Any applicable comprehensive plan policies; and These standards are addressed under 'Compliance with Plan Policies" in this staff report. 5. Any applicable provisions of the City's implementing ordinances. The implementing ordinances are contained in the Tigard Community Development Code, which are addressed in this section of the staff report. STAFF REPORT CPA 19994002 Page 14 EXHIBITS: EXHIBIT A: Washington Square Development & Redevelopment Opportunities Memorandum EXHIBIT B: Washington Square Regional Center Transportation Plan EXHIBITC: Washington Square Regional Center Comprehensive Plan Amendments and Zoning Ordinance STAFF REPORT CPA 1999-0002 Page 15 AGENDA ITEM O For Agenda of. March 14, 2000 CITY OF TIGARD, OREGON COUNCIL AGENDA ITEM SUMMARY ISSUE/AGENDA TITLE: Amend Le al Descriptions for the 15 Island Areas Previ sly Annexed PREPARED BY: Julia Powell Hajduk DEPT HEAD OK u ITY AD IN OK ISSUE BEFORE THE COUNCIL Should the City Council adopt an. ordinance amending the legal descriptions for the Walnut Island areas previously annexed to reflect the corrections approved by the Department of Revenue? STAFF RECOMMENDATION Adopt the attached ordinance amending the legal descriptions for the Walnut Island areas previously annexed to reflect the corrections approved by the Department of Revenue. INFORMATION SUMMARY The Walnut Island Annexations were processed correctly in accordance with the City, Metro and State requirements. The public hearing notices and information provided at the hearing accurately reflected the areas to be annexed. It has come to the City's attention, however, that the legal descriptions attached to the ordinances have some errors that need to be corrected. As part of the processing of the Walnut Island annexations, the City forwarded a copy of the legal descriptions to the Department of Revenue for pre-approval. The legal descriptions originally sent were not approved because some technical corrections were needed. City staff made these changes and forwarded the legal descriptions to the Department of Revenue a second time, this time obtaining pre-approval of the corrected legal descriptions. Inadvertently, the legal descriptions included as exhibits to the ordinance adopted by the City Council were not replaced with the approved legal descriptions. Pre-approval is recommended, but not required. By obtaining pre- approval, a city is assured that they will not have to go back to correct a legal description if disapproved. As long as the annexation is approved by a city prior to March 31", they have until July IS` to fix mistakes in the legal descriptions. While we attempted to avoid having to come back to correct the legal descriptions, it is not uncommon for cities to have to correct errors and it is, in fact, accounted for in the Department of Revenue review process. Given that the errors were clerical in nature (we did not describe the wrong property, we just did not describe the i property correctly for the purposes of legal review) staff contacted the Department of Revenue and the City Attorney for advice on how to proceed to correct the legal descriptions. Based on the advice obtained, staff has prepared a new ordinance amending the previous ordinances to replace the legal descriptions with the corrected previously approved ordinances. By adopting the ordinance as an emergency, the ordinance will become effective immediately and there will be no delay in the effective date of the annexations. By holding the hearing on 3/14/00 Council meeting i:\curpln\julia\annex\Wainut\legal description corrcctionAlS.doc Julia P.H. I-Mar-00 February 8', this allowed ample time for the unexpected to be addressed prior to the March 3 V deadline and there should be no delays as a result of this oversight. Attachments: Ordinance Exhibits A-O OTHER ALTERNATIVES CONSIDERED Take no action at this time. FISCAL NOTES There is no fiscal impact because the properties have already been annexed and the processing fee has already been paid. 3/14/00 Council meeting is\curpln\julia\annex\Walnut\legal description corrcctionA]S.doc Julia P.H. 1-Mar-00 ~P,. , 3 ~alvv MEMORANDUM TO: Local Contract Review Board FROM: John Roy RE: Contract ward to Consulting Engineering Services DATE: March 13, 2000 As you may recall the bid award for wetland design and construction at Cook Park appeared before the Board on December 14, 1999. Through the Council Agenda Item Summary, staff sought authorization from the Board to negotiate a final dollar amount (dollar amount proposed was $10,472.00) with Consulting Engineering Services once the scope of services had been specifically identified. The original RFP identified the scope of services as; including the components of information compilation and review, project design including grading and erosion control plan, wetland planting and maintenance plan, preparation of bid documents and assistance with bid award. My original intent was to omit the irrigation design and construction assistance on this proposal. Within a few days after the Local Contract Review Board authorized negotiating with CES, staff was made aware of the new requirements that would soon be implemented by USA and Metro, commonly known as Title III. The Title III rules were to go into effect February 4, 2000 and would have a serious impact on the Cook Park Master Expansion Plan. The new rules would increase buffer width requirements and impact design of parking lots, paths, and structures within the floodplain. After meeting with Planning staff and discussing the options with Ed Wegner, it was decided that for expediency purposes, to meet the February 3Id deadline for land use approval and fall under the old rules, we would expand the scope of services for CES to include the necessary work for submitting the application. The fee for the land use approval was $19,555.00. Additionally, after having further discussions with Tony Weller of CES, it was necessary to add an irrigation service plan and construction assistance to the scope of services. The irrigation plan is unique in that it calls for utilizing recycled water from the USA Treatment Plant at Durham for augmenting the summer flows into the wetland ponds and for irrigating the sports fields. This work was not identified in the scope of services nor was it offered as part of CES original proposal. It was also deemed necessary that some construction assistance time would be required to ensure that the contractor performed the work according to the construction documents. These items are identified on the attached documents as Phase 3 and Phase 4 for a total dollar amount of $13,816.00. The final dollar amount is a top end approximation and may be less dependant upon actual time utilized. (AL ok I would like to add that CES met the February 3 d, 2000 application deadline although they had only about 3 weeks to prepare the application. The land use approval application will appear before the Land Use Hearings Officer on April 10 h, 2000. PURCHASE REQUISITION CITY OF TIGARD 13125 SW Hall Blvd. Date: February 24, 2000 Tigard, Oregon 97223 From: K. Kaatz (503) 639-4171 Fax (503) 639-6795 Dept: Public Works TO: Consulting Engineering Services Inc. 15256 NW Greenbrier Parkway Beaverton. OR 97006 Phone: 690-6600 Fax: 690-2595 Federal ID No.: (For services only) DELIVER TO: ❑ 13125 SW HALL BLVD ❑ 3720 SW BURNHAM STREET ❑ 12800 SW ASH STREET ❑ 8777 SW BURNHAM STREET Vendor Item Dept/Account Unit Extended Qty No. Description No. Price Price Engineering services for Cook Park Plan 52-6400-7540.022 44,243.00 as described in the attached scope of services Phase I - Wetland Mitigation Grading & Planting $10,472 New Phase II - Land Use Approval $19,555 New Phase III - Irrigation service Plan $5,888 New Phase IV - Construction Assistance $8,328 : I S&H i 1 TOTAL 44,243.00 APPROPRIATION BALANCE: AS OF: PURCHASING AGENT: APPROVALS: (IF UNDER $50) DEPARTMENT DESIGNEE: (IF UNDER $2500) DEPARTMENT DESIGNEE: (IF UNDER $7500) DEPARTMENT HEAD/DESIGNEE: (IF UNDER $25000) CITY MANAGER: (IF OVER $25000) LOCAL CONTRACT REVIEW BOARD: G C R 6 CAPITAL EXPENDITURES NOT BUDGETED: (IF UNDER $2500) DIRE OR OF FINANCE: (IF OVER $2500) CITY MANAGER: 061y W i de',pu,chreq.dot 11 Rim. 1~ 5/13/C 15: M LAST-AA-1 LNU tip ► bdgtk$g42 NU. n.5e Irl PROJECTED HOURS PER TASK PER EMPLOYEE C"aSIFICATION Ph"a 1 a Flared M419s&n Gradlnrg and POanOng Plan 1. Pn4ect Orientation beefing w/Chy Peir-ipal: Tory Teller. P.E., 2 hours @ $112 = $ 224 Wetland Sdenftt RIM Mrw , P.W.S., 2 hours 0 $60 = $ 120 i ar&cape Architect: Eileen Obanrnllai, L.A. 2 hours a $68 = $ 136 Subtoftl 480 2. Site Reconnaissance On-Site Review Of DSL/Army Corps Permit, Existing Data Prodded By City Principal: Tony Weller, P.F. 2 hour @ $112 = $ 224 wetlaw Scientist R4a mroczek, P.L.S., 2 hour Coo $60 = $ 124 Lends spe ArcNbect: Effeen Obsrmiller, L.A. 2 hour 0 $68 = $ 136 Ore-Site Review of Topographic Sumay Map Provided by 0ty Survey tit of 2 2 lours 0 $4 N = $ 200 684 SubtaW S. Preliminary Design - Gracing 8 WaVand Planting PrIno"l: Toro, Weller, P.E., 4 hours @ $112 = $ 448 Wetland Sc enftct: Rita Mrawk k, P.W_S., 4 ha:re 0 $60 = $ 244 tare pe RMhiteM Ei1w, Obarrnill$r, L.A. 40 halm @ $6$ -42,720 Tscl~►►ilaiOCAD Operator - 40 hours 0 42.240 low $5 W 4. Final Design - Qradlna & Wetland Planting $112 = 4¢8 Prlnclpel. Tong Weller, P. E., tu9urs Wetia.- Scientist Rim Mroczek, P.M.S., 4 hors 0 $00 = $ 240 Landscape Architect Eileen (berm tsr, L.A. 24 hours 0 = $1,632 Techn11caV-1- t1 Operator 24 twu1 s @ = $1,344 Sabloul O ! tP ! lYm t T~t~+ST+.Tft!lltCtTITTT tt}TC+.+sTM.'T++tTSf+f....TfIK~T++TKfK+.TTTeeTi TTf T+T !'j COMM 9WIMRMft1 GERVICK 1NC. h.3/13/GK 1t~:M C:1.1NbULI LNU kztti i bb4tRi4W fVJ.34d IJbi SIB 2 - t AOi VAI 9. AppllcaWn Pre tIon a.. Aftend Pro-appOcation mmdIng wfClty St'affr b. Pr re mid aid n elgh"ood meeting. c. Update Master Plan based an actual t"rs raphic survey mid Master Plant tinges recently kicorporafed by !r#Yy: d. Repare aeon narrative. e. Prepare preliminary ergineadng drawings for site plan, gracOnag plan and uti{ity plan. f. Prepare prellminmy drainage report for stormwater quality and review grading impacts for 1 "ear floodplaln. Prindpal: Tony Wallar, P.E., 32 tours 0 $112 = $3,584 $ergor Planner. Kirstan VanLoo, 10 burs 0 $68 = $ 680 Landscape Arch./Plarmer. P. Obsrmiller, L.A. 100 hours @ $68 = $6,800 Pmect Qeel r 72 hours 0 = $4,:896 TecW.ftl/CAG operator 8 hours a $56 = $ 448 subtotal $16*4ft 2. ApplicationNafling Expenses a. Qlaitai Aerial into ($148)- p. Postage a F-llvelopes for Neigh- Mtg- ($91) G. Prirttlr g, of appllaaW rllQfts% ($212). Stbtcttat $ 451 3. H arine Prosentaflan s. Prop qon far hearim.)s o#f w presentation. b. Hearing presentation before hearings atfioar. Principal- Tony Weller, P.E., 8 hours 0 $112 a $ 886 SeMor Plmm! er: Wraten VanUm:o, 1a t cum @ $68 _ $ No tanysw.pe Ar& ?lanne : E. Qbe:rniller, L.A. 8 tuna @ $Y8 = $ 544 VVatlaW Warttlst: RA NROOasl<, P.W.S.. 4 hmrs a = $ 240 Tee-IniiicalYi.AcD. Operator 6 tue 0 $56 = $ 3W Suubyt~ojtall...... •..-$2,696 F••-•<.••...earn:-~ee~es~e~:r•eeee.e•r•exe.r.ermrrseeereeeexrr:..se.ur=veer:r fa. H a CbPRSULi M EN[iA}1- WQ MERV=. Im. 0,3/ 13/ 15: k~ l.U16L -1 l N a ENLi + b848841d r4j• toz! 1704 ph.9 - irrigation S" we P/M 1. Preliminary Design Irrigation Service Principal: Tony Weller, P.E., 4 hours 0 $112 = $ 448 Weiland Sclen#st: F03a Mroczak, P.W.S., 4 hours @ = $ 240 pto Designer 40 hours @ $69 x,720 On-Site VeAflcOon at eAsling irriggaW line location Survay team of 2 4 hours 0 $100 = $ 400 Sul l,.=,=,.,, $ 3,808 2. Final Design - lrrlgatlon Service Principal: Tony Weller, P.E., 4 hours 0 $112 = $ 448 Pralect Dedgrw 24 hcwrs 0 $68 = $1,8.32 SUMM! $2,060 TOM Mal" leer=-ee:err~e:r:en:=:........rmar••rrr'-•~*'-"<~et'<Bret:xrr+e~:••-•rer.••r+rt~~£+P~ Ph4se 4 - Come pruation Ass0fance 1. Allowance for on-call construction assistance services as requested by City of Tigard. Prinriipa1- TmgY WAI1Ar, P, IF,, 32 hours Q $112 = $13j684 Watland &Ientist• Rita Mromek, P.W.S., 32 hhom 0 $_A0 = $1,824 Lwndsaap A~t11 Ei1-.- q 0bavr:11 1 t or, L. A, 1E jh_- 0 1101, . = $1,0 N S6ftrw $ 6,.M, a 2 2. Grassing Verification. Principal: Ton's Weller, P.E,, 4 hours ® $112 = $ 448 MUM g fist' Me- Mrouek, A W.S., 4 ~-_um 0 %,0 = $ 240 St.-4 Vi C rew el .S'f. L&EaCd! PROJEC'!. TOTAL ....=..rr........... .:.=r=.,==___ 1 -I r.~asulnwo ENJ~tNEEA1NU eo=R1Re69, RAC. AGENDA ITEM # 4 FOR AGENDA OF 14 Dec 1999 CITY OF TIGARD, OREGON COUNCIL AGENDA ITEM SUMMARY ISSUE/AGENDA TITLE Shall Council award the contract for the engineering design services for the Cook Park Wetland Mitigation Project to Consultin Engineering Services. PREPARED BY: John Roy --td-DEPT HEAD,OK Ed Wegner CITY MGR OK LA/ 10 -u i ISSUE BEFORE THE COUNCIL Shall Council award the engineering design contract to Consulting Engineering Services for the Cook Park Wetland Mitigation Project, that is required to mitigate land developed as a part of the Cook Park Master Plan Expansion. STAFF RECOMMENDATION Staff recommends that Council award the contract to Consulting Engineering Services. INFORMATION SUMMARY Staff advertised for Request For Proposals for the Cook Park Wetland Mitig~.tion Project on October 23,1999. For the purpose of the proposal, the City requested submittal of an estimated project budget with final engineering costs to be negotiated between the City and the selected consultant. Five proposals were submitted with estimated project budgets from the following firms: Greenworks PC $29,941.00 Water Resource Management $24,945.00 The IT Group $18,278.00 Abiqua Engineering $14,695.00 ,U Consulting Engineering Services $10,472.0Q ~ On 8 December 1999, interviews were held with Consulting Engineering Services, the IT Group, and Abiqua Engineering. john R(,y, ri-operty Manager, and Van.-tie Nguyen, Engineering Maaagcr ::onduat d interviews. It was the consensus of the interviewers that Consulting Engineering Services should be selected for this project based upon the qualifications, experience, and resources of the team they have enlisted for this project. Hydraulic design will be a major component of this project and Consulting Engineering Services have placed a licensed Civil Engineer, who appears to have extensive hydraulic design experience as the project manager. Other members of their team include a licensed Landscape Architect and a Wetland Scientist. The fin r amount of the contract will be determined after the topographic survey has been verified,. recycled-wafer -juantity and-oressure are identified by Unified Scwera~e Agency, and all elements of the scope of work have been established with staff: - - OTHER ALTERNATIVES CONSIDERED Reject staffs recommendation. Award bid to one of the other proposers. Re-advertise for proposals. VISION TASK FORCE GOAL AND ACTION COMMITTEE STRATEGY This project is an on going effort by the City to improve livability by enhancing opportunities for citizens to recreate in our Parks. The wetlands created by this project will provide wildlife habitat, which will in turn provide opportunities for wildlife viewing by the public, particularly migratory waterfowl. FISCAL NOTES The 1999/2000 FY budget identifies $245,000.00 as being allocated for the Cook Park Master Plan Expansion activities. To date this fiscal year approximately $64,573.50 has been spent out of this fund. Ocitywid6sum dot i a i i 1y~ M 1 CITY OF TIGARD, OREGON CONTRACT FOR ENGINEERING SERVICES THIS AGREEMENT, made and entered into this 28th day of February, 2000, by and between the City of Tigard, a municipal corporation, hereinafter referred to as the "City," and Consulting Engineering Services, Inc., whose authorized representative is Tony Weller, and having a principal being a registered engineer of the State of Oregon, hereinafter referred to as the "Engineer." WITNESSETH: WHEREAS, the engineering services for Cook Park Wetland Mitigation WHEREAS, the accomplishment of the work and services described in this Agreement is necessary and essential to the public works improvement program of the City; and WHEREAS, the City desires to engage the Engineer to render professional engineering services for the project described in this Agreement, and the Engineer is willing and qualified to perform such services. IN CONSIDERATION of the promises and covenants contained herein, the parties hereby agree as follows: 1. Engineer's Scope of Services The Engineer shall perform professional engineering services relevant to the Project in accordance with the terms and conditions set forth herein, and as provided in Exhibit I, which is attached hereto and by this reference made a part of this Agreement. 2. Engineer's Fee A. Basic Fee. (1.) As compensation for Basic Services as described in Exhibit I of this Agreement, and for services required in the fulfillment of Paragraph 1, the Engineer shall be paid on an hourly rate based upon the "Schedule of Rates" in Exhibit 1 of this agreement, which shall constitute full and complete payment for said services and all expenditures which may be made and expenses incurred, except as otherwise expressly provided in this Agreement. The Basic Fee shall not exceed the amount of Forty-Four thousand, twohundred and forty-three dollars ($44,243.00) without prior written authorization. (2.) The parties hereto do expressly agree that the Basic Fee is based upon the Scope of Services to be provided by the Engineer and is not necessarily related to the estimated construction cost of the Project. In the event that the actual construction cost differs from the estimated construction cost, the Engineer's compensation will not be adjusted unless the Scope of Services to be provided by the Engineer changes and is authorized and accepted by the City. CONTRACT FOR ENGINEERING SERVICES Page 1 NMI MIMMI B. Payment Schedule for Basic Fee. Payments shall be made upon receipt of billings based on the work completed. Billings shall be submitted by the consultant periodically, but not more frequently than monthly. Payment by the City shall release the City from any further obligation for payment to the engineer for service or services performed or expenses incurred as of the date of the statement of services. Payment shall be made only for work actually completed as of the date of invoice. Payment shall not be considered acceptance or approval of any work or waiver of any defects therein. C. Payment for Special Services. Only when directed in writing by the City, the Engineer shall furnish or acquire for the City the professional and technical services based on the hourly rate schedule as described in Exhibit I of this contract for minor project additions and/or alterations. D. Certified Cost Records. The Engineer shall furnish certified cost records for all billings pertaining to other than lump sum fees to substantiate all charges. For such purposes, the books of account of the Engineer shall be subject to audit by the City. The Engineer shall complete work and cost records for all billings on such forms and in such manner as will be satisfactory to the City. E. Contract Identification The Engineer shall furnish to the City its employer identification number, as designated by the Internal Revenue Service, or Social Security Number, as the City deems applicable. F. Payment - General (1.) Engineer shall pay to the Department of Revenue all sums withheld from employees pursuant to ORS 316.167. (2.) Engineer shall pay employees at least time and a half pay for all overtime worked in excess of 40 hours in any one week except for individuals under the contract who are excluded under ORS 653.010 to 653.261 or under 29 USC sections 201 to 209 from receiving overtime. (3.) Engineer shall promptly, as due, make payment to any person, co- partnership, association or corporation, furnishing medical, surgical and hospital care or other needed care and attention incident to sickness or injury to the employees of Engineer or all sums which Engineer agrees to pay for such services and all moneys and sums which Engineer collected or deducted from the wages of employees pursuant to any law, contract or agreement for the purpose of providing or paying for such service. (4.) The City certifies that sufficient funds are available and authorized for expenditure to finance costs of this contract. CONTRACT FOR ENGINEERING SERVICES Page 2 3. Ownership of Plans and Documents: Records A. The field notes, design notes, and original drawings of the construction plans, as instruments of service, are and shall remain, the property of City. B. The City shall make copies, for the use of and without cost to the Engineer, of all of its maps, records, laboratory tests, or other data pertinent to the work to be performed by the Engineer pursuant to this Agreement, and also make available any other maps, records, or other materials available to the City from any other public agency or body. C. The Engineer shall furnish to the City, copies of all maps, records, field notes, and soil tests which were developed in the course of work for the City and for which compensation has been received by the Engineer at no additional expense to the City except as provided elsewhere in this Agreement. 4. Engineer is Independent Contractor A. Engineer's services shall be provided under the general supervision of City's project director or his/her designee, but Engineer shall be an independent contractor for all purposes and shall be entitled to no compensation other than the compensation provided for under Section 3 of this Agreement. B. In the event Engineer is to perform the services described in this Agreement without the assistance of others, Engineer hereby agrees to file a joint declaration with City to the effect that Engineer's services are those of an independent contractor, as provided under Chapter 864 Oregon Laws 1979. C. Engineer acknowledges that for all purposes related to this agreement, Engineer is and shall be deemed to be an independent contractor and not an employee of City, shall not be entitled to benefits of any kind to which an employee of the City is entitled and shall be solely responsible for all payments and taxes required by law. Furthermore, in the event that Engineer is found by a court of law or an administrative agency to be an employee of the City for any purpose, City shall be entitled to offset compensation due, or to demand repayment of any amounts paid to Engineer under the terms of the agreement, to the full extent of any benefits or other remuneration Engineer receives (from City or third party) as a result of said finding and to the full extent of any payments that City is required to make (to Engineer or to a third party) as a result of said finding. D. The undersigned Engineer hereby represents that no employee of the City or any partnership or corporation in which a City employee has an interest, has or will receive any remuneration of any description from the Engineer, either directly or indirectly, in connection with the letting or performance of this Agreement, except as specifically declared in writing. CONTRACT FOR ENGINEERING SERVICES Page 3 M 11111JR1111111 I ~MWJ E. If this payment is to be charged against Federal funds, Engineer certifies that he/she is not currently employed by the Federal Government and the amount charged does not exceed his/her normal charge for the type of service provided. F. Engineer and its employees, if any, are not active members of the Oregon Public Employees Retirement System and are not employed for a total of 600 hours or more in the caiendar year by any public employer participating in the Retirement System. G. Engineer certifies that it currently has a City of Tigard business license or will obtain one prior to delivering services under this Agreement. H. Engineer is not an officer, employee, or agent of the City of Tigard as those terms are used in ORS 30.265. 5. Indemnity The City has relied upon the professional ability and training of the Engineer as a material inducement to enter into this Agreement. Engineer warrants that all its work will be performed in accordance with generally accepted professional practices and standards as well as the requirements of applicable federal, state and local laws, it being understood that acceptance of an Engineer's work by the City shall not operate as a waiver or release. Engineer agrees to indemnify and defend the City, its offers, agents and employees and hold them harmless from any and all liability, causes of action, claims, losses, damages, judgments or other costs or expenses including attorney's fees and witness costs and (at both trial and appeal level, whether or not a trail or appeal ever takes place) that may be asserted by any person or entity which in any way arise from, during or in connection with the performance of the work described in this contract, except liability arising out of the sole negligence of the City and its employees. Such indemnification shall also cover claims brought against the City under state or federal worker's compensation laws. If any aspect of this indemnity shall be found to be illegal or invalid for any reason whatsoever, such illegality or invalidity shall not affect the validity of the remainder of this indemnification. 6. Insurance Engineer and its subcontractors shall maintain insurance acceptable to City in full force and effect throughout the term of this contract. Such insurance shall cover all risks arising directly or indirectly out of Engineer's activities or work hereunder, including the operations of its subcontractors of any tier. Such insurance shall include provisions that such insurance is primary insurance with respect to the interests of City and that any other insurance maintained by City is excess and not contributory insurance with the insurance required hereunder. The policy or policies of insurance maintained by the Engineer and its subcontractor shall provide at least the following limits and coverages: A. Commercial General Liability Insurance Engineer shall obtain, at Engineer's expense, and keep in effect during the term of this contract, Comprehensive General Liability Insurance covering Bodily Injury and Property Damage on an "occurrence" form (1986 ISO or equivalent). This coverage CONTRACT FOR ENGINEERING SERVICES Page 4 shall include Contractual Liability insurance for the indemnity provided under this contract. The following insurance wilt be carried: Coverage Limit General Aggregate 2,000,000 Products-Completed Operations Aggregate 1,000,000 Personal & Advertising Injury 1,000,000 Each Occurrence 1,000,000 Fire Damage (Any one fire) 50,000 Medical Expense (Any one person) 5,000 B. Commercial Automobile Insurance Engineer shall also obtain, at engineer's expense, and keep in effect during the term of the contract, "Symbol 1" Commercial Automobile Liability coverage including coverage for all owned, hired, and non-owned vehicles. The Combined Single Limit per occurrence shall not be less than $1,000,000. C. Workers' Compensation Insurance The Engineer, its subcontractors, if any, and all employers providing work, labor or materials under this Contract are subject employers under the Oregon Workers' Compensation Law and shall comply with ORS 656.017, which requires them to provide workers' compensation coverage that satisfies Oregon law for all their subject workers. Out-of-state employers must provide Oregon workers' compensation coverage for their workers who work at a single location within Oregon for more than 30 days in a calendar year. Engineers who perform work without the assistance or labor of any employee need not to obtain such coverage. This shall include Employer's Liability Insurance with coverage limits of not less than $100,000 each accident. D. Additional Insured Provision The City of Tigard, Oregon, its officers, directors, and employees'shall be added as additional insureds with respect to this contract. All liability insurance policies will be endorsed to show this additional coverage. E. Notice of Cancellation There shall be no cancellation, material change, exhaustion of aggregate limits or intent not to renew insurance coverage without 30 days written notice to the City. Any failure to comply with this provision will not affect the insurance coverage provided to the City. The 30 days notice of cancellation provision shall be physically endorsed on to the policy. 7 a F. Insurance Carrier Rating Coverages provided by the Engineer must be underwritten by an insurance company deemed acceptable by the City. The City reserves the right to reject all or any insurance carrier(s) with an unacceptable financial rating. CONTRACT FOR ENGINEERING SERVICES Page 5 asn's RENEW G. Certificates of Insurance As evidence of the insurance coverage required by the contract, the contractor shall furnish a Certificate of Insurance to the City. No contract shall be effected until the required certificates have been received and approved by the City. The certificate will specify and document all provisions within this contract. A renewal certificate will be sent to the address below ten days prior to coverage expiration. H. Independent Contractor Status The service or services to be rendered under this contract are those of an independent contractor. Engineer is not an officer, employee or agent of the City as those terms are used in ORS 30.265. 1. Primary Coverage Clarification All parties to this contract hereby agree that the Engineer's coverage will be primary in the event of a loss. J. Cross-Liability Clause A cross-liability clause or separation of insureds clause will be included in all general liability, professional liability, pollution and errors and omissions policies required by this contract. Engineer's insurance policy shall contain provisions that such policies shall not be canceled or their limits of liability reduced without 30 days prior notice to City. A copy of each insurance policy, certified as a true copy by an authorized representative of the issuing insurance company, or at the discretion of City, in lieu thereof, a certificate in form satisfactory to City certifying to the issuance of such insurance shall be forwarded to: John Roy, Property Manager 13125 SW Hall Blvd. Tigard, Oregon 97223 Such policies or certificates must be delivered prior to commencement of the work. Thirty days cancellation notice shall be provided City by certified mail to the name at the address listed above in event of cancellation or non-renewal of the insurance. The procuring of such required insurance shall not be construed to limit contractor's liability hereunder. Notwithstanding said insurance, Engineer shall be obligated for the total amount of any damage, injury, or loss caused by negligence or neglect connected with this contract. 7. Termination Without Cause: At any time and without cause, City shall have the right in its sole discretion, to terminate this Agreement by giving notice to Engineer. If City terminates the contract pursuant to this paragraph, it shall pay Engineer for services rendered to the date of termination. CONTRACT FOR ENGINEERING SERVICES Pag 6 e 8. Termination With Cause: A. City may terminate this Agreement effective upon delivery of written notice to Engineer, or at such later date as may be established by City, under any of the following conditions: (1.) If City funding from federal, state, local, or other sources is not obtained and continued at levels sufficient to allow for the purchase of the indicated quantity of services. This Agreement may be modified to accommodate a reduction in funds (2.) If Federal or State regulations or guidelines are modified, changed, or interpreted in such a way that the services are no longer allowable or appropriate for purchase under this Agreement. (3.) If any license or certificate required by law or regulation to be held by Engineer, its subcontractors, agents, and employees to provide the services required by this Agreement is for any reason denied, revoked, or not renewed. (4.) If Engineer becomes insolvent, if voluntary or involuntary petition in bankruptcy is filed by or against Engineer, if a receiver or trustee is appointed for Engineer, or if there is an assignment for the benefit of creditors of Engineer. Any such termination of this agreement under paragraph (a) shall be without prejudice to any obligations or liabilities of either party already accrued prior to such termination. B. City, by written notice of default (including breach of contract) to Engineer, may terminate the whole or any part of this Agreement: (1.) If Engineer fails to provide services called for by this agreement within the time specified herein or any extension thereof, or (2.) If Engineer fails to perform any of the other provisions of this Agreement, or so fails to pursue the work as to endanger performance of this agreement in accordance with its terms, and after receipt of written notice from City, fails to correct such failures within ten days or such other period as City rnay authorize. (3.) if Engineer fails to eliminate a conflict as described in Section 12 of this agreement. The rights and remedies of City provided in the above clause related to defaults (including breach of contract) by Engineer shall not be exclusive and are in addition to any other rights and remedies provided by law or under this Agreement. If City terminates this Agreement under paragraph (B), Engineer shall be entitled to receive as full payment for all services satisfactorily rendered and expenses incurred, an amount which bears the same ratio to the total fees specified in this Agreement as the services satisfactorily rendered by Engineer bear to the total CONTRACT FOR ENGINEERING SERVICES page 7 1110110 1 services otherwise required to be performed for such total fee; provided, that there shall be deducted from such amount the amount of damages, if any, sustained by City due to breach of contract by Engineer. Damages'for breach of contract shall be those allowed by Oregon law, reasonable and necessary attorney fees, and other costs of litigation at trial and upon appeal. 9. Non-Waiver: The failure of City to insist upon or enforce strict performance by Engineer of any of the terms of this Agreement or to exercise any rights hereunder, should not be construed as a waiver or relinquishment to any extent of its rights to assert or rely upon such terms or rights on any future occasion. 10. Method And Place Of Giving Notice, Submitting Bills And Making Payments. All notices, bills and payments shall be made in writing and may be given by personal delivery or by mail. Notices, bills and payments sent by mail should be addressed as follows: CITY OF TIGARD John Roy, Property Manager 13125 SW Hall Blvd. Tigard, Oregon 97223 CONTRACTOR Consulting Engineering Services 15256 SW Greenbrier Parkway Beaverton, OR 97006 and when so addressed, shall be deemed given upon deposit in the United States mail, postage prepaid. In all other instances, notices, bills and payments shall be deemed given at the time of actual delivery. Changes may be made in the names and addresses of the person to whom notices, bills and payments are to be given by giving written notice pursuant to this paragraph. 11. Merger: This writing is intended both as a final expression of the Agreement between the parties with respect to the included terms and as a complete and exclusive statement of the terms of the Agreement. No modification of this Agreement shall be effective unless and until it is made in writing and signed by both parties. i i _ 12. Professional Services: The City requires that services provided pursuant to this agreement shall be provided to the City by a Engineer which does not represent clients on matters contrary to City interests. Further, Engineer shall not engage services of an attorney and/or other professional who individually, or through members of his/her same firm, represents clients on matters contrary to City interests. CONTRACT FOR ENGINEERING SERVICES 'Page 8 Should the Engineer represent clients on matters contrary to City interests or engage the services on an attorney and/or other professional who individually, or through members of his/her same firm, represents clients on matters contrary to City interests, Engineer shall consult with the appropriate City representative regarding the conflict. After such consultation, the Engineer shall have ten days to eliminate the conflict to the satisfaction of the City If such conflict is not eliminated within the specified time period, the agreement may be terminated pursuant to Section 8 (B - 3) of this agreement. 13. Force Majeure: Neither City nor Engineer shall be considered in default because of any delays in completion and responsibilities hereunder due to causes beyond the control and without fault or negligence on the part of the parties so disenabled, including but not restricted to, an act of God or of a public enemy, civil unrest, volcano, earthquake, fire, flood, epidemic, quarantine restriction, area-wide strike, freight embargo, unusually severe weather or delay of subcontractor or supplies due to such cause; provided that the parties so disenabled shall within ten days from the beginning of such delay, notify the other party in writing of the cause of delay and its probable extent. Such notification shall not be the basis for a claim for additional compensation. Each party shall, however, make all reasonable efforts to remove or eliminate such a cause of delay or default and shall, upon cessation of the cause, diligently pursue performance of its obligation under the Agreement. 14. Non-Discrimination: Engineer agrees to comply with all applicable requirements of federal and state civil rights and rehabilitation statues, rules, and regulations. Engineer also shall comply with the Americans with Disabilities Act of 1990, ORS 659.425, and all regulations and administrative rules established pursuant to those laws. 15. Errors: Engineer shall perform such additional work as may be necessary to correct errors in the work required under this Agreement without undue delays and without additional cost. I 16. Extra (Changes) Work: i Only the Property Manager or Public Works Director may authorize extra (and/or changes) work. Failure of Engineer to secure authorization for extra work shall i constitute a waiver of all right to adjustment in the contract price or contract time due to such unauthorized extra work and Engineer thereafter shall be entitled to no compensation whatsoever for the performance of such work. a 17. Governing Law: The provisions of this Agreement shall be construed in accordance with the provisions of the laws of the State of Oregon. Any action or suits involving any question arising under this Agreement must be brought in the appropriate court of the State of Oregon. CONTRACT FOR ENGINEERING SERVICES Page 9 ANSI 1111 F= lllilli[IMI'llimil 18. Compliance With Applicable Law. Engineer shall comply with all federal, state, and local laws and ordinances applicable to the work under this Agreement, including those set forth in ORS 279.310 to 279.320. 19. Conflict Between Terms: It is further expressly agreed by and between the parties hereto that should there be any conflict between the terms of this instrument in the proposal of the contract, this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. 20. Audit: Engineer shall maintain records to assure conformance with the terms and conditions of this Agreement, and to assure adequate performance and accurate expenditures within the contract period. Engineer agrees to permit City, the State of Oregon, the federal government, or their duly authorized representatives to audit all records pertaining to this Agreement to assure the accurate expenditure of funds. 21. Severability: In the event any provision or portion of this Agreement is held to be unenforceable or invalid by any court of competent jurisdiction, the remainder of this Agreement shall remain in full force and effect and shall in no way be affected or invalidated thereby. 22. Complete Agreement: This Agreement and attached exhibits constitutes the entire Agreement between the parties. No waiver, consent, modification, or change of terms of this Agreement shall bind either party unless in writing and signed by both parties. Such waiver, consent, modification, or change if made, shall be effective only in specific instances and for the specific purpose given. There are no understandings, agreements, or representations, oral or written, not specified herein regarding this Agreement. Engineer, by the signature of its authorized representative, hereby acknowledges that he has read this Agreement, understands.it and agrees to be bound by its terms.and conditions. i i i i CONTRACT FOR ENGINEERING SERVICES Page 10 , T IN WITNESS WHEREOF, City has caused this Agreement to be executed by its duly authorized undersigned officer and Engineer has executed this Agreement on the date hereinabove first written. CITY OF TIGARD By: Bill Monahan, City Manager Date: ENGIN ER By: Anthony R. eller, Vice President Consulting Engineering Services, Inc. An Aonq P. Weiler / Print Name Date: s/ j? /aD OcityM detcont•es. dot CONTRACT FOR ENGINEERING SERVICES Page 11 EXHIBIT I Duty of Engineer A. Basic Services: The Engineer shall render professional engineering services as described in the attached proposal dated February 22, 2000, titled "Scope of Work - Cook Park CONTRACT FOR ENGINEERING SERVICES Page 12