Loading...
Report GEOPACIFIC 04/20/2005 09:13 5035988705 ENG INC PAGE 01 53Sa CG • GOOP .+.: Engineering, Inc. • • Real -World Geotechnical Solutions • Investigation • Design • Construction Support April 20, 2005 Project No. 03 -8183 • Attention; Andy Venture Properties, Inc. 4230 Galewood Street, Suite 100 Lake Oswego, Oregon 617035 Fax No. 503- 670 -9099 RE: SOiL ENGiNEER'S REVIEW OF FOUNDATION EXCAVATION SUBGRADE 23 LOTS-Or. AND 81 SUMMIT RIDGE TIGARD, OREGON References: 1. GeoPacific Engineering Inc., Geotechnical Investigation, Summit Ridge Development. Tigard, Oregon, dated May 12, 2003. • 2.Oeoaecifc Cngineering Inc., Sell ana wail Engineer's Summary at Conclusion of Earthwork, Summit Ridge Development - Phase 1, Tigard, Oregon, Revised January 21, 2004 (should state 2005). • GooPeolfjc Engineer, Jim Imbrie, visited the site Monday to review the foundation excavation subgrade. The • obseived. native soils are stiff clayey silt. Some mucking may be required if the subgrade is left exposed to' • . wet weather for a long duration, however the current subgrade is r•.onsidered adequate. Batted on our observations, it is our opinion that the current foundation subgrade is suitable for spread foundation support to a maximum allowable bearing pressure of 1,500 psf. Minimum reinforcement has been recommended' in the above Reference 2. Setbacks on adjoining rookery wa113 are adequate. Our work scope pertains to a geotechnical engineer's foundation excavation review only and the conditions existing and exp000d rat the time of our site visit. No deck rooting, patio, or other appurtenant structure • subgrades were observed. Our work was performed to the current local standards of practice. No other warranty is herein expressed or implied_ If you have any questions, please call. • Sincerely, • • GeoPacific Engineering, Inc, � �RG Pitn�� � ■t3 UllA I NEEiO 41 i ce 14743 , �\ • OREGON r • James D. Imbrie, P.E„ ' .0. ,f �;� t�' � N st, Geotechnical Engineer '� O ttA / �'�a • - • • • • • •