Loading...
Correspondence a rtf r August 10, 2004 �� z OF TI s`k i"t • DULL OLSON WEEKES ARCHITECTS OREGON John Westfal 319 SW Washington Street #200 Portland, OR 97204 RE: LIBRARY TENANT IMPROVEMENT Project Information Building Permit: BUP2004 -00206 Occupancy Type: E -1 Tenant Name: Tigard High School Construction Type: II -1HR Address: 9000 SW Durham Road Occupant Load: 1342 Area: 39,922 Sq Ft Stories: 2 The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 1998 edition; and the Tualatin Valley Fire & Rescue Ordinance 99 -01 (TVFR99 -01) 1999 edition. The submitted plans are approved subject to the following conditions. 1. Provide listed product, manufacturer's installation instructions for spray proofing and rated penetrations to city inspector at time of inspection. 2. Exit signs shall be illuminated at all times and shall be provided with a second source of power that will provide 1 1 /2 hours of illumination in case of primary power loss. 1003.2.8.5 OSSC 3. The means of egress shall be provided with illumination of not less than 1 foot candle at the floor level anytime the building is occupied. The means of egress illumination shall be provided with a second source of power in case of primary power loss. 1003.2.9.2 OSSC 4. Provide one 2 -A rated fire extinguisher in the new area. The extinguisher shall be located so that no usable space has a distance greater than 75 feet to the extinguisher. Standard 10 -1, Chapter 3 TVFR99 -01. 5. Deferred submittals such as Fire Alarm, Fire Sprinkler, Truss Joist Shop Drawings, etc, will be charged a deferred submittal fee based on the valuation of the portion of the work being deferred. The minimum fee shall be $200.00. Special Inspection: Structural Observation and Special inspection is required for item #53 4 of the attached "STRUCTURAL PLAN REVIEW #2. The special inspection agency • of record shall furnish inspection reports to the Engineer of Record, NISHKIAN DEAN, the General Contractor, ROBINSON CONSTRUCTION and the City of Tigard, Building • Division, attention Hap Watkins. All discrepancies shall be brought to the immediate 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 attention of the general contractor for correction. The special inspector shall submit a final i i ..-.} signed report stating whether the work requiring special inspection was, to the best of the inspector's knowledge, in conformance with the approved plans and specifications and the applicable workmanship provisions of the code. 1701.3 OSSC American with Disabilities Act (ADA): It shall be the responsibility of the Architect, Engineer, Designer, Contractor, Owner and Lessee to research the applicability of the ADA requirements for the structure. The City of Tigard reviews the plans and inspects the structure only for compliance with Chapter 11 of the OSSC which may not include all of the requirements of the ADA. Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp, shall be maintained on the jobsite. The plans shall be available to the Building Division inspectors throughout all phases of construction. 106.4.2 OSSC When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectful , rian B :i : ck, Seni•,4ans Examiner 1