Loading...
Correspondence CEN figs Ca Electric Co. Inc. �uN 02 2 09 CI1� pFIAGEO B1 I�DINGD I � ISION May 28, 2009 Plans Examiner City of Tigard Building Services 13125 SW Hall Blvd. Tigard, OR 97223 Re: Ameriprise Tenant Fire Alarm System Additions Two Lincoln Center, Suite 120 10220 SW Greenburg Road Tigard, OR 97223 Please find attached a building permit application, Tri- County Commercial Application Checklist, three sets of plans, calculations, and product submittals for the fire alarm tenant improvements at the address shown above. Occupancy Group: B The fire alarm system design includes the following: 1. Install ADA synchronized fire alarm notification devices in the tenant space including (2) horn /strobes, and (2) strobes. 2. We will pre -test the fire alarm devices prior to requesting a final fire alarm inspection. Please contact me if you have questions or comments. Respectfully, J ' Ii Dan Wilson Project Manager /Estimator Fire /Life Safety Division Capitol Electric Company, Inc. (503) 255 -9488 dan @cepdx.com NICET Level IV, Fire Alarm Systems #104512 11401 NE Marx • Portland, Oregon 97220 -1041 • 503 - 255 -9488 • Fax 503 - 257 -7121 CCB# 48748 • www.capitolelectricco.com 14 • TRI- COUNTY COMMERCIAL APPLICATION CHECKL }� QED Date: 5/28/2009 JUN 02 200° Project Name: AMERIPRISE FINANCIAL T.I., SUITE 120 2LINCOL CITY OF TIGARD 1 @ I1ILDING DIVISION Project Address: 10220 SW GREENBURG TIGARD, OR 97223 Scope of Work: INSTALL TENANT FIRE ALARM NOTIFICATION DEVICES Reference # : Map & Tax Lot #: Contact Person: Name: Dan Wilson Phone: (503) 255 -9488 Cellular: (971) 506 -3072 Fax: (503) 255 -1966 E -mail: dan @cepdx.com Company: Capitol Electric Company, Inc. Please Note: • The purpose of this checklist is to help define a complete submittal package for the scope of work. Plan review will not take place until a complete package is submitted. ■ This checklist can be used for all commercial construction projects, including new construction, additions, alterations, and tenant improvements (Tls). IN For complex projects, applicants should use the "location" space to note the item's location and page number from the plans or the specification book. • It is not necessary to duplicate submittal information, even if it is asked for in multiple sections. ■ REQUIRED means that the applicant must provide this information for plan review. • I I P means (a) if checked by the applicant, the information is provided for the plan review or (b) if checked by the plans reviewer, this information is required for the plan review. • ❑ NA means that the information does not apply. ■ Choose only those sections of the checklist that apply to your scope of work. Section 1.0, "General Project Data ", must be included with each project submitted. 1 Commercial Checklist For Tri- County Building Department Jurisdictions in Clackamas, Multnomah, and Washington Counties Li Section 1.0 General Project Data Construction Documents No: Item: Location (sheet number or spec section): 1.1 © REQUIRED (Number) 3 Sets Of Plans 3 SETS PROVIDED 1.2 © REQUIRED Cover sheet title block (On Plans) 1.3 © REQUIRED Cover sheet vicinity map (mapquest.com) ATTACHED 1.4 In R EQUIRED Cover sheet index ( REQUIRED IF LARGE NUMBER OF PAGES ) 1.5 © P n NA Code summary Cover Letter 1.6 n P © NA Deferred submittal summary 1.7 I I P © NA Professional stamp and signature (For new bldg, meets intent of architect design) 1.8 n P • © NA Fire and life safety plan 1.9 n P © NA Landscape plan 1.10 In P C NA Landscape specifications Supporting Documents No: Item: Notes: 1.20 n P • © NA Land use or planning actions 1.21 n P © NA Required fire flow calculations 1.22 In P • © NA Fire hydrant flow test report 1.23 n P • © NA Fire department or fire district building survey report 1.24 n P © NA Landscape specifications 3 Commercial Checklist For Tri- County Building Department Jurisdictions in Clackamas, Multnomah, and Washington Counties Section 11.0 Fire Detection and Alarm Data Construction Documents No: Item: Location (sheet number or spec section): 11.1 © REQUIRED Floor plan(s) FP1 11.2 n P 0 NA Site plan 11.3 n P • © NA Reflected ceiling plan(s) 11.4 n P • I X NA Transverse & longitudinal cross section(s) 11.5 n P • © NA Wiring schematic 11.6 f P © NA Elevator recall information 11.7 n P © NA Operational matrix 11.8 n P © NA Fire -rated construction details 11.9 n P © NA Standard electrical notes Supporting Documents No: Item: Notes: 11.20 n REQUIRED Structural calculations for vertical loads and lateral loads for equipment weighing over 400 lbs. No loads over 400 lbs 11.21 © REQUIRED Equip. manufacturer's catalog "cut sheets" Included 11.22 © REQUIRED Installer certification information Included 11.23 © P NA Battery calculations Included 11.24 n P © NA Sample fire alarm log book 11.25 n P • 0 NA Emergency power system specifications 11.26 n P TO NA Monitoring station information 11.27 1 X I P n NA Voltage drop calculations Included 14 Commercial Checklist For Tri- County Building Department Jurisdictions in Clackamas, Multnomah, and Washington Counties It FIRE ALARM INSTALLER CERTIFICATION INFORMATION Date: 5/28/2009 Project Name: AMERIPRISE FINANCIAL T.I., SUITE 120 @ 2LINCOLN Project Address: 10220 SW GREENBURG TIGARD, OR 97223 Scope of Work: INSTALL TENANT FIRE ALARM NOTIFICATION DEVICES 0 Reference # : 0 Map & Tax Lot # : 0 Contact Person: Name: Dan Wilson Phone: (503) 255 -9488 Cellular: (971) 506 -3072 Fax: (503) 255 -1966 E -mail: dan @cepdx.com Oregon License: 17231J NICET Cert.# 104512 Fire Alarm Systems, Level IV Company: Capitol Electric Company, Inc. 11401 NE Marx Street Portland, Oregon 97220 (503) 255 -9488 Office (503) 255 -1966 Fax Oregon License: 26 -496C Commercial Checklist For Tri- County Building Department Jurisdictions in Clackamas, Multnomah, and Washington Counties