Loading...
Resolution No. 99-28 CITY OF TIGARD,OREGON R SOLUTION NO.99-0S A RESOLUTION DELAYR\TG ESTABLISHING BUILDING, PLUMBING, MECHANICAL AND ELECTRICAL PERMITS AND RELATED FEES WHEREAS,building regulatory services are solely fee supported;and WHEREAS, Subsection(c)ul Section 14.04.040 and subsection(g) of Section 14.04.065 of Title 14 of Tigard Municipal Code indicates that fees for the building code program administration shall be established by resolution of the City Council;and WHEREAS, Section 3.32 of the Tigard Municipal Code grants the City Council the authority to set rates for fees and charges by resolution;and WHEREAS,Tigard must assess those fees necessary to recover costs associated with the building code ® administration program;and WHEREAS,the Tigard City Council reviewed a cost analysis of building code administration activities on January 19,1999 and February 23,1999;and WHEREAS,the Tigard City Council held a public hearing on March 9, 1999,and moved that staff return to the next regularly scheduled meeting with a resolution setting building fees;and WHEREAS, the Tigard City Council directed that a study on these fees determining overhead costs associated with the building administration program be completed before future consideration of building fee increases;and WHEREAS,the study on these fees will be completed within the next year;and WHEREAS,the Tigard City Council directed that the study be completed prior to future consideration of building fees evaluating all non-building code related functions performed by the building division; WHEREAS, the Horne Builders Association of Metropolitan Portland appealed Tigard's recently adopted building, mechanical, and plurnbing permit fees that were adopted by Council on March 9, 1999. WHEREAS,On April 19, 1999,the Hearing Officer for the Building Code Division of the Oregon Department of Consumer and Business Services conducted a hearing on the proposed fees. N WHEREAS,tie ORS requires that the hearing must be convened and decision rendered within 60 days of receipt of an appeal and the Director of the Building Codes Division will issue a decision on or before May 27,1999. a NOW,THEREFORE,BE IT RESOLVED by the Tigard City Council that fees for services provided under the building code administration program shall be as follows: RESOLUTION NO. 99-Qg a nyc a Effective June 1,1999: Plumbing Fees: Description: Fee: New Single-Family: 1 Bath $178.00 2 Bath 250.00 3 Bath 285.00 FIXTURES (individual) Sink 11.50 Lavatory 11.50 Tub or Tub/Shower Comb. 11.50 Shower Only 11.50 Water Closet 11.50 Dishwasher 11.50 Garbage Disposal 11.50 Washing Machine EE�1 1.50 o Floor Drain/Fluor Sink 2" 1 1.50 t-5n i 4" 11.50 Water Heater 11.50 Laundry Room Tray 11.50 Urinai 11.50 Other Fixtures 15.00 . Sewer-1 st 100' 38.00 Sewer-each additional 100' 32.00 Water Service-1st 100' 38.00 Water Service-each additional 200' 32.00 Storm&Rain Drain-1st 100' 38.00 Storm&Rain Drain-each additional 100' 32.00 Mobile Home Space 32.00 Commercial Backflow Prevention Device or Anti-Pollution Device 32.00 Residential Backflow Prevention Device 19.00 Any Trap or Waste Not Connected to a Fixture 11.50 Catch Basin 11.50 Insp.of Existing Plumbing 50.00/hr Specially Requested Inspections 50.00/hr Rain Drain,single family dwelling 45.00 Grease Traps 11.50 Minimum Permit Fee 50.00 Minimum Permit Fee Residential Backflow 25.00 H Plan Review 251/6 of Permit Fee H H YyJ' Description Fee: A) Permit Issuance Fee 516.00 RESOLUTION NO.99-.a'( Page 2 1110L:1l Al1lcRl Fees: Description Fee: 1) Furnace to 100,000 BTU inciuding ducts&vents 9,65 ® 2) Furnace 100,000 BTU+including ducts&vents - 12.00 3) Floor Furnace including vent 9.65 4) Suspended heater,wall heater or floor mounted heater 9.65 5) Vent not included in appliance permit _ 4.75 6)<3HP;absorb unit to 100K BTU 9.65 7)3-15 HP;absorb unit 100k to 500k BTU 17.65 8)15-30 HP;absorb unit.5-1 mil BTU 24.15 9)30-50 HP;absorb unit 1-1.75 mil BTU 36.00 10)>50HP;absorb unit>1.75 mil BTU 60.15 l ll Air handling unit to 10,000 CFM Note:This S does not apply to an air- 7.00 handling unit which is a portion of a factory-assembled appliance,cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in the Mechanical Code. 12)Air handling unit 10,000 CFM+ 11.85 13)Non-portable evaporate cooler 7.00 14)Vent fan connected to a single duct 4.75 15)1r'entilatlon sy=em not? luec_in arplit,rce- 7.00 16)Hood served by mechanical exhaust 7.00 17)Domestic incinerators 12.00 18)Commercial or industrial type incinerator 48.25 19)Repair units 8.40 20)Wood stove 7.00 21)Clothes dryer,etc. 7.00 22)Other units 7.00 23)Gas piping one to four outlets 3.75 24)More than 4-per outlet(each) .75 25)Hazardous Process Piping System(HPP)of one to four outlets 3.75 26)Hazardous Process Piping System(HPP)of five or more outlets,per outlet .75 27)For each appliance or piece of equipment regulated by the Mechanical 7.00 Code but not classed in other appliance categories,or for which no other fee is listed in the table Minimum Pe-mit Fee $50.00 B)Plan review 25%of Permit Fee Other Inspections and Fees: 1. Inspections outside of normal business hours(minimum charge-two hours) $50.00 per hour 2. Inspections for which*,o fee is specifically indicated(minimum charge- one-half hour) $50.00 each 3. Additional plan review required by changes,additions or revisions to plans i (minimum charge-one-half hour) 1 $50.00 per hour i ]Building Fees; 7 Valuation shall be determined by the most recent edition of"Building Valuation Data"published by the International Conference of Huilding Omciais,using"gi,ou"can>u.:ctio,-,d,d t,,...,...e.......,,y .,.. ® RESOLUTION NO.99 rage 3 • Total''a'_untien Fee: $1.00 to$500.00 $50.00 $501.00 to$2,000 $15.50 for the first$50U.00 plus$2.25 for each additional$100 or fraction thereof,to and including$2,000($50.00 minimum) $2,001.00 t $$25,000.00 $47.75 for the first$2,000.00 plus$9.25 for each additional$1,000 or fraction thereof,to and including$25,000 $25,001.00 to$50,000.00 $261.25 for the first$25,000.00 plus$6.75 for each additional$1,000 or fraction thereof,to and including$50,000 $50,001.00 to$100,000 $431.50 for the first$50,000.00 plus$4.65 for each additional$1,000 or fraction thereof,to and including$100,000 $100,001.00 to$500,000.00 $664.00 for the first$100,000.00 plus$3.75 for each additional$1,000 or fraction thereof,to and including$500,000 $500,001.00 to$1,000,000.00 $2,144.00 for the first$500,000.00 plus$3.40 for each additional$1,000 or fraction thereof,to and including$1,000,000 $1,000,001.00 and up $3,819.00 for the first$1,000,000.00 plus$2.65 for each additional$1,000 or fraction thereof Other Inspections and Fees: 1.;nspections outside of normal business hours(minimum charge-two hours) $50.00 per hour 2.Inspections for which no fee is specifically indicated (minimum charge-one-half how) $50.00 per hour 3.Additional plan review required by changes,additions or revisions to plans(minimum charge-one-half hour) $50.00 per hour 4.Manufactured dwelling installation $235.00 5.Manufactured dwelling and mobile home parks, recreation parks and organizational camps Fee per OAR Electrical Fees: i 1. New residential,single or multi-family per dwelling unit;service included: A. 1000 square feet or less $117.75 B. Each additional 500 square feet or portion thereof 26.75 C. Limited energy 60.00 D. Each manufactured home or modular dwelling service or feeder 72.75 2. Services or feeders;installation,alterations or relocation: i + A. 200 amps or less 64.25 B. 201 amps to 400 amps 85.50 a C. 401 amps to 600 amps 128.50 D. 601 amps to 1000 amps 192.50 E. Over 1000 amps or volts "6;,;5 F. Rccornect only 53.50 RESOLUTION NO.99-__2F(�' Page 4 3. Temporary services or feeders;installation,alteration or rz oration: A. 200 amps or less 53.50 B. 201 amps to 400 amps 80.25 ® C. 401 amps to 600 amps 107.00 D. Over 600 amps to 100 volts (see 2 above) 4. Branch circuits;new,alteration or extension per panel: A. With purchase of service or feeder-each branch circuit 5.35 B. Without purchase of service or feeder First branch circuit 37.50 Each additional branch circuit 5.35 5. Miscellaneous(service or feeder not included): A. Each pump or irrigation circuit 42.75 B. Each sign or outline lighting 42.75 C. Signal circuit(s)or a limited energy panel,alteration or extension 60.00 D. Each additional inspection over the allowable in any of the above(min I hr) Per inspection 50.000 ii) Per hour 50.00 E. Industrial Plant Inspection$59.00 per hour including travel and office time with a minimum charge of 1 hour F. Electrical permit plan review fee: Plan review fees shall be 25 percent ofthe electrical permit fee. G. Minor Labels: $107.00 for ten labels. Miscellaneous]Fees: Description Fee: Re-inspection: Building $50.00 Mechanical $50.00 Plumbing $50.00 Electrical $50.00 Temporary Occupancy $90.00 Phased Occupancy $200.00 Permit or Plan Review Extension $50.00 Address Change $55.0 Research on non-current permits $45.00 per hour (minimum one hour,charged in one hour increments) " Fee paid inspections for residential structures pursuant to " Title 14,Chapter 16 D - Single and Two Family Dwelling3 $100.00 Apartment Houses and Social Care Facilities $160.00,plus$7 for each dwelling unit in excess of 3 Hotels I $160.00,plus$5 for each dwelling unit in excess of 5 s I RESOLUTION NO.99,�X !� P?ge 5 I Classification. The Citv Council has determined that the fees imposed by this resolution are not taxes subject to the property tax limitations of Article XI,section l lb of the Oregon Constitution. PASSED: This t`day of ' ( 1999, Mayor of Tigard ATTEST:6�z6w,i M City Recorder-City of Tigard l:\CITYWIDEICDADMUERP.EEVDA\GEN\FEERESOLU nON47399 a .ti � 1 RFROLUTION NO.99-29 Page 6