Loading...
Ordinance No. 02-03 CITY OF TIGARD, OREGON ORDINANCE NO. 02- Q3 AN ORDINANCE ADOPTING THE TRANSPORTATION SYSTEM PLAN (TSP), AND AMENDING THE COMPREHENSIVE PLAN TO RELFECT THE UPDATED TSP. WHEREAS, Metro Urban Growth Management Functional Plan Title 6 requires all local governments within its district, including the City of Tigard, to adopt certain transportation measures,including street connectivity requirements by August 2002; and. WHEREAS, state law requires the City to comply with Metro's Urban Growth Management Functional Plan Title 6; and WHEREAS, the City Council has determined that it must comply with Metro transportation requirements,including minimum connectivity requirements; and WHEREAS, the adoption of the TSP and changes to the Comprehensive Plan are the minimum necessary to comply with Metro's requirements, and WHEREAS, the City Council has determined to be in compliance despite the risk that Ballot Measure 7 from the November, 2000, election may be found to have been constitutionally adopted, which would create the risk of Measure 7 claims against the City relating to implementation of the TSP; and WHEREAS, the TSP was prepared with the help of a 12 member Task Force made up of the Planning Commission and 3 citizens, agencies, staff and the consulting firm, and WHEREAS,the TSP was presented to the Citizen Involvement Team on November 3, 2000, and at a public meeting with the Planning Commission and TSP Task Force members on December 4, 2000, and WHEREAS, the Planning Commission held a public hearing, which was noticed in accordance with the City standards, on March 20, 2001 and voted to recommend approval of the TSP and proposed Comprehensive:Plan changes to the City Council, and WHEREAS, the City Council held a public hearing on January 8, 2002, which was noticed in accordance with City standards, and voted to approve the TSP and Comprehensive Plan changes proposed, and WHEREAS, the decision to adopt was based on compliance with Oregon Statewide Planning Goals#1, #2, #5, #6, #7, #8, #9,#10, #11 and#12; OAR 666-12; the Regional Transportation Plan, Comprehensive Plan policies 1.1.1, 2.1.1, 2.1.2, 2.1.3 and 8.1.1 through 8.1.8 and Community Development Code chapter 18.390.060 as detailed in the staff report(Exhibit 1) ORDINANCE NO. 02-Dis\lrpin\julia\TSP\TSP adoption ord.doe Page 1 of 2 12/11/01 11:21AM NOW,THEREFORE,THE CITY OF TIGARD ORDAINS AS FOLLOWS: SECTION 1: The attached draft Transportation System Plan (Exhibit 2) and Comprehensive Plan changes(Exhibit 3)are adopted. SECTION 2: If any section of the TSP or resulting Development Code changes trigger a Measure 7 claim, the City may make a determination regarding whether the TSP or Development Code provision should be applied on a case by case basis. SECTION 3: This ordinance shall be effective 30 days after its passage by the Council, signature by the Mayor, and posting by the City Recorder. PASSED: By QIVOt1 tlft i.6vote of all Council members present after being read by number and title only,this �) ' day of 2002. Catherine Wheatley,City Recorder APPROVED: By Tigard City Council this day of 2002. (. Awl � mes E. Gr R', r A proved as to form: i ity AttoItle Date ORDINANCE NO. 02-fT is\lrpin\julia\TSP\TSP adoption ord.doc Page 2 of 2 12/11/01 11:21AM Tigard Transportation System Plan Draft Report 5� fl) I TNOT �I C Rwer ; it Prepared for r. CITY OF TIGARD Prepared by DKSAssociates October 2I 1 1 DKS Associates 1400 SW.i"Avenue. Suite 500 Portland. OR 97201 Phone: (503)243-3500 Fax: (503)243-1934 October 30, 2001 Julia Hajduk City of Tigard 13125 SW Hall Boulevard Tigard, OR 97223 Subject: Final DRAFT Tigard TSP Update P99161x0 Dear Julia: DKS Associates is pleased to submit this Final Draft Transportation System Plan Update for the City of Tigard. This report reflects comments and revisions collected from the public, the Planning Commission and the City Council through workshops and open houses over the past year. The comment log that has been prepared provides additional detail in the response to questions which have been raised in review of the October 2000 draft of the TSP. It has been a pleasure assisting the City with the TSP project and we look forward to helping you with final adoption. Please call Julie Sosnovske, Chris Maciejewski or me with any questions regarding this report. Sincerely, D s tesPoo �$8 Co o �4Ct�00� Ran S. u ,P.E.,P.T.O.E � :: Principal x:/projects/1999/P99161/report/october 2001 Finaltcovletter.doc attachincllt CITY OF TIGARD OREGON TABLE OF CONTENTS CHAPTER 1: SUMMARY—TIGARD TRANSPORTATION SYSTEM PLAN PowerPoint Presentation Slides 1-1 ................................................................................................. CHAPTER 2: GOALS AND POLICIES Background.................................................................................................................................2-1 Goals and Policies 2-3 ...................................................................................................................... Other Plans 2-8 ................................................................................................................................. CHAPTER 3: EXISTING CONDITIONS Street Network 3-1 ............................................................................................................................ TrafficSpeed and Volume.........................................................................................................3-5 Collisions3-9 .................................................................................................................................... Schools Collisions 3-15 .................................................................................................................... Traffic Control 3-15 .......................................................................................................................... Travel Time Information 3-20 .......................................................................................................... Traffic Performance on Key Streets........................................................................................3-22 AverageVehicle Occupancy....................................................................................................3-32 Access Issues 3-33 ............................................................................................................................ Land Use3-33 ................................................................................................................................... Transit3-35 ....................................................................................................................................... Bicycles....................................................................................................................................3-37 Pedestrian3-39 ................................................................................................................................. Trucks3-41 ....................................................................................................................................... Rail3-41 ............................................................................................................................................ Air3-41 ............................................................................................................................................. Water3-41 ........................................................................................................................................ Pipeline.....................................................................................................................................3-41 CHAPTER 4: FUTURE DEMAND AND LAND USE ProjectedLand Uses...................................................................................................................4-1 Metro Area Traffic Model 4-9 ......................................................................................................... Model Application to Tigard...................................................................................................4-12 i CITY OF TIGARD OREGON CHAPTER 5: PEDESTRIANS Needs 5-1 .......................................................................................................................................... Facilities 5-2 ..................................................................................................................................... Criteria 5-3 ........................................................................................................................................ Strategies....................................................................................................................................5-4 Recommended Pedestrian Facility Plan....................................................................................5-6 PotentialProject List..................................................................................................................5-8 Complementing Land Development Actions..........................................................................5-12 Address Gaps in Pedestrian System........................................................................................5-12 Parks and Trail Development...................................................................................................5-13 Safety........................................................................................................................................5-13 2040 Coordination 5-14 .................................................................................................................... CHAPTER 6: BICYCLES Needs6-1 .......................................................................................................................................... Facilities6-2 ..................................................................................................................................... Criteria6-3 ........................................................................................................................................ Strategies....................................................................................................................................6-3 Alternatives 6-7 ................................................................................................................................ Recommended Bikeway Facility Plan.......................................................................................6-7 PotentialProject List..................................................................................................................6-7 Complementing Land Development Actions..........................................................................6-12 CHAPTER 7: TRANSIT Needs7-1 .......................................................................................................................................... Facilities7-3 ..................................................................................................................................... Criteria7-3 ........................................................................................................................................ Strategies....................................................................................................................................7-3 Recommended Transit Plan 7-8 ....................................................................................................... Recommended Land Use Actions 7-11 ........................................................................................... CHAPTER 8: MOTOR VEHICLES Criteria8-1 ........................................................................................................................................ Functional Classification 8-4 ........................................................................................................... Cross Sections 8-14 .......................................................................................................................... Connectivity/Local Street Plan................................................................................................8-22 Circulation and Capacity Needs..............................................................................................8-29 Recommended Improvements..................................................................................................8-44 Safety........................................................................................................................................8-54 AccessManagement.................................................................................................................8-55 Maintenance 8-56 ............................................................................................................................. Neighborhood Traffic Management........................................................................................8-60 Parking......................................................................................................................................8-62 TSM/ITS8-63 ................................................................................................................................... Trucks8-63 ....................................................................................................................................... ii CITY OF TIGARD OREGON CHAPTER 9: OTHER MODES Criteria 9-1 ........................................................................................................................................ Recommended Facilities 9-1 ............................................................................................................ Air 9-2 ............................................................................................................................................... Water 9-2 .......................................................................................................................................... Pipeline.......................................................................................................................................9-2 CHAPTER 10: TRANSPORTATION DEMAND MANAGEMENT Background............................................................................................................................... 10-1 Criteria10-3 ...................................................................................................................................... Strategies.................................................................................................................................. 10-4 Recommended Plan 10-4 .................................................................................................................. CHAPTER 11: FUNDING/IMPLEMENTATION Funding..................................................................................................................................... 11-2 Costs11-5 ......................................................................................................................................... FinancingIssues..................................................................................................................... 11-14 iii CITY OF TIGARD OREGON LIST OF FIGURES FIGURE 2-1 Goals and Policy Relationship,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,2-2 FIGURE 2-2 Relationship of TSP to Regional Planning,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,2-9 FIGURE 3-1 Existing Functional Classification,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,3-2 FIGURE 3-2 Roadways with More than Two Lanes,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,3-3 FIGURE 3-3 Existing Typical Street Cross Sections ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,3-4 FIGURE 3-4 Existing Speed Zones.....................................................................................................3-6 FIGURE 3-5 Existing Traffic Volumes..............................................................................................3-7 FIGURE 3-6 Traffic Volume Summaries 3-8 ........................................................................................... FIGURE 3-7 Hourly Traffic Variation in Tigard,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,3-10 FIGURE 3-8 Signalized Intersections...............................................................................................3-17 FIGURE 3-9 Travel Time Surveys (1994)........................................................................................3-21 FIGURE 3-10 Travel Speed Profiles for ORE 217,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,3-22 FIGURE 3-11 Tigard Traffic%on ORE 99W,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,3-24 FIGURE 3-12 Average Vehicle Occupancies,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,3-32 FIGURE 3-13 Existing Land Use........................................................................................................3-34 FIGURE 3-14 Transit Routes 3-36 .............................................................................................................. FIGURE 3-15 Existing Bicycle Facilities,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,3-38 FIGURE 3-16 Existing Sidewalk Facilities,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,3-40 FIGURE 3-17 Existing Truck Routes.................................................................................................3-42 FIGURE 3-18 Major Pipeline Routes.................................................................................................3-43 FIGURE 4-1 Metro TAZs 4-4 .................................................................................................................... FIGURE 4-2 Disaggregated Tigard TAZs..........................................................................................4-5 FIGURE 4-3 Traffic Forecast Model Process 4-10 .................................................................................. FIGURE 5-1 Pedestrian Master Plan 5-7 .................................................................................................. FIGURE 5-2 Pedestrian Action Plan 5-11 ................................................................................................. FIGURE 6-1 Bicycle Plan Alternative(all collectors and arterials),,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 6-8 FIGURE 6-2 Bicycle Master Plan(framework option),,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 6-9 FIGURE 6-3 Bicycle Action Plan.....................................................................................................6-10 FIGURE 7-1 RTP Public Transportation System Classification,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,7-2 FIGURE 7-2 Existing Transit Coverage.............................................................................................7-6 FIGURE 7-3 Future Transit Coverage................................................................................................7-7 FIGURE 7-4 Future Transit Service 7-10 .................................................................................................. FIGURE 8-1 Vehicular Elements of the Street Plan 8-2 ........................................................................... FIGURE 8-2 Street Function Relationship,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 8-5 FIGURE 8-3 Proposed Functional Classification System,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 8-7 FIGURE 8-4 Proposed Neighborhood Routes,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,8-11 FIGURE 8-5 Existing Typical Street Cross Sections,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,8-14 FIGURE 8-6 Washington County Arterial Typical Street Cross Sections,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,8-15 FIGURE 8-7 Washington County Typical Street Cross Sections,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,8-16 FIGURE 8-8 Alley, Cul-de-sac and Local Street Cross Sections,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,8-17 FIGURE 8-9 Neighborhood Street Cross Sections,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,8-18 iv CITY OF TIGARD OREGON FIGURE 8-10 Arterial and Collector Street Cross Sections 8-19 .............................................................. FIGURE 8-11 Future Streets Where ROW is Planned for More Than Two Lanes 8-21 .......................... FIGURE 8-12 Local Street Connectivity: East Tigard.......................................................................8-23 FIGURE 8-13 Local Street Connectivity: Metzger.............................................................................8-24 FIGURE 8-14 Local Street Connectivity: Central Tigard..................................................................8-25 FIGURE 8-15 Local Street Connectivity: North Dakota....................................................................8-26 FIGURE 8-16 Local Street Connectivity: Southwest Tigard.............................................................8-27 FIGURE 8-17 Local Street Connectivity: South Tigard.....................................................................8-28 FIGURE 8-18 RTP and CIP Planned Improvements..........................................................................8-40 FIGURE 8-19 Street Improvement Plan..............................................................................................8-47 FIGURE 8-20 Intersection Improvement Locations...........................................................................8-48 FIGURE 8-21 Traffic Signal Master Plan...........................................................................................8-52 FIGURE 8-22 Pavement Life Cycle....................................................................................................8-58 FIGURE 8-23 Pavement Condition on City Streets............................................................................8-59 FIGURE 8-24 Traffic Calming Measures Inventory..........................................................................8-61 FIGURE 8-25 Through Truck Routes.................................................................................................8-65 FIGURE 9-1 Major Pipeline Routes...................................................................................................9-3 v CITY OF TIGARD OREGON LIST OF TABLES TABLE 3-1 Washington County SPIS Listing....................................................................................3-13 TABLE 3-2 Tigard Signal System.......................................................................................................3-18 TABLE 3-3 Average Vehicle Occupancies in Tigard.........................................................................3-33 TABLE 3-4 Daily Transit Ridership in Tigard(1990, 1994, 1999)....................................................3-35 TABLE 4-1 Tigard Area Adjusted Land Use Summary.......................................................................4-2 TABLE 4-2 Forecasted Vehicle Trips in Tigard...................................................................................4-3 TABLE 4-3 Tigard Land Use Summary................................................................................................4-6 TABLE 4-4 Approximate Average PM Peak Hour Trip Rates used in Metro Model.......................4-11 TABLE 4-5 Existing and Future Projected External Trip Generation................................................4-11 TABLE 5-1 Pedestrian Facility Strategies Comparisons ...................................................................... 5-6 TABLE 5-2 Potential Pedestrian Projects.............................................................................................. 5-8 TABLE 6-1 Corridors in Proposed Bikeway Network.......................................................................... 6-4 TABLE 6-2 Bicycle Connectivity to Adjacent Jurisdictions................................................................ 6-4 TABLE 6-3 Bikeway Facility Strategies Comparisons......................................................................... 6-6 TABLE 6-4 Bicycle Project Priorities..................................................................................................6-11 TABLE 7-1 Transit Strategies Comparisons.........................................................................................7-8 TABLE 7-2 Potential Transit Projects...................................................................................................7-9 TABLE 8-1 Proposed Changes to Existing Roadway Classification.................................................... 8-9 TABLE 8-2 Proposed Street Characteristics........................................................................................8-13 TABLE 8-3 Metro Regional Street Design and Motor Vehicle Designations ...................................8-20 TABLE 8-4 2015+Intersection Level of Service—PM Peak Hour 8-30 .................................................... TABLE 8-5 ORE 99W Alternatives Evaluation 8-35 .................................................................................. TABLE 8-6 Proposed 20 Year Metro and Planned CIP Projects........................................................8-41 TABLE 8-7 Future Street Improvements.............................................................................................8-45 TABLE 8-8 City of Tigard Future Intersection Improvements...........................................................8-49 TABLE 8-9 Traffic Signal Warrants....................................................................................................8-53 TABLE 8-10 City of Tigard Street Maintenance Budget Summary.....................................................8-57 TABLE 8-11 NTM Performance 8-62 ............................................................................................................ TABLE 10-1 Transportation Demand Management Strategies............................................................ 10-2 TABLE 11-1 Potential Transportation Revenue Sources...................................................................... 11-3 TABLE 11-2 Sample TIF in the Region................................................................................................ 11-4 TABLE 11-3 Issues With Non-Auto,Pedestrian and Bicycle Costs .................................................... 11-6 TABLE 11-4 Pedestrian Action Plan Project List and Costs................................................................ 11-7 TABLE 11-5 Bicycle Action Plan Improvement List and Cost............................................................ 11-8 TABLE 11-6 Future Street Improvements and Costs(with RTP Cross Reference)............................. 11-9 TABLE 11-7 City of Tigard Future Intersection Improvements and Cost.......................................... 11-11 TABLE 11-8 Costs for Tigard Transportation Plan over 20 years...................................................... 11-14 TABLE 11-9 Funding Source by Project Type.................................................................................... 11-15 TABLE 11-10 Estimation of Available Transportation Funding from Existing Sources .................... 11-16 vi CITY OF TIGARD OREGON LIST OF ACRONYMS / ABBREVIATIONS ■ CBD—Central Business District ■ D/C—Demand to Capacity Ratio ■ DEIS—Draft Environmental Impact Study ■ DEQ—Department of Environmental Quality ■ ECO—Employee Commute Options ■ FHWA—Federal Highway Administration ■ HCM—Highway Capacity Manual ■ ITS—Intelligent Transportation System ■ LID—Local Improvement Districts ■ LOS—Level of Service ■ LRT—Light Rail Transit ■ MSTIP—Major Streets Transportation Improvement Projects • ODOT—Oregon Department of Transportation ■ OHP—Oregon Highway Plan ■ RLIS—Regional Land Information System ■ ROW—Right of Way ■ RTP—Regional Transportation Plan ■ SDC—System Development Charges • SOV—Single Occupancy Vehicle ■ SPIS —Safety Priority Indexing System • SPWF—Special Public Works Fund ■ TAC—Technical Advisory Committee ■ TAZ—Transportation Analysis Zone ■ TDM—Travel Demand Management ■ TGM—Transportation and Growth Management ■ TIF—Traffic Impact Fee ■ TPR—Transportation Planning Rule ■ TSM—Transportation System Management ■ TSP—Transportation System Plan ■ V/C—Volume to Capacity Ratio ■ VPD—Vehicles Per Day ■ WACO—Washington County vii Chapter 1m. Summary Tigard Transportation System Plan Master Plan for the next 20 years CITY of TIGARD OREGON Tigard DKS ASSOCIafes CITY OF iIG/1RD Transportation System Plan OREGON What is a TSP? • Blue print for Transportation Investment • Enables City to make prudent and effective choices regarding land use • Coordination tool with regional and nearby agencies • Fulfills State mandate (Goal 12) & RTP • Addresses Existing and Future needs Tigard DKS ASSOCIafes CITY OF iIG/1RD Transportation System Plan OREGON Why do a plan now? • To get ready for the future - Now • Growth — Forecasts call for 6,000 more Dwelling Units and 15,000 more employees in the next 20 years • Metro RTP completed in 2000 • State Requirements (new highway plan) • New Funding Opportunities Tigard DKS ASSOCIafes CITY OF iIG/1RD Transportation System Plan OREGON Report Organization • Existing Conditions and Forecasting • Policy • Future Demand • Modal Chapters — Pedestrians, Bicycles, Transit, Motor Vehicles — Transportation Demand Management, Rail, Freight • Funding Tigard DKS Associates CITY OFTIGARD Transportation System Plan OREGON Existing Conditions • City generates 35,000 9000 8000 PM hour vehicle trips 7000 6000 5000 ORE 99W and Scholls a > 4000 3000 2000 Ferry N50,,000 /day 1000 ° Much through traffic in 1 2 3 4 5 6 7 8 9 101112 1 2 3 4 5 6 7 8 9 101112 Hour rMNoou7hb ,d Tigard • It takes 5-20 minutes to 70 Southbound ► PM Q 60 get across Tigard W 50 30 Scholls Ferry has the 20 AM 10 highest collision rating dos o� 22 intersections near/at capacity in PM peak Tigard DKS Associates CITY OFTIGARD Transportation System Plan OREGON Existing Conditions 0 • Key bottlenecks GFFNB 21 m PFAFFLE sr Q = 5 U'G today: r ° �c NAV � ry sr — ORE 99W/McDonald 5 wq Nur PpAN — ORE 99W/Hall-Greenburg y — Hall/McDonald9w) GAARDE ST - McDONALD ST Sch of l s Ferry/Nimbus BULL MUONTAIN RD NOT TO SCALE — Scholls Ferry/Hall g" R — I-5/Carman Interchange DURHAM RD C 4 ,.River Tigard DKS Associates CITY OFTIGARD Transportation System Plan OREGON Where Does Traffic on ORE 99W Go? T ��T P:;SCAiL IM P Throughout Tigard, 217 � ory ORE 99W carries about half Tigard traffic, half through G NALDST traffic Lege n-dI-5 to ORE 217 -<30%* -30-40 > ->40%40% ° linkage is significant � DURHAM Ra 7k-The percentage of trips originating cr destined to sites within Tigard oampared to total traffic an ORE 99W. No alternative route MAIM TRAFFIC for corridor travel ON ORE SOW Tigard DKS Associates CITY OFTIGARD Transportation System Plan OREGON Existing Pedestrian / Bicycles • Bicycles Pedestrian — No continuous network in — Significant gaps in sidewalk Tigard system — Peak bicycle volume in the — Few interconnected 10 to 15 per hour range locations linking to schools, — Most bicycle lanes have retail, parks, transit been added in last 10 years — Peak hour pedestrian volumes heaviest along ORE 99W — Most peak hour pedestrain volumes below 50 per hour Tigard DKS Associates CITY OFTIGARD Transportation System Plan OREGON Existing Transit • Significant bus service in Tigard • 9,500 daily bus Tigard bus trips • Transit Centers are most active transit stops in Tigard • Western Tigard and north of Durham area only areas without quarter mile access to buses Tigard DKS ASSOCIafes CITY OF iIG/1RD Transportation System Plan OREGON TSP Task Force • Planning Commission • Business/Chamber • Bicycle/Transit involvement • Technical Advisory Committee with local jurisdictions Tigard DKS Associates CITY OFTIGARD Transportation System Plan OREGON Transportation Goals • Livability • Balanced Transportation System • Safety • Performance • Accessibility • Goods Movement • Coordination Tigard DKS Associates CITY OFTIGARD Transportation System Plan OREGON Future Travel Forecast • Based upon regional travel modeling — Assessed both 2015 and 2020 forecasts • Disaggregated Tigard into nearly 200 Transportation Analysis Zones • Looked at build out condition in Tigard • Established a modified 2015 forecast that resulted in 8% greater vehicle trip generation in Tigard than 2020 Tigard DKS ASSOCIafes CITY OF iIG/1RD Transportation System Plan OREGON Pedestrian Plan • Top Strategies — Fill in gaps in network — Link to schools, parks, recreation, activity centers, transit • Establish Pedestrian Districts — Regional Center — Town Centers • Minimum five feet • Complimenting Land Use Actions Tigard DKS Associates CITY OFTIGARD Transportation System Plan OREGON DKS Associates CITY OF TIGARD Transportation Systems Plan ■ Legend I J. %4 ---------- - ------- .- Figure 5-2 PEDESTRIAN ACTION PLAN Tigard Drla%*"%L;%p Associates CITY OF TIGARD Transportation System Plan OREGON Pedestrian Action Plan Project List Rank* Project From To Cost H North Dakota Street 121"Avenue Greenburg Road $230,000 H McDonald Street ORE 99W Hall Boulevard $200,000 H Tiedeman Avenue Walnut Street Greenburg Road $350,000 H Oak Street(RTP 6019) Hall Boulevard 80`h Avenue $500,000 H ORE 99W McDonald Street South City Limits $500,000 M Bull Mountain Road ORE 99W Beef Bend Road $1,200,000 M Roshak Road Bull Mountain Road Scholls Ferry Road $300,000 M 121"Avenue Gaarde Street North Dakota Street $450,000 M Hunziker Street Hall Boulevard 72nd Avenue $250,000 M Washington Square Pedestrian Improvements(RTP 6022) $6,000,000 R =i nal Center L Taylor's Ferry Rd Washington Drive 62nd Avenue $1,000,000 L Washington Drive Hall Boulevard Taylor's Ferry Road $200,000 Subtotal $11,800,000 Sidewalks to be built with Street Improvements H Bonita Road West of 72nd Avenue 72nd Avenue $50,000 H Walnut Street 135`h Avenue Tiedeman Avenue $570,000 H Gaarde Street Walnut Street ORE 99W $620,000 H Hall Boulevard Scholls Ferry Road Pfaffle Street $1,000,000 H Dartmouth Street 72nd 68th Avenue $120,000 H Tigard Street 115th Street Main Street $350,000 H Burnham Street Main Street Hall Boulevard $100,000 H Fonner Street walnut Street 121st Avenue $250,000 H Commercial Street Main Street Lincoln Street $50,000 M 72nd Avenue ORE 99W Bonita Road $1,200,000 M Hall Boulevard North of Hunziker Street South City Limits $670,000 M Beef Bend Road ORE 99W Scholls Ferry Road $1,000,000 M Barrows Road Scholls Ferry Road(W) Scholls Ferry Road(E) $950,000 L 72nd Avenue Carman/Upper BoonesFry. Durham Road $250,000 Subtotal $7,180,000 Annual Sidewalk Program at$50,000 per year for 20 years $1,000,000 Action Plan Total $19,360,000 Tigard DKs Associates CITY OFTIGARD Transportation System Plan OREGON Bicycle Plan • Key Strategies — Fill in gaps in bicycle network — Connect to key activity centers, schools, parks • Coordinated with adjacent jurisdictions • Selected Framework Alternative • Major Trails: — Loop Fanno/Tualatin/Power — Tualatin River Crossing — Link to I-5/ORE 217 overcrossing Tigard DKS Associates CITY OFTIGARD Transportation System Plan OREGON DKS Associates I (L-, iy -- CITY OF TIGARD I 7 C �- II p Trans ortation - Systems Plan ?� rT T ` F- i-- ; :' ��= � et r-� x 5'.:c,.f�. �Flj _'i I i 1 � J� r � •f r. 1 rel,; i . x l7�F .. ... r -- — - � .r.1�Ltir t• 1 � I� vs�cnau —.� —_ �� -.�.< LLI i_t 5, I }4--'4 1 r 1 �- ui� Figure 6-2 BICYCLE MASTER PLAN -r ' /• l (Framework Option) TigardDKS Associates CITY OFTIGARD Transportation System Plan OREGON Bic cle Action Plan Improvement List and Cost RANK* Pro'ect From To Cost H Hunziker Street Hall Boulevard 72°d Avenue $250,000 H Bonita Road 72°d Avenue West of 72°d Ave. $50,000 H Burnham Street Main Street Hall Boulevard $135,000 H Oak Street RTP 6019 Hall Boulevard 901h Avenue $300,000 H 981h Avenue Murdock Stret Durham Road $275,000 H 92°d Avenue Durham Road Cook Park $270,000 H Tiedeman Avenue Greenburg Road Walnut Street $250,000 M 121 ` Avenue Walnut Street Gaarde Street $400,000 L Taylor's Ferry Road Washington Drive City Limits $500,000 L Washington Drive Hall Boulevard Taylor's Ferry Rd $100,000 L O'Mara Street McDonald Street Hall Boulevard $275,000 L Frewing Street ORE 99W O'Mara Street $150,000 Subtotal $2,955,000 H Gaarde Street Walnut Street ORE 99W $600,000 H Hall Boulevard Scholls Ferry Road Locust Street $500,000 H Greenburg Road Hall Boulevard Cascade Avenue $300,000 H ORE 99W East City Limits South City Limits $1,300,000 M 72°d Avenue ORE 99W South City Limits $960.000 M Hall Boulevard Pfaffle Street Bonita Road $550,000 M Carman Drive 1-5 Durham Road $200,000 M Walnut Street ORE 99W Barrows Road $1,400,000 M Barrows Road Scholls Ferry Road W Scholls Ferry Rd. E $900,000 L Bull Mountain Road 150'h Avenue Beef Bend Road $550,000 L Beef Bend Road ORE 99W Scholls FerrvRd. $1,600,000 Subtotal $8,860,000 Multi-Use Pathways H Hunziker Link to LO Linkage to Kruse Way Trail in Lake Oswego $500,000 M Fanno Creek Trail Tualatin River to City Hall, ORE 99W to Tigard $3,600,000 M Tualatin River Trail Adjacent to Cook Park from Powerlines to Fanno $2600000 000 M Tualatin River CrossingNear 108"'Avenue $3,000,000 L Powerlines Corridor From Beaverton to Tualatin River Trail $2,500,000 Subtotal $12,200,000 Action Plan Total $24,015,000 Tigard DKs Associates CITY OFTIGARD Transportation System Plan OREGON Transit Plan • Key Strategies — Commuter Rail — Provide more frequent service, more hours of day — Express routes — Circulator Service in Tigard — Transit Amenities • New Transit Center at Murray/ Scholls • New Service Coverage: Durham/ Gaarde/ Barrows/ Bonita / Hall • Complimentary Land Use Actions — Transit Center/Rail Station Development Tigard DKS ASSOCIafes CITY OF iIG/1RD Transportation System Plan OREGON DKS Associates +y! CITY OF MISARD OREGON - L Transportation -- Systems Plan - l+ —k i t ,I� �I�-�_lT-- 'T- Legend 14 Vill - ,'`t`• �-n ��''�. - l _--)1 od,F-.� ,1 1 1 �.. �ct�i •�`JC' I I n rm u.a r�.+. .,.a..r - .r. AA �� y �'IT'�jl- -� —1i� � � Nr:p:.:d F. it-n:d�•euf.G:s d,,aar,s 71 F .s.-moi 1 14 Figure 7-4 Future Transit Service - , Jll - Tigard DKS Associates CITY OFTIGARD Transportation System Plan OREGON Motor Vehicle Plan CITY OF TIGARD Transportation System Plan � 7 i ■ Transportafion ■ ■r # sysim manageffienflffs t Figure 8-1 VEHICULAR ELEMENTS OF THE STREET PLAN Tigard DKS Associates CITY OFTIGARD Transportation System Plan OREGON Functional Classification CLASSIFICATION EXAMPLE • Freeways • I-5/ORE 217 • Principal Arterials • ORE 99W/ Scholls • Arterials Hal l/Gaarde/ Durham • Collectors Walnut/ Bull Mountain • Neighborhood 130th/Watkins • Local Cul-de-sacs/ redundant streets Tigard DKS Associates CITY OFTIGARD Transportation System Plan OREGON DKS Associates I: CITY .�', - I � � •- _ TIL_I OF TIGARD `-r r - �• - OREGON Transportation U?`< r Systems Plan ` ice Legend -1—__ � _ �J�—• — _�� '. �—T"---`-___- I _ _l7� —_ �L.I L I�I � :1.]r v.. r I L4 - � \ '1! -SII �I( I' - ♦` i.__ �:' Pn;r•y-.>bcKr . 1 N J '\ l 1 _ — - xe.�[.1 'Tw•'I 0t . '�c.'r tl r-y ar, •r,411Mrd i•r a r w -n a Fi—n ir,3A.,c r.h- 1rJi t nn r Y i I - I— .1141 rn _1iyr:Jr d ffr rXrn l!i[ J1TSF F.t ' lr.ISI nIC•,C !'p.: ,I-irrrr•�: T r " u Y '? hn r ;r pi pian na alar dnu n,nrcr 'l lr 'ham [1-,ll,llrnrn:ut •hid lfr:l_ 1. nni.cr...f _ � �y i - ' — �I-; J. r i I 'r.. 74. 't�� Figure 8-3�I k -a 1� _ 9 Proposed Functional Classification System Y Tigard DKS Associates CITY OFTIGARD Transportation System Plan OREGON DKS Assocates Looai Street cm Of Ro Restcfantlal a Transportation System Plan r'±i m (ml R/W 36'-50' (ml m .xe L7 4'A Laical Street Commercial&lndwAdal 34'm 5' R/W 50'fml 'm m' Mirror Collector ' i•---�' ,�, = -�-mss—�9 ---` 40 7 m R/W 60'fml � Major Collector I s censer T rn Lane .i.■— - . — , �-; r—� _ # ..._r or Med ia 6' 16' 12' 16' 6' 1.5' - r R/W 60'80' ml _*'re'a:'R'A' r�b�ll T•A Q•a -..i. Arteria/ " cccow" e er Tum lane nr�:w.�annp orMedian 2;.�ceia��a T•k. _ - , �� 12' 12' 12' 14' � S�a•na�� - tra•c at•St�q+a � r., fc— .. ...~ Flours 8- Nr•;w^,n! y. ��NQi t Figure 8-10 Im 1- Minimum Required Width nPICAL STREET CI SEOT10N6 * - _ ARTERIAL AND COLLECTOR SAMPLE STREET CROSS SECTIONS REQUIRED ROW WIDTH Tigard DKS Associates CITY OFTIGARD Transportation System Plan OREGON DKS Associates r: CITY OF TIGARD OREGON - --� ^ Transportation fI -`1 - Systems Plan 1 - { T tl ry _`'^` Legend �� ! P am h 1 t f.;J,; �ttt r 1 y4 1- 1 _111-`4e{"� _ I �r I -` LIa L �_ �• i I .I_:Lan o. r ow �. �_.r.' k _ ' ��� r_i I r r F, rf� I I I f s�. �, l .:'�i� 7•� r- I I_I 9F^- r • — — -S a ::.yrl• I t — I TAT_ '� � r: r :� ``{ ( •'f L I 1 _ I Y- �� ..v.. r k' : E..a r= tr r. I 'Jctc rtl Art thLf Irrla tar f•TT TA7 — y __ a -aA 1r C IIc In-/5c Irrn:na u.d i rTIL t �-�1 14--�— irD urru1 Jn BP rn a�v. �_e7 1_>'V rn r:[ I- •: 1 L. - r,hetr rr •crrt cr t..!rcr sl•a Ir Irnil toa�''ar .] n_Irr. 1.V --r I l ., J�, L i ; ! 1. I f -- r -T. Figure 8-11 Future Streets Where ROW is Planned for More Than Two Lanes Tigard DKS Associates CITY OFTIGARD Transportation System Plan OREGON Local Connectivity Plans North Dakota Example CRY OF TIGARD Transportation System Plan a tL0' Q� M 0J a s _ 4p NORTH **DAKOTA ST i P H �y ST WALNUT' Figure&15 ♦' LOCAL STREET CONNECTIVITY • North Dakota Tigard DKS Associates CITY OFTIGARD Transportation System Plan OREGON Capacity and Circulation Keylssues • ORE 217 and I-5 are over capacity • Tigard serves more ORE 99W through traffic in future • ORE 99W fails in future • Half of the traffic signalized intersection fail in 20 years assuming no improvements are made Tigard DKS ASSOCIafes CITY OF iIG/1RD Transportation System Plan OREGON Key Solution Concepts for Tigard • Con nectivity/Circulation Enhancement — Washington Square — Tigard Triangle — Western Tigard — East/West • Traffic Operational Improvements — Street Improvement Plan — Intersection capacity upgrades Tigard DKS Associates CITY OFTIGARD Transportation System Plan OREGON DKSAssocibtes CITY OFTIGARD Transportation Systems Plan Legend ED ............ - ri F 3 Figure 8-18 / ;� RTP AND CIP PLANNED IMPROVEMENTS Tigard Drla%*"%O;p Associates CITY OF TIGARD Transportation System Plan OREGON DKSAssociates u. CITY OF TIGARD 7 V. 6 Transportation Systems Plan 7 Legend L 3 7 ....... 3 3 J* t 7 7 141 Figure 8-19 STREET IMPROVEMENT PLAN 4" Tigard D Ick"Sp Associates CITY OF TIGARD Transportation System Plan OREGON DKS Associates CITY OF TIGARD Transportation Iy' p Systems Plan '., Legend u 1 j' Figure 8-20 INTERSECTION IMPROVEMENT LOCATIONS Tigard DKS Associates CITY OFTIGARD Transportation System Plan OREGON Recommendations in the following areas : • Traffic Signals — Master Plan — Coordination — ITS • Safety — Upgrade record keeping to focus on hot spots • Access Management — ORE 99W — Beef Bend — 150th Tigard DKS Associates CITY OFTIGARD Transportation System Plan OREGON More Motor Vehicle Recommendations • Maintenance — Continue Pavement Management System — Fund program to get rid of pavement reconstruction backlog • Neighborhood Traffic Management (NTM) — Continue current city program — Incorporate NTM into new land use/road approvals • Parking — Metro Maximums already adopted into code • Intelligent Transportation Systems Tigard DKS ASSOCIafes CITY OF iIG/1RD Transportation System Plan OREGON More Motor Vehicle Recommendations • Trucks — Route map — Truck Friendly design • Key Implementation Items — Access Spacing, Traffic Signal Spacing — Level of Service — Street spacing/local connections — Neighborhood Impact — School Access Impact — Mixed Use Determination Tigard DKS Associates CITY OFTIGARD Transportation System Plan OREGON Other Modes in TSP • Rail • Air • Water • Pipeline • Freight Tigard DKS Associates CITY OFTIGARD Transportation System Plan OREGON TDM Plan • Coordinate with Regional ECO programs • Encourage the development of high speed communication to residents and businesses • Mixed uses • Park-and-ride Tigard DKS ASSOCIafes CITY OF iIG/1RD Transportation System Plan OREGON Preliminary Cost Summary Modes 20 year Costs Motor Vehicle: ODOT $900 M Motor Vehicle: City $250 M Maintenance $45 M Commuter Rail $75 M Bicycle $25 M Pedestrian $13 M Tigard DKS ASSOCIafes CITY OF iIG/1RD Transportation System Plan OREGON Whyare these estimates so large? Motor Vehicle Ped/Bike/Transit • Significant new • Commuter Rail roadway connections . Significant right-of- and widenings way and topography • Major regional needs to establish bike lanes in the vicinity of and sidewalks Tigard Lack of on-going programs for sidewalks,TDM, Traffic Signals Tigard DKS Associates CITY OFTIGARD Transportation System Plan OREGON Potential Transportation Funding • Over 20 years current programs would only fund $250,000,000 • Substantial shortfall due to regional nature of improvements • Key sources of future funds: — Bond Measures (local, MSTIP, regional) — Increase existing fees commensurate with needs (SDC) — Focus on high priority needs — Exactions — Roadway pricing Tigard DKS ASSOCIafes CITY OF iIG/1RD Transportation System Plan OREGON Steps Taken So Far to Get Here • TSP Task Force Approved TSP Spring 2000 • Planning Commission Approved TSP Winter 2000 • CIT & Public Open Houses- Nov 2000 • City Council Workshops- Nov 2000,, March 2001,, November 2001 • City Council Adoption - Early 2002 Tigard DKS ASSOCIafes CITY OF iIG/1RD Transportation System Plan OREGON How Can Your Comments be heard? • Comment on specific details of the draft plan and provide recommendations • Attend hearings • Review report on the web (www.ci.tigard.or.us) • Call (639-4171),, write or email the City • Julia Hajduk (julia@ci-tigard -or- us) • Gus Duenas (gus@ci-tigard -or- us) Tigard DKS ASSOCIafes CITY OF iIG/1RD Transportation System Plan OREGON DKS Associates Chapter 2 Goals and PolicyGIN OFTIGARD OREGON BACKGROUND These goals and policies have been developed to guide the City's twenty year vision of transportation system needs. They are intended to replace the current transportation related goals and policies in the Tigard Comprehensive Plan (these can be found in the appendix of this report). Additionally, they build upon material developed in the visioning process from January, 19981. State Transportation Planning Rule, Metro Functional Plan guidelines and the past comprehensive plan call for a more comprehensive and balanced approach to transportation policy, addressing walking, bicycling, transit, rail, truck and other modes as well as automobile travel. These goals and policies are a result of widespread technical work by staff, Tigard Planning Commission, a Technical Advisory Committee and the consultant. Using input from the Planning Commission regarding their likes/dislikes about transportation in Tigard, goals and policies were developed. The City of Tigard Draft Transportation System Plan (TSP) Goals and Policies consist of seven goals with related policies organized under each goal. The goals are simple, brief guiding statements which describe a desired result. The policies focus on how goals will be met by describing the types of actions that will contribute to achieving the goal. Figure 2-1 provides an outline of the relationship between goals, policies, actions and implementation. This Transportation System Plan addresses the top three elements identified in Figure 2-1. The existing City of Tigard goals in the Comprehensive Plan have been incorporated into these Goals and Policies, reflecting other regional policy from the state,region and adjacent jurisdictions. Below many of the policies, the italic text represents a detailed description about the intent of the policy. While the italics provide the intent of the policy,they are not implementable as a land use action without inclusion in land use regulations.2 The Draft TSP Goals and Policies are linked to mode maps provided in the City of Tigard TSP. The TSP includes master plan maps for motor vehicles, pedestrians,bicycles, transit and other modes. In addition to the transportation related goals and policies, the goals &policies related to other elements of the Tigard Comprehensive Plan were reviewed in terms of both transportation and land use. Several modifications to these policies in other elements are also recommended. 1 Tigard Beyond Tomorrow, Community Vision-1St Annual Report,January, 1998. 2 ORS 197.175(2); ORS 197.195(1). Tigard Transportation System Plan P99161x0 Goals and Policies 2-1 October 30,2001 DKS Associates CITY OF TIGARD Transportation System Plan From Vision to Action Tigard Transportation System Plan Public Input Comprehensive Plan Brief T�anspodatiion Goals ' Planomg Rule Meho Functional Plan Washington County T�anspodafwn leuiding Statements Brief Statements Plan Which Focus on How Goals PolicyWill Be Met Including Measures of . . ness Standards Recommended Action Maps Improvements Studies Implement Policy Design Manual Standard DrawingsSpecific for Development da ' sntation Code Figure 2-1 GOALS AND POLICIES RELATIONSHIP DKS Associates GOALS AND POLICIES Goal 1—Livability Plan, design and construct transportation facilities in a manner which enhances the livability of Tigard. Policy 1 Maintain the livability of Tigard through proper location and design of transportation facilities. Design streets and highways to respect the characteristics of the surrounding land uses, natural features, and other community amenities. Policy 2 Encourage pedestrian accessibility by providing safe, secure and desirable pedestrian routes. The City will develop and maintain a pedestrian plan in Tigard, outlining pedestrian routes. Sidewalk standards will be developed to define various widths, as necessary, for City street types. Policy 3 Address issues of excessive speeding and through traffic on local residential streets through a neighborhood traffic program. The program should address corrective measures for existing problems and assure that development incorporates traffic calming. Develop and maintain a program of street design standards and criteria for neighborhood traffic management(NTM) for use in new development and existing neighborhoods. Measures to be developed may include (but not limited to) narrower streets, speed humps, traffic circles, curb/sidewalk extensions, curving streets, diverters and/or other measures, as developed as part of a City NTM plan. Goal 2—Balanced Transportation System Provide a balanced transportation system, incorporating all modes of transportation (including motor vehicle, bicycle, pedestrian, transit and other modes). Policy 1 Develop and implement public street standards that recognize the multi- purpose nature of the street right-of-way for utility, pedestrian, bicycle, transit, truck and auto use. Develop and maintain a series of system maps and design standards for motor vehicles, bicycle, pedestrian, transit and truck facilities in Tigard. Policy 2 The City shall coordinate with Tri-Met, and/or any other transit providers Tigard Transportation System Plan P99161x0 Goals and Policies 2-3 October 30,2001 DKS Associates serving Tigard, to improve transit service to Tigard. Fixed route transit will primarily use arterial and collector streets in Tigard. Development adjacent to transit routes will provide direct pedestrian accessibility. The Regional Transportation Plan (RTP) and Tri-Met service plans will be the guiding documents for development of Tigard's transit plan. The City should provide input to Tri-Met regarding their specific needs as they annually review their system. This input should focus on improving service (coverage and frequency)to underserved areas. New transit service should be considered concurrent to street improvements when significant street extensions are completed. The City should encourage land intensive uses to locate near transitways and require high intensity uses (i.e. large employment, commercial sites) to provide transit facilities When bus stops reach 75 boardings per day, bus shelters should be considered in development review. Sidewalks should be available within X mile from all transit routes and transit should be provided to schools and parks. Policy 3 Bicycle lanes must be constructed on all arterials and collectors within Tigard consistent with the Bicycle Master Plan (with construction or reconstruction projects). All schools, parks, public facilities and retail areas shall have direct access to a bikeway. The City will develop a bicycle plan which connects key activity centers (such as schools, parks, public facilities and retail areas) with adjacent access. Standards for bicycle facilities within Tigard will be developed and maintained. Where activity centers are on local streets, connections to bicycle lanes shall be designated. Policy 4 Sidewalks must be constructed on all streets within Tigard (with construction or reconstruction projects). All schools, parks, public facilities and retail areas shall have direct access to a sidewalk. The City will develop a pedestrian plan which connects key activity centers with adjacent access. Standards for pedestrian facilities within Tigard will be developed and maintained. Policy 5 Bicycle and pedestrian plans shall be developed which link to recreational trails. The bicycle and pedestrian plans will need to indicate linkages between recreational and basic pedestrian networks. A primary facility in Tigard should link together Fanno Creek, Tualatin River and the BPA right-of-way in the west of Tigard. Design standards for recreational elements will need to be developed and maintained. Policy 6 Local streets shall be designed to encourage a reduction in trip length by providing connectivity and limiting out-of-direction travel. Provide connectivity to activity centers and destinations with a priority for bicycle and pedestrian connections. 3 Planning and Design for Transit Handbook,Tri-Met,January, 1996. Tigard Transportation System Plan P99161x0 Goals and Policies 2-4 October 30,2001 DKS Associates The purpose of this policy is to provide accessibility within Tigard, with a focus on pedestrian connectivity. Pedestrian connectivity can be provided via pedestrian/bike paths between cul-de-sacs and/or greenways where auto connectivity does not exist or is not feasible. Wherever necessary, new streets built to provide connectivity shall incorporate traffic management design elements, particularly those which inhibit speeding. As a planning standard, require local streets to have connections every 530 feet in planning local and neighborhood streets. Policy 7 Tigard will participate in vehicle trip reduction strategies developed regionally targeted to achieve non-single occupant vehicle levels outlined in Table 1.3 of the Regional Transportation Plan. DEQ and Metro have developed regional policies regarding trip reduction. Some of these policies are aimed at provision of parking and others are aimed at ridesharing (Employee Commute Options—ECO rules). Policy 8 Tigard will support the development of a commuter rail system as part of the regional transit network. Tigard will support development of a commuter rail system connecting the south Metro area to the Beaverton/Hillsboro area, with stop(s) in Tigard. Goal 3—Safety Strive to achieve a safe transportation system by developing street standards, access management policies and speed controls when constructing streets, by making street maintenance a priority and through a comprehensive program of engineering, education and enforcement. Policy 1 Design of streets should relate to their intended use. A functional classification system shall be developed for Tigard which meets the City's needs and respects needs of other agencies (Washington County, Metro, ODOT). Appropriate design standards for these roadways will be developed by the appropriate jurisdiction. Policy 2 Street maintenance shall be a priority to improve safety in Tigard. The City shall place a high priority on routine street maintenance to preserve its infrastructure investment. Policy 3 Safe and secure pedestrian and bikeways shall be designed between parks and other activity centers in Tigard. Policy 4 Safe and secure routes to schools shall be designated for each school and any new residential project shall identify the safe path to school for children. Tigard Transportation System Plan P99161x0 Goals and Policies 2-5 October 30,2001 DKS Associates Working with the school district, citizens, and developers, the City should undertake a process of defining school routes. Policy 5 Access management standards for arterial and collector streets shall be developed to improve safety in Tigard. Guidelines will be developed to provide access control standards. These standards shall be applied to all new road construction and new development. For roadway reconstruction, existing driveways shall be compared with the standards and a reasonable attempt shall be made to comply(consolidating driveway accesses or relocating driveways to a lower classification street are examples). Policy 6 Establish a City monitoring system that regularly evaluates, prioritizes and mitigates high accident locations within the City. Review traffic accident information regularly to systematically identify, prioritize and remedy safety problems. Working with the County, develop a list of high collision sites and projects necessary to eliminate such problems. Require development applications to identify and mitigate for high collision locations if they generate 10% increase to existing traffic on an approach to a high collision intersection. Washington County's SPIS (Safety Priority Indexing System) could be used as a basis for determining high collision locations. Policy 7 New roadways shall meet appropriate Lighting Standards. Existing roadways shall be systematically retrofitted with roadway lighting. Priority locations for roadway lighting include paths to schools,parks, and town center areas. Local property owners fund lighting districts. Policy 8 New development shall be required to provide safe access and to gain access from a publicly dedicated street (i.e. dedicate right-of-way, if not already on a public street in rough proportionality to the development's impact) and provide safe access. Development will be required to provide right-of-way(if needed)and safe access as determined by application of the City's development code and standards for design. The minimum City standards must be met for half- street adjacent to developing property for a development to proceed. This policy applies to both pedestrians and motor vehicles. Goal 4—Performance Transportation performance measures shall be set and maintained by the City. Policy 1 A minimum intersection level of service standard shall be set for the City of Tigard. All public facilities shall be designed to meet this standard. Level of service E(and demand-to-capacity ratio of 1.0 or less), Highway Capacity Manual, Chapters 15, 16, and 17 (or subsequent updated references) is recommended to balance provision of roadway capacity with level of service and funding. ODOT, Metro and Washington County performance standards should be considered on state or county facilities and for 2040 Concept Areas (as defined in Table 1.2 of the Regional Transportation Plan). Monitor Metro and Washington County's current work to develop a Tigard Transportation System Plan P99161x0 Goals and Policies 2-6 October 30,2001 DKS Associates level of service standard.. The City will work to make the arterial& collector street system operate effectively to discourage "cut-through"traffic on neighborhood and local streets. Policy 2 Parking ratios shall be set to provide adequate parking, while providing an incentive to limit the use of the single occupant vehicle. Parking standards shall be listed in the development code for the City of Tigard. DEQ and Metro Functional Plan Title 2 encourages lower parking ratios to encourage use of alternative modes (walking, biking, transit, car pooling, etc.). Policy 3 Work with other transportation providers in Washington County, including Tri-Met, Metro and ODOT to develop, operate and maintain intelligent transportation systems, including coordination of traffic signals. Goal 5—Accessibility Develop transportation facilities which are accessible to all members of the community and minimize out of direction travel. Policy 1 Design and construct transportation facilities to meet the requirements of the Americans with Disabilities Act. Policy 2 Develop neighborhood and local connections to provide adequate circulation in and out of the neighborhoods. Work toward the eventual connection of streets identified on the plan as development occurs, as funds are available and opportunities arise. As a planning guideline, require residential streets to have connections every 530 feet for local and neighborhood streets. Policy 3 Work with Washington County and ODOT to develop an efficient arterial grid system that provides access within the City, and serves through City traffic. As outlined in Title 6 of the Metro Urban Growth Management Functional Plan, access connection standards will be developed. The arterial street system should facilitate street and pedestrian connectivity. Goal 6—Goods Movement Provide for efficient movement of goods and services. Policy 1 Design arterial routes, highway access and adjacent land uses in ways that facilitate the efficient movement of goods and services. Tigard Transportation System Plan P99161x0 Goals and Policies 2-7 October 30,2001 DKS Associates Policy 2 Require safe routing of hazardous materials consistent with federal and state guidelines. Work with federal agencies, the Public Utility Commission, the Oregon Department of Energy and ODOT to assure consistent laws and regulations for the transport of hazardous materials. Goal 7—Coordination Implement the Transportation System Plan (TSP) in a coordinated manner. Policy 1 Coordinate and cooperate with adjacent agencies (including Washington County, Beaverton, Tualatin, Lake Oswego, City of Portland, Tri-Met, Metro and ODOT)when necessary to develop transportation projects which benefit the region as a whole in addition to the City of Tigard. Maintain plan and policy conformance to the Regional Transportation Plan and Transportation Planning Rule (OAR 660-012). Seek compatibility with all adjacent county and city jurisdiction plans. OTHER PLANS The relationship of the TSP to other regional planning documents can be puzzle of acronyms, activities and plans. Figure 2-2 summarizes the transportation planning puzzle, identifying where the Tigard TSP fits within the on-going regional context of planning. Many of the most common planning initiatives and terms are reduced to acronyms,which are summarized below: TPR- Transportation Planning Rule, Statewide Planning Goal 12 developed by Department of Land Conservation and Development(DLCD) to guide transportation planning in Oregon. OTP - Oregon Transportation Plan, a federally mandated plan developed by Oregon Department of Transportation (ODOT)to guide statewide transportation development. Consists of several modal plans, developed separately. OHP— 1999 Oregon Highway Plan, defines policies and investment strategies for Oregon's state highway system for the next 20 years. It further refines the goals and policies of the Oregon Transportation Plan and is part of Oregon's Statewide Transportation Plan. Standards for access management on state highways is clearly defined as adopted May 1999. RTP - Regional Transportation Plan, developed by metropolitan planning organizations (MPO)to guide regional transportation investment, required to secure federal funding. In Portland this task is performed by Metro (Metropolitan Service District). Adopted August 10, 2000. TSP - Transportation System Plan, a requirement of the TPR for cities and counties in Oregon to guide local transportation decisions and investments. (ORS 660-012-0015(3)). Corridor Plan - ODOT transportation plans which focus on state transportation corridors to specifically outline needs, modes, strategies and effective investment. Tigard Transportation System Plan P99161x0 Goals and Policies 2-8 October 30,2001 CITY OF R. Transportation System Plan Access RTP Tigard Management Main Visioning Street Plan TDM Regional Corridor ECO Center Plan ITS Comp Plan 2040 1qP\-j I TSP OTP TPR Town Functional Center Plan City of • • • TSP TPR " OTP RTP Corridor Plan Functional Plan Regional Growth TDM access ITS Concept/2040 ECO Management Regional Town Center Center Main Street Fi ure 2-2 RELATIONSHIP OF SP TO DKSAssociates REGIONAL PLANNING DKS Associates Access Management - Methods to address improved safety and performance of state highways through control of access commensurate with facility needs. ITS - Intelligent Transportation Systems. Use of advancing technology to improve movement of people and goods safely. TDM -Transportation Demand Management. An element of the TSP,that includes a series of actions to reduce transportation demand during peak periods. ECO - Employee Commute Options. An urban area TDM program required by Department of Environmental Quality(DEQ) of employers of 50 or more persons to reduce vehicle trips. Functional Plan —A Metro adopted plan(November 21, 1996,updated September, 1998)which outlines mandatory criteria for evaluating transportation systems and land use,translating state and regional policy to local requirements necessary to implement the 2040 planning effort. Title 2 and Title 6 require that the City adopt changes to its land use regulations to address parking ratios, connectivity and level of service. Superceded by the Regional Transportation Plan. Tigard Comprehensive Plan—This plan is a strategy to guide the City in the conservation, protection and development of the City of Tigard. 2040 - A long range effort directed by Metro to explore the choices for growth in the next 50 years and defining performance standards for local government to implement the regional growth concept. It defines several development types which will create higher density population and employment centers in the region. They are as follows: ❑ Regional Center: Compact centers of employment and housing served by high quality transit. They will become the focus of transit and highway improvements. Washington Square is identified as a regional center. ❑ Town Center: Provides for localized services within a 2-3 mile radius,with a community identity. There is a town center identified in the Main Street area and another identified near the intersection of ORE 99W and Durham Road. ❑ Station Areas: Development centered on LRT or high capacity transit, accessible by all modes. ❑ Main Street: Similar to town centers, an area with a traditional commercial identity,but smaller in scale, along a street with good transit services ❑ Corridors: Development along a primary and frequent transit corridor that encourages mixed use and pedestrian access to transit. ORE 99W, Scholls Ferry Road and Hall Boulevard have been identified as corridors in Tigard. Tigard Transportation System Plan P99161x0 Goals and Policies 2-10 October 30,2001 DKS Associates Chapter 3 Existing Conditions CIN OFTIGARD V OREGON This chapter summarizes existing traffic and transportation conditions in the City of Tigard. The focus is on motor vehicle,transit,pedestrian, bicycle and truck facilities. To understand existing travel patterns and conditions, a variety of aspects of the city's transportation system were considered. In the fall of 1994, an inventory of traffic conditions in Tigard was undertaken to establish a base year for all subsequent analysis. As refinements have been made to the regional land use forecasts over the past five years, conditions have changed. Current, up-to-date counts were conducted in 1997 and again in 1999 at many of the same intersections and at some additional intersections. This data collection update provides a unique opportunity to look at intersection level growth trends within the City over a period of approximately five years. Updated counts were conducted only at intersections,however, the remaining data summarized in this chapter would still apply to current conditions,including relative variation among routes,peaking characteristics, speed zones, high accident locations, bus routes, etc. The following sections briefly describe existing roadway functions, circulation, traffic speeds and volumes and levels of service in the Tigard transportation system as well as existing pedestrian,bicycle and transit facilities. STREET NETWORK The Transportation Planning Rule requires that classification of streets within the City be provided. ' The classification must be consistent with state and regional transportation plans for continuity between adjacent jurisdictions. The City of Tigard has an existing street classification system. This system is shown in Figure 3-1.2 The number of lanes on roadways in Tigard are shown in Figure 3-2. Existing typical street cross-sections are shown in Figure 3-3. ' Transportation Planning Rule, State of Oregon,Department of Land Conservation and Development,Section 660-12-020(2)(b),May 1991 (updated November, 1998). 2 Comprehensive Plan: Transportation Map,City of Tigard,Ordinance No. ORD-91-13,Map adopted June 11, 1991. Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 1 October 30, 2001 DKSAssociates (` 26 kx NOT R° CITY OF TIGARD TO SCALE ¢ TAYLORSFERRY RD Transportation ¢ � Q Systems Plan LOCUST ST z Legend o m w Q m Z -ARTERIAL o - MAJOR COLLECTOR T 217) m MINOR COLLECTOR r > > GRFF F o a Sr T co BPRR0 i�FR 99W) o z Y 2 O o AARDE T .n NALn sRUSE SUN /N ¢ z RD BONITA Rn 0� W ¢ BATTLER ST 5 P� M GPQCR `L 0 m RO SUMMERFIELD BEND DURHAM Rn BEEF ¢ ...................... w ...River........ � o W Qo�` 1��oG�� Figure 3 EXISTING FUNCTIONAL s CLASSIFICATION DKSAssociates (t) 26 kx NO Ro GIN OF TIGARD TO SCALE S� TAYLORS FERRY RD Transportation O O Systems Plan Q LOCUST ST z Legend W ti N OAK ST m Z 3 . -3 Lanes RRy x -5 Lanes ORTH DAKOTA ST 2 ) PFAFFLE ST Q� TIGARD P (� ST co BPRR0 S WA�N�� MPS ti�NZ�FR P 99W) r � � P 0 GAARDE S MCDONALD ST ASF BULL MOON /N Q x RD BONITA RD W ¢ ¢ SATTLER ST ¢ 5 ti W o DR � m RD SUMMERFIELD BEND DURHAM RD BEEF v Q z River........ N Figure 3-2 ee ROADWAYS WITH MORE THAN TWO LANES �g DKS Associates Local Street a Residential 5' 24'-32' m) (m) R/W 36-50' (ml (ml Local Street f Commercial & Industrial 2.5 5' 34' m 5' 2.5' m) (m) R/W 50'(m) (m) (m), Minor Collector Q � 2.5' 5' 40' 5' 2.5' (m (m) R/W 60'(m) (m) (m Major Collector o Center Turn Lane or Median 1.5' 6' 16' 12' 16' 6' 1.5' (m) (m) R/W 60'-80' (m) (m) o Arterial � Tura re or Median 1.5' 8' 14' 12' 12' 12' 14' 8' 1.5' � (m) (m) R/W 60'-90' (ml (ml, (m) - Minimum Required Width Figure 3-3 EXISTING TYPICAL STREET CROSS SECTIONS DKS Associates Washington County roadway classifications are generally consistent with City of Tigard designations. The following table shows roadway segments where the classification differs between the two jurisdictions. A table summarizing functional classification of Tigard streets by other jurisdictions is shown in the appendix of this report. Functional Classification Differences Roadway Tigard Washington County Greenburg Road Major Collector Minor Arterial Scholls Ferry Road Arterial Major Collector ODOT and Metro only classify roads that are of statewide or regional significance, respectively. These classifications are compatible with Tigard classifications, although the specific titles differ to some degree. ODOT and Metro classifications can be found in the Roadway Functional Classification According to Jurisdiction table in the appendix of this report. TRAFFIC SPEED AND VOLUME Speed zones on arterials and collectors within the City of Tigard are summarized in Figure 3-4. Speed zones are set by the Oregon's State Speed Control Board(SSCB). The SSCB is an independent board who sets speed zones for city streets, county roads and state highways passing through cities. The SSCB considers any factors such as roadway width, surface, lanes, shoulders, signals, intersections, roadside development,parking, accidents and 85th percentile speed. A decision made by the SSCB is not arbitrary or political, and is based on the considerations described above. Speed zones are set by the State of Oregon using an analysis process which considers the measured 85th percentile speed of traffic on a given roadway. Speed zones are not set arbitrarily or as part of apolitical decision.' Vehicle speeds on several collector and residential streets are a concern for the community. As examples, streets such as Watkins and Bull Mountain Road are locations mentioned in discussions with the community. In most cases, speeding becomes very noticeable when it is above 35 miles per hour. Speeding can usually be expected on local streets which are wide and straight for long stretches or where downhill grades are extended. A complete inventory of peak traffic conditions was performed in the fall of 1994 as part of the Tigard Transportation System Plan. The traffic counts conducted as part of this inventory provide the basis for analyzing existing problem areas as well as establishing a base condition for future monitoring. The City of Tigard conducted evening (4-6 PM)peak period turning movement counts at 30 locations to determine intersection operating conditions. Updated counts have been conducted in 1997 and in 1999 at many of these locations,plus a few additional locations, for a total of 62 intersections. Figure 3-5 shows the existing average daily and peak hour traffic volumes on several key routes in Tigard. On a typical day, ORE 99W is the most heavily traveled street in Tigard. The segment near the ORE 217 ramps carries about 46,000 vehicles per day(two-way). Figure 3-6 shows average daily traffic (ADT) on several routes in Tigard and a comparison of traffic volumes on several routes over the period between 1994 and 1999. 3 Speed Zoning: Who Decides,State Speed Control Board,April, 1992. Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 5 October 30, 2001 DKSAssociates (t) hAlz 26 , kx NOT Ro GIN OF TIGARD TO SCALE TAYLORS FERRY RD Transportation Systems Plan SPEED SPEED 35 35 SPEED p RO LOCUST SPEED N SPEED 30 ST N Legend SPEED40 30 OAK SPEED 45 Z 35 SPEED FERRY 40 ORTH DAKOTA ST SPEED 217 SPEED 35 SRF PFA FFLE 35 ST 10 QO Q Q SPEED Q RG O 5 \_� 4E0 ED SAP T 'f JO pp SPEED SPEEDA/W.TH ST 4O 30 Q SPEEDS� SPEED 30 yeti SPEED ...45 RROVY SPEED WAIN P�� SPEED Z//rte 30 gP 35 P _ M 30 SPEED 35 SPEED y SPEED 45 o GAARDE ST SPEED MCDONALD ST AUSF 35 o MOON �/V Q N BULL SPEED 5 RD SPEED 35 Pn 40 SPEED L2 Q ¢S TTL R SPEED ST Q 35 35 SPEED W DR 35 m RD SUMMERFIELD BEND SPSPEED RD BEEF v a 0 z w PE ,..RIVer...... SPEED SED = Qo 35 Figure 3-4 EXISTING SPEED ZONES �� DKS Assodates (t) Hglz 26 kx ® CIN OF TIGARD TO SCALE O R� ¢ TAYLORS�9Do FERRY RD Transportation O Systems Plan poo M 'Q 0 RO LOCUST ST z Legend mLU " 36 0 OA 1900 ST 0000 Peak Hour Volume -ADT Volume 10 5400 CV Q 217 Th DAKOTA Sr 0000 -Daily Volumes from Previous Counts NORr (1993-1994) TIGARD P URS S ?10) p o O Q Go ro®4��"�P� co, ¢ 1999 Traffic Volumes Q ST y RRpVJS ��0 ,� Peak Hour BP x wq�N� P MP ��FR Street Volume Dartmouth Street 1,000 z 00 S� 72nd Avenue Y P _ south of Dartmouth 950 ^� 3 0 — Hall Boulevard 99W - north of Durham 1,375 o GAARDE S McDONALD ST ?USF Durham Road 300 Q N east of Hall 2,050 BULL 11 UNTA/N Bonita Road 1,500 RD 2600 BONITA RD 1200 McDonald Street 975 1 11 z ¢ 1500 SATTLER S ¢ 5 m ¢ GPQ�P W DR m RD SUMMERFIELD BEND DURHAM RD 500 BEEF 19,100 Ro '11 ' a > Q � _ o o - N M ...River..... 00 N 35 o� Figure - EXISTING TRAFFIC TRAFFIC VOLUMES DKS Associates Tigard Historical Traffic Volumes 5000 4500 019941 2 4000 - 1 1 3500 `g 3000 2500 F _ — 2000 1500 1000 500 0 AMR l� #� a� Intersection Traffic Variation in Tigard (1994) 34,300 26,300 11,500 10,700 9,300 3,800 3,300 1,100 850 680 { a. Figure 3-6 Traffic Volume Summaries Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 8 October 30, 2001 DKS Associates Traffic data collected over the course of this study illustrate the typical fluctuations of traffic over the course of a day(Figure 3-7). In particular, Figure 3-7a shows traffic volumes on ORE 99W,both at the south City Limits and near downtown Tigard. This figure demonstrates that morning and evening peak periods have similar characteristics in both locations,but that there is much more midday traffic in downtown than at the south City Limits. In Figure 3-7b,traffic volumes are shown for streets near retail areas of Tigard. These graphs show that traffic volumes generally tend to increase over the course of the day (through the evening peak period). In Figure 3-7c, streets showing typical residential and employment areas are shown. These streets generally tend to peak in the morning and evening peak(commute)hours. COLLISIONS Both the regional highway and regional retail facilities in Tigard tend to generate significant traffic incidents to which the police department routinely responds. The following four areas are all regional in nature and have the highest accident rates in the City: ■ ORE 99W- In particular, the segment between Hall Boulevard and ORE 217. Many of the accidents are due to access issues or turning traffic (many driveways). ■ ORE 217 - In particular, the segment between ORE 99W and 1-5. Many of the problems here are related to merging traffic and rear-end accidents the end of the traffic queue. ■ Washington Square- In particular, on Greenburg Road between Locust Street and the ORE 217 ramps due to the large volume of vehicles,weaving and turning vehicles. The large number of people from outside the area traveling to shopping areas increases the number of system users who are not familiar with the circulation. ■ Tigard Triangle(bounded by ORE 99W, I-5, ORE 217) - This is developing as a regional retail center,thereby increasing vehicle trips in the area. It is now experiencing similar "out of area" drivers to the Washington Square area. The accident rate has increased by 50 percent in the last two years.4 Recent accident data on state highways in Tigard was obtained from ODOT. This data indicates the following: Route 1996 1997 1998 Total (1996-1998) ORE 99W 323 276 284 883 1-5 47 57 71 175 Hall Boulevard 87 93 115 295 Scholls Ferry Road 9 32 22 63 ORE 217 165 141 132 438 4 Per meeting with Tigard Police Chief Ron Goodpaster,February 14, 1995. Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 9 October 30, 2001 DKS Associates ORE 99W North of Tualatin River a� 3500 PM Peak E 3000 a 2500 2000 ❑Southbound 0 1500 o Northbound 1000 500 0 Time of Day ORE 99W West of ORE 217 Ramps PM Peak aD 3500 E 3000 2500 2000 ❑Westbound U 1500 M Eastbound 1000 od 500 0 Time of Day Figure 3-7a ORE 99W (Hourly Traffic Variation in Tigard) Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 10 October 30, 2001 DKS Associates Upper Boones Ferry Road South of Durham Road a� 1400 PM Peak E 1200 a 1000 800 ❑Southbound 0 400 o Northbound 200 0 Time of Day Bonita Road West of 1-5 1200 PM Peak a� a 1000 0 800 ❑ Westbound 600 -- 0 400 o Eastbound 200 -- 0 w r_ w Time of Day Figure 3-71b Retail Areas (Hourly Traffic Variation in Tigard) Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 11 October 30, 2001 DKS Associates Bull Mountain Road West of 150th Avenue 450 E 350 PM Peak a a 250 ❑ Westbound 0 150OFIDOUD � Eastbound 50 _gin } ry Time of Day Hall Boulevard South of ORE 217 PM Peak a� 1200 E 1000 0 800 ❑Southbound 600 -- 0 400 o Northbound 200 -- 0 Time of Day Figure 3-7c Residential and Employment Areas (Hourly Traffic Variation in Tigard) Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 12 October 30, 2001 DKS Associates Washington County maintains a safety priority index system (SPIS) listing that ranks the high accident locations county-wide. SPIS number and rank are based upon the number, rate and severity of accidents at a particular location. The 1997-1999 is the most current listing. Table 3-1 lists the existing hazard locations as defined by the SPIS value for locations in Tigard for the last three SPIS periods (1994-1996, 1996-1998 and 1997-1999). Fourteen intersections have SPIS values above the threshold identifying existing hazard locations for the 1997-1999 listing produced by Washington County. Table 3-1 Washington County SPIS Listing 1997-1999 RANK type LOCATION INTERSECTING ROAD ADT SPIS #ACC 9 co/city Nimbus Ave/Dr Scholls Ferry Rd 57877 99.42 50 33 co/state Bull Mountain Rd Highway 99w 45568 71.15 51 36 co/state Beef Bend Rd Highway 99w 45460 69.06 20 52 co/city Boones Bend Dr/121 st Ave Scholls Ferry Rd 36158 60.39 30 74 co/city Barrows Road (E) Scholls Ferry Rd 31305 50.40 19 77 co/city 135th Avenue Scholls Ferry Rd 30654 49.74 28 92 co/city Greenburg Rd Locust Street 15358 46.48 15 94 co/state Greenberg/Oleson Hall Blvd 34761 45.03 35 139 co/city North Dakota St/125th Ave Scholls Ferry Rd 34907 37.08 31 143 co/city Conestoga Drive Scholls Ferry Rd 38496 36.31 17 185 co/city Taylors Ferry Rd 70th Ave 5957 29.96 3 191 co/state Oak Street Hall Blvd 16338 29.45 10 208 co/state Locust Street Hall Blvd 15195 27.82 11 218 co/city 130th Avenue Scholls Ferry Rd 34773 26.92 10 SPIS Listing 1996-1998 RANK type LOCATION INTERSECTING ROAD ADT SPIS #ACC 3 co/state Hall Blvd Scholls Ferry Rd 45790 141.95 92 10 co/city Nimbus Ave/Dr Scholls Ferry Rd 52239 105.59 53 31 co/state Beef Bend Rd Highway 099w 45460 74.69 22 34 co/state Bull Mountain Rd Highway 099w 45840 73.00 52 38 co/city Boones Bend Dr/121st Ave Scholls Ferry Rd 36158 68.80 35 48 co/city Scholls Ferry Rd 135th Ave 30654 65.79 30 84 co/state Greenburg Rd/Oleson Rd Hall Blvd 34761 51.36 39 124 co/state Garland Rd Highway 099W 34200 41.33 3 142 co/state Fischer Rd Highway 099w 38825 37.42 24 155 co/city North Dakota St/125th Ave Scholls Ferry Rd 34907 35.55 28 159 co/co Old Scholls Ferry Rd (092 Ave) Scholls Ferry Rd 16462 35.00 18 171 co/co Beef Bend Rd Bull Mountain Rd 12128 33.47 11 173 co/co Old Scholls Ferry Rd 092nd Ave 620 33.39 4 184 co/city Walnut St 124th Ave 9618 32.06 4 192 co/state Boones Ferry Rd Bridgeport Rd 23155 31.25 6 203 co/co Scholls Ferry Rd Scholls Sherwood Rd 8780 30.17 3 206 co/state Hall Blvd Locust St 15195 29.32 11 221 co/city Scholls Ferry Rd Springwood Dr 46757 27.76 10 249 co/city Scholls Ferry Rd 130th Ave 34773 24.52 9 Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 13 October 30, 2001 DKS Associates 252 co/state Hall Blvd Oak St 16338 24.23 8 261 co/co Walnut St 121stAve 17165 23.24 10 262 co/co Cedarcrest St 080th Ave 5295 23.24 5 264 co/city Bridgeport Rd/Lwr Boones 072nd Ave 37023 23.10 11 267 co/city Greenburg Rd Mapleleaf St/WashSq Dr 24645 22.83 11 271 co/co Beef Bend Rd Elsner Rd 6710 22.37 6 288 co/city Greenburg Rd Locust St 14035 20.71 11 291 co/co Barrows Rd Roshak Rd 7108 20.57 6 339 co/co Elsner Rd Scholls Sherwood Rd 9315 17.56 5 342 co/co Taylors Ferry Rd 080th Ave 10665 17.17 7 388 co/co Scholls Ferry Rd 175th Ave 13375 14.79 5 400 co/co Locust St 080th Ave 7445 14.17 3 427 co/co Old Scholls Ferry Rd (GC) Scholls Ferry Rd 16144 12.64 4 481 co/city Walnut St 132nd Ave 11484 9.98 3 483 co/state Highway 099w Pacific Dr (s) 35782 9.79 3 Washington County SPIS Listing 1994-1996 3 YEAR TOTALS TYPE LOCATION INTERSECTING ROAD ADT SPIS RANK #ACC #VEH F A B C co/state Hall Blvd Scholls Ferry Rd 44690 56.48 12 61 130 0 0 7 37 co/city Nimbus Dr Scholls Ferry Rd 41990 47.57 35 40 84 0 1 1 28 co/co Beef Bend Rd Scholls Ferry Rd 14495 46.73 42 21 39 0 3 5 4 co/city Boones Bend Dr/121st Ave Scholls Ferry Rd 36158 45.81 45 27 51 1 1 2 4 1 13 co/city 135 Ave Scholls Ferry Rd 30654 44.66 54 25 53 0 3 2 9 co/city Barrows Rd Scholls Ferry Rd 15600 43.53 65 18 39 0 0 0 11 co/state Bull Mountain Rd Hwy 99W 41790 42.93 73 32 72 0 0 4 19 co/city North Dakota St/125th Ave Scholls Ferry Rd 34907 42.55 79 1 22 48 1 2 1 10 co/city Greenburg Rd Locust St 10690 42.27 83 11 23 0 1 2 1 co/co Walnut St 121stAve 14950 41.48 89 15 31 0 0 2 10 co/city Greenburg Rd Mapleleaf St/WashSq Dr 24645 39.85 104 21 43 0 0 1 10 co/co Beef Bend Rd Bull Mtn Rd 7320 38.15 122 9 19 0 0 3 11 co/state Greenburg Rd/Oleson Rd Hall Blvd 25650 35.39 155 16 35 0 0 2 10 co/co Locust St 72nd Ave 2506 34.83 163 3 6 0 0 0 2 co/co Locust St 80th Ave 7445 32.75 189 4 8 0 0 4 0 co/state Beef Bend Rd Hwy 99W 40260 32.54 193 16 33 0 0 5 9 Source: Was mgton County. R&O 86-95 defines determines existing hazard locations to e SPIS greater than 32.24. Key: SPIS = Safety Priority Index System, ADT=Average Daily Traffic,Rank=ranking of Countywide SPIS,#Ace =total collisions,#veh=total vehicles,F=fatalities,A= severe injuries, B =moderate injuries, C=minor injuries Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 14 October 30, 2001 DKS Associates SCHOOLS There are a number of schools in Tigard where the surrounding roadways create barriers for access due to limited width and pedestrian facilities. In conversations with the Tigard-Tualatin School District,the following issues were noted by school site. ■ Metzger Elementary: Adequacy of walking paths and adjacent street width ■ Mary Woodword School: Difficult for traffic circulation due to congestion ■ Fowler Intermediate School: Access from both Walnut Street and Tiedeman Avenue ■ Durham Elementary School: Adequacy of Durham Road width,walking paths, turn lanes ■ Tigard High School: Driveway spacing conflicts ■ Templeton Elementary School: Adequacy of sidewalks TRAFFIC CONTROL Tigard has 66 signalized intersections,with the majority on arterial streets. A summary of the ownership of these signals as well as who operates and maintains them is shown in Table 3-2. There are five key coordinated systems within the City. These include: ■ ORE 99W ■ 72nd Avenue between ORE 217 southbound ramps and Hampton Street ■ Scholls Ferry Road ■ Greenburg Road between ORE 217 southbound ramps and Locust Street ■ 72nd Avenue between ORE 217 southbound ramps and Hampton Street Of the 66 signals in the City of Tigard, 11 are owned by the City of Tigard, 11 are owned by Washington County and 44 are owned by ODOT. Most signals do not need upgrade or modernization. The signal at Main Street/Scoffins Street is the oldest in the City and would be the most likely candidate for upgrade. The signal at 72nd Avenue/Bonita Road has recently been upgraded to include protective/permissive left turn phasing on all approaches. The signals at Durham/Upper Boones Ferry Road, 72nd AvenueBoones Ferry Road and 72nd Avenue/Carman Drive should eventually be intertied. Figure 3-8 shows the signalized locations. Traffic signals are valuable devices for the control of vehicle and pedestrian traffic. Traffic control signals,properly located and operated, can have one or more of the following advantages: ■ They provide for the orderly movement of traffic ■ Where proper physical layouts and control measures are used, they can increase the traffic handling capacity of the intersection 5 Per conversation with Dr. 7oki, Superintendent,Tigard-Tualatin School District,February 22, 1995. Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 15 October 30, 2001 DKS Associates ■ They reduce the frequency of certain types of accidents, especially right angle type ■ Under favorable conditions, they can be coordinated to provide continuous or nearly continuous movement of traffic at a definite speed along a given route ■ They permit minor street traffic,vehicular or pedestrian, to enter or cross continuous traffic on the major street ■ Improper or unwarranted signal installations may cause: ■ Excessive delay ■ Disobedience of signal indications ■ Circuitous travel of alternative routes ■ Increased accident frequency,particularly rear-end type Consequently, it is important that the consideration of a signal installation and the selection of equipment be preceded by a thorough study and be based on consistent criteria. The study must identify the need for left turn phasing, lanes and phase type. The justification for the installation of a traffic signal at an intersection should be based upon the warrants stated in the Manual on Uniform Traffic Control Devices (MUTCD). The MUTCD has been adopted by the state of Oregon and is used throughout the nation. The same conditions hold true for installation of stop sign traffic controls. Specific warrants identify conditions which may warrant two-way or multi-way stop sign installations. A stop sign is not a cure- all and is not a substitute for other traffic control devices. Guidelines and warrants for stop sign installations are outlined in the MUTCD. 6 Manual on Uniform Traffic Control Devicesfor Streets and Highways,US Department of Transportation,Federal Highway Administration, 1988,pages 4C1-4C12. Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 16 October 30, 2001 DKS Assodates (t) hAlZ 26 , kx NOT Ro CITY OF TIGARD TO SCALE TAYLORS FERRY RD Transportation Systems Plan Q RO LOCUST ST o � Legend W OAK ST m Z 3 -Signalized Intersection FER y ORTH DAKOTA sr 2? m PFAFFLE ST 210 TIGARD P URG S TH ST ST s BPRR0 S WA�N�� Pt' ti�NZ�FR � � P � 99W) GAARDE T McDONALD ST ASF MOU Q o BULL /N N x RD BONITA RD W ¢ ¢ SATTLER ST ¢ 5 M GP�� ti W o DR � m RD SUMMERFIELD BEND DURHAM RD BEEF v a Q o w ...River........ figure - �`°�° SIGNALIZED INTERSECTIONS �� DKS Associates Table 3-2 Tigard Signal System Intersection Ownership Agency Operating Agency Mainainin Scholls Ferry Road Barrows Road(West) WA County WA County WA County Barrows Road(East) WA County WA County Beaverton Murray Boulevard WA County WA County Beaverton 136h Avenue WA County WA County Beaverton 125th Avenue WA County WA County Beaverton 121" Avenue WA County WA County Beaverton Conestoga Drive WA County WA County Beaverton Nimbus Avenue WA County WA County Beaverton Cascade Avenue ODOT Beaverton Beaverton ORE 217 SB Ramps ODOT Beaverton Beaverton ORE 217 NB On/WA Square ODOT Beaverton Beaverton Hall Boulevard ODOT Beaverton Beaverton Hall Boulevard Scholls Ferry Road ODOT Beaverton Beaverton Embassy Suites Driveway ODOT ODOT ODOT Target Driveway ODOT ODOT ODOT Circuit City/US Bank Dwys ODOT ODOT ODOT Greenburg Road/Oleson Road ODOT ODOT ODOT Locust Street ODOT ODOT ODOT Oak Street ODOT ODOT ODOT ORE 99W ODOT ODOT ODOT Hunziker Street ODOT ODOT ODOT Burnham Street ODOT ODOT ODOT McDonald Street ODOT ODOT ODOT Bonita Road ODOT ODOT ODOT Durham Road ODOT ODOT ODOT Durham Road ORE 99W ODOT ODOT ODOT Summerfield Drive Tigard Tigard WA County 92 Id Avenue Tigard Tigard WA County Hall Boulevard ODOT ODOT ODOT Upper Boones Ferry Road I ODOT ODOT ODOT 72°d Avenue Tigard Tigard WA County 72" Avenue Durham Road Tigard Tigard WA County Upper Boones Ferry Road Tigard Tigard WA County Carman Drive Tigard Tigard WA County Bonita Road Tigard Tigard WA County Varns/ORE 217 SB Ramps ODOT ODOT ODOT Hunziker Street ODOT ODOT ODOT ORE 217 NB Ramps ODOT ODOT ODOT Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 18 October 30, 2001 DKS Associates Intersection Ownership Agency Operating Agency Mainainin Hampton Street Tigard Tigard WA County ORE 99W ODOT ODOT ODOT ORE 99W 68th Avenue/69th Avenue ODOT ODOT ODOT 72° Avenue ODOT ODOT ODOT Tigard Cinemas ODOT ODOT ODOT Dartmouth Street ODOT ODOT ODOT ORE 217 NB Ramps ODOT ODOT ODOT ORE 217 SB Ramps ODOT ODOT ODOT Hall Boulevard ODOT ODOT ODOT Greenburg Road ODOT ODOT ODOT Johnson Street/Main Street ODOT ODOT ODOT Walnut Place ODOT ODOT ODOT Garrett Street ODOT ODOT ODOT Park Street ODOT ODOT ODOT Tigard Marketplace ODOT ODOT ODOT Gaarde/McDonald Street ODOT ODOT ODOT Canterbury Lane ODOT ODOT ODOT Bull Mountain Road ODOT ODOT ODOT Beef Bend Road ODOT ODOT ODOT Royalty Parkway ODOT I ODOT ODOT Durham Road ODOT ODOT ODOT Fischer Road ODOT ODOT ODOT Greenburg Road ORE 99W ODOT ODOT ODOT Tiedeman Avenue Tigard Tigard WA County Cascade Boulevard Tigard Tigard WA County ORE 217 SB Ramps ODOT ODOT ODOT ORE 217 NB Ramps ODOT ODOT ODOT Washington Square Road WA County WA County WA County Locust Street WA County WA County WA County Hall Boulevard/Oleson Road ODOT ODOT ODOT Carman Drive I-5 SB Ramps ODOT ODOT ODOT I-5 NB Ramps ODOT ODOT ODOT Sequoia Parkway Tigard Tigard WA County Upper Boon es Ferry Road Bridgeport Road ODOT ODOT ODOT Durham Road ODOT ODOT ODOT Main Street Scoffins Street Tigard Tigard WA County Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 19 October 30, 2001 DKS Associates TRAVEL TIME INFORMATION Travel time information was collected to provide a gauge of roadway system performance. Travel time runs were conducted on several key routes in Tigard. These travel time runs measured the length of time it took to travel from a starting point to and end point of each key route (typically, a mile or more in length) during various time periods during the week. The key routes surveyed were ORE 99W, Hall Boulevard, 72nd Avenue,Main Street/Greenberg Road and Durham Road. The time periods observed were weekday morning peak, weekday midday,weekday evening peak and Saturday midday. The most significant delays were generally observed in the PM peak hour. However, on two routes which are heavily influenced by retail activity, delays were significant at other times (ORE 99W Saturday and Greenburg midday). The results of these travel time runs are shown in Figure 3-9. Travel times from various time periods are shown for comparison. 72nd Avenue shows significant delay both northbound and southbound in the PM peak hour. Since 1994, new signal timings were installed at four intersections near ORE 217 and the four intersections linked via interconnect. Delays through these four intersections were initially reduced by more than 40% in both the northbound and southbound directions as a result of this improvement. Since the initial delay reduction a few years ago, the route has attracted additional demand and at least 70-100 additional northbound and about 200-300 additional southbound vehicles now use this route in the evening peak hour, which has increased delays on the route. Travel time data on ORE 217 indicates that some of the slowest travel speed on the facility occurs in Tigard. Floating car surveys were conducted on ORE 217 during the morning and evening peak periods (see appendix for data summaries). Travel time data were collected along the entire length of ORE 217 at various times through the peak period. The average travel speed for the entire corridor drops to between 30 and 40 miles per hour(mph) during periods of time in both the morning and evening peak representing level of service F conditions for those time segments. Figure 3-10 summarizes the peak travel speeds over the length of ORE 217. Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 20 October 30, 2001 DKS Assodates (t) z 26 kX NOT Ro GIN OF TIGARD TO SCALE TAYLORS FERRY RD Transportation Systems Plan Legend RD LOCUST ST z ��Hall Boulevard W ti N m z ¢ OAK ST i11.14*01111[61 Ll I I LTj I 112 N/B 10:26 11:48 FERRY 217) S/B 19:04112:58 ORTH DAKOTA ST —� 210 Q ¢ ¢ TIGARD P GRFF RG PFAFFLE ST ---— 72nd Avenue O p a PM i i Ll I I LTJ I 112 .-•i a1i Sr N/137:41 15:37113:215 sr s Q SIB 6:42 9:10 8: O s BPRRwa�N P P0 ?'�F� TNMain St./Greenburg Rd. 9 11.401111[61i PSS E/B-N/B 10:22 9:22 ZE S/B-W/B 9:35 9:26 0 GAARDE S McDONALD ST ASF ------- Durham Road MpUN /� BULL E/B 4:15 4:21 4:24 RD BONITA RD W/B 4:25 6:57 4:56 W ¢ ¢ SATTLER ST ¢ 5 P�°� �ORE 99W m P�� 1"T NITA _-- w RD SUMMERFIELD DR p E/B 110:27113,:32 13:47 19:22 BEND W/B111:12112:39115:59111:25 BEEF v MID -MIDDAY, 1:00pm-3:00pm PM PM PEAK, 4:00pm-6:00pm z w Signal Timing Change 12/94 R'ver D Sections with D,E or F-LOS ........ W -9Figure 3 Gd�d 1994 l s TRAVEL TIME SURVEYS (Except where Noted) DKS Associates Figure 3-10 Travel Speed Profiles for ORE 217 April/May 1999 For Critical(slowest)Time Slice a� 70 Northbound 4 PM 60 Z 50 Q 40Ann E 30 20 10 Cn Cn 0 70 Southbound 4 Cn 60 75 50 � Q 40 E 30 20 10 �n 0 0 �d5 Gtr O� Source:ORE 217 Corridor Study Initial Improvement Concepts Draft,ODOT,February 2000. TRAFFIC PERFORMANCE ON KEY STREETS The following sections review the performance of various key routes in Tigard in terms of volumes, capacity, accidents, adjacent land use (including schools), intersection level of service, arterial level of service and general observations. The key routes include ORE 99W, Scholls Ferry Road, Hall Boulevard, Greenburg Road, 72nd Avenue and Durham Road/Boones Ferry Road/Carman Drive. Each route evaluation is organized to provide a description in terms of functional classification, number of lanes, existing traffic volumes, accident locations and a summary of PM peak hour operating conditions. The 1994 calculations were based on the 1985 Highway Capacity Manual. Since then,the Highway Capacity Manual has been updated twice and the 1997 calculations are based on the 1994 Highway Capacity Manual and the 1999 calculations are based on the 1997 Highway Capacity Manual. While there are some subtle distinctions in the methodologies used, the results produced are comparable. Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 22 October 30, 2001 DKS Associates In general, intersection level of service in Tigard has either remained the same or degraded slightly over the past three years. As regional growth has occurred, traffic volumes around the City have increased. In 1999, most intersections in Tigard operate at level of service D or better,with some exceptions. The intersections which are operating at conditions below level of service D in 1999 are discussed in the following sections. Travel time runs (which provided the data for the arterial level of service analysis) are shown graphically in Figure 3-9. Areas where arterial level of service is D or worse are identified on these figures. Arterial level of service was calculated according to the 1994 Highway Capacity Manual.' A majority of these runs were conducted in 1994,with updated runs on ORE 99W conducted in 1997. Overall, average evening peak hour travel time along ORE 99W westbound(between 68th Avenue (near I-5) and Fischer Road,west of the City limits)has increased by about three minutes. Travel time in the opposite direction(eastbound) has remained approximately the same. More information on level of service descriptions and calculations (both arterial and intersection) as well as travel time methodology, can be found in the appendix. ORE 99W ORE 99W provides regional access to the City of Tigard, but _ also serves a large percentage of local traffic. ORE 99W connects Tigard with cities to the south and west and eventually to the Oregon Coast. To the east, ORE 99W N z; becomes Barbur Boulevard, a key route in Portland, providing access to downtown Portland. Tigard classifies ORE 99W as an arterial while Washington County and Metro designate it a Major Arterial. ODOT's designation is a Statewide Highway as part of the National Highway System. Portland designates Barbur Boulevard as a regional trafficway. J ORE 99W carries approximately 33,300 vehicles per day (ADT-Average Daily Traffic)near the south Tigard city limits and approximately 45,900 ADT near downtown. ORE 99W is a five lane roadway throughout Tigard. Figure 3-11 shows the percentage of vehicles which are local for various segments.' The percentage of local trips on ORE 99W is much higher near downtown Tigard than at either end. The table below summarizes level of service for a number of signalized intersections along ORE 99W during the weekday evening peak hour. Of the 16 intersections analyzed, all but one intersection performs at level of service D or above. This is generally considered to be acceptable operating performance for a signalized intersection. There are five intersections which operate at level of service D, ORE 99W/Durham Road, ORE 99W/Walnut Street, ORE 99W/Greenberg Road/Main Street, ORE 99W/Hall Boulevard, and ORE 99W/72nd Avenue. If additional traffic is added to these intersections, it is possible that they may decline to an unacceptable level of service. One intersection, ORE 99W/McDonald Street/Gaarde Street, 7 1994 Highway Capacity Manual, Special Report 209,Transportation Research Board,Washington D.C., 1994, Chapter 11. a Data provided to the City of Tigard by Metro,December 1992. A plot was generated showing trips on ORE 99W with either an origin or destination in a Tigard traffic analysis zone. This plot was then related to a plot showing all trips on ORE 99W. Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 23 October 30, 2001 DKS Associates currently operates at level of service E. This intersection is already operating at unacceptable levels of service andr long queues tend to form on various legs of the intersection. Sometimes these queues extend to other Vis, intersections, creating unnecessary operating problems there as well. A long queue(greater than 20 vehicles) forms for about 15-20 minutes in the PM peak hour at the intersection at 68th Parkway/69th Avenue. Over the course of the entire peak hour, this intersection performs ` acceptably. .xs It should be noted that the 1997 and 1999 LOS calculations at Hall Boulevard/ORE 99W reflect a lane configuration change in the northbound direction, resulting in a slightly improved level of service over 1994 conditions. TIGARD TRAFFIC ON ORE 99W PM Peak Hour Intersection Level of Service Figure 3-11 Signalized Intersections Along ORE 99W Signalized 1994* 1997* 1999* Intersections LOS Dela V/C LOS Dela V/C LOS Dela V/C Durham Road D 27.9 0.77 D 48.7 0.88 Beef Bend Road B 12.1 0.86 B 11.1 0.80 Bull Mtn Road B 8.3 0.67 Canterbury Lane B 9.8 0.74 McDonald/Gaarde D 33.0 0.93 E 50.5 1.0 E 58.9 1.0 Tigard Mkt lace B 12.4 0.60 Park Street A 4.8 0.58 Walnut Street D 27.2 0.89 D 31.8 0.95 Main/Johnson B 12.6 0.62 B 13.2 0.70 Greenburg/Main E 43.1 0.97 D 30.3 0.85 D 43.9 0.85 Hall Boulevard E 46.3 0.99 D 34.5 0.91 D 49.2 0.87 ORE 217 SB Ramps C 19.2 0.75 C 21.6 0.83 ORE 217 NB Ramps B 5.5 0.65 B 6.5 0.75 78th Ave/Dartmouth C 19.7 0.81 C 24.3 0.89 D 35.5 0.86 72 nd Avenue B 14.7 0.75 D 25.6 0.93 C 32.9 0.86 68"/69" Avenues C 16.0 0.87 * For analysis purposes the capacity calculation methodology has changed twice over the past six years. The level of service analysis was conducted using the following methodology: 1994 Calculations use 1985 Highway Capacity Manual(HCM)Methodology 1997 Calculations use 1994 HCM Methodology 1999 Calculations use 1997 HCM Methodology 9 1994 counts conducted prior to opening of Costco on Dartmouth Street,therefore,counts may be lower than normal. 10 1994 counts conducted during Fred Meyer Strike(August, 1994)and may therefore be lower than normal. Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 24 October 30, 2001 DKS Associates The 1994 arterial level of service along ORE 99W tends to mimic that at the signalized intersections. ORE 99W generally flows at a level of service between A and C except in certain areas. These areas generally correspond to areas where intersection level of service is poor. Segments experiencing levels of service D or worse include, ORE 99W northbound between Main Street/Johnson Street and ORE 217 southbound ramps, and southbound from I-5 to 72nd Avenue, from ORE 217 northbound ramps to Hall Boulevard and from Main Street/Johnson Street to Walnut Street. It should be noted that, since ORE 99W is congested between Main Street/Johnson Street and ORE 217, it is unable to deliver as much traffic as is demanded at specific intersections. Because of this, intersection level of service does not appear as poor as arterial level of service,which is more reflective of route (rather than intersection) congestion. Scholls Ferry Road Scholls Ferry Road is an east-west roadway that serves as the north city limits for much of Tigard. It is five lanes from Murray Boulevard to Hall Boulevard. It carries approximately 30,000 to 45,000 ADT through Tigard. It has recently been transferred to Washington County, except the portion in the interchange area near ORE 217. It is classified by Metro and Washington an Major Arterial to the west of ORE 217 and as a Minor Arterial to the east of ORE 217. The City of Tigard and Beaverton both classify it as an Arterial for its length within the city limits. Scholls Ferry Road serves local traffic,but also provides regional access to Beaverton, ORE 217 and cities to the west of Tigard. Arterial level of service was not analyzed for Scholls Ferry Road and intersection level of service was only analyzed for 1999 volumes. Scholls Ferry Road serves as a border between Tigard and Beaverton and is under the jurisdiction of ODOT and Washington County. Although it provides access to Tigard, it is not integral to the internal street network of Tigard. PM Peak Hour Intersection Level of Service Signalized Intersections Along Scholls Ferry Road Signalized 1999* Intersections LOS Dela V/C Beef Bend Road C 25.5 0.84 Barrows Road(West) B 8.3 0.54 MurrayBoulevard C 29.8 0.79 Barrows Road(East) B 15.0 0.57 North Dakota/125t' D 42.9 0.95 Nimbus Avenue D 47.0 0.98 * 1999 Calculations use 1997 HCM Methodology Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 25 October 30, 2001 DKS Associates Hall Boulevard Hall Boulevard is a north-south roadway that predominantly serves local ; Tigard traffic,but also provides access to Beaverton to the north. It is classified by Metro and Washington County as a Minor Arterial and by the City of Tigard and Beaverton as an arterial. ODOT classifies Hall as a j District Highway. It carries approximately 12,000 to 23,000 ADT through Tigard. It is generally two lanes, with occasional left turn lanes, from Durham Road to Greenburg Road. It is three lanes between Durham Road 3 . and just south of Sattler Street,between ORE 99W and Pfaf le Street and ,.. between just north of Spruce Street and just north of Locust Street, and five lanes from Greenburg Road to Scholls Ferry Road. There are 11 traffic signals at intersections on Hall Boulevard. It has many driveways connecting directly to the roadway, serving mostly commercial and residential land uses. A driveway survey was conducted along Hall Boulevard and can be found in the appendix of this report." r The table below summarizes level of service for a number of intersections on Hall Boulevard. Of the seven intersections analyzed, four perform at level of service D. Hall Boulevard/McDonald Street and Hall Boulevard/Durham Road have long queues on some approaches. The queues at Hall Boulevard/McDonald street are on the northbound left and southbound approaches and the queues at the Hall Boulevard/Durham Road intersection are on the southbound and westbound through approaches. These queues generally tend to clear during each signal cycle,but both intersections are virtually at capacity. 1994 arterial level of service along Hall Boulevard shows levels of service C and above are experienced everywhere along Hall Boulevard, except at ORE 99W,where level of service D is experienced both northbound and southbound. PM Peak Hour Intersection Level of Service Signalized Intersections Along Hall Boulevard Signalized 1994* 1997* 1999* Intersections LOS Dela V/C LOS Dela V/C LOS Dela V/C Locust Street B 12.7 0.56 C 19.8 0.86 ORE 99W E 46.3 0.99 D 34.5 0.91 D 49.2 0.87 Hunziker Street B 14.0 0.62 Burnham Street B 13.0 0.54 McDonald Street C 20.7 0.99 E 52.7 1.0 D 38.0 0.93 Bonita Road C 16.8 0.68 C 21.0 0.97 D 47.7 0.90 Durham Road C 24.1 0.83 E 48.1 1.0 D 45.1 0.86 * 1994 Calculations use 1985 Highway Capacity Manual(HCM)Methodology 1997 Calculations use 1994 HCM Methodology 1999 Calculations use 1997 HCM Methodology Driveway survey,conducted by DKS Associates, September, 1994. Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 26 October 30, 2001 DKS Associates Greenburg Road Greenburg Road is a north-south street connecting downtown ao Tigard to the Washington Square area. It provides direct access to o� both ORE 99W and ORE 217. At Hall Boulevard, Greenburg Road becomes Oleson Road as it proceeds north into Portland. e«o Greenburg Road, is classified by Metro as a Major Arterial and by i LOCUST ST Washington County as a Minor Arterial north of ORE 217 and as a NOT OAK ST TO SCALE Major Collector south of ORE 217. It is classified, for its length, by Tigard as a Major Collector. The City of Portland designates Oleson as a Neighborhood Collector. It is three lanes between DAKOTA ST c) 21 ORE 99W and Hall Boulevard, except between ORE 217 and Qw vR Locust Street and just south of Hall Boulevard where it is five lanes. c�F S� The table below summarizes level of service for four signalized 99W intersections on Greenburg Road. Of these four intersections,two operate acceptably at level of service C and the others, Greenburg Road/Main Sreet/ORE 99W and Greenburg Road/Oleson Road/Hall Boulevard operate at level of service D. Long queues form in the eastbound direction on ORE 99W in the PM peak hour,with vehicles waiting through multiple cycles to clear the intersection. Some of this queuing may be caused by unacceptable operating conditions at Hall Boulevard,where the queue spills back to the Greenburg Road/Main Street/ORE 99W intersection. Arterial level of service along Greenburg Road/Main Street is above level of service C for most of the length of the route. Locations experiencing levels of service D and lower include northbound Main Street between Scoffins and ORE 99W,northbound Greenburg Road between ORE 217 northbound ramps and Washington Square Road, southbound Greenburg Road between Locust Street and Cascade Boulevard and between Center Street and ORE 99W. The arterial level of service on this route is comparable to intersection level of service, especially since arterial level of service near ORE 99W is poor, where the intersection operates at level of service E. PM Peak Hour Intersection Level of Service Signalized Intersections Along Greenburg Road Signalized 1994* 1997* 1999* Intersections LOS Dela V/C LOS Dela V/C LOS Dela V/C ORE 99W/Main E 43.1 0.97 D 30.3 0.85 D 43.9 0.85 Tiedeman Ave C 19.0 0.77 Wash Square Rd 1 23.3 0.73 Oleson/Hall Blvd I D 34.3 0.95 * 1994 Calculations use 1985 Highway Capacity Manual(HCM)Methodology 1997 Calculations use 1994 HCM Methodology 1999 Calculations use 1997 HCM Methodology Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 27 October 30, 2001 DKS Associates 72nd Avenue 72nd Avenue is a north-south roadway serving mostly local traffic in Tigard. It serves industrial traffic from land uses along its frontages,but also provides connections to ORE 99W, ORE 217, 1-5 and Tualatin to �9w the south. It is a three lane roadway between Bridgeport Road and the ORE 217 ramps. North of there,it is a two lane roadway with occasional ry S? left turn lanes. 72nd Avenue is classified as a Major Collector by the 217 City of Tigard and as a Minor Arterial by Metro. It is not classified by ����-�F�s AMPTONST Washington County. 72nd Avenue carries approximately 16,000 ADT. The table below summarizes level of service for several signalized intersections on 72nd Avenue. Of the 10 signalized intersections,five perform at level of service C or above (generally considered acceptable BON/TA RO operating conditions). The five remaining intersections, 72nd ' ll� NOT Avenue/ORE 99W, 72nd Avenue/ORE 217 Northbound Ramps, 72nd TO SCALE N Avenue/ORE 217 Southbound Ramps/Varus Street, 72nd Avenue/Bonita �o Road and 72nd Avenue/Carman Drive operate at level of service D. o��y Several of these intersections have been improved in the past few years. 72nd Avenue/Bonita Road was changed from protected left turn phasing on all approaches to protected/permissive phasing on all approaches. w m o� 72nd Avenue/ORE 217 Northbound Ramps and 72nd Avenue/ORE 217 Southbound Ramps/Varns Street were part of an overall signal timing/coordination project along 72nd Avenue between Varns Street/ORE 217 Southbound Ramps and Hampton Street. While these intersections operate at a better level of service as a result of these improvements, the 72nd Avenue has become a more desirable route, attracting at least 70-100 additional northbound vehicles and approximately 200-300 additional southbound vehicles between Hampton Street and the ORE 217 Southbound Ramps/Varns Street intersections. Arterial level of service along 72nd Avenue is poor(level of service D or lower)for a significant portion of its length. In particular level of service is poor northbound from Upper Boones Ferry Road to the ORE 217 southbound ramps. In the southbound direction, level of service is poor between Hampton Street and the ORE 217 southbound ramps,between Sandburg Street and Bonita Road and between Carman Drive and Upper Boones Ferry Road. This is fairly consistent with the intersection operating conditions, which are mostly at level of service D in these areas. In this case, arterial level of service is poor,while intersection level of service may not look so bad since a number of closely spaced signals were not interconnected when the travel time runs were made. Since these signals were not interconnected, additional delay was introduced from uncoordinated signal timing. These signals have since been retimed and the arterial level of service is much improved,however increased traffic volumes create increased delay. PM Peak Hour Intersection Level of Service Signalized Intersections Along 72nd Avenue Signalized 1994* 1997* 1999* Intersections LOS Dela V/C LOS Dela V/C LOS Dela V/C ORE 99W B 14.7 0.75 D 25.6 0.93 Hampton Street B 11.5 0.43 ORE 217 NB Rams B 10.9 0.48 D 29.6 0.99 Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 28 October 30, 2001 DKS Associates Signalized 1994* 1997* 1999* Intersections LOS Dela V/C LOS Dela V/C LOS Dela V/C Hunziker Street C 16.3 0.84 C 22.7 0.93 ORE 217 SB/Varns E 40.7 1.00 D 36.2 0.99 Bonita Road E 48.2 0.95 D 37.9 0.89 D 47.7 0.90 Carman Drive C 24.8 0.79 D 29.4 0.88 Upper Boones Ferry B 12.0 0.67 B 17.6 0.65 Durham Road B 8.7 0.31 Bridgeport Road B 12.5 0.54 * 1994 Calculations use 1985 Highway Capacity Manual(HCM)Methodology 1997 Calculations use 1994 HCM Methodology 1999 Calculations use 1997 HCM Methodology Durham Road/Boones Ferry Road/Carman Drive Durham Road is an east-west roadway that serves the southern part of Tigard. It is three lanes for its length. Durham Road is 1 classified by Metro as a Minor Arterial,by Washington County as a study area west of Hall and as a Minor Arterial " east of Hall, and as an Arterial by the City of Tigard east of ?' Hall Boulevard. West of Hall Boulevard, it is classified by the ' "1 City of Tigard as a Major Collector. Lake Oswego designates Carman Drive as a Major Collector. The route provides predominantly local access, but also serves vehicles traveling to ORE 99W or I-5 via Boones Ferry Road and Carman Drive and through traffic between King City and I-5. The table below summarizes level of service conditions along Durham Road/Boones Ferry Road/Carman Drive. Five of the six intersections perform at level of service D or above. ORE 99W/Durham Road, Hall Boulevard/Durham Road,Upper Boones Ferry Road/Durham Road and I-5 northbound ramps/Carman Drive all operate at level of service D. I-5 southbound ramps/Carman Drive operates at level of service E and is just about at capacity. Queues tend to form westbound and southbound at ORE 99W/Durham Road, with some vehicles waiting through more than one signal cycle. The same is true at Hall Boulevard/Durham Road. PM Peak Hour Intersection Level of Service Signalized Intersections on Durham Road Signalized 1994* 1997* 1999* Intersections LOS Dela V/C LOS Dela V/C LOS Dela V/C ORE 99W D 27.9 0.77 D 48.7 0.88 Hall Boulevard C 24.1 0.83 E 48.1 1.0 D 45.1 0.86 Upper Boones Ferry C 22.0 0.79 D 32.2 0.97 D 52.0 0.98 72° /Upper Boones B 12.0 0.67 1-5 SB/Carman Dr D 34.2 0.83 E 42.6 1.0 I-5 NB/Carman Dr D 25.9 0.89 D 31.5 0.96 * 1994 Calculations use 1985 Highway Capacity Manual(HCM)Methodology 1997 Calculations use 1994 HCM Methodology 1999 Calculations use 1997 HCM Methodology Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 29 October 30, 2001 DKS Associates Unsignalized Intersections In addition to the signalized intersections along Tigard's key routes, there are a number of unsignalized intersections which are important to traffic operations in Tigard. The table below summarizes the capacity analysis for evening peak conditions at 11 unsignalized intersections in Tigard. These additional intersections, combined with the signalized intersections mentioned above,represent the key study intersections identified by City staff for analysis in this study.' Unsignalized intersections are subject to a separate capacity analysis methodology which is described in the appendix of this report. Of the 11 unsignalized intersections, six are all-way stop controlled and five have one or more approaches which are uncontrolled. The methodology used for each of these cases is different and results are reported slightly differently(please see Appendix for more detail). PM Peak Hour Intersection Level of Service Unsignalized Intersections 1994 1997 1999 Intersection LOS* LOS* LOS* Walnut Street/135" Avenue A/A AB Walnut Street/121" Avenue C D Walnut/Tiedeman/Fonner B D Main Street/Burnham Street A/C 68th Parkway/Atlanta/Haines C D 72° Avenue/Dartmouth Street F F D McDonald Street/97" Avenue AB 68" Avenue/Dartmouth Street D Hall/Sattler/Ross B/E Greenbur Road/Oak Street B/C 1215 Avenue/North Dakota Street F * 1994 Calculations use 1985 Highway Capacity Manual(HCM)Methodology 1997 and 1999 Calculations use 1994 HCM Methodology Most of the unsignalized intersections that were analyzed operate acceptably at level of service D or above. However, three intersections are shown as level of service E or F. Often poor levels of service at unsignalized intersections affect only a small number of vehicles, since a majority of the vehicles (on the main street) are uncontrolled and flow freely at level of service A or B. Other Key Routes in Tigard Interstate 5 is the west coast's major north-south corridor and it provides regional and interstate access directly to the City of Tigard. 1-5 connects Tigard with adjoining cities in the Portland Metropolitan Region as well as with cities further south in Oregon such as Salem and Eugene. I-5 also provides access to other states such as Washington and California. ODOT classifies I-5 as an Interstate Highway as part of the National Highway System. For access management it is designated a Freeway. 12 Per discussions with Laurie Nicholson,City of Tigard staff, December, 1996 and spring 1999. Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 30 October 30, 2001 DKS Associates ORE 217 provides regional access to the City of Tigard. ORE 217 connects Tigard with Beaverton and Lake Oswego and provides access to US 26 and I-5. US 26 is a major route leading to the Oregon Coast to the west and to eastern Oregon. ODOT classifies ORE 217 as a Statewide Highway as part of the National Highway System. For access management it is designated an Expressway. Gaarde Street is an east-west Major Collector providing local access to residential streets in Tigard. It is two lanes and, in conjunction with 121st Avenue, connects ORE 99W and Scholls Ferry Road via Walnut Street. Main Street is an east-west Major Collector serving the commercial downtown core of Tigard. It parallels ORE 99W from Johnson Street to Greenburg Road. Bull Mountain Road serves residential and rural traffic west of Tigard as a Major Collector. This area is developing rapidly and, besides Beef Bend Road,Bull Mountain Road is one of the only roadways accessing this area. In addition, as ORE 99W becomes more congested, both Bull Mountain Road and Beef Bend Road are becoming part of an alternate route to rural areas to the west of Tigard. McDonald Street is an east-west Major Collector which runs between Hall Boulevard and ORE 99W. It serves predominantly residential traffic, although, as areas to the west in Tigard develop, it is being used more and more as a cut-through route. 121st Avenue is a north-south Major Collector which runs through mostly residential areas in Tigard. In conjunction with Gaarde Street, it connects Scholls Ferry Road with ORE 99W. North Dakota Street is an east-west Minor Collector which runs through mostly residential areas in Tigard It connects Scholls Ferry Road to Greenburg Road and generally runs parallel to Scholls Ferry Road. Beef Bend Road is parallel to, and south of, Bull Mountain Road. It is classified as a Major Collector and functions in a similar way as Bull Mountain Road as growth occurs in the area to the west of Tigard Walnut Street is an east-west Major Collector serving primarily residential traffic in Tigard. In conjunction with 135th Avenue, and with a short jog at Tiedeman Avenue, it provides a connection from ORE 99W to Scholls Ferry Road. Hunziker Street is an east-west Major Collector connecting Hall Boulevard with 72nd Avenue near the ORE 217 ramps. This street serves both commercial and residential traffic and is increasingly being used as a cut-through route across Tigard. Dartmouth Street is a relatively new Major Collector in Tigard. It is five lanes at its west end and three at its east end. It serves the new Cub Foods and Costco developments and provides direct access to ORE 99W and 1-5. Bonita Road is an east-west Major Collector which connects Hall Boulevard with Lake Oswego (via Bangy Road) and 1-5 (via 72nd Avenue and Carman Drive or via Bangy Road and Kruse Way). Locust Street is an east-west Major Collector which provides access to local neighborhood streets and between Hall Boulevard and Greenburg Road. Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 31 October 30, 2001 DKS Associates Upper Boones Ferry Road is a north-south Arterial which connects Durham Road with I-5 and Tualatin. Since there is very limited access to Tualatin due to the Tualatin River, much of the traffic between Tigard and Tualatin uses this route. Taylors Ferry Road is a Major Collector that serves as the northern boundary of the Tigard planning area. This route provides a link between the Metzger area and 1-5 and Portland to the east. AVERAGE VEHICLE OCCUPANCY Average vehicle occupancy(AVO)was measured at two locations in Tigard.13 These locations were at ORE 99W west of Hall Boulevard,and on Hall Boulevard south of ORE 99W Overall AVO measured in Tigard(between the two locations, over all time periods) was 1.21. This rate is somewhat lower than observed typical ranges for auto occupancy(over all time periods and trip purposes) which range from about 1.31 to 1.54.14 A breakdown by time period and location is shown in Table 3-3 and the percentage of vehicles by number of passengers and location is shown in Figure 3-12. Figure 3-12 Average Vehicle Occupancies Average Vehicle Occupancy Avorage Vehicle Occupancy ORE 99W West of Hall Boulevard Hall Boulevard South of ORE 99W TN~ >Thr« >lnree 3% 1% Thr« t% A / t r Two – Twp 17% - 161E -- i 1, I Single -- - Single ---_— _-- 8154 – – 81% 13 Counts conducted for DKS Associates on September 28 through October 6, 1994. 14 Calibration and Adjustment of System Planning Models,U.S. Department of Transportation and Federal Highway Administration,December, 1990,and Quick-Response Urban Travel Estimation Techniques and Transferable Parameters: User's Guide,NCHRP Report 187, Transportation Research Board,Washington,D.C., 1978. Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 32 October 30, 2001 DKS Associates Table 3-2 Average Vehicle Occupancy in Tigard Time Period ORE 99W Hall Blvd Overall Weekda 7:00-9:00 AM Morning 1.13 1.14 1.13 11:30 AM-1:30 PM Midday 1.23 1.24 1.23 4:00-6:00 PM Evening 1.27 1.24 1.26 Overall 1.21 1.21 1.21 Saturday 1:00-3:00 PM Midday 1.58 1.54 1.57 ORE 217 Weekday Northbound Southbound 7:00-9:00 AM Morning 1.08 1.08 4:00-6:00 PM Evening 1.16 1.12 Source: DKS Associates surveys—Tigard Streets 1994, ORE 217 1999. ACCESS ISSUES Two major corridors in Tigard are key locations where some form of access management may be applied. These corridors are ORE 99W, which has a significant portion of its frontage occupied by commercial land uses, and Hall Boulevard, which has a large number of access locations for such a major route. An inventory of driveway conditions along Hall Boulevard was conducted as part of this study. The results of this inventory indicate that access conditions vary greatly along Hall Boulevard. In some segments there are as many as 15 driveways between street intersections. Other segments have as few as zero driveways between street intersections. When adjacent land use was considered, a combination of residential and commercial tended to have the highest number of driveways between streets. A summary of the driveway inventory can be found in the appendix of this report. LAND USE Existing land use in Tigard is shown in Figure 3-13. In general, most retail activity in Tigard is located on arterial and major collector roadways.15 Although residential development is found on arterial and major collector roadways, much of the residential land uses in Tigard generally have access to minor collector or local streets. The transportation system is most impacted by changes in land use. Trip generation from added land use has and will create needs for new transportation facilities. The most significant changes in land use which have occurred recently are occurring in the area west of Tigard, in the Tigard Triangle and in the southern and western areas of Tigard. 15 Tigard City Code requires retail development to gain access from arterial or collector streets. Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 33 October 30, 2001 DKS Associates N III NOT { CITY OF TIGARD TO SCALE I OREGON Transportation y 5 LDS y �° Systems Plan _J Legend Existing Land Use Commercial a o Industrial ¢° RTH Multi-Family Residential PFAFFL Public Single-Family Residential 9 �'y Vacant Land e N sw � Source: Metro RLIS Database WALNUT 41 NALD K SZN BULL RD ON RD C z N Q° SW RHA DURHAM O C 0 a0 O H Figure 3-13 J l Existing Land Use DKS Associates TRANSIT Transit service is provided to the general population of the City of Tigard by Tri-Met. Figure 3-14 shows the routes passing through Tigard. There are two transit centers and two express routes serving Tigard. There are two express routes which have a limited number of stops. Coming from Portland, route 95X stops only at the Tigard Cinemas before it begins making regular stops at Walnut/ORE 99W. Also coming from Portland,route 92X does not stop before reaching the Progress Park&Ride station,where it begins making regular stops. Other routes have stops approximately every 200 feet within Tigard. A comparison of 1990, 1994 and 1999 transit ridership in Tigard is summarized in Table 3-4. No data was available for 1994 for route 38 or for 1990 for route 95. More complete data from 1999 indicates appoximately 9,500 daily transit riders in Tigard'. Table 3-4 Daily Transit Ridership in Tigard 1990 , 1994 and 1999 1990 1994 1999 Route Dir Ons Offs Tot Ons Offs Tot Ons Offs Tot 12 Barbur Out 152 683 835 316 941 1257 386 1017 1403 12 Barbur In 691 160 851 900 254 1154 894 389 1283 38 Boones Ferry SB 34 33 67 9 37 46 38 Boones Ferry NB 30 17 1 47 29 16 1 45 43 Taylors Ferry WB 24 110 134 24 127 151 20 158 178 43 Taylors Ferry EB 109 19 128 109 19 128 148 24 172 44 King City Out 110 84 194 44 King City In 19 45 64 45 Garden Home WB 48 209 257 65 241 306 65 252 1 317 45 Garden Home EB 220 47 267 199 66 265 235 71 306 56 Scholls Ferry SB 1 241 242 3 306 309 3 300 303 56 Scholls Ferry NB 253 4 257 261 40 301 303 2 305 62 Murray Blvd EB 24 93 1 117 1 43 214 257 94 430 524 62 MurrayBlvd WB 67 24 1 91 1 200 58 258 418 107 1 525 64X Marquam-Tig Out 4 36 40 64X Marquam-Tig In 41 1 42 76 Tig-Tual SB 377 530 907 76 Tig-Tual NB 552 357 909 78 Beav-LO SB 224 442 666 275 580 855 252 498 1 750 78 Beav-LO NB 434 219 653 562 285 847 419 225 644 92X S. Beav Exp WB 13 103 116 92X S. Beav Exp EB 138 10 148 95 Ti I-5 Exp WB 1 3 84 87 12 117 129 95 Tig I-5 Exp EB 64 1 65 104 1 2 106 TOTS 1 4645 1 4811 9456 SOURCE: Tri-Met Passenger Census,ons and offs occurring in Tigard. 16 Route Level Passenger Census,Tri-Met,Spring 1999. Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 35 October 30, 2001 DKS Assodates 76 43 Taylors Ferry Rd 78 56 NOT 45 Garden Home CITY OF TIGARD TO SCALE 56 Scholls Ferry Rd 45 ® Murray Blvd TAVI 43 Transportation ® Beaverton-Tualatin Systems Plan 78 Beaverton-Lake Oswego 43 45 43 62 92X 62 78 ST o 92X LOCUST Ro 12 N Legend LU OAK ST - Z 95X Transit Line Travel ��RRV 92X QQ -Indicates Transit Line Route Number 27) m 96 ORTH DAKOTA Sr 12 -Transit Center Location � RF�cN 76 PFAFFL 64X � TIGARD P 78 -Park&Ride Lot Location 45 78 95X a 5 �P rH ST¢ A-Major Transit Stop Q -Unserved Areas 5 PRR0NJS WMN�( 45 78 � P � ry 99W P of 38 o � 76 38 kRUSF o GAARDE ST cDONALD S 38 BULL MOON /N RD 12 BONITA RD W ¢ ¢ SATTLER ST m PQM is 38 37 m RD SUMMERFIELD BEND U DURHAM RD 76 BEEF 0 a z .. • 36 37 R .. Barbur Blvd roc 76 36 .......... 92 45 Garden Home 95X ®-Marquam Hill � Figure 3-14 ' ® Beaverton Tualatin 76 96 TRANSIT ROUTES ® Beaverton-Lake Oswego moo° DKS Associates BICYCLES Existing bike lanes and off-street multi-use paths are shown in Figure 3-15. While there is significant inventory of bicycle lanes, most existing lanes are only for short segments. Except for I-5 and ORE 217, bicycles are permitted on all roadways in Tigard. However,because there are few continous and interconnected bikeways in the City, bicycle use is relatively low. Bicycle use in Tigard is generally used for recreational, school and commuting purposes. Bicycle counts at study intersections indicate fewer than 10 bicycle trips at each intersection over a two-hour period of time (either 7-9 AM or 4-6 PM), except at the following intersections, which had between 10 and 15 bicycles in the two hour period: ❑ Hall Boulevard/McDonald Street(AM peak period) ❑ Upper Boones Ferry Road/Durham Road(AM and PM peak period) Metro identifies the following facilities as part of the Regional Bicycle System: Regional Access Regional Corridor Community Regional Corridor Off-Street on-street Connector ❑ Hall to Greenberg ❑ Walnut Street ❑ 72nd Avenue ❑ Fanno Creek to Main to ❑ Scholls Ferry Rd ❑ Bonita-McDonald ❑ Tualatin River Hunziker ❑ Hall Boulevard ❑ Carman-Durham ❑ Powerlines ❑ ORE 99W ❑ Hunziker to LO through ❑ Hall-Durham- I-5/ORE 217 Boones The adjacent jurisdictions have adopted bicycle maps that provide the opportunity for interconnection between jurisdictions. The Washington County Transportation Plan shows on-street bicycle routes on ORE 99W, Scholls Ferry Road, Hall Boulevard, Greenberg Road, Durham Road, Walnut/Gaarde/McDonald, Oak Street and Locust Street. The County Plan also shows an on-street bicycle route on ORE 217 and I-5 in Tigard(which would be inconsistent with ODOT policy). The powerlines off-street route is the only off- street route shown in Tigard. Using the Transportation Planning Rule criteria, all arterial and collector streets would require bikeways. The City of Portland designates Oleson Road and Barber Boulevard as City Bikeways (which would connect in Tigard to Greenberg Road and ORE 99W). The City of Lake Oswego designates Bonita Road, Carman Drive and Kruse Way as bike lanes or pathways. These routes would link in Tigard to Bonita/McDonald, Carman/Durham and Hunziker(via the ORE 217/I-5 interchange). The City of Beaverton designates Murray Boulevard(which would link to Walnut), Scholls Ferry Road, Barrows Road, 125t" Avenue (which would link to North Dakota Street),Nimbus Avenue and Cascade Avenue as bike lanes/bikeways. Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 37 October 30, 2001 DKSAssociates (t) 26 kx NO Ro CITY OF TIGARD TO SCALE TAYLORS FERRY RD Transportation Q Q Systems Plan iz Q J � x LOCUST ST o Legend N 1 D Q m t__ ♦=Z OAK sr -Bike Lanes on One Side of Street w l., Bike Lanes on Both Sides of Street F ��♦��♦♦ ORTH DAKOTA ST ,♦� 217 - -Off Street Paths 210 �O ' •Yr- ' TIGARD Q RFE PFAFFLE Sr -Parks G Z, c, Sr ST S� BPRRQS 99W ♦♦`� T o � i o GAARDE McDONALD ; RUSF BULL N N nIVIT4 W ¢ ¢ SATTLER ST ¢ 5 P�O� W o DR � m RD SUMMERFIELD BEND DURHAMPn BEEF v a Q o �♦ si ...River... ♦ Figure ................. re 315 0 0 �oG o u EXISTING BICYCLE FACILITIES DKS Associates PEDESTRIANS Existing sidewalks are shown in Figure 3-16. A majority of arterial and collector streets in Tigard do not have sidewalks on either side of the street. Connectivity and pedestrian linkages are generally fair to poor on the arterial and collector street system. Although sidewalk availability on the arterial and collector system is poor, many residential streets do have sidewalks, especially in areas developed within the past ten to fifteen years. Pedestrian counts were conducted during the evening peak period(4:00-6:00 PM) at several key intersections in Tigard. A majority of these intersections had fewer than 10 pedestrians in the PM peak hour. However,there were more than 10 pedestrians at many intersections' , including the following: ❑ Hall Boulevard/Sattler Street 11 pedestrians ❑ ORE 217 NB Ramps/ORE 99W 12 pedestrians ❑ ORE 217 SB Ramps/ORE 99W 13 pedestrians ❑ 72nd Avenue/Upper Boones Ferry Road 13 pedestrians ❑ Main Street/Johnson Street/ORE 99W 14 pedestrians ❑ Hall Boulevard/ORE 99W 15 pedestrians ❑ Hall Boulevard/Bonita Road 18 pedestrians ❑ 72nd Avenue/Bonita Road 18 pedestrians ❑ Dartmouth Street/ORE 99W 19 pedestrians ❑ Hall Boulevard/Locust Street 21 pedestrians ❑ Greenburg Road/Washington Square Road 23 pedestrians ❑ 72nd Avneue/Vams Street/ORE 217 SB 26 pedestrians ❑ ORE 99W/Gaarde Street 37 pedestrians ❑ ORE 99W/Walnut Street 50 pedestrians ❑ ORE 99W/Greenburg Road/Main Street 54 pedestrians Sidewalks at least five feet wide are required in all new developments and many new local streets do have sidewalks in the City. Metro has classified several routes in Tigard as part of its Regional Pedestrian System'8: Transit/Mixed-Use Multi-use Facility with Pedestrian Districts Corridors Pedestrian Function ❑ ORE 99W ❑ Fanno Creek ❑ Washington Square Regional Center ❑ Hall Boulevard ❑ Tualatin River ❑ Tigard Downtown Town Center ❑ Scholls Ferry Road ❑ Powerlines ❑ Murray/Scholls Town Center ❑ Hunziker Street ❑ Hunziker to LO ❑ King City Town Center 17 Pedestrian volumes represent the number of crossings on all crosswalks combined. 18 Metro's Regional Pedestrian System map,draft Regional Transportation Plan,2000. Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 39 October 30, 2001 DKSAssociates (t) yqlz 26 , kx NOT Ro CITY OF TIGARD TO SCALE TAYLORS FERRY RD Transportation O O � Systems Plan Q Rp LOCUST sr o Legend m Z OAK sr -Continuous Sidewalk on at Least One Side of Street g 0 H DAKOTA ST 2 ) m PFAF LE 210 TIGARD i p S a ST Q BPRR0 S wA�N�( h�vZi�FR P o 99W) r m z � 0 GAARDE S McDONALD ST ASF MOU Q o BULL /N N R RD D o Q Q = Q 0� W S TTL 5P� m � °PQCR ti W o � m RD BEND ni JPHAM RD BEEF v a Q o z w ...................................... Gee° Figure 3-16 EXISTING SIDEWALK s FACILITIES DKS Associates TRUCKS Principal truck routes in Tigard(as identified by Washington County) include I-5, ORE 217, ORE 99W and some arterial streets. This system provides connections with truck routes serving areas within and outside of Tigard making efficient truck movement and the delivery of raw materials, goods, services and finished products possible. These routes are generally found in and serve areas where there are concentrations of commercial and/or industrial land uses. Figure 3-17 shows truck routes within Tigard. In general, trucks make up about 2-5 percent of the overall traffic at a majority of intersections in Tigard. RAIL Railroad tracks traverse Tigard from its northern boundary to the southeast. There are two adjacent but separate tracks south from north of North Dakota Street to Bonita Road. South of Bonita Road, one set of tracks crosses the Tualatin River to Tualatin and the other set of tracks turns east to Lake Oswego. They are both owned by Portland&Western (P&W), a sister company of Willamette &Pacific (W&P)Railroad. AIR Tigard is served by the Portland International Airport, located in Northeast Portland on the Columbia River. The Portland International Airport is a major air transportation and freight facility,which serves Oregon and Southwest Washington. It provides a base for over twenty commercial airlines and air freight operations. The Port of Portland reported that 12.6 million passengers were served at the Portland International Airport in 1997. Tigard is also served by the Portland-Hillsboro Airport, a general aviation facility located in the north central portion of the City. The airport facility is owned and operated by the Port of Portland as part of the Port's general aviation reliever system of airports. The Port of Portland maintains a Master Plan for this facility which was most recently updated in October, 1996. WATER The Tualatin River is located along the southern border of Tigard. It is used primarily for recreational purposes. No policies or recommendations in this area of transportation are provided. PIPELINE There are high pressure natural gas feeder lines owned and operated by Northwest Natural Gas Company along several routes in Tigard. Figure 3-18 shows the feeder line routes for Tigard.19 19 Based on the Portland Area Distribution System Map(Dated September, 1998)received from Northwest Natural Gas Company. Tigard Transportation System Plan P99161 x0 Existing Conditions 3- 41 October 30, 2001 DKS Assodates (t) yql� , kX NOT Ro CITY OF TIGARD TO SCALE TAYLORS FERRY RD Transportation Systems Plan Q N LOCUST ST o Legend o m W m Z o OAK sr -Existing Truck Routes U � ` O� ORTH DAKOTA ST �2�i m PFAFFLE ST 210 TIGARD P URG eeP Sr Q Sr ST S� BPRR0 S wA�N�� MPS y�NZi�FR P 99W) � � P 0 GAARDE S p McDONALD ST F MpU Q o BULL /N N x RD BONITA RD W ¢ ¢ SATTLER ST ¢ 5 P�O� ti � o � mRD SUMMERFIELD DR BEND DURHAM RD BEEFASP— v a � Q w ...River........ RDFigure 3-17 �e EXISTING TING TRUCK W Q� ROUTES �g DKS Associates N III NOT { CITY OF TIGARD TO SCALE I OREGON Transportation Is y R° Systems Plan z _-j Legend NExisting High Pressure Gas Pipeline Existing Kinder Morgan Pipeline RTH PFAFFL �9 5 � e SWC WALNUT NALD BULL RD RD z N �O O Sw RHA KU DURHAM O Figure 3-18 H RD m MAJOR PIPELINE J ROUTES DKS Associates Chapter 4 Future Demand and GIN OFTIGARD OREGON Land Use This chapter summarizes the methodology used to obtain future year forecasts for various modes in the City of Tigard. The plan for street improvements within Tigard depends on determining existing needs and needs of future growth. As a first step in assessing future needs, Metro's urban area traffic forecast model and land use forecast for 2015 was identified as a source for determining future traffic volumes in Tigard. This traffic forecast model translates land uses into roadway volume projections. These traffic volume projections form the basis for identifying potential roadway deficiencies and for evaluating alternative circulation improvements. This section describes the forecasting process, including key assumptions and the analysis of the land use scenario developed from the current Comprehensive Plan development designations and allowed densities. Future change of these variables could significantly change the future travel forecast. The 2015 forecast was refined to include detailed information about Tigard buildout. This 2015 forecast was used for detailed operational analysis'. The refined 2015 forecast was used in concert with the updated 2020 Metro forecasts. This chapter compares the land use inputs between refined 2015 and 2020. PROJECTED LAND USES Land use is a key factor in how the transportation system operates. The amount of land that is developed, the type of land uses and how the land uses are mixed together have a direct relationship to expected demands on the transportation system. Understanding the amount and type of land use is critical to taking actions to maintain or enhance transportation system operation. Projected land uses were developed for all areas within the urban growth boundary reflecting the comprehensive plan and Metro's land use assumptions for year 2015. Complete land use data sets were developed for the following conditions: ■ Existing Base 1994 Conditions ■ Year 2015 The base year model is updated every few years. For this study effort, the available base model provided by Metro was for 1994. Land uses were inventoried throughout Tigard(and the adjacent jurisdictions)by Metro and then again by the City of Tigard(the City conducted a detailed inventory of commercial uses in three key ' All references to 2015 in this document refer to the refined Tigard land use 2015 model and its co-use with updated 2020 forecasts. Tigard Transportation System Plan P99161 Future Demand and Land Use 4-1 October 30,2001 DKS Associates areas: Tigard Triangle, ORE 99W, Sequoia Parkway area). This land use database includes the number of dwelling units, number of retail employees and number of other employees and is based on Metro's data and was adjusted to reflect the results of the City's inventory. Table 4-1 summarizes the adjusted land uses for existing conditions and the future scenario in the Tigard area.2 A detailed summary of the land uses for each Transportation Analysis Zone (for both the 1994 and 2015 model years) is included in the appendix. As the land use data is updated in the future, TSP updates can reflect current conditions and new forecasts. Table 4-1 Tigard Area Adjusted Land Use Summary Percent Land Use 1994 Modified Growth Increase 2015 Households 21,765 32,481 10,716 +49% Retail Employees 9,152 13,257 4,105 +45% Other Employees 33,553 50,382 16,829 +50% Source: Metro/City of Tigard The land use for 2015 used in this study was refined from the base Metro 2015 data. Year 2020 land uses and trip generation were compared to the modified 2015 information. Table 4-2 summarizes the vehicle trip generation for the base 1994 forecast, future 2015 Metro forecast, modified 2015 Tigard forecast and the Metro 2020 forecast. The modified 2015 forecast generated the greatest number of vehicle trips and was used for the TSP. For the detailed study of Tigard streets, the modified 2015 forecast represented near build out, worst case conditions and provides a reasonable assessment of motor vehicle needs within the city (which the forecast was primarily used to determine). More detailed forecasting of the 2020 for regional conditions could be undertaken following this TSP analysis, but it is unlikely(based upon the trip generation)to generate substantially different needs. This would best be undertaken following Metro's adoption of the RTP, and would be a minor update to this TSP. 2 Based on Metros 2015 land use forecasts. Tigard Transportation System Plan P99161 Future Demand and Land Use 4-2 October 30,2001 DKS Associates Table 4-2 Forecasted Vehicle Trips in Tigard PM Peak Hour Scenario Peak Hour Vehicle Trips 1994 Base Model 34,500 2015 Metro Model 46,000 2020 Metro Model 48,500 2015 Modified Tigard Model 52,600 If land uses are significantly changed in proportion to each other (i.e. there is a significant increase in retail employment relative to households),there will be a shift in the overall operation of the transportation system. Retail land uses generate significantly higher numbers of trips than do households and other land uses. The location and design of retail land uses in a community can greatly affect transportation system operation. Additionally, if a community is homogeneous in land use character (i.e. all employment, all residential), the system must support export of trip making. Typically, there should be both residential type land uses as well as employment type land uses so that some residents may work locally, reducing the need for residents to commute long distances to work. Tigard has a mix of land uses, however, many residents must travel outside the City for employment opportunities. Table 4-1 indicates that a significant amount of growth is expected in Tigard area in the coming years. These land use quantities should be monitored to make sure that Tigard is working to achieve a balance of land use that is compatible with the available transportation system. This TSP balances transportation needs with the forecasted 2015 land uses. Transportation Analysis Zones: For traffic forecasting,the land use data is stratified into geographical areas called traffic analysis zones (TAZ's)which represent the sources of vehicle trip generation. There are about 30-40 Metro TAZ's which represent Tigard and its vicinity (Figure 4-1). These 30-40 TAZ's were disaggregated, as part of this plan, into about 130-140 TAZ's to more specifically represent land use in and around Tigard. The original Metro and disaggregated model zone boundaries for Tigard are shown in Figure 4-2. Metro uses EMME/2, a computer based program for transportation planning, to process the large amounts of data for the Portland Metropolitan area. Land uses were inventoried throughout Tigard by Metro and adjusted to reflect Tigard's more detailed land use inventory in 2015. The adjustments reflected what was termed to be "near buildout". This land use data base includes the number of dwelling units,number of retail employees and number of other employees. Table 4-3 summarizes the land uses for existing conditions and the future scenario by transportation analysis zones (TAZ's). Tigard Transportation System Plan P99161 Future Demand and Land Use 4-3 October 30,2001 DKS Associates NOT CIN OF TIGARD TO SCALE Transportation System Plan HA<< 0 \ Spy i p�E BSG 00 m 90 i 92 89 R� FERRY 317 31 310 1309 308 l21or 315 So�oVs 319340 ,oma `�9 314 m 311 318 �y� /� 313 i � 338 � 2 320 321 W 337 ' 312 m 336 403 m 341 335 322 995 342 �� 332 v 334 2Q` 333 �0 394 343 344 315 I W 2 River g 3481 349 TU satin 4 J Figure 4-1 METRO TAZ DKS Associates NOT CIN OF TIGARD TO SCALE Transportation System Plan I\ 1531 53 B`GO 0 154 54 1529 1525 C ro 1537 1543 901527 1526 89 > Q g 210) k 162 \ M 1605 1616 1613 � 1�6 FERRO 317 � 1631 1630 217 1615 310 1614 303 /180 315 1�9�1611 1512 1632 31 165 1612 1513 608 151 1663 1�4 1625 S 1633 315 163 1635 1627 ,�%�� 62 1617 61 1514 1515 339 ST �j 1E25m I 1624 1618 NIP 319 314 1626 311 162 163 1634 320 313 1662 1661 335 1635 1636 ry i 1655 682 1679 1639 (99w)) 321 1640 1623 332 1669 337 1660 1659�i 1650 1670 335 1642 312 BULL OUNTAI 1665 16583361655 5RD 1641 1691 1667 1656 1657 341 1666 344 i 12 64 0 645 1671 R v 1653 I 164 1677 342 QQ 1652 1654 333 1651 BEND 334 URHAM RD 1644 EEF 1674 345 — z 1655 -' 1649 / 3941 m 343 1675 = r 16477 1645 1676 1650 �; 1672 1675 _F_ — 1673 g m 348 349 W I TU 7atin 4 J Figure 4-2 DISAGGREGATED TIGARD TAZ DKS Associates Table 4-3 Tigard Land Use Summary Households Retail Employees Other Employees TAZ 1994 2015 1994 2015 1994 2015 67 888 958 3 3 61 76 89 191 217 0 0 17 23 90 299 409 3 4 261 489 92 0 9 143 207 273 519 308 185 195 28 28 21 27 309 77 78 1 1 9 11 310 69 96 2 11 4 22 311 33 37 0 400 58 58 312 0 22 12 12 1,193 1,363 313 3 32 62 51 1,208 1,306 314 160 184 24 24 117 147 315 624 825 212 293 647 1,165 316 77 76 22 24 64 91 317 683 705 161 141 955 1,096 318 303 321 0 0 28 33 319 58 68 0 0 7 16 320 225 251 72 72 100 491 321 120 251 0 0 406 416 322 324 158 0 0 433 518 332 0 1 18 18 422 600 333 125 243 0 5 3 42 334 223 262 43 59 69 166 335 86 167 0 1 2 21 336 170 201 63 70 152 219 337 11 206 0 0 7 40 338 66 163 0 0 4 11 339 66 254 1 2 11 46 340 239 309 0 1 0 139 341 199 294 0 0 27 40 342 269 390 6 5 45 60 343 105 265 0 0 0 102 344 92 260 4 15 19 101 345 223 368 331 397 111 174 394 25 26 0 0 17 20 403 81 231 0 1 17 53 932 0 10 42 42 399 941 933 5 9 92 137 40 78 1511 61 194 0 2 0 104 1512 207 374 0 6 0 331 1513 45 130 0 0 0 24 1514 26 503 0 3 0 167 1515 33 178 1 5 41 298 1526 364 517 0 0 39 91 Tigard Transportation System Plan P99161 Future Demand and Land Use 4-6 October 30,2001 DKS Associates Households Retail Employees Other Employees TAZ 1994 2015 1994 2015 1994 2015 1527 412 487 1 1 87 104 1528 92 130 0 0 12 22 1530 54 146 5 5 496 653 1537 8 115 1,406 2,064 2,686 5,167 1538 97 103 153 149 292 373 1539 0 0 164 142 314 355 1540 25 44 316 418 604 1,048 1541 6 20 78 143 149 357 1542 30 42 152 186 290 467 1543 1 3 52 57 99 144 1605 24 31 1,226 1,084 2,343 2,715 1606 188 241 109 135 80 129 1607 2 10 97 102 71 97 1608 4 22 0 242 168 231 1609 198 236 349 363 110 156 1610 2 18 24 54 18 51 1611 1 29 95 139 70 132 1612 2 45 0 298 170 285 1613 86 93 1 2 8 24 1614 269 308 2 4 26 59 1615 61 92 25 86 38 170 1616 39 63 9 34 14 66 1617 43 61 0 100 188 286 1618 7 37 0 600 41 41 1619 7 13 0 0 116 300 1620 11 16 202 278 44 78 1621 39 77 0 0 165 180 1622 1 16 161 200 54 137 1623 221 323 12 12 2,130 2,800 1624 32 76 61 101 1,189 1,326 1625 206 315 400 500 270 400 1626 269 324 147 250 716 1,019 1627 299 334 36 45 176 283 1628 255 330 20 41 62 162 1629 0 6 73 72 312 368 1630 29 27 131 218 377 830 1631 635 689 89 74 529 573 1632 194 230 22 20 137 162 1633 588 607 0 0 60 64 1634 250 354 0 0 14 46 1635 24 117 0 0 1 27 1636 192 480 0 0 10 93 1637 45 43 1 1 186 182 1638 119 137 0 0 94 131 1639 485 511 283 350 296 375 Tigard Transportation System Plan P99161 Future Demand and Land Use 4-7 October 30,2001 DKS Associates Households Retail Employees Other Employees TAZ 1994 2015 1994 2015 1994 2015 1640 29 102 0 0 24 101 1641 209 358 0 0 85 141 1642 317 533 0 0 60 407 1643 0 5 42 42 422 502 1644 1 3 26 26 466 466 1645 1 9 113 113 3,001 3,552 1646 2 15 129 129 2,999 3,986 1647 4 11 149 149 500 617 1648 1 26 312 433 317 843 1649 40 75 11 20 76 20 1650 62 112 11 10 76 10 1651 394 521 2 12 14 12 1652 548 655 5 8 26 8 1653 259 446 18 247 95 127 1654 432 467 4 4 19 27 1655 472 520 7 7 33 45 1656 316 402 0 1 5 28 1657 261 404 3 3 53 89 1658 451 584 74 83 177 261 1659 148 172 224 224 128 128 1660 258 310 0 0 96 104 1661 15 106 0 0 3 13 1662 127 466 0 0 4 45 1663 526 689 2 4 32 81 1664 379 522 4 4 56 86 1665 116 277 0 0 22 45 1666 60 312 0 0 11 47 1667 73 112 0 0 9 14 1668 180 307 0 0 24 42 1669 53 259 0 0 2 32 1670 60 114 0 0 11 18 1671 38 362 1 5 12 54 1672 74 223 0 0 18 111 1673 548 645 8 13 39 89 1674 1,717 1,903 186 186 444 489 1675 116 155 13 17 4 7 1676 392 468 23 33 8 14 1677 28 29 0 0 16 18 1678 55 57 0 0 25 29 1679 21 349 0 1 1 69 1680 54 182 0 1 13 46 1681 92 299 0 1 20 71 1682 6 28 35 35 247 600 1683 10 20 60 60 426 569 1684 4 12 29 29 208 241 Tigard Transportation System Plan P99161 Future Demand and Land Use 4-8 October 30,2001 DKS Associates Households Retail Employees Other Employees TAZ 1994 2015 1994 2015 1994 2015 1685 1 27 64 64 455 700 1686 9 20 257 335 113 191 1687 10 15 87 300 38 69 1688 115 296 2 49 4 82 1689 89 389 0 0 18 248 Total 21,765 32,481 9,152 13,257 33,553 50,382 Source: Metro/City of Tigard A comparison of the modified 2015 land use assumptions to 2020 land use assumptions indicates that the 2020 forecast assumes more households,more retail employees and fewer other employees than the modified 2015 forecast. Key areas where discrepancies occurred were the Washington Square area (more retail employees and fewer other employees in 2020), Downtown(more "other" employees in 2020), Sequoia Parkway area (significantly fewer"other" employees in 2020) and Tigard Triangle (significantly fewer"other" employees in 2020). Detail regarding the trip generation by TAZ is provided in the appendix. METRO AREA TRAFFIC MODEL The development of future traffic system needs for Tigard depends on the ability to accurately forecast travel demand resulting from estimates of future population and employment for the City. The objective of the transportation planning process is to provide the information necessary for making decisions on when and where improvements should be made in the transportation system to meet travel demands. Metro has developed an urban area travel demand model as part of the Regional Transportation Plan Update process to help identify street and roadway needs. Traffic forecasting can be divided into several distinct but integrated components that represent the logical sequence of travel behavior(Figure 4-3). These components and their general order in the traffic forecasting process follow: ■ Trip Generation ■ Trip Distribution ■ Mode Choice ■ Traffic Assignment The initial roadway network used in the traffic model was the existing streets and roadways. Future land use scenarios were tested and roadway improvements were added in to mitigate traffic conditions, using programmed improvements as a starting basis. Forecasts of PM peak hour traffic flows were produced for every major roadway segment within the Tigard area. Traffic volumes are projected on most arterials and collector streets. Some local streets are included in the model, but many are represented by centroid connectors in the model process. Trip Generation. The trip generation process translates land use quantities (in numbers of dwelling units and retail and other employment) into vehicle trip ends (number of vehicles entering or leaving a TAZ)using trip generation rates established during the model verification process. The trip rates were based upon Tigard Transportation System Plan P99161 Future Demand and Land Use 4-9 October 30,2001 DKS Associates INPUTS PROCESS OUTPUTS Road Network +Data Land Uses Trip Generation Rates _ . GENERATION _ . DISTRIBUTION ASSIGNMENTTRAFFIC -j Traffic Volume Projections Loaded Levels of Road Network Service Transportation System Measures :G%rapphic ufputs Figure 4-3 TRAFFIC FORECASTING MODEL PROCESS DKS Associates Institute of Transportation Engineers research3 and documentation and adjusted to suit the Portland area in the calibration process. PM peak hour trip rates used in the Metro model are summarized in Table 4-4. Table 4-4 Approximate Average PM Peak Hour Trip Rates Used in Metro Model Average Trip Rate/Unit Unit In Out Total Household 0.43 0.19 0.62 Retail Employee 0.78 0.69 1.47 Other Employee 1 0.07 0.29 0.36 Source: Metro Table 4-5 illustrates the estimated growth in daily vehicle trips generated within the Tigard, between 1994 and 2015. It indicates that vehicle trip generation in Tigard would grow by approximately 50 percent between 1994 and 2015 if the land develops according to the assumptions made. Assuming a 20 year time horizon to the 2015 scenario, this represents a growth rate of about 2 percent per year. Table 4-5 Existing and Future Projected External Trip Generation* PM Peak Hour Vehicle Trips Modified 2015M-1994 Percent Trips 1994 2015 2020 Growth Increase Tigard Area 34,447 52,606 48,518 18,159 +53% Source: Metro/City of Tigard NOTE: *-External trips refer to model trips that exit a Tigard centroid Trip Distribution. This step estimates how many trips travel from one zone in the model to any other zone. The distribution is based on the number of trip ends generated in each zone pair, and on factors that relate the likelihood of travel between any two zones to the travel time between the zones. In projecting long-range future traffic volumes, it is important to consider potential changes in regional travel patterns. Although the locations and amounts of traffic generation in Tigard are essentially a function of future land use in the city, the distribution of trips is influenced by growth in neighboring areas such as Portland, Beaverton, Lake Oswego, Tualatin, etc. External trips (trips which have either an origin or destination in Tigard and the other trip end outside Tigard) and through trips (trips which pass through Tigard and have neither an origin nor a destination there)were projected using trip distribution patterns based upon census data and traffic counts performed at gateways into the Metro area UGB. Mode Choice. This is the step where it is determined how many trips will be by single-occupant vehicle, transit or carpool. The 1994 mode splits would be incorporated into the base model and adjustments to that mode split may be made for the future scenario, depending on any expected changes in transit or carpool use. These considerations are built into the forecasts used for 2015. In the Tigard area, the 2015 model assumes 3 Trip Generation Manual, Institute of Transportation Engineers. Tigard Transportation System Plan P99161 Future Demand and Land Use 4-11 October 30,2001 DKS Associates approximately two percent would use transit and average vehicle occupancy would be about 1.24 passengers during the evening peak period. Traffic Assignment. In this process, trips from one zone to another are assigned to specific travel routes in the roadway network, and resulting trip volumes are accumulated on links of the network until all trips are assigned. Different models are actually used for auto assignment versus transit assignment. Various techniques exist for auto assignment, such as all-or-nothing, stochastic, incremental capacity restraint and equilibrium capacity restraint. The EMME/2 package, among others, uses the equilibrium capacity restraint technique, which is considered to produce the most realistic network traffic loading of all the techniques. With this technique, the auto trips are assigned iteratively to the network in such a way that the final traffic loading will closely approximate the true network"equilibrium." Network equilibrium is defined as the condition where no traveler can achieve additional travel time savings by switching routes. Between iterations, network travel times are updated to reflect the congestion effects of the traffic assigned in the previous iteration. Congested travel times are estimated using what are called "volume-delay functions" in EMME/2. There are different forms of volume/delay functions, all of which attempt to simulate the capacity restraint effect of how travel times increase with increasing traffic volumes. The volume-delay functions take into account the specific characteristics of each roadway link, such as capacity, speed, and facility type. Model Verification. The base 1994 modeled traffic volumes were compared against actual traffic counts across screenlines, on key arterials and at key intersections. Most arterial traffic volumes are closely replicated, even down to turn movements by the model based upon detailed calibration. Based on this performance, the model was used for future forecasting and assessment of circulation changes. MODEL APPLICATION TO TIGARD Intersection turn movements were extracted from the model at key intersections for both year 1994 and future scenarios. These intersection turn movements were not used directly, but the increment of the future year turn movements over the year 1994 turn movements was applied(added)to existing(actual 1994/1997/1999) turn movement counts in Tigard. Actual turn movement volumes used for future year intersection analysis can be found in the appendix(Level of Service Calculations). Tigard Transportation System Plan P99161 Future Demand and Land Use 4-12 October 30,2001 DKS Associates Chapter 5 Pedestrians GIN OFTIGARD OREGON This chapter summarizes existing and future pedestrian needs in the City of Tigard, outlines the criteria to be used in evaluating these needs,provides a number of strategies for implementing a pedestrian plan and recommends a pedestrian Action Plan for the City of Tigard. The needs, criteria and strategies were identified in working with the City's TSP Task Force. This committee provided input regarding the transportation system in Tigard, specifically exploring pedestrian needs. The methodology used to develop the pedestrian plan combined citizen and staff input,specific Transportation Planning Rule requirements' and continuity to the regional pedestrian network. NEEDS A limited number of sidewalks are provided on the arterial and collector roadways(see Figure 3-15)in the City of Tigard,resulting in a fair existing pedestrian network. However,many residential subdivisions in Tigard are relatively new and a majority of them have sidewalks available. A problem exists outside the limits of the new developments where connecting sidewalks often do not exist. Continuity and connectivity are key issues for pedestrians in Tigard since, generally, if there is a sidewalk available, there will be sufficient capacity. In other words,it is more important that a continuous sidewalk be available than that it be of a certain size or type. The most important existing pedestrian needs in Tigard are providing sidewalks on arterials and collectors and connectivity to key activity centers in the City. This includes the need for safe,well lighted arterial and collector streets. Arterials and collectors can act as barriers to pedestrian movement if safe facilities are not provided.In the future,pedestrian needs will be similar,but there will be additional activity centers that will need to be considered and interconnected. Walkway needs in Tigard must consider the three most prevalent trip types: • Residential based trips—home to school,home to home,home to retail,home to park,home to transit, home to entertainment,home to library • Service based trips—multi-stop retail trips,work to restaurant,work to services,work/shop to transit • Recreational based trips—home to park, exercise trips, casual walking trips Residential trips need a set of interconnected sidewalks radiating out from homes to destinations within one-half to one mile. Beyond these distances,walking trips of this type become significantly less common (over 20 minutes). Service based trips require direct,conflict-free connectivity between uses(for example, 1 Transportation Planning Rule,State of Oregon,DLCD,Sections 660-12-020(2)(d)and 660-12-045-3. 2 Metro Draft RTP, 1999,Regional Pedestrian System. Tigard Transportation System Plan DRAFT P99161 Pedestrians 5-1 October 30, 2001 DKS Associates a shopping mall with its central spine walkway that connects multiple destinations). Service based trips need a clear definition of connectivity. This requires mixed use developments to locate front doors which relate directly to the public right-of-way and provide walking links between uses within one-half mile. Recreational walking trips have different needs. Off-street trails, well landscaped sidewalks and relationships to unique environmental features (creeks, trees, farmland) are important. Because all of these needs are different,there is no one pedestrian solution. The most common need is to provide a safe and interconnected system that affords the opportunity to consider the walking mode of travel, especially for trips less than one mile in length. FACILITIES Sidewalks should be built to current design standards of the City of Tigard/Washington County and in compliance with the Americans with Disabilities Act(at least four feet of unobstructed sidewalk).3 Wider sidewalks may be constructed in commercial districts or on arterial streets. Additional pedestrian facilities may include accessways, pedestrian districts and pedestrian plazas, as defined in the Transportation Planning Rule:4 Accessway: A walkway that provides pedestrian and/or bicycle passage either between streets or from a street to a building or other destination such as a school,park or transit stop. Pedestrian District: A plan designation or zoning classification that establishes a safe and convenient pedestrian environment in an area planned for a mix of uses likely to support a relatively high level of pedestrian activity. Pedestrian Plaza: A small, semi-enclosed area usually adjoining a sidewalk or a transit stop which provides a place for pedestrians to sit, stand or rest. These designations will be provided as the TSP is implemented. Any pedestrian districts,for example the downtown area (Main Street), may be identified in further studies which address pedestrian issues. In addition,pedestrian issues in Main Street and Town Center areas(as defined by Metro)should be reviewed in greater detail for pedestrian accessibility, facilities and/or street crossing treatments. The land uses proposed in the Main Street and Town Center areas will help to promote more pedestrian use. Better pedestrian access should be developed to support and encourage this use. Sidewalks should be sized to meet the specific needs of the adjacent land uses and needs. Guidance to assess capacity needs for pedestrians can be found in the Highway Capacity Manual and Pushkarev and Zupan.5 Typically,the base sidewalk sizing for local and neighborhood routes should be 5 feet(clear of obstruction). 3 Americans with Disabilities Act,Uniform Building Code. 4 Transportation Planning Rule,State of Oregon,Department of Land Conservation and Development,OAR-660-12- 005(2, 14 and 15). 5 Highway Capacity Manual,Special Report 209,Transportation Research Board, 1994;Chapter 13;and Pushkarev, Zupan,Urban Spaces for Pedestrians, 1975. Tigard Transportation System Plan DRAFT P99161 Pedestrians 5-2 October 30, 2001 DKS Associates Pushkarev&Zupan define impeded pedestrian flow occurring at 2 to 6 pedestrians per foot per minute. At this upper level(6 p/f/m)a five foot sidewalk would have peak five minute capacity of 150 pedestrians. There is no location in Tigard with this level of pedestrian activity. While identified as level of service B in the Highway Capacity Manual,no sidewalk in Tigard should exceed 6 pedestrians per foot per minute without widening. The critical element of this analysis is the effective width of walkway. Because of street utilities and amenities, a five foot walkway can be reduced to two feet of effective walking area. This is the greatest capacity constraint to pedestrian flow. Therefore,landscape strips should be considered on all walkways to reduce the impact of utilities and amenities—retaining the full sidewalk capacity. As functional classification of roadways change,so should the design of pedestrian facilities. Collectors may need to consider minimum sidewalk widths of 6 to 8 feet and arterials should have sidewalk widths of 6 to 10 feet. Wider sidewalks may be necessary depending upon urban design needs and pedestrian flows(for example, adjacent to storefront retail or near transit stations). Curb-tight sidewalks are generally acceptable at the local and neighborhood route classification,however, with high vehicle volumes and on collector/arterial streets, landscape strips between the curb and the sidewalk should be required. Where curb-tight sidewalks are the only option, additional sidewalk width must be provided to accommodate the other street side features (light poles, mail boxes, etc...potentially an additional 3 to 4 feet). CRITERIA Tigard's TSP Task Force created a set of goals and policies to guide transportation system development in Tigard(see Chapter 2). Several of these policies pertain specifically to pedestrian needs: Goal I Policy 2 Encourage pedestrian accessibility by providing safe, secure and desirable pedestrian routes. Goal 2 Policy I Develop and implement public street standards that recognize the multi-purpose nature of the street right-of-way for utility, pedestrian, bicycle, transit, truck and auto use. Policy 4 Sidewalks must be constructed on all streets within Tigard (with construction or reconstruction projects). All schools,parks,public facilities and retail areas shall have direct access to a sidewalk. Policy 5 Bicycle and pedestrian plans shall be developed which link to recreational trails. Policy 6 Local streets shall be designed to encourage a reduction in trip length by providing connectivity and limiting out-of-direction travel. Provide connectivity to activity centers and destinations with a priority for bicycle and pedestrian connections. Goal 3 Policy 3 Safe and secure pedestrian and bicycle ways shall be designed between parks and other activity centers in Tigard. Tigard Transportation System Plan DRAFT P99161 Pedestrians 5-3 October 30, 2001 DKS Associates Policy 4 Safe and secure routes to schools shall be designated for each school and any new residential project shall identify the safe path to school for children Goal 5 Policy I Design and construct transportation facilities to meet the requirements of the Americans with Disabilities Act. These goals and policies are the criteria that all pedestrian improvements in Tigard should be compared against to determine if they conform to the intended vision of the City. STRATEGIES Several strategies were evaluated by the TSP Task Force for future pedestrian projects in Tigard. These strategies aimed at providing the City with priorities to direct its funds toward pedestrian projects that meet the goals and policies of the City: Strategy 1 - "Fill in Gaps in the Network Where Some Sidewalks Exist" This strategy provides sidewalks which fill in the gaps between existing sidewalks where a significant portion of a pedestrian corridor already exists. This strategy maximizes the use of existing pedestrian facilities to create complete sections of an overall pedestrian network. Strategy 2— "Connect Key Pedestrian Corridors to Schools, Parks, Recreational Uses and Activity Centers" This strategy provides sidewalks leading to activity centers in Tigard, such as schools and parks. This strategy provides added safety on routes to popular pedestrian destinations by separating pedestrian flow from auto travel lanes. These routes are also common places that children may walk,providing them safer routes. A key element of this strategy is to require all new development to define direct safe pedestrian paths to parks,activity centers,schools and transit(in the future)within one mile of the development site. Direct will be defined as 1.25 times the straight line connection to these points from the development. Any gaps (off-site)will be defined(location and length). Strategy 3- "Coordination of Land Use Approval Process to Provide Sidewalks & Links to Existing Sidewalks" This strategy uses the land use approval process to ensure that sidewalks are provided adjacent to new development and that links from that new development to existing sidewalks are evaluated. If there are existing sidewalks in close proximity, either the developer or the City will be required to extend the sidewalk adjacent to the new development to meet the existing nearby sidewalk. The development shall use the pedestrian master plan as a basis for determining adjacent sidewalk placement. To effectively implement this strategy, close proximity shall be determined to be within 300 feet of the proposed development. In addition, if extension is not found to be roughly proportional to the development, the City Shall add this to future years CIP consideration list. Strategy 4— "Improved Crossings" This strategy focuses on ensuring that safe street crossing locations are available,particularly along Tigard Transportation System Plan DRAFT P99161 Pedestrians 5-4 October 30, 2001 DKS Associates high traffic volume streets or locations where there is a lot of pedestrian traffic(i.e. adjacent to schools, activity centers, etc.) Strategy 5— "Pedestrian Corridors that Connect to Major Recreational UsesO This strategy provides a connection between the sidewalk network and major recreational facilities, such as the Greenway Trail, the the Fanno Creek Trail and other recreational uses. Strategy 6— "Pedestrian Corridors that Connect to Major Transit LocationsO This strategy provides sidewalks leading to major transit facilities, such as bus stops which service a high volume of riders. This strategy increases pedestrian safety and encourages transit use. Strategy 7— "Pedestrian Corridors that Connect Neighborhoods" This strategy puts priority on linking neighborhoods together with pedestrian facilities. This can include walkways at the end of cul-de-sacs and direct connections between neighborhoods (avoiding "walled" communities). Strategy 8- "Reconstruct All Existing Substandard Sidewalks to City of Tigard Standards" This strategy focuses on upgrading any substandard sidewalks to current city standards. Current standards are for five foot sidewalks to meet ADA6 requirements. Several sidewalks exist that do not meet the minimum five foot requirement. Fronting property owners are responsible for sidewalk maintenance where pavement has fallen into disrepair. Strategy 9— "Pedestrian Corridors that Commuters Might Use" This strategy focuses on providing sidewalks in areas where commuters might walk. For example, connecting neighborhoods to large employment areas (i.e Washington Square Regional Center or the Tigard Triangle). Table 5-1 lists each strategy in the order it was ranked by the committee and provides an assessment of how each of the strategies meets the requirements of each of the goals and policies. 6 Americans with Disabilities Act,Uniform Building Code. Tigard Transportation System Plan DRAFT P99161 Pedestrians 5-5 October 30, 2001 DKS Associates Table 5-1 Pedestrian Facility Strategies Comparisons Policies Strategy 1-2 2-4 2-5 2-6 3-3 3-4 5-1 1. Fill in gaps in network 1 1 O O 1 1 O where some sidewalks exist 2. Connect pedestrian 4 0 4 4 0 0 4 corridors to schools, parks,activity centers 3. Coordination of land 4 4 O 1 O 1 1 use approval process to provide sidewalks& links to existing 4. Improved crossings 0 4 O 4 4 4 4 5. Pedestrian corridors that connect to major 1 1 • O 1 1 1 recreational uses 6. Pedestrian corridors that connect to major transit 1 1 O 1 O O 1 locations 7. Pedestrian corridors that connect neighborhoods 1 O O 1 O 1 O 8. Reconstruct O 1 O O • O 1 substandard sidewalks to City standards 9. Pedestrian corridors 4 0 O 1 O 1 1 commuters might use X Does not meet criteria 1 Mostly meets criteria O Partially meets criteria • Fully meets criteria RECOMMENDED PEDESTRIAN FACILITY PLAN The strategies that had been evaluated by the TSP Task Force were ranked by each member of the committee according to his or her vision of priorities for the City of Tigard. The ranking of these strategies is listed in Table 5-1 from most important to least important. Three strategies were considered to be a high priority for pedestrians in Tigard and ranked significantly higher than the remaining strategies. These strategies were filling in network gaps, connections to schools,parks and activity centers and coordination of land use approval process to provide sidewalks and links to existing sidewalks. Tigard Transportation System Plan DRAFT P99161 Pedestrians 5-6 October 30, 2001 DKS Associates N CITY OF TIGARD NOT TO SCALE OREGON Transportation .......... .. .. .................... ':::: ::: 5 Systems Plan Legend • RTP Major Trenslt Stop I Schools ••...■ RTP TianalVMlzed Use COMdor ♦♦ '.::................. ........... ... ....... RTP Pedestrian DlsMcts • ,': ...... .................. :................... ::::: ♦ ♦♦:'.... . Fxlstln9 Park �■■. .... ♦•• ♦ Tigard Off-Street MultFUse Paths .. ...... ♦♦ : �.♦ Preposed ♦♦M Fxlstlng ;;;�y';;;;;. ♦�• ••••• ■ THRPD Trails :..K::::::.':' ■ :^f::: ♦ ♦ ♦ DRQ Existing .R:' ♦ ♦♦.►♦■♦♦♦ Preposed RTP Regional Corridor Off-Street Regional Mufti-Use Path ♦ • Y Fxlstlng i ran SW_J_ Preposed W UT • Sidewalks ♦ N Exlstlng(Continuous on at Least One Side-Future Both Sides) • N Proposed(Both Skies) NALD SW BULL RO ♦♦♦ N Lu • V �Q 00 .. RHA DURHAM C Figure 5-1 I H RD m PEDESTRIAN J MASTER PLAN DKS Associates A list of likely actions to achieve fulfillment of these priorities was developed into a Pedestrian Master Plan. The Pedestrian Master Plan (Figure 5-1) is an overall plan and summarizes the "wish list" of pedestrian-related projects in Tigard. From this Master Plan,a more specific,shorter term,Action Plan was developed. The Action Plan consists of projects that the City should give priority to in funding. As development occurs,streets are rebuilt and other opportunities(such as grant programs)arise,projects on the Master Plan should be pursued as well. It is preferable to provide pedestrian facilities on one side of the street if it means a longer section of the system could be covered(i.e. sidewalk on one side of the street for two miles is preferable to sidewalk on both sides of the street for one mile). In the case of significant stretches where sidewalk is only provided on one side of the road, particular emphasis should be placed on developing safe crossing locations. Development shall still be responsible for any frontage improvements,even if a pedestrian facility already exists opposite the proposed development. Sidewalks on both sides of all streets is the ultimate desire. POTENTIAL PROJECT LIST Table 5-2 outlines potential pedestrian projects in Tigard. The City, through its Capital Improvement Program(CIP),joint funding with other agencies (Washington County,Metro)and development approval would implement these projects. The following considerations should be made for each sidewalk installation: • Every attempt should be made to meet City standards • All sidewalks should be a minimum of five feet wide • Landscape strips should be considered and are encouraged(see standard street cross-sections in Motor Vehicles chapter) Action Plan Projects Figure 5-2 and Table 5-2 summarize the Pedestrian Action Plan. Tigard Transportation System Plan DRAFT P99161 Pedestrians 5-8 October 30, 2001 DKS Associates Table 5-2 Potential Pedestrian Projects Rank* I Project From To Action Plan Projects H Taylor's Ferry Rd Washington Drive 62 d Avenue H Washington Drive Hall Boulevard Taylor's Ferry Road H Hall Boulevard Scholls Ferry Road Pfaffle Street H Dartmouth Street 72nd 68th Avenue H 72 Avenue ORE 99W Bonita Road H 72 Avenue Carman/Upper Boones Ferry Durham Road H Hunziker Street Hall Boulevard 72 d Avenue H Hall Boulevard North of Hunziker Street South City Limits H Bonita Road West of 72 Avenue 72 d Avenue H McDonald Street ORE 99W Hall Boulevard H ORE 99W McDonald Street South City Limits H Beef Bend Road ORE 99W Scholls Ferry Road H Bull Mountain Road ORE 99W Beef Bend Road H Roshak Road Bull Mountain Road Scholls Ferry Road H Barrows Road Scholls Ferry Road(West) Scholls Ferry Road(East) H Walnut Street 135` Avenue Tiedeman Avenue H Gaarde Street Walnut Street ORE 99W H 121st Avenue Gaarde Street North Dakota Street H North Dakota Street 121st Avenue Greenburg Road H Tiedeman Avenue Walnut Street Greenburg Road H Tigard Street 115` Avenue Main Street H Burnham Street Main Street Hall Boulevard H Fonner Street Walnut Street 121st Avenue H Commercial Street Main Street Lincoln Street H Oak Street(RTP 6019) Hall Boulevard 801Avenue Other Potential Projects M 801Avenue Taylor's Ferry Road Spruce Street M Spruce Street Hall Boulevard 801Avenue M Oak Street Greenburg Road Hall Boulevard M Oak Street 801Avenue 715`Avenue M Locust Street 801Avenue 72 ndAvenue M 74` Avenue Taylor's Ferry Road South of Barbara Lane M 72 Avenue North of Locust Street Oak Street M Spruce Street 781Avenue 715`Avenue M 715`Avenue Oak Street ORE 99W M 78` Avenue Spruce Street ORE 99W Tigard Transportation System Plan DRAFT P99161 Pedestrians 5-9 October 30, 2001 DKS Associates Rank* Project From To M Pine Street 71"Street 691Street M 69` Street Pine Street ORE 99W M 90` Avenue Hall Boulevard Locust Street M 62 /61s`Avenues Taylor's Ferry Road Pomona Street M Pomona Street 61s`Avenue 64` Avenue M 64Avenue Pomona Street ORE 99W M 68` Avenue ORE 99W South of Hampton Street M 66` Avenue South of Hampton Street Dartmouth Street M Hampton Street 68` Avenue 66` Avenue M Haines Street 68` Avenue Tigard City Limits M Shady Lane Greenburg Road 95 th Avenue M 95` Avenue Shady Lane Greenburg Road M 98` Avenue Greenburg Road Main Street M 115` Avenue North Dakota Street Tigard Street M Cascade Avenue Scholls Ferry Road Existing sidewalk M Johnson Street ORE 99W End M Grant Avenue Johnson Street Tigard Street M Scoffins Street Main Street Hall Boulevard M Ash Avenue Commercial Street Scoffms Street M Ash Avenue McDonald Street Burnham Street M Frewing Street ORE 99W O'Mara Street M Garrett Street ORE 99W Ash Avenue M O'Mara Street McDonald Street Hall Boulevard M 97` Avenue McDonald Street Murdock Street M Murdock Street 97` Avenue 103r Avenue M 103r Avenue Murdock Avenue Canterbury Lane M Canterbury Lane 103rd Avenue ORE 99W M 100` Avenue McDonald Street Highland Drive M Highland Drive I 00th Avenue Summerfield Drive M Sattler Street 100` Avenue 98` Avenue M 98` Avenue Sattler Street Murdock Avenue M Ross Street Hall Boulevard East End M 79` Avenue Durham Road Bonita Road M 108` Avenue Durham Road South End M D3 Avenue Bull Mountain Road South End M Peachtree Drive Bull Mountain Road South End M 150` Avenue Bull Mountain Road Beef Bend Road M 135` Avenue Walnut Street Hillshire Drive M Hillshire Drive 135 th Avenue Mistletoe Drive Tigard Transportation System Plan DRAFT P99161 Pedestrians 5-10 October 30, 2001 DKS Associates Rank* Project From To M Mistletoe Drive Hillshire Drive Benchview Terrace M Benchview Terrace White Cedar Place Bull Mountain Road M 132" Avenue Walnut Street Benchview Terrace M Mentor Lane Barrows Road Sunrise Lane M Sunrise Lane Mentor Lane 150` Avenue M 150` Avenue Sunrise Lane Bull Mountain Road M Washington Square Pedestrian Improvements Regional Center (RTP 6022) M Tiedeman Avenue Walnut Street Existing Sidewalk to North M Watkins Avenue Park Street Walnut Street M Off-Street Multi-Use Tualatin River Crossing at approximately 1081Avenue Path M Off-Street Multi-Use I-5/ORE 217 Kruse Way Bridge linkage to 72 Avenue south of ORE Path 217 M Off-Street Multi-Use Powerline Corridor/Tualatin River/Fanno Creek/Greenway Park Loop Path • H=High,M=Medium,L=Low Priority Tigard Transportation System Plan DRAFT P99161 Pedestrians 5-11 October 30, 2001 DKS Assodates (t) HAIL 26 , kx NOT Ro CITY OF TIGARD TO SCALE RD Transportation e Q Systems Plan Q � Q Rp LOCUST RT ❑ � r � � Legend m Z OA sr -Continuous Sidewalk on at Least One Side of Street 217) ---- -Proposed Sidewalk on at Least g o H T One Side of Street PFAF LE i -Schools 210 TIGARD G Pedestrian District Regional Center Town Center BPRR� = W P r z ■ � PS 99W) S TTL ¢ 5 GP��P ti o � Rp D F i i r a � Q N ...River........ � R o ep•� Figure 5-2 l %. PEDESTRIAN �g ACTION PLAN DKS Associates Complementing Land Development Actions Land use actions are where significant improvements to the pedestrian system can occur. Basically a change in land use from vacant or under utilized land creates two key impacts to the pedestrian system: 1. Added vehicle trips that conflict with pedestrian flows 2. Added pedestrian volume that requires safe facilities These impacts require mitigation to maintain a safe pedestrian system. Pedestrians walking in the traveled way of motor vehicles are exposed to potential conflicts that can be minimized or removed entirely with sidewalk installation. The cost of a fronting sidewalk to an individual single family home would be about $1,000 to$2,000 (representing less than one percent of the cost of a house). Over a typical 50 year life of a house this would represent less than$50 per year assuming the cost of money is 4%annually. This cost is substantially less than the potential risk associated with the cost of an injury accident or fatality without safe pedestrian facilities(injury accidents are likely to be$10,000 to$50,000 per occurrence and fatalities are$500,000 to$1,000,000). Sidewalks are essential for the safety of elderly persons,the disabled,transit patrons and children walking to school,a park or a neighbor's home. No area of the city can be isolated from the needs of these users (not residential,employment areas or shopping districts). Therefore,fronting improvements including sidewalk are required on every change in land use or roadway project. For any developing or redeveloped property in Tigard,the benefit of not providing sidewalks is only the cost savings to the developer—at the potential risk and future expense to the public. Therefore, sidewalks are required in Tigard with all new development and roadway projects. It is important that, as new development occurs, connections or accessways are provided to link the development to the existing pedestrian facilities in as direct manner as possible. As a guideline, the sidewalk distance from the building entrance to the public right-of-way should not exceed 1.25 times the straight line distance. If a development fronts a proposed sidewalk(as shown in the Pedestrian Master Plan), the developer shall be responsible for providing the walkway facility as part of any frontage improvement required for mitigation of development. It is also very important that residential developments consider the routes that children will use to walk to school and provide safe and accessible sidewalks to accommodate these routes,particularly within one mile of a school site. Additionally, all commercial projects generating over 1,000 trip ends per day should provide a pedestrian connection plan showing how pedestrian access to the site links to adjacent uses,the public right-of-way and the site front door. Conflict free paths and traffic calming elements should be identified, as appropriate. Address Gaps in Pedestrian System Many of the areas developed in Tigard 10 to 25 years ago did not provide sidewalks. With as much of the City built-out(as is the case today)there are limited opportunities for development to create major portions of the missing pedestrian system. The historic gaps in the pedestrian walking system become more important as land development and activity grow creating new demands for an integrated pedestrian system. Current land developments build sidewalks on project frontages, but have little means or incentive to extend sidewalks beyond their property. Property owners without sidewalks are unlikely to independently build sidewalks that do not connect to anything. In fact, some property owners are resistant to sidewalk Tigard Transportation System Plan DRAFT P99161 Pedestrians 5-13 October 30, 2001 DKS Associates improvements due to cost (they do not want to pay) or the impact to their frontage (they may have landscaping in the public right-of-way). As an incentive to fill some of these gaps concurrent with development activities, the City could consider an annual walkway fund that would supplement capital improvement-type projects. A fund of about$40,000 to $50,000 per year could build over a quarter mile of sidewalk to help fill gaps. If matching funds were provided, over double this amount may be possible. The fund could be used several ways: • Matching other governmental transportation funds to build connecting sidewalks identified in the master plan. • Matching funds with land use development projects to extend a developer's sidewalks off-site to connect to non-contiguous sidewalks (especially with residential development and its access to schools and parks, commercial development linking retail(ie deli,bank, ..)with employment) • Supplemental funds to roadway projects which build new arterial/collector sidewalks to create better linkages into neighborhoods. • Matching funds with adjacent land owners that front the proposed sidewalk. • Reimbursement agreements with developers Parks and Trails Development The City Parks and Recreation Department and Metro Greenspaces programs are responsible for the majority of off-street trail opportunities. These two agencies must coordinate their pedestrian plans to provide an integrated off-street walking system in Tigard. Recent Metro Greenspaces initiatives and City park projects provide an opportunity to implement the off-street trails in Tigard as an integrated element of the pedestrian action plan. The Fanno Creek Trail and Powerlines trail systems are already well developed north of Tigard in Beaverton. Because of the regional nature of the interconnected powerlines to Tualatin River to Fanno Creek trail system, Tigard will need to work cooperatively with Metro, Washington County,Tualatin Hills Parks and Recreation District and the City of Beaverton. Safety Pedestrian safety is a major issue. Pedestrian conflicts with motor vehicles are a major issue in pedestrian safety. These conflicts can be reduced by providing direct links to buildings from public rights-of-way, considering neighborhood traffic management(see Chapter 8: Motor Vehicles),providing safe roadway crossing points and analyzing/reducing the level of pedestrian/vehicle conflicts in every land use application. In setting priorities for the pedestrian action plan, school access was given a high priority to improve safety. However,beyond simply building more sidewalks, school safety involves education and planning. Many cities have followed guidelines provided by Federal Highway Administration and Institute of Transportation Engineers. Implementing plans of this nature has demonstrated accident reduction benefits. However, this type of work requires staffing and coordination by the School District as well as the City to be effective. Several"pedestrian crossing evaluation"locations were identified on the Pedestrian Master Plan and on the Pedestrian Action Plan. These are locations where it may be desirable (where warrants are met) to install a pedestrian activated signal for the sole purpose of allowing pedestrians to cross the roadway. Tigard Transportation System Plan DRAFT P99161 Pedestrians 5-14 October 30, 2001 DKS Associates 2040 Coordination Metro has designated three areas within Tigard as 2040 land use designated pedestrian districts. These areas will require the greatest attention to the development of integrated pedestrian networks. The three areas include: • Washington Square Regional Center • Downtown Tigard Town Center/Main Street/Commuter Rail Station Area • King City Town Center The City of Tigard has developed a plan for the Washington Square Regional Center which is in the final approval process. While not a 2040 land use designated area, the Tigard Triangle has special development code regulation in Tigard that pertain to pedestrian design. Plans will need to be developed for both the Tigard Downtown and King City. The areas designated on Figures 5-1 and Figure 5-2 are the pedestrian districts in Tigard. Tigard Transportation System Plan DRAFT P99161 Pedestrians 5-15 October 30, 2001 DKS Associates Chapter 6 Bicycles CITY OF TIGARD OREGON This chapter summarizes existing and future facility needs for bicycles in the City of Tigard. The following sections outline the criteria to be used to evaluate needs,provide a number of strategies for implementing a bikeway plan and recommend a bikeway plan for the City of Tigard. The needs, criteria and strategies were identified in working with the City's TSP Task Force. As part of the TSP Task Force,the Planning Commission provided input regarding the transportation system in Tigard, specifically exploring bicycle needs. The methodology used to develop the bicycle plan combined citizen and staff input, specific Transportation Planning Rule requirements' and continuity to the regional bicycle system. Metro's Draft Regional Transportation Plan (RTP)has identified a Proposed Regional Bicycle Network. As such,these routes will eventually have bicycle lanes,if they don't already. The following Tigard streets are classified as follows in the RTP: Regional Access Regional Corridor Community Regional Corridor Off-Street (on-street) Connector • Hall to Greenburg • Walnut Street • 72nd Avenue • Fanno Creek to Main to • Scholls Ferry Rd • Bonita-McDonald • Tualatin River Hunziker • Hall Boulevard • Carman-Durham • Powerlines • ORE 99W • Hunziker to LO through • Hall-Durham- 1-5/ORE 217 Boones NEEDS Continuous bikeways are currently only provided for the full length of Durham Road, McDonald Street and Tigard Street in the City of Tigard. Bikeways are also currently provided for significant portions of ORE 99W, Hall Boulevard, Bonita Road, 97th/98th Avenues, Greenburg Road, Walnut Street, 121st Avenue and Bull Mountain Road. In addition, there are a few segments where bikeways do exist where new development and roadway improvements have occurred. Continuity and connectivity are key issues for bicyclists and the lack of facilities (or gaps)cause significant problems for bicyclists in Tigard. Without connectivity of the bicycle system, this mode of travel is severely limited(similar to a road system full of cul-de-sacs). The TPR3 calls for all arterial and collector streets to have bicycle facilities. To meet the TPR requirements and fill in existing gaps in the existing bicycle system, an action plan that focuses on a framework system should be developed to prioritize bicycle investment. ' Transportation Planning Rule, State of Oregon,DLCD, Section 660-12-020(2)(d), 660-12-035(3)(e), 660-12-095(3)(b&c). 2 Regional Bicycle System Map,Regional Transportation Plan Draft,Metro, 1999. 3 Oregon Administrative Rules,Chapter 660,Division 12, Section 045(3). Tigard Transportation System Plan P99161 Bicycles 6-1 October 30, 2001 DKS Associates Bicycle trips are different from pedestrian and motor vehicle trips. Common bicycle trips are longer than walking trips and generally shorter than motor vehicle trips. Where walking trips are attractive at lengths of a quarter mile(generally not more than a mile),bicycle trips are attractive not only for these short trips,but lengths of two to three miles. Bicycle trips can generally fall into three groups: commuters, activity-based and recreational. Commuter trips are typically home/work/home(sometimes linking to transit) and are made on direct, major connecting roadways and/or local streets. Bicycle lanes provide good accommodations for these trips. Activity based trips can be home-to-school, home- to-park, home-to-neighborhood commercial or home-to-home. Many of these trips are made on local streets with some connections to the major functional classification streets. Their needs are for lower volume/speed traffic streets, safety and connectivity. It is important for bicyclists to be able to use through streets4. Recreational trips share many of the needs of both the commuter and activity-based trips,but create greater needs for off-street routes, connections to rural routes and safety. Typically, these bike trips will exceed the normal bike trip length. FACILITIES Bicycle facility needs fall into two primary categories: route facilities and parking facilities. Bicycle lanes are the most common route facilities in Tigard. Racks, lockers and shelters are typical bicycle parking facilities that are provided at individual land use sites. Bicycle ways can generally be categorized as bike lanes,bicycle accommodation, or off-street bike paths/multi-use trails. Bike lanes are areas within the street right-of-way designated specifically for bicycle use. Federal research has indicated that bike lanes are the most cost effective and safe facilities for bicyclists when considering all factors of design. Bicycle accommodations are where bicyclists and autos share the same travel lanes, including a wider outside lane and/or bicycle boulevard treatment(priority to through bikes on local streets). Multi-use paths are generally off-street routes (typically recreationally focused)that can be used by several transportation modes, including bicycles,pedestrians and other non-motorized modes (i.e. skateboards,roller blades, etc.). The term bikeway is used in this plan to represent any of the bicycle accommodations described above. The bicycle plan designates where bike lanes and multi-use paths are anticipated and any other bicycleways are expected to be bike accommodations (i.e. shared with motor vehicles). Bicycle lanes adjacent to the curb are preferred to bicycle lanes adjacent to parked cars or bicycle lanes combined with sidewalks. Six foot bicycle lanes are recommended. Provision of a bicycle lane not only benefits bicyclist but also motor vehicles which gain greater shy distance/emergency shoulder area and pedestrians which gain buffer between walking areas and moving vehicles. On reconstruction projects,bicycle lanes of five feet may need to be considered. Bicycle accommodations can be provided by widening the curb travel lane(for example, from 12 feet to 14 or 15 feet. This extra width makes bicycle travel more accommodating and provides a greater measure of safety). Off-street trails should be planned for 12 feet in width, desirable for mixed-up activity(ped and bike). Signing and marking of bicycle lanes should follow the Manual on Uniform Traffic Control Devices, as adopted for Oregon. Design features in the roadway can improve bicycle safety5. For example,using curb storm drain inlets rather than catch basins significantly improves bicycle facilities. 4 This can include end of cul-de-sac connections,but even better is regular spacing of local streets. 5 Oregon Bicycle and Pedestrian Plan,ODOT,June, 1995;this provides an in-depth discussion on bicycle network development. Tigard Transportation System Plan P99161 Bicycles 6-2 October 30, 2001 DKS Associates Bicycle parking is required in Tigard for new land use applications (see Development Code Section 18.765, Table 18.765.2 Minimum and Maximum Required Off-street Vehicle and Bicycle Parking) Requirements in Community Development Code Section 18.765.050 outline the design and placement of bicycle parking(within 50 feet of building entrance). CRITERIA Tigard's TSP Task Force created a set of goals and policies to guide transportation system development in Tigard(see Chapter 2). Several of these policies pertain specifically to bicycle needs: Goal 2 Policy 3 Bicycle lanes must be constructed on all arterials and collectors within Tigard (with construction or reconstruction projects). All schools,parks,public facilities and retail areas shall have direct access to a bikeway. Policy 5 Bicycle and pedestrian plans shall be developed which link to recreational trails. Policy 6 Local streets shall be designed to encourage a reduction in trip length by providing connectivity and limiting out-of-direction travel. Provide connectivity to activity centers and destinations with a priority for bicycle and pedestrian connections. Goal 3 Policy 3 Safe and secure pedestrian and bikeways shall be designed between parks and other activity centers in Tigard. These goals and policies are the criteria that all bikeway improvements in Tigard should be measured against to determine if they conform to the intended direction of the City. Policy 2-3 sets a specific requirement that bicycle lanes be constructed on all arterials and collectors within Tigard consistent with the Bicycle Master Plan and that all schools,parks,public facilities and retail areas have direct access to a bikeway. Table 6-1 summarizes the bicycle corridors created by overlaying the bicycle network over the arterial and collector system in Tigard. Since bicyclists can generally travel further than pedestrians, connections that lead to regional destinations such as Portland, Beaverton, Tualatin and Lake Oswego are important. Tigard's bicycle network should connect to Washington County's, Beaverton's, Tualatin's and Lake Oswego's bicycle networks and be consistent with the Regional Bicycle System. Key locations where connections should be made to these other jurisdiction's networks are shown in Table 6-2. STRATEGIES Several strategies were considered for construction of future bikeway facilities in Tigard. These strategies were studied to provide the City with priorities since it is likely that the available funding will be insufficient to address all of the projects identified in the Bikeway Master Plan. Tigard Transportation System Plan P99161 Bicycles 6-3 October 30, 2001 DKS Associates Strategy 1 - "Fill in Gaps in the Network where Some Bikeways Exist" This strategy provides bikeways which fill in the gaps between existing bikeways where a significant portion of a bikeway corridor already exists. This strategy maximizes the use of existing bicycle facilities to create complete sections of an overall bikeway network. Examples would include ORE 99W, Hall Boulevard, Bull Mountain Road, Greenburg Road and 121"Avenue, where short segments would complete routes. Table 6-1 Corridors in Proposed Bikeway Network North-South Corridors East-West Corridors Beef Bend Road Taylor's Ferry Road Walnut Street 121"Avenue Barrows Road Bull Mountain Road Greenburg Road Nimbus/Oak Street Beef Bend Rd./Durham Rd./ Carman Drive ORE 99W North Dakota/Greenburg/ Gaarde St/McDonald St./ Hunziker Bonita Road Hall Boulevard Pfaffle/Dartmouth Street 72" Avenue Table 6-2 Bicycle Connectivity to Adjacent Jurisdictions Link Included in City Interface Street Tigard Master Plan? Lake Oswego Haines Street Atlanta Kruse Way multi-use pathway Hunziker Bonita Road Bonita Carman Drive Carman Beaverton Scholls Ferry Road Scholls Ferry Barrows Road Barrows Powerlines multi-use path Powerlines off-street path Murray Boulevard Walnut Davies Road Barrows 125r Avenue North Dakota Nimbus Avenue Nimbus to Locust Hall Boulevard Hall Portland Taylors Ferry Taylors Ferry Barbur Boulevard ORE 99W Oleson Road Greenburg Tualatin Tualatin Road/Boones Ferry Rd. Hall Boulevard Upper Boones Ferry Road Upper Boones Ferry Lower Boones Ferry Road 72nd Washington County Elsner Road Beef Bend Tigard Transportation System Plan P99161 Bicycles 6-4 October 30, 2001 DKS Associates Strategy 2- "Connect Key Bicycle Corridors to Schools, Parks and Activity Centers (public facilities, etc.)" This strategy provides bikeway links to schools,parks,recreational facilities and activity centers from the arterial/collector bikeway network. This alternative provides added safety to likely bicyclist destinations as well as destinations where children are likely to travel. Examples would include Hall Boulevard,Durham Road, Walnut Street, Tiedeman Avenue,Bull Mountain and the off-street multi- use paths throughout Tigard. Strategy 3- "Develop Bicycle Network on Flat Routes" This strategy focuses on providing bicycle lanes on"flat"routes, or those routes without significant grade changes. This strategy provides bicycle facilities where a larger percentage of the population is likely to travel. Examples would include routes such as Walnut Street, Hall Boulevard,Durham Road, North Dakota Street, etc. Strategy 4- "Develop a Bike Sign Program—Focus on Low Volume Streets" This strategy would provide signs to guide bicyclists to appropriate bicycle routes in the City Strategy 5- "Bicycle Corridors that Connect to Major Recreational Facilities0 This strategy provides a connection between the bikeway network and major recreational facilities, such as the Greenway Trail. Examples would be the Greenway Trail,Fanno Creek Trail and the proposed powerline corridor in the western part of the City. Strategy 6- "Develop Maintenance Program to Clean Bike Lanes" This strategy establishes a program to provide maintenance services to clean the bike lanes. Debris in bike lanes is one of the biggest complaints (deterrents)of bicyclists. Strategy 7- "Bicycle Corridors that Commuters Might Use" This strategy focuses on providing bicycle facilities where commuters are likely to go such as local (within Tigard)or regional (i.e. Beaverton,Tualatin,Lake Oswego or downtown Portland) employment centers or leading to transit which provides access to regional employment centers. Examples would include ORE 99W, Scholls Ferry Road and Hall Boulevard. Strategy 8 - 'Bicycle Corridors that Connect Neighborhoods" This alternative puts priority on bicycle lanes for routes which link neighborhoods together. Some of these could include paths crossing parks, schools or utility rights-of-way. Tigard Transportation System Plan P99161 Bicycles 6-5 October 30, 2001 DKS Associates Strategy 9- "Construct All Bikeways to City of Tigard/Washington County Standards" This strategy focuses on upgrading any substandard existing bikeways to current city/county standards. Current standards are for six foot wide bike lanes with appropriate striping and signs for bicycle safety. Strategy 10- "Bicycle Corridors that Access Commercial AreasO This strategy puts priority on bicycle lanes for arterials/collectors which provide access to commercial areas within the City. Examples would include ORE 99W, 72nd Avenue, Dartmouth Street and Hall Boulevard. Table 6-3 summarizes the strategies in the priority order ranked by the TSP Task Force in terms of meeting the transportation goals and objectives. Table 6-3 Bikeway Facility Strategies Comparisons Policies Strategy 2-3 2-5 2-6 3-3 1. Fill in gaps in the network where some bikeways exist 1 O O O 2. Connect key bicycle corridors to schools,parks and activity centers (public facilities, etc.) 1 1 1 • 2. Develop bicycle network on flat routes O O 1 1 3. Develop a bike sign program—focus on low volume streets O O O 1 4. Bicycle corridors that connect to major recreational facilities 1 • 1 1 5. Develop maintenance program to clean bike lanes X X X X 7. Bicycle corridors that commuters might use 1 O O O 8. Bicycle corridors that connect neighborhoods O O 1 O 8. Construct all bikeways to City of Tigard standards O O O O 10. Bicycle corridors that access commercial areas 1 O 1 1 X Does not meet criteria 4 Mostly meets criteria O Partially meets criteria • Fully meets criteria Tigard Transportation System Plan P99161 Bicycles 6-6 October 30, 2001 DKS Associates ALTERNATIVES Two basic alternative bicycle networks were developed through the TSP Task Force discussion. The first option was to place bicycle lanes on every existing arterial and collector street. Figure 6-1 summarizes the All Arterial and Collector alternative. The end result is several redundant bicycle facilities on routes that will no longer be collectors or arterials in the new functional classification. Additionally the cost and right-of-way impact is so significant that this alternative may be difficult to successfully implement. A second alternative was developed by the TSP Task Force that is build upon a framework of bicycle lanes through Tigard. This alternative provides framework grids of bicycle lanes with fewer lanes identified on lower classification streets (which typically have lower traffic volumes). Based upon the highest priority strategies the TSP Task Force recommended the framework option as the Tigard Bicycle Master Plan(Figure 6-2). RECOMMENDED BIKEWAY FACILITY PLAN A list of likely actions to achieve fulfillment of these priorities was developed into a Bicycle Master Plan. The Bicycle Master Plan(Figure 6-2) is an overall plan and summarizes the"wish list"of bicycle- related projects in Tigard,providing a long-term map for planning bicycle facilities. From this Master Plan, a more specific, shorter term,Action Plan was developed. The Action Plan(Figure 6-3)consists of projects that the City should actively try to fund. These projects form a basic bicycle grid system for Tigard. As development occurs, streets are rebuilt and other opportunities (such as grant programs) arise,projects on the Master Plan should be pursued as well. POTENTIAL PROJECT LIST Table 6-4 outlines potential bicycle projects in Tigard. The City, through its Capital Improvement Program(CIP) and bond measure funding(along with joint funding with other agencies such as Washington County or Metro or development approval)would implement these projects. Figure 6-3 summarizes the Bicycle Action Plan. Multi-use paths identified on the bicycle plans should be aligned to cross roadways at intersections for safe crossing rather than crossing roadways at mid-blocks without traffic control. There is an off-street multi-use trail shown along the powerline corridor in the western part of Tigard. This corridor is designated as a proposed Off-Street Multi-Use Path in Metro's Regional Bicycle System6,however,the corridor follows a very steep grade and would be extremely difficult for most bicyclists. The corridor could be developed as a multi-use path that could be used by serious bicyclists as well as pedestrians. 6 Regional Bicycle System Map,Version 4.0,Metro,December 1, 1997. Tigard Transportation System Plan P99161 Bicycles 6-7 October 30, 2001 DKS Assodates (t) Hglz 26 kX NOT CITY OF TIGARD TO SCALE S Transportation Systems Plan ST Legend Existing Bike Lanes FERR �� o Proposed Bike Lanes* 0 TH DAKOTA ST 217) ------ -Off Street Paths v� ¢ neARD P RFE P F Parks 2t0 G O ♦ r �Q� 90 ¢ i -Schools ■ r Th T ST ■ ` *Note:There may be existing bike lanes . x on one side of street-see Existing Bike Lanes graphic for clarification. 9W O S McDONALD ST m i i 5 i R DURHAM BEEF i i r River... _. Figure 6-1 .. .................. BICYCLE PLAN ALTERNATIVE (All Arterials/Collectors Option) DKS Associates N F`�d7CJ Il l I {I NOT U L L� I CITY OF TIGARD TO SCALE �°— aRecoN Transportation �y '� Systems Plan Legend . RTPL%.rT.nsil Slop •••••■ r. Schools ♦ Parks :• a o Fidsting Park O ♦ - Bike Lanes N♦♦• � Fidsting ♦♦ . i —I I N PmPosed LL__,,__ • • Turd Off-Street Multi-Use Paths LJ is ♦ •.... : ♦� I \ ♦� Prop—d Usfing Fidsting ♦ 1 ° THRPD Trails Fidsting e C N SW I ♦ I .• �yJ� :•r PmPosed UT RTP Bicycle System Designations ♦ Ragional Access Bikeway ♦ � Regional Conidorortetreet bikeway • Community Connector 3 ♦ \ RTP Regional Corridor Off-Street Regional Multi-Use Path —� Fidsting NALD -1 PmPosed J SW BULL RD •♦♦ ♦ — SW^ RHA DURHAM C m o Figure 6-2 ' " RD — R BICYCLE MASTER PLAN (Framework Option) DKS Assodates (t) hAlz 26 , kX NOT Ro CITY OF TIGARD TO SCALE S y Transportation ¢ Systems Plan iz LOCUST _ Legend m r__ •=Z oA sr -Existing Bike Lanes Proposed Bike Lanes* • o NORTH DAKOTA ST •; 217� —' ------- -Off Street Paths ♦:�� ♦� Ci/�FF PFAFFLE Sr -Parks 210 ♦ �- ¢ TIGARD P G po Schools rH sr ` *Note:There may be existing bike lanes ST Z on one side of street-see Existing Bike PRR WAIN . ♦ P� Lanes graphic for clarification. = P 9W •••J 2 i • 3 O � o �♦ S Mc DONALD ST ;• ?USF BONITA PQ m i ¢ SAT LER ST ¢ 5 x GPQ� DR DURHAM � R SUMMERFIELD D DURHAM BEEF ¢ z F.*w..n.. ... z � �• w W ...River... • � W g re63 ��G�� Fi u - a 4Z BICYCLE �g ACTION PLAN DKS Associates Table 6-4 Bicycle Project Priorities Rank Project From To Action Plan Projects H Taylor's Ferry Road Washington Drive City Limits H Washington Drive Hall Boulevard Taylor's Ferry Road H Hall Boulevard Pfaffle Street Bonita Road H Greenburg Road Hall Boulevard Cascade Avenue H Oak Street(RTP 6019) Hall Boulevard 80thAvenue H Oak Street Hall Boulevard 90t Avenue H ORE 99W East City Limits South City Limits H 72° Avenue ORE 99W South City Limits H Hunziker Street Hall Boulevard 72° Avenue H Upper Boones Ferry Rd 1-5 Durham Road H Bonita Road 72° Avenue West of 72° Avenue H Burnham Street Main Street Hall Boulevard H O'Mara Street McDonald Street Hall Boulevard H Frewing Street ORE 99W O'Mara Street H Murdock Street 98t Avenue 97t Avenue H 98t Avenue Murdock Stret Durham Road H 92° Avenue Durham Road Cook Park H Tiedeman Avenue Greenburg Road Walnut Street H Walnut Street ORE 99W Barrows Road H 121st Avenue Walnut Street Gaarde Street H Gaarde Street Walnut Street ORE 99W H Barrows Road Scholls Ferry Road(West) Scholls Ferry Road(East) H Scholls Ferry Road Hall Boulevard Barrows Road H Bull Mountain Road 1501 Avenue Beef Bend Road H Beef Bend Road ORE 99W Scholls Ferry Road H Other Master Plan Projects M 80thAvenue Taylor's Ferry Road Spruce Street M Oak Street Greenburg Road 90t Avenue M Oak Street 80th Avenue 71St Avenue M 71St Avenue Oak Street Pine Street M Pine Street 71St Avenue 69t Avenue M 69t Avenue Pine Street ORE 99W M 68t Avenue ORE 99W South End of Street M Dartmouth Street ORE 99W 68thAvenue M Hampton Street 72° Avenue 68thAvenue M Pfaffle Street Hall Boulevard ORE 99W M Haines Street 68thAvenue East City Limits Tigard Transportation System Plan P99161 Bicycles 6-11 October 30, 2001 DKS Associates Rank Project From To M Bonita Road 727Avenue East City Limits M Scoffins Street Hall Boulevard Main Street M Sattler Street 100` Avenue Hall Boulevard M Ross Street Hall Boulevard East End of Street M Hall Boulevard Durham Road South City Limits M 108` Avenue Durham Road South End of Street M 150` Avenue Bull Mountain Road Beef Bend Road M 130` Avenue Scholls Ferry Road Winterlake Drive M Winterlake Drive 130` Avenue 128` Avenue M 128r Avenue Winterlake Drive Walnut Street M North Dakota Street Scholls Ferry Road Greenburg Road M Springwood Drive Scholls Ferry Road 121'`Avenue M Cascade Avenue Scholls Ferry Road Greenburg Road M Durham Road Upper Boones Ferry Road 72° Avenue M 79` Avenue Durham Road Bonita Road M Off-Street Multi-Use Path Powerline corridor in west Tigard M Off-Street Multi-Use Path Southside ORE 217 from Hunziker to I-5 Bridge M Off-Street Multi-Use Path Adjacent to Tualatin River M Off-Street Multi-Use Path Bridge over Tualatin River at 108th M Off-Street Multi-Use Path Adjacent to Fanno Creek *H=High,M=Medium,L=Low Priority COMPLEMENTING LAND DEVELOPMENT ACTIONS The Transportation Planning Rule requires that bicycle parking facilities be provided as part of new residential developments of four units or more,new retail, office and institutional developments, and all transit transfer stations and park and ride lots.' The City through its Community Development Code has in place requirements for bicycle parking. It is important that, as new development occurs, connections or accessways are provided to link the development to the existing bicycle and pedestrian facilities in as direct manner as is reasonable. If a development fronts a proposed bikeway or sidewalk(as shown in the Bicycle or Pedestrian Master Plans),the developer shall be responsible for providing the bikeway or walkway facility as part of any half-street improvement required for project mitigation. 7 Transportation Planning Rule, State of Oregon,Department of Land Conservation and Development, Section 660-12-045(3)(a). Tigard Transportation System Plan P99161 Bicycles 6-12 October 30, 2001 DKS Associates Chapter 7 Transit CITY OF TIGARD OREGON This chapter summarizes existing and future transit needs in the City of Tigard. The following sections outline the criteria to be used to evaluate needs,provides a number of strategies for implementing a transit plan and recommends a transit plan for the City of Tigard. The needs, criteria and strategies were identified in working with the City's TSP Task Force. This committee provided input regarding the transportation system in Tigard, specifically exploring transit needs. The methodology used to develop the transit plan combined citizen and staff input. NEEDS There are currently 12 fixed bus routes which provide service within the City of Tigard. These bus routes are summarized in Chapter 3 (Existing Conditions). There are four express routes providing service to Tigard residents(12E, 64X,92X and 95X).Existing transit headways on bus routes in Tigard range from 10-15 minutes on Routes 12 and 92X to about 30 minutes on Routes 76 and 78 during peak commute periods. Metro's Draft Regional Transportation Plan (RTP) identifies the following routes on its Public Transportation System Map(Figure 7-1)t: • ORE 217 HCT Corridor • Greenburg/Hall/Durham HCT Corridor • ORE 99W(East of ORE 217) HCT Corridor • Hall Boulevard(North of ORE 217) Frequent Bus • Hunziker Street Frequent Bus • ORE 99W(West of ORE 217) Primary Bus • Scholls Ferry Road(East of Murray)Primary Bus • 121"/Walnut Street Primary Bus • 681h Parkway/Hampton Street Primary Bus • 72nd Avenue(South of Hampton) Primary Bus Based upon these designations,the City of Tigard designates all bus stops on HCT Corridors and Frequent Bus routes as Major Transit Stops. In addition, all park and ride sites and transit stations are designated major transit stops (Downtown Tigard, Washington Square,park and ride at ORE 99W/72nd Avenue). While Tri-Met bus ridership in Tigard increased by 35% from 1990 to 1994 and another 15% from 1994 to 1999(comparing 12 routes), transit ridership represents 6 percent of Tigard PM peak hour trip making. I Public Transportation System Map,Metro,Version 4.0,December 1, 1997. Tigard Transportation System Plan P99161 Transit 7-1 October 30, 2001 DKS Assodates (t) H4 26 kx NOT CITY OF TIGARD TO SCALE TAYLORS FERRY RD Transportation Systems Plan Q mCR LOCUST RT o� � Legend Q Z OAK sr ■ ■ ■ -High Capacity Transit(HCT) o -Frequent Bus 217) m -Regional Bus ORTH DAKOTA ST G�F�cN PFAFFLE -Transit Center Location Q� Q TIGARD P R �s 0 a CR -Potential Commuter Railstation Sr Park&Ride Lot Location CR A-Major Transit Stop BPRRaNJS � W� � P F tiUNZ��R ♦ � sr 99W PSS G o � ♦ dj 0 GAARDE ST ♦ McDONALD ST RAS � cyy BULL MDUN YV RD Q 5 ♦ x BONITA RD ♦ W SATTLER ST m • ti W o DR m RD SUMMERFIELD BEND DURHAM RD BEEF v Q Q a ■ ¢ z ■ z ...River.... N R Figure 7-1 RTP PUBLIC W TRANSPORTATION SYSTEM CLASSIFICATION �g DKS Associates Existing Tri-Met service covers nearly all of the routes established in the Metro Public Transportation Plan today. Primary routes provide the backbone of the transit system and are intended to provide high quality service operating at frequencies of 15 minutes all day. The HCT service on Hall that diverges to Durham should be considered to stay on Hall to the south when Hall is extended in the future. All of Tri-Met's bus routes are accessible and most are equipped with lifts. Every Tri-Met bus has priority seating near the front for seniors and passengers with disabilities. Tri-Met also operates a LIFT program for those who are unable to use Tri-Met buses or MAX because of a disability. One of Tigard's greatest transit needs in the future will be improving transit service to the southwest portion of the City where much of the new development is occurring. Tri-Met has identified Durham Road and Barrows Road for transit service in the future. Rapidly increasing employment and housing creates a much greater opportunity to create productive public transit routing in Tigard. CRITERIA Tigard's TSP Task Force created a set of goals and policies to guide transportation system development in Tigard. These goals and policies represent the criteria that all transit improvements in Tigard should be compared against to determine if they conform to the intended vision of the City. A few of these policies pertain specifically to transit needs: Goal 2 Policy 2 The City shall coordinate with Tri-Met, and/or any other transit providers serving Tigard, to improve transit service to Tigard. Fixed route transit will primarily use arterial and collector streets in Tigard. Development adjacent to transit routes will provide direct pedestrian accessibility. Policy 7 Tigard will participate in vehicle trip reduction strategies developed regionally targeted to achieve non-single occupant vehicle levels outlined in Table 1.3 of the Regional Transportation Plan. Policy 8 Tigard will support the development of a commuter rail system as part of the regional transit network. Goal 5 Policy I Design and construct transportation facilities to meet the requirements of the Americans with Disabilities Act. STRATEGIES Tri-Met is responsible for any changes in routes through their annual transit service plan process. In order for the City to have its transit needs assessed,the City can provide input to Tri-Met through this process. Several strategies were developed for the implementation of future transit facilities in Tigard. These strategies were developed to provide the City with priorities in providing guidance to Tri-Met since it is likely that the available funding will be insufficient to address all of the projects identified in the Transit Master Plan. Tigard Transportation System Plan P99161 Transit 7-3 October 30, 2001 DKS Associates Strategy 1 - "Provide Commuter Rail" This strategy focuses on providing Commuter Rail through Tigard. This allows greater connectivity to the regional transit network and to other nearby Cities such as Hillsboro, Tualatin and Wilsonville. Stations in the Tigard area would be located in the Downtown Area and near Washington Square. Beyond the current Beaverton/Wilsonville proposal, the significant traffic operational problems in the ORE 99W corridor make extended commuter rail service to Sherwood, Newberg, McMinnville, Spirit Mountain and the coast requires further study. Strategy 2 (Tie) - "Provide Service Often (i.e. every 15 minutes) in Peak Commute Periods" This strategy focuses on decreasing the headways between buses during peak morning and evening commute periods. This increases operating costs for Tri-Met and without increased ridership(or potential for more ridership), Tri-Met would not upgrade services. In the 1999 service plan, Tri-Met focused on more frequent service. Strategy 2 (Tie) - "Provide Express Routes to Regional Employment Centers (i.e. Downtown Portland, Washington Square)" This strategy is aimed at providing service directly from Tigard to regional employment centers. This might include a few stops in Tigard followed by express service to downtown Portland(one or two stops at park &ride lots along the way)or Beaverton Transit Center, etc. Strategy 2 (Tie) - "Provide Bus Shelters/Improved User Amenities" This strategy focuses on installation of bus shelters and other user amenities along bus routes in Tigard. The need for bus shelters at bus stops, as well as other user amenities, should be evaluated in conjunction with any new commercial or residential development adjacent to a transit street. One user amenity that got a favorable reaction from the Task Force was"real time"bus schedule information at bus stops, indicating how long it would be before the next bus arrives at a particular stop. Tri-Met's Planning and Design for Transit Handbook should be used as a guide in providing transit amenities. Generally,when a transit stop has 75 or more daily boardings, transit amenities should be pursued. Strategy 5 (Tie) - "Provide Access to Employment Areas" This strategy focuses on providing access to locations where people work in Tigard. Employment areas in and near Tigard might include Washington Square, Tigard Triangle, ORE 99W and Sequoia Parkway/72nd Avenue. Strategy 5 (Tie) - "Provide More Local Transit Service" This strategy focuses on providing more transit service on local routes (typically near where people live), rather than primarily on arterials and collectors. An assessment of existing transit route coverage in Tigard was done comparing current and future placement of transit services in relationship to land use densities that would be supportive of transit use. The land use data from the travel demand forecast model was Tigard Transportation System Plan P99161 Transit 7-4 October 30, 2001 DKS Associates utilized in this assessment. A one quarter mile "buffer" was established around each transit stop and compared to the adjacent land use. The existing conditions indicate that about 80 percent of the land area in Tigard with density supportive of transit use would be within one-quarter mile of a transit stop (Figure 7-2). With the proposed future transit service coverage,approximately 85 percent of the land area in Tigard with land use densities supportive of transit service would be within one-quarter mile of a transit stop (Figure 7-3). This does not specifically address the frequency of some of the transit services or the destinations (which would require coordination with Tri-Met for this strategy to be effectively implemented). Strategy 7— "Provide Access to Commercial Areas" This strategy focuses on providing access to locations where people choose to do their shopping. Commercial areas in Tigard might include Washington Square, the Tigard Triangle, ORE 99W, Main Street, and the area adjacent to Sequoia Parkway. Strategy 8 - "Provide Park & Ride Lots" This strategy provides park&ride lots at locations where concentrated transit demand exists or where it is desirable for Tri-Met to stop. Strategy 9 - "Provide Access to Activity & Service Centers" This strategy focuses on providing transit access to destinations such as community centers, hospitals, schools, churches, etc. Table 7-1 summarizes the strategies in terms of meeting the transportation goals and policies of Tigard. The strategies are listed in the priority order as determined by the TSP Task Force. Tigard Transportation System Plan P99161 Transit 7-5 October 30, 2001 • ■■� . CITY OREGON Transportation Systems PlanLegend Existing Transit/Service Route 0M ss,ss MM Shuttle Area Existing LOS A-C Transit Buffer Existing LOS D Transit Buffer ., IVA� 1994 Transit Supportive Zones Not covered by Buffer, RlII�. Existing LOS E Transit BufferExisting LOS F Transit Buffer Note' Transit LO n headway in the PM Peak Perig4-=ion th KL Capacity Manual. LOS A 1-9 minutes L SB 10-14 minutes LOS C: 15-20 minutes a - R� + . �■� �L�� 30 minutes r ■ _ ► . .•minutes Figure 7-2Existing Transit �,i - Coverage �1OREGONCITY OF TIGARD Transpoftation � Systems Plan MMME ate. -K ME WAS M Ira ;111 � _ ��! ■ . Kw no- .�••,� r WE DKS Associates Table 7-1 Transit Strategies Comparisons Policies Strategy 2-2 2-7 2-8 5-1 1 1 • 1 1. Provide Commuter Rail 1 1 / 1 2. Provide Service Often in Peak Commute Periods 3. Provide Express Routes to Regional Employment Centers 1 1 O 1 4. Provide Bus Shelters/User Amenities 5. Provide Access to Employment Areas 1 1 O 1 6. Provide More Local Transit Service 1 O 1 1 7. Provide Access to Commercial Areas 8. Provide Park&Ride Lots 1 1 O 1 1 1 1 1 9. Provide Access to Activity& Service Centers x Does not meet criteria O Partially meets criteria 1 Mostly meets criteria • Fully meets criteria RECOMMENDED TRANSIT PLAN The strategies that had been developed by the TSP Task Force were then ranked by the committee. Each committee member was assigned a certain number of points that he or she could allocate to each of the strategies according to his or her priorities. The ranking of these strategies is the same as listed previously. Potential Project List Proposed transit routes/facilities are summarized in Table 7-2 and Figure 7-4. Transit projects were determined based on strategies listed above and project feasibility. Park and ride lots,pedestrian districts and potentially new service areas are shown on Figure 7-4. Tigard Transportation System Plan P99161 Transit 7-8 October 30, 2001 DKS Associates Table 7-2 Potential Transit Projects Rank Project Description 1 Provide Commuter Rail Station As part of the Beaverton to Wilsonville Commuter Rail in Tigard system provide a park and ride station in downtown Tigard. Support regional study of western extensions of commuter rail service(or comparable options). 2 Provide Transit Amenities at Provide shelters, information kiosks, etc key transit routes Major Transit Stops in Tigard with land use development. Focus on development of"SMART"bus stops. 3 Improve Pedestrian Connections Construct sidewalks, crosswalks, etc. adjacent to transit to Transit Facilities routes and facilities (i.e.park-and-ride lots,bus stops, etc.). Within '/4 mile of bus stops, focus on enhancing pedestrian access. Enhance Regional Center and Town Center pedestrian access to transit. 4 Decrease Headways Provide more frequent transit service during peak commute periods. 5 Establish Additional Transit Provide service along Durham Road and in the western Routes part of the City(i.e. Durham Road,Barrows Road, Murray/Walnut/Gaarde) . Time additional transit service to coordinate with major road extensions or street improvements. 6 Add a new Transit Center at the Provide a new transit center with the development of the Murray/Scholls Town Center Murray/Scholls Town Center. The Downtown Town Center and Washington Square Regional Center are the existing Transit Center locations. Tigard Transportation System Plan P99161 Transit 7-9 October 30, 2001 DKS Associates N 7CJIll I {I NOT 56 I 45 CITY OF TIGARD TO SCALE OREGON 3 43 45 76 56 Transportation 62 78 P 78 L Systems Plan � 3 43 _-JLegend 62 76 78 ❑ Proposed Commuter Rail Stations Proposed Commuter Rail 62 — 12 Future Transit Center Opportunity �p 96 Transit Center Location KiFI © Park and Ride Location b PFAFFL 42P � 45 � � �� Existing TransittService Route ',• Planned Future TransittService Route Potential Future TransittService Route • RTP Major Transit Stop N SW WALNUT 78 12 45 Proposed RTP Transit Route Designations 44 76 Regional Bus 96 41 Frequent Bus 76 38 \ Rapid Bus 38 L 38 0 SW BULL Rp P rm ka 38 37 KHA b 96 0 s 3 Figure 7-4 H m C1 Future Transit J Service DKS Associates Recommended Land Use Actions The City of Tigard Development Code includes requirements for land use changes to address transit access. Section 18.360.090 provides approval criteria related to public transit. a. Provisions within the plan shall be included for providing for transit if the development proposal is adjacent to existing or proposed transit route; b. The requirements for transit facilities shall be based on: (1) The location of other transit facilities in the area; and (2) The size and type of the proposal. c. The following facilities may be required after City and Tri-Met review: (1) Bus stop shelters; (2) Turnouts for buses; and (3) Connecting paths to the shelters. The only modification to this code provision is to define adjacent as having a bus stop within 500 feet of the property. Tigard Transportation System Plan P99161 Transit 7-11 October 30, 2001 DKS Associates Chapter 8 Motor Vehicles GIN OF TIGARD OREGON This chapter summarizes needs for the motor vehicle system for both existing and future conditions in the City of Tigard. This chapter also outlines the criteria to be used in evaluating needs,provides a number of strategies and recommends plans for motor vehicles(automobiles, trucks,buses and other vehicles). The needs, criteria and strategies were identified in working with the City's Task Force (which consisted primarily of the Tigard Planning Commission). This group explored automobile and truck needs in the City of Tigard and provided input about how they would like to see the transportation system in their city develop. The Motor Vehicle modal plan is intended to be consistent with other jurisdictional plans including Metro's Draft Regional Transportation Plan (RTP), Washington County's Transportation Plan and ODOT's Oregon Highway Plan(OHP). The motor vehicle element of the TSP involves several elements as shown in Figure 8-1. This chapter is separated into the following ten sections: • Criteria • Functional Classification(including summary of cross sections and local street connectivity) • Circulation and Capacity Needs • Safety • Access Management • Maintenance • Neighborhood Traffic Management • Parking • Transportation System Management/Intelligent Transportation Systems • Truck Routes CRITERIA Tigard's TSP Task Force created a set of goals and policies to guide transportation system development in Tigard(see Chapter 2). Many of these goals and policies pertain specifically to motor vehicles. These goals and policies represent the criteria that all motor vehicle improvements or changes in Tigard should be measured against to determine if they conform to the intended direction of the City. Goal Livability Policy I Maintain the livability of Tigard through proper location and design of transportation facilities. Policy 3 Address issues of excessive speeding and through traffic on local residential streets through a neighborhood traffic program. The program should address corrective measures for existing problems and assure that development incorporates traffic calming. Tigard Transportation System Plan P99161 Motor Vehicles 8 - 1 October 30, 2001 DKSAssociates CITY OF TIGARD Transportation System Plan a ■.■ . --a • Truck • t Routing Parking Figure 8-1 VEHICULAR ELEMENTS OF THE STREET PLAN DKS Associates Goal 2 Balanced Transportation System Policy I Develop and implement public street standards that recognize the multi-purpose nature of the street right-of-way for utility,pedestrian,bicycle,transit,truck and auto use. Policy 6 Local streets shall be designed to encourage a reduction in trip length by providing connectivity and limiting out-of-direction travel. Provide connectivity to activity centers and destinations with a priority for bicycle and pedestrian connections Policy 7 Tigard will participate in vehicle trip reduction strategies developed regionally targeted to achieve non-single occupant vehicle levels outlined in Table 1.3 of the Regional Transportation Plan. Goal Safety Policy I Design of streets should relate to their intended use. Policy 2 Street maintenance shall be a priority to improve safety in Tigard. Policy 5 Access management standards for arterial and collector streets shall be developed to improve safety in Tigard. Policy 6 Establish a City monitoring system that regularly evaluates,prioritizes and mitigates high accident locations within the City. Goal 4 Performance Measures Policy I A minimum intersection level of service standard shall be set for the City of Tigard. All public facilities shall be designed to meet this standard. Policy 3 Work with Washington County,Metro,and ODOT to develop,operate and maintain intelligent transportation systems including coordination of traffic signals. Goal Accessibility Policy 2 Develop neighborhood and local connections to provide adequate circulation in and out of the neighborhoods. Policy 3 Work to develop an efficient arterial grid system that provides access within the City and serves through City traffic. Goal 6 Goods Movement Policy I Design arterial routes,highway access and adjacent land uses in ways that facilitate the efficient movement of goods and services. Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8 -3 October 30,2001 DKS Associates FUNCTIONAL CLASSIFICATION Roadways have two functions,to provide mobility and to provide access. From a design perspective, these functions can be incompatible since high or continuous speeds are desirable for mobility,while low speeds are more desirable for land access. Arterials emphasize a high level of mobility for through movement; local facilities emphasize the land access function; and collectors offer a balance of both functions(Figure 8-2). Functional classification has commonly been mistaken as a determinate for traffic volume,road size, urban design, land use and various other features which collectively are the elements of a roadway,but do not represent function. For example,the volume of traffic on a roadway is directly related to land uses and because a roadway carries a lot or a little traffic does not necessarily determine its function. The traffic volume, design(including access standards)and size of the roadway are outcomes of function, but do not define function. Function can be best defined by connectivity. Without connectivity,neither mobility nor access can be served. Roadways that provide the greatest reach of connectivity are the highest level facilities. Arterials can be defined by regional level connectivity. These routes go beyond the city limits in providing connectivity and can be defined into two groups:principal arterials(typically state routes)and arterials. The efficient movement of persons, goods and services depends on an interconnected arterial system. Collectors can be defined by citywide or district wide connectivity. These routes span large areas of the city but typically do not extend significantly into adjacent jurisdictions. They are important to city circulation. The past textbooks on functional classification generally defined all other routes as local streets,providing the highest level of access to adjoining land uses. These routes do not provide through connection at any significant regional, city-wide or district level. Based upon connectivity there is a fourth level of functional classification-neighborhood route. In many past plans, agencies defined a minor collector or a neighborhood collector;however,use of the term collector is not appropriate. Collectors provide citywide or large district connectivity and circulation. There is a function between a collector and a local street that is unique due to its level of connectivity. Local streets can be cul-de-sacs or short streets that do not connect to anything.' Other routes people use to get in and around their neighborhood. They have connections within the neighborhood and between neighborhoods.These routes have neighborhood connectivity,but do not serve as citywide streets. They have been the most sensitive routes to through, speeding traffic due to their residential frontages. Because they do provide some level of connectivity,they can commonly be used as cut-through routes in lieu of congested or less direct arterial or collector streets that are not performing adequately. Cut-through traffic has the highest propensity to speed, creating negative impacts on these neighborhood routes. By designating these routes, a more systematic citywide program of neighborhood traffic management can be undertaken to protect these sensitive routes. Or in the case of neo-traditional grid systems, extensive redundancy in facilities results in local status to streets that have greater than local connectivity. Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8 -4 October 30,2001 DKS Associates CITY OF TIGARD Transportation System Plan fie,yac \5tteek t e ° t ate J a atlet`a, yv q1,10 l� o % es a° t s b o ESP o,v �tee,0o1 vo m�. p Complete access control No through Increasing proportion of through No /oca/ troffic traffic.Increasing speed. traffic MOVEMENT FUNCTION Source: University of California, Figure �'2 'Fundamentals of Traffic Engineering' JameWolfgang Kell STREET James S. STREET FUNCTION RELATIONSHIP DKS Associates In the past, traffic volume and the size of a roadway have been directly linked to functional classification. More recently,urban design and land use designations have also been tied to functional classification. Discussions of neo-traditional street grids that eliminate the need for functional classification creates another commentary on this issue. All of these approaches to functional classification tend to be confusing and ever changing, complicating an essential transportation planning exercise. The planning effort to identify connectivity of routes in Tigard is essential to preserve and protect future mobility and access,by all modes of travel. In Tigard, it is not possible to have a citywide neo-traditional layout. Past land use decisions, topography and environmental features preclude this'. Without defining the varying levels of connectivity now in the TSP, the future impact of the adopted Comprehensive Plan land uses will result in a degraded ability to move goods and people (existing and future)in Tigard. The outcome would be intolerable delays and much greater costs to address solutions later rather than sooner. By planning an effective functional classification of Tigard streets', the City can manage public facilities pragmatically and cost effectively. These classifications do not mean that because a route is an arterial it is large and has lots of traffic. Nor do the definitions dictate that a local street should only be small with little traffic. Identification of connectivity does not dictate land use or demand for facilities. The demand for streets is directly related to the land use. The highest level connected streets have the greatest potential for higher traffic volumes, but do not necessarily have to have high volumes as an outcome, depending upon land uses in the area. Typically, a significant reason for high traffic volumes on surface streets at any point can be related to the level of land use intensity within a mile or two. Many arterials with the highest level of connectivity have only 35 to 65 percent"through traffic". Without the connectivity provided by arterials and collectors, the impact of traffic intruding into neighborhoods and local streets goes up substantially. If land use is a primary determinate of traffic volumes on streets, then how is it established? In Oregon, land use planning laws require the designation of land uses in the Comprehensive Plan. Tigard's Comprehensive Plan land uses have been designated for over two decades. These land use designations are very important not only to the City for planning purposes, but to the people that own land in Tigard. The adopted land uses in Tigard have been used in this study, working with the Metro regional forecasts for growth in the region for the next 20 years. A regional effort, coordinated by Metro and local agencies, has been undertaken to allocate the determined overall land use in the most beneficial manner for transportation. Without this allocation, greater transportation impacts would occur(wider and more roads than identified in this plan). As discussed in Chapter 10, if the outcome of this TSP is either too many streets or solutions that are viewed to be too expensive, it is possible to reconsider the core assumptions regarding Tigard's livability- its adopted land uses or its service standards related to congestion. The charge of this TSP (as mandated by State law)is to develop a set of multi-modal transportation improvements to support the Comprehensive Plan land uses. Key to this planning task is the functional classification of streets. ' While subdivisions or areas of neo-traditional development exist and are possible (even desirable), on the whole, the concept cannot be generically applied citywide in lieu of functional classification. 'Including definition of which routes connect through Tigard,within Tigard and which routes serve neighborhoods and the local level in the city. Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8 -6 October 30,2001 DKS Associates Functional Classification Definitions The proposed functional classification of streets in Tigard is represented by Figure 8-3. Any street not designated as either an arterial,collector or neighborhood route is considered a local street. Principal Arterials are typically freeways and state highways that provide the highest level of regional connectivity. These routes connect over the longest distance(many miles long)and are less frequent than other arterials or collectors. These highways generally span several jurisdictions and many times have statewide importance(as defined in the ODOT Level of Importance categorization).' In Tigard,1-5 is designated an Interstate Highway and two routes(ORE 217 and ORE 99W)are designated Statewide Highways. All three of these routes are part of the National Highway System. While State Highways make up only 10 percent of Oregon's road mileage,they handle over 60 percent of the daily traffics. Arterial streets serve to interconnect and support the principal arterial highway system. These streets link major commercial,residential,industrial and institutional areas. Arterial streets are typically spaced about one mile apart to assure accessibility and reduce the incidence of traffic using collectors or local streets for through traffic in lieu of a well placed arterial street. Access control is the key feature of an arterial route. Arterials are typically multiple miles in length. Many of these routes connect to cities surrounding Tigard and commonly provide access to freeways via interchanges. Collector streets provide both access and circulation within and between residential and commercial/industrial areas. Collectors differ from arterials in that they provide more of a citywide circulation function,do not require as extensive control of access(compared to arterials) and penetrate residential neighborhoods,distributing trips from the neighborhood and local street system. Collectors are greater than 0.5 to 1.0 miles in length. Neighborhood routes are usually long relative to local streets and provide connectivity to collectors or arterials. Because neighborhood routes have greater connectivity,they generally have more traffic than local streets and are used by residents in the area to get into and out of the neighborhood,but do not serve citywide/large area circulation. They are typically about a quarter to a half mile in total length. Traffic from cul-de-sacs and other local streets may drain onto neighborhood routes to gain access to collectors or arterials. Because traffic needs are greater than a local street,certain measures should be considered to retain the neighborhood character and livability of these routes. Neighborhood traffic management measures are often appropriate(including devices such as speed humps,traffic circles and other devices-refer to later section in this chapter). However,it should not be construed that neighborhood routes automatically get speed humps or any other measures. While these routes have special needs,neighborhood traffic management is only one means of retaining neighborhood character and vitality. Local Streets have the sole function of providing access to immediate adjacent land. Service to "through traffic movement"on local streets is deliberately discouraged by design. ' 1999 Oregon Highway Plan,ODOT,March 1999. 5 1999 Oregon Highway Plan,ODOT,March 1999,page 13. Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8 - 7 October 30,2001 DKS Associates N III NOT { CITY OF TIGARD TO SCALE I OREGON r Transportation ILORS0RDr I �= Systems Plan _T Legend ® Road Closure —t— ST Functional Classification (f > Proposed Freeway NProposed Arterial TAfProposed Collector r--re I N Proposed Neighborhood Route QJ PFAFFLE ,* Planned Arterial Planned Collector w �V Planned Neighborhood Route 1 'a s� Regional Center,Town Center,or Sub Area �V � yc I nv �N WALNUT / yqt, � 4 "-Transportation facilities in the Tigard Triangle and Washington Square planning areas have specific design regulations and classifications that may slightly differ from those in the TSP for -14- 41 consistency purposes. In these overlay areas, 5 \ there are specific planning overlay documents for transportation design regulations. 3 I fNcDONALD ST-1 Note: The exact alignment of dashed lines to r-.,.:LL U IN address physical,access control,right-of-way BULL RD) J I and environmental constraints in alignment"R RD developement. 0 Figure 8-3 I H m Proposed Functional ,� Classification System DKS Associates Functional Classification Changes The proposed functional classification differs from the existing approved functional classification. Neighborhood routes were not defined in the existing functional classification. The proposed functional classification was developed following detailed review of Tigard's,Washington County's and Metro's current functional classification maps. Table 8-1 summarizes the major differences between the proposed functional classification and the existing designations for streets in Tigard. This table also outlines the streets which were previously designated collectors that are now identified as neighborhood routes. Criteria for Determining Changes to Functional Classification The criteria used to assess functional classification have two components: the extent of connectivity(as defined above)and the frequency of the facility type. Maps can be used to determine regional, city/district and neighborhood connections. The frequency or need for facilities of certain classifications is not routine or easy to package into a single criterion. While planning textbooks call for arterial spacing of a mile, collector spacing of a quarter to a half mile, and neighborhood connections at an eighth to a sixteenth of a mile,this does not form the only basis for defining functional classification. Changes in land use, environmental issues or barriers,topographic constraints, and demand for facilities can change the frequency for routes of certain functional classifications. While spacing standards can be a guide,they must consider other features and potential long term uses in the area(some areas would not experience significant changes in demand,where others will). Linkages to regional centers and town centers are another consideration for addressing frequency of routes of a certain functional classification. Connectivity to these areas is important,whereas linkages that do not connect any of these centers could be classified as lower levels in the functional classification. Table 8-1 Proposed Changes to Existing Roadway Classification Roadway Classification Accordin to Jurisdiction Roadway Tigard Wash County Metro Proposed TSP Greenburg Road Major Collector Minor Arterial/ Major Arterial Arterial Major Collector 72'dAvenue Major Collector Study Area Minor Arterial Arterial Durham(W. of Hall) Major Collector Study Area Minor Arterial Arterial Murray(Scholls Ferry Major Collector Proposed Collector Proposed Collector of Arterial to Barrows) Regional Significance Walnut Major Collector Proposed Collector Collector of Regional Arterial (Barrows to Gaarde) Significance Gaarde Street Major Collector Proposed Collector/ Collector of Regional Arterial Major Collector Significance Beef Bend Road Major Collector Major Collector Collector of Regional Arterial Significance Barrows Road Arterial Major Collector Not Classified Collector Sequoia Parkway Not Classified Not Classified Not Classified Collector Oak St(e of Lincoln) Not Classified Not Classified Not Classified Collector Oak St(w of Lincoln) Minor Collector Not Classified Not Classified Local Table 8-1(cont.) Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8 -9 October 30,2001 DKS Associates Tech Center Drive Minor Collector Not Classified Not Classified Local 97"/98"Avenue Major Collector Major Collector Not Classified Neighborhood Routes that Chan a rom Minor Collector to Neighborhood Route 1351 (s/o Gaarde) Sunrise Lane Watkins Avenue Summerfield Drive 133` Avenue Benchview Terrace Grant Avenue Sattler Street 130` Avenue Peachtree Drive Park Street Ross Street 128` Avenue Morning Hill Drive Johnson Street Alderbrook Drive 115` Avenue Falcon Rise Drive Commercial Street Pinebrook Street 1091 Avenue Winter Lake Drive Shady Lane 98` Avenue North Dakota St. Washington Drive 95` Avenue Springwood Drive Ash Avenue 791Avenue Tigard Street O'Mara Street 74'11/72° Avenue Former Street Canterbury Lane Chan es rom Collector or Local desi nation to Nei hborhood Route (see Figure 8-4) Metzger Area South Tigard Central Tigard North Dakota Area Southwest Washington Drive Sattler Street Shady Lane North Dakota Street Horizon Boulevard Cedarcrest Street Pinebrook Street 95` Avenue Springwood Drive Creekshire Drive 82'dAvenue Alderbrook Drive Dakota Street 115` Avenue Fern Street Locust Street 92 Avenue 90` Avenue Tigard Street Ascension Drive 74` Avenue Inez Street 98thAvenue Tigard Drive Windsong Court 69` Avenue 93rdAvenue Commercial Street 116` Avenue Northview Drive Alfred Street 97Avenue Tigard Street Ann Street Mistletoe Drive Ventura Court Murdock Street Grant Avenue Katherine Street 135` Avenue Ventura Drive 98` Avenue Johnson Street 125` Avenue Essex Drive 72'dAvenue 100` Avenue Brookside Avenue Karen Street Benchview Terrace 80` Avenue 103r Avenue Watkins Avenue 127` Avenue 132 Avenue Pine Street Canterbury Lane Park Street 128` Avenue Greenfield Drive 75` Street Highland Drive 110` Avenue Winter Lake Drive Menlor Lane Spruce Street Summerfield Drive 115` Avenue 130` Avenue Sunrise Lane 78thAvenue 92d Avenue Former Street Brittany Drive 150` Avenue 69` Avenue 108thAvenue 116` Avenue Morning Hill Drive Uplands Drive East Tigard Riverwood Lane Howard Drive Falcon Rise 141'`Avenue Fanno Creek Drive Copper Creek Drive Garrett Street 131"Avenue Woodhue Street 79` Avenue Millen Drive Frewing Street Tewkesbury Drive Ross Street River Drive Ash Avenue Barrington Terrace Ashford Street Tualatin Drive O'Mara Street Westminster Drive Edgewood Street Peachtree Drive 133 Avenue The proposed changes in functional classification on Durham Road,Murray Boulevard, Gaarde Street, 72nd Avenue, Greenburg Road and Beef Bend Road affect Washington County roadways. These proposed changes have been discussed with County staff and the County is in the process of reviewing these changes. Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8- 10 October 30,2001 DKS Associates N III NOT { CITY OF TIGARD TO SCALE I OREGON Transportation y 5 LOS y Systems Plan -j Legend ® Road Closure Neighborhood Routes ° Proposed Planned PFAFFL day SWC WALNUT 41 NALD K SW BULL RD ON RD C z N sw L �O a Rte' DURHAM O C m Figure 8-4 H Proposed J Neighborhood Routes DKS Associates Characteristics of Streets for each Functional Classification The design characteristics of streets in Tigard were developed to meet the function and demand for each facility type. Because the actual design of a roadway can vary from segment to segment due to adjacent land uses and demands,the objective was to define a system that allows standardization of key characteristics to provide consistency,but also to provide criteria for application that provides some flexibility,while meeting standards. Figures 8-5 to 8-10 depict sample street cross-sections and design criteria for arterials, collectors,neighborhood routes and local streets. Figure 8-5 shows the Existing Tigard Standard Cross-Sections,Figure 8-6 and 8-7 shows Washington County's Standard Cross- Sections(these apply to Washington County owned roadways)and Figures 8-8 through 8-10 show the proposed Tigard Standard Cross-Sections. Planning level right-of-way needs can be determined utilizing these figures and Table 8-2 and the lane geometry outlined later in this chapter. Specific right-of-way needs will need to be monitored continuously through the development review process to reflect current needs and conditions (that is to say that more specific detail may become evident in development review which requires improvements other than these outlined in this 20 year general planning assessment of street needs). The analysis of capacity and circulation needs for Tigard outlines several roadway cross sections. The most common are 2, 3 and 5 lanes wide. Where center left turn lanes are identified(3 or 5 lane sections), the actual design of the street may include sections without center turn lanes(2 or 4 lane sections') or with median treatments, where feasible. The actual treatment will be determined within the design and public process for implementation of each project. The plan outlines requirements which will be used in establishing right-of-way needs for the development review process. The right-of-way (ROW)requirements for arterial and collector streets on the Washington County system are 50-74 feet for collector streets,90 feet for three-lane arterials and 90-122 feet for four-to-seven-lane arterials'. 6 For example,designations by Metro,ODOT and Washington County all play a role in the ROW determination. ' For example,adjacent to environmentally sensitive or physically constrained areas. ' Washington County Uniform Road Improvement Design Standards, Ordinance No. 524, Adopted July 28, 1998, pages 13-18. Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8- 12 October 30,2001 DKS Associates Table 8-2 Proposed Street Characteristics Vehicle Lane Widths: Truck Route 12 feet (minimum widths) Bus Route 11 feet Arterial 12 feet Collector 11 feet Neighborhood= 10 feet Local 99 to 10 feet Turn Lane 12 feetio On-Street Parking: 8 feet" Bicycle Lanes: New Construction 6 feet (minimum widths) Reconstruction 5 to 6 feet Curb Extensions for Pedestrians: Consider on any Pedestrian Master Plan Route Sidewalks: Local 5 feet 12 (minimum width) Neighborhood 5 feet 12 Collector 6 to 813 feet Arterial 6 to 1013 feet Landscape Strips: Residential/Neighborhood=Required Collector/Arterial Required Medians: 5-Lane=Required 3-Lane Optional Neighborhood Traffic Management: Local=Should not be necessary Neighborhood=Should Consider Collectors Under Special Conditions Arterials Only under Special Conditions Transit: Arterial/collectors Appropriate Neighborhood=Only in special circumstances Turn Lanes: When Warranted 14 Access Control: See later section for Arterials and Collectors 9 9 foot lanes would only be used in conjunction with on-street parking. 10 In constrained conditions on collectors, neighborhood and local routes, a minimum width of 10 feet may be considered (except on bus routes) 11 For 32 foot streets,the City recognizes that there will not be 20 feet of unobstructed pavement. 12 5 foot with landscape strip,6 foot against curb. "Larger sidewalks than minimums should be considered for areas with significant pedestrian volumes. In commercial areas where pedestrian flows of over 100 pedestrians an hour are present or forecast, specific analysis should be conducted to size sidewalks appropriately for safe movement. 14 Turn lane warrants should be reviewed using Highway Research Record, No. 211, NCHRP Report No. 279 or other updated/superseding reference. Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8- 13 October 30,2001 DKS Associates Local Street a Residential 5' 24'-32' m) (m) R/W 36-50' (ml (ml Local Street f Commercial & Industrial 2.5 5' 34' m 5' 2.5' m) (m) R/W 50'(m) (m) (m), Minor Collector Q � 2.5' 5' 40' 5' 2.5' (m (m) R/W 60'(m) (m) (m Major Collector o Center Turn Lane or Median 1.5' 6' 16' 12' 16' 6' 1.5' (m) (m) R/W 60'-80' (m) (m) o Arterial � Tura re or Median 1.5' 8' 14' 12' 12' 12' 14' 8' 1.5' � (m) (m) R/W 60'-90' (ml (ml, (m) - Minimum Required Width Figure 8-5 EXISTING TYPICAL STREET CROSS SECTIONS DKS Associates CITY OF TIGARD Transportation System Plan Arterial Major and Minor Center Turn Lane or Median 1 5' 6' 6' 12' 1 12' 1 14' 12' 12' 6' 5.5' 6.5' ( J (m) (m) Bike Bike (m) (m) RM/98' 5 Lanes Arterial Minor Only a Center TurnLane or Median 14.5' 5.5' 6' 12' 14' 12' 6' 13' 6' 1 (m) (m) Bike Bike (m) (m) RM/90' 3 Lanes Figure 6-6 (m) Minimum Required Width WASHINGTON COUNTY ARTERIAL TYPICAL STREET CROSS SECTIONS DKS Associates CITY OF TIGARD Transportation System Plan Major Collector ( Center Turn Lane or Median 1 6' 1 5' 6' 12' 14' 12' 6' 5.5' 6.5' (M), (m) (m) Bike R/W 74' 3 Lanes Minor Collector or Minimum Transit 8 1 6' 5' 6' 12' 12' 6' 1 5.5' 6.5' ( (m) (m) Bike R/W 60' Bike (m) (m) 2 Lanes Commercial and Industrial ( Center o� Turn Lane or Median 1.5'5.5' 6' 12' 14' 12' 6' 5.5' 1.5' (m) (m) Bike R/W 64' Bike (m) (m 3 Lanes Local Street (Standard) d a� 1 5' 4' r1 32' r1 4' 5' 1 (m) (m) RM/38' (m) (m) Parking Both Sides Figure 8-7 (m) Minimum Required Width WASHINGTON COUNTY Q - On-street Parking TYPICAL STREET CROSS SECTIONS DKS Associates CITY OF TIGARD Transportation a 5 p System Plan One Side �k Access 1.5' 5.5' 36' 1 T R/W 25' R/W 50' Industrial/Commercial Local (No parking) 5.5' 5.5' 24' 5.5' 5.5' R/W 46' Cul-de-sac/Residential Local Street rr i .. (No parking) a � a a 5.5'1 5.5'1 [2 28' 1 5.5' 5.5' 13.511 5.5'1 Q 32' 5.5' 3.5' R/W 50' i i R/W 50' Residential Local Street/Cul-de-sac On-street Parking One Side On-street Parking = If parking on both sides, block length not to exceed 600 feet Notes: 1. Selection of placement of sidewalk and planter strip specific to application. 2. Width of curb is included in sidewalk width when adjacent to street. 3. Samples show the desirable applications given number of lanes; Criteria minimum standards can be applied case by case. Vehicle Lane Widths: 9 to loft. 4. Actual width of street and sidewalk area can be adjusted within (minimum widths) R/W based on modal priorities and adjacent land use. On-Street Parking 8 ft. 5. Volume guides represent estimated Full Buildout Conditions,not just Sidewalks: 5 ft. existing or project needs. (minimum width) 6. The 36'street shall be used in any area adjacent to commercial or Landscape Strips: Where Appropriate industrial zoning. Sidewalk would be T curb tight in Commercial areas and 5.5'for Industrial areas(cross section shows both samples). Neighborhood Traffic Should not be necessary (under 7. Where existing street curb to curb widths vary from those shown,the Management: special conditions&over 1500 vpd) minimum length of new cross section should be(or have the potential to be)500 feet contiguous. 13 -On-street Parking Figure 8-8 (does not reaffic quire e coon er ion of ePer xisting routes) ALLEY,CUL-DE-SAC AND LOCAL STREET 7k Where volume exceeds 1500 vpd, this cross section may still be SAMPLE STREET CROSS SECTIONS utilized however land use actions or roadway projects impacting such streets may require additional connectivity to reduce volume and/or REQUIRED ROW WIDTH neighborhood traffic management measures to reduce impacts. DKS Associates CITY OF TIGARD Transportation System Plan 5.5' 5.5'i 28' i 5.5' i 13.51 i 5.5' i Q 32' 1�7 i 5.5' 3.5' R/W 50' R/W 50' No Parking on One Side With Parking on Both Sides o� o� 36' 6.5' 1 5.5' & Bkei 12' 1 12' 6'Bike 5.5' 1 6.5' R/W 60' With Bike Lanes/No Parking Notes: Criteria 1. Selection of placement of sidewalk and planter specific to application. Vehicle Lane Widths:(minimum widths) 9-10 ft. 2. Width of curb is included in sidewalk width when adjacent to street. On-Street Parking 8 ft. 3. Samples show the desirable applications given number of lanes; Curb Extensions for Pedestrians: Consider on Pedestrian Routes minimum standards can be applied case by case. Sidewalks: (minimum width) 5 ft. 4. Actual width of street and sidewalk area can be adjusted within Landscape Strips: Where Appropriate R/W based on modal priorities and adjacent land use. Neighborhood Traffic Management: Appropriate when Warranted 5. These are guidelines for future neighborhood route development and does not require changes/conversion to existing streets. Figure 8-9 NEIGHBORHOOD SAMPLE STREET CROSS SECTIONS - On-street Parking REQUIRED ROW WIDTH DKS Associates CITY OF TIGARD p Transportation System Plan 1' 5' 1 6' 16 Bike 12' 1 12' 6'Bike 6' 1 5' 1 R/W 60' 2 Lane 60'R/W 12'-14'Mediaep/ 1' 5' 1 6' 6'Bike 1 12'-13' 1 Turn Lane 12'-13' 6'Bike1 6' 1 5' 1 1 R/W 74' 3*Lane 74'R/W 14'Media 1' 5' 6' 6'Bike 12' 12' Turn Lanen12' 1 12' 6'Bike I 6' I 5' R/W 98' 5*Lane 98'R/W 12'Median 6' 6' 6'Bike 12' 12' 12' Turn Lane 1 12' 12' 1 12' 1 Bike 6' 6' 1 6' 1 R/W 98' 7*Lane 122'R/W Criteria Vehicle Lane Widths: Truck Route= 12 ft. (minimum widths) Bus Route= 12 ft. 11 ft.(12 ft.Preferred) Collector 10-11 ft. On Street Parking: None(with few existing exceptions) Bicycle Lanes: New Construction=6 ft. (minimum widths) Reconstruction=5 to 6 ft. Sidewalks: (minimum width) 5-13 ft. Consider Curb Extensions on Ped Routes Landscape Strips: Required Medians: 5/7 Lane=Required 3 Lane=Optional Neighborhood Traffic Only Under Special Conditions: Management: Selected Measures Figure 8-10 *Note that,sidewalk widths above 6 ft.may require additional right-of-way. ARTERIAL AND COLLECTOR Where appropriate,the median/lane may not be provided resulting in 2,4 and SAMPLE STREET CROSS SECTIONS 6 lane cross sections. The removal of the center turn lane must consider both REQUIRED ROW WIDTH safety and pedestrian needs. DKS Associates Wherever arterial or collectors cross each other,planning for additional right-of-way to accommodate turn lanes should be considered within 500 feet of the intersection. Figure 8-11 summarizes the Tigard streets that are anticipated within the TSP planning horizon to require right-of-way for more than two lanes. Planning level right-of-way needs can be determined utilizing Figure 8-11 and the lane geometry outlined later in this chapter. Specific right-of-way needs will need to be monitored continuously through the development review process to reflect current needs and conditions. This will be necessary since more specific detail may become evident in development review which requires improvements other than these outlined in this 20 year general planning assessment of street needs. These cross sections are provided for guiding discussions that will update the City of Tigard Public Improvement Design Standards for Public Works Construction. There is an on-going discussion at the regional level regarding street cross sections. Several of the major streets in Tigard are maintained and operated by Washington County or ODOT. Metro has specified Regional Street Design designations in their draft of the RTP 15. These designations change over the length of the road. The City of Tigard will need to coordinate with regional agencies to assure consistency in cross section planning as the County Transportation Plan and the Metro Regional Transportation Plan move forward. The designations are summarized in Table 8-3. The Metro definitions for their designations are provided in the Appendix. Table 8-3 Metro Regional Street Design and Motor Vehicle Designations Roadway Regional Street Design Motor Vehicle Classification ORE 217 Freeway Principal Arterial(Freeway) I-5 Freeway Principal Arterial(Freeway) ORE 99W Regional St./Regional Boulevard Major Arterial Scholls Ferry Road Regional St./Regional Boulevard Major Arterial Greenburg Road Regional St./Regional Boulevard Major Arterial Hall Boulevard Regional Boulevard Major Arterial (Scholls Ferry to Greenburg) Hall Boulevard Community St./Community Blvd Minor Arterial (Greenburg to South City Limits) Durham Road Community Street Minor Arterial 72° Avenue Urban Road Minor Arterial Upper Boones Ferry Road Urban Road Minor Arterial Beef Bend Road(West of City Rural Road Rural Arterial Limits to Scholls Ferry) Dartmouth Street Community Street Collector of Regional Significance Gaarde/Walnut/Murray Community Street Collector of Regional Significance McDonald Street Community Street Collector of Regional Significance Beef Bend Rd (East of City Limits) 1 Community Street Collector of Regional Significance NOTE: Refer to Metro's RTP Policy Chapter for background on guidelines for streets, 1997. 15 Refer to Regional Street Design System,Preliminary Draft RTP, Metro,June 17, 1999. Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8- 20 October 30,2001 DKS Associates N III NOT ` CITY OF TIGARD TO SCALE OREGON Transportation s � TAvLo s it rT �t RDr i Systems Plan _-j Legend Planned Right of Way 8 Lanes HAdded Person Capacity Corridor* 7 Lanes Rni 6 Lanes PFAFFL 5 Lanes q� N 4/5 Lanes day y 2/3 Lanes 4P SP.. N sw L WALNUT \ "r2.� Corridor Alingment Study Area 4 "Assume eight lanes for setbacks Preserve ROW for 5 lanes in Future \ Note: All Arterial/Arterial,Arterial/Collector and Collector/Collector intersections should D ` sw McDONALD ST-1and for needed ROW for tum lanes within 500 feet of the intersection. SW BULL RD _ BONrr RD 2/3 and 4/5: Two or four lanes may be used for segments where environmental constraints limit roadway and access is controlled to eliminate left tum lane need. BE m sW^ RHA RD DURHAM BEEF BEND {U I Figure 8-11 Future Streets Where FV 11 H ROW is Planned for J More Than Two Lanes DKS Associates Connectivity/Local Street Plan Much of the local street network in Tigard is already existing and,in many cases,fairly well connected. In other words,multiple access opportunities exist for entering or exiting neighborhoods. However, there are a number of locations in Tigard where, due to the lack of connection points,the majority of neighborhood traffic is funneled onto one single street. This type of street network results in out-of- direction travel for motorists and an imbalance of traffic volumes that impacts residential frontage. The outcome can result in the need for wider roads,traffic signals and turn lanes(all of which negatively impact traffic flow and degrade safety). By providing connectivity between neighborhoods,out-of- direction travel and vehicle miles traveled(VMT) can be reduced,accessibility between various modes can be enhanced and traffic levels can be balanced out between various streets. Several goals and policies established by this TSP are intended to accomplish these objectives. In Tigard, some of these local connections can contribute with other street improvements to mitigate capacity deficiencies by better dispersing traffic. Several roadway connections will be needed within neighborhood areas to reduce out of direction travel for vehicles,pedestrians and bicyclists. This is most important in the sub-areas to the west where a significant amount of new development is possible(i.e. Bull Mountain area). In many areas of Tigard,most of the land is built out. Figures 8-12 through 8-17 show the proposed Local Street Connectivity Plans for Tigard. In most cases,the connector alignments are not specific and are aimed at reducing potential neighborhood traffic impacts by better balancing traffic flows on neighborhood routes. The arrows shown in the figures represent potential connections and the general direction for the placement of the connection. In each case,the specific alignments and design will be better determined upon development review. The criteria used for providing connections is as follows' : • Every 330 feet,a grid for pedestrians and bicycles • Every 530 feet,a grid for automobiles To protect existing neighborhoods from potential traffic impacts of extending stub end streets,connector roadways should incorporate neighborhood traffic management into their design and construction. Neighborhood traffic management is described later in this chapter. All stub streets should have signs indicating the potential for future connectivity. The arrows shown on the local connectivity figures indicate priority connections only. Topography, railroads and environmental conditions limit the level of connectivity in Tigard. Other stub end streets in the City's road network may become cul-de-sacs,extended cul-de-sacs or provide local connections. Pedestrian connections from the end of any stub end street that results in a cul-de-sac should be considered mandatory as future development occurs. The goal would continue to be improved city connectivity for all modes of transportation. 16 The Regional Transportation Plan calls for pedestrian/bicycle connectivity every 330 feet and motor vehicle connectivity every 530 feet for vacant areas of residential and mixed use zoning greater than five acres. Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8- 22 October 30,2001 DKS Associates 00, CITY OF TIGARD NOT Transportation TO SCALE System Plan 99W (92 217 AP I FAM R F � w z 0 0 CIO Legend Figure 8-12 F Stub End Street Pedestrian Connection LOCAL STREET CONNECTIVITY �•••- t-School Site East Tigard DKS Associates CITY OF TIGARD NOT Transportation TO SCALE O System Plan �Gg4� TAYLORS FERRY RD Q �W (217 ®®�919j" ®®®� ®�L±hl I 99W) Legend F Figure 8-13 -Stub End Street ••• LOCAL STREET CONNECTIVITY Pedestrian Connection it-School Site Metzger DKS Associates CITY OF TIGARD NOT 21 Transportation TO SCALE System Plan Q ST 0 WA►- J m 99W r D t �LLL1 ALD S Legend F Figure 8-14 -Stub End Street ••• LOCAL STREET CONNECTIVITY Pedestrian Connection it-School Site Central Tigard DKS Associates 0 CITY OF TIGARD Transportation TOSOCALE System Plan Q �Q 217 2 U') FERRY SCNOLLS O me e O �O H K TA Q' O NINE M � e Legend Figure 8-15 -Stub End Street ••• LOCAL STREET CONNECTIVITY Pedestrian Connection Ti -School Site North Dakota �T� � `�-/��lit�\".' \\\IIIUI/moi_ • ' 1 � 1 �► i-�I/u►O��A��\\IIS.: ♦ i //■IV�/III■\� • II-:�� • • • • �� .`11111\//IIIA►�♦II 111111111I11r\ . , ;�1�����-�,i. I�=���i'!1 I�u iil■�_■��I � /II��'r■i 111 P-09 illinglain I ._mp :�uG°I�'•='• '`,,` 1 �� 1 -�IuI _iu ■ In,e �, , 1■ �n1n uunur�_ 1 iii I �J■`J�I� I �1 ■■ I u\�II uq I I�.uuni 1111 _ _.I u • I��� il� �L71= I _��1■'�����\,� I'v: \111111 • ■ �L■ 71� ' �:IIIIIIi!� �' �Illlu affi ■vI-1111nII u1111 �" - IIIV■1irw 11nm umw _' , \I _ ♦, ♦- V L>..1111111111■ h �1111.1 1111 111.11 iill 11111111%�i q1 III II - i�llu�11I�1 ■ i�11- 111111■11`►�� w II _ - \ I.♦ 11111111�\I 1 � -_ � �I �-,,11� -4� I-_INS �J�"■ ■. .♦Ir 1►�i1_unqu' 11 uu I ��i i umu qi ♦�� r1 1 q // un I■aw1_-nuu-=m1 � Ipiuwmnu Il♦�� � ■un■i �■.■ 11� � � ■■1 io hll umuu=aural- �� . . �� ♦�t,♦- , � u" Irl r�•I 1►i.�1�liiil-.1liiii� ''l i�- �� � 1■.■,��•.��.�I1\ ,� � Thr■D 1,° —: ! � �L— �� �r•n■.:� ■ ♦ �`� �■t■..1�■■1■ ia■■1►►�i11i11i 1�•�■illlruumuu— � �� ♦ri �� �♦ Iia■►■ . III■1 III► �j/111111111111r/7� �!i �b1�1 i�is� ����iQ 'fir •\1111,III111111)q� 1 w u►►\Idllllr��Iluullll-_'_ �� ♦ ♦ �. /� •� •�� Imo i� �.9.►►rte G �� i ��:i ►� ifit11"A �� • u1 uP/►\II=_=ullllllll-=�- � � Vr� ��_ �� Oi11n n1u�■I■11!�� �m uu�iulll=IIIIIIIIIII�1 Ir\ ..� ���� �, ♦.t�.► ► ♦� ♦,�+♦..�. �IU rj ■►� ► �_11111111 111111- ' ♦ ♦ ` , �,� �, I tt.•J` ♦ ��►1•1 � __►•: If=�a 11 ■ 1C r ii IIf��►♦�,,♦♦,���*��� \li ii r►t'i.• Ci 11111111= , 1111 111►, �� 'g ■ "."•►I •i`�� I Ir1111■■/ - I■ r■,,.r-' ��ate*� ��� � I _.r■ �/Iln.uu\�,����j�►♦♦\��■,�i•♦.�� fir•///Iu 1■r� � � � ■ ■I/n.uu1�■� ��1 I -I/� ... I r r I '���-■� �/�■i_► �� pa Ell �/�����i iii■Fn- � ■...■.,...II��I 'Iu11u1 a ■�� .n. ... �,■�■ on =4 oil 11 1�*/,��arra■■ ��r■ 1 ■ 1 • ■■ ' �_� � � � ■■■�■r�M �■_ T ■■ �■I■■lu]•ILII t r • 1_���■/ /■■■� . l\11'.Ui;l■■til �� ♦�.,, pour_==�►�' It■■■■I� I`�■�r •• 11111111... .., ..1�■■:i ■11 ���■■.■■-■...•■��•r --�.����a� .�� .■.: „11111111 i�,1,� ■.•,■�l ..... � • t / . y a'�.�,.. ► .i„r I ■■ � uu.u111 1 � ,�_A � t A ��■■■,■■■/►���� ��' ■�C� w\Imo, � ■■ __� � ' n■uuu,fit���♦I a1 �,a■.\\�al ��.■Y1.■i�♦11,1��11 ���17 ��r 7:::��fir,1����a�r �I.� �' Illlllllu:'a'■�,�/ ■_+��/111 � �_rr■■,i�►♦,�:•�'. �%/O I�,��■1 II,I�■I,I�■Y � ■...■■u ■�� L� p1111..�� r/Nib ����■-I�i••r ♦r 1 � �■■o-1 1��� . 1■•� � ■�11���1....1 �'w�QI11 , ■■ ` II♦1 1♦t ■_� \\�■ P■■1■. i ......■\�1�� /IIS■d111A11�1� �_` li�i♦♦♦ ♦i�■��. i►. l� �� .iuv.; �� NOR N, r'���I■■ a■�■�:I:a■r��■ ��JI■ ►X11/r�/�an�_ ,�� �� �����Ilu�w Vu Inu�f 1j�►ice■ � ����� 'qu As �-■��■.r.,.■■_■•III x111111111111111 C\ , �� �' �',� SII I■i,�'��♦�:ri � � ,` i i•wn •♦♦♦♦i♦i�.0� .��%o �� � \♦♦:I\iii♦�4♦♦i♦i♦�: is �"•\ � ���1��/ ■■V 11111 ■` •.0 u►. ♦.. � \� 41� i i DKS Associates CITY OF TIGARD NOT Transportation TO SCALE System Plan GAARDE ST McDONALD ST O 7 �1J_J_LJ� ® ML® �e Soo Legend a s Figure 8-17 F Stub End Street Pedestrian Connection LOCAL STREET CONNECTIVITY �•••- it-School Site South Tigard DKS Associates CIRCULATION AND CAPACITY NEEDS The motor vehicle capacity and circulation needs in Tigard were determined for existing and future conditions. The process used for analysis is outlined below, followed by the findings and recommendations of the analysis. The extent and nature of the street improvements for Tigard are significant. This section outlines the type of street improvements that would be necessary as part of a long range master plan. Phasing of implementation will be necessary since all the improvements cannot be done at once. This will require prioritization of projects and periodic updating to reflect current needs. It should be understood that the improvements outlined in the following section are a guide to managing growth in Tigard, defining the types of right-of-way and street needs that will be required as development occurs. Strategies A series of strategies were developed to address the future motor vehicle needs of Tigard. Each of these strategies were discussed by the TSP Task Force and prioritized. The initial prioritization was reviewed and refined following discussion about the implications of the high priority strategies. The actual strategy selected is a prioritization of the highest priority strategies. The following listing reflects the initial prioritization of strategies. • Promote Regional Circulation(I-5, ORE 217, ORE 99W) • Improve Local Street Circulation(connectivity) • Provide Additional Street System Capacity to LOS D" (turn lanes, signals, widening, new roads) • Improve Operation of Existing System(signal coordination, intelligent transportation systems, neighborhood traffic management) • Transportation Demand Management(telecommuting, alternative modes,pricing) • Change Land Use to Promote Alternative Modes Use • Improve Access Control to increase capacity • Change Level of Service Definitions Model Forecasts Existing conditions were identified in Chapter 3. Future capacity needs were developed using a detailed travel demand forecast tool,based on the Metro regional travel demand model. This detailed model more accurately reflects access and land use in Tigard than the regional travel demand model. Evening peak hour traffic volumes were forecast for the future(modified year 2015 buildout) scenario for the Tigard area. This 2015 forecast included the highest level of transit service given regional funding constraints. It also assumes that Transportation Demand Management(TDM)will occur. The initial 2015 test was performed on a street network that included existing roads,plus those improvements which are currently funded and would likely be implemented before the 2015 scenario is reached. The most significant of these improvements in Tigard include the following: "Level of service D as defined by the Highway Capacity Manaul. Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8- 29 October 30,2001 DKS Associates • ORE 217 widened one additional lane each direction and the ORE 217/1-5 interchange improvements • Gaarde Street linking from ORE 99W to Murray Boulevard • Walnut Street improved to three lanes • Dartmouth Street as five lanes from ORE 99W to I-5 • Hall Boulevard as a continuous three lane roadway with improvements at ORE 99W The modified 2015 forecast for Tigard is unique in that it reflect greater land use in Tigard than the Metro 2015 forecast(reflective of a build out-like scenario). 2015 was used as a base rather than the 2020 because of the greater Tigard trip generation and detailed network included in the 2015 forecast. A separate 2020 forecast was done for a sensitivity analysis of recommended motor vehicle improvements to validate their need. Future Needs Future transportation conditions were evaluated in a similar manner to existing conditions. Improvements to intersections,roadways between intersections and brand new or extended facilities were considered and a package of recommended improvements was determined. Where level of service conditions approached level of service E or volume-to-capacity ratio of 0.90 or above, improvements were initially considered. The final conditions for mitigation were set at conditions below V/C of 1.0 and level of service E. Table 8-4 summarizes the intersection levels of service under year 2015 base future conditions and the recommended mitigated scenario. In summary,nearly half of the study intersections fail in the future,even with funded roadway improvements. The extent of failure is so severe that it is unlikely that the land use scenario assumed for the modified 2015 forecast would be achieved with the extent of congestion. Because of this many alternatives were evaluated in developing the recommended set of mitigation measures for the TSP. The following sections explore the options and the findings for each alternative. Table 8-4 2015 Intersection Level of Service PM Peak Hour Intersection 2015 Base 2015 Mitigated Signalized Intersections (future) Delay LOS VIC Davies/Scholls Ferry Road >60.0 F >1.0 33.2 C 0.89 Barrows(E)/Scholls Ferry Road 11.1 B 0.73 15.3 B 0.93 North Dakota/I25t/Scholls Ferry Road >60.0 F >1.0 38.7 D 0.95 Nimbus/Scholls Ferry Road >60.0 F >1.0 44.7 D 0.94 121st/Walnut >60.0 F >1.0 33.0 C 0.87 Greenburg/Oleson/Hall >60.0 F >1.0 46.8 D 0.91 Greenburg/Washington Square Road >60.0 F >1.0 51.4 D 0.92 Greenburg/Locust 43.6 D 1.0 29.9 C 0.91 Hall/Locust 32.7 C 0.86 25.5 C 0.79 Greenburg/ORE 217 WB Ramps 27.8 C 0.74 29.3 C 0.65 Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8- 30 October 30,2001 DKS Associates Intersection 2015 Base 2015 Mitigated Signalized Intersections (future) Delay LOS VIC Greenburg/ORE 217 EB Ramps 29.1 C 0.72 23.4 C 0.58 Greenburg/Tiedeman 53.1 D >1.0 39.6 D 0.96 Main/Greenburg/ORE 99W 60.4 E 0.96 51.3 D 0.88 Hall/Oak 56.2 E >1.0 33.4 C 0.88 Hall/ORE 99W >60.0 F >1.0 54.7 D 0.95 ORE 217 NB Ramps/ORE 99W 28.8 C 0.95 18.0 B 0.79 ORE 217 SB Ramps/ORE 99W 40.7 D 0.99 31.6 C 0.86 Main/Johnson/ORE 99W 23.1 C 0.80 16.4 B 0.75 Dartmouth/ORE 99W >60.0 F >1.0 52.1 D 0.96 72°/ORE 99W 41.7 D 0.88 53.8 D 0.92 68 /ORE 99W >60.0 F >1.0 48.3 D 0.94 72°/Dartmouth >60.0 F >1.0 31.3 C 0.70 68 /Dartmouth >60.0 F >1.0 21.4 C 0.72 72°/Hampton 34.0 C 0.90 52.8 D 0.84 68 /Atlanta/Haines 29.9 D 0.92 16.5 B 0.61 Hall/Hunziker >60.0 F >1.0 40.7 D 0.88 Hall/Burnham 19.6 B 0.75 21.0 C 0.65 ORE 217 SB Ramps/72° /Varns 65.4 E 1.0 31.0 C 0.83 72°/Bonita >60.0 F >1.0 49.9 D 0.97 Hall/McDonald 47.0 D 0.99 36.1 D 0.93 Hall/Bonita 33.5 C 0.86 45.0 D 0.82 72°/Carman 50.1 D 0.97 43.7 D 0.95 1-5 SB Ramps/Carman >60.0 F >1.0 58.9 E 1.0 72°/Upper Boones Ferry 51.4 D 1.0 49.8 D 0.97 72°/Durham 20.6 C 0.75 9.0 A 0.50 1-5 NB Ramps/Carman >60.0 F >1.0 47.1 D 0.91 Upper Boones Ferry/Durham 62.3 E >1.0 31.0 C 0.85 Upper Boones Ferry/Bridgeport >60.0 E 1.0 31.9 C 0.79 Hall/Sattler/Ross >60.0 F >1.0 27.4 C 0.85 Hall/Durham >60.0 F >1.0 45.6 D 0.86 ORE 99W/Walnut 40.6 D 0.93 52.0 D 0.87 ORE 99W/Garrett 3.4 A 0.51 3.4 A 0.51 ORE 99W/Park 22.8 C 0.84 18.6 B 0.76 ORE 99W/Tigard Marketplace 18.5 B 0.57 18.5 B 0.57 ORE 99W/McDonald/Gaarde >60.0 F >1.0 67.1 E 1.0 ORE 99W/Canterbury 16.9 B 0.83 15.4 B 0.76 ORE 99W/Bull Mountain 30.1 C 0.95 27.0 C 0.89 ORE 99W/Beef Bend 67.2 E >1.0 54.8 D 0.88 ORE 99W/Durham >60.0 E >1.0 40.2 D 0.82 Tiedeman/Walnut >60.0 F >1.0 24.0 C 0.90 Murray/Old Scholls Ferry 79.4 E >1.0 51.1 D 0.92 Barrows(W)/Scholls Ferry 8.7 B 0.73 9.1 B 0.70 Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8- 31 October 30,2001 DKS Associates Intersection 2015 Base 2015 Mitigated Signalized Intersections (future) Delay LOS VIC Beef Bend/Scholls Ferry >60.0 F >1.0 140.2 D 0.96 Unsignalized Intersections Greenburg/Oak A/C A/C Bumham/Main A/C A/E 97 Ave/McDonald A/E A/D 135"/Walnut Alternatives To address these deficiencies, a series of alternatives and strategies were considered by the TSP Task Force. The range of strategies includes: • Do nothing: This results in severe impacts to motor vehicle and transit circulation in Tigard with delays which would not be tolerable. • Assume that alternative modes can serve excess demand. The TSP analysis assumed that alternative modes would be developed to their optimal levels. The order of magnitude of trips to be served in 2015 goes well beyond the capacity of the alternative mode systems by themselves, even at their optimal levels. Forecasted vehicle trips in the PM peak hour range from 40,000 to 50,000 in the future—transit would serve only about 3,000 to 5,000 person trips in Tigard. • Build all the road capacity necessary to achieve level of service D conditions at intersections. This strategy would have significant impact on right-way-way for roads. Larger roads would be the result; that is contrary to the more livable,pedestrian friendly outcome expressed by the TSP Task Force. • Pragmatically add capacity to all modes,developing a balanced system. Outline the long term configuration of streets to allow development to best accommodate future needs.The TSP Task Force chose to pursue this strategy. It involves significant system improvements,but is the only alternative that balances performance between modes,consistent with regional policy. With the chosen strategy,there were numerous alternatives explored in developing the balanced system. Street improvements are required throughout Tigard in the next twenty years. Working with the top three priorities of the TSP Task Force, alternatives were considered in each of the following: 1. Regional Circulation Enhancements 2. Connectivity/Circulation Improvements within Tigard 3. Traffic Operational Improvements Regional Circulation Enhancements Through the travel forecasting efforts,tests were conducted of a variety of motor vehicle improvements. Within Tigard, the most significant changes in future traffic volume resulted from Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8- 32 October 30,2001 DKS Associates improvements to regional highways. Because Tigard is located at the junction of two major urban freeways and is bifurcated by ORE 99W,its arterial street system(which is very limited—not a traditional grid)is impacted by the performance of these regional facilities. Today,incidents on I-5 or ORE 217 send traffic cascading through Tigard, snarling local circulation that has few options. Future solutions could focus on regional highways alone—however,this TSP takes an integrated approach to regional, city circulation and traffic operational improvements. Therefore,while the following regional improvements are substantial—they are part of an overall package of improvements needed to balance future circulation needs. The following four sections outline problems identified in the future forecasts and possible solutions for ORE 217, traffic between ORE 99W and 1-5,1-5 and ORE 99W. 1. ORE 217 is Overcapacity. Many prior adopted plans have identified the need for additional capacity on ORE 217 (RTP, Western Bypass Study, Washington County Transportation Plan, Beaverton TSP). Recent studies by ODOT"indicate additional corridor capacity can accommodate 20 year demand and that various alternatives are possible (ranging from general purpose lanes to high occupancy vehicle lanes to high occupancy toll lanes to a transitway to off-system improvements). Further analysis in the ORE 217 Corridor Study will lead to a preferred alternative for this corridor. Tigard is substantially impacted by the lack of additional capacity on ORE 217 (routes such as Scholls Ferry Road, Hall Boulevard, ORE 99W, Greenburg Road and Walnut Street all will operate over capacity without ORE 217 improvements). An improvement to ORE 217 is critical to maintaining adequate circulation capacity in Tigard. However,the improvements to ORE 217 are of regional significance and the City should work together with other agencies to define the most appropriate corridor enhancement. For this TSP, a space holder project of widening ORE 217 by one lane each way is identified(similar to other approved plans noted above) until the Corridor Study gains consensus on the preferred ORE 217 alternative. 2. Tigard continues to serve growing cut-through traffic on ORE 99W. Future forecasts for ORE 99W show it is well over capacity in future demand. A significant share of traffic is regional in nature and cuts through Tigard. This demand(Sherwood/Yamhill County/Oregon Coast)has limited other alternative routes. Prior studies in the Washington County Transportation Plan called for a Western Bypass connecting 1-5 with ORE 99W and further to the north toward Hillsboro. This connection has been studied in the Western Bypass Corridor Study conducted by ODOT in the early 1990's. There are few alternatives to serving this regional traffic. Therefore tests were conducted of two regional options to determine their impact on Tigard streets. The first is a connection between 1-5 and ORE 99W. ODOT continues to evaluate this connection. While helpful in reducing cut through traffic on ORE 99W in Tigard(a few hundred vehicles in the peak hour), its benefit to Tigard traffic operation is minimal. ORE 99W still fails with or without the 1-5/ORE 99W connector. The greatest benefits of the 1-5/ORE 99W connector are east-west streets in Tualatin. Even Durham Road benefits from the 1-5/ORE 99W connector. While by itself the benefits are not large in Tigard, the I-5/ORE 99W contributes to mitigating ORE 99W and should be supported by Tigard as a helpful regional improvem en t. The northern portion of the Western Bypass was also investigated as to its benefits to Tigard circulation. In testing this connection with the regional model, there was little if any benefit of "ORE 217 Corridor Study Initial Improvement Concepts Draft,ODOT,February 2000. Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8- 33 October 30,2001 DKS Associates northerly connections north of Scholls Ferry Road. While traffic is attracted to the new route, it creates significant impact on streets such as Scholls Ferry Road(creates balanced peak flows rather than directional flows resulting in capacity failures). Additionally, routes such as ORE 99W which are in the most need of benefits from such a facility sees less than 100 vehicles per hour benefit. ORE 99W gains as much mitigation benefit from an enhanced Beef Bend/Elsner Road arterial as it does from any"Western Bypass". Therefore, this analysis finds little or no operational benefit to Tigard from a Western Bypass. 3. I-5 fails south of ORE 217 impacting Tigard streets at peak times. The modified 2015 travel forecasts show congestion on I-5 south from ORE 217 to I-205 and Wilsonville. The lack of capacity on I-5 results in diversion onto Tigard surface streets (and as with ORE 217,the limited circulation network breaks down). Without I-5 improvements, it is unlikely that the southeastern portion of Tigard will be without extensive congestion in peak periods. Unlike improvements to ORE 217 (which have been adopted in various plans)there is little regional recognition of the I-5 south corridor deficiencies and need for improvements. No amount of ramp metering or freeway management can avoid this deficiency. Based upon the modified 2015 forecasts, the addition of one lane each direction(including ramp braids between ORE 217 and Carman Drive,retaining auxiliary lanes from Carman Drive to Lake Oswego/Durham exit) is necessary to reduce impact of several hundred peak hour vehicles on Tigard surface streets. As with ORE 217, this improvement is of regional significance and Tigard should work with affected agencies in determining the most appropriate corridor improvements. There is a strong relationship between the ORE 217 needs and I- 5 needs and any corridor improvement to one corridor should consider the other. For this TSP, a space holder of additional person carrying capacity on I-5 south of ORE 217 to I-205 is identified until appropriate corridor studies can determine the preferred solution for both I-5 and ORE 217. 4. ORE 99W fails in the future without improvement. Of all the regional transportation issues in Tigard, ORE 99W is probably the closest to a"rubik's cube". Tigard depends heavily on ORE 99W as its primary arterial. There are no parallel routes to ORE 99W and its diagonal alignment and the physical features of Tigard make using ORE 99W essential for also any trip in Tigard. ORE 99W's statewide status and linkage to Yamhill County and the Oregon Coast have similar issues—the only route servicing northeast-southwest travel. The future demand for this corridor is well beyond its five lane capacity without system-wide improvements. Ten various alternatives to improving ORE 99W were investigated,ranging from the no improvement to radical capacity improvements. Table 8- 5 summarizes the wide range of alternatives. Unfortunately,no one improvement results in desirable (better than level of service F) operation. The most significant finding was that no matter whether ORE 99W was widened southwest of Greenburg Road,the end result was failure. Added capacity on ORE 99W(tested by modeling seven lanes)resulted in significantly higher turning movements on/off ORE 99W and large through movements on ORE 99W. The end result was that not only would you have to widen to seven lanes but at nearly every intersection additional turning lanes were needed (double lefts,right turn) creating nearly a 10 lane cross section at intersection. And even after that the end result was level of service F conditions. Therefore the recommended approach combines several elements to produce a minimally acceptable operating condition. The TSP recommends: 1) widening ORE 99W to seven lanes between I-5 and Greenburg Road,2) retaining the five lane cross section southwest of Greenburg Road,3) extensive intersection improvements—turning lanes;4)access management,5)improvements to ORE 217 and 1-5 noted above; 6) off-system Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8- 34 October 30,2001 DKS Associates improvements such as freeway improvements and arterials such as Walnut extension;and 7) consideration of a western/Yamhill County commuter rail corridor. Table 8-5 ORE 99W Alternatives Evaluation Retain ORE 99W as 5 lanes No improvement Level of Service F operation in 20 years; extensive congestion beyond existing levels Widen to 7 lanes I-5 to Widening of ORE 99W in key Resolves many of the Tigard Triangle Greenburg segment between I-5 and ORE 217 operational problems,requires off- Retain 5 lanes west of Greenburg system improvements and access management to work at Level of Service E,significant business impact Widen ORE 99W to seven lanes Complete corridor widening Attracts significant traffic from arterials Requires extensive intersection that can be made to work in future— improvement(multi-turn lane) added ORE 99W traffic is nearly unmitigatable at intersections due to heavy through traffic and conflicts with turning vehicles—results in LOS F conditions after widening, substantial business impact Retain 5 lane ORE 99W, use Widening of ORE 217,1-5 and a new Helps ORE 99W significantly(several other regional routes to mitigate ORE 99W to 1-5 Connector hundred vph)but segment between 1-5 and Greenburg(Tigard Triangle area) remains at LOS F Retain 5 lane ORE 99W,widen Other Tigard arterials widened to five Does not resolve Tigard Triangle area, Hall/McDonald/Bonita/Durham lanes to improve other arterials major residential impacts of multiple arterial widening, other arterials can get by with three lanes Build a viaduct above ORE 99W Provide ramps only at the ends and at Pulls substantial(30 to 60%)portion of from I-5 to southwest of Durham ORE 217 traffic off ORE 99W, a few local intersections still operate poorly,very expensive($300,000,000) Implement Access Management Closes driveways,limits access points Improves capacity 25-35%, substantial to 1,000 feet business impact,difficult to implement —could take 50 years to fully implement—minor capacity gain with phased or limited implementation— level of service is still a problem Build a bypass around ORE 99W New roadway near Beef Bend/Elsner Does not substantially reduce traffic on in Tigard linking to Scholls Ferry Road and ORE 99W,LOS F remains heading further north Fronting Roadways along ORE Build entirely new fronting roadway Substantial land use impact,traffic 99W either adjacent to ORE 99W or behind benefit is marginal on the whole but fronting land uses good benefits in selected locations, LOS still F, could consider better connectivity between 1-5 and ORE 217 Commuter Rail to the west Would require large park and ride lots, May be useful in twenty years to reduce serving Sherwood,Newberg, could consider bus alternative ORE 99W potential demand by 400 to Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8- 35 October 30,2001 DKS Associates Yamhill County, Spirit Mountain however, congestion on ORE 99W 800 vehicles per hour—by itself not and the coast would result in slower operation enough to mitigate problems on ORE 99W but helps reduce through traffic Connectivity/Circulation Improvements in Tigard Several alternative connections were explored throughout Tigard to address future deficiencies. While improvements were considered in many locations,there were four primary areas where future problems are significant: • Washington Square Area • Tigard Triangle Area • Western Tigard capacacity • East-West Circulation Capacity 1. Durham Road area 2. North of Durham Washington Square Area. The Washington Square Regional Center Plan has recently been completed and will be adopted by City Council. It outlines many of the transportation alternatives for this area. There are three significant improvements that have been identified for the regional center area: • Overcrossings of ORE 217. To relieve the over-capacity ORE 217 interchanges near Washington Square, two new overcrossings are identified for the next 20 years. The first is between Greenburg and Scholls Ferry Road, linking Washington Square Road over the top of ORE 217 connecting Locust with Nimbus Avenue. This overcrossing is highly effective in reducing traffic at ORE 217/Scholls Ferry Road(about 10,000 to 20,000 vehicles per day). The linkage to Nimbus is critical in mitigating problems at the Scholls Ferry interchange. ODOT has evaluated this overcrossing for its potential to serve drop-in ramps to any high occupancy toll lane scenario on ORE 217. The second overcrossing is an extension of the Washington Square Road near Scholls Ferry, over ORE 217 to access Cascade Avenue (potentially Nimbus Avenue also). This linkage may become necessary with the widening of ORE 217 and the close proximity of the Scholls Ferry/Cascade intersection to ORE 217. Widening of ORE 217 may require the closure of the Scholls Ferry/Cascade intersection and this new overcrossing would be a replacement to that lost access. The southern overcrossing should be viewed as the higher priority of the two overcrossings since it carries more traffic (the southerly crossing has 5,000 to 10,000 vehicles per day). • Scholls Ferry Road widened to seven lanes. Future traffic in the regional center area results in level of service F conditions without additional lanes on Scholls Ferry Road. Even with new overcrossings, Scholls Ferry fails in 20 Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8- 36 October 30,2001 DKS Associates years. Because widening Scholls Ferry Road is a complex right-of-way task,the overcrossings of ORE 217 should be implemented first before full widening of Scholls Ferry Road. The timing of ORE 217 improvements will also affect the timing of the seven lane improvement. Based upon capacity analysis for the future years,the seven lane widening should extend to Barrows Road/Davies Road. Right of way for seven lanes should be preserved in this corridor to Murray Boulevard to address potential future Town Center and other future growth potential needs possibly within or outside the 20 year planning horizon. An alternative to be considered in this projects development would be a viaduct from ORE 217 west over the railroad tracks forming an expressway for approximately a half mile from Hall to west of Nimbus. • Greenburg Road widening. The eastern face of Washington Square will require reevaluation of access to the center. Widening of Greenburg Road to two lanes each way north of Locust past the cemetery will require extensive right-of-way acquisition. The four lanes are needed to avoid level of service F conditions on Greenburg at Locust and Hall. The segment adjacent to the cemetery could be four lanes with no access and no left turn lanes to minimize right of way taking. • Other roadway connections. Three other roadway connections were considered in the Washington Square area. Two were recommended in the Regional Center Plan. While these roadway connections have some benefit to capacity in the area, but these linkages are significant in improving circulation in the Washington Square area. The first connection is the extension of Nimbus Avenue south to Greenburg Road. This linkage attracts 9,000 to 15,000 vehicles per day(in the future with ramp metering). It is very helpful in reducing short trips on ORE 217 and minimizing impacts to streets such as 121St Avenue. Wetland and railroad constraints require further investigation as to the feasibility of this linkage. The second was a collector roadway linking Locust Street to Oak Street east of Greenburg Road. This linkage serves between 5,000 and 10,000 vehicles per day, reducing the burden of local trips on Greenburg Road. Both of these connections were recommended in the Washington Square Regional Center Plan. The third connection studied was a link from Pfaffle Street with Oak Street and Lincoln Street,paralleling ORE 217. This linkage was rejected in the Washington Square Regional Center Plan study. While helpful in relieving Hall Boulevard,the impacts were found to be greater than the benefits in that study. The outcome of not selecting this connector is that Hall Boulevard must have right-of-way set aside for a five lane roadway. Tigard Triangle Area. This subarea is also subject of a recently adopted plan. The basic package of street improvements needed to mitigate level of service F conditions in this area include: • ORE 99W seven lanes • Dartmouth Street five lanes • 72nd Avenue five lanes • Atlanta Street extended from Haines Street to 72nd Avenue • Backage roads to ORE 99W(providing access to business but not directly on ORE 99W) Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8- 37 October 30,2001 DKS Associates • Reconstructed ORE 217/72nd Avenue interchange utilizing 68th Parkway for northbound ORE 217 access (closing the existing substandard northbound 72nd ramps). • A Hunziker to Hamption overcrossing of ORE 217 Other options considered in this sub area included a Dartmouth to Hunziker overcrossing of ORE 217, an extension of Atlanta Street to Dartmouth Street and five lanes on ORE 99W. The following summarizes the findings of these options: Dartmouth to Attracts less than 5,000 vehicles per day by itself, extend Walnut to link up with the Hunziker overcrossing of ORE 217 and the volume increase to 8,000 per day. Implement ORE 217 complete ramp metering in the Tigard Triangle area(on ORE 217 and I-5) and the Overcrossing volume increases to 13,000 vehicles per day. Most of the traffic benefits of the overcrossing are produced with the Hunziker to Hampton overcrossing and the Dartmouth to Hunziker overcrossing has limited additional benefit. Unfortunately, ORE 99W still requires mitigation with or without overcrossing; access to ORE 217 would not be allowed by ODOT due to substandard spacing resulting in unsafe operation at large expense. One option where this overcrossing may be desirable in the future would be where ramp metering is fully operational and improvements to ORE 217 include a High Occupancy Toll (HOT) or High Occupancy Vehicle (HOV) lane alternative where direct connections to ORE 99W are desired. The Dartmouth to Hunziker overcrossing could provide access to the Tigard Triangle and ORE 99W area via drop in ramps. Therefore, a potential alignment should be preserved for future consideration(where the alignment would go through parking lots). However, the overcrossing is not part of the street improvement plan in the TSP. Atlanta While the Atlanta extension to 72° is 10,000 to 15,000 vehicles per day the segment Extension to to the south connecting to Dartmouth is well below that level. Recent development Dartmouth has blocked an optimal alignment. Backage roads will be more effective in this setting. The TSP includes the Atlanta extension to 72nd and backage roads with redevelopment. Five lane Level of service F conditions result in Tigard Triangle without 7 lanes. This option ORE 99W would limit the potential of the Tigard Triangle to serve the projected land use in the future. There were no subarea alternatives that precluded the need for 7 lanes between I-5 and 217. Western Tigard Capacity. Future growth in western Tigard results in the need for improved north- south and east-west capacity. Today most of the western Tigard land is vacant or under utilized. While Beef Bend Road serves this area adequately today,future land use growth will generate demand for over 10,000 vehicles per day. For Beef Bend to operate satisfactory in the future with two to three lanes, access must be limited to maximize the operating capacity of the only north/south and east/west linkage in the western end of Tigard. With 1,000 foot spacing the capacity of Beef Bend Road can be preserved at 1,200 to 1,500 vehicles per hour per lane. With current access spacing the capacity of Beef Bend Road would drop to 700 to 900 vehicles per hour per lane. Because of its rural stature today and under developed frontage,there is potential to avoid similar mistakes made on other arterial routes (such as ORE 99W or Greenburg Road)where frequent driveways rob the potential capacity of the roadway. Access from local streets not Beef Bend, consolidation of driveways and the use of medians should all be implemented on Beef Bend. Without this treatment, Bull Mountain Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8- 38 October 30,2001 DKS Associates Road will carry the additional load and the lost capacity from frequent driveways will virtually require another new roadway to service the same traffic. Similar consideration should be given to 150th Avenue. Spacing of access points every 600 feet should be considered on 150tH East-west Circulation Capacity. Future demand for east-west travel on Tigard's east side will result in level of service F conditions. Two options were evaluated to address this future deficiency. First widening Bonita and McDonald to five lanes was considered. Because Bonita does not connect to the 1-5 freeway ramps (Carman does), there is limited benefit achieve by five laning the McDonald- Bonita corridor. Both Carman and Durham remain at LOS F. A second option was considered by widening Carman Drive at 1-5 to five lanes and connecting it directly to Durham Road. This option eliminates the level of service F conditions and provided safer operation for the majority of vehicular traffic. The heavy traffic on Durham Road is prevalent from Carman Drive to Hall Boulevard. Traffic on Durham drops sharply west of Hall and can be handled by a three lane cross section. Right-of-way in the Durham corridor should be preserved for a five lane roadway, even though this TSP calls for three lanes west of Hall Boulevard. The impacts of the Carman to Durham option are less than the Bonita/McDonald option for the following reasons: 1)level of service is adequate with Carman/Durham and not with Bonita/McDonald resulting in unsafe operating conditions; 2) Carman/Durham accesses 1-5; 3) even with three lanes Durham is carrying high traffic volume east of Hall (15,000 to 20,000 vehicle per day). The impacts of street improvements to Carman/Durham can be minimized through design(medians, landscaping). Other alternatives to serve future east-west demand are precluded due to the railroad, wetlands,river and being too far north or south to serve the projected demand. Traffic Operational Improvements A series of intersection improvements were identified which primarily add turning movement capacity. These roadway improvements typically consist of left and right turn lanes and/or traffic signals. Nine of the study intersections require significant improvements. Most of these intersection improvements are complementary to the regional improvements and connectivity enhancement noted above. Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8- 39 October 30,2001 DKS Assodates ( yqlz 26 , kx NOT Ro CITY OF TIGARD TO SCALE TAYLORS FERRY RD Transportation Systems Plan Q � Locusr ST Legend m Z OAK ST ®-Intersection Improvement p -Interchange I rovement ER g F R y NORTHDAKOTA sr 217) Street Improvement GRFF PFAFFLE ST ® -RTP Project List 210 TIGARD RG �p -City of Tigard CIP SG�o��s ��o�eeP pH rH ¢ Proposed Off Street Path ST s, BPRR0 S = MPt' y�FZi E g3 G 0 0 (99W)) i GAARDE McDONALD ST ,ASF BULL UNTA/N x BONITA L2RD w B m W ¢ 1 ¢ SATTLER ST ¢ 5 P�O� o rn R SUMMERFIELD DR BEND v 1 RD BEEF a ...River.... o Qo W ��G�o Figure 8-18 RTP AND CIP PLANNED 9 IMPROVEMENTS DKS Associates Table 8-6 Proposed 20 Year Metro and Planned CIP Projects Table 8-6 Project Project Name (Facility) Project Location Project Description Estimated No. Project Cost Regional Transportation Plan,August 2000 1 Beaverton-Wilsonville Wilsonville to Beaverton Constructs peak-hour service $75,000,000 Commuter Rail only with 30-minute frequency 2 Highway 217 Ramp Greenburg Road and Widen Greenburg off-ramps; $ 12,000,000 Improvements - Highway 217 install ramp meter to Highway Greenburg 217 3 Highway 217 Washington Square Area Cascade Plaza to $25,000,000 Overcrossings& Washington Square OC $15,000,000 Connections Locust to Nimbus OC Nimbus to Greenburg $15,000,000 connector 4 Hall Boulevard Scholls to Locust Widen to 5 lanes with $ 4,700,000 Improvements boulevard design 5 Greenburg Road Wash ingtonSquare Road to Widen to 5 lanes with $ 2,500,000 Improvements Shady Lane boulevard design; NB Highway 217 off-ramp improvement 6 Greenburg Road Hall Boulevard to Widen to five lanes with $2,500,000 Improvements, North Washington Square Road bikeways and sidewalks 7 Greenburg Road Shady Lane to N. Dakota Widen to five lanes with $2,000,000 Improvements, South bikeways and sidewalks 8 Taylors Ferry Road Washington Drive to Oleson Three lane extension with $ 1,900,000 Extension Road bikeway and sidewalks 9 Oak Street Hall Boulevard to 80th Signal improvement, bikeway $ 800,000 Improvements Avenue and sidewalks 10 Powerline Trail Corridor Farmington Road to Lower Plan, design and construct n/a Tualatin Greenway multi-use path 11 Scholls Ferry Road Highway 217 to 125th Widen to seven lanes with $ 15,760,000 Improvements Avenue access management 12 Hall Boulevard Locust to Durham Road Improve Hall Boulevard to 5 $4,700,000 Improvements lanes 13 Greenburg Road Tiedeman Road to 99W Widen to 5 lanes $4,800,000 Improvements 14 Highway 217 Hunziker Street to 72nd at Construct new two-lane $4,000,000 Overcrossin -Tigard Hampton crossing of Highway 217 15 Walnut Street at 121 st Avenue Install traffic signal at 121 st $ 1,750,000 Improvements, Phase 1 Avenue 16 Walnut Street Gaarde Street to 121st Widen to three lanes with $ 5,720,000 Improvements, Phase 3 Avenue bikeways and sidewalks 17 Gaarde Street 110th Avenue to Walnut Widen to three lanes with $4,000,000 Improvements Street bikeways and sidewalks 18 Bonita Road Hall Boulevard to Bangy Widen to four lanes $ 8,000,000 Improvements Road 19 Durham Road Upper Boones Ferry Road to Widen to five lanes $ 3,500,000 Improvements Hall Boulevard Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8-41 October 30,2001 DKS Associates Table 8-6 Project Project Name (Facility) Project Location Project Description Estimated No. Project Cost 20 Durham Road Hall Boulevard to 99W Widen to two lanes $ 5,000,000 Improvements westbound, 1 lane eastbound, turn lane, bikeways and sidewalks 21 99W Improvements 1-5 to Highway 217 Widen to seven lanes $ 25,0001000 22 72nd Avenue 99W to Hunziker Road Widen to five lanes $ 3,000,000 Improvements 23 72nd Avenue Hunziker Road to Bonita Widen to five lanes $ 5,000,000 Improvements Road 24 72nd Avenue Bonita Road to Durham Widen to five lanes with $ 5,000,000 Improvements Road bikeways and sidewalks 25 Upper Boones Ferry 1-5 to Durham Road Widen to five lanes $ 3,000,000 Road 26 Dartmouth Street Dartmouth Road to Hunziker Three lane extension; new $28,000,000 Extension Road Highway 217 overcrossin 27 Dartmouth Street 72nd Avenue to 68th Widen to four lanes with turn $ 500,000 Improvements Avenue lanes 28 I-5/ORE 217 I-5/ORE 217 Interchange Interchange Modernization $ 54,000,000 Improvements Phases 2 &3 29 Highway 217/72nd Highway 217 and 72nd Complete interchange $ 15,000,000 Avenue Interchange Avenue reconstruction with additional Improvements ramps and overcrossin s 30 Scholls Ferry Road At Hall Boulevard Add SB right turn lane from $ 500,000 Intersection SB Hall Boulevard Improvement 31 Highway 99W Bikeway Hall Boulevard to Greenburg Retrofit for bike lanes $ 500,000 Road 32 Highway 99W/Hall 99W/Hall Boulevard Add turn signals and modify $ 3,700,000 Boulevard Intersection signal Improvements 33 Hall Boulevard Extension from Durham to Extend Hall Boulevard to $25,000,000 Extension Tualatin Road connect across the Tualatin River 34 Beef Bend Road King Arthur to 1315 Widen to three lanes $5,000,000 35 Beef Bend/Elsner ORE 99W to Scholls Ferry Widen to three lanes $24,000,000 Subtotal RTP Group $410,830,000 Tigard GIP Projects (FY 1999-2000 CIP, Includes Projects through 2001-2002) A Grant Avenue Park Street to School Street Provide a pedestrian path $47,000 Pedestrian to Charles F. Tigard along Grant Avenue Improvements Elementary School connecting the existing walkway to Charles F. Tigard Elementary School Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8-42 October 30,2001 DKS Associates Table 8-6 Project Project Name (Facility) Project Location Project Description Estimated No. Project Cost B Bonita Road Railroad Tracks to Fanno Underground utilities, $ 386,000 Improvements Creek reconstruction of railroad completed crossings, street widening C Walnut/Tiedeman Walnut Street/Tiedeman Intersection realignment and $1,300,000 Realignment Avenue signalization completed D Lincoln Street Between Greenburg Road Construct half-street $ 190,000 Improvements and Commercial Street improvements, including sidewalks, curbs and streetlights E 69th Avenue LID Between Hampton Street Construct 69th Avenue to $ 1,600,000 and Dartmouth Street, also ultimate section in includes Beveland Street compliance with Tigard from 68th Avenue to 70th Triangle Design Standards Avenue F Mapleleaf/71st Avenue from 72nd Avenue to Oak Widens existing pavement on $ 650,000 Street 71 st Avenue and Mapleleaf Street to the standard width of a local street G Gaarde Street Quail Hollow to Walnut Construct street to ultimate $ 50,000 Extension (completed) section (Cost is for design & ROW only) Subtotal I JCityCIP Group 1 $ 4,223,000 Total I 1 1 $415,053,000 Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8-43 October 30,2001 DKS Associates Recommended Improvements The improvements needed to mitigate modified 2015 future conditions combine both those identified in prior plans(Figure 8-18 and Table 8-6) and those determined as the outcome of the TSP transportation analysis. The improvements shown in Figure 8-18 are part of the updated RTP listing for the Tigard area which is in process of approval(planned summer 2000). Also shown on Table 8-6 is a listing of the City of Tigard Capital Improvement Program projects through 2002. Of all the improvements identified in the TSP analysis,only three projects were not included in the TSP improvements. Each of these three improvements may be necessary within or after the 20 year time frame of the TSP. The forecasts for the TSP did not indicate they were necessary with the modified 2015 forecast. Right-of-way should be preserved for each of these projects for future consideration. • Bonita Road widening to four lanes from Hall to Bangy(preserve right-of-way) • Durham Road widening west of Hall Boulevard(preserve right-of-way) • Dartmouth to Hunziker overcrossing of ORE 217(retain an alignment for future ORE 217 HOT/HOV options) Of all the TSP recommended improvements most projects have been discussed for several years. There is one significant project(the extension of Walnut)that is different than prior plans. Circulation and capacity deficiencies along ORE 99W and Tigard Triangle required more than spot intersection improvements or roadway widening to mitigate future growth impacts. The ability to circulate in Tigard from northwest to east is severely limited except for ORE 99W. There are few options to accommodate additional circulation. One option was to realign Greenburg Road to Johnson Street. Another was to extend Walnut Street west of ORE 99W. The Greenberg Road realignment did little to improve capacity. The Walnut extension helped resolve problems in the ORE 99W area near Hall/Greenburg and in the Tigard Triangle area on ORE 99W. The specific alignment of this improvement would need to be detailed in project development. However,three alignments were initially investigated. First an alignment from ORE 99W/Walnut northeasterly over Fanno Creek to the Ash Street right-of-way running north to intersect with Scoffins/Hunziker. This allowed traffic to proceed on Hunziker east to Tigard Triangle over the recommended overcrossing to 72nd/Hampton. It would also serve as direct access to the proposed commuter rail station area. Other alignment options that should be explored would be connecting to Burnham/Hall and continuing northward to Hunziker to a likely location for the conceptual overcrossing of ORE 217 from Dartmouth(not part of this TSP—more than 20 years in the future). A third alignment would utilize City Hall right-of-way and align similar to the second option with Hunziker. More detailed study of the alignment will be part of the future project development. A key issue in determining need was the level of service calculation. The 1997 Highway Capacity Methodology for the peak hour was utilized. ODOT and Metro have recently adopted two hour level of service. To approximate this measure,the volume-to-capacity ratios in Table 8-4 can be multiplied by a ratio of the average of the two hour volume divided by the peak hour volume. This ratio ranges from 0.93 to 0.97 at intersections in Tigard in 1999. Very few improvements would change under this assessment of capacity. Nearly all the improvements needed in the peak hour would also be necessary in the two hour. Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8-44 October 30,2001 DKS Associates The recommended TSP motor vehicle improvements are summarized in Table 8-7 and Figure 8-19. Several spot improvements were also identified at various intersection in Tigard and they are summarized in Figure 8-20 and Table 8-8. Prioritization should occur in coordination with the CIP Figure 8-18 Street Improvement Plan process. All improvements on arterials and collectors shall include sidewalks,bike lanes and transit facilities. These improvement lists should be used as a starting point for inclusion in regional funding programs for streets. Table 8-7 Future Street Improvements All Projects include sidewalks,bicycle lanes and transit accommodations as required Location Description Funding I-5 Widen to 4 plus auxiliary lanes(each direction)between ORE Not Funded 217 and I-205/Wilsonville Not in any plan Widen to 4 lanes(each direction)south to Wilsonville ORE 217 Widen to 3 lanes plus auxiliary lanes(each direction)between Not Funded US 26 and 72 d Avenue In RTP(as widening or HOV or HOT) New ORE 217/I-5 interchange between 72 d Avenue and Phase I Funded Bangy Road Phase II in RTP ORE 99W Widen to 7 lanes(total—both directions)between I-5 and In RTP Greenburg Road I-5 to ORE 99W Connector Connector linking I-5 and ORE 99W(model assumed In RTP connector would be located north of Sherwood—specific location to be determined by further study) Overcrossings over ORE 217 5 lane overcrossings linking Washington Square and Cascade Not Funded Avenue—one north of Scholls Ferry Road,one south of (identified in Scholls Ferry Road to Nimbus. The Washington Square Washington Square Regional Center study also identifies linking Nimbus to Regional Center Greenburg. Study&RTP) Overcrossing of I-5 Widen Carman Drive interchange overcrossing to six lanes Not Funded from four(two through lanes each way,side by side left turn In no Plans lanes). Scholls Ferry Road Widen to 7 lanes(total—both directions)between ORE 217 Not Funded and Barrows Road(East). Preserve right-of-way for seven (widening to 125`" lanes to Murray Boulevard for future corridor needs. identified in Wa.Co, Beaverton TSP& RTP) Greenburg Road Widen to 4 lanes adjacent to cemetary Not funded In Wa.Co.Plan Walnut Boulevard Widen to 3 lanes(total—both directions)between 135 (or In RTP where Gaarde connects)to ORE 99W MSTIP for parts Extend Walnut east of ORE 99W to meet Hall Boulevard and Not Funded Hmziker Street(3 lanes—total,both directions) In no plans Gaarde Street Widen to 3 lanes west of 121st to ORE 99W In RTP Use access control and 2 lanes in sensitive areas Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8-45 October 30,2001 DKS Associates Location Description Hall Boulevard Extend south to Tualatin(3 lanes—total,both directions) In RTP Durham Road Widen to 5 lanes(total,both directions)between Hall Boulevard and Upper Booties Ferry Road. In RTP Reserve right-of-way to the west for 5 lanes Durham Road/Upper Booties Realign intersection so that Durham Road continues on Not Funded Ferry Road intersection continous route to I-5/Carmen interchange—Upper Booties In no plans Ferry Road would"tee"into Durham Road/Upper Booties Ferry Road intersection 72n Avenue Widen to 5 lanes(total,both directions)between ORE 99W In RTP (could be and south city limit at Upper Booties Ferry Road/Carman partially funded by Drive/Durham Road development in Tigard Triangle—ie. LID) Hunziker/Hampton Realign Hunziker Road to meet Hampton Road at 72n In RTP Avenue—requires overcrossing over ORE 217—removes existing 72nd Avenue/Hunziker intersection Atlanta Street Extend Atlanta Street west to meet 72 nd Avenue To be funded with development in Tigard Triangle(i.e. LID) Dartmouth Street Widen to five lanes from ORE 99W to I-5 In RTP, To be funded by fronting improvements 68 th Avenue Widen to 3-lanes between Dartmouth/I-5 Ramps and ORE 217 Not Funded(could be partially funded Extend 68th Avenue south to meet ORE 217 providing right- by development in in/right-out only access to 68`"Avenue from ORE 217, Tigard Triangle—ie. replacing the NB ramps to 72nd at ORE 217 LID) Scoffins/Hunziker/Hall Realign Scoffins to meet Hunziker at Hall Not Funded intersection Hall Boulevard Widen to 5 lanes between Washington Green and ORE 99W In RTP Beef Bend Road Access Control should be implemented to preserve capacity Not Funded with 2 lanes(with intersection turn lanes). Minimum 1,000 Implemented with foot spacing should be used between any driveway(s)and/or adjacent public street(s) development Widen from King Aruther to 131'`to 3-lanes In RTP MSTIP Widen Beef Bend/Elsner Road to 3-lanes from ORE 99W to In RTP Scholls Ferry Road MSTIP *-Refers to inclusion in prior plans such as Regional Transportation Plan(RTP),Major Streets Transportation Improvement Program(MSTIP),Washington County Transportation Plan,Beaverton TSP or other subarea plan. The RTP anticipates funding for projects within the plan in a 20 year horizon. Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8-46 October 30,2001 DKSAssoeiates Widen to 3 lanes between US 26&72nd Av. (t) Hq�z NOT Ro CITY OF TIGARD TO SCALE •�� O��SO� 'TAYLORS FERRY RD Transportation Q � ¢ Systems Plan 7 RO 5 LOCUST ST o o .• � m Legend **Luo W S z ¢ 5 OAK ST 3 05 Number of Lanes oFreeway Widening ERRy 217) Roadway Widening F ORTH DAKOTA Sr -Proposed Roadway PFAFFLE Sr 7 ••••• Q Q J FF ••'� -Proposed Overcrossin 2P U/�G ATLANr Sr p g 10 TIGARD Q� fo b■� "' ,'r -Interchange Improvement Access Control 5 sr ®-Added Person Capacity rs� 3 = � 3 H � $�-Preserve Right-of-Way for 7 Lanes BPRRQ�S = w�� , P� .• TNZi,�FR Corridor Alignment Study Area P 3 • • 3 o 99 ZW) ..P: ♦. T . Y 3 �� � P5� ..••'a 0 5 GAARDE 3 r McDONALD Sr .: ASF BULL MDUH 7N ¢ N = RD BONITA RD SATTLER ST ¢ 5 RD SUMMERFIELD DR 0 5 U DURHAM RD 5 z N ..................... .... N ■ � R 3 o G�Qo�c :. � ��°�° � Flgure 9-19 Ted, .......... :: a �� 20 YEAR STREET dam. 1 I-5 to ORE 99W IMPROVEMENT PLAN .: "" Connector �' S Widen to 4 plus auxilliary lanes between ORE 217 4 - &I-205.Widen to 4 lanes south to Wilsonville. DKS Assodates (t) hAlz 26 , kx NOT Ro CITY OF TIGARD TO SCALE TAYLORS S FERRY RD Transportation Systems Plan J RO S Locu=r S ST z Legend S m W S FERRY S Z ¢ OAK 1 sr 1 1 -Intersection Improvement Location/Number 217) O SPIS Safety Improvement ORT DAKOTA ST Location PFAFFLE T TIGARD P URG Note-Safety Improvements would also be done Po a at same time intersection improvements �S �eeP sr < are undertaken. Sr ST S� gPRR0 S q�N�� MPS y�12ik6p Y 99W P 0 GAARDE S McDONALD ST ASF � o z BULL S OUN Y/V ¢ ^ 5 x RD BONITA RD 1 S W ¢ ¢ SATTLER ST w DR m RD SUMMERFIELD BEND DURHAM RD BEEF v a � Q o w ...River........ m \0��0 Flgure -20 Gdd INTERSECTION T �g IMPROVEMENT LOCATIONS DKS Associates Table 8-8 City of Tigard Future Intersection Improvements Table 8-8: Future Intersection Improvements • Intersection Description 1 Davies/Scholls Ferry Road • Traffic signal • Northbound right turn lane • Realign to meet Barrows Road,close Barrow to local traffic 2 North Dakota/125h/Scholls Ferry Road • Southbound right turn lane • Retain westbound right turn lane when 3rd lane added on Scholls Ferry Road • Change from protected left turn phasing to permitted phasing north/south 3 Nimbus/Scholls Ferry Road • Retain eastbound right turn lane when 3rd lane added on Scholls Ferry Road • Retain westbound right turn lane when 3rd lane added on Scholls Ferry Road • Southbound right turn lane • Reconfigure northbound and southbound lanes to create exclusive left turn lanes • Change from split phasing to protected left turn phasing north/south 4 121"/Walnut • Traffic signal • Northbound left turn lane • Southbound left turn lane • Eastbound left turn lane • Westbound left turn lane 5 121"/North Dakota • Traffic signal 6 Greenburg/Oleson/Hall • 2nd northbound left turn lane • Extend signal cycle length • Assumes Hall widened to 5 lanes 7 Greenburg/Washington Square Road • Southbound right turn lane • Overlap eastbound right turn • Extend signal cycle length 8 Main/Greenburg/ORE 99W • Southbound left turn lane • Retain westbound right turn lane when ORE 99W widened to 7 lanes 9 Greenburg/Tiedeman • Extend signal cycle length • Improved geometry/alignment 10 Hall/Oak • Extend signal cycle length • Assumes Hall widened to 5 lanes 11 Hall/ORE 99W • Southbound right turn lane • Northbound left turn lane • Westbound right turn overlap • Retain westbound right turn lane when ORE 99W widened to 7 lanes 12 JORE 217 NB Ramps/ORE 99W • Retain eastbound right turn lane when ORE 99W widened to Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8-49 October 30,2001 DKS Associates Table 8-8: Future Intersection Improvements • Intersection Description 7 lanes • Retain westbound right turn lane when ORE 99W widened to 7 lanes • 2nd northbound left turn lane 13 ORE 217 SB Ramps/ORE 99W • 2nd southbound right turn lane • Retain eastbound right turn lane when ORE 99W widened to 7 lanes 14 Dartmouth/ORE 99W • Retain eastbound right turn lane when ORE 99W widened to 7 lanes 15 72n/ORE 99W • Southbound right turn lane • Northbound right turn overlap • Change to protected left turn phasing north/south • Retain eastbound right turn lane when ORE 99W widened to 7 lanes 16 68 /ORE 99W • 2nd westbound left turn lane • Northbound left turn lane • Southbound left turn lane • Change to protected left turn phasing north/south 17 72n/Dartmouth • Traffic signal • Assumes 72nd Avenue and Dartmouth widened to 5 lanes 18 68 /Atlanta/Haines • Traffic signal 19 ORE 217 SB Ramps/72n • Assumes 72nd Avenue widened to 5 lanes 20 72n Bonita • Assumes 72nd Avenue widened to 5 lanes 21 72nd/Carmen • 2nd northbound right turn lane 22 72n/Upper Boones Ferry Road • Assumes Durham/Upper Boones Ferry/72nd widened to 5 lanes 23 Hall/Sattler/Ross • Traffic signal • Northbound left turn lane • Southbound left turn lane 24 Hall/Durham • 2nd southbound left turn lane • Widen west of intersection to introduce 5-lane section on Durham(include existing westbound right turn lane) 25 ORE 99W/McDonald/Gaarde • Westbound right turn lane • 2nd Northbound left turn lane 26 ORE 99W/Beef Bend • Southbound right turn lane(on ORE 99W) • Adjust cycle length 27 Tiedeman/Walnut • Completed • Southbound left turn lane • Eastbound left turn lane • Westbound left turn lane • 2nd westbound right turn lane 28 Murray/Scholls Ferry Road Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8- 50 October 30,2001 DKS Associates Table 8-8: Future Intersection Improvements • Intersection Description • Add additional southbound lane to achieve 2 southbound left turn lanes and two southbound through lanes • Extend signal cycle length • Changes to protected left turn phasing north/south and east/west 29 Beef Bend/Scholls Ferry Road • Eastbound right turn lane • Northbound left turn lane • Eastbound right turn overlap • Change to protected phasing east/west • Change to split phasing north/south 30 Walnut/ORE 99W • Retain westbound right turn lane when ORE 99W is widened to 7 lanes • Change to protected left turn phasing on Walnut 31 72 /Hampton/Hunziker • Southbound right turn lane OR eastbound right turn lane • Change to protected left turn phasing all directions 32 Durham/Upper Boones Ferry Road • Reconfigure intersection to make through route between Durham and I-5/Carmen interchange 33 Gaarde/Walnut • Traffic signal • Eastbound right turn lane 34 68 /Dartmouth • Traffic signal 35 Carman/I-5 southbound • Eastbound right turn lane 36 Carman/1-5 northbound • 2nd westbound through lane • 2nd northbound left turn lane • Eastbound separate through and left turn(2)lanes Intersection Safety Enhancements Evaluate improvements to reduce collisions at high SPIS intersections(refer to 1997-99 intersection list in Chapter 3) Pedestrian Crossing Evaluation/Signals Study and determine appropriate locations for Pedestrian Crossing Signals Traffic Signal Guidelines Traffic signal warrant analyses were performed for all unsignalized study intersections operating at LOS E or worse under future base(2015)conditions(Table 8-9). Traffic signal warrants were based on the Manual on Uniform Traffic Control Device's(MUTCD)Warrant 11 (Peak Hour Volume).19 To guide future implementation of traffic signals to locations which have the maximum public benefit by serving arterial/collector/neighborhood routes,a framework master plan of traffic signal locations was developed(Figure 8-21). The intent of this plan is to outline potential locations where future traffic re Manual on Uniform Traffic Control Devices for Streets and Highways,Federal Highway Administration, 1988 Edition. Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8- 51 October 30,2001 DKS Assodates (t) hAlZ26 , NOT o� �a CITY OF TIGARD TO SCALE TAYLORS FERRY RD Transportation Systems Plan Q RO LOCUSTST o o Legend LU 3 OAK ST Z � � -Existing Signalized Intersection ERRy ~ U 217) o ® -Potential Future Traffic Signal F ORTH DAKOTA ST °o PFAFFLE sr Note: Signals may be needed at other sites if Q� TIGARD P URS warranted.This map shows those locations P� Pp that are most likely to be signalized 210 �e� Sr T consistent with TSP objectives. ST ST Co BPRR0 S WA�N�� PR y�l2iirFR '¢ � � P 0 99W) GAARDE ST McDONALD ST ASF MOU Q o BULL /N N x BOMTA RD RD W ¢ ¢ SATTLER ST ¢ 5 P�O� M GP�� ti L o DR m RD SUMMERFIELD BEND DURHAM RD BEEF v a � Q o River........ w � R e°�� Figure 8-21 �o�o Q' TRAFFIC SIGNAL �g MASTER PLAN DKS Associates signals would be placed to avoid conflicts with other development site oriented signal placement. To maintain the best opportunity for efficient traffic signal coordination on arterials, spacing of up to 1,000 feet should be considered. No traffic signal should be installed unless it meets Manual of Uniform Traffic Control Devices warrants. Three key traffic signal issues are outlined in this TSP as part of the transportation policy of Tigard: • Establishing a traffic signal spacing standard of 1,000 feet and a traffic signal master plan to guide future traffic signal placements. When this standard is not met, additional evaluation should be prepared to assure signal progression can be efficiently maintained; • Traffic signals disrupt traffic flow. Their placement is important for neighborhood access, pedestrian access and traffic control. To not utilize the limited placements of traffic signals to serve private land holdings will limit the potential for use that will generally benefit the public,neighborhoods and pedestrian access. Limiting placement of traffic signals to locations that are public streets would minimize or eliminate the potential for traffic signals solely serving private access. • ODOT signal design and signal phasing guidelines should be followed for all traffic signal installations. Table 8-9 Traffic Signal Warrants MUTCD Peak Hour Volume Warrant Intersection Warrant Met? 72°/Dartmouth Yes 68 /Dartmouth Yes Gaarde/121st Yes Gaarde/Walnut Yes Walnut/121st Yes Walnut/Tiedeman Yes Sattler/Hall Yes Bonita/79th Yes Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8- 53 October 30,2001 DKS Associates SAFETY Needs Accident data was obtained for the City of Tigard from Washington County. Chapter 3 provides detailed data regarding motor vehicle accidents in Tigard. Several strategies are suggested for improving safety in the City of Tigard. These strategies aimed at providing the City with priorities that meet the goals and policies of the City. • Work with other agencies such as Washington County and ODOT to help prioritize and fund safety programs-coordinated approach • Develop a citywide safety priority system which identifies high accident locations,ranks the locations and identifies safety mitigation measures • Address safety issues on an as needed basis Suggested Improvements Most of these high accident locations are included in future street improvements listed in Tables 8-6 and 8-7. The only two intersection not being improved are the two on Locust Street(at 72nd and 80'). Accident numbers over three years at these all-way stop sign controlled intersections are very low(3-4 in 3 years). Beyond maintenance, signing and lighting there is little else necessary at these two locations. In the short term, specific action plans should be prepared to address whether beneficial improvements at these locations can be made without affecting future plans. A future issue with regard to safety involves the decision to go to three lanes from two lanes or five lanes from four lanes. National research has clearly demonstrated the benefits of providing a turning lane when daily traffic volumes exceed 15,000 vehicles per day20. While widening the street can commonly be viewed as pedestrian unfriendly,the potential impact of not having a turning lane is that accident rates will increase substantially(I I to 35 percent)on two lane roads compared to three lane roads. One safety action that can have an immediate impact is to condition all land use development projects that require access on city streets to maintain adequate sight distance. This should address all fixed or temporary objects(plants,poles,buildings, signs, etc.)that potentially obstruct sight distance. Any property owner,business, agency or utility that places or maintains fixed or temporary objects in the sight distance of vehicles,bicycles or pedestrians should be required to demonstrate that adequate sight distance is provided(per American Association of State Highway and Transportation Officials).21 Finally,the City should coordinate with Washington County and ODOT to develop real-time accident reporting statistics that allow the city to prioritize current collision issues,not four to seven year old data. Current vendors exist that provide accident report software(Washington County uses Intersection Magic). Tigard, as one of several cities with this need, should work cooperatively with peer jurisdictions to implement software that prioritizes collision locations,produces detailed accident diagrams to allow for assessment and is real time(no more than 3 to 6 months old data with five years of historical data). 20 Multilane Design Alternatives for Improving Suburban Highways,TRB NCHRP Report No.282,March 1986. 21 "A Policy on Geometric Design of Highways and Streets", Green Book American Association of State Highway and Transportation Officials, 1994. Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8- 54 October 30,2001 DKS Associates ACCESS MANAGEMENT Access Management is a broad set of techniques that balance the need to provide efficient, safe and timely travel with the ability to allow access to the individual destination. Both Washington County and ODOT have clear and concise access management policies and the supporting documentation to ensure that the highway system is managed as wisely as possible for the traveling public.Proper implementation of Access Management techniques should guarantee reduced congestion,reduced accident rates,less need for highway widening, conservation of energy, and reduced air pollution. Access management is control or limiting of access on arterial and collector facilities to preserve their functional capacity. Numerous driveways erode the capacity of arterial and collector roadways. Preservation of capacity is particularly important on higher volume roadways for maintaining traffic flow and mobility. Where as local and neighborhood streets function to provide access,collector and arterial streets serve greater traffic volume. Numerous driveways or street intersections increase the number of conflicts and potential for accidents and decrease mobility and traffic flow. Tigard, as with every city,needs a balance of streets that provide access with streets that serve mobility. Several access management strategies were identified to improve access and mobility in Tigard: • Provide left turn lanes where warranted for access onto cross streets • Work with land use development applications to consolidate driveways where feasible • Meet Washington County/ODOT access requirements on arterials • Establish City access standards for new developments on collectors and arterials • Develop city access requirements that are consistent with Metro Title 6 access guidelines The following recommendations are made for access management: • Incorporate a policy statement regarding prohibition of new single family residential access on arterials and collectors. A design exception process should be outlined that requires mitigation of safety and NTM impacts. This addresses a problem in Tigard where property owners consume substantial staff time on issues of residential fronting impacts after they have chosen to build adjacent to an arterial. • Use Washington County and ODOT standards for access on arterials and collectors under their jurisdiction(see tables showing Washington County and ODOT standards in Appendix). • Specific access management plans be developed for arterial streets in Tigard to maximize the capacity of the existing facilities and protect their functional integrity. New development and roadway projects should meet the following requirements: Arterial: Maximum spacing of roadways and driveways= 1,000 feet Minimum spacing of roadways and driveways=600 feet Collector: Maximum Spacing of roadways and driveways=400 feet Minimum Spacing of roadways and driveways=200 feet All Roads: Require an access report stating that the driveway/roadway is safe as designed meeting adequate stacking, sight distance and deceleration requirements as set by ODOT, Washington County and AASHTO. Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8- 55 October 30,2001 DKS Associates Access management is not easy to implement and requires long institutional memory of the impacts of short access spacing—increased collisions,reduced capacity,poor sight distance and greater pedestrian exposure to vehicle conflicts. The most common opposition response to access control is that"there are driveways allover the place at closer spacing than mine—just lookout there". These statements are commonly made without historical reference. Many of the pre-existing driveways that do not meet access spacing requirements were put in when traffic volumes were substantially lower and no access spacing criteria were mandated. With higher and higher traffic volume in the future, the need for access control on all arterial roadways is critical—the outcome of not managing access properly is additional wider roadways which have much greater impact than access control. Staff will have to come back at a later to date to propose revisions to the development code to reflect the standards being developed in the TSP and Comprehensive Plan. At that time, additional attention can be given to the specific standards and whether exceptions are appropriate to be written into the code or if variances are the action needed. The ODOT Highway Plan spacing standards will apply to ORE 99W (530 - 740 feet), Hall Boulevard(400 -475 feet) and streets/driveways within 1,320 feet of ORE 217 or 1-5 interchanges. For Washington County roads access spacing standards would be 1,000 feet for major arterials, 600 feet for minor arterials and 150 feet for major collectors. The spacing standards outlined in the TSP would apply for City streets 1,000 feet maximum/600 feet minimum for arterials and 400 feet maximum/200 feet minimum for collectors. The maximum and minimum standards balance safety needs and connectivity needs. Additionally, three other standards are recommended. First, a restriction of direct access of new single family units on arterials and collectors (this would include an exception process that addresses safety and neighborhood traffic management needs). Second, an access report with new land development that requires applicants to verify design of their driveways and streets are safe meeting adequate stacking needs, sight distance and deceleration standards as set by ODOT, Washington County, the City and AASHTO (utilizing future traffic volumes from this TSP as a future base for evaluation). Third, driveways should not be place in the influence area of intersections. The influence area is that area where queues of traffic commonly form on the approach to an intersection (typically between 150 to 300 feet). In a case where a project has less than 150 feet of frontage, the site would need to explore potential shared access, or if that were not practical,place driveways as far from the intersection as the frontage would allow (permitting for 5 feet from the property line). MAINTENANCE Preservation,maintenance and operation are essential to protect the City investment in transportation facilities. The majority of current gas tax revenues are used to maintain the transportation system. With an increasing road inventory and the need for greater maintenance of older facilities,protecting and expanding funds for maintenance is critical. A Pavement Management Program is a systematic method of organizing and analyzing information about pavement conditions to develop the most cost effective maintenance treatments and strategies. As a management tool,it aids the decision-making process by determining the magnitude of the problem, the optimum way to spend funds for the greatest return on the dollar,and the consequences of not spending money wisely. Tigard maintains an annual program of pavement management and monitors Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8- 56 October 30,2001 DKS Associates conditions in setting priorities for overlays, slurry seals and joint sealing. With over 130 miles of roadway,maintenance is one of the largest transportation expenditures,requiring almost$1,500,000 per year(to put this budget in perspective,this relates to about$2 per foot of road). A pavement management program can be a major factor in improving performance in an environment of limited revenues. A pavement management program is not and should not be considered the answer to every maintenance question. It is a tool that enables the public works professional to determine the most cost-effective maintenance program. The concept behind a pavement management system is to identify the optimal rehabilitation time and to pinpoint the type of repair which makes the most sense. With a pavement management program,professional judgment is enhanced,not replaced. A critical concept is that pavements deteriorate 40 percent in quality in the first 75 percent of their life. However,there is a rapid acceleration of this deterioration later, so that in the next 12 percent of life,there is another 40 percent drop in quality. A pavement management system can identify when pavements will begin to deteriorate before rapid deterioration starts to focus preventative maintenance efforts cost effectively. These solutions are generally one-fifth to one-tenth the cost required after a pavement is 80 percent deteriorated. Figure 8-22 illustrates the pavement life cycle. A visual inspection of Tigard's surface street system was prepared by a consultant for the City of Tigard in 1998/99. This inspection produced a"report card" of the street pavement status for each roadway in Tigard. Figure 8-23 summarizes the pavement condition identified on City streets in the last pavement management inspection. The next pavement inspection will be conducted in 2001. Based upon the last inspection, a determination was made that Tigard has approximately a$3,000,000 back log of needed maintenance that cannot be addressed by annual on-going maintenance programs. Tigard has recently taken on the maintenance and operation of several county roads over the past several years. The on-going maintenance budget has increased as Tigard receives more of the statewide motor vehicle fee allocation for roadway preservation and operation. Table 8-10 summarizes the roadway maintenance funding history for the last five fiscal years. Table 8-10 City of Tigard Street Maintenance Budge Summar 22 FY 96-97 FY 97-98 FY 98-99 FY 99-00 FY 00-01 Requirements actual actual budgeted budgeted budgeted Description Street Maintenance Overlays/Slurry Seal $300,000 $300,000 $300,000 $300,000 $380,000 Contracted out Minor Safety Imp. $140,000 $140,000 $140,000 $140,000 $140,000 Small Improvements NTM $ 45,000 $ 45,000 $ 60,000 $ 60,000 $ 60,000 Traffic Calming Striping $ 7,000 $ 7,000 $ 7,000 $ 7,000 $ 12,000 Restriping roads Street Program Dig Outs/Contracts Reconstruction, Signs, LaborOutlay $523,000 $620,000 $814,000 $1,050,000 $774,000 Guard rail, Sweeping Capital/Equipment Administration $30,000 $31,000 $41,000 $58,000 $55,000 Total 1$1,045,0001$1,143,000 1$1,362,000 1$1,615,0001$1,421,000, Note: Tigard started maintaining an increase share of County streets from 1997 to present. 22 Based on information received from Gus Duneas,City of Tigard,February 2000. Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8- 57 October 30,2001 DKS Associates CITY OF TIGARD Transportation System Plan Excellent Good 40% drop in quality U $1.00 for renovation *0 Fair 75% of life here 4) Poor 40% drop in quality 12% Will cost 4.00 to Ver Poor of life �$ Y 5.00 here Failed Time 20 yrs. Pavement Life Figure 8-22 PAVEMENT LIFE CYCLE DKSAssociates (t) hAlz 26 , kx NOT Ro CITY OF TIGARD TO SCALE TAYLORS FERRY RD Transportation Systems Plan ¢ Q RO N LOCUST ST o W Legend Cc z 3 OAK ST Good ...... -Fair FERRY 217) Poor ORTH DAKOTA ST PFAFFLE ST 210 Q� ¢ TIGARD P RFF RG o a ST T S� BPRRQ�S WA�N�� MPS 'y�1Zii�A P 99W) r `, S� � � P 0 GAARDE S McDONALD ST ASF BULL x RD BONITA RD W ¢ SATTLER ST ¢ 5 M 2 �P� ti W m RD SU FIELD R BEND DURHAM RD BEEF v a � ¢ ¢ o River........ W Figure 8-23 ONDITION � Gee PAVEMENT C ....... ON CITY STREETS �g DKS Associates NEIGHBORHOOD TRAFFIC MANAGEMENT Neighborhood Traffic Management(NTM) is a term that has been used to describe traffic control devices typically used in residential neighborhoods to slow traffic or possibly reduce the volume of traffic. NTM is descriptively called traffic calming due to its ability to improve neighborhood livability. Tigard has done extensive work in the way of testing and implementing NTM measures such as speed humps,chokers,pavement texturing,circles,chicanes and other elements(Figure 8-24). The City initiated a formalized NTM program in 1995 and expends about$60,000 per year in traffic calming city wide. The following are examples of neighborhood traffic management strategies: • speed wagon(reader board that displays vehicle speed) • speed humps • traffic circles • medians • landscaping • curb extensions • chokers (narrows roadway at spots in street) • narrow streets • closing streets • photo radar • on-street parking • selective enforcement • neighborhood watch Typically, NTM can receive a favorable reception by residents adjacent to streets where vehicles travel at speeds above 30 MPH. However,NTM can also be a very contentious issue within and between neighborhoods,being viewed as moving the problem rather than solving it, impacting emergency travel or raising liability issues. A number of streets in Tigard have been identified in the draft functional classification as neighborhood routes. These streets are typically longer than the average local street and would be appropriate locations for discussion of NTM applications. A wide range of traffic control devices is being tested throughout the region, including such devices as chokers,medians,traffic circles and speed humps. NTM traffic control devices should be tested within the confines of Tigard before guidelines are developed for implementation criteria and applicability. Also,NTM may be considered in an area wide manner to avoid shifting impacts between areas and should only be applied where a majority of neighborhood residents agree that it should be done. Strategies for NTM seek to reduce traffic speeds on neighborhood routes,thereby improving livability. Research of traffic calming measures demonstrates their effectiveness in reducing vehicle speeds. Table 8-11 summarizes nationwide research of over 120 agencies in North America. The City could consider adopting a neighborhood traffic management program. This program would help prioritize implementation and address issues on a systematic basis rather than a reactive basis. Criteria should be established for the appropriate application of NTM in the City. This would address warrants, standards for design, funding,the required public process,use on collectors/arterials(fewer acceptable measures—medians)and how to integrate NTM into all new development design. Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8- 60 October 30,2001 DKS Assodates (t) NOT �a CITY OF TIGARD TO SCALE TAYLORS FERRY RD Transportation Systems Plan ¢ VEN Rp LOW ST z Legend N OAK sr • -Speed Hump LD -Portable Speed Hump FERRv SQA Q 217 0 H DAKOTA sr m A -Diverter(Shows Direction) RF PFAFFLE c ST X -Islands in Intersection 210 Q� ¢ ¢ TIGARD BA LOR KATHERS �O ST ST T R Ty ST ' S� N� H019leo ST 6PRR0� F aA Sr � o � MIS LL OE � GAARDE^ ST McDONALD ST ASF MO ¢ z BULL UNT YN `99W BONITA RD Q RD J LID � J o Q = Q BATTLER ST 5 = WOODHUE ST °P LL o = mRp SU FI D BEND DURHAM RD BEEF Q ' U � � � z . .... ...................... ..River24 . o w R igure - 85 °G�° TRAFFIC CALMING af4eMEASURES INVENTORY �� DKS Associates Table 8-11 NTM Performance Speed Reduction(MPH) Volume Change(ADT) Measures No.of Public Studies Low High Average Low High Ave. Satisfaction Speed Humps 262 1 11.3 7.3 0 2922 328 79% Speed Trailer 63 1.8 5.5 4.2 0 0 0 90% Diverters 39 - - .4 85 3000 1102 72% Circles 26 2.2 15 5.7 50 2000 280 72% Enforcement 16 0 2 2 0 0 0 71% Traffic Watch 85 .5 8.5 3.3 0 0 0 98% Chokers 32 2.2 4.6 3.3 45 4100 597 79% Narrow Streets 4 5 7 4.5 0 0 0 83% SOURCE: Survey of Neighborhood Traffic Management Performance and Results,ITE District 6 Annual Meeting, by R S.McCourt,July 1997. PARKING Parking has not typically been a significant transportation issue in the past for Tigard. New land uses were required to provide the code designated number of parking spaces to assure there would be no impact to surrounding land uses(overflow parking). These parking ratios were developed based upon past parking demand characteristics of each land use type. Most recently,parking has become an element of transportation planning policy through two actions. The adoption of the Transportation Planning Rule in 1991,which was updated in November 1998 (sections 660-12-020(2g) and 660-12- 045(5c)) and the Metro Functional Plan of November 1996, Title 2. The City of Tigard has adopted these changes in section 18.765 of its Development Code (refer to Table 18.765.2 Minimum and Maximum Required Off-street Vehicle and Bicycle Parking Requirements). By adopting the minimum and maximum parking ratios outlined in Title 2,the City has addressed the TPR required reduction in parking spaces per capita over time. Several strategies were identified to address the desire to reduce parking needs in Tigard: • Shared parking • Parking pricing • Parking needs should be reviewed by individual developments at the site plan review stage. Parking provisions should be compared to demand,as identified by ITE or DEQ.23 • Maximum Parking Ratios One of the concerns with parking reduction policies is the impact to adjacent land uses should the vehicle needs of a site exceed the provision of parking. 23 Parking Demand, 2nd Edition, Institute of Transportation Engineers, 1987; and Peak Parking Space Demand Study, Oregon Department of Environmental Quality,by JHK&Associates,June 1995. Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8- 62 October 30,2001 DKS Associates TRANSPORTATION SYSTEM MANAGEMENT/ INTELLIGENT TRANSPORTATION SYSTEMS Transportation System Management(TSM)focuses on low cost strategies to enhance operational performance of the transportation system. Measures that can optimize performance of the transportation system include signal improvements, intersection channelization, access management(noted in prior section),HOV lanes,ramp metering,rapid incident response, and programs that smooth transit operation (refer to Table 8-7 for samples of intersection-level TSM improvements). The most significant measure that can provide tangible benefits to the traveling public is traffic signal coordination and systems. Traffic signal system improvements can reduce the number of stops by 35 percent, delay by 20 to 30 percent, fuel consumption by 12.5 percent and emissions by 10 percent24. This can be done without the major cost of roadway widening. Ramp metering has been proven to improve freeway performance, reducing travel time,reducing accidents,increasing vehicle speed and reducing fuel consumption. ODOT plans to meter all the on-ramps to 1-5 and ORE 217 within Tigard(presently the ORE 217 ramps are metered). As ramp metering is installed in Tigard,the City should work with ODOT to develop ramp meter bypass lanes for high occupancy vehicles and transit. Several of the strategies were elements of an Intelligent Transportation System(ITS)plan being implemented regionally by ODOT and participating agencies. ITS focuses on a coordinated, systematic approach toward managing the region's transportation multi-modal infrastructure. ITS is the application of new technologies with proven management techniques to reduce congestion, increase safety,reduce fuel consumption and improve air quality. One element of ITS is Advanced Traffic Management Systems(ATMS). ATMS collects,processes and disseminates real-time data on congestion alerting travelers and operating agencies, allowing them to make better transportation decisions. Examples of future ITS applications include routine measures such as"smart"ramp meters, automated vehicle performance(tested recently in San Diego), improved traffic signal systems, improved transit priority options and better trip information prior to making a vehicle trip(condition of roads-weather or congestion, alternative mode options-a current"real time" schedule status, availability/pricing of retail goods). Some of this information will be produced by Tigard,but most will be developed by ODOT or other ITS partners(private and public). The information will be available to drivers in vehicles,people at home, at work, at events or shopping. The Portland region is just starting to implement ITS and the City of Portland, Tri-Met and ODOT have already developed their own ITS strategic plans. TRUCKS Efficient truck movement plays a vital role in maintaining and developing Tigard's economic base. Well planned truck routes can provide for the economical movement of raw materials, finished products and services. Trucks moving from industrial areas to regional highways or traveling through Tigard are different than trucks making local deliveries. The transportation system should be planned to accommodate this goods movement need. The establishment of through truck routes provides for this efficient movement while at the same time maintaining neighborhood livability,public safety and minimizing maintenance costs of the roadway system. A map of proposed through truck routes in Tigard was developed(Figure 8-25). This map is built from the approved Through Truck Route Map 24 Portland Regionwide Advanced Traffic Management System Plan, ODOT,by DKS Associates,October 1993. Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8- 63 October 30,2001 DKS Associates in the Washington County Transportation Plan(1988), the recent Metro Regional Freight System (1999) and this plan. The plan is aimed at addressing the through movement of trucks,not local deliveries. The objective of this route designation is to allow these routes to focus on design criteria that is"truck friendly", i.e., 12 foot travel lanes, longer access spacing, 35 foot(or larger) curb returns and pavement design that accommodates a larger share of trucks. Because these routes are through routes and relate to regional movement, they should relate to the regional freight system. The Draft Regional Transportation Plan 15 includes the following routes in the regional freight system in Tigard, which are consistent with the city map: • I-5, ORE 217 and ORE 99W Main Roadway Route • 72nd Avenue south of ORE 217 Road Connector • Hunziker Street east of Hall Boulevard Road Connector • Scholls Ferry Road from east of Nimbus to ORE 217 Road Connector Key differences from the City TSP truck plan to the to the previously adopted Washington County Plan and Metro RTP include the following: • Hall Boulevard south of Hunziker Street is removed from the plan along with Durham Road east of Hall Boulevard as shown in the Washington County Plan. In its place Hunziker Street and 72nd Avenue south of ORE 217 are added(as they are in the Regional Freight System). • Scholls Ferry Road west of Nimbus and east of ORE 217 to Hall Boulevard are retained from the Washington County Plan(although not part of the Regional Freight System)along with Hall Boulevard from ORE 217 to Hunziker. There are other streets in Tigard that due to their adjacent land uses will need to be"truck friendly". Local industrial streets such as Tech Center Drive and Wall Street would represent samples of streets which where the local industrial street cross-section(Figure 8-7)would apply. In the future,industrial land development will need similar connections to the through truck routes. Criteria Tigard's TSP Advisory Committee created a set of goals and policies to guide transportation system development in Tigard(see Chapter 2). Several of these policies pertain specifically to trucks: Goal 2:Multi-Modal Policy ] Develop and implement public street standards that recognize the multi-purpose nature of the street right-of-way for utility,pedestrian, bicycle, transit, truck and auto use. 25 Draft Regional Transportation Plan,Metro,December 1999. Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8- 64 October 30,2001 DKS Assodates (t) yql� , kx NOT Ro CITY OF TIGARD TO SCALE TAYLORS FERRY RD Transportation Systems Plan Q N LOCUST ST o Legend o m W m Z o OAK sr -Through Truck Routes U � ) O� ORTH DAKOTA ST �2�i m PFAFFLE ST 210 TIGARD P URG eeP Sr Q ST ST S� BPRR0 S P � J T 99W) � � P 0 o GAARDE S McDONALD ST kRUSF MOU Q o BULL /N N x RD BONITA RD W ¢ ¢ SATTLER ST ti mRD SUMMERFIELD OR BEND DURHAM RD BEEF v a � Q z Aw— w ...River........ y RD Figure 8-2J m �oG�o THROUGH W Q� TRUCK ROUTES 0 DKS Associates Goal 6: Goods Movement Policy 1 Design arterial routes,highway access and adjacent land uses in ways that facilitate the efficient movement of goods and services. Policy 2 Require safe routing of hazardous materials consistent with federal and state guidelines. These goals and policies are the criteria that all truck related improvements in Tigard should be measured against to determine if they conform to the intended vision of the City. Tigard Transportation System Plan **DRAFT** P99161 Motor Vehicles 8- 66 October 30,2001 DKS Associates Chapter 9 Other Modes GIN OF TIGARD OREGON This chapter summarizes existing and future rail, air, water and pipeline needs in the City of Tigard. While auto, transit, bicycle and pedestrian transportation modes have a more significant effect on the quality of life in Tigard, other modes of transportation must be considered and addressed. CRITERIA No goals or policies were developed related to rail, air, water or pipeline transportation systems. RECOMMENDED FACILITIES RAIL Railroad tracks traverse Tigard from its northern boundary to the southeast. There are two adjacent but separate tracks south from north of North Dakota Street to Bonita Road. South of Bonita Road, one set of tracks crosses the Tualatin River to Tualatin and further south(parallel to I-5 to just north of Salem). The other set of tracks turns east to Lake Oswego/Milwaukie and Southeast Portland. North of Tigard, both tracks go on into Beaverton and Hillsboro. They are both owned by Portland& Western (P&W), a sister company of Willamette & Pacific (W&P) Railroad. Within the next five years all of the rubberized at-grade crossing panels will be replaced with concrete panels. The concrete panels have longer life and are more skid resistant. Presently all the grade crossings of the railroad and roadways in Tigard are controlled by gated crossings. There are a few private crossings which are not gated. Grade separation of the railroad crossings has not been determined to be necessary at any of the existing crossings. The highest volume at-grade crossing in Tigard is on Scholls Ferry Road. Because of the close proximity of the rail crossing to the ORE 217 interchange, future expansion of ORE 217 should consider the operational need of Scholls Ferry Road south of ORE 2171 . A commuter rail system, linking Wilsonville and Beaverton/Hillsboro, has been discussed and preliminary analysis has been conducted to determine possible alignments and station locations. The system would travel through Tigard with at least one or two stops in the City. One of the City's policies is to support ' Outside the 20 year perspective of this plan,it may become necessary to consider a grade separation of the railroad crossing. While not part of this TSP,this concept should be considered in future planning of the Scholls Ferry Corridor. A grade separation concept may include a viaduct Scholls Ferry Road from ORE 217 to south of Nimbus.Urban interchanges would need to be designed for Nimbus and Cascade This viaduct approach may preclude the need for seven lanes on Scholls Ferry Road. This type of alternatives analysis would be necessary in the project development of any Scholls Ferry Road widening,ORE 217 widening and/or rail crossing changes. Tigard Transportation System Plan P99161 Other Modes 9-1 October 30, 2001 DKS Associates the development of a commuter rail system as part of the regional transit network. The commuter rail project would enhance the rail line by providing sidings (double track)over portions of the alignment. The commuter rail would operate when there is little freight activity. There has been a recent increase in volume to about eight trains per day through Tigard(includes both northbound and southbound trains total of about four round-trips per day). P & W anticipates changes in freight service in the near future, but the changes are likely to affect timing rather than the number of trains passing through Tigard. AIR Tigard is served by the Portland International Airport, located in Northeast Portland on the Columbia River. The Portland International Airport is a major air transportation and freight facility, which serves Oregon and Southwest Washington. It provides a base for over twenty commercial airlines and air freight operations. The Port of Portland reported nearly 13.7 million passengers were served at the Portland International Airport in 19993. Ground access to Portland International Airport from Tigard is available by automobile, taxi and shuttle (in year 2001 light rail access will be available). Tigard is also served by the Portland-Hillsboro Airport, a general aviation facility located in the north central portion of the City. The airport facility is owned and operated by the Port of Portland as part of the Port's general aviation reliever system of airports. The Port of Portland maintains a Master Plan for this facility which was most recently updated in October 1996. No airports exist or are expected within the City in the future. Therefore, no policies or recommendations in this area of transportation are provided for Tigard. WATER The Tualatin River is located along the southern border of Tigard. It is used primarily for recreational purposes. No policies or recommendations in this area of transportation are provided. PIPELINE There are high pressure natural gas feeder lines owned and operated by Northwest Natural Gas Company along several routes in Tigard. Figure 9-1 shows the feeder line routes for Tigard.4 No future pipelines are expected within the City. No policies or recommendations in this area of transportation are provided for Tigard. 2 Washington County Commuter Rail Study,Phase II,Prepared by BRW,etc.,May, 1999. 'Based upon Port of Portland web page,http://www.portofportlandor.com/1299month.htm 4 Based on the Portland Area Distribution System Map(Dated September, 1998)received from Northwest Natural Gas Company. Tigard Transportation System Plan P99161 Other Modes 9-2 October 30, 2001 DKS Associates N III NOT { CITY OF TIGARD TO SCALE I OREGON Transportation Is y R° Systems Plan z _-j Legend NExisting High Pressure Gas Pipeline Existing Kinder Morgan Pipeline RTH PFAFFL �9 5 � e SWC WALNUT NALD BULL RD RD z N �O O Sw RHA KU DURHAM O Figure 9-1 H RD m MAJOR PIPELINE J ROUTES DKS Associates Chapter 10 Transportation Demand GIN OFTIGARD Management OREGON INTRODUCTION Transportation Demand Management(TDM) is the general term used to describe any action that removes single occupant vehicle trips from the roadway network during peak travel demand periods. The Transportation Planning Rule outlines a goal of reducing vehicle miles traveled(VMT)per capita. TDM measures applied on a regional basis can be an effective tool in reducing vehicle miles traveled. Samples include: ❑ Employers installing bicycle racks ❑ Work with property owners to place parking stalls for carpoolers near building entrances ❑ Provide information regarding commute options to larger employers ❑ Encourage linkage of housing,retail and employment centers ❑ Encourage flexible working hours ❑ Encourage telecommuting ❑ Provide incentives to take transit and use other modes (i.e. free transit pass) ❑ Schedule deliveries outside of peak hours The strategies for transportation demand management were identified in working with the City's TSP Task Force which included the City Planning Commission. These committees provided input regarding the transportation system in Tigard, specifically exploring TDM needs. BACKGROUND In 1993, the Oregon Legislature passed a law to help protect the health of Portland area residents from air pollution and to ensure that the area complies with the federal Clean Air Act. The Employee Commute Options (ECO) rules are provisions of the law.' The ECO program requires larger employers to provide commute options to encourage employees to reduce auto trips to the work site. It is one of several strategies included in the Ozone Maintenance Plan for the Portland Air Quality Maintenance Area(AQMA)which will be in place until the year 2006. Employers in the Portland AQMA with more than 50 employees at a work site must provide commute options that have the potential to reduce employee commute auto trips by 10 percent within three years, and maintain the trip reductions through the life of the plan. TDM can include a wide variety of actions tailored to the individual needs of employers to achieve trip reduction. Table 10-1 provides a list of several strategies identified in the ECO program. Research By 10 percent over 20 years 2 Oregon Administrative Rules Chapter 340,Division 30. Tigard Transportation System Plan P99161 Transportation Demand Management 10-1 October 30, 2001 DKS Associates Table 10-1 Transportation Demand Management Strategies Potential Trip Strategy --Description Reduction Telecommuting Employees perform regular work duties at home or at a work 82-91% (Full Time) center closer to home, rather than commuting from home to work. This can be full time or on selected work days. This can 14-36% (1-2 day/wk) require computer equipment to be most effective. Compressed Work Schedule where employees work their regular scheduled number 7-9% (9 day/80 hr) Week of hours in fewer days per week(for example, a 40 hour week in 16-18% (4/40) 4 days or 36 hours in 3 days) 32-36% (3/36) Transit Pass Subsidy For employees who take transit to work on a regular basis, the 19-32% (full subsidy, employer pays for all or part of the cost of a monthly transit pass. high transit service) 2-3% (half subsidy, medium transit service) Cash Out Employee An employer that has been subsidizing parking(free parking) 8-20 %(high transit Parking discontinues the subsidy and charges all employees for parking. service available) An amount equivalent to the previous subsidy is then provided to 5-9 %(medium transit each employee,who then can decide which mode of travel to use services available) (with subsidy above the cost of a monthly transit pass, those 2-4%(low transit employees would realize monetary gain for using transit). services available) Reduced Parking Parking costs charged to employees are reduced for high 1-3 % Cost for HOVs occupancy vehicles (HOV) such as carpools and vanpools. Alternative Mode For employees that commute to work by modes other than 21-34% (full subsidy of Subsidy driving alone, the employer provides a monetary bonus to the cost,high alt.modes) employee. Most often, the bonus is provided monthly in the 24% (half subsidy of employee's paycheck. cost,medium alt.modes) On-Site Services Provide services at the worksite that are frequently used by the employees of that worksite. Examples include cafes,restaurants, 1-2 % dry cleaners, day care and bank machines. Bicycle Program Provides support services to those employees that bicycle to work. Examples include: safe/secure bicycle storage, shower 0-10 % facilities and subsidy of commute bicycle purchase. On-site Rideshare Employees who are interested in carpooling or vanpooling provide Matching for HOVs information to a transportation coordinator regarding their work hours, availability of a vehicle and place of residence. The 1-2 % coordinator then matches employees who can reasonably rideshare together. Provide Vanpools Employees that live near each other are organized into a vanpool 15-25% (company for their trip to work. The employer may subsidize the cost of provided van with fee) operation and maintaining the van. 30-40% (company subsidized van) Gift/Awards for Employees are offered the opportunity to receive a gift or an Alternative Mode award for using modes other than driving alone. 0-3 % Use Provide Buspools Employees that live near each other or along a specified route 3-11 % are organized into a buspool for their trip to work Walking Program Provide support services for those who walk to work. This could 0-3 % Tigard Transportation System Plan P99161 Transportation Demand Management 10-2 October 30, 2001 DKS Associates Potential Trip Strategy Description Reduction include buying walking shoes or providing showers. Company Cars for Employees are allowed to use company cars for business-related 0-1 % Business Travel travel during the day. Guaranteed Ride A company owned or leased vehicle or taxi fare is provided in 1-3 % Home Program the case of an emergency for employees that use alternative modes. Time off with Pay for Employees are offered time off with pay as an incentive to use 1-2 % Alternative Mode alternative modes (rather than monetary,bonus, gift or awards) Use SOURCE: Guidance for Estimating Trip Reductions From Commute Options, Oregon Department of Environmental Quality,August 1996. has indicated that a comprehensive set of complementary policies implemented over a large geographic area can have an effect on vehicle miles traveled However, the emphasis of much of the research indicates that these policies must go well beyond the low-cost,uncontroversial measures commonly attributed to TDM (such as carpooling, transportation coordinators/associations,priority parking spaces) to be effective. Elements including parking and congestion pricing, improved services for alternative modes and other market-based measures are needed for TDM to have significant impact on reducing overall vehicle miles traveled. At the same time, the same research indicates that employee trip reduction programs can be an effective instrument of localized congestion relief. For example, employers can substantially reduce peak hour trips by shifting work schedules, which may not reduce VMT but can effectively manage congestion. In Wilsonville, a Nike warehouse/distribution site generates 80% less vehicle trips than standard similar uses in the evening peak hour by using employee shifts that are outside the peak period (4 - 6 PM) s. This type of congestion management technique can extend the capacity of transportation facilities. CRITERIA Tigard TSP Task Force created/refined a set of goals and policies to guide transportation system development in Tigard(see Chapter 2). Goal 2 directly addresses reduction in travel, forming the basis for TDM. Goal 2 Policy 7 Tigard will participate in vehicle trip reduction strategies developed regionally DEQ and Metro have developed regional policies regarding trip reduction. Some of these policies are aimed at provision of parking and others are aimed at ridesharing (Employee Commute Options—ECO rules). 3The Potential for Land Use Demand Management Policies to Reduce Automobile Trips, ODOT, by ECO Northwest, June 1992. Evaluation of Employee Trip Reduction Programs Based upon California's Experience with Regulation XV, Institute of Transportation Engineers,Technical Council Committee 6Y-51,January 1994. 5 Nike Parking Lot Expansion Trip Generation Study,City of Wilsonville,by DKS Associates,May 1997. Tigard Transportation System Plan P99161 Transportation Demand Management 10-3 October 30, 2001 DKS Associates STRATEGIES Several strategies were evaluated by the TSP Task Force for transportation demand management in Tigard. These strategies are aimed at providing the City with priorities toward implementing transportation demand management projects that meet the goals and policies of the City. The ranking of the strategies follows from most important to least important: ❑ Focus programs on high demand districts (ie. Downtown Tigard, Tigard Triangle and Washington Square) ❑ Telecommuting/Fiber Optic to all residents and businesses ❑ Require larger employers to meet DEQ's ECO rules ❑ Encourage linkage of housing with retail and employment centers ❑ Mandate TDM though development review(would reinforce regional DEQ requirements) ❑ Limiting Parking(establish maximum parking ratios) ❑ City funded program to provide information regarding commute options to larger employers (possibly via web page and email) ❑ Support regional pricing policies/strategies ❑ Do nothing related to TDM ❑ Provide business association support for TDM coordination RECOMMENDED PLAN State,regional and county policy' all call for encouraging and promoting transportation demand management. The proposed policy of this plan calls for the city to support TDM. Collectively, the implementation of the modal plans in this TSP, along with the TDM plan,will contribute to the regional VMT reduction goal. Unlike bicycles,pedestrians and motor vehicles, implementation of this policy does not necessarily require capital infrastructure. In fact, much more of TDM is policy and management rather than concrete and asphalt. Because of this, the recommended TDM plan for Tigard consists of the following: ❑ Support continued efforts by Washington County,Metro, ODOT,DEQ, Tri-Met and the Westside Transportation Alliance to develop productive TDM measures that reduce VMT and peak hour trips. Focus attention in Washington Square, downtown Tigard and Tigard Triangle. ❑ Encourage the development of high speed communication in all parts of the city(fiber optic, digital cable, DSL,....). The objective would be to allow employers and residents the maximum opportunity to rely upon other systems for conducting business and activities than the transportation system during peak periods. ❑ Encourage development that effectively mix land uses to reduce vehicle trip generation. These plans may include development of linkages (particularly non-auto) that support greater use of alternative modes. Land use density should be higher at commuter rail transit stations (half mile radius) than elsewhere in the community (Tigard Transit Center and Washington Square Station areas). ❑ Mixed land use projects have demonstrated the ability to reduce vehicle trips by capturing internal ' Transportation Planning Rule, Section 660-12-035; Regional Transportation Policy, Metro, July 1996, page 1-39; and Washington County Transportation Plan,October 1988,page 30. Tigard Transportation System Plan P99161 Transportation Demand Management 10-4 October 30, 2001 DKS Associates trips between land use types, encouraging walk/bike trips and producing shorter vehicle trips'. ❑ As vehicle traffic levels increase with the build out of land uses within Tigard, it may become necessary to go beyond the coordination with the regional Employee Commute Options program developed by DEQ. This may include developing localized TDM programs for the city or subareas of the city to address vehicle trip reduction. For example,measures which are appropriate for site planning such as close-in parking for carpools,bicycle parking and convenient transit stops are already part of the Community Development Code (Section 18.765.030(F) calls for close in carpool parking for lots with 20 or more long term spaces and Section 18.360.090 requires pedestrian access to transit). ❑ As a capital oriented element, coordinate with ODOT and Tri-Met on the development of park-and -ride transit station or freeway interchange locations in Tigard(these are locations proven to be successful in attracting carpool/transit use). Figure 7-2 shows the current park and ride locations. Expansion of these sites should focus on transit station or freeway interchange locations. Interchange reconstruction projects should be required to identify potential sites for park-and-ride (even small sites of 50 spaces). Over the next 20 years, a reasonable budget for park-and-ride expansion might be about$100,000 per year(about 50 spaces a year, assuming pre-existing ROW). ' Trip Generation,5th edition, Institute of Transportation Engineers, 1991,Chapter VII,indicates potential for PM peak hour capture of between 27%and 66%. Tigard Transportation System Plan P99161 Transportation Demand Management 10-5 October 30, 2001 DKS Associates Chapter 11 Funding/ GIN OF TIGARD OREGON Implementation This chapter outlines the funding sources that can be used to meet the needs of the transportation system. The costs for the elements of the transportation system plan are outlined and compared to the potential revenue sources. Options are discussed regarding how costs of the plan and revenues can be balanced. Transportation funding is commonly viewed as a user fee system where the users of the system pay for infrastructure through motor vehicle fees (such as gas tax and registration fees) or transit fares. However, a great share of motor vehicle user fees goes to road maintenance, operation and preservation of the system rather than construction of new system capacity. Much of what the public views as new construction is commonly funded (partially or fully) through property tax levies, traffic impact fees and fronting improvements to land development. In Washington County, the Major Streets Transportation Improvement Program(MSTIP) and traffic impact fees (TIF), similar to system development charges(SDC) are key examples. The transportation needs typically out pace dedicated funding sources. The key to balancing needs and funding are user fees. Motor vehicle fees have become a limited source of funding new transportation system capacity due to many factors: • Gas taxes have been applied on a fixed cents per gallon basis not a percentage basis. Increases in the gasoline tax have not kept pace with cost of transportation needs. The Department of Transportation's Bureau of Transportation Statistics data indicates that in real terms the amount of federal gas tax paid by American households has actually declined by 41 percent from 1965 (when Interstate freeway building was at its peak) to 1995. That occurred with the real dollar gas tax increasing from 4 cents to 18.4 cents in the same time frame. • Oregon gas taxes have not increased since 1992 (currently 24 cents per gallon) and registration fees have been at $15 per vehicle per year for over ten years. Significant new roadway construction particularly that attributed to new development, has increased Tigard's inventory of roads and maintenance during this time. Additionally, the demands of region-wide growth have increased the need for capacity improvements in the system. The most current proposal for increased gas tax(Measure 82)is before the voters in May 2000. • Significant improvements in fuel economy over the last 15 years have reduced the relationship of user fees to actual use. For example, a passenger car with 12,000 miles of use in a year at 15 miles per gallon could generate about $350 per year in revenue using current federal, state and county gas tax levels (about 44 cents) compared to less than $200 per year with a 27 miles per Tigard Transportation System Plan P99161 Funding and Implementation 11-1 October 30, 2001 DKS Associates gallon vehicle (a 45 percent reduction). Unfortunately the same vehicle does not use less roadway capacity. • The bill is coming due on many roads built 20 years ago in terms of maintenance. As the inventory of roads increased, the use of the roads increased faster. This is evident from national transportation statistics. The number of passenger cars and miles of urban roadways doubled from 1960 to 1995. However, the number of vehicle miles traveled on those roadways increased 470%. This increased use proportionally increases maintenance needs. Many of these roads are heavily used and the maintenance activities in the urban area have a substantial impact on operation unless work is conducted in off-peak periods, which increases the cost to maintain these roads. To compound matters, the amount of passenger car fuel consumed from 1960 to 1995 has only increased 66%,reducing the rate that revenue comes in from user fees relative to actual use. FUNDING Funding Sources and Opportunities There are several potential funding sources for transportation improvements. Table 11-1 summarizes several funding options available for transportation improvements. These are sources that have been used in the past by agencies in Oregon. In most cases these funding sources when used collectively are sufficient to fund transportation improvements for local communities. Due to the complexity of today's transportation projects, it is necessary to seek several avenues of funding projects. Unique or hybrid funding of projects generally will include these funding sources combined in a new package. Examples of funding sources which generally do not provide funding for roadways include: Property Tax General Funds, Car Rental Tax, Transient Lodging Tax, Business Income Tax, Business License Tax and Communication Services Tax. The federal gas tax is allocated through Intermodal Surface Transportation Efficiency Act (ISTEA). The United States Congress has approved reauthorization of transportation funding (TEA 21) for another six years. Federal transportation funds are primarily distributed in the Portland region by Metro (hence the term"regional funds"). ISTEA/TEA 21 funds are much more flexible than state gas tax funds, with an emphasis on multi-modal projects. ISTEA/TEA 21 funds are allocated through several programs including the National Highway System (NHS), Surface Transportation Program (STP) and Congestion Mitigation and Air Quality (CMAQ) Improvement Programs. NHS funds focus on the interstate highway system and CMAQ funds are targeted for air quality non-attainment areas. Within the Portland region, funding for major transportation projects often is brought to a vote of the public for approval. This is usually for a large project or list of projects. Examples of this public funding includes the Major Streets Transportation Improvement Program (MSTIP) in Washington County, the Westside Light Rail Project and prior transportation bond measures in Tigard. Because of the need to gain public approval for transportation funding, it is important to develop a consensus in the community that supports needed transportation improvements. That is the value of the Transportation System Plan. In most communities where time is taken to build a consensus regarding a transportation plan,funding sources can be developed to meet the needs of the community. Tigard Transportation System Plan P99161 Funding and Implementation 11-2 October 30, 2001 DKS Associates Table 11-1 Potential Transportation Revenue Sources Type Description Traffic Impact Traffic Impact Fees or System Development Charges (SDCs) have been used in Oregon and throughout the Fees (TIF) & United States. The cornerstone to development of TIF/SDCs involves two principles: 1) there must be a System reasonable connection between growth generated by development and the facilities constructed to serve that Development growth (generally determined by level of service or connectivity); and 2) there must be a general system-wide Charges(SDC) connection between the fees collected from the development and the benefits development receives. Charges are typically developed based on a measurement of the demand that new development places on the street system and the capital costs required to meet that demand. Washington County has a traffic impact fee(TIF)which is a voter approved tax. SDCs do not require a vote of the public and are not a tax. Gas Tax The State,cities and counties provide their basic roadway funding through a tax placed on gasoline. State gas tax is approved legislatively while voters approve local gas taxes. State funds are dedicated to roadway construction and maintenance, with one percent allocated to pedestrian and bicycle needs. This tax does not fall under the Measure 5 limits, because it is a pay-as-you-go user tax. Washington County has a one cent gas tax and a recent ballot initiatives to increase this county tax failed. Other Motor The state collects truck weight mile taxes, vehicle registration fees and license fees. These funds are pooled Vehicle Fees together with the gas tax in distributing state motor vehicle fees to local agencies. Annual motor vehicle fee allocations to Washington County highways amount to about $100 million (including gas tax). Washington County considered raising motor vehicle registration by$15 per year in 1997 but it was not approved. Street Utility Certain cities have used street utility fees for maintenance. The fees are typically collected monthly with water or Fees sewer bills. These funds are not for capacity improvements,but for supporting local roadway maintenance based upon land use type and trip generation. This frees other revenue sources for capacity needs. Utility fees can be vulnerable to Measure 5 limitations, unless they include provisions for property owners to reduce or eliminate charges based on actual use. Exactions Frontage improvements are common examples of exaction costs passed to developers. These have been used to build much of Tigard's local street system. Developers of sites adjacent to unimproved roadway frontage are responsible for providing those roadway improvements. Developers of sites adjacent to improvements identified as TIF/SDC projects can be credited the value of their frontage work,which is included in the TIF/SDC project- list cost estimate. Local LIDs provide a means for funding specific improvements that benefit a specific group of property owners. Improvement Assessments are placed against benefiting properties to pay for improvements. LIDs can be matched against other Districts(LID) funds where a project has system wide benefit beyond benefiting the adjacent properties. Similarly, districts can be created for tax increment type financing. In Tigard, legal and public acceptance issues with LIDs have made them less effective and expense to administer. Special A variety of special assessments are available in Oregon to defray costs of sidewalks,curbs,gutters,street lighting, Assessments parking and CBD or commercial zone transportation improvements. These assessments would likely fall within the Measure 50 limitations. In Washington County,other examples of transportation assessments include MSTIP (Major Streets Transportation Improvement Program) and the urban road maintenance district property tax levy. Both of these are property tax assessments which have been imposed through votes of the public. A regional example would be the Westside LRT where the local share of funding was voter approved as an addition to property tax. Tigard is forwarding a transportation bond measure to the voters in 2000. Driveway Fees Gresham collects a Public Street Charge and a Driveway Approach Permit Fee. These fees are project specific and revenue varies year to year based upon development permits. These funds are used for city maintenance and operation. Employment Tri-Met collects a tax for transit operations in the Portland region through payroll and self employment taxes. Taxes Approximately$120 million are collected annually in the Portland region for transit. Oregon Special The Special Public Works Fund (SPWF) Program was created by the legislature in 1985 as an economic Public Works development element of the Oregon Lottery. The program provides grants and loan assistance to eligible Fund municipalities. There has been limited use of these funds on urban arterials. These funds are commonly used on state highways (a recent Portland area example being Immediate Opportunity Funds used for the US 26/Shute interchange associated with Nike). Tigard Transportation System Plan P99161 Funding and Implementation 11-3 October 30, 2001 DKS Associates Traffic impact fees (TIF) are used to off set the cost of growth related capacity needs within the transportation system. Washington County oversees administration of the TIF program coundtywide, but each city assesses, collects and spends TIF funds for their own jurisdiction. The fee is updated periodically to adjust for inflation. System development charges (SDCs) are similar to TIF, except TIF require a vote of the public for implementation where SDCs do not. Both SDCs and TIFs rely upon a strong nexus between the impact of growth on the transportation system and the cost for transportation capacity improvements to serve land use growth. For example, maintenance costs or upgrading design without adding capacity are elements that would not be included in a TIF or SDC. SDC can also be placed over districts to address growth related impacts. In Wilsonville, the city has imposed an interchange SDC to provide local matching funds to ODOT for the widening of the I- 5/Wilsonville Road interchange. New development pays a SDC for each trip they add to the I- 5/Wilsonville Road interchange area in the PM peak hour. Table 11-2 provides a comparison of SDC/TIF rates in the Portland region. Table 11-2 Sample TIF in the Region Residential Non-Residential Cost per Dwelling Cost per 1,000 Square Feet Unit Land Use Single Multi- Light Indust Office* Medical Retail* Fast Family Family Office Food ITE Code 210 220 1 110 710 720 820 834 Lake Oswego $ 3,592 $ 2,573 $ 3,820 $ 6,383 $ 13,221 $ 4,002 $ 61,052 Vancouver $ 989 $ 672 $ 313 $ 710 $ 1,844 Traffic Std $ 4,071 Gresham $ 1,202 $ 750 $ 1,166 $ 2,225 $ 4,855 $ 3,641 $ 17,386 Troutdale $ 588 $ 285 $ 570 $ 1,088 $ 2,375 $ 3,393 $ 24,642 Wilsonville $ 2,256 $ 1,573 $ 2,547 $ 3,700 $ 3,700 $ 4,755 $ 14,265 Washougal $ 775 $ 445 $ 752 $ 1,159 $ 3,132 Clark County: Mt. Vista $ 2,638 $ 1,787 $ 1,807 $ 3,169 $ 7,415 $ 3,3591 $ 32,062 Clark County: Orchards $ 1,161 $ 786 $ 795 $ 1,394 $ 3,262 $ 1,478 $ 14,107 Washington County $ 1,790 $ 1,181 $ 1,199 $ 2,034 $ 5,604 $ 2,998 $ 4,500 Clackamas County $ 1,277 $ 884 $ 985 $ 1,557 $ 5,108 $ 2,874 $ 12,895 Battleground $ 2,869 $ 1,988 $ 1,955 $ 3,169 $ 8,489 $ 3,894 $ 27,226 Ridgefield $ 1,9131 $ 1,099 $ 1,858 $ 4,243 $ 7,728 $ 11,042 $ 80,192 Camas proposed $ 1,416 $ 921 $ 1,348 $ 2,626 $ 4,592 $ 2,708 $ 21,636 West Linn $ 2,170 $ 1,470 $ - 1 $ 2,961 $ - I $ 8,349 $ - Note:Assumes a 100,000 sf office and a 150,000 sf retail center. Tigard Transportation System Plan P99161 Funding and Implementation 11-4 October 30, 2001 DKS Associates COSTS Cost estimates (general order of magnitude) were developed for the projects identified in the motor vehicle, bicycle and pedestrian elements. Costs estimates from the RTP or MSTIP projects in Tigard were used in this study. Other projects were estimated using general unit costs for transportation improvements, but do not reflect the unique project costs that can (on some projects due to right-of- way, environmental mitigation and/or utilities) significantly add to project cost (25 to 75 percent in some cases, due to environmental, utility or right-of-way issues). Development of more detailed project costs can be prepared in the future with project development. Since many of the projects are multi-modal, the costs were developed at a project level incorporating all modes, as appropriate. It may be desirable to break project mode elements out separately, however, in most cases, there are greater cost efficiencies of undertaking a combined, overall project. Each of these project costs will need further refinement to detail right-of-way requirements and costs associated with special design details as projects are pursued. Table 11-3 summarizes the elements of the plan that were not project specific and how costs will be addressed for these elements. It should be noted that all costs are 2000 based. Using the Engineering News Record' research on historical construction costs, it can be anticipated that (based on the past ten years) construction costs will increase 2.5 percent per year. Since 1980, construction costs have increased 196 percent over 20 years. Tables 11-4, 11-5, 11-6 and 11-7 summarize the key projects in the TSP by three key groups including: • Bicycle Improvements • Pedestrian Improvements • Motor Vehicle Improvements Many of the project costs have been developed by Washington County, Metro or ODOT for projects in the RTP. These project costs have been utilized for the purposes of this TSP. ' Engineering News Record,construction cost index data,enr.com. Tigard Transportation System Plan P99161 Funding and Implementation 11-5 October 30, 2001 DKS Associates Table 11-3 Issues With Non-Auto, Pedestrian and Bicycle Costs Mode Issues Parking The TSP does not define specific projects. Off-street parking will be provided by private property owners as land develops. Neighborhood Traffic Management Specific NTM projects are not defined. Traffic humps can cost $2,000 to $4,000 each and traffic circles can cost $3,000 to $8,000 each. A speed trailer can cost about $10,000. Based upon this continuing the existing City program of about $50,000 per year meet future needs. Public Transportation Tri-Met will continue to develop costs for implementing transit related improvements. The City can supplement this by incorporating transit features through development exactions and roadway project design. Developing new transit services in Tigard similar to the corridor services outlined in the TSP will require Tri-Met to reallocate funding or seek additional sources of operating funds. Commuter Rail Washington County is currently in the environmental phase of this project that may cost between $60 and $80 million. The City should work with Washington County and Yamhill County to encourage the development of a western commuter rail line to Yamhill County and points west. Trucks/Freight Roadway funding will address these needs. Roadway overcrossings of railroads can use special Public Utilities Commission funds set aside for safety improvements to railroad crossings. Rail Costs to be addressed and funded by private railroad companies and the state. Air,Water,Pipeline Not required by City. Transportation Demand Management DEQ has established regional guidelines. Private business will need to support employee trip reduction programs. In the future, the city may need to support a supplemental program that may have a cost range of $25,000 to $50,000 per year. Tigard Transportation System Plan P99161 Funding and Implementation 11-6 October 30, 2001 DKS Associates Table 11-4 Pedestrian Action Plan Project List Rank* Project From To Cost H North Dakota Street 121x`Avenue Greenburg Road $230,000 H McDonald Street ORE 99W Hall Boulevard $200,000 H Tiedeman Avenue Walnut Street Greenburg Road $350,000 H Oak Street(RTP 6019) Hall Boulevard 80 Avenue $500,000 H ORE 99W McDonald Street South City Limits $500,000 M Bull Mountain Road ORE 99W Beef Bend Road $1,200,000 M Roshak Road Bull Mountain Road Scholls Ferry Road $300,000 M 121x`Avenue Gaarde Street North Dakota Street $450,000 M Hunziker Street Hall Boulevard 72 Avenue $250,000 M Washington Square Pedestrian Improvements(RTP 6022) $6,000,000 Regional Center L Taylor's Ferry Rd Washington Drive 62" Avenue $1,000,000 L Washington Drive Hall Boulevard Taylor's Ferry Road $200,000 Subtotal $11,800,000 Sidewalks to be built with Street Improvements H Bonita Road West of 72 d Avenue 72 Avenue $50,000 H Walnut Street 135` Avenue Tiedeman Avenue $570,000 H Gaarde Street Walnut Street ORE 99W $620,000 H Hall Boulevard Scholls Ferry Road Pfaffle Street $1,000,000 H Dartmouth Street 72nd 68th Avenue $120,000 H Tigard Street 115th Street Main Street $350,000 H Burnham Street Main Street Hall Boulevard $100,000 H Former Street walnut Street 121st Avenue $250,000 H Commercial Street Main Street Lincoln Street $50,000 M 72 Avenue ORE 99W Bonita Road $1,200,000 M Hall Boulevard North of Hunziker Street South City Limits $670,000 M Beef Bend Road ORE 99W Scholls Ferry Road $1,000,000 M Barrows Road Scholls Ferry Road(W) Scholls Ferry Road(E) $950,000 L 72 Avenue Carman/Upper BoonesFry. Durham Road $250,000 Subtotal $7,180,000 Annual Sidewalk Program at$50,000 per year for 20 years $1,000,000 Action Plan Total $19,360,000 Tigard Transportation System Plan P99161 Funding and Implementation 11-7 October 30, 2001 DKS Associates Table 11-5 Bicycle Action Plan Improvement List and Cost RANK* Project From To Cost H Hunziker Street Hall Boulevard 72° Avenue $250,000 H Bonita Road 72° Avenue West of 72° Ave. $50,000 H Burnham Street Main Street Hall Boulevard $135,000 H Oak Street(RTP 6019) Hall Boulevard 90t Avenue $300,000 H 98"Avenue Murdock Stret Durham Road $275,000 H 92° Avenue Durham Road Cook Park $270,000 H Tiedeman Avenue Greenburg Road Walnut Street $250,000 M 121st Avenue Walnut Street Gaarde Street $400,000 L Taylor's Ferry Road Washington Drive City Limits $500,000 L Washington Drive Hall Boulevard Taylor's Ferry Rd $100,000 L O'Mara Street McDonald Street Hall Boulevard $275,000 L Frewing Street ORE 99W O'Mara Street $150,000 Subtotal $2,955,000 H Gaarde Street Walnut Street ORE 99W $600,000 H Hall Boulevard Scholls Ferry Road Locust Street $500,000 H Greenburg Road Hall Boulevard Cascade Avenue $300,000 H ORE 99W East City Limits South City Limits $1,300,000 M 72° Avenue ORE 99W South City Limits $960,000 M Hall Boulevard Pfaffle Street Bonita Road $550,000 M Carman Drive 1-5 Durham Road $200,000 M Walnut Street ORE 99W Barrows Road $1,400,000 M Barrows Road Scholls Ferry Road(W) Scholls Ferry Rd. (E) $900,000 L Bull Mountain Road 1501 Avenue Beef Bend Road $550,000 L Beef Bend Road ORE 99W Scholls FerryRd. $1,600,000 Subtotal $8,860,000 Multi- Use Pathways H Hunziker Link to LO Linkage to Kruse Way Trail in Lake Oswego $500,000 M Fanno Creek Trail Tualatin River to City Hall, ORE 99W to Tigard $3,600,000 M Tualatin River Trail Adjacent to Cook Park from Powerlines to Fanno $2,600,000 M Tualatin River Crossing Near 1081 Avenue $3,000,000 L Powerlines Corridor From Beaverton to Tualatin River Trail $2,500,000 Subtotal $12,200,000 Action Plan Total $24,015,000 *H=High,M=Medium,L=Low Priority Tigard Transportation System Plan P99161 Funding and Implementation 11-8 October 30, 2001 DKS Associates Table 11-6 Future Street Improvements (All Projects include sidewalks,bicycle lanes and transit accommodations as required) Table Location Description Cost Estimate Funding Status*Widen to 4 plus auxiliary lanes (each direction) $200,000,000 Not Funded between ORE 217 and I-205 Not in any plan Provide additional throughput capacity (each $50,000,000 direction) south to Wilsonville ORE 217 Widen to 3 lanes plus auxiliary lanes (each direction) $240,000,000 Not Funded between US 26 and 72nd Avenue In RTP (as widening or HOV or HOT) New ORE 217/1-5 interchange between 72nd Avenue Phase 1 Funded and Bangy Road Phase 2 $39,000,000 Phase 2 &3 in RTP Phase 3 $15,000,000 RTP 6027 &6028 ORE 99W Widen to 7 lanes (total—both directions) between 1- $25,000,000 RTP 6039 5 and Greenburg Road 1-5 to ORE 99W Connector linking 1-5 and ORE 99W (model assumed $250,000,000 RTP 6005 connector would be located north of Sherwood— (Toll Route) specific location to be determined by further study) Overcrossings over ORE 5 lane overcrossings linking Washington Square and $40,000,000 RTP 6011 &6052 217 Cascade Avenue—one north of Scholls Ferry Road, one south of Scholls Ferry Road to Nimbus Connector Road Nimbus south to Greenburg $15,000,000 RTP 6053 Overcrossing of 1-5 Widen Carman Drive interchange overcrossing to six $4,000,000 Not Funded lanes from four (two through lanes each way, side by In no Plans side left turn lanes). Scholls Ferry Road Widen to 7 lanes (total—both directions) between $30,000,000 To 1251 –RTP 6021 ORE 217 and Barrows Road(East) West of 125th not funded TSM/Corridor Signal Timing/ITS $500,000 RTP 6025 Greenburg Road Widen to 4 lanes adjacent to cemetery (Hall to $2,500,000 RTP 6015 Locust) Widen to 5 lanes: Locust to Shady Lane $2,500,000 RTP 6014 Shady Lane to North Dakota $2,000,000 RTP 6016 Tiedeman to ORE 99W $4,800,000 RTP 6031 Walnut Boulevard Widen to 3 lanes between 1351 (or where Gaarde $11,800,000 RTP 6033 &6034 connects)to ORE 99W Extend Walnut east of ORE 99W to meet Not Funded Ash/Scoffins and Hunziker Streets (3 lanes) $19,000,000 In no plans Tigard Transportation System Plan P99161 Funding and Implementation 11-9 October 30, 2001 DKS Associates Table 11-6Location Description Gaarde Street Extend and widen to 3 lanes Walnut to ORE 99W $4,000,000 RTP 6035 Use access control and 2 lanes in sensitive areas Hall Boulevard Widen to 5 lanes Scholls Ferry to Locust $4,700,000 RTP 6013 Widen Hall south of Locust $4,700,000 RTP 6030 Extend south to Tualatin (3 lanes—total, both $25,000,000 RTP 6069 directions) Durham Road Widen to 5 lanes (total,both directions)between Hall $8,000,000 RTP 6037 Boulevard and Upper Boones Ferry Road. Reserve right-of-way to the west for 5 lanes Durham Road/Upper Realign intersection so that Durham Road continues $5,000,000 RTP 6043 Boones Ferry Road on continous route to I-5/Carmen interchange— intersection Upper Boones Ferry Road would "tee" into Durham Road/Upper Boones Ferry Road intersection 72n Avenue Widen to 5 lanes: Tigard Triangle LID ORE 99W to Hunziker $3,000,000 RTP 6040 Hunziker to Bonita $5,000,000 RTP 6041 Bonita to Durham $5,000,000 RTP 6042 Hunziker/Hampton Realign Hunziker Road to meet Hampton Road at $10,000,000 RTP 6032 72nd Avenue—requires overcrossing over ORE 217— removes existing 72nd Avenue/Hunziker intersection Atlanta Street Extend Atlanta Street west to meet 72n Avenue $2,500,000 To be funded with development in Tigard Triangle (i.e. LID) Dartmouth Street Widen to five lanes from ORE 99W to 1-5 $750,000 RTP 6045 To be funded by fronting improvements 68t Avenue Widen to 3-lanes between Dartmouth/1-5 Ramps and $3,600,000 Not Funded(could be ORE 217 partially funded by development in Tigard Extend 68th Avenue south to meet ORE 217 Triangle—ie. LID) providing right-in/right-out only access to 68th Avenue from ORE 217, replacing the NB ramps to $15,000,000 RTP 6047 72nd at ORE 217 Scoffins/Hunziker/Hall Realign Scoffins to meet Hunziker at Hall $1,000,000 Not Funded intersection Beef Bend Road 131st to King Arthur–3 lanes $5,000,000 RTP 6059 Access Control should be implemented to preserve capacity with 2 lanes (with intersection turn lanes). $500,000 Not Funded Minimum 1,000 foot spacing should be used between Implemented with any driveway(s) and/or public street(s) adjacent development Beef Bend/Elsner from ORE 99W to Scholls Ferry $24,000,000 RTP 6111 Rd Tigard Transportation System Plan P99161 Funding and Implementation 11-10 October 30, 2001 DKS Associates Table 11-6Location Description Taylors Ferry Road Extend to Oleson Road $1,900,000 RTP 6017 Wall Street New roadway connecting Hunziker Street and Hall $10,000,000 Not Funded Boulevard ORE 99W Traffic Signal Signal interconnection from 1-5 to Durham $2,000,000 RTP 6054 &6055 System/Management TOTALI $1, 091,750,000 *-RTP cost estimates and project numbers utilized where available Table 11-7 City of Tigard Future Intersection Improvements DescriptionTable 11-7 No. Intersection 1 Davies/Scholls Ferry Road • Traffic signal • Northbound right turn lane $3,230,000 • Realign to meet Barrows Road 2 North Dakota/125 /Scholls Ferry• Southbound right turn lane Road • Retain westbound right turn lane when 3rd lane added on Scholls Ferry Road $450,000 • Change from protected left turn phasing to permitted phasing north/south 3 Nimbus/Scholls Ferry Road • Retain eastbound right turn lane when 3rd lane added on Scholls Ferry Road • Retain westbound right turn lane when 3rd lane added on Scholls Ferry Road $1,150,000 • Southbound right turn lane • Reconfigure northbound and southbound lanes to create exclusive left turn lanes • Change from split phasing to protected left turn phasing north/south 4 121x`/Walnut • Traffic signal RTP 6033 • Northbound left turn lane • Southbound left turn lane $2,150,000 • Eastbound left turn lane • Westbound left turn lane 5 12 1"/North Dakota • Traffic signal $150,000 6 Greenburg/Oleson/Hall • 2nd northbound left turn lane • Extend signal cycle length $550,000 • Assumes Hall widened to 5 lanes 7 Greenburg/Washington Square • Boulevard Treatment Road • RTP 6015 $2,500,000 8 Main/Greenburg/ORE 99W • Southbound left turn lane • Retain westbound right turn lane when $700,000 ORE 99W widened to 7 lanes 9 Greenburg/Tiedeman • Extend signal cycle length • Improved geometry/alignment $2,050,000 10 Hall/Oak • Extend signal cycle length Tigard Transportation System Plan P99161 Funding and Implementation 11-11 October 30, 2001 DKS Associates DescriptionTable 11-7 No. Intersection • Assumes Hall widened to 5 lanes $50,000 11 Hall/ORE 99W • Southbound right turn lane RTP 6056 • Northbound left turn lane • Westbound right turn overlap $3,700,000 • Retain westbound right turn lane when ORE 99W widened to 7 lanes 12 ORE 217 NB Ramps/ORE 99W • Retain eastbound right turn lane when $900,000 ORE 99W widened to 7 lanes • Retain westbound right turn lane when ORE 99W widened to 7 lanes • 2nd northbound left turn lane 13 ORE 217 SB Ramps/ORE 99W • 2nd southbound right turn lane $400,000 • Retain eastbound right turn lane when ORE 99W widened to 7 lanes 14 Dartmouth/ORE 99W • Retain eastbound right turn lane when $200,000 ORE 99W widened to 7 lanes 15 727/ORE 99W • Southbound right turn lane • Northbound right turn overlap • Change to protected left turn phasing north/south $500,000 • Retain eastbound right turn lane when ORE 99W widened to 7 lanes 16 68 /ORE 99W • 2nd westbound left turn lane • Northbound left turn lane • Southbound left turn lane $1,550,000 • Change to protected left turn phasing north/south 17 72n/Dartmouth • Traffic signal • Assumes 72nd Avenue and Dartmouth $150,000 widened to 5 lanes 18 68th/Atlanta/Haines • Traffic signal $150,000 19 ORE 217 SB Ramps/72d • Assumes 72nd Avenue widened to 5 Roadway Widening lanes 20 72n/Bonita • 72nd Avenue widened to 5 lanes Roadway Widening 21 T277/Carmen • 2nd northbound right turn lane $200,000 22 72n/Upper Boones Ferry Road • Assumes Durham/Upper Boones $1,000,000 Ferry/72nd widened to 5 lanes (Also see Table 11-6a) 23 Hall/Sattler/Ross • Traffic signal • Northbound left turn lane $1,150,000 • Southbound left turn lane 24 Hall/Durham • 2nd southbound left turn lane • Widen west of intersection to introduce $1,220,000 5-lane section on Durham (include existing westbound right turn lane) 25 ORE 99W/McDonald/Gaarde • Westbound right turn lane $700,000 Tigard Transportation System Plan P99161 Funding and Implementation 11-12 October 30, 2001 DKS Associates DescriptionTable 11-7 No. Intersection • 2nd Northbound left turn lane 26 ORE 99W/Beef Bend • Southbound right turn lane (on ORE $250,000 99W) • Adjust cycle length 27 Tiedeman/Walnut • Completed 28 Murray/Scholls Ferry Road • 2nd westbound right turn lane • Add additional southbound lane to achieve 2 southbound left turn lanes and two southbound through lanes $800,000 • Extend signal cycle length • Changes to protected left turn phasing north/south and east/west 29 Beef Bend/Scholls Ferry Road • Eastbound right turn lane • Northbound left turn lane • Eastbound right turn overlap $850,000 • Change to protected phasing east/west • Change to split phasing north/south 30 Walnut/ORE 99W • Retain westbound right turn lane when $250,000 ORE 99W is widened to 7 lanes • Change to protected left turn phasing on Walnut 31 72"/Hampton/Hunziker • Southbound right turn lane OR eastbound right turn lane $300,000 • Change to protected left turn phasing all directions 32 Durham/Upper Boones Ferry Road • Reconfigure intersection to make $1,000,000 through route between Durham and I- (Also see Table I I-6a) 5/Carmen interchange 33 Gaarde/Walnut • Traffic signal $350,000 • Eastbound right turn lane 34 68`/Dartmouth • Traffic signal $150,000 35 Carman/I-5 southbound • Eastbound right turn lane $200,000 36 Carman/1-5 northbound • 2nd westbound through lane • 2nd northbound left turn lane $500,000 • Eastbound separate through and left turn (2)lanes Safety Enhancements Several Intersections $20,000,000 Pedestrian Crossings Several Locations $8,000,000 Total Intersection Improvements $57,450,000 *-Based upon tentative draft RTP preferred improvement list from Metro,reference numbers from November 1998 listing. Planned indicates projects included in the MSTIP, STIP,CIP or approved(1995)RTP funding programs. Not in Plans indicates projects that have not be previously addressed in one of the local or regional transportation improvement plans. Tigard Transportation System Plan P99161 Funding and Implementation 11-13 October 30, 2001 DKS Associates FINANCING ISSUES The collective funding requirements of the Tigard TSP is outlined by mode in Table 11-8. Based upon current sources of funding, the cost of the needs far exceeds the existing funding projected over the next 20 years. It should be noted that elements of the bicycle and pedestrian project lists that are redundant to the street improvement list were deducted to avoid double counting. A small portion of this difference can be made up by land use development exactions, where unimproved frontage is built to the TSP standards as projects are implemented. A rough estimate of the potential value of fronting development exactions is about $50 million dollars over 20 years, assuming that all the unimproved frontages of roadway projects (sidewalk plus 18 feet of street) identified in this plan were exactions. This would assume that the fronting improvements would not be credited to TIF/SDC revenue that is already included in the existing funding outlook. The magnitude of the fronting improvements is such that the City and County will need to develop private/public partnerships to assure the reasonable delivery of future improvements in a timely manner. Table 11-8 Costs for Tigard Transportation Plan over 20 years(2000 Dollars) Transportation Element Approximate Cost Street Improvement Projects*: Current Plans (RTP) $529,350,000 Unfunded/Not in Plans $619,850,000 Signal Coordination/ITS Systems ($100,000/yr) $2,000,000 Road Maintenance (assumes 4%per year growth) $46,000,000 Bicycle Master Plan(Total$24,015,000) $15,155,000 Pedestrian Action Plan(Total$19,436,000) $12,480,000 Pedestrian/School Safety Program($10,000/yr) $250,000 Sidewalk Grant Program($50,000/yr) $1,000,000 Park-and-ride Expansion(1,000 spaces) $2,000,000 Commuter Rail(Beaverton-Wilsonville) $71,500,000 Neighborhood Traffic Management($50,000/yr) $1,000,000 TSP Support Documents (i.e., Design standard update, $1,000,000 TDM Support($25,000/yr) $500,000 TWENTY YEAR TOTAL in 2000 Dollars $1,302,085,000 * Many of these projects include multi-modal elements built with streets, such as bike lanes and sidewalks. Project costs are included here and not repeated in bicycle and pedestrian costs. While projects in the RTP do not have committed funds,they represent a level of funding that is considered likely over the next 20 years given current funding sources. Of this total,ten projects on I-5, ORE 217,1-5/ORF- 99W connector and ORE 99W (state facilities) represent about$900,000,000 of the total. The remaining projects in Tigard represent about $400,000,000. Tigard Transportation System Plan P99161 Funding and Implementation 11-14 October 30, 2001 DKS Associates The funding sources,which can be used for various modes of transportation are summarized in Table 11-9. Historically, funding sources have been developed to support roadways for automobiles. Few funding sources have been allocated to other travel modes. Other travel modes were commonly implemented as an element of a roadway project, if funded at all. A few funding sources that the City receives for other modes include an allocation of the state motor vehicle fees which come to the City being dedicated to pedestrian/bicycle paths (about$24,000 per year) and a small set aside of the MSTIP funds for bikeways (about$20,000 per year). While federal gas tax funds are specifically allocated to multi-modal and balanced investments in transportation, other sources of funds such as state gas tax cannot be used for anything but highway use. To address these other modes the City will need to specifically seek funds for a balanced transportation system,while managing the overall needs and revenues. Table 11-9 Fund Source by Project Type Source Bicycle Pedestrian Streets Maintenance Transit Traffic Impact Fee(TIF) • • ✓ System Development Charges(SDC) Gas Tax/Motor Vehicle Fees STATE • • ✓ ✓ FEDERAL ✓ ✓ ✓ ✓ ✓ Street Utility Fees ✓ Exaction's • ✓ ✓ Local Improvement Districts(LID) • • ✓ Tax Increment Financing ✓ ✓ ✓ Special Assessments • ✓ ✓ ✓ Driveway Fees ✓ ✓ Payroll Employee Tax ✓ Oregon Special Public Works Fund • IL • Iry IL I ✓ • Typically as part of roadway project where other modes are incorporated ✓ Used as a primary source of funding Tigard Transportation System Plan P99161 Funding and Implementation 11-15 October 30, 2001 DKS Associates Current transportation revenue for the City of Tigard is summarized in Table 11-10. Presuming a constant funding level for 20 years, this would potentially fund about $250,000,000 of transportation projects (maintenance, operation, construction). As a comparison to this number, the amount of regional funding allocated to transportation projects in Tigard was calculated using the RTP constrained funding scenario. Approximately $150 million of transportation projects have been identified in the current funding programs.' While these numbers are not exactly the same (the numbers from Table 11-10 include all City and local funding sources), they clearly point out that there is a serious shortfall between the cost of the transportation plan and the current funding sources. The transportation plan costs of$1.3 billion are much greater than the best case revenue scenario of about $250 million using existing funding sources. While fronting improvements and exactions have the potential to be roughly $120 million in the best scenario, this leaves a billion dollar gap between needs and reasonably expected revenue. Table 11-10 Estimation of Available Transportation Funding From Existing Sources 2000 Dollars (approximate) Source Approximate Annual Revenue State Motor Vehicle Fees to City $1,500,000 County Gas Tax to City $100,000 TIF to City $1,200,000 MSTIP with City(approximate) $2,000,000 State/Federal Fees use in City $5,000,000 (approximate,assuming 30%capital allocation) ANNUAL TOTAL $9,800,000 20 YEAR Tigard Transportation Bond Potentail $50,000,000 20 YEARS OF CURRENT FUNDING $250,000,000 Exploring Funding Concepts The gap between transportation plan costs and existing revenue sources creates the need to explore several other concepts. Several options are outlined below: A. Reduce the transportation plan costs. This can eliminate funding shortfalls by deferring or eliminating projects. While some cost reduction is expected in the normal implementation of transportation projects of this size, to meet the total funding shortfall by this strategy would have negative impacts. Lower service levels for all modes of transportation, more extensive congestion, and impacts on community livability would be expected. Depending how much of the plan is eliminated (assuming land use forecasts occur), this strategy could negatively impact the economic potential of Tigard (businesses relocate, people move out and development does not reach modified 2015 forecasts). Additionally, by deferring capital costs of significant projects outside of 20 years it can be expected that the same projects will cost multiples of their estimated costs in the short term. This is similar to deferring roadway maintenance and paying 4 to 5 times the cost of the same improvement by waiting years into the future to act. Rising land costs and the development of vacant land adjacent to roadways, which increases mitigation requirements (dealing with hundreds of residents rather than one 'Interim Federal Regional Transportation Plan,Metro,July 1995,Table 7-2. Tigard Transportation System Plan P99161 Funding and Implementation 11-16 October 30, 2001 DKS Associates landowner). Additionally changing water quality/detention needs with Salmon legislation result in higher project costs with time. These increases in cost erode transportation dollars, making deferral of transportation system improvements an unwise choice in managing the public interest. B. Build alternative mode projects and eliminate costly road projects. This strategy is commonly discussed by people as a way to "get people out of their cars". However, the overall future need for transportation in Tigard results from the majority of people using motor vehicles (single occupant vehicles and carpool/vanpools). By not building road projects, the resulting congestion would severely impact bus transit, bicycle and pedestrian travel which all use the same streets as automobiles. The forecast increase in PM peak hour vehicle use in Tigard(about 7,000 to 15,000 additional vehicle trips in 20 years is 5 to 7 times the total existing Tri-Met bus ridership in Tigard. While transit will play a significant role in reducing motor vehicle trips, it is unlikely it could eliminate the need for the majority of roadway projects. C. Increase gas tax to meet TSP needs. The gas tax, although assumed to be the major transportation funding element is one of many sources of funds. It is primarily used to maintain the transportation system not build new local street system capacity. Presently, the state gas tax generates about $2.5 million per year in revenue for the city and the county one cent gas tax generates about$100,000 per year for the city. If all the motor vehicle fees of the state, county and city were increased proportionately to by themselves fund the Tigard transportation (less ODOT projects) shortfall, it would require an increase of over $0.40 per gallon of gasoline in Tigard. Major increases to motor vehicle fees of this type would likely require voter approval. This amount of gas tax increase by itself would not be reasonable today, and points to the fact that funding will need to be from a variety of sources, not just one fee. D. Make development pay for all the difference in future transportation needs since they are caused by growth. If all the excess funds for Tigard improvements (less ODOT projects) were divided by the increment of trips between 1997 and the year 2015 and Tigard was responsible for the total cost of improvements it would require $8,000 per evening peak trip would need to be charged to all development on top of all existing fees, taxes and exactions. This would double the current TIF by just adding on Tigard's needs. An increase of this type would impact the economic development potential of Tigard since other cities (or states) may not have similar charges. Additionally, many of the transportation projects identified in the TSP serve existing and future users. For example, a roadway connection project with sidewalks and bicycle lanes (such as Walnut Street) is beneficial to all system users. This approach would unfairly impose the entire responsibility of TSP implementation on development. Additionally, some improvements are needed even if no growth were to occur, creating a need to fund at least some transportation improvements by other means. E. Do not allow land development unless all transportation needs can be funded. This concept is known as concurrency. This has been implemented in various forms through level of service code amendments required by state laws (Florida and Washington). The examples over the last 15 years of these policies is clear. Funding policy redirects itself to fix capacity problems. Transit, pedestrian, bicycle and other mode facilities are generally not based on capacity but connectivity and access. The outcome in these communities is always larger Tigard Transportation System Plan P99161 Funding and Implementation 11-17 October 30, 2001 DKS Associates roads - from Clark County, Washington to Contra Costa County, California to Boward County, Florida. A balanced transportation system is difficult to develop under concurrency assumptions. Outright development moratoria based upon transportation are difficult to impose given Oregon Planning and property rights laws. Creating extraordinary requirements for development would impact economic vitality and likely move the problem rather than fix it. ODOT has taken positions recently that have opposed rezoning of land if state facilities do not have adequate capacity and funding is not programmed. This is similar to concurrency. It blends assumptions that Comprehensive Plan land uses could be adequately served and that all new/additional vehicle trips are bad for the transportation system. Again, the linkage of concurrency in any form, no matter how simple or appealing, does not produce the most effective or efficient transportation system. This approach defers improvements increasing their eventual cost of implementation. It is a reactive policy, not a progressive plan to reduce overall transportation system costs. F. Use bonds to fund transportation needs. Bonds are commonly used for financing transportation projects (the Westside LRT project property tax levy uses tax receipts to fund bond payments to fund the project). The use of public bonds would require a vote of the public. This type of program would include a list of transportation projects that would be funded and a general time frame for completion. Based upon an estimate of property value in Tigard, the funding gap would require an increase in property tax approximately $500 per year over 20 years for a homeowner of a $200,000 home. If all the transportation improvement in the Tigard area were pass on via bonds to Tigard property owners it would represent over$2,000 per year to a $200,000 home. Because increases to property tax are not generally viewed positively by the public, an extensive public involvement effort would be necessary to coordinate the understanding of need, the extent that the bonds should fund transportation needs and what the actual program elements would include. In studying various strategies, it is clear a "one size fits all"plan will not succeed. It is recommended that a diversified and pragmatic strategy be developed that reflects political realities, economic needs, community livability and a balanced transportation system. Since transportation funding is not controlled locally, it will require steps to be taken at the state, regional, county and city level to be effective and fair. The following steps are necessary to implement the Tigard TSP. • Prioritize all transportation projects in Tigard so that the Regional Transportation Plan includes the projects of greatest need. The other projects should be included in preferred and strategic project lists to be eligible to compete for future regional funding. Additionally, as conditions change in the future the need for certain projects may change. • Use the priority listing to create City of Tigard transportation bond measures — this would have the potential to fund $50 to $100 million over 20 years. The current bond measure would be part of this implementation step. • Start with funding the highest priority TSP needs on the anticipation that over the next 20 years, new and complementary funding programs will be developed. This is more pragmatic than presuming all projects must have funding commitments today and accommodates changing needs and priorities over time. It is important not to stop everything today until a plan to fully fund all the transportation needs approved. Over time policies and programs in the plan which are intended to reduce vehicle demand can mature and new technologies that improve transportation Tigard Transportation System Plan P99161 Funding and Implementation 11-18 October 30, 2001 DKS Associates efficiency can evolve that may change how much or when funding becomes needed. • Given the relative size of a gas tax increase to fund transportation improvements in Tigard, a more diverse source of state and regional funding will be needed. Assuming that funding shortfalls can best be paid by gas tax statewide ignores the fact that the rest of the state may not share Tigard's or the Portland region's need to fund transportation. Three steps can be taken including: Statewide: Support gradual and incremental increases to the state gas tax are made (about $0.06 to $0.10 per gallon each six to eight years (assumes three increases in 20 years). Support statewide collection and proportional increases to truck fees (presently weight- mile tax and diesel tax in other states). Regionally: Support increases to motor vehicle registration and air quality surcharges (payable every two years at DEQ inspection or upon sale of vehicle based upon actual miles driven). These relate the urban needs and problems. However, if air quality improves the nexus of higher fees may be difficult. County: Update the TIF to better reflect arterial and collector needs in the county. Credits and fronting improvements will need to be reevaluated, particularly with more and more potential for redevelopment. It can almost be assured that TIF's would need to be increased given the county wide transportation needs. In addition, a program similar to the MSTIP where a property tax levy is used to fund the most significant projects in Tigard (or regionally, as in Washington County) could be done over the next 20 years, potentially funding up to a quarter to a half of the funding shortfall. Additionally, county gas tax and vehicle registration fees could be increased or created. • Maximize the use of funding sources from smaller pedestrian and bicycle projects. Over a twenty year period the following funding sources could generate a few million dollars which is significant for those modes of travel: 1. Obtain planning assistance money from the Transportation/Growth Management Program. This could include project grants or planning assistance through "Quick Response"teams. The TGM program is administered by ODOT/DLCD. 2. ODOT's Bicycle and Pedestrian Program administers two grant programs to assist in the development of walking and bicycling options. Local grants up to $100,000 are shared 80% state/20% local can be useful in filling gaps. 3. The Oregon Livability Initiative could be a source of funds for further commuter rail planning to Yamhill County. 4. TEA-21 Congestion Mitigation Air Quality Improvement Program is a source of funds administered by Metro that provides a regional source of money for smaller pedestrian/bicycle projects. • At a city level, consider needed city code/charter changes to allow broad use of local improvement districts, area SDC's and bond measures to fund elements of the transportation plan. One of the toughest problems for development of concurrency are initial costs for street improvements. Tax increment financing commonly used for redevelopment has nearly been discontinued by public agencies due to tax reduction measures. Tax increment refers to selling bonds to pay for infrastructure that are paid off by the net income of increased tax revenues Tigard Transportation System Plan P99161 Funding and Implementation 11-19 October 30, 2001 DKS Associates created by increased property value. Tax increment financing can be very effective in district level master plans or redevelopment. • Another bonding concept requiring legislative change, would be to bond sidewalk/fronting improvements in already-developed areas with net proceeds tied to the title on the land such that upon transfer or resale the city is paid back, including interest. Current property owners would benefit from the improvements and could pay off the assessment earlier at their discretion. The city would need to front and back the bonds and if over the bond life resale/transfer does not occur the city would be responsible. Given that the great majority of homes change ownership over 20 years the risks should be minimal. This concept requires further study and legislative review before testing the application. • Using the development review process to protect the needed right-of-way in the next twenty years to meet transportation system demands is another possible tool. This can reduce the ultimate cost of street improvements. This requires an analysis process (build out assessment or frequent updates) to stay current of future right-of-way needs based upon changing land use (for example, three lanes in 2015 may need to be 5 lanes in 2025). Also known as a corridor set back strategy, this approach helps preserve long term right-of-way needs. • Develop funding programs (using new motor vehicle fees or other funding sources) to encourage private/public cooperation in funding transportation improvements. This may take several forms and will require more assessment. One example would be establishing a city funding source that can be matched with private funding sources to implement elements of the TSP. • Roadway pricing strategies may become necessary for the large deficit in ODOT projects in not only the Tigard area,but the Portland region. While tolls would not represent the full deficit,they would (like all the above measures) contribute to funding the needed transportation system. Any road pricing strategy would not be predicated upon past "toll booth" approaches, but would be built on new technology that would not require people to stop and pay (automatic vehicle identification and debiting). Tigard Transportation System Plan P99161 Funding and Implementation 11-20 October 30, 2001 ACKNOWLEGEMENTS City of Tigard Julia Hajduk City Project Manager James Hendryx Community Development Director Gus Duenas Brian Rager Engineering Department DKS Associates Ransford S. McCourt, PE, PTOE Project Manager Julie Sosnovske, PE Assistant Project Manager Chris Maciejewski Danella Whitt Jennifer Hoffman Transportation System Pian Task Force Nick Wilson Judith Anderson James Griffith Lisa incalcaterra Glenn Mores John Olsen Mark Padgett Shel Scolar Steven Topp Joe Schweiz Dennis Kruger Dean Williams EXHIBIT 3 PROPOSED COMPREHENSIVE PLAN CHANGES 8. TRANSPORTATION This chapter addresses Statewide Planning Goal #12: Transportation which requires local jurisdictions "to provide and encourage a safe, convenient and economic transportation system." Transportation planning has been defined as "...the process by which transportation improvements or new facilities are systematically conceived, tested as to present and future adequacy, and programmed for future construction. Modern transportation planning emphasizes the total transportation system. It considers all modes of transport which are economically feasible to a state, region or urban area." (Goodman & Freund, Principals and Practices of Urban Planning, "Transportation Planning") The transportation plan for Tigard reaches beyond the Tigard Planning Area and includes traffic and transportation impacts within other areas of the southwest subregion of the Portland Metropolitan Area. Tke- MetFopolitafi Se - PistFiet (`SDTMETRO acts as the regional coordinator for transportation planning throughout the Portland Metropolitan Area. The other major service district impacting Tigard is Tri-Met which is charged with the responsibility for providing public transportation throughout the metropolitan area. The Comprehensive Plan proposes a land use plan that encourages and facilitates balanced transportation development for the City. The plan recognizes that land use and transportation investments are interconnected and that relationship should be reinforced to produce an acceptable urban environment. Detailed historical information concerning transportation in the Tigard Urban Planning Area is available in the "Comprehensive Plan Report: Transportation." Detailed current information is available in the 2001 Tigard Transportation System Plan. The 2001 Tigard Transportation System Plan updates the comprehensive plan and policies. However, it does not hilly replace all elements of the comprehensive plan adopted prior to the 2001 TSP. For this reason, a new Section has been added to the be�,Yinningy of the Transportation Policies Section to encompass the system wide changes developed as part of the TSP process. Some of this information is repeated and expanded upon in other policy sections. Where a policy or implementation strate�,Yy specifically conflicts with the updated TSP, the specific policy or implementation strate�,Yy has been deleted. 8.1 TRANSPORTATION SYSTEM Findings • Much of the traffic within Tigard is through traffic with origins and destinations outside of Tigard. There are no reasonable alternate routes for the 99W corridor traffic. Proposed Comprehensive Plan changes, page 1 of 17� • There are 22 intersections near or at capacity based on the 2001 Tigard Transportation Svstem Plan. • There is no continuous bicycle network in Tigard. • There are significant daps in the sidewalk Svstem with few interconnected locations linking to schools, retail, parks and transit. • Segments of MYhway 217 and I-5 are over capacity and ORE 99W will continue to serve more through traffic in the future. • Future traffic models indicate ORE 99W and half of the signalized traffic intersections fail within 20 years assuming no improvements are made. • Travel time data on MYhway 217 indicates that some of the slowest travel speed on the facility occurs in Tigard due to existing capacity issues and the need for interchange improvments. • In the development of the transportation Svstem plan, seven foals were identified which were used as the guidelines for the development of the policies and implemenation strategies. The foals were: livibility, balanced transportation Svstem, safety, performance, accessibility, foods movement, and coordination. POLICIES 8.1.1 PLAN, DESIGN AND CONSTRUCT TRANSPORTATION FACILITIES IN A MANNER WHICH ENHANCES THE LIVABILITY OF TIGARD BY: A. PROPER LOCATION AND DESIGN OF TRANSPORTATION FACILITIES. B. ENCOURAGING PEDESTRIAN ACCESSIBILITY BY PROVIDING SAFE, SECURE AND DESIRABLE PEDESTRIAN ROUTES. C. ADDRESSING ISSUES OF EXCESSIVE SPEEDING AND THROUGH TRAFFIC ON LOCAL RESIDENTIAL STREETS THROUGH A NEIGHBORHOOD TRAFFIC PROGRAM. THE PROGRAM SHOULD ADDRESS CORRECTIVE MEASURES FOR EXISTING PROBLEMS AND ASSURE THAT DEVELOPMENT INCORPORATES TRAFFIC CALMING. 8.1.2 PROVIDE A BALANCED TRANSPORTATION SYSTEM, INCORPORATING ALL MODES OF TRANSPORTATION (INCLUDING MOTOR VEHICLE, BICYCLE, PEDESTRIAN, TRANSIT AND OTHER MODES) BY: Proposed Comprehensive Plan changes, page 2 of 17� A. THE DEVELOPMENT OF AND IMPLEMENTATION OF PUBLIC STREET STANDARDS THAT RECOGNIZE THE MULTI-PURPOSE NATURE OF THE STREET RIGHT-OF-WAY FOR UTILITY, PEDESTRIAN, BICYCLE, TRANSIT, TRUCK AND AUTO USE. B. COORDINATION WITH TRI-MET, AND/OR ANY OTHER TRANSIT PROVIDERS SERVING TIGARD, TO IMPROVE TRANSIT SERVICE TO TIGARD. FIXED ROUTE TRANSIT WILL PRIMARILY USE ARTERIAL AND COLLECTOR STREETS IN TIGARD. DEVELOPMENT ADJACENT TO TRANSIT ROUTES WILL PROVIDE DIRECT PEDESTRIAN ACCESSIBILITY. C. CONSTRUCTION OF BICYCLE LANES ON ALL ARTERIALS AND COLLECTORS WITHIN TIGARD CONSISTENT WITH THE BICYCLE MASTER. ALL SCHOOLS, PARKS, PUBLIC FACILITIES AND RETAIL AREAS SHALL STRIVE TO HAVE DIRECT ACCESS TO A BIKEWAY. D. CONSTRUCTION OF SIDEWALKS ON ALL STREETS WITHIN TIGARD. ALL SCHOOLS, PARKS, PUBLIC FACILITIES AND RETAIL AREAS SHALL STRIVE TO HAVE DIRECT ACCESS TO A SIDEWALK. E. DEVELOPMENT OF BICYCLE AND PEDESTRIAN PLANS WHICH LINK TO RECREATIONAL TRAILS. F. DESIGN LOCAL STREETS TO ENCOURAGE A REDUCTION IN TRIP LENGTH BY PROVIDING CONNECTIVITY AND LIMITING OUT-OF-DIRECTION TRAVEL AND PROVIDE CONNECTIVITY TO ACTIVITY CENTERS AND DESTINATIONS WITH A PRIORITY FOR BICYCLE AND PEDESTRIAN CONNECTIONS. G. TIGARD WILL PARTICIPATE IN VEHICLE TRIP REDUCTION STRATEGIES DEVELOPED REGIONALLY TARGETED TO ACHIEVE NON-SINGLE OCCUPANT VEHICEL LEVELS OUTLINED IN TABLE 1.3 OF THE REGIONAL TRANSPORTATION PLAN. H. TIGARD WILL SUPPORT THE DEVELOPMENT OF A COMMUTER RAIL SYSTEM AS PART OF THE REGIONAL TRANSIT NETWORK. 8.1.3 STRIVE TO ACHIEVE A SAFE TRANSPORTATION SYSTEM BY THE DEVELOPMENT OF STREET STANDARDS, ACCESS MANAGEMENT POLICIES AND SPEED CONTROLS WHEN CONSTRUCTING STREETS, AND BY MAKING STREET MAINTENANCE A PRIORITY AND THROUGH A COMPREHENSIVE PROGRAM OF ENGINEERING, EDUCATION AND ENFORCEMENT. A. DESIGN OF STREETS SHOULD RELATE TO THEIR INTENDED USE. Proposed Comprehensive Plan changes, page 3 of 17� B. DESIGN SAFE AND SECURE PEDESTRAIN AND BIKEWAYS BETWEEN PARKS AND OTHER ACTIVITY CENTERS IN TIGARD. C. DESIGNATE SAFE AND SECURE ROUTES TO SCHOOLS FOR EACH SCHOOL. ANY NEW RESIDENTIAL PROJECT SHOULD IDENTIFY THE SAFE PATH TO SCHOOL FOR CHILDREN D. REFINE AND MAINTAIN ACCECSS MANAGEMENT STANDARDS FOR ARTERIAL AND COLLECTOR STREETS TO IMPROVE SAFETY IN TIGARD. E. ESTABLISH A CITY MONITORING SYSTEM THAT REGULARLY EVALUATES, PRIORITIZES AND MITIGATES HIGH ACCIDENT LOCATIONS WITHIN THE CITY. F. NEW ROADWAYS SHALL MEET APPROPRIATE LIGHTING STANDARDS. EXISTING ROADWAYS SHALL BE SYSTEMATICALLY RETROFITTED WITH ROADWAY LIGHTING. H. REQUIRE NEW DEVELOPMENT TO PROVIDE SAFE ACCESS TO AND TO GAIN SAFE ACCESS FROMA4bT-'F A PUBLICALLY DEDICATED AND IMPROVED STREET (LE. DEDICATE RIGHT-OF- WAY, IF NOT ALREADY ON A PUBLIC STREET, AND INSTALL IMPROVEMENTS IN ROUGH PROPORTIONALITY TO THE DEVELOPMENT'S IMPACT) AND PROVIDE SAFE ACCESS. 8.1.4 SET AND MAINTAIN TRANSPORTATION PERFORMANCE MEASURES THAT: A. SET A MINIMUM INTERSECTION LEVEL OF SERVICE STANDARD FOR THE CITY OF TIGARD AND REQUIRES ALL PUBLIC FACILITIES TO BE DESIGNED TO MEET THIS STANDARD. B. SET PARKING RATIOS TO PROVIDE ADEQUATE PARKING, WHILE PROVIDING AN INCENTIVE TO LIMIT THE USE OF THE SINGLE OCCUPANT VEHICLE. C. ENCOURAGE WORKING WITH OTHER TRANSPORTATION PROVIDERS IN WASHINGTON COUNTY, INCLUDING TRI-MET, METRO AND MOT TO DEVELOP, OPERATE AND MAINTAIN INTELLIGENT TRANSPORTATION SYSTEMS, INCLUDING COORDINATION OF TRAFFIC 8.1.5 DEVELOP TRANSPORTATION FACILITIES WHICH ARE ACCESSIBLE TO ALL MEMBERS OF THE COMMUNITY AND MINIMIZE OUT OF DIRECTION TRAVEL BY: Proposed Comprehensive Plan changes, page 4 of 17� A. THE DESIGN AND CONSTRUCTION OF TRANSPORTATION FACILITIES TO MEET THE REQUIREMENTS OF THE AMERICANS WITH DISABILITIES ACT. B. THE DEVELOPMENT OF NEIGHBORHOOD AND LOCAL CONNECTIONS TO PROVIDE ADEQUATE CIRCULATION 1N AND OUT OF THE NEIGHBORHOODS. C. WORK WITH WASHINGTON COUNTY AND MOT TO DEVELOP AN EFFICIENT ARTERIAL GRID SYSTEM THAT PROVIDES ACCESS WITHIN THE CITY, AND SERVES THROUGH CITY TRAFFIC. 8.1.6 PROVIDE FOR EFFICIENT MOVEMENT OF GOODS AND SERVICES THROUGH THE DESIGN OF ARTERIAL ROUTES, HIGHWAY ACCESS AND ADJACENT LAND USES 1N WAYS THAT FACILITATE THE EFFICIENT MOVEMENT OF GOODS AND SERVICES AND THE SAFE ROUTING OF HAZARDOUS MATERIALS CONSISTENT WITH FEDERAL AND STATE GUIDELINES. 8.1 .7 IMPLEMENT THE TRANSPORTATION SYSTEM PLAN (TSP) IN A COORDINATED MANNER BY COORDINATING AND COOPERATING WITH ADJACENT AGENCIES (INCLUDING WASHINGTON COUNTY, BEAVERTON, TUALATIN, LAKE OSWEGO, CITY OF PORTLAND, TRI- MET, METRO AND ODOT) WHEN NECESSARY TO DEVELOP TRANSPORTATION PROJECTS WHICH BENEFIT THE REGION AS A WHOLE 1N ADDITION TO THE CITY OF TIGARD. IMPLEMENTATION STRATEGIES 1. Design streets and highways to respect the characteristics of the surrounding land uses, natural features, and other community amenities. 2. The Gity;A,4 'Develop and maintain a pedestrian plan in Tigard, outlining pedestrian routes. Sidewalk staf1'aMs will b"Develope4 sidewalk standards to define various widths, as necessary, for City street types. 3. Develop and maintain a program of street design standards and criteria for neighborhood traffic management(NTM) for use in new development and existing neighborhoods. Measures to be developed may include(but are not limited to) narrower streets, speed humps, traffic circles, curb/sidewalk extensions, curving streets, diverters and/or other measures, as developed as part of a City NTM plan. 4. Develop and maintain a series of system maps and desi,-n standards for motor vehicles, bicycle, pedestrian, transit and truck facilities in Ti,-ard. Proposed Comprehensive Plan changes, page 5 of 17� 5. The Re,-ional Transportation Plan (RTP) and Tri-Met service plans will be the 'uidin, documents for development of Ti,-ard's transit plan. The City should provide input to Tri- Met re,-ardin,- their specific needs as they annually review their system. This input should focus on improving service (coverage and frequency) to under-served areas. New transit service should be considered concurrent to street improvements when significant street extensions are completed. The City should encourage land intensive uses to locate near transitways and require hi,h intensity uses (i.e. lar'e employment, commercial sites) to provide transit facilities-. When bus stops reach 75 boardino per day, bus hselters should be considered in development review. Sidewalks should be available within '/4 mile from all transit routes and transit should be provided to schools and parks. 6. Develop a bicycle plan which connects key activity centers (such as schools, parks, public facilities and retail areas) with adjacent access. Standards for bicycle facilities within Tigard will be developed and maintained. Where activity centers are on local streets, connections to bicycle lanes shall be designated. 7. Develop a pedestrian plan which connects key activity centers with adjacent access. Require sidewalks to be constructed on all streets within within Ti"ard. 8. Standards for pedestrian facilities within Tigard will be developed and maintained. 9. The bicycle and pedestrian plans will need to indicate linkages between recreational and basic pedestrian networks. A primary facility in Tigard should link together Fanno Creek, Tualatin River and the BPA right-of-way in the west of Tigard. Design standards for recreational elements will need to be developed and maintained. 10. Revise the Code to require new streets built to provide connectivity to incorporate traffic management design elements, particularly those which inhibit speeding. As a planning standard, require local streets to have connections every 530 feet in planning local and neighborhood streets. The purpose of this policy is to provide accessibility within Tigard, with a focus on pedestrian connectivity. Pedestrian connectivity can be provided via pedestrian/bike paths between cul-de-sacs and/or greenways where auto connectivity does not exist or is not feasible. 11. Support development of a commuter rail system connecting the south Metro area to the Beaverton/Hillsboro area, with stop(s) in Tigard. 12. A functional classification system shall be developed for Tigard which meets the City's needs and respects needs of other agencies (Washington County, Metro, ODOT). Appropriate design standards for these roadways will be developed by the appropriate jurisdiction. 13. Place a high priority on routine street maintenance to preserve its infrastructure investment and improve safety. 14. Undertake a process of defining school routes for pedestrians by working with the School District, citizens and developers. Proposed Comprehensive Plan changes, page 6 of 17� 15. Develop guidelines to provide access control standards and apply these standards to all new road construction and new development. For roadway reconstruction, existin, driveways shall be compared with the standards and a reasonable attempt shall be made to comply (consolidatin, driveway accesses or relocatin, driveways to a lower classification street are examples). 16. Develop a process to review traffic accident infonnation regularly to systematically identify, prioritize and remedy safety problems. Workin, with the County, develop a list of high collision sites and projects necessary to eliminate such problems. Require development applications to identify and mitigate for high collision locations if they generate 10% increase to existing traffic on an approach to a high collision intersection. Washington County's SPIS (Safety Priority Indexing System) could be used as a basis for detennininy high collision locations. 17. Include paths to schools, parks, and town center areas as priority roadway li,yhtiny locations. 18. Require development to provide right-of-way(if needed) and safe access as determined by application of the City's development code and standards for design. Require that the minimum City standards be met for half-street adjacent to developing property for a development to proceed (with consideration of rough proportionality). Apply this policy to both pedestrians and motor vehicles. 19. Monitor Metro and Washington County's current work to develop a level of service standard. Level of service-DE (and demand-to-capacity ratio of 1.0 or less), Hi,-hway Capacity Manual, Chapters °, ' 15, 16, and 17 (or subsequent updated references) is recommended to balance provision of roadway capacity with level of service and funding:. ODOT, Metro and Washington County performance standards should be considered on state or County facilities and for 2040 Concept Areas (as defined in Table 1.2 of the RTP). sdaFdfeasible-(i.e. ORE 99W4. The City will work to make the arterial & collector street systems operate effectively to discourage "cut-through" traffic on nei-hborhood and local streets. 20. Work toward the eventual connection of streets identified on the Transportation plan map as development occurs, as funds are available and opportunities arise. 21. As outlined in Title 6 of the Metro Urban Growth Management Functional Plan, develop access connection standards. The arterial street system should facilitate street and pedestrian connectivity. 22. Work with federal a-encies, the Public Utility Commission, the Oregon Department of Enemy and ODOT to assure consistent laws and regulations for the transport of hazardous materials. 23. Maintain plan and policy conformance to the ReLyional Transportation Plan and Transportation Planning Rule (OAR 660-012). Seek compatibility with all adjacent county and city jurisdiction plans. Proposed Comprehensive Plan changes, page 7 of 17� 8.4-2 TRAFFICWAYS Findings • A need exists to place all of the existing public local and collector streets in the Tigard City Limits under the City's jurisdiction. • According to a Washington County computer study 48-60% of Tigard residents work outside of the Washington County area. • Between 77-83% of Tigard residents commute to work by auto as single occupants. • Major congestion problems within the City have resulted from the rapid population growth since 1970, creating a need for major street improvements. • A corridor study for Pacific Highway(99W)has not been prepared by-NIS-DMctro. It is the only major trafficway within the region which has not been studied. Pacific Highway, the major trafficway through the City, has the highest traffic volumes, congestion and accident[s] rates within the City. There is a need to prepare a corridor study for Pacific Highway. The City, Metropolitan Service District and [the] State should coordinate such a study. • Many of the streets in Tigard are dead-ended which adds to the congestion on existing completed streets. Therefore, a number of street connections need to be constructed. • A major concern of the community regarding transportation is the need to maintain and improve the livability of residential areas in the face of increasing population and transportation requirements. • The City needs to develop a strategy to coordinate public street improvements with private sector improvements to achieve the most effective use of the limited dollars available for road development and improvement. • Major residential growth during the planning period is expected to occur in the westerly and southerly areas of Tigard. Both of these areas lack adequate improved trafficways. • A need exists during the planning period to complete a collector street system between Scholls Ferry Road, Walnut Street, Gaarde Street, Bull Mountain Road and Pacific Highway. The location of these connections needs to be coordinated between the City, County, State and [the] Metropolitan Service District. • A need exists to complete the collector street system within the Tigard Triangle area to make more of this area accessible to developers, employers and employees. Proposed Comprehensive Plan changes, page 8 of 17� POLICIES 8. 2.1 THE CITY SHALL PLAN FOR A SAFE AND EFFICIENT STREET AND ROADWAY SYSTEM THAT MEETS CURRENT NEEDS AND ANTICIPATED FUTURE GROWTH AND DEVELOPMENT. 8. 2.2 THE CITY SHALL PROVIDE FOR EFFICIENT MANAGEMENT OF THE TRANSPORTATION PLANNING PROCESS WITHIN THE CITY AND THE METROPOLITAN AREA THROUGH COOPERATION WITH OTHER FEDERAL, STATE, REGIONAL AND LOCAL JURISDICTIONS. 8. 2.3 THE CITY SHALL REQUIRE AS A PRECONDITION TO DEVELOPMENT APPROVAL THAT: a. DEVELOPMENT ABUT A PUBLICLY DEDICATED STREET OR HAVE ADEQUATE ACCESS APPROVED BY THE APPROPRIATE APPROVAL AUTHORITY; b. STREET RIGHT-OF-WAY BE DEDICATED WHERE THE STREET IS SUBSTANDARD IN WIDTH; C. THE DEVELOPER COMMIT TO THE CONSTRUCTION OF THE STREETS, CURBS AND SIDEWALKS TO CITY STANDARDS WITHIN THE DEVELOPMENT; d. INDIVIDUAL DEVELOPERS PARTICIPATE IN THE IMPROVEMENT OF EXISTING STREETS, CURBS AND SIDEWALKS TO THE EXTENT OF THE DEVELOPMENT'S IMPACTS; e. STREET IMPROVEMENTS BE MADE AND STREET SIGNS OR SIGNALS BE PROVIDED WHEN THE DEVELOPMENT IS FOUND TO CREATE OR INTENSIFY A TRAFFIC HAZARD; £ TRANSIT STOPS, BUS TURNOUT LANES AND SHELTERS BE PROVIDED WHEN THE PROPOSED USE OF A TYPE WHICH GENERATES TRANSIT RIDERSHIP; g. PARKING SPACES BE SET ASIDE AND MARKED FOR CARS OPERATED BY DISABLED PERSONS AND THAT THE SPACES BE LOCATED AS CLOSE AS POSSIBLE TO THE ENTRANCE DESIGNED FOR DISABLED PERSONS; AND h. LAND BE DEDICATED TO IMPLEMENT THE BICYCLE/PEDESTRIAN CORRIDOR IN ACCORDANCE WITH THE ADOPTED PLAN. 84.4 A114-EN TLIE n C-Tr T n r ROUTES nf2 F. TTT Tri 1~ TRANSPORTATION xry ! -PRO LE TENTS LI n NT-' NOT BEEN PETERN494-EP, TLI-' CITY CLI n T T.. DESIGNATE TE CTT DY AREAS n S ON TLITE C—OMPRE14-ENSINLE PLAN N Proposed Comprehensive Plan changes, page 9 of 17� TRANSPORTATION Hann AND D -PROVI E GENERAL nn nXEC-T PESC-n rnTIONS To: TTIt,'i T-42Y T14-E APPROXIMATE A Tt A n E A c AAlITt IN A1141C-14 Ttlt,'c t PRO !„Tc WILL OC-C-T Tn AND; D; L. TO -EXPLAPP1 T-14-E TYPE AND D EXTt,NT Ol : Tg-ESE F' TTT Tn E mann ONIEMENTc 84.5 A114-EN RENO- ATPDEVELOPMENT A nnT T!„A TIONS AAlIT14IN !„!mann E14- ,'i SINIE TRANSPORTATION nT A N MAP n STT DY AREAS,E A c Ttlt CITY cu A T T WORK TI AAlIT14 A nnT T!„A NTS TO AVOID OID !„lli 14 C-T AAlIT14 Ttlt iT OC-A TION OFF F=UTURE Tn E Tn ANSPO T A TION Tnann ONIEMENTc 8. 2.6 A CHANGE IN ROADWAY CLASSIFICATION, OR LOCATION SHALL REQUIRE AN AMENDMENT TO THE COMPREHENSIVE PLAN TRANSPORTATION MAP, AND; 114noTun r nr-n TION OF, ALL 0 �r PO TION OF, n ROADWAY AAlIT14IN n TRANSPORTATION MAP STU AREA 14n c Bt,'t,N PETERMPrnP, THE MAP WILL BE AMENDED BY= a. DESIGNATING THE LOCATION OF THE ROADWAY AND- b. DESIGNATING ITS CLASSIFICATION_, ^ DELETING T-14-E APPROPRIATE T A TE -PO TION Ot' Ti�CoTT DY AREA E A P Arnr VEE 8. 2.7 THE CITY SHALL SUPPORT THE GOALS AND OBJECTIVES OF THE OREGON DEPARTMENT OF TRANSPORTATION TO IMPROVE TRAFFIC FLOW AND CAPACITY AT THE INTERCHANGE OF I-5 AND HIGHWAY 217/KRUSE WAY. HOWEVER, THE CITY RETAINS THE PREROGATIVE TO REVIEW, COMMENT AND CONCUR WITH THE ACTUAL ALIGNMENTS OF THE PROJECT. 8. 2.8 THE CITY SHALL ADOPT THE FOLLOWING TRANSPORTATION IMPROVEMENT STRATEGY IN ORDER TO ACCOMMODATE PLANNED LAND USES IN THE TIGARD TRIANGLE: a. Highway 99W should be widened to 6 lanes throughout the study area (tool box). This improvement should be constructed in the short term. In the event that widening Highway 99 to six lanes is prohibitive due to physical constraints, the Dartmouth extension could potentially provide needed northeast-to-southwest travel demand. b. 72nd Avenue should be widened to four lanes with left turn lanes at major intersections and the Hunziker/Hampton overcrossing should be constructed. These two improvements will provide additional roadway capacity for circulation within the Triangle and for access to and from the triangle via 72nd Avenue. Construction of the Hunziker/Hampton overcrossing would have the Proposed Comprehensive Plan changes, page 10 of 17� additional advantages of eliminating geometric deficiencies at the Highway 217/72nd Avenue interchange; thereby providing further additional capacity at this interchange. For the buildout scenario (2015), these improvements will provide adequate capacity in the vicinity of the Highway 217/72nd Avenue interchange. C. The Hampton/Hunziker connection is only justified based on its operational relief to the 72nd interchange. Further study should be conducted to examine alternative measures to relieve this situation in a more cost effective way. Further study may indicate that extending Hampton further southwesterly (to connect with Hall Boulevard in the vicinity of McDonald Street) may better accommodate projected travel demand. Short of constructing this structure, a direct ramp instead of a loop ramp from southbound 72nd Avenue to northbound Highway 217 would provide additional capacity in the vicinity of the Highway 217/72nd Avenue interchange. d. Access from Dartmouth to northbound Highway 217 is critical to Tigard Triangle traffic circulation, therefore, it should be studied as part of the Highway 217 corridor analysis to be performed by ODOT and Metro. Under existing conditions, there is significant roadway congestion near the Highway 99W/Highway 217 interchange. Construction of the Dartmouth Extension and access to northbound Highway 217 would mitigate congestion at this interchange because motorists in this area of the Tigard Triangle would have the option to access northbound Highway 217 from Dartmouth or Highway 99W. C. Analysis indicates that there is a long term (20-30 years) need for Dartmouth Road to continue over Highway 217 and potentially south to Hall Boulevard as well as for extending the collector-distributor roads from the Highway 217/72nd Avenue interchange through the Highway 217/Highway 99W interchange. The Highway 217 corridor analysis to be performed by Metro and ODOT should consider the advantages and disadvantages of these improvements. The Dartmouth extension to Hall Boulevard should be constructed only if further system improvements to Hall Boulevard are made concurrently. If additional capacity is not added to Hall Boulevard south of where the Dartmouth extension would be connected, the effectiveness of this connection would be diminished. Alternatively, another roadway could be constructed that provides a connection from the Dartmouth extension to Hall Boulevard in the vicinity of McDonald Street. £ Adopt the functional classification plan for streets internal to the Tigard Triangle as shown on Figure 1. The following policies apply to local streets within the Tigard Triangle: 1. Local street spacing shall be a maximum of 660 feet. 2. Access way spacing shall be a maximum of 330 feet. 3. Spacing of signalized intersections on Major Arterials shall be a minimum of 600 feet. Proposed Comprehensive Plan changes, page 11 of 17� 4. Existing rights of way will, to the greatest extent possible, be utilized for a local street system. Right of way vacations will be considered only when all other policies in this subsection are met. g. The transportation projects described in this section should be added to the City of Tigard's Transportation System Plan. The City, ODOT and Metro should work to include these improvements in regional and state implementation programs. (Rev. Ord. 91-13; Ord. 96-42) IMPLEMENTATION STRATEGIES 1. The City shall develop, adopt and implement a master street plan that anticipates all needed trafficway improvements so as to plan for the necessary available resources to develop these streets when they are needed. 2. The City shall develop, maintain and implement a capital improvements program which: a. Is consistent with the land use policies of the Comprehensive Plan; b. Encourages a safe, convenient and economical transportation system; C. Furthers the policies and implementation strategies of the City's Comprehensive Plan; d. Considers a variety of transit modes within the rights-of-way; C. Meets local needs for improved transportation services; £ Pursues and establishes other funding sources from the federal, state, regional and/or local agencies; and g. Designates the timing of such projects to ensure their installation when those facilities are needed. 3. The City shall specify street design standards within the Tigard Community Development Code. 4. The City shall maintain the carrying capacity of arterials and collectors by reducing curb cuts and other means of direct access, and requiring adequate right-of-way and setback lines as part of the development process. The Community Development Code shall state the access requirements for each street classification. 5. The City's Tigard Community Development Code shall require developers of land to dedicate necessary rights-of-way[s] and install necessary street improvements to the City's standards when such improvements have not been done prior to the developer's proposals. These necessary dedications may be required upon approval of any development proposal. Proposed Comprehensive Plan changes, page 12 of 17� 6. The City shall control and limit the number of access points and will signalize trafficways in a manner that provides for a consistent flow of traffic and therefore minimizes or reduces vehicular emissions. 7. The City shall include provisions in the Tigard Community Development Code which addresses the aesthetic quality of the transportation system to ensure community livability and to minimize the effects on abutting properties. This can be accomplished through: a. Building setback requirements; b. Requirements for landscaping and screening and through other site design criteria for visual enhancement; C. Limiting residential land uses along major arterial trafficways; and d. Sign controls. 8. The City shall coordinate their planning efforts with adjacent cities and other agencies e.g., Beaverton, Portland and Tualatin, Washington County, tke Meer-apaht " Ser-vol� eMETRO, Tri-Met and ODOT. 9. The City shall work out reciprocal agreements with other agencies for exchanging information pertinent to local transportation planning. 82-3 PUBLIC TRANSPORTATION Findings • Since the oil embargos of the 1970s, the cost of motor fuels has increased fourfold. • The Tri-County Metropolitan Transportation District of Oregon (Tri-Met) is responsible for providing public transportation to the residents of Multnomah, Washington and Clackamas Counties. • Presently, there are few(4}Eleven (11) bus lines that service the Tigard area. • Public transit offers the community an opportunity to reduce traffic and pollution as well as increase energy efficiency. • Work trips and shopping trips are most conducive to mass transportation. • The proposed downtown Tri-Met Tigard transfer center will increase service and lessen travel time for riders. Proposed Comprehensive Plan changes, page 13 of 17� POLICIES 8. 3.1 THE CITY SHALL COORDINATE WITH TRI-MET TO PROVIDE FOR A PUBLIC TRANSIT SYSTEM WITHIN THE PLANNING AREA WHICH: a. MEETS THE NEEDS OF BOTH THE CURRENT AND PROJECTED, FOR THE TIGARD COMMUNITY; b. ADDRESSES THE SPECIAL NEEDS OF A TRANSIT DEPENDENT POPULATION; C. REDUCES POLLUTION AND TRAFFIC; AND d. REDUCES ENERGY CONSUMPTION. 8. 3.2 THE CITY SHALL ENCOURAGE THE EXPANSION AND USE OF PUBLIC TRANSIT BY: a. LOCATING LAND INTENSIVE USES IN CLOSE PROXIMITY TO TRANSITWAYS; b. INCORPORATING PROVISIONS INTO THE COMMUNITY DEVELOPMENT CODE WHICH REQUIRE DEVELOPMENT PROPOSALS TO PROVIDE TRANSIT FACILITIES; AND C. SUPPORTING EFFORTS BY TRI-MET AND OTHER GROUPS TO PROVIDE FOR THE NEEDS OF THE TRANSPORTATION DISADVANTAGED. IMPLEMENTATION STRATEGIES 1. The City shall request Tri-Met to extend service to areas within the City that do not currently have service. 2. In the City's Community Development Code, the City shall require large developments to provide transit facilities e.g., pull-offs and shelters, if such developments are located adjacent to transit routes. 43. The City shall propose land use densities, within the Comprehensive Plan, along transit oriented corridors that support public transportation service. �4. The City shall work with Tri-Met and other transit providers to encourage transit service for the transit dependent population e.g., the poor and handicapped. Proposed Comprehensive Plan changes, page 14 of 17� 45. The City shall encourage its citizens to use mass transit systems, where possible, to make greater effectiveness of the transit system while reducing automobile usage. -76. The City shall coordinate with the transit providers to encourage carpooling and investigate if there is a local need for carpooling in the Tigard area. 83-4 TRANSPORTATION FOR THE DISADVANTAGED Findings • Tri-Met is responsible for providing handicapped transit accessibility including coordination of special transit services by social service agencies. • Tri-Met conducts the detailed special handicapped transit planning necessary to identify required service improvements and adopt a plan for meeting federal requirements for handicapped accessibility. POLICY 8.44.1 THE CITY SHALL COORDINATE WITH WASHINGTON COUNTY, TRI-MET AND OTHER REGIONAL AND STATE AGENCIES IN THE IDENTIFICATION AND ACCOMMODATION OF INDIVIDUALS WITH SPECIAL TRANSPORTATION NEEDS. IMPLEMENTATION STRATEGIES 1. The City shall require, through the implementation process, that parking spaces be set aside and marked for disabled persons [parking] and that such spaces be located in convenient locations. 2. The City shall continue to coordinate with [the] appropriate agencies in the identification and accommodation of those individuals with special transportation needs. 8.4-5 PEDESTRIAN AND BICYCLE PATHWAYS Findings • As the City of Tigard continues to grow, more people may rely on the bicycle and pedestrian pathways for utilitarian as well as for recreational purposes. • In 1974, the City Council adopted a Comprehensive Pedestrian/Bicycle Pathway Plan. • The City has required adjacent development to install that portion of the bicycle/pedestrian pathways shown on the adopted plan which abuts the development. Proposed Comprehensive Plan changes, page 15 of 17� • The City has implemented portions of the adopted plan through the City's overlay program. • The adopted Bicycle/Pedestrian Plan provides for a dual function pathway system; bicycles and pedestrians use the same system. POLICY 8.45.1 THE CITY SHALL LOCATE BICYCLE/PEDESTRIAN CORRIDORS IN A MANNER WHICH PROVIDES FOR PEDESTRIAN AND BICYCLE USERS, SAFE AND CONVENIENT MOVEMENT IN ALL PARTS OF THE CITY, BY DEVELOPING THE PATHWAY SYSTEM SHOWN ON THE ADOPTED PEDESTRIAN/BIKEWAY PLAN. IMPLEMENTATION STRATEGIES 1. The City shall review each development request adjacent to areas proposed for pedestrian/bike pathways to ensure that the adopted plan is properly implemented, and require the necessary easement or dedications for the pedestrian/bicycle pathways. 2. The City shall review and update the adopted Pedestrian/Bikeway Plan on a regular basis to ensure all developing areas have accessibility to the Pedestrian/Bikeway system. 3. The City shall coordinate with Washington County to connect the City's Pedestrian/Bike Pathway system to the County's system. 4. City codes shall include provisions which prohibit motor driven vehicles on designated and maintained pedestrian/bicycle pathways. 8.-5-6 RAILROADS Findings • Tigard is serviced by Southern Pacific and Burlington Northern railroad lines which carry strictly freight through the City Limits. • Within the downtown area each railroad company has its own trackage and the usage of those lines is based on the railroads' needs. • There should only be one set of railroad tracks traversing the downtown area. The City is in the process of discussing this issue with both railroads. • Many of the commercial and industrial businesses within Tigard rely on the railroads for the shipping and receiving of goods. • The City is currently coordinating the upgrading of all the railroad crossings within Tigard with the railroads. Proposed Comprehensive Plan changes, page 16 of 17� POLICY 8. 6.1 THE CITY SHALL COOPERATE WITH THE RAILROADS IN FACILITATING RAIL FREIGHT SERVICE TO THOSE COMMERCIAL AND INDUSTRIAL BUSINESSES WITHIN THE CITY THAT DEPEND ON RAILROAD SERVICE. IMPLEMENTATING STRATEGIES 1. The City shall continue to coordinate with the Southern Pacific and Burlington Northern railroads to provide adequate railroad service. 2. The City shall designate adequate commercial and industrial land within close proximity to existing railroad service lines to ease railroad accessibility to those businesses that rely on the service. 3. The City shall coordinate with the railroads to combine the trackage within the downtown area. Proposed Comprehensive Plan changes, page 17 of 17�